Sunteți pe pagina 1din 1

SCF No.

2131 Rev1
LTE SITE ACCEPTANCE FORM Date 18-Nov-18
NEW FDD 800MHz
Site Information
Site ID LOJD2131 Phase L800 Project
Cluster 2G Vendor Ericsson
EPC/MME Latitude 21.48953
District Longitude 39.18460
Street Site Coverage City
City Jeddah Site Type Macro 3m WM
Region West Scope New FDD800
Technology FDD [800]MHz Frequency Band 800MHz [B20]

Antenna Configuration
A B C D
Antenna Type RV4-65D-R5-V4 RV4-65D-R5-V4 RV4-65D-R5-V4 RV4-65D-R5-V4
Number of Antennas 1 [Existing FDD] 1 [Existing FDD] 1 [Existing FDD] 1 [Existing FDD]
Antenna Azimuth (°) 10 120 220 300
Electrical Tilt (°) 4 4 4 4
Mechanical Tilt (°) 0 0 0 0
Antenna Height (m) 40 40 40 40
RET SRET SRET SRET SRET
TMA/ASC No No No No
Diplexers No No No No

Feeder Configuration A B C D
Feeder Type 1/2" Jumper 1/2" Jumper 1/2" Jumper 1/2" Jumper
Feeder Length (m) 5 5 5 5
Total Losses (dB) 0.5 0.5 0.5 0.5
Dl/Ul Attenuation 5 5 5 5
Dl/Ul Feeder Delay 23.00 23.00 23.00 23.00

RBS Configuration
Cabinet Type 1x RBS6201 [Existing 3G]
Cabinet Shared Yes
Carriers [FDD] FDD800
Power [FDD] 2x40W
DU Type [FDD] 1 BB6630 + R503[Existing FDD]
RU Type [FDD] 4 ERS2217[B20]
CU's 3 HUP

Cell Configuration 800MHz


Cell ID 2131-03A 2131-03B 2131-03C 2131-03D
Carrier Bandwidth 10 MHz 10 MHz 10 MHz 10 MHz
No. of RB's 50 50 50 50
Output Power 2x40W 2x40W 2x40W 2x40W
Type of MIMO 2T2R 2T2R 2T2R 2T2R

Justification
Coverage Capacity

Associated 2G/3G Site Changes (For collolated 2G/3G sites)


2G/3G Site Changes Needed Yes If Yes Is 2G/3G SCF Attached
2G/3G SCF Reference No Any Other Attachments

- Scope is Introduction of FDD800 ( site is with 4 sectors)..


- FDD800 will share the existing 3G RBS6201.
Comments: - FDD800 will share the existing FDD antenna RV4-65D-R5-V4.
- Radio 2217 B20, (800MHz), [4 Qty] with Power Cable Connector [Qty 4].
- FDD800 will share the existing BB6630&R503 with FDD.

Ericsson Responsible
RND Responsible Alisa Zhou RND Team Leader Badr Barboud
Date of Approval 18-Nov-18 Date of Approval 18-Nov-18
Mobily Responsible
RND Responsible RND Team Leader
Date of Approval Date of Approval

S-ar putea să vă placă și