Documente Academic
Documente Profesional
Documente Cultură
1
12/28/2018
2
12/28/2018
3
12/28/2018
Erection Of 2nd Dhaleswari Bolted Steel Truss Foundation Work OF Kanchan Bridge
4
12/28/2018
5
12/28/2018
PC Girder Lifting in position by Barge Crane. Picture and Cross- Section Of Meghna Bridge
23
6
12/28/2018
Pier cap
Pier
Pile Cap
Pile
Stopper
Block Launching Truss
Roller Trestle
Trestle Foundation
Existing Pile Cap
7
12/28/2018
Bottom Haunch
Bottom Slab
Grouting
Stressing Jack
8
12/28/2018
Proposed Intersection - 01
(Chittagong end) at Bakulia 830.0
SHIKALBAHA
KOLARPOOL
MOYZZERTEK P6 A2
Proposed Intersection - 02
P7 P8 P9 P10
(Cox's bazar end) at Mozzartek
Cable
Profile of Superstructure
Strut
L
24.470
0.305 1.500 1.650 7.300 2.360 7.300 1.650 1.500 0.305
Model of Main Girder
0.300 0.300
Side Slow 2 Lane Slow Side
2 Lane
Location of the new walk Vehicle
2.5% 2.5%
Vehicle Walk
~ 6.750
4.000
upstream of the existing 2
9
12/28/2018
Front upper
Rear Anchor 4.0
Cross beam Form
Guide rail
Suspender
Outer guide beam Lower chord
Cross beam
A Typical Cable System for Third Karnaphuli Bridge Installation of Saddle at Top of Tower
10
12/28/2018
P6 P7 P8 P9 P10 A2
SK SK
Legend
11
12/28/2018
12
12/28/2018
Site
80
70
60
50
40
N/mm2
30
20
10
06/10/08
06/10/08
06/10/08
06/10/08
08/10/08
08/10/08
08/10/08
08/10/08
13/10/08
13/10/08
13/10/08
13/10/08
14/10/08
14/10/08
14/10/08
15/10/08
15/10/08
15/10/08
15/10/08
16/10/08
16/10/08
19/10/08
19/10/08
19/10/08
19/10/08
20/10/08
20/10/08
20/10/08
20/10/08
24/10/08
24/10/08
24/10/08
24/10/08
30/10/08
30/10/08
30/10/08
30/10/08
30/10/08
30/10/08
31/10/08
31/10/08
31/10/08
31/10/08
31/10/08
31/10/08
Pour Date
13
12/28/2018
250
CHOICE OF STRUCTURAL FORM
RC/PC Bridge
Steel Bridge
OF BHULTA FLYOVER
200
Third Karnaphuly BR IN A yl
he
t En
d
NUTSHELL
S
Span in meter
2 Stor
ied Bu
ilding
Hazrat Shah Amanat BR
150 1
G G2 G3 G4
G
5
Gab Khan BR
5.116
Lama Kazi BR
The proposed four lane
31.451 6
G
6.267
7
31.548 G
Bangabondhu BR 31.611 G
8
Tins
1 St
Tinshed Structure
hed
orie
Stru
d Bu
cture
ildin
g
2.091
1 St
orie
1 St
First Buriganga BR
d Bu
100
orie
31.690 p
ildin
d Bu
g
ildin
g
Pum
toilet
Tinshed Structure
Tinshed
Structure
Building e
0.991 Tinshed
Structure
Structure
Semi Puc
Semi Pucca
ca Structu
6.975
Structure
re
ure
ruct
Structure
d St
Pucca
Tinshe
Semi
4.021
ure
ruct
Tinshed
d St
Structure
Tinshe
7.230
Bridge
11.945 Tinshed
Structure
g
ildin
Semi Pucca Structur
e
d Bu
orie
Semi Pucca Structur
Amin Bazar BR
e
5 St
11.630 Semi
Pucca
Structure
Structure
Structure
ure
ca Struct
10.598
Semi Pucca
Semi Puc
0.626
3 Storied Building
8.150 Tinshed
pre-stressed standard I-
Structure
1 Storied
Building
re
ctu
3.074
d Stru
Semi Pucca
Structure Tinshed
Structur
Tinshe
e
50
Tinshed Structure
ure
Structure
Vulta Gaucia
ruct
d St
5.702
G5
Tinshe
To Rupgonj
ure
Semi
ruct
Pucca
d St
Semi Pucca Structur
Tinshe
ure
ruct
d St
Tinshe
Tinshed Structure
Tinshed Structure
G6 2.013
G7 10.227
3 Storied Building
mosque
G8 1.948
3 Storied Building
Tinshed Structure
section.
2 Storied Building
Under Constriction
4 Storied Building
G4 khall
Jaghir BR
3 Storied Building
1 Storied Building
8.756
G3
G2 3 Storied Building
4.074
G1
ture
Semi Pucca Struc
Semi Pucca
Structure
Tinshed
Structur
e
Semi Pucca
Structur
e
Tinshed
Structur
e
0
4.233
Tinshed Structur
e
Semi Pucca
Structure
ure
7.15
Struct
4 Storied
Building
hed
Tinshed Structure
Tins
2 Storied Building
Tinshed Structure
Toilet
5
Tinshed Structure
30.42
1.372 Semi Pucca Structure
Tinshed Structure
Tinshed Structure
Tinshed Structure
e
Structur
Tinshed
e
Tinshed Structur
19
e
10.0
Tinshed Structure Tinshed Structur
Tinshed Structure
Year
1 Storied Building
khall
Structure
Toilet
Tinshed
2 Storied Building
Structure
Tinshed
e
Tinshed Structur
Tinshed Structure
Tinshed Structure
re
Tinshed Structure
Tinshed Structu
ructure
Tinshed Structure
Tinshed Structure
Tinshed St
Tinshe
Structure
Semi Pucca
d St
ruct
ure
e
Structur
Pucca
Semi
cture
ure
ure
Tinshed Structure
Tinshed Structure
Tinshed Stru
Tinshed Struct
Tinshe
Tinshed Struct
e Tinshed Structure
Tinshed Structur
d St
ruct
ure
The presentation gives an
Progress of Center Span of Long Span
End
ka
overview of the design
Dha
Bridges of Bangladesh development process. Location of the Bhulta Flyover
300X1000
VENTILATION
directions is provided at middle Pier (alternately at Pier 4
and Pier 5 in the subsequent modules) and horizontal
300X300
HOLE 50 Ø @
1500 C/C.
DRAIN PIPE 50 Ø
Composite I- section
the deck to move relative to the fixed pier..
RCC twin box section
Gross concrete area of the
section was 11.37 m2/meter Gross concrete area of the
of length. box section is 9.21 m2/meter
of length.
14
12/28/2018
Mass Concrete
Water Plug
Bored Pile
Osama El Garf Use of Lift Slab Technique in the Constuction of Under Water Pile Caps
Osama El Garf Use of Lift Slab Technique in the Construction of Under Water Pile Caps
15
12/28/2018
Gumti Bridge
N8
N1 Comilla
SPSP Foundation
Pie
r
Schematic DWG of pile Steel
timberin
Steel pipe sheet
cap pile g
Pile cap
connectio
Stud n
welding
Moment Precuttin
g Underwate
rebar
r cutting
16
12/28/2018
DN DE
Msn Mso
68
Gumti Bridge Girder Cross Section
17
12/28/2018
SM570
50mm
69 70
18
12/28/2018
19
12/28/2018
Managing Engineering Works in Economic Way Managing Engineering Works in Economic Way
20
12/28/2018
Sarail BRIDGE
MIK KADIM BRIDGE
It is on Mir Kadim Khal
of Mir Kadim Municipal
of Munshigonj.
The bridge is on
The bridge was not
Comilla-Sylhet highway.
affected by Great Indian
It is not in usable
Earthquake in 1897.
condition.
It is a three span four
It is a single span four
centered arch bridge.
centered arch bridge.
The central span is larger
and 4.24 m wide and
other two is smaller and
Photograph of Mir Kadim Bridge symmetrical and 2.17 m Photograph of Sarail Bridge
wide.
wPÎ bs :3 fiv el©vq bvwi›`v SzjšÍ †jvnvi †mZzwUi Av‡jvKwPÎ, QwewU 1880 mv‡j †Zvjv
wPÎ bs-1 : ïKbv †gŠmy‡g bvwi›`v SzjšÍ †jvnvi †mZzwUi Av‡jvKwPÎ, QwewU 1904 mv‡j †Zvjv, wPÎMÖvnK Fritz kapp
21
12/28/2018
wPÎ bs : 4 bvwi›`v SzjšÍ †jvnvi †mZzwUi cÖ‡ek gy‡Li Av‡jvKwPÎ, GwU GKwU Møvm-†cøU d‡UvMÖvd, mgqKvj I wPÎMÖvn‡Ki bvg D‡jøL †bB
22