Sunteți pe pagina 1din 9

Adnan Ahmad

AC Motor Inspection/Testing
EPCL & Commissioning Check List:
Electrical Section

Motor Duty: Project:


Starting Method: Location / Area:
Feeder / MCC
Motor Spec's:
HP IP Class Grease Nipple YES No
KW Type Recommended Grease
RPM Type
Current Frame Size
Voltage Serial No
P.F Enclosure
Insul Class Manufacturer
Ambt Temp Bearing DE Motor Cable x mm2, Core
Connection Bearing NDE Earth Cable x mm2, Core
Pre Commissioning Test:
Motor & Motor Cable Test:
Insulation @ 500V (M.Ohms) Resistance (Ohms) Remarks:
R-Y Y-B B-R R-E Y-E B-E R-Y Y-B B-R
Motor
Rotor
Motor Cable-1
Motor Cable-2
General Checks: Remarks:
1-Verfity Starter Components Rating i.e. MCCB's, Contactor, O/L Relays,
3-Verfity Starter Measuring Components i.e. CT's, PTs, Volt & Ampere Meters.
2- Verify adequate size of Power/Control/Earth Cables.
4- Verify tightness of Power/Control/Earth Cables in Motor, MCC & Remote box
5-Verify tightness of Motor Foot Bolts, Fan Cover, Connection Boxes.
6-Verify Sealing's of MCC, Motor Connection Box, JB's
7-Verify Motor against Rain / Plant leakage on Motor, MCC & Remote box
Motor Protection Settings:
Motor Starter Breaker Amps: Type: Make: Motor Overload Relay:
Nominal Current Set at (A): Overload Range:
Overcurrent Set at (A): Overload Set At:
Short Circuit Delay Time Set at:
Instantaneous Short Circuit Set at: Start Delta timer Set At:
Commissioning Test:
Motor No Load (A): R Y- B- Motor Running Load (A): R Y- B-
Motor No Load Vibration: Motor Running Load Vibration:
MOBH MIBH MIBV MIBA MOBH MIBH MIBV MIBA
POBH PIBH PIBV PIBA POBH PIBH PIBV PIBA
Comments: Serviceable: Yes No Post Improvement Actions: Yes No Give detail if any

Checked By: Signature: Date:


Verified By: Signature: Date:
PROTOCOL FOR H.T BREAKERS

COMMISSIONING & TEST REPORT OF :-

CHECK LIST YES NO


EARTH CONNECTED
PHASE SEQUANCE CHECKED BEFORE TERMINATION KIT INSTALLATION
CABLE GLAND PROPERLY INSTALLED
CABLE GLAND ARMOUR CONNECTED
TERMINATION KIT PROPERLY INSTALLED
PHASE SEQUANCE CHECKED AFTER TERMINATION KIT INSTALLATION
PANELS LEVEL CHECKED
BUSBAR TIGHTNESS CHECKED
CONTROL CIRCUIT TIGHTNESS CHECKED
CONTROL CIRCUIT INTERLOCKING CHECKED
EARTHING VALUE CHECKED

MEGGER TEST
TEST EQUIPMENT RATING
PHASE TO PHASE

R/Y Y/B B/R

PHASE TO EARTH

R/E Y/E B/E

HIGH POT TEST


TEST EQUIPMENT RATING
PHASE TO EARTH LEAKAGE

R/E Y/E B/E

TESTED BY:-__________________. SIGNATURE:-________________. DATE:-_________________.


VERIFIED BY:-_________________. SIGNATURE:-________________. DATE:-_________________.

MASOOD UL HASSAN ARIF


N.A

_________________.
_________________.
MOTOR DATA AND TEST REPORT
DUTY
AREA
MOTOR DATA
1 HP / KW 2 R.P.M

3 RATED CURRENT 4 TYPE

5 SERIAL NO. 6 VOLT

7 INSL.CLASS 8 FRAME SIZE

9 CONNECTIONS 10 ENCLOSURE

11 MANUFACTURER 12 AMB. TEMP

13 DRIVING 14 P.F

15 BEARING NON DRIVING END 16 BEARING DRIVING END

MOTOR TEST REPORT


MOTOR RESISTANCE WITH AVO METER
PHASE TO PHASE

R/Y Y/B B/R

MOTOR MEGGARED TEST EQUIPMENT RATING


PHASE TO PHASE

R/Y Y/B B/R


PHASE TO EARTH
R/E Y/E B/E
STARTER CHECKS
* Main contactor contacts resistance
* Star contactor contacts resistance
* Delta contactor contacts resistance
* Connection tightness of starter power cables
* Connection tightness of starter control cables
* Connection tightness of motor connection box
* Timer setting
* Overload setting
* Earth check
DE-COUPLED COUPLED
Star
AMBIENT TEMP. Starting Torque

MOTOR TEMPERATURE AFTER 0.5 HR 01 HR 0.5 HR

Nanovip reading
V A KW PF KVAR KVA
DE-COUPLED

COUPLED

TESTED BY:-__________________. SIGNATURE:-________________. DATE:-_______________.

VERIFIED BY:-_________________. SIGNATURE:-________________. DATE:-_______________.


D
Delta

01 HR

Hz
ATE:-_______________.