UJJAIN UNDER GROUND SEWERAGE SCHEME COMMENTS REPLY SHEET (CRS)-CLIENT Page 1 of 2

Reply Tracker
Rev No. ECO Protection Reply Reference/Date Client Letter Reference/Date Remarks

0 Submitted on 22.09.2018 Comments received via mail dated -

ECO Protection TPL Reply 04.11.18


Sl. Reply Dated
TCPL comments dated 16.10.2018
No 31.10.2018
/27.11.18
TPL-340062-UJN-STP-CVL-BN-NU-2012 B (Sheet 1 of 2)
1. Show Fencing details Noted and No fencing details are seen in the drawings.
incorporated.
Show calculations for strength of wall retained soil The Wall is in RR The wall shall be checked for stability, bearing pressure due to 4m height
2.
Masonry of standard soil height and also consider surcharge due to vehicle load.
detail.
Show c/s details as marked to indicate the soil retained The Exact soil levels/soil heights in the cross sections shall be indicated
2. Noted and
details. near the parking end side and at the road turn junction. Show c/s at rod turning
incorporated.
along with road.
TPL-340062-UJN-STP-CVL-BN-NU-2012 B (Sheet 2 of 2)
5. Don’t show sloped portion, directly connect to drain. Noted and Please clarify what is the reason for leaving small gap. slope can be taken
(at all locations) incorporated. upto the drain.
6. 30 mm BC Noted and
incorporated.
7. Delete - SHOULDER Noted and OK
incorporated.
8. Thickness of paver block - 80MM Noted and OK
incorporated.
9. Shall be finalized only after ensuring exact SOAKED Noted and CBR test shall be performed and only then the thickness of other courses shall be
CBR value at site by testing. incorporated. Arrived at.Soaked CBR in laboratory shall be performed.
10. 100 thick M10 grade. Noted and OK
incorporated.
UJJAIN UNDER GROUND SEWERAGE SCHEME COMMENTS REPLY SHEET (CRS)-CLIENT Page 2 of 2

ECO Protection TPL Reply 04.11.18


Sl. Reply Dated
TCPL comments dated 16.10.2018
No 31.10.2018
/27.11.18
11. 3.0% Noted and OK
incorporated.

12. 2.5 % Noted and Please check and incorporate.


incorporated.
13. M10 Noted and OK
incorporated.
14. Gravel Filling (Typ) Noted and OK
incorporated.
DESIGN CALCULATION OF STORM WATER DRAIN FOR 92.5MLD SPT
15. How much flow is considered for the design of outfall. Noted and Please check.
incorporated.
16. Minimum velocity to be considered shall be as per Noted and OK
CPHEEO manual. incorporated.