Sunteți pe pagina 1din 32

G

Gemcom Software
S ft International
I t ti l Inc.
I
Rationalizing Mincom Model
M 2010
May

Copyright 2007, Gemcom Software International Inc.


Starting a New Project
1 F
1. From the
th File
Fil menu, select
l t Project
P j t and
d then
th Project
P j t Manager.
M

2. Click New.

3. Type
yp the name of the p
project,
j , for example
p PROJECT_MINEX and then click OK.
Creating a New Borehole Database
Borehole Database Variables

KEY
Short term Planning
Main modules

Key features of the database are:


GEMS SQL Seam modelling
with Faulting
• 20000+
Pit drill Open
holesPit Design
DATABASE Scheduling
• Opt500+
imisation
seams & Reserves
• 512 variables Survey
COAL • User defined variablesDrill & Blast
WASHABILITY
• Supports numeric Earthworks
and alpha variables
• Mixed data type S il R
Spoil Regrade
d

Minex Core (strings, volumes, grids, plotting)

4
Minex Data Load Process

1. Dump Mincom structures data (roof and floor) to ASCII

2. Dump Mincom coal quality data (CV, Ash, etc) to ASCII

3 Move data to Minex PC check file size is same


3.

4. Load ROOF FLOOR into Minex & check

5. Load quality into Minex & check


Minex Data Load Process

Check file size on PC is same or close to Minescape


Minex Data Load Process

Initialize STRUCTURE.GRD & QUALITY.GRD to store Grids.


Minex Data Load Process

1 3 2

File > Import > Import Mincom Grids

Select Input file (1)


Select output DD Name (2)
Scan (3)
Minex Data Load Process

Check
Ch k output
t t reportt
Do values look sensible
Minex Data Load Process

Check menu is correct


FLOOR = SF
ROOF = SR
Minex Data Load Process

Proceed OK
Minex Data Load Process

Check data has loaded into STRUCTURE


STRUCTURE.GRD
GRD
Creating a Seam/Layer Sequence List
14

Langkah-Langkah Persiapan
1. Import mincom model
2. Copy borehole db dan edit seam sequence
3. Buat grid topo progress
• Import dxf to gm3
• Buat boundary topo (jika belum ada)
• Ti
Triangulasi
l i ttopo
• Convert triangulasi topo to grid
• Gabungkan grid topo progress dengan topo periode sebelumnya
4
4. Cek hasil import model dengan cross section
5. Buat seam thickness grid menggunakan menu Seam Model
Operation – Arithmetic

August 2007 Copyright 2007, Gemcom Software International Inc.


Minex Data Load Process

Create thickness grids (ST) using Grid Arithmetic


Minex Data Load Process

Check data graphically


17

Minex6 – Rationalizing the Geological model

‰ Correcting Holes in Grids


‰ Creating Merged Grids

August 2007 Copyright 2007, Gemcom Software International Inc.


18

Langkah-Langkah Persiapan
5. Membuang nilai null dari grid seam thickness dengan SQL – cek
dengan report. Seam Model – Seam Model Operation - SQL
6
6. Rename Quality Grid menggunakan SQL
SQL.
Seam Model – Seam Model Operation - SQL
7. Rename parting grid
8. Copy UNCUT.GRD folder menjadi UNCUT_EDIT.GRD
9. Mengurangi seam thickness dengan ketebalan parting
menggunakan
gg SQL.
Q
Seam Model – Seam Model Operation – SQL
10. Membuat kembali seam roof dengan menggunakan arithmetic
S
Seam Model
M d lOOperation
ti – Arithmetic
A ith ti
11. Membuat model Merged
• Pit Design – Create Merged Model, definisikan TOPO, WEATH dan urutan
merged buat ST and IB
merged,

August 2007 Copyright 2007, Gemcom Software International Inc.


19

Minex6 – Correcting Holes in Grids


‰ Use
U an SQL St
Statement
t t to
t Fix
Fi Holes
H l ini aM
Model
d lGGrid
id

August 2007 Copyright 2007, Gemcom Software International Inc.


20

Minex6 – Correcting Holes in Grids


‰ Use
U an SQL St
Statement
t t to
t Fix
Fi Holes
H l ini aM
Model
d lGGrid
id

To generate reserves accurately, you must fill in the holes in


the thickness grids so that the thickness is 0.0 rather than null.

August 2007 Copyright 2007, Gemcom Software International Inc.


21

Minex6 – Creating Merged Grids


‰ Merge
M grids
id up tto th
the b
base off weathering
th i

August 2007 Copyright 2007, Gemcom Software International Inc.


22

Minex6 – Creating Merged Grids

‰ A dipping seam disappears where it reaches the surface. By merging


grids,
g ds, you force
o ce a
all tthe
eggrids
ds to follow
o o tthe
e base o
of weathering
eat e g when
e tthey
ey
reach the surface.

‰ none of the merged grids have empty spaces (that is, null values) in
them that would cause errors when Minex performs mathematical
operations on the grids.

‰ A
An alternative
lt ti technique
t h i — one that
th t you could
ld use ffor gently-dipping
tl di i
seams — is to merge grids up to a TOPCOAL grid.

August 2007 Copyright 2007, Gemcom Software International Inc.


23

Minex6 – Checking the Merged Grids for Problems


‰ C
Compare a volume
l calculation
l l ti and d an IInsitu
it RResource R
Reportt tto
check that they report very similar amounts.

August 2007 Copyright 2007, Gemcom Software International Inc.


24

Minex6 – Checking the Merged Grids for Problems


‰ C
Compare a volume
l calculation
l l ti and d an IInsitu
it RResource R
Reportt tto
check that they report very similar amounts.

August 2007 Copyright 2007, Gemcom Software International Inc.


Minex Data Load Process

1 3 2

File > Import > Import Mincom Grids

Select Input QUALITY file (1)


Select output file (2)
Scan (3)
Minex Data Load Process

Check output report


Do values look sensible
‰ Note some seams have no quality grids
Minex Data Load Process

Check menu & make changes


R
Remove allll _ so BA
BA_RD
RD b
becomes BARD
BARD,
BA_TS becomes BATS, etc
Minex Data Load Process

Proceed OK
Minex Data Load Process

Check data has loaded into QUALITY.GRD


Minex Data Load Process

Check data graphically


Minex Data Load Process

Check data graphically


Go to Pit Design

S-ar putea să vă placă și