Sunteți pe pagina 1din 9

KAR OIL & GAS CO.

Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location

References RTKB
Well KDN-21(K-448)
Depth (mMD) 914
Lower fars formation
Current Formation

Circulation prior to POOH f/ logging.


Current Operation at 24:00:

Drill 17 1/2" hole f/ 900 m. t/ 914 m.W


confirmed the 914 m as a target dept
shakers.POOH f/ 914 m. t/ 388 m. Ob
Operations last 24 hours(00:00 to 24:00)
drag 6 klbs @ 434 m.,7 klbs @ 532 m
Pumped 40 bbl hi-vis and observed o

Totco
432m
643
842.5

Last Survey m MD

MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
GEO

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Interval m. MD
Claystone: Light brown to brown, dark br
calcareous.

Anhydrite: White, off white, snow white, c

(900-914) Limestone: Off white, white, light greyish


argillaceous.

Marl: Gray, dark gray, greenish gray, soft

Interval m. MD

Gas Type Interval


(m)
Background Gas

Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth

Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Ao 750
R6 N/A
R7 N/A
R8 N/A
R9 N/A
Seepage Beds 802
B1
B2
B3
B4
Saliferous Beds 836
S1
Transition Beds 913
T1
T2
T3
T4
T5
BFC
Avana Dense 943
Avana Porous 1012
Khurmala A 1059
Total Depth
0
Depth (mMD) 914

Operations 00:00–06:00

Plan next 24 hrs

Overall Comments

Supervisor Geologist Akram Maqsud


Wellsite Geologist Ahmed Adnan
Wellsite Geologist Dlnya Hoshyar
Signature

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


DAILY GEOLOGY REPORT (DGR)

ENTRY DATA
318 GL 309 Rig
Date80 1/9/2018 day spud 10/8/2018
Depth (mTVD RT 914 Progress 14
wer fars formation

culation prior to POOH f/ logging. Pumped 40 bbl hi-vis and observed on the shakers. Observed cavings on shak

ll 17 1/2" hole f/ 900 m. t/ 914 m.WOB: 18 - 20 klbs, Pump rate: 720 gpm, Rotary: 85- 90, Pressure: 1350 psi, Tor
nfirmed the 914 m as a target depth of the 17-1/2'' hole.Circulate the hole until shaker cleaned. Pumped 30 bbl hi-
akers.POOH f/ 914 m. t/ 388 m. Observed overpull 10 klbs @ 887 m.,748 m. & 675 m.Slipped drilling line 7,5m (1
ag 6 klbs @ 434 m.,7 klbs @ 532 m., 8 klbs @ 588 m., 10 klbs @ 666 m., 5 klbs @ 710 m. and 3 klbs @ 886 m.C
mped 40 bbl hi-vis and observed on the shakers. Observed cavings on shakers.

Inc 0.5 Azi


Inc 0.75 Azi
Inc 0.5 Azi
Inc 0.75 Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Csg Size (inch) 20" Csg Depth (m)
Csg Size (inch) 17 1/2" Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Lithology Descriptions
ht brown to brown, dark brown in parts, soft, sub blocky, sticky, amorphous, moderate

te, off white, snow white, creamy, translucent, blocky to sub blocky, compact, soft.

white, white, light greyish white, soft, occasionally sub blocky, amorphous, fine crysta

k gray, greenish gray, soft to moderately hard, amorphous in parts, sticky, slightly to n

Shows
Description

GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm

Well site Top MD Actual Depth


Difference
Depth TVDss Actual
Thickness
M m +/-

735 -417
735 -417

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


735 -417
740 -422
755 -437
764 -446
778 -460
792 -474
792 -474
808 -490
816 -498
822 -504
829 -511
901 -583
911 -593
911 -593

06:00 UPDATE
Depth (mTVD RT) 914 Current Activity
Circulate the hole until shakers cleaned.During circulation, Increased MW 11,0 ppg to 11,1 ppg. Dro
t/ surface. Overpull 15klbs @ 870 m. B/O 1 ea 17-1/2'' Stabilizer and Bit sub and 17 1/2" PDC bit. 1
¾ ° @900 m.Preparation prior to wireline logging operations.
wireline logging

Team Crew
Days on Ranjdar Ahmed
Days on Kovan waleed
Days on twana alyas

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GYP.8
Rpt No 23
ROP m/h 3.3

d on the shakers. Observed cavings on shakers.

gpm, Rotary: 85- 90, Pressure: 1350 psi, Torque: 6500 - 7500 ft*lb. Kar geologists
hole until shaker cleaned. Pumped 30 bbl hi-vis and observed on the
.,748 m. & 675 m.Slipped drilling line 7,5m (1/4),RIH f/ 388 m. t/ 914 m. Observed
6 m., 5 klbs @ 710 m. and 3 klbs @ 886 m.Circulation prior to POOH f/ logging.
on shakers.

Csg Depth (m) 4m


Csg Depth (m) 406m
Csg Depth (m)
Csg Depth (m)
Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


cky, sticky, amorphous, moderately calcareous to highly

y to sub blocky, compact, soft.

sub blocky, amorphous, fine crystalline, chalky in parts,

rphous in parts, sticky, slightly to non calcareous.

ion

iC4 nC4 iC5 nC5


ppm ppm ppm ppm

Basis of Pick

BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Circulate the hole until shakers cleaned.
tion, Increased MW 11,0 ppg to 11,1 ppg. Dropped totco @ 900 m.POOH f/ 914 m.
' Stabilizer and Bit sub and 17 1/2" PDC bit. 1-0-CT-N-X-I-PN-TD. Totco survey: 2
ations.

Ranjdar Ahmed Days Off


Kovan waleed Days Off
twana alyas Days Off

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)