KAR OIL & GAS CO.

Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location

References RTKB
Well KDN-21(K-448)
Depth (mMD) 406.5
Upper Fars Formation
Current Formation

Release elevator from casing. Exa


Current Operation at 24:00:

WOC. R/D cement lines. Clean rig flo


move.OK. . Remove portable 20" bu
pipe.Observe Cement level inside
Operations last 24 hours(00:00 to 24:00)

Totco
Totco

Last Survey m MD

MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEO
Interval m. MD

(m)

Interval m. MD

Gas Type Interval


(m)
Background Gas

Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Seepage Beds 802
B1
B2
B3
B4
Saliferous Beds 836
S1
Transition Beds 913
T1
T2
T3
T4
T5
BFC
Avana Dense 943
Avana Porous 1012
Khurmala A 1059
Total Depth
0
Depth (mMD) 406.5
Operations 00:00–06:00

Plan next 24 hrs

Overall Comments

Supervisor Geologist Ranjdar Ahmed


Wellsite Geologist Ahmed Adnan
Wellsite Geologist Hemn salih
Signature

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


DAILY GEOLOGY REPORT (DGR)

ENTRY DATA
318 GL 309 Rig
Date 18/8/2018 day spud 10/8/2018
Depth (mTVD RT 406.5 Progress
per Fars Formation

lease elevator from casing. Exactly no move.OK. . Remove portable 20" bushing, 20" elevator and 20" s

OC. R/D cement lines. Clean rig floor. Clean flow line and shale shakers. Clean cellar. Clean mud tanks.Release
ve.OK. . Remove portable 20" bushing, 20" elevator and 20" slip,Cut 30" conductor pipe from the base
e.Observe Cement level inside annulus is 2.9O m below cellar base. Rough cut 20" casing.

Inc 0.5 Azi


Inc 0 Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEOLOGICAL SUMMARY
Lithology Descriptions

Shows
Description

GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm

Well site Top MD Actual Depth Actual Difference


Depth TVDss Thickness
M m +/-

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


06:00 UPDATE
Depth (mTVD RT) 406.5 Current Activity
Take fine measurements and fine cut of 20" casing 1.87 cm below surface .Begin to weld
to the 20" casing .Welding is ongoing, Meanwhile continue to mix KCL mud.
WOC, Wellhead preparation.

Team Crew
Days on Akram Maqsud
Days on Kovan waleed
Days on Twana alias

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GYP.8
Rpt No 9
ROP m/h

able 20" bushing, 20" elevator and 20" slip

ers. Clean cellar. Clean mud tanks.Release elevator from casing. Exactly no
ip,Cut 30" conductor pipe from the base of cellar.Remove conductor
base. Rough cut 20" casing.

Csg Depth (m)


Csg Depth (m)
Csg Depth (m)
Csg Depth (m)
Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


ion

iC4 nC4 iC5 nC5


ppm ppm ppm ppm

Basis of Pick

BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


casing cut
ng 1.87 cm below surface .Begin to weld 21 1/4"X 2K casing head housing
continue to mix KCL mud.

Akram Maqsud Days Off


Kovan waleed Days Off
Twana alias Days Off

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)