Calculate the design storms for minor and major systems for medium density residential
development at Kota Bharu. The catchment area is 200 ha and the time of concentration for
the catchment is 30 minutes. Use the empirical IDF equation from MSMA 2nd Edition.
Given:
Area : 200ha
Major system: 100 years ARI
Minor system: 5 years ARI
Tc = d : 30 minutes = 0.5 hours.
𝜆𝑇 𝐾
Formula:
(𝑑+𝜃)ŋ
λ: 60.988
K: 0.214
Θ: 0.148
ŋ: 0.616
(60.988)(100)0.214
Calculation for Major System: = 213.459 mm/hr.
(0.5+0.148)0.616
(60.988)(5)0.214
Calculation for Minor System: = 112.433 mm/hr.
(0.5+0.148)0.616
Question 2
Precipitation drains from a park area into a street gutter to a storm sewer inlet. The flow path
from the sewer inlet to the most hydraulically distant point in its watershed consists of 50 m
of overload flow through Bermuda grass, n=0.05 on a 2.2 percent slope and gutter flow in a
26 m length of paved gutter on a longitudinal slope of 1.5 percent. Estimate the time of
concentration.
Given:
Overland Flow
o n: 0.05
o slope: 2.2%
o Length: 50m
Curb Gutter Flow
o Length: 26m
o Slope: 1.5%
tc = tg + to
Calculation:
𝐿
Curb Gutter Flow: Formula: tg =
40√𝑆
26
tg = = 0.53minutes
40√1.5
3
107 𝑥 𝑛 𝑥 √𝐿
Overland Flow: Formula: to = 5
√𝑆
3
107 𝑥 0.05 𝑥 √50
to = 5 = 16.41 minutes
√2.2
tc = to + tg
𝑜𝑣𝑒𝑟𝑙𝑎𝑛𝑑 𝑙𝑒𝑛𝑔𝑡ℎ 200𝑚
to = 𝑜𝑣𝑒𝑟𝑙𝑎𝑛𝑑 𝑣𝑒𝑙𝑜𝑐𝑖𝑡𝑦 = 10𝑚/𝑚𝑖𝑛𝑢𝑡𝑒 = 20 minutes
= 1.596 m3/s
Question 7
A 75ha catchment has the following time area relation:
Time(min) Contributing Area (ha)
0 0
5 2
10 7
15 19
20 38
25 68
30 75
Estimate the runoff hydrograph using the time area method for a 30 min rainfall excess
distribution given by
Time (min) Average Intensity (mm/hr)
0–5 120
5 – 10 70
10 – 15 50
15 – 20 30
20 – 25 20
25 - 30 10
Calculation:
Time (min) Contributing Area (ha) Area (ha)
0 0 0
5 2 2
10 7 5
15 19 12
20 38 19
25 68 30
30 75 7
t = 0 mins
Q0 = 0 m3/s
t = 5 mins
Q1 = I1A1 = [120(2)][5÷3600] = 0.67 m3/s
t = 10 mins
Q2 = I2A1 + I1A2 = [70(2) + 120(5)][5÷3600] = 2.10 m3/s
t = 15 mins
Q3 = I3A1 + I2A2 + I1A3 = [50(2) + 70(5) + 120(12)][ 5÷3600] = 5.30 m3/s
t = 20 mins
Q4 = I4A1 + I3A2 + I3A2 + I1A4 = [30(2) + 50(5) + 70(12) + 120(19)] [5÷3600]
= 9.50 m3/s
t = 25 mins
Q5 = I5A1 + I4A2 + I3A3 + I2A4 + I1A5 = [20(2) + 30(5) + 50(12) + 70(19) +
120(30)]0.002778
= 15.90 m3/s
t = 30 mins
Q6 = I6A1 + I5A2 + I4A3 + I3A4 + I2A5 + I1A6 = [10(2) + 20 (5) + 30 (12) + 50 (19) + 70
(30) + 120(7)] 0.002778 = 12.10m³/s
t = 35 mins
Q7 = I7A1 + I6A2 + I5A3 + I4A4 + I3A5 + I2A6 + I1A7 = [10(5) + 20(12) + 30(19) + 50(30)
+ 70(7)] 0.002778 = 7.90m³/s
t = 40mins
Q8 = I8A1 + I7A2 + I6A3 + I5A4 + I4A5 + I3A6 + I2A7 + I1A8 = [10 (12) + 20 (19) + 30 (30)
+ 50 (7)] 0.002778 = 4.90m³/s
t = 45mins
Q9 = I9A1 + I8A2 + I7A3 + I6A4 + I5A5 + I4A6 + I3A7 + I2A8 + I1A9 = [10 (19) + 20 (30) +
30 (7)] 0.002778 = 2.80m³/s
t = 50mins
Q10 = I10A1 + I9A2 + I8A3 + I7A4 + I6A5 + I5A6 + I4A7 + I3A8 + I2A9 + I1A10 = [10 (30 + 20
(7)] 0.002778 = 1.20m³/s
t = 55 mins
Q11 = I11A1 + I10A2 + I9A3 + I8A4 + I7A5 + I6A6 + I5A7 + I4A8 + I3A9 + I2A10+ I1A11 = [10
(7)] 0.002778 = 0.20m³/s
t = 60 mins
Q12 = I12A1 + I11A2 + I10A3 + I9A4 + I8A5 + I7A6 + I6A7 + I5A8 + I4A9 + I3A10+ I2A11 +
I1A12 = 0m³/s
Time (mins) Runoff (m3/s) Time (mins) Runoff (m3/s)
0 0 35 7.90
5 0.67 40 4.90
10 2.10 45 2.80
15 5.30 50 1.20
20 9.50 55 0.20
25 15.90 60 0
30 12.10
18
16
14
12
Runoff (m3/s)
10
0
0 10 20 30 40 50 60 70
Time (mins)
Question 8
Plans are being considered to develop a 20ha mixed development project consists of
commercial, industrial and residential use. Mean annual rainfall for the catchment is
3000mm. The values for Event Mean Concentration (EMC) for the study area are given in
Table 1. The fraction of landuse for Kajang catchment is given in Table 2. Calculate the
annual pollution loading for TSS, TP and BOD from a 20ha mixed development area located
in Kajang catchment located in Selangor. Load estimation, based on EMC method is
recommended for this project. This is simplest but most widely used method to estimate
runoff pollutants from urban areas.
Given:
Area: 20ha
Mean annual rainfall: 3000mm/year
A1: 5ha, Commercial
A2: 10ha, Commercial
A3: 5ha, Residential
Calculation:
Formula:
Annual Runoff = Volumetric Runoff Coefficient x Mean Annual Rainfall
Annual Loading =
(𝐴𝑟𝑒𝑎)(𝑉𝑜𝑙𝑢𝑚𝑒𝑡𝑟𝑖𝑐 𝑅𝑢𝑛𝑜𝑓𝑓 𝐶𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡)(𝐸𝑀𝐶)(𝑀𝑒𝑎𝑛 𝐴𝑛𝑛𝑢𝑎𝑙 𝑅𝑎𝑖𝑛𝑓𝑎𝑙𝑙)
100
60
50
40
Discharge (m3/s)
30
Outflow (m3/s)
Inflow (m3/s)
20
10
0
0 1 2 3 4 5 6 7 8 9 10
Time (h)