Criticality

Sr. NO Equipment Code Equipment Description CATEGORY


Score

1 BF3-FURN-BLT FURNANCE BLT SYSTEM BLT 648


2 SP-COOL-TESP TAIL ESP ESP 648
3 SP-SS-HESP HEAD ESP ESP 648
4 BF3-O2N2-MAC MAIN AIR COMPRESSOR COMPRESSOR 486
6 BF3-CH-DM CAST HOUSE DRILL MACHINE DRILL MACHINE 432
7 BF3-CH-MUDGUN CAST HOUSE MUDGUN MACHINE MUDGUN 432

8 432
BF3-HMH-CRANE HOT METAL HANDLING CRANE-100/20CRANE
T
9 BF3-RMHS-C7 RMHS CONVEYOR C7 CONVEYOR 432
12 SP-SS-MAIN-FAN MAIN EXHAUST FAN FAN 324
13 SP-SS-SM SINTERING MACHINE SINTER MACHINE 324
14 SP-SS-SRC SINGLE ROLL CRUSHER SRC 324
17 BF3-O2N2-CB COLD BOX EQUIPMENT COLD BOX 216
18 BF3-CH-CRANE CAST HOUSE CRANE-16 T CRANE 144
19 BF3-CH-MUDPWPK CAST HOUSE POWER PACK POWER PACK 144
21 BF3-GCS-GDCEQ GDC EQUIPMENTS GDC 144
25 BF3-RMHS-C1 RMHS CONVEYOR C1 CONVEYOR 144
26 BF3-RMHS-C10 RMHS CONVEYOR C10 CONVEYOR 144
27 BF3-RMHS-C11 RMHS CONVEYOR C11 CONVEYOR 144

28 96
BF3-COMP-REG2 DEHUMIDIFIER AND REGENERATION UNIT-2
REGENRATOR
29 BF3-GCS-BKT BUCKET ELEVATOR BUCKET ELEVATOR 96
36 BF3-RMHS-C12 RMHS CONVEYOR C12 CONVEYOR 96
38 SP-COOL-ABC SINTER COOLER SINTER COOLER 96
39 BF3-O2N2-COMP PRODUCT COMPRESSOR COMPRESSOR 72

40 72
BF3-O2N2-PPU AIR PRECOOLING & PRE-PURIFICATIONPURIFICATION
44 SP-PROP-BWF BELT WEIGH FEEDER BELT WEIGH FEEDER 24
45 SP-SS-CA-FAN COMBUSTION AIR FAN FAN 9
47 BF3-HT-PCC-PNL 11KV BF HT PCC PANEL ELECTRICAL PANEL 72
48 BF3-HT-BLR-PNL 11KV BLOWER HT PANEL ELECTRICAL PANEL 72
49 BF3-HT-CWPS-PNL 11KV HT CWPS PANEL ELECTRICAL PANEL 108
50 BF3-BL-PANEL BLOWER PANEL ELECTRICAL PANEL 144
51 BF3-O2N2-DCS DISTRIBUTED CONTROL SYSTEM DCS 96
53 SP-SS-HESP-TRAFO1 HEAD ESP TRANSFORMER 1 TRANSFORMER 144
54 SP-SS-HESP-TRAFO2 HEAD ESP TRANSFORMER 2 TRANSFORMER 144
55 SP-SS-HESP-TRAFO3 HEAD ESP TRANSFORMER 3 TRANSFORMER 144
60 BF3-O2N2-MCC O2N2 PLANT MCC ROOM ELECTRICAL PANEL 128
61 SP-SS-11KV-PANEL SINTER 11KV PANEL ELECTRICAL PANEL 216
64 BF3-SH-TRANS STOCKHOUSE TRANSFORMER TRANSFORMER 36
67 SP-SS-TESP-TRAFO1 TAIL ESP TRANSFORMER 1 TRANSFORMER 72
68 SP-SS-TESP-TRAFO2 TAIL ESP TRANSFORMER 2 TRANSFORMER 72
69 SP-SS-TESP-TRAFO3 TAIL ESP TRANSFORMER 3 TRANSFORMER 72
70 BF3-PUMP-TRANS TRANSFORMER TRANSFORMER 36
71 BF3-FURN-TRANS TRANSFORMER TRANSFORMER 36

Summary
Mechanical Electrical Inst

SCHEDUL
Criticality status STATUS CA ideal CA actual CA ideal CA actual CA ideal
E
condition condition condition condition condition
Most Critical YES APRIL Not Done Done Not Done Done Done Done
Most Critical YES APRIL Not Done Done Not Done Done Done Done
Most Critical YES APRIL Not Done Done Not Done Done Done Done
Most Critical YES APRIL Not Done Done Not Done Done Done Done
Most Critical YES APRIL Not Done Done Not Done Done Done NA
Most Critical YES APRIL Not Done Done Not Done Done Done NA

Most Critical YES APRIL Not Done Done Not Done Done Done NA
Most Critical YES MAY Not Done Done Not Done Done Done Done
Most Critical YES APRIL Not Done Done Not Done Done Done Done
Most Critical YES APRIL Not Done Done Not Done Done Done Done
Most Critical YES APRIL Not Done Done Not Done Done Done Done
Critical YES APRIL Not Done Done Not Done NA NA NA
Critical YES JULY Not Done Done Not Done Done Done NA
Critical YES JUNE Not Done Done Not Done Done Done Done
Critical YES MAY Not Done Done Not Done Done Done Done
Critical YES MAY Not Done Done Not Done Done Done Done
Critical YES JUNE Not Done Done Not Done Done Done Done
Critical YES JULY Not Done Done Not Done Done Done Done

Critical YES AUG Not Done Done Done Not Done Not Done Done
Critical YES APRIL Not Done Done Not Done Done Done Done
Critical YES JULY Not Done Done Not Done Done Done Done
Critical YES APRIL Not Done Done Not Done Not Done Not Done Done
Critical YES APRIL Not Done Done Not Done Done Done Done

Critical YES APRIL Not Done Done Not Done NA NA NA


Critical YES APRIL Not Done Done Not Done Not Done Not Done Done
Critical YES JUNE Not Done Not Done Not Done Not Done Not Done Done
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done Done
Critical YES MAY Not Done NA NA Done Done NA
Critical YES MAY Not Done NA NA Done Done NA
Critical YES MAY Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES MAY Not Done NA NA Done Done NA
Critical YES MAY Not Done NA NA Done Done NA
Critical YES MAY Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
Critical YES APRIL Not Done NA NA Done Done NA
0 0 0 0 0 0
Inst

CA actual
condition
Done
Done
Done
Done
NA
NA

NA
Done
Done
Done
Done
NA
NA
Done
Done
Done
Done
Done

Done
Done
Done
Done
Done

NA
Done
Done
NA
NA
NA
NA
Done
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
0
CONDITION APPRAISAL OF AIR DRYER AND REGENA

EQUIPMENT: SUB EQUIPMENTS COMPONENT

BF3-COMP-REG2 BF3-COMP-REG2 HEATER FOR DRYER

BF3-COMP-REG2 BF3-COMP-REG2 DIAPHRAGM VALVE 1

BF3-COMP-REG2 BF3-COMP-REG2 DIAPHRAGM VALVE 2

BF3-COMP-REG2 BF3-COMP-REG2 DIAPHRAGM VALVE 3

BF3-COMP-REG2 BF3-COMP-REG2 DIAPHRAGM VALVE 4


BF3-COMP-REG2 BF3-COMP-REG2 NRV 1
BF3-COMP-REG2 BF3-COMP-REG2 NRV 2
BF3-COMP-REG2 BF3-COMP-REG2 DRAIN VALVE
BF3-COMP-REG2 BF3-COMP-REG2 DRAIN VALVE

MICRO CONTROLLER
BF3-COMP-REG2
THERMOCOUPLE
SOLENOID VALVE
ION APPRAISAL OF AIR DRYER AND REGENARTION UNIT

DESCRIPTION / DIMENSION TYPE


TOOLS
OF CHECK
REQUIRED
(RUN CHECK / STOP CHECK / SHUTDOWN)

CHECK FOR COIL RESISTANCE MULTIMETER STOP CHECK

CHECK FOR DIAPHRAGM CONDITIONSPANNERS STOP CHECK

CHECK FOR DIAPHRAGM CONDITIONSPANNERS STOP CHECK

CHECK FOR DIAPHRAGM CONDITIONSPANNERS STOP CHECK

CHECK FOR DIAPHRAGM CONDITIONSPANNERS STOP CHECK


CHECK FOR PASSING OF VALVE SPANNERS STOP CHECK
CHECK FOR PASSING OF VALVE SPANNERS STOP CHECK
CHECK FOR PASSING OF VALVE SPANNERS STOP CHECK
CHECK FOR FUNCTIONING WRT TIMEOPERATION/STOP WATCH RUN CHECK

CHECK FOR COMMAND TO BED CHANMULTI METER RUN CHECK


CHECK FOR TEMPARATURE OF BED MULTI METER, SPANER RUN CHECK
CHECK FOR BED CHANGE OVER MULTI METER, SPANER RUN CHECK
DATE-AUG 09, 2018

ACTUAL CONDITION
IDEAL CONDITION ACTION REQUIRED
OBSERVED

300Ω-500Ω 396Ω
SEATED IN GROOVES AND
NO PHYSICAL DAMAGE AND WELL NO DAMAGE
DIAPHRAGM MINOR
NO PHYSICAL DAMAGE AND WELL DAMAGE FROM EDGE VALVE TO BE REPLACED
SEATED IN GROOVES AND
NO PHYSICAL DAMAGE AND WELL NO DAMAGE
SEATED IN GROOVES AND
NO PHYSICAL DAMAGE AND WELL NO DAMAGE
NO PASSING OF VALVE VALVE NOT PASSING
NO PASSING OF VALVE VALVE NOT PASSING
NO PASSING OF VALVE VALVE NOT PASSING
01 CYCLE EVERY 10MIN 01 CYCLE EVERY 15MIN CYCLE TIME TO BE CORRECTED
NO FAULTS FOUND ON
CONTROLLER SHOULD BE HELTHY CONTROLLER
TEMPARATURE >35 DEGREE TEMPARATURE >35 DEGREE
NO AIR PASSING AND COIL DAMAGCOIL WORKING OK
EQUIPMENT: SUB EQUIPMENTS

BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC
BF3-O2N2-MAC BF3-O2N2-MAC

BF3-O2N2-MAC BF3-O2N2-MAC
C

COMPONENT ITEM CODE SPECIFICATION

ELEMENT OIL FILTER 5115010003


(USE 24107997)
IGV - DIAPHRAGM FOR MAC 5915010001
BOV –DIAPHRAGM FOR MAC 5915010003
LUBE OIL PUMP MAIN FOR MAC 5115010010
PRE LUBE OIL PUMP WITH MOTOR,MAC 5115010011

MAIN OIL PUMP (MOP) COUPLING 5202080029


, SIZE L-99 MAKE LOVE JOY
AUXILLARY OIL PUMP (AOP) COUPLING, TRANSMISSION 0804010058
, L100, LOVE JOY.
OIL COOLER UNIT OF MAC 5915010002

FLEXIBLE COUPLING, 804070063 6GBH-160 FOR MAC


1ST COOLER F/ MAC- 5115010016
CENTAC 3CIIP/ C90MX3
2ND COOLER F/ MAC- 5115010017
CENTAC - 3CIIP/ C90MX3
AFTER COOLER F/ MAC 5115010018
CENTAC 3CIIP/ C90MX3
1ST STAGE SUCTION AIR FILTER 5915010041
F/ MAC O2N2
2ND STAGE SUCTION AIR FILTER 5915010042
F/ MAC O2N2
3RD STAGE SUCTION AIR FILTER 5915010043
F/ MAC O2N2
ASSEMBLY ROTOR STG-1 5915010008 PART NO.23779499
ASSEMBLY ROTOR STG-2
5915010009 PART NO. 23779507
ASSEMBLY ROTOR STG-3 5915010010 PART NO. 23779572

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTHING

HT PANEL BUSBAR HORIZONTAL AND


VERTICAL INSULATOR

HT FCMA SOFTSTARTER

HT NUMERICAL PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

HT Motor Windings

Terminal Box
HT VACUUM ISOLATION CONTACTOR

HT VACUUM BYPASS CONTACTOR

LT Auxiliary oil Pump Motor Windings

Auxiliary oil Pump Terminal Box


Auxiliary oil Pump Power Contactor

Auxiliary oil Pump Overload Relay

Vibration Transmitter

Oil DPT

RTD
power and feed back cable

pressure switch

Relay

DI ,DOCard,DCS , IM modules

SMPS

VNET Cable
CODITION APPRAISAL OF MAC

DESCRIPTION / DIMENSION TOOLS REQUIRED

CHECK PRESSURE DIFFERENCE FOR


CLOGGING DP GAUGE
CHECK FOR AIR LEAKAGE VISUAL
CHECK FOR AIR LEAKAGE VISUAL
CHECK FOR PRESSURE AT DISCHARGE VISUAL AT DCS
CHECK FOR PRESSURE AT DISCHARGE VISUAL AT DCS

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR WATER AND OIL OUTLET TEMP VISUAL AT DCS AND FIELD GAUGE
CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR WATER AND AIR OUTLET TEMP VISUAL AT DCS AND FIELD GAUGE

CHECK FOR WATER AND AIR OUTLET TEMP VISUAL AT DCS AND FIELD GAUGE

CHECK FOR WATER AND AIR OUTLET TEMP VISUAL AT DCS AND FIELD GAUGE
CHECK PRESSURE DIFFERENCE FOR
CLOGGING DP GAUGE
CHECK PRESSURE DIFFERENCE FOR
CLOGGING DP GAUGE
CHECK PRESSURE DIFFERENCE FOR
CLOGGING DP GAUGE
CHECK DISCHARGE PRESSURE AT DCS

CHECK DISCHARGE PRESSURE AT DCS


CHECK DISCHARGE PRESSURE AT DCS

Check for proper tigteness of the busbar


and busbar support insulator. It should SPANNERS / TORQUE
have sufficient stiffness to be supported in WRENCH
air by insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be
generally uninsulated, and should be VISUAL / COTTON CLOTHE
proper insulation between busbar and
switchgear panel through busbar insualtor.

Check for megger value of Busbar and


HT MEGGER
panel body.

Check for proper interlocking of earth


switch and HT Breaker. Also, check for
VISUAL
interlocking of earth switch and panel
back door.

Check for high electrical & mechanical


strength used in electrical panels to
support the copper busbar. Check for VISUAL
megger value between insulator and panel
body.

To protect an electrical circuit from


damage caused by excess current from an
VISUAL, COTTON CLOTHE,
overload or short circuit. Its basic function
MULTIMETER
is to interrupt current flow after a fault is
detected.

To detect the fault and initiates the


SECONDARY INJECTION
operation of circuit breaker to isolate the
CURRENT AND VOLTAGE
defective element from the rest of the
TEST KIT
system.

Check for proper tigteness of the power SPANNERS / TORQUE


cable and HT Breaker Terminals. WRENCH

Check for megger value of HT Cable


MEGGER
phase to phae and phase to earth.
Check for megger value of HT Cable
MEGGER
phase to phae and phase to earth.

Check for partial discharge test of HT


TAN-DELTA TEST KIT
Cable for HT Cable insualtion testing.

Check for tighteness of connections and


measure the correct voltage and indication
VISUAL / SECONDARY
shown in the meter.
INJECTION CURRENT AND
Also, check for tripping of the HT
VOLTAGE TEST KIT
Numerical Relay by Secondary Injection
kit.

Check for tighteness of connections and


measure the correct current shown in the
VISUAL / SECONDARY
meter.
INJECTION CURRENT AND
Also, check for tripping of the HT
VOLTAGE TEST KIT
Numerical Relay by Secondary Injection
kit.

To form magnetic field when


energized with current to produce
Megger & Multimeter
torque. Check for winding resistance
and megger value of Motor.

Check for TAN DELTA of the motor. TAN-DELTA TEST KIT

Check for proper tigteness of the


Spanners
power cable to the HT Motor
Check for physical condition of
vacuum bottles and its terminals.
Visual, Spanners, Screw
Check for contactor rating and
Drivers, Allen Key,
tighteness of contactor terminals.
Multimeter
Check for coil resistance of the
contactor.

Check for physical condition of


vacuum bottles and its terminals.
Visual, Spanners, Screw
Check for contactor rating and
Drivers, Allen Key,
tighteness of contactor terminals.
Multimeter
Check for coil resistance of the
contactor.

To form magnetic field when


energized with current to produce
Megger & Multimeter
torque. Check for winding resistance
and megger value of Motor.

Check for proper tigteness of the


Spanners
power cable to the HT Motor
Check for contactor rating and
tighteness of contactor terminals. Spanners, Screw Drivers,
Check for coil resistance of the Allen Key, Multimeter
contactor.

Check for overload relay range and


setting of relay current for motor Visual
tripping.

Check for Healthness of Mac


vibration at Different Stages VISUAL, Multimeter
CHECK FOR Differencial oil PRESSURE AT oil
Filter VISUAL, Multimeter
Check For MAC Discharge Air
Tempararture VISUAL, Multimeter
checking healthyness Run Motor. Multimeter,Tester

check healthyness of contact change


Multimeter,Tester
over by operaing with oil pressure

checking healthyness by Run Motor. Multimeter,Tester

checking healthyness by Run Motor. Multimeter,Tester


check supply voltage and output
Multimeter,Tester
Voltage .
checking healthyness by Run Motor. Multimeter,Tester
TYPE OF CHECK
(RUN CHECK / STOP IDEAL CONDITION ACTUAL CONDITION OBSERVED
CHECK /
SHUTDOWN)

RUN CHECK SHOULD BE <1BAR


STOP CHECK NO LEAKAGE
STOP CHECK NO LEAKAGE
RUN CHECK SHOULD BE >1.34BAR
RUN CHECK SHOULD BE >1.34BAR

STOP CHECK NO DAMAGE

STOP CHECK NO DAMAGE

RUN CHECK WATER-<45*C, OIL-<49*C


STOP CHECK NO DAMAGE

RUN CHECK WATER-<40*C, AIR-<49*C

RUN CHECK WATER-<40*C, AIR-<49*C

RUN CHECK WATER-<40*C, AIR-<49*C

RUN CHECK DP SHOULD BE <0.2MMWC

RUN CHECK DP SHOULD BE <15MMWC

RUN CHECK DP SHOULD BE <12MMWC


RUN CHECK SHOULD BE >1.2BAR

RUN CHECK SHOULD BE >2.8BAR


RUN CHECK SHOULD BE >4.0BAR
Tightened with 12mm
high tensile stainless No looseness of the bolts and
SHUTDOWN
steel bolts with flat connecting links checked by torque
CHECK
washers and nuts by wrench.
Torque Wrench.
Insulators should be
installed properly to hold Insulators were installed properly and
SHUTDOWN
and support busbars. was clean. No oxydation observed
CHECK
Insulators should be between insulator and bubar.
clean.

Resistance between panel


SHUTDOWN Resistance between panel to busbar is
to busbar should be ˃ 20
CHECK 1200 mega ohms.
mega ohms.

Earthing should be Earthing is connected to the body and


RUN CHECK
healthy. to the Earth Pit.

Vertical and Horizontal


insulators should provide
high electrical and Vertical and Horizontal insulators
SHUTDOWN
mechanical strength to strength to the busbars are good. Also,
CHECK
the busbars. Also, megger value is 1200 mega Ohms.
megger value should be ˃
20 mega Ohms.

HT Softstarter should be
HT Softstarter found clean. There is
SHUTDOWN clean. There should not
no moisture or wear and rusting of
CHECK be any moisture or wear
contacts.
and rusting of contacts.

HT Breaker Numerical
Relay tripping should be HT Breaker Numerical Relay tripping
SHUTDOWN healthy to trip the is healthy to trip the breaker on the
CHECK breaker on the faults faults described in the relay on
described in the relay on prescribed values.
prescribed values.
Tightened with 12mm
high tensile stainless No looseness of the bolts and
SHUTDOWN
steel bolts with flat connecting links checked by torque
CHECK
washers and nuts by wrench.
Torque Wrench.
Insulation resistance
SHUTDOWN between Phase to Phase Insulation resistance between Phase to
CHECK should be > 20 Mega Phase is 1000 Ohms
Ohms
Insulation resistance
SHUTDOWN between Phase to Earth Insulation resistance between Phase to
CHECK should be > 20 Mega Earth is 1000Mega Ohms
Ohms
TAN-DELTA test of HT
SHUTDOWN TAN-DELTA test of HT Cable is
Cable should be < 0.004
CHECK 0.0019
absolute.

PT connections should be
tight and should
1. measure correct
PT connections are tight and display
voltage on the relay or
correct voltage on the relay. Indication
meter.
SHUTDOWN of voltage on the panel is shown.
2. provide indication of
CHECK Trippig of the HT Breaker through HT
voltage on the panel.
Relay on Over voltage / Under
3. trip the HT Breaker
Voltage is healthy.
through HT Relay on
Over voltage / Under
Voltage.

CT connections should
be tight and should
1. measure current CT connections are tight and display
accurately on the relay or accurate current on the relay. Trippig
SHUTDOWN
meter. of the HT Breaker through HT Relay
CHECK
2. trip the HT Breaker on Over curent / CIR / ITOC / DMT is
through HT Relay on healthy.
Over curent / CIR / ITOC
/ DMT.

Winding Resistances
should be balanced of
all three phases, i.e., No abnormal difference in winding
less than 5 ohms. resistances. Winding resistance of
Shut Down check Megger values all three phases is 0.7 ohms.
shouldbe above 5 Megger values are 2 Giga ohms
megaohms from all and in healthy condition.
three phases to
ground.

TAN-DELTA test of HT
SHUTDOWN TAN-DELTA test of HT Motor is
Motor should be < 0.04
CHECK 0.004
absolute.
Tightened with 16mm No looseness of 16 mm Chrome
Shut Down check Chrome Vanadium Vanadium bolts and connecting
Bolts. links.
Proper tighteness of
foundation of
contactor and at
terminals. No looseness in fitting of
No abnormalities to contactor and connection of
SHUTDOWN
be seen for the cables to power contactor and
CHECK
contacts and proper its contacts. Coil resistance of
fitting to be done. contactor checked 18 ohms.
Coil resistance
should be between 10
ohms - 30 ohms.

Proper tighteness of
foundation of
contactor and at
terminals. No looseness in fitting of
No abnormalities to contactor and connection of
SHUTDOWN
be seen for the cables to power contactor and
CHECK
contacts and proper its contacts. Coil resistance of
fitting to be done. contactor checked 18.2 ohms.
Coil resistance
should be between 10
ohms - 30 ohms.

Winding Resistances
should be balanced of
all three phases, i.e., No abnormal difference in winding
less than 10 ohms. resistances. Winding resistance of
Shut Down check Megger values all three phases is 9.7 ohms.
shouldbe above 5 Megger values are 200 Mega ohms
megaohms from all and in healthy condition.
three phases to
ground.

Tightened with 8 mm No looseness of 8 mm Chrome


Shut Down check Chrome Vanadium Vanadium bolts and connecting
Bolts. links.
Proper tighteness of
foundation of
contactor and at
terminals. No looseness in fitting of
No abnormalities to contactor and connection of
SHUTDOWN
be seen for the cables to power contactor and
CHECK
contacts and proper its contacts. Coil resistance of
fitting to be done. contactor checked 28 ohms.
Coil resistance
should be between
20 ohms - 30 ohms.

Relay settings:
Inspected Relay Range = 6 -10 A
SHUTDOWN Relay Range = 6 -10
Relay setting = 7A
CHECK A
Running Current = 6.0 A
Relay setting = 7A

RUN CHECK SHOULD BE <1 mill No Abnormalities found

RUN CHECK SHOULD BE >1.34BAR No Leakages or Damage

RUN CHECK No Abnormalities found


Physical check or
Run check No damage
damage of cable
Physical check or
Run check No damage
damage of coil

Physical check or
Run check contact damage of No damage
coil using multimeter

Run check Physical check No damage

Run check Physical check No damage

Run check Physical check No damage


ACTION REQUIRED
CONDITION APPRAISAL O

Sub SPEC
EQUIPMENT: Equipme COMPONENT Item Code IFICA DESCRIPTION / DIMENSION
nts TION

BF3-O2N2-CB MAIN HEAT EXCHANGER CHECK FOR OUTLET TEMP

BF3-O2N2-CB DISTILLATION COLUMN CHECK FOR OUTLET TEMP

BF3-O2N2-CB DISTILLATION COLUMN CHECK FOR OUTLET PURITY


NDITION APPRAISAL OF COLD BOX

TYPE OF
CHECK (RUN
CHECK /
TOOLS REQUIRED IDEAL CONDITION ACTUAL CONDITION OBSERVED
STOP
CHECK /
SHUTDOWN)

RUN CHECK SHOULD BE BETWEEN


DCS 10-35*C

RUN CHECK SHOULD BE BETWEEN (-


DCS 180 TO -197*C)

DCS RUN CHECK SHOULD BE >90%


ACTION REQUIRED
EQUIPMENT SUB EQUIPMENTS COMPONENT

BF3-O2N2-COMP O2N2-GOX V BELTS 8V 2350 ,FOR OXYGEN COMPRESSOR SIZE


BF3-O2N2-COMP O2N2-GOX OIL FILTER F/O2 COMPRESOR, MODEL-SR11006
BF3-O2N2-COMP O2N2-GOX 1ST STAGE SUCTION VALVE
BF3-O2N2-COMP O2N2-GOX 1ST STAGE SUCTION VALVE
BF3-O2N2-COMP O2N2-GOX 1ST STAGE DISCHARGE VALVE
BF3-O2N2-COMP O2N2-GOX 1ST STAGE DISCHARGE VALVE
BF3-O2N2-COMP O2N2-GOX 2ND STAGE SUCTION VALVE
BF3-O2N2-COMP O2N2-GOX 2ND STAGE SUCTION VALVE
BF3-O2N2-COMP O2N2-GOX 2ND STAGE DISCHARGE VALVE
BF3-O2N2-COMP O2N2-GOX 2ND STAGE DISCHARGE VALVE
BF3-O2N2-COMP O2N2-GOX 1ST STAGE PISTON RING
BF3-O2N2-COMP O2N2-GOX 2ND STAGE PISTON RING
BF3-O2N2-COMP O2N2-GOX AUXILLARY OIL PUMP WITH MOTOR DULY ASSEMB
BF3-O2N2-COMP O2N2-GOX MAIN OIL PUMP GOX COMP
BF3-O2N2-COMP O2N2-GOX INTER COOLER F/ GOX-MODEL NO SR11006
BF3-O2N2-COMP O2N2-GOX AFTER COOLER F/ GOX-MODEL NO SR11006
BF3-O2N2-COMP O2N2-GOX DRIVE PULLEY FOR OXYGEN COMPRESSOR

BF3-O2N2-COMP O2N2-GOX LT Motor Windings

BF3-O2N2-COMP O2N2-GOX Terminal Box

BF3-O2N2-COMP O2N2-GOX GOX SOFTSTARTER

Command and Feed back cable

Relay
DI ,DOCard,PLC , IM modules

SMPS
BF3-O2N2-COMP O2N2-GOX
Profibus Cable

GOX COMP CW INLET TEMP

GOX C SUCTION SNUBBER PRESS

GOX C 1ST STG DIS (LEFT AND RIGHT) TEMP

GOX COMP 2ND STG DIS TEMP

GOX COMP OIL PRESS


CONDITION APPRAISAL OF PRODUCT COMP.

ITEM CODE SPECIFICATION DESCRIPTION / DIMENSION TOOLS REQUIRED

0802990034 CHECK FOR WEAROUT AND DAMA VISUAL


5915030004 CHECK FOR DP AT GAUGE
5115030001 CHECK FOR TEMP RISE VISUAL
5115030001 CHECK FOR GAS LEAKAGE VISUAL
5115030002 CHECK FOR TEMP RISE VISUAL
5115030002 CHECK FOR GAS LEAKAGE VISUAL
5115030003 CHECK FOR TEMP RISE VISUAL
5115030003 CHECK FOR GAS LEAKAGE VISUAL
5115030004 CHECK FOR TEMP RISE VISUAL
5115030004 CHECK FOR GAS LEAKAGE VISUAL
5115030005 CHECK FOR DAMAGE VISUAL
5115030007 CHECK FOR DAMAGE VISUAL
5115030013 CHECK FOR PRESSURE AT DISCHARGVISUAL AT DCS
5915020010 CHECK FOR PRESSURE AT DISCHARGVISUAL AT DCS
5915030015 CHECK FOR WATER AND AIR OUTLEVISUAL AT DCS AND FIEL
5915030016 CHECK FOR WATER AND AIR OUTLEVISUAL AT DCS AND FIEL
0812990004 CHECK FOR PHYSICAL DAMAGE VISUAL

To form magnetic field


when energized with current
Megger &
to produce torque. Check for
Multimeter
winding resistance and
megger value of Motor.

Check for proper tigteness of


the power cable to the LT Spanners
Motor

Check for cleaning and Cotton clothe,


tighteness of power and control spanners, Screw
cable. driver

checking healthyness by
Multimeter,Tester
Run the Belt Conveyor
checking healthyness by
operating DOL starter of Multimeter,Tester
conveyor.
checking healthyness by
operating DOL starter of
conveyor/ by activating Multimeter,Tester
pull cord, BSS, ZSS and
LCS Box.
check supply voltage and
Multimeter,Tester
output Voltage
checking healthyness by
Multimeter,Tester
Run the Belt Conveyor
Multimeter,Tester
CHECK FOR WATER INLET PRE

Multimeter,Tester
CHECK FOR DP OF DISCHARGE

Multimeter,Tester
ND RIGHT) TEMP CHECK FOR DISCHARGE TEMP A

Multimeter,Tester
CHECK FOR DISCHARGE TEMP AT

Multimeter,Tester
CHECK OIL LUBRICATING OIL
T COMP.

TYPE OF CHECK (RUN


CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)
STOP CHECK NO WEAROUT AND DAMAGE
RUN CHECK SHOULD BE<1BAR
RUN CHECK TEMP <35*C
STOP CHECK NO LEAKAGE
RUN CHECK TEMP <35*C
STOP CHECK NO LEAKAGE
RUN CHECK TEMP <35*C
STOP CHECK NO LEAKAGE
RUN CHECK TEMP <35*C
STOP CHECK NO LEAKAGE
SHUTDOWN NO DAMAGE
SHUTDOWN NO DAMAGE
RUN CHECK SHOULD BE >1.34BAR
RUN CHECK SHOULD BE >1.34BAR
RUN CHECK WATER-<40*C, AIR-<49*C
RUN CHECK WATER-<40*C, AIR-<49*C
STOP CHECK NO PHYSICAL DAMAGE

Winding Resistances should


be balanced of all three
phases, i.e., less than 5
Shut Down check ohms.
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Tightened with 10 mm
Shut Down check
Chrome Vanadium Bolts.

Softstarter should clean.


SHUTDOWN CHECK Check the tighteness of the
power and control cable.

Physical check or damage


Run check
of cable
Check for healthiness of
Run check NO - NC contacts during
operation.
Run check Physical check

Run check Physical check

Run check Physical check

Run check
temp <40*C

Run check
PRESSURE <0.16 bar

Run check
temp <110*C

Run check
temp <110*C

Run check
pressURE >2 bar
ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormal difference in
winding resistances. Winding
resistance of all three phases is
5.4 ohms. Megger values are 500
mega ohms and in healthy
condition.

No looseness of 10 mm Chrome
Vanadium bolts and connecting
links.

Softstarter is clean. Tighteness of


the power and control cable is
normal.

No abnormalities found
No abnormalities found in
switching of contacts during
operation.
No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found
CONDITION APPRAIS

Sub
EQUIPMENT: Equipments COMPONENT Item Code SPECIFICATION

BF3-O2N2-PPU PPU AFTER FILTER -F/O2N2 5915010036 CHECK FOR Dp


BF3-O2N2-PPU HEATER NUT ASSEMBLY 5115050001
BF3-O2N2-PPU HEATER NUT ASSEMBLY 5115050001
BF3-O2N2-PPU MOLECULAR SIEVE ADSORBENT 3101310063 13X BEADS PPU
BF3-O2N2-PPU ACTIVATED ALUMINA ADSORBE 3101310062 F-200
CONDITION APPRAISAL OF PPU

TYPE OF
CHECK (RUN
DESCRIPTION / DIMENSION TOOLS REQUIRED CHECK / STOP IDEAL CONDITION
CHECK /
SHUTDOWN)

CHECK FOR Dp VISUAL at dcs RUN CHECK <50MILIBAR


CHECK FOR TEMP. VISUAL at dcs RUN CHECK >150*C
CHECK FOR CURRENT AT FIELD RUN CHECK 70-80A
CHECK FOR OUTLET CO2 PPM VISUAL at dcs RUN CHECK SHOULD BE <0.5PPM
CHECK FOR OUTLET CO2 PPM VISUAL at dcs RUN CHECK SHOULD BE <0.5PPM
ACTUAL
ACTION
CONDITION REQUIRED
OBSERVED
COND

EQUIPMENT Sub Equipments COMPONENT Item Code

5102000132
BLT Bleeder valve Bleeder valve seat
5102000110
BLT Bleeder valve Bleeder valve seal
5102000133
BLT Bleeder valve Bleeder valve cap

Hydraulic cylinder for 5103990046


BLT Bleeder valve bleeder valve
2511010018
BLT Relief valve Relief vv sealing seal

5103990067
BLT Relief valve silencer f/relief v/v

Relief valve hydraulic 5109000066


BLT Relief valve cylinder
2511010017
BLT Equlization valve Eq v/v seating seal

Eq valve hydraulic 5109000067


BLT Equlization valve cylinder
Spring loded Nitrogen
BLT Equlization valve v/v DN 65 5107000050
cylinder of 5102000128
BLT Burden Stop Valve Hydraulic
Burden stop valve
for Burden stop 5102000156
BLT Burden Stop Valve Gate
valve (flap)
5102000129
Hydraulic cylinder for
BLT Upper sealing valve Upper sealing valve

5102000111
Upper sealing valve V/V plate for Upper
BLT sealing valve
5102000158
Upper sealing valve Holding arm for Upper
BLT sealing valve flap

for Upper sealing 5102000112


BLT Upper sealing valve Seal
valve flap

Upper sealing valve Links for Upper sealing


BLT valve

Upper sealing valve Upper Sealing valve


BLT arm
5102000129
Hydraulic cylinder for
BLT Lower sealing valve Lower sealing valve

v/v plate for Lower 5102000111


BLT Lower sealing valve sealing valve
Seal for Lower sealing 5102000112
BLT Lower sealing valve valve flap

stock rod gear box with


BLT stock rod O2N2 SIDE motor ,bob,chain,
complete assembly
5102000141

stock rod gear box with


BLT stock rod PCM SIDE motor ,bob,chain,
complete assembly
5102000141
Burden flow Gear box for Burden 5102000117
BLT regulating Flow Regulating Valve
valve/Gama drive (BFRV)

Burden flow Coupling for Burden


BLT regulating Flow Regulating Valve
valve/Gama drive (BFRV)

Coupling bolts for


Burden flow Burden Flow
BLT regulating Regulating Valve
valve/Gama drive (BFRV)
Burden flow
BLT regulating Valve plate for BFRV 5102000156
valve/Gama drive

Burden flow
BLT regulating Drive Shaft for BFRV
valve/Gama drive

Burden flow Non Drive Shaft for


BLT regulating BFRV
valve/Gama drive
Distributor/Beta Beta drive Primary 5102000124
BLT drive Gear box with motor
Distributor/Beta Encoder feedback 5102000140
BLT drive pinion
Distributor/Beta Intermediate gear box
BLT drive of Beta drive
BLT Alpha drive Alpha drive Arms
Alpha drive gear box 5102000123
BLT Alpha drive with motor full
assembly
Secondary Alpha drive
BLT Alpha drive gear box
pinion F/alpha drive 806990070
BLT Alpha drive gear box

BLT Alpha drive Alpha drive arms pins

Linear plate for burden


BLT BURDEN TANK tank

RECEIVING HOPPER Linear plate for


BLT receiving hopper

BELL LESS TOP


BLT HYDRAULIC LT Motor Windings
MOTOR#1
BELL LESS TOP
BLT HYDRAULIC Terminal Box
MOTOR#1

BELL LESS TOP


HYDRAULIC
BLT Power Contactor
MOTOR#1
FEEDER

BELL LESS TOP


HYDRAULIC
BLT Overload Relay
MOTOR#1
FEEDER

BELL LESS TOP


BLT HYDRAULIC LT Motor Windings
MOTOR#2

BELL LESS TOP


BLT HYDRAULIC Terminal Box
MOTOR#2

BELL LESS TOP


HYDRAULIC
BLT Power Contactor
MOTOR#2
FEEDER
BELL LESS TOP
HYDRAULIC
BLT Overload Relay
MOTOR#2
FEEDER

Burden flow
BLT regulating LT Motor Windings
valve/Gama drive

Burden flow
BLT regulating Terminal Box
valve/Gama drive

Burden flow
BLT regulating Servo Drive
valve/Gama drive

Burden flow
BLT regulating Power cable
valve/Gama drive

Distributor/Beta Distributor Motor


BLT
drive Windings

Distributor/Beta Distributor motor


BLT
drive Terminal Box
Distributor/Beta Gear Oil Pump
BLT
drive Motor Windings

Distributor/Beta Cooling Fan motor


BLT
drive winding

Distributor motor
Distributor/Beta
BLT Variable Frequency
drive
Drive

Distributor/Beta Distributor motor


BLT
drive Power cable

Distributor/Beta Gear Oil Power


BLT
drive Contactor
Distributor/Beta Cooling Fan Power
BLT
drive Contactor

BLT Alpha drive LT Motor Windings

BLT Alpha drive Terminal Box

BLT Alpha drive Servo Drive

BLT Alpha drive Power cable


STOCK ROD BF
STOCK ROD BF
CONTROL ROOM
BLT CONTROL ROOM
SIDE SIDE Motor
SIDE
Windings

STOCK ROD BF
STOCK ROD
BLT CONTROL ROOM
Terminal Box
SIDE

STOCK ROD BF STOCK ROD


BLT CONTROL ROOM Thruster Brake
SIDE Motor Windings

STOCK ROD BF
Cooling Fan motor
BLT CONTROL ROOM
winding
SIDE

STOCK ROD BF
STOCK ROD Motor
BLT CONTROL ROOM
Sanmotion DC Drive
SIDE
STOCK ROD BF
STOCK ROD motor
BLT CONTROL ROOM
Power cable
SIDE

STOCK ROD BF STOCK ROD


BLT CONTROL ROOM Thruster Brake
SIDE Power Contactor

STOCK ROD BF
STOCK ROD Cooling
BLT CONTROL ROOM
Fan Power Contactor
SIDE

STOCK ROD BF Tap


STOCK ROD BF
BLT Hole SIDE Motor
Tap Hole SIDE
Windings

STOCK ROD BF STOCK ROD


BLT
Tap Hole SIDE Terminal Box
STOCK ROD
STOCK ROD BF
BLT Thruster Brake
Tap Hole SIDE
Motor Windings

STOCK ROD BF Cooling Fan motor


BLT
Tap Hole SIDE winding

STOCK ROD BF STOCK ROD Motor


BLT
Tap Hole SIDE Sanmotion DC Drive

STOCK ROD BF STOCK ROD motor


BLT
Tap Hole SIDE Power cable
STOCK ROD
STOCK ROD BF
BLT Thruster Brake
Tap Hole SIDE
Power Contactor

STOCK ROD BF STOCK ROD Cooling


BLT
Tap Hole SIDE Fan Power Contactor

Proximity switch

power and feed back


cable

Bleeder Valve, solenoid coil


BLT Relief valve,
Equalizing valve ,
USV, BSV, LSV, Relay

DI ,DOCard,PLC , IM
modules

SMPS

Profibus Cable

Proximity switch

BLT BFRV, CHUTE


power and feed back
cable

BLT BFRV, CHUTE Relay

DI ,DO,AO Card PLC


, IM modules

SMPS

Proximity switch

power and feed back


cable

BLT Stock Rod Relay

DI ,DO Card PLC ,


IM modules

SMPS

Proximity switch

power and feed back


cable

BLT Distributor Relay

DI ,DO Card PLC ,


IM modules

SMPS

power and feed back


cable

pressure switch

Relay
BLT BLT Hydraulic Motor
DI ,DOCard,PLC , IM
modules
BLT BLT Hydraulic Motor

SMPS failure

Profibus Cable
CONDITION APPRAISAL as on 24.04.2017

SPECIFICATION DESCRIPTION / DIMENSION TOOLS REQUIRED

DN 550mm VISUAL
Bleeder valve CHECK FOR VALVE SEAT DAMAGE
DN 550mm VISUAL
Bleeder valve CHECK FOR VALVE SEAL DAMAGE
DN 550mm VISUAL
Bleeder valve CHECK FOR PHYSICAL DAMAGE IN CAP
VISUAL
125 x 90 x 350 CHECK FOR CYLINDER LEAKAGE and operation

OD 380 x ID 330x CHECK FOR SEAL SEATING AND DEFORMATION


id 310x W24

NOISE/SOUND
CHECK FOR SOUND METER

VISUAL
80 x 45 x 200 CHECK FOR CYLINDER LEAKAGE
od 320 x id 265 x id OPERATIONAL
235 x w 25 CHECK FOR SEALING BY EQUALIZING
VISUAL
80 x 45 x 200 CHECK FOR CYLINDER LEAKAGE
CHECK FOR OPEARTION AND LPASSING OF OPERATIONAL
DN 65 VALVE
VISUAL
100 x 56 x 300 CHECK FOR CYLINDER LEAKAGE
VISUAL
CHECK FOR WEAR AND DAMAGE

VISUAL
80 x 45 x 500 CHECK FOR CYLINDER LEAKAGE
VISUAL
DN 700 CHECK FOR PLATE WEAR AND DAMAGE
VISUAL
CHECK FOR CRACKS AND DEFORMATION
CHECK FOR SEAL SEATING AND DEFORMATION

VISUAL
CHECK FOR CRACKS AND DEFORMATION
VISUAL
CHECK FOR CRACKS AND DEFORMATION

VISUAL
80 x 45 x500 CHECK FOR CYLINDER LEAKAGE
VISUAL
CHECK FOR PLATE WEAR AND DAMAGE
CHECK FOR SEAL SEATING AND DEFORMATION

VISUAL AT SITE AND


AT PLC
Chines CHECK BY TRIAL FOR SMOOTH OPERATION

VISUAL AT SITE AND


AT PLC
Chines CHECK BY TRIAL FOR SMOOTH OPERATION

BWEY 53-289 CHECK FOR INERNAL GEAR DAMAGE SPANNERS

W 51-06-08 CHECK FOR CRACKS AND DEFORMATION SPANNERS

W 51-06-08 CHECK FOR CRACKS AND DEFORMATION SPANNERS


CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR LEAKAGES AND ABNORMAL


W 31-44-00 VISUAL
SOUND

CHECK FOR PENION WEAR SPANNERS

XLD6-35-5.5 CHECK FOR INERNAL GEAR DAMAGE SPANNERS

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR LEAKAGES AND ABNORMAL


W31-16-00 VISUAL
SOUND

CHECK FOR INERNAL GEAR DAMAGE SPANNERS

CHECK FOR PENION WEAR SPANNERS

CHECK FOR WEAR SPANNERS

CHECK FOR WEAR AND DAMAGE VISUAL

CHECK FOR WEAR AND DAMAGE VISUAL

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.
Check for proper tigteness of the power
Spanners
cable to the LT Motor

Check for contactor rating and tighteness Spanners, Screw


of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter

Check for overload relay range and setting


Visual
of relay current for motor tripping.

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

Check for proper tigteness of the power


Spanners
cable to the LT Motor

Check for contactor rating and tighteness Spanners, Screw


of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter
Check for overload relay range and setting
Visual
of relay current for motor tripping.

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

Check for proper tigteness of the power


Spanners
cable to the LT Motor

To receive a command signal from a


control system, amplifies the signal, and Clamp Meter
transmits electric current to a servo Screw Drivers
motor in order to produce motion Visual
proportional to the command signal.

To transport electrical energy from the


Megger &
source of the electricity to the motor or
Multimeter
device.

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

Check for proper tigteness of the power


Spanners
cable to the LT Motor
To form magnetic field when energized
with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

To check for power connections


tighteness, load monitoring and drive
Clamp Meter
cooling fan sound and vibration.
Screw Drivers
To check for motor parameters feeded into
Visual
the Drive.
Motor FLC = 14.3A

To check for cable insulation greater than


Megger &
100 megaohms and continuity of cable
Multimeter
cores.

Check for contactor rating and tighteness Spanners, Screw


of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter
Check for contactor rating and tighteness Spanners, Screw
of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

Check for proper tigteness of the power


Spanners
cable to the LT Motor

To receive a command signal from a


control system, amplifies the signal, and Clamp Meter
transmits electric current to a servo Screw Drivers
motor in order to produce motion Visual
proportional to the command signal.

To transport electrical energy from the


Megger &
source of the electricity to the motor or
Multimeter
device.
To form magnetic field when energized
with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

Check for proper tigteness of the power


Spanners
cable to the LT Motor

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

To check for power connections


tighteness, load monitoring and drive
Clamp Meter
cooling fan sound and vibration.
Screw Drivers
To check for motor parameters feeded into
Visual
the DriveField FLC = 2.01 A
Armature FLC = 12.5 A
To check for cable insulation greater than
Megger &
100 megaohms and continuity of cable
Multimeter
cores.

Check for contactor rating and tighteness Spanners, Screw


of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter

Check for contactor rating and tighteness Spanners, Screw


of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

Check for proper tigteness of the power


Spanners
cable to the LT Motor
To form magnetic field when energized
with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

To form magnetic field when energized


with current to produce torque. Check for Megger &
winding resistance and megger value of Multimeter
Motor.

To check for power connections


tighteness, load monitoring and drive
Clamp Meter
cooling fan sound and vibration.
Screw Drivers
To check for motor parameters feeded into
Visual
the DriveField FLC = 2.01 A
Armature FLC = 12.5 A

To check for cable insulation greater than


Megger &
100 megaohms and continuity of cable
Multimeter
cores.
Check for contactor rating and tighteness Spanners, Screw
of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter

Check for contactor rating and tighteness Spanners, Screw


of contactor terminals. Check for coil Drivers, Allen Key,
resistance of the contactor. Multimeter

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

check coil Resistance Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

check supply voltage and output Voltage Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester


checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

check supply voltage and output Voltage Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

check supply voltage and output Voltage Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

checking healthyness by operating valve. Multimeter, Tester

check supply voltage and output Voltage Multimeter, Tester

checking healthyness by operating valve. Multimeter,Tester

check healthyness of contact change over


Multimeter,Tester
by operaing with pressure

checking healthyness by operating valve. Multimeter,Tester

checking healthyness by operating valve. Multimeter,Tester


check supply voltage and output Voltage Multimeter,Tester

checking healthyness by operating valve. Multimeter,Tester


TYPE OF
CHECK (RUN
CHECK / IDEAL CONDITION ACTUAL CONDITION OBSERVED
STOP
CHECK /
SHUTDOWN)

ShutDown No Deformation Deformed to be changed

ShutDown No Deformation

ShutDown No body damage

RUN CHECK NO LEAKAGE

ShutDown No Wear & Deformation

RUN CHECK SOUND <75DB

RUN CHECK NO LEAKAGE

RUN CHECK SHOULD BE EQUALIZING

RUN CHECK NO LEAKAGE

RUN CHECK NO LEAKAGE AND SMOOTH


OPERATION

RUN CHECK NO LEAKAGE

ShutDown NO HOLES & Deformation

RUN CHECK NO LEAKAGE

ShutDown No Wear & Deformation


ShutDown NO CRACKS AND DAMAGE

ShutDown No Wear & Deformation

ShutDown NO CRACKS AND DAMAGE

ShutDown NO CRACKS AND DAMAGE

RUN CHECK NO LEAKAGE

ShutDown No Wear & Deformation

ShutDown No Wear & Deformation

RUN CHECK SMOOTH OPERATION

RUN CHECK SMOOTH OPERATION

NO INTERNAL TEETH
ShutDown DAMAGES

ShutDown NO CRACKS AND DAMAGE

ShutDown NO CRACKS AND DAMAGE


ShutDown NO PHYSICAL DAMAGE

ShutDown NO PHYSICAL DAMAGE

ShutDown NO PHYSICAL DAMAGE

RUN CHECK NO ABNORMAL SOUND AND


LEAKAGE

ShutDown No Wear & Deformation

NO INTERNAL TEETH
ShutDown DAMAGES
ShutDown NO PHYSICAL DAMAGE

RUN CHECK NO ABNORMAL SOUND AND


LEAKAGE

NO INTERNAL TEETH
ShutDown DAMAGES

ShutDown No Wear & Deformation

ShutDown No Wear & Deformation

NO WEAR AND DISPLACED


ShutDown LINERS
NO WEAR AND DISPLACED
ShutDown LINERS

Winding Resistances
should be balanced of all No abnormal difference in winding
three phases, i.e., less than resistances. Winding resistance of all
Shut Down
10 ohms. three phases is 7.1 ohms. Megger values
check
Megger values shouldbe are 500 mega ohms and in healthy
above 5 megaohms from condition.
all three phases to ground.
Shut Down Tightened with 10 mm No looseness of 10 mm Chrome
check Chrome Vanadium Bolts. Vanadium bolts and connecting links.

Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 25 ohms.
between 20 ohms - 30
ohms.

Relay settings: Inspected Relay Range = 48-54A


SHUTDOW
Relay Range = 48-54A Relay setting = 48A
N CHECK
Relay setting = 48A Running Current = 18 A
Winding Resistances
should be balanced of all No abnormal difference in winding
three phases, i.e., less than resistances. Winding resistance of all
Shut Down
10 ohms. three phases is 7.5 ohms. Megger
check
Megger values shouldbe values are 500 mega ohms and in
above 5 megaohms from healthy condition.
all three phases to ground.

Shut Down Tightened with 10 mm No looseness of 10 mm Chrome


check Chrome Vanadium Bolts. Vanadium bolts and connecting links.

Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 25.4 ohms.
between 20 ohms - 30
ohms.
Relay settings: Inspected Relay Range = 48-54A
SHUTDOW
Relay Range = 48-54A Relay setting = 48A
N CHECK
Relay setting = 48A Running Current = 35 A

Winding Resistances
should be balanced of all
Winding resistances of all three are 46
three phases, i.e., less than
Shut Down ohms. Megger values are 10.8 mega
50 ohms.
check ohms phase to ground and are in
Megger values should be
healthy condition.
above 5 megaohms from
all three phases to ground.

Brazing of cable to motor


Shut Down Brazing of connector with cable
and encoder connector
check checked. No abnormalities found.
properly done.

To check for power


Power connections tighteness on the
connections tighteness,
drive, load checking and drive cooling
SHUTDOW load monitoring and drive
fan vibration and abnormal sound
N CHECK cooling fan abnormal
checked. No abnormalities found.
sound and vibration.
Running Currnet = 2.2A
Motor FLC = 32A

To check for cable


Power cable insulation checked
SHUTDOW insulation greater than
through megger 850 megaohms.
N CHECK 100 megaohms and
Continuity of cable cores are normal.
continuity of cable cores.

Winding Resistances
should be balanced of all
Winding resistances of all three are 6.2
three phases, i.e., less than
Shut Down ohms. Megger values are 800 mega
10 ohms.
check ohms phase to ground and are in
Megger values should be
healthy condition.
above 5 megaohms from
all three phases to ground.

Shut Down Tightened with 10mm No looseness of the bolts and


check chrome vanadium Bolts. connecting links.
Winding Resistances
should be balanced of all
Winding resistances of all three are 9.2
three phases, i.e., less than
Shut Down ohms. Megger values are 100 mega
10 ohms.
check ohms phase to ground and are in
Megger values should be
healthy condition.
above 5 megaohms from
all three phases to ground.

Check for cooling fan


motor winding resistance
Cooling fan motor winding resistance
should be in between 50
Shut Down 56 ohms and meger value is 55
ohms - 60 ohms and
check megaohms and continuity of power
megger should be greater
cable checked.
than 50 megaohms and
power cable.

To check for power


connections tighteness,
Power connections tighteness on the
load monitoring and drive
drive, load checking and drive cooling
cooling fan sound and
Shut Down fan vibration and sound checked.
vibration.
check Motor parameters feeded into the drive
To check for motor
checked. No abnormalities found.
parameters feeded into
Running Current = 4.6A
the Drive.
Motor FLC = 14.3A

To check for cable


Power cable insulation checked
Shut Down insulation greater than
through megger 800 megaohms.
check 100 megaohms and
Continuity of cable cores are normal.
continuity of cable cores.

Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 21.5 ohms.
between 20 ohms - 30
ohms.
Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 24 ohms.
between 20 ohms - 30
ohms.

Winding Resistances
should be balanced of all
Winding resistances of all three are 41
three phases, i.e., less than
Shut Down ohms. Megger values are 11 mega ohms
50 ohms.
check phase to ground and are in healthy
Megger values should be
condition.
above 5 megaohms from
all three phases to ground.

Brazing of cable to motor


Shut Down Brazing of connector with cable
and encoder connector
check checked. No abnormalities found.
properly done.

To check for power


Power connections tighteness on the
connections tighteness,
drive, load checking and drive cooling
SHUTDOW load monitoring and drive
fan vibration and abnormal sound
N CHECK cooling fan abnormal
checked. No abnormalities found.
sound and vibration.
Running Currnet = 1.9A
Motor FLC = 32A

To check for cable


Power cable insulation checked
SHUTDOW insulation greater than
through megger 800 megaohms.
N CHECK 100 megaohms and
Continuity of cable cores are normal.
continuity of cable cores.
Winding Resistances
should be balanced of all
Winding resistances of all three are 6.2
three phases, i.e., less than
Shut Down ohms. Megger values are 800 mega
10 ohms.
check ohms phase to ground and are in
Megger values should be
healthy condition.
above 5 megaohms from
all three phases to ground.

Shut Down Tightened with 10mm No looseness of the bolts and


check chrome vanadium Bolts. connecting links.

Winding Resistances
should be balanced of all
Winding resistances of all three are 9.2
three phases, i.e., less than
Shut Down ohms. Megger values are 250 mega
10 ohms.
check ohms phase to ground and are in
Megger values should be
healthy condition.
above 5 megaohms from
all three phases to ground.

Check for cooling fan


motor winding resistance
Cooling fan motor winding resistance
should be in between 50
Shut Down 56 ohms and meger value is 55
ohms - 60 ohms and
check megaohms and continuity of power
megger should be greater
cable checked.
than 50 megaohms and
power cable.

To check for power


connections tighteness,
Power connections tighteness on the
load monitoring and drive
drive, load checking and drive cooling
cooling fan sound and
fan vibration and sound checked.
Shut Down vibration.
Motor parameters feeded into the drive
check To check for motor
checked. No abnormalities found.
parameters feeded into
Drive Field RC = 2.01 A
the DriveField FLC = 2.01
Armature RC = 4.7 A
A
Armature FLC = 12.5 A
To check for cable
Power cable insulation checked
Shut Down insulation greater than
through megger 900 megaohms.
check 100 megaohms and
Continuity of cable cores are normal.
continuity of cable cores.

Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 21.0 ohms.
between 20 ohms - 30
ohms.

Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 22 ohms.
between 20 ohms - 30
ohms.

Winding Resistances
should be balanced of all
Winding resistances of all three are 6.2
three phases, i.e., less than
Shut Down ohms. Megger values are 1000 mega
10 ohms.
check ohms phase to ground and are in
Megger values should be
healthy condition.
above 5 megaohms from
all three phases to ground.

Shut Down Tightened with 10mm No looseness of the bolts and


check chrome vanadium Bolts. connecting links.
Winding Resistances
should be balanced of all
Winding resistances of all three are 9.2
three phases, i.e., less than
Shut Down ohms. Megger values are 250 mega
10 ohms.
check ohms phase to ground and are in
Megger values should be
healthy condition.
above 5 megaohms from
all three phases to ground.

Check for cooling fan


motor winding resistance
Cooling fan motor winding resistance
should be in between 50
Shut Down 56 ohms and meger value is 55
ohms - 60 ohms and
check megaohms and continuity of power
megger should be greater
cable checked.
than 50 megaohms and
power cable.

To check for power


connections tighteness,
Power connections tighteness on the
load monitoring and drive
drive, load checking and drive cooling
cooling fan sound and
fan vibration and sound checked.
Shut Down vibration.
Motor parameters feeded into the drive
check To check for motor
checked. No abnormalities found.
parameters feeded into
Drive Field RC = 2.01 A
the DriveField FLC = 2.01
Armature RC = 4.9 A
A
Armature FLC = 12.5 A

To check for cable


Power cable insulation checked
Shut Down insulation greater than
through megger 1000 megaohms.
check 100 megaohms and
Continuity of cable cores are normal.
continuity of cable cores.
Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 21.0 ohms.
between 20 ohms - 30
ohms.

Proper tighteness of
foundation of contactor.
No abnormalities to be No looseness in fitting of contactor and
SHUTDOW seen for the contacts and connection of cables to power contactor
N CHECK proper fitting to be done. and its contacts. Coil resistance of
Coil resistance should be contactor checked 22 ohms.
between 20 ohms - 30
ohms.

Physical check or damage of


Run check No damage
sensor

Physical check or damage of


Run check No damage
cable
Physical check or damage of
Run check No damage
coil
Physical check or contact
Run check damage of coil using No damage
multimeter

Run check Physical check No damage

Run check Physical check No damage

Run check Physical check No damage

Physical check or damage of


Run check No damage
sensor
Physical check or damage of
Run check No damage
cable
Physical check or contact
Run check damage of coil using No damage
multimeter

Run check Physical check No damage

Run check Physical check No damage

Physical check or damage of


Run check No damage
sensor
Physical check or damage of
Run check No damage
cable
Physical check or contact
Run check damage of coil using No damage
multimeter

Run check Physical check No damage

Run check Physical check No damage

Physical check or damage of


Run check No damage
sensor
Physical check or damage of
Run check No damage
cable
Physical check or contact
Run check damage of coil using No damage
multimeter

Run check Physical check No damage

Run check Physical check No damage

Physical check or damage


Run check No damage
of cable
Physical check or damage
Run check No damage
of coil
Physical check or contact
Run check damage of coil using No damage
multimeter

Run check Physical check No damage


Run check Physical check No damage

Run check Physical check No damage


ACTION
REQUIRED
EQUIPMENT: Sub Equipments COMPONENT

SP-COOL-TESP SP-COOL-TESP TAIL ESP REDUCER CATHODE


SP-COOL-TESP SP-COOL-TESP TAIL ESP ASSEMBLY OF HAMMERS CATHODE
TAIL ESP HAMMER SHAFTSUPPORTING BASE
SP-COOL-TESP SP-COOL-TESP CATHODE
SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT JOIN SLEEVE
SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT-1 CATHODE
SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT-2 CATHODE
SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT-3 CATHODE
SP-COOL-TESP SP-COOL-TESP TAIL ESP REDUCER ANODE
SP-COOL-TESP SP-COOL-TESP TAIL ESP HAMMERS ANODE

SP-COOL-TESP SP-COOL-TESP TAIL ESP HAMMER SHAFTSUPPORTING BASE ANODE

SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT JOIN SLEEVE


SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT-1 ANODE
SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT-2 ANODE
SP-COOL-TESP SP-COOL-TESP TAIL ESP SHAFT-3 ANODE
SP-COOL-TESP SP-COOL-TESP U CLAMP FOR TAIL ESP -SP
SP-COOL-TESP SP-COOL-TESP FABRIC CLOTH,FOR TAIL ESP PIPE INLET
SP-COOL-TESP SP-COOL-TESP FABRIC CLOTH,FOR TAIL ESP PIPE OUTLET
SP-COOL-TESP SP-COOL-TESP Geared motor motor for screw conveyor
SP-COOL-TESP SP-COOL-TESP EXPANSION BELLOW FOR TAIL ESP - SP
SP-COOL-TESP SP-COOL-TESP TAIL ESP CHEN DRIVE REDUCER

SP-COOL-TESP SP-COOL-TESP
RELAY
SP-COOL-TESP SP-COOL-TESP CAMMAND & FEEDBACK CABLE
SP-COOL-TESP SP-COOL-TESP
DI ,DO, AI, AO Card, PLC , IM modules
SP-COOL-TESP SP-COOL-TESP SMPS
SP-COOL-TESP SP-COOL-TESP Profibus Cable
CONDITION APPRAISAL OF TAIL ESP

DESCRIPTION / DIMENSION TOOLS REQUIRED

CHECK FOR PHYSICAL DAMAGE VISUAL


CHECK FOR HAMMER WEAROUT VISUAL

CHECK FOR BOLT TIGHTNESS AND RUSTING SPANNERS


CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR HAMMER WEAROUT VISUAL

CHECK FOR BOLT TIGHTNESS AND RUSTING SPANNERS


CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR BOLT TIGHTNESS AND RUSTING SPANNERS
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL

checking healthyness by operating DOL starter of motor. Multimeter,Tester


checking healthyness by Run the motor Multimeter,Tester

checking healthyness by operating DOL starter of motor and run feedback. Multimeter,Tester
check supply voltage and output Voltage Multimeter,Tester
checking of commnunication on SCADA sytem and on PLC card Multimeter,Tester
IL ESP

TYPE OF CHECK (RUN


CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

STOP CHECK NO PHYSICAL DAMAGE TO BODY


STOP CHECK NO WEAROUT OF HAMMERS

STOP CHECK BOLTS SHOULD NOT BE RUSTED AND SHOULD BE TIGHT


STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO PHYSICAL DAMAGE TO BODY
STOP CHECK NO WEAROUT OF HAMMERS

STOP CHECK BOLTS SHOULD NOT BE RUSTED AND SHOULD BE TIGHT


STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK BOLTS SHOULD NOT BE RUSTED AND SHOULD BE TIGHT
STOP CHECK NO TORNOUT IN CLOTH
STOP CHECK NO TORNOUT IN CLOTH
STOP CHECK NO PHYSICAL DAMAGE TO BODY
STOP CHECK NO PHYSICAL DAMAGE TO BODY
STOP CHECK LINKS SHOULD NOTBE DAMAGED

Run check Check for healthiness of NO - NC contacts during operation.


Run check Physical check or damage of cable

Run check Physical check


Run check Physical check
Run check Physical check
ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormalities found in switching of


contacts during operation.
No abnormalities found

No abnormalities found
No abnormalities found
No abnormalities found
EQUIPMENT: Sub Equipments COMPONENT

SP-SS-HESP SP-SS-HESP HEAD ESP VIBRATING HAMMER ASSEMBLY,CATHODE


SP-SS-HESP SP-SS-HESP HEAD ESP REDUCER, CATHODE
SP-SS-HESP SP-SS-HESP HEAD ESP CATHODE SHAFT-1
SP-SS-HESP SP-SS-HESP HEAD ESP CATHODE SHAFT-2
SP-SS-HESP SP-SS-HESP HEAD ESP CATHODE SHAFT-3
SP-SS-HESP SP-SS-HESP HEAD ESP CATHODE SHAFT-4
SP-SS-HESP SP-SS-HESP HEAD ESP SHAFT JOIN SLEEVE CATHODE
SP-SS-HESP SP-SS-HESP HEAD ESP HAMMER SUPPORT BASE CATHODE
SP-SS-HESP SP-SS-HESP HEAD ESP PULL PIN COUPL.
SP-SS-HESP SP-SS-HESP HEAD ESP VIBRATING HAMMER ASSEMBLY,ANODE
SP-SS-HESP SP-SS-HESP HEAD ESP REDUCER, ANODE
SP-SS-HESP SP-SS-HESP HEAD ESP ANODE SHAFT-1
SP-SS-HESP SP-SS-HESP HEAD ESP ANODE SHAFT-2
SP-SS-HESP SP-SS-HESP HEAD ESP ANODE SHAFT-3
SP-SS-HESP SP-SS-HESP HEAD ESP ANODE SHAFT-4
SP-SS-HESP SP-SS-HESP HEAD ESP HAMMER SUPPORT BASE ANODE
SP-SS-HESP SP-SS-HESP HEAD ESP SHAFT JOIN SLEEVE ANODE
SP-SS-HESP SP-SS-HESP EMITTING ELECTRODE FOR HEAD ESP -CATHODE
SP-SS-HESP SP-SS-HESP DUST COLLECTING PLATE FOR HEAD ESP anode
SP-SS-HESP SP-SS-HESP DUPLEX CHAIN
SP-SS-HESP SP-SS-HESP SPROCKET BIG
SP-SS-HESP SP-SS-HESP SPROCKET SMALL
SP-SS-HESP SP-SS-HESP SLIDE GATE TYPE-SZ-400 FOR HEAD ESP-SP
SP-SS-HESP SP-SS-HESP U BOLT FOR HEAD ESP HAMMER-SP

SP-SS-HESP SP-SS-HESP
RELAY
SP-SS-HESP SP-SS-HESP CAMMAND & FEEDBACK CABLE
SP-SS-HESP SP-SS-HESP
DI ,DO Card, PLC , IM modules
SP-SS-HESP SP-SS-HESP SMPS
SP-SS-HESP SP-SS-HESP Profibus Cable
CONDITION APPRAISAL OF HEAD ESP

Item Code SPECIFICATION

5114000047
5114000041 SP,DN-CTD130-08
5114000042 ,SP,DN-CTD130-08
5114000043 ,SP,DN-CTD130-08
5114000044 ,SP,DN-CTD130-08
5114000045 ,SP,DN-CTD130-08
5114000056 ,SP,CTD130-10
5114000054 (2),SP
5114000046 ,SP,CTD130-08
5114000047
5114000048 SP,DN-CTD 130-10
5114000049 ,SP,CTD 130-10
5114000050 ,SP,CTD 130-10
5114000051 ,SP,CTD 130-10
5114000052 ,SP,CTD 130-10
5114000053 (1),SP
5114000056 ,SP,CTD130-10
1902010031
5114040017
5114040003
5114010021
5114010020
5114040019
0609010002
CONDITION APPRAISAL OF HEAD ESP

DESCRIPTION / DIMENSION TOOLS REQUIRED

CHECK FOR HAMMER WEAROUT VISUAL


CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR BOLT TIGHTNESS AND RUSTING SPANNERS
CHECK FOR WEAR &CRACKS IN HUB SPANNERS
CHECK FOR HAMMER WEAROUT VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR BOLT TIGHTNESS AND RUSTING SPANNERS
CHECK FOR PHYSICAL DAMAGE VISUAL
CHECK FOR BEND & DISLOCATED CATODE VISUAL
CHECK FOR BEND & DISLOCATED CATODE VISUAL
CHECK FOR CHAIN LINKS DEFORMATION VISUAL
CHECK FOR DAMAGED THEETH VISUAL
CHECK FOR DAMAGED THEETH VISUAL
CHECK FOR SMOOTH OPENING AND CLOSING OPERATING
CHECK FOR BOLT TIGHTNESS AND RUSTING SPANNERS

checking healthyness by operating DOL starter of motor. Multimeter,Tester


checking healthyness by Run the motor Multimeter,Tester

checking healthyness by operating DOL starter of motor and run feedback. Multimeter,Tester
check supply voltage and output Voltage Multimeter,Tester
checking of commnunication on SCADA sytem and on PLC card Multimeter,Tester
TYPE OF CHECK
(RUN CHECK / IDEAL CONDITION
STOP CHECK /
SHUTDOWN)

STOP CHECK face width should not be less than 40% of original size
STOP CHECK NO PHYSICAL DAMAGE TO BODY
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK BOLTS SHOULD NOT BE RUSTED AND SHOULD BE TIGHT
STOP CHECK NO CRACKS AND WEAROUT IN HUB
STOP CHECK NO WEAROUT OF HAMMERS
STOP CHECK NO PHYSICAL DAMAGE TO BODY
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK BOLTS SHOULD NOT BE RUSTED AND SHOULD BE TIGHT
STOP CHECK NO CRACKS AND DAMAGE
STOP CHECK NO BEND AND DISLOCATED CATHODE
STOP CHECK NO BEND AND DISLOCATED CATHODE
STOP CHECK NO DEFORMED LINKS
STOP CHECK NO DAMAGED TEETHS
STOP CHECK NO DAMAGED TEETHS
STOP CHECK SMOOTH OPENING AND CLOSING
STOP CHECK BOLTS SHOULD NOT BE RUSTED AND SHOULD BE TIGHT

Run check Check for healthiness of NO - NC contacts during operation.


Run check Physical check or damage of cable

Run check Physical check


Run check Physical check
Run check Physical check
ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormalities found in switching of contacts


during operation.
No abnormalities found

No abnormalities found
No abnormalities found
No abnormalities found
CON
EQUIPMENT: Sub Equipments COMPONENT

DRUM NO.1 BEARING FOR DRUM NO. 1 (22236CA)

DRUM NO.1 PLUMMER BLOCK FOR DRUM NO. 1

DRUM NO.2 BEARING FOR DRUM NO. 2

DRUM NO.2 PLUMMER BLOCK FOR DRUM NO. 2

DRUM NO.3 BEARING FOR DRUM NO. 3

DRUM NO.3 PLUMMER BLOCK FOR DRUM NO. 3

DRUM NO.4 BEARING FOR DRUM NO. 4

DRUM NO.4 PLUMMER BLOCK FOR DRUM NO. 4

DRUM NO.5 BEARING FOR DRUM NO. 5

DRUM NO.5 PLUMMER BLOCK FOR DRUM NO. 5

DRUM NO.6 BEARING FOR DRUM NO. 6

DRUM NO.6 PLUMMER BLOCK FOR DRUM NO. 6 (GTU)

DRUM NO.7 BEARING FOR DRUM NO. 7 (22228 CA)

DRUM NO.7 PLUMMER BLOCK FOR DRUM NO. 7

DRUM NO.8 BEARING FOR DRUM NO. 8

DRUM NO.8 PLUMMER BLOCK FOR DRUM NO. 8

DRUM NO.9 BEARING FOR DRUM NO. 9

DRUM NO.9 PLUMMER BLOCK FOR DRUM NO. 9


DRUM NO.10 BEARING FOR DRUM NO. 10

DRUM NO.10 PLUMMER BLOCK FOR DRUM NO. 10 (GTU)

DRUM NO.11 BEARING FOR DRUM NO. 11

DRUM NO.11 PLUMMER BLOCK FOR DRUM NO. 11

DRUM NO.12 BEARING FOR DRUM NO. 12

DRUM NO.12 PLUMMER BLOCK FOR DRUM NO. 12

DRUM NO.13 BEARING FOR DRUM NO. 13 (22236CA)

DRUM NO.13 PLUMMER BLOCK FOR DRUM NO. 13

TEFLON BUSH / COUPLING PIN

SPIDER FOR CONVEYOR NO 1 INPUT COUPLING


COUPLING
COUPLING,

OUTPUT COUPLING
FUSIBLE PLUG -
FLUID COUPLING CPLG
GEAR BOX 1
GEARBOX
GEAR BOX 2

PLUMMER BLOCK FOR CB1 GTU DRUM


PLUMMER BLOCK
PLUMMER BLOCK F/ DRIVE DRUM -

Brake drum
BRAKE DRUM Brake drum coupling
Brake drum coupling
HOLDBACK HOLD BACK FOR SH CB1

SH CB#1 Drive 1 MOTOR SH CB#1 Motor Windings


SH CB#1 Drive 1 MOTOR SH CB#1 Terminal Box

SH CB#1 Drive 1 MOTOR SH CB#1 Thruster Brake Motor


THRUSTER BRAKE Windings

SH CB#1 Drive 1 COOLING SH CB#1 Cooling Pump motor


PUMP MOTOR winding

SH CB#1 Soft Starter

SH CB#1 Power Contactor

SH CB#1 Overload Relay

SH CB#1 cooling pump Power


STOCK HOUSE CB1/1 BELT Contactor
BF3-SH-CB1 PANEL
BF3-SH-CB1 PANEL

SH CB#1 cooling pump


AUXILIARY CONTACTOR

SH CB#1 Thruster brake


AUXILIARY CONTACTOR

SH CB#1 Thruster brake Power


Contactor

Speed sensor probe

ZERO SPEED SWITCH 1 & 2


Zero speed device

BELT SWAY BELT SWAY SWITCH

PULL CORD PULL CORD SWITCH


SH CB#1 Drive 2 MOTOR SH CB#1 Motor Windings

SH CB#1 Drive 2 MOTOR SH CB#1 Terminal Box

SH CB#1 Drive 2 MOTOR SH CB#1 Thruster Brake Motor


THRUSTER BRAKE Windings

SH CB#1 Drive 2 COOLING SH CB#1 Cooling Pump motor


PUMP MOTOR winding

SH CB#1 Soft Starter

SH CB#1 Power Contactor

SH CB#1 Overload Relay

STOCK HOUSE CB1/1 BELT


PANEL
SH CB#1 cooling pump Power
STOCK HOUSE CB1/1 BELT Contactor
PANEL

SH CB#1 cooling pump


AUXILIARY CONTACTOR

SH CB#1 Thruster brake


AUXILIARY CONTACTOR

SH CB#1 Thruster brake Power


Contactor
CONDITION APPRAISAL OF SH CB#1 (B
DESCRIPTION / DIMENSION TOOLS REQUIRED

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS


SPANNERS AND FILLER
CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

SPANNERS AND FILLER


CHECK FOR BEARING CLEARANCE GAUGE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

CHECK FOR PHYSICAL DAMAGE OF SPIDER SPANNERS

CHECK FOR PHYSICAL DAMAGE OF COUPLING SPANNERS

CHECK FOR PHYSICAL DAMAGE OF COUPLING SPANNERS

CHECK FOR PHYSICAL DAMAGE OF COUPLING SPANNERS


CHECK FOR PHYSICAL DAMAGE OF GEARBOX SPANNERS
CHECK FOR PHYSICAL DAMAGE OF GEARBOX SPANNERS

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS SPANNERS

CHECK FOR PHYSICAL DAMAGE SPANNERS


CHECK FOR PHYSICAL DAMAGE SPANNERS
CHECK FOR PHYSICAL DAMAGE SPANNERS
CHECK FOR PHYSICAL DAMAGE OF TEETHS SPANNERS

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.
Check for proper tigteness of the power cable to
Spanners
the LT Motor

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

Clamp Meter
To drive the motor smoothly without inrush flow
Screw Drivers
of current during starting.
Visual

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter

Check for overload relay range and setting of relay


Visual
current for motor tripping.

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter
The auxiliary contactor is often used in a logic
circuit, or for some other part of the control Visual
scheme.

The auxiliary contactor is often used in a logic


circuit, or for some other part of the control Visual
scheme.

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter

To detect the speed of the conveyor and provides a


Visual
pulse to the zero speed switch.

To detect the stoppage or unacceptably slow Multimeter, Screw


movement of a rotating conveyor tail end pulley. Driver

For detecting the sway or deviation of belt


conveyors, and sends out an alarm signal and an
Multimeter, Screw
emergency stop signal.
Driver
Suited to be used for belt breakage and materials
falling prevention due to the belt sway.

Check rope when operated for safety tripping


switch for conveyor belts. When the rope is pulled Multimeter, Screw
the lever of the pc unit is operated which in turn, Driver
actuates a switch, thereby the conveyor is stopped.
To form magnetic field when energized with
Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

Clamp Meter
To drive the motor smoothly without inrush flow
Screw Drivers
of current during starting.
Visual

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter

Check for overload relay range and setting of relay


Visual
current for motor tripping.
Check for contactor rating and tighteness of Spanners, Screw
contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter

The auxiliary contactor is often used in a logic


circuit, or for some other part of the control Visual
scheme.

The auxiliary contactor is often used in a logic


circuit, or for some other part of the control Visual
scheme.

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter
F SH CB#1 (BF3-SH-CB1)
TYPE OF CHECK (RUN CHECK / STOP IDEAL CONDITION
CHECK / SHUTDOWN)

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS
STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.70MM

STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED


BOLTS

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE


STOP CHECK NO PHYSICAL DAMAGE
STOP CHECK NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE AND NO RUSTED
STOP CHECK BOLTS
NO PHYSICAL DAMAGE AND NO RUSTED
STOP CHECK
BOLTS
STOP CHECK NO PHYSICAL DAMAGE
STOP CHECK NO PHYSICAL DAMAGE
STOP CHECK NO PHYSICAL DAMAGE
STOP CHECK NO PHYSICAL DAMAGE

Winding Resistances should be


balanced of all three phases,
i.e., less than 1 ohms.
Shut Down check
Megger values shouldbe above
5 megaohms from all three
phases to ground.
Shut Down check Tightened with spanner set.

Winding Resistances should be


balanced of all three phases,
i.e., less than 10 ohms.
Shut Down check
Megger values should be above
5 megaohms from all three
phases to ground.

Cooling pump motor to be fit


Shut Down check
properly on the shaft

To check for power connections


tighteness, load monitoring and
Shut Down check drive cooling fan abnormal
sound and vibration.
Motor FLC = 313 A

Proper tighteness of foundation


of contactor.
No abnormalities to be seen for
SHUTDOWN CHECK the contacts and proper fitting
to be done.
Coil resistance should be 42-43
ohms.
Relay settings:
SHUTDOWN CHECK BOCR Relay = 1.4A; O time=2s;
D time=6s
Proper tighteness of foundation
of contactor.
No abnormalities to be seen for
SHUTDOWN CHECK the contacts and proper fitting
to be done.
Coil resistance should be 42-43
ohms.
The auxiliary contctactor is
used to provide tripping
SHUTDOWN CHECK indication whenever the lube
oil pump will trip or power
fails.
The auxiliary contctactor is
used to provide tripping
SHUTDOWN CHECK indication whenever the lube
oil pump will trip or power
fails.

Proper tighteness of foundation


of contactor.
No abnormalities to be seen for
SHUTDOWN CHECK the contacts and proper fitting
to be done.
Coil resistance should be
between 20 ohms - 30 ohms.

To check for continuous


SHUTDOWN CHECK sensing of the speed of the
conveyor.

To check for NO - NC contacts


through a relay according to
SHUTDOWN CHECK
Time and Speed adjustable
settings.

To check for healthiness of NO


SHUTDOWN CHECK
- NC contacts during operation.

To check for healthiness of NO


SHUTDOWN CHECK
- NC contacts during operation.
Winding Resistances should be
balanced of all three phases,
i.e., less than 1 ohms.
Shut Down check
Megger values shouldbe above
5 megaohms from all three
phases to ground.

Shut Down check Tightened with spanner set.

Winding Resistances should be


balanced of all three phases,
i.e., less than 10 ohms.
Shut Down check
Megger values should be above
5 megaohms from all three
phases to ground.

Cooling pump motor to be fit


Shut Down check
properly on the shaft

To check for power connections


tighteness, load monitoring and
Shut Down check drive cooling fan abnormal
sound and vibration.
Motor FLC = 313 A

Proper tighteness of foundation


of contactor.
No abnormalities to be seen for
SHUTDOWN CHECK the contacts and proper fitting
to be done.
Coil resistance should be 42-43
ohms.
Relay settings:
SHUTDOWN CHECK BOCR Relay = 1.4A; O time=2s;
D time=6s
Proper tighteness of foundation
of contactor.
No abnormalities to be seen for
SHUTDOWN CHECK the contacts and proper fitting
to be done.
Coil resistance should be 42-43
ohms.

The auxiliary contctactor is


used to provide tripping
SHUTDOWN CHECK indication whenever the lube
oil pump will trip or power
fails.
The auxiliary contctactor is
used to provide tripping
SHUTDOWN CHECK indication whenever the lube
oil pump will trip or power
fails.

Proper tighteness of foundation


of contactor.
No abnormalities to be seen for
SHUTDOWN CHECK the contacts and proper fitting
to be done.
Coil resistance should be
between 20 ohms - 30 ohms.
ACTUAL CONDITION OBSERVED ACTION REQUIRED
No abnormal difference in
winding resistances. Winding
resistance of all three phases is
0.8 ohms. Megger values are
400 mega ohms and in healthy
condition.
No looseness of the bolts and
connecting links.

Winding resistances of all three


are 9.2 ohms. Megger values
are 250 mega ohms phase to
ground and are in healthy
condition.

No looseness found in fitting of


cooling fan to the shaft.

Power connections tighteness


on the drive, load checking and
drive cooling fan vibration and
abnormal sound checked. No
abnormalities found.
Running Current = 105.9 A

No looseness in fitting of
contactor and connection of
cables to power contactor and
its contacts. Coil resistance is
42 ohms.

Inspected BOCR Relay = 1.4A;


O time=2s; D time=6s

No looseness in fitting of
contactor and connection of
cables to power contactor and
its contacts. Coil resistance is
42 ohms.
Indication for tripping of lube
oil pump is healthy.

Indication for tripping of lube


oil pump is healthy.

No looseness in fitting of
contactor and connection of
cables to power contactor and
its contacts. Coil resistance of
contactor checked 22 ohms.

No abnormalities found in
sensing of speed probe.

No any abnormalities found in


open - close contacts through
relay during running of
conveyor according to speed
and time settings.

No abnormalities found in
switching of contacts during
operation.

No abnormalities found in
switching of contacts during
operation.
No abnormal difference in
winding resistances. Winding
resistance of all three phases is
0.8 ohms. Megger values are
400 mega ohms and in healthy
condition.

No looseness of the bolts and


connecting links.

Winding resistances of all three


are 9.7 ohms. Megger values
are 300 mega ohms phase to
ground and are in healthy
condition.

No looseness found in fitting of


cooling fan to the shaft.

Power connections tighteness


on the drive, load checking and
drive cooling fan vibration and
abnormal sound checked. No
abnormalities found.
Running Current = 110 A

No looseness in fitting of
contactor and connection of
cables to power contactor and
its contacts. Coil resistance is
44 ohms.

Inspected BOCR Relay = 1.4A;


O time=2s; D time=6s
No looseness in fitting of
contactor and connection of
cables to power contactor and
its contacts. Coil resistance is
42 ohms.

Indication for tripping of lube


oil pump is healthy.

Indication for tripping of lube


oil pump is healthy.

No looseness in fitting of
contactor and connection of
cables to power contactor and
its contacts. Coil resistance of
contactor checked 27 ohms.
EQUIPMENT: Sub Equipments COMPONENT

Drifter complete set


BF3-CSTHEQ-DM BF3-CSTHEQ-DM

BF3-CSTHEQ-DM BF3-CSTHEQ-DM Carraige Movement chain


BF3-CSTHEQ-DM BF3-CSTHEQ-DM chain mounting roller pins
BF3-CSTHEQ-DM BF3-CSTHEQ-DM chain mounting rollers

BF3-CSTHEQ-DM BF3-CSTHEQ-DM chain sprocket


BF3-CSTHEQ-DM BF3-CSTHEQ-DM chain tensioning unit
BF3-CSTHEQ-DM BF3-CSTHEQ-DM hooking frame
BF3-CSTHEQ-DM BF3-CSTHEQ-DM Drill mc Boom

BF3-CH-MUDPWPK-PMP-
BF3-CSTHEQ-DM Motor Windings
MTR1

BF3-CH-MUDPWPK-PMP-
BF3-CSTHEQ-DM Terminal Box
MTR1

BF3-CSTHEQ-DM BF3-CH-MUDPWPK-PNL Power Contactor


BF3-CSTHEQ-DM BF3-CH-MUDPWPK-PNL Overload Relay

BF3-CH-MUDPWPK-PMP-
BF3-CSTHEQ-DM Motor Windings
MTR2

BF3-CH-MUDPWPK-PMP-
BF3-CSTHEQ-DM Terminal Box
MTR2

BF3-CSTHEQ-DM BF3-CH-MUDPWPK-PNL Power Contactor

BF3-CSTHEQ-DM BF3-CH-MUDPWPK-PNL Overload Relay

BF3-CH-MUDPWPK-PMP-
BF3-CSTHEQ-DM MTR3 Motor Windings

BF3-CH-MUDPWPK-PMP-
BF3-CSTHEQ-DM Terminal Box
MTR3
BF3-CSTHEQ-DM BF3-CH-MUDPWPK-PNL Power Contactor

BF3-CSTHEQ-DM BF3-CH-MUDPWPK-PNL Overload Relay


TOOLS
Item Code DESCRIPTION / DIMENSION REQUIRED

5103020172
CHECK FOR OPERATIONS OF HAMMERING VISUAL
CHECK FOR OIL LEAKAGE VISUAL
5103020123 CHECK CHAIN LINKS FOR DAMAGE VISUAL
5103020115 CHECK FOR PIN DAMAGE VISUAL
5103020115 CHECK FOR ROLLERS BUSH WEAROUT VISUAL

5103020170 CHECK FOR TEETH DAMAGE OF SPROCKET SPANNERS


1908000044 CHECK FOR ROLLER DAMAGE & THREAD DAMAGE SPANNERS
5103020115 CHECK FOR PHYSICAL DAMAGE OF FRAME VISUAL
5103020115 CHECK FOR PHYSICAL DAMAGE OF BOOM VISUAL

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter
Check for overload relay range and setting of relay
Visual
current for motor tripping.

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of relay


Visual
current for motor tripping.

To form magnetic field when energized with


Megger &
current to produce torque. Check for winding
Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor
Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of relay


Visual
current for motor tripping.
TYPE OF
CHECK (RUN
CHECK / IDEAL CONDITION
STOP
CHECK /
SHUTDOWN)

RUN CHECK SHOULD BE HAMMERING WITHOUT STUCKING


RUN CHECK NO OIL LEAKAGE
STOP CHECK NO DMAMAGED LINKS IN CHAIN
STOP CHECK NO WEAROUT AND DAMAGE TO PINS
RUN CHECK NO WEARED BUSH
NO WEARED OF BUSHES & NO DAMAGE OF
STOP CHECK TEETHS
STOP CHECK NO THREAD & ROLLERS DAMAGE
STOP CHECK NO PHYSICAL DAMAGE OF FRAME
STOP CHECK NO PHYSICAL DAMAGE OF BOOM

Winding Resistances should be balanced of all


Shut Down three phases, i.e., less than 10 ohms.
check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down Tightened with 10mm Chrome Vanadium


check Bolts.

Contactor rarting to be 150 A. Proper


tighteness of foundation of contactor.
Shut Down
No abnormalities to be seen for the contacts
check and proper fitting to be done.
Coil resistance should be 35-45 ohms.
Relay Range :
Shut Down (90 - 150)A
check Relay settings = 90A
FLC = 103A

Winding Resistances should be balanced of all


Shut Down three phases, i.e., less than 10 ohms.
check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down Tightened with 10mm Chrome Vanadium


check Bolts.

Contactor rarting to be 150 A. Proper


tighteness of foundation of contactor.
Shut Down
No abnormalities to be seen for the contacts
check and proper fitting to be done.
Coil resistance should be 35-45 ohms.

Relay Range :
Shut Down (90 - 150)A
check Relay settings = 90A
FLC = 103A

Winding Resistances should be balanced of all


Shut Down three phases, i.e., less than 10 ohms.
check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down Tightened with 10mm Chrome Vanadium


check Bolts.
Contactor rarting to be 150 A. Proper
tighteness of foundation of contactor.
Shut Down
No abnormalities to be seen for the contacts
check and proper fitting to be done.
Coil resistance should be 35-45 ohms.

Relay Range :
Shut Down (90 - 150)A
check Relay settings = 90A
FLC = 103A
ACTUAL CONDITION ACTION
OBSERVED REQUIRED

No abnormal difference in
winding resistances.
Winding resistance of all
three phases is 5.6 ohms.
Megger values are 1000
mega ohms and in healthy
condition.
No looseness of 10mm
Chrome Vanadium bolts and
connecting links.
Contactor rarting is 150 A.
No looseness in fitting of
contactor and connection of
cables to power contactor
and its contacts. Coil
resistance is 42 ohms.
Checked Relay Range :
(90 - 150)A
Relay settings = 90A
RC = 69.3A

No abnormal difference in
winding resistances.
Winding resistance of all
three phases is 6.2 ohms.
Megger values are 1000
mega ohms and in healthy
condition.

No looseness of 10mm
Chrome Vanadium bolts and
connecting links.

Contactor rarting is 150 A.


No looseness in fitting of
contactor and connection of
cables to power contactor
and its contacts. Coil
resistance is 43.2 ohms.

Checked Relay Range :


(90 - 150)A
Relay settings = 90A
RC = 68.0A

No abnormal difference in
winding resistances.
Winding resistance of all
three phases is 5.8 ohms.
Megger values are 1200
mega ohms and in healthy
condition.

No looseness of 10mm
Chrome Vanadium bolts and
connecting links.
Contactor rarting is 150 A.
No looseness in fitting of
contactor and connection of
cables to power contactor
and its contacts. Coil
resistance is 44.6 ohms.

Checked Relay Range :


(90 - 150)A
Relay settings = 90A
RC = 69.4A
EQUIPMENT: Sub Equipments

BF3-CH-MUDGUNBF3-CH-MUDGUN
BF3-CH-MUDGUNBF3-CH-MUDGUN
BF3-CH-MUDGUNBF3-CH-MUDGUN

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PMP-MTR1

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PMP-MTR1

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PNL

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PNL

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PMP-MTR2

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PMP-MTR2
BF3-CH-MUDGUNBF3-CH-MUDPWPK-PNL

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PNL

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PMP-MTR3

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PMP-MTR3

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PNL

BF3-CH-MUDGUNBF3-CH-MUDPWPK-PNL
TOOLS
COMPONENT
REQUIRED

Mud barrel VISUAL CHECK


Mudgun Swell joint flang bolts SPANNER
Mudgun indicater Rope VERNIER

Motor Windings Megger & Multimet

Terminal Box Spanners

Power Contactor Spanners, Screw Dri

Overload Relay Visual

Motor Windings Megger & Multimet

Terminal Box Spanners


Power Contactor Spanners, Screw Dri

Overload Relay Visual

Motor Windings Megger & Multimet

Terminal Box Spanners

Power Contactor Spanners, Screw Dri

Overload Relay Visual


TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)
STOP CHECK NO MAJOR MUD LEAKAGE TO BE FOUND
STOP CHECK NO BOLTS DAMAGE
STOP CHECK SHOULD BE >5.4MM

Winding Resistances should be balanced of all three phases,


Shut Down check
Megger values shouldbe above 5 megaohms from all three p

Shut Down check Tightened with 10mm Chrome Vanadium Bolt

Contactor rarting to be 150 A. Proper tighteness of foundatio


Shut Down check No abnormalities to be seen for the contacts and proper fitti
Coil resistance should be 35-45 ohms.

Relay Range :
(90 - 150)A
Shut Down check
Relay settings = 90A
FLC = 103A

Winding Resistances should be balanced of all three phases,


Shut Down check
Megger values shouldbe above 5 megaohms from all three p

Shut Down check Tightened with 10mm Chrome Vanadium Bolt


Contactor rarting to be 150 A. Proper tighteness of foundatio
Shut Down check No abnormalities to be seen for the contacts and proper fitti
Coil resistance should be 35-45 ohms.

Relay Range :
(90 - 150)A
Shut Down check
Relay settings = 90A
FLC = 103A

Winding Resistances should be balanced of all three phases,


Shut Down check
Megger values shouldbe above 5 megaohms from all three p

Shut Down check Tightened with 10mm Chrome Vanadium Bolt

Contactor rarting to be 150 A. Proper tighteness of foundatio


Shut Down check No abnormalities to be seen for the contacts and proper fitti
Coil resistance should be 35-45 ohms.

Relay Range :
(90 - 150)A
Shut Down check
Relay settings = 90A
FLC = 103A
ACTUAL CONDITION ACTION
OBSERVED REQUIRED

2 Bolts slipped while tighness


checking
thickness 5.2MM and dry rope
No abnormal difference in
winding resistances. Winding
resistance of all three phases is 5.6
ohms. Megger values are 1000
mega ohms and in healthy
condition.
No looseness of 10mm Chrome
Vanadium bolts and connecting
links.

Contactor rarting is 150 A. No


looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 42 ohms.

Checked Relay Range :


(90 - 150)A
Relay settings = 90A
RC = 69.3A
No abnormal difference in
winding resistances. Winding
resistance of all three phases is 6.2
ohms. Megger values are 1000
mega ohms and in healthy
condition.
No looseness of 10mm Chrome
Vanadium bolts and connecting
links.
Contactor rarting is 150 A. No
looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 43.2 ohms.

Checked Relay Range :


(90 - 150)A
Relay settings = 90A
RC = 68.0A
No abnormal difference in
winding resistances. Winding
resistance of all three phases is 5.8
ohms. Megger values are 1200
mega ohms and in healthy
condition.
No looseness of 10mm Chrome
Vanadium bolts and connecting
links.

Contactor rarting is 150 A. No


looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 44.6 ohms.

Checked Relay Range :


(90 - 150)A
Relay settings = 90A
RC = 69.4A
CONDITION
APPRAISAL OF
HOT METAL
HANDLING
CRANE
EQUIPMENT: Sub Equipments

BF3-HMH- EHMH-CRANE-MH-
CRANE GB

BF3-HMH- EHMH-CRANE-MH-
CRANE GB
BF3-HMH- EHMH-CRANE-MH-
CRANE GB
BF3-HMH- EHMH-CRANE-MH-
CRANE GB

BF3-HMH- EHMH-CRANE-MH-
CRANE GB

BF3-HMH- EHMH-CRANE-MH-
CRANE GB
BF3-HMH- EHMH-CRANE-LT-
CRANE GB1
BF3-HMH- EHMH-CRANE-LT-
CRANE GB1
BF3-HMH- EHMH-CRANE-LT-
CRANE GB1
BF3-HMH- EHMH-CRANE-LT-
CRANE GB2
BF3-HMH- EHMH-CRANE-LT-
CRANE GB2
BF3-HMH- EHMH-CRANE-LT-
CRANE GB2
BF3-HMH- EHMH-CRANE-LT-
CRANE GB2
BF3-HMH- EHMH-CRANE-LT-
CRANE GB2
BF3-HMH- EHMH-CRANE-LT-
CRANE GB2
BF3-HMH- EHMH-CRANE-CT-
CRANE GB
BF3-HMH- EHMH-CRANE-CT-
CRANE GB
BF3-HMH- EHMH-CRANE-CT-
CRANE GB
BF3-HMH- EHMH-CRANE-CT-
CRANE GB
BF3-HMH- EHMH-CRANE-CT-
CRANE GB
BF3-HMH- EHMH-CRANE-CT-
CRANE GB
BF3-HMH- EHMH-CRANE-CT-
CRANE GB
BF3-HMH- EHMH-CRANE-AH-
CRANE GB
BF3-HMH- EHMH-CRANE-AH-
CRANE GB
BF3-HMH- EHMH-CRANE-AH-
CRANE GB
BF3-HMH- EHMH-CRANE-AH-
CRANE GB

BF3-HMH- HMH CRANE


CRANE PROTECTIVE PANEL

BF3-HMH- HMH CRANE


CRANE PROTECTIVE PANEL

BF3-HMH- HMH CRANE


CRANE PROTECTIVE PANEL
BF3-HMH- HMH CRANE
CRANE PROTECTIVE PANEL

BF3-HMH- HMH CRANE


CRANE PROTECTIVE PANEL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- EHMH-CRANE-MH-
CRANE MTR

BF3-HMH- EHMH-CRANE-MH-
CRANE MTR

BF3-HMH- HMH-CRNE-MH-
CRANE MTR-RB
BF3-HMH- EHMH-CRANE-MH-
CRANE MTR

BF3-HMH- EHMH-CRANE-MH-
CRANE MTR

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL
BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- EHMH-CRANE-MH-
CRANE BRK1

BF3-HMH- EHMH-CRANE-MH-
CRANE BRK1
BF3-HMH- EHMH-CRANE-MH-
CRANE BRK1

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

EHMH-CRANE-MH-
BRK2

BF3-HMH- EHMH-CRANE-MH-
CRANE BRK2

BF3-HMH- EHMH-CRANE-MH-
CRANE BRK2
BF3-HMH- EHMH-CRANE-AH-
CRANE MTR

BF3-HMH- EHMH-CRANE-AH-
CRANE MTR

BF3-HMH- HMH-CRNE-AH-
CRANE MTR-RB

BF3-HMH- EHMH-CRANE-AH-
CRANE MTR

BF3-HMH- EHMH-CRANE-AH-
CRANE MTR

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL
BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL
BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- EHMH-CRANE-AH-
CRANE BRK1

BF3-HMH- EHMH-CRANE-AH-
CRANE BRK1

BF3-HMH- BF3-HMH-CRANE-
CRANE PNL
BF3-HMH- BF3-HMH-CRANE-
CRANE PNL

BF3-HMH- EHMH-CRANE-AH-
CRANE BRK2

BF3-HMH- EHMH-CRANE-AH-
CRANE BRK2

BF3-HMH- EHMH-CRANE-LT-
CRANE MTR1

BF3-HMH- EHMH-CRANE-LT-
CRANE MTR1
BF3-HMH- EHMH-CRANE-LT-
CRANE MTR2

BF3-HMH- EHMH-CRANE-LT-
CRANE MTR2

BF3-HMH- EHMH-CRANE-CT-
CRANE MTR

BF3-HMH- HMH-CRNE-LT-MTR-
CRANE RB

BF3-HMH- HMH-CRNE-LT-MTR-
CRANE RB
BF3-HMH- HMH-CRNE-CT-
CRANE MTR-RB

BF3-HMH- EHMH-CRANE-LT-
CRANE MTR1

BF3-HMH- EHMH-CRANE-LT-
CRANE MTR2

BF3-HMH- EHMH-CRANE-CT-
CRANE MTR

BF3-HMH- EHMH-CRANE-LT-
CRANE MTR1

BF3-HMH- EHMH-CRANE-LT-
CRANE MTR2

BF3-HMH- EHMH-CRANE-CT-
CRANE MTR
BF3-HMH- EHMH-CRANE-LT-
CRANE PNL

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL2

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL
BF3-HMH- EHMH-CRANE-LT-
CRANE PNL2

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL1

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL

BF3-HMH- EHMH-CRANE-LT-
CRANE PNL

BF3-HMH- EHMH-CRANE-CT-
CRANE PNL
BF3-HMH- EHMH-CRANE-CT-
CRANE PNL

BF3-HMH- EHMH-CRANE-CT-
CRANE PNL

BF3-HMH- EHMH-CRANE-CT-
CRANE PNL

BF3-HMH- EHMH-CRANE-CT-
CRANE PNL

BF3-HMH- EHMH-CRANE-CT-
CRANE PNL

BF3-HMH- EHMH-CRANE-CT-
CRANE PNL

BF3-HMH- EHMH-CRANE-CT-
CRANE PNL
BF3-HMH- EHMH-CRANE-LT-
CRANE BRK1

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK1

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK1

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK1

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK1
BF3-HMH- EHMH-CRANE-LT-
CRANE BRK2

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK2

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK2

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK1

BF3-HMH- EHMH-CRANE-LT-
CRANE BRK2
BF3-HMH- EHMH-CRANE-CT-
CRANE BRK

BF3-HMH- EHMH-CRANE-CT-
CRANE BRK

BF3-HMH- EHMH-CRANE-CT-
CRANE BRK

BF3-HMH- EHMH-CRANE-CT-
CRANE BRK
COMPONENT

EXTENTION SHAFT

TOP PULLEY ASSEMBLEY WITH SHAFT

SNATCH BOX PULLEY

PULLEY BLOCK WITH HOOK,

100T J HOOK FOR LADDLE LIFTING,

THIMBLE32 MM

GEAR BOX LT

EXTENTION SHAFT G.B.OUT TO WHEEL


IN COUPLING LHG107
EXTENTION SHAFT MOTOR TO G.B. IN
COUPLING LHG103

GEAR BOX LT

GEAR BOX INPUT SHAFT COUPLING


LHG103
GEAR BOX OUT PUT SHAFT COUPLING
LHG107
WHEEL INPUT SHAFT COUPLING
LHG107
EXTENTION SHAFT G.B.OUT TO WHEEL
IN COUPLING LHG107
EXTENTION SHAFT MOTOR TO G.B. IN
COUPLING LHG103
GEAR BOX CT

G.B. OUT PUT SHAFT BOTH SIDE


COUPLING LHG107
WHEEL INPUT SHAFT COUPLING
LHG107
EXTENTION SHAFT GEAR BOX O/P TO
WHEEL I/P BOTH SIDE LHG-107

G.B. IN PUT SHAFT COUPLINGLHG103

EXTENTION SHAFT MOTOR SIDE


COUPLINGLHG102
EXTENTION SHAFT GEAR BOX SIDE
COUPLINGLHG-103
EXTENTION SHAFT (MOTOR OUT
G.B.INPUT) COUPLING LHG103
GEAR BOX AUX HOIST WITH DRUM20 T
HOIST

20T CRANE TOP PULLEY ASSEMBLEY

20T PULLEY BLOCK WITH HOOK

SFU, 1000 A

MAIN POWER CONTACTOR

PHASE INDICATION LAMP


CURRENT TRANSFORMER

CONTROL TRANSFORMER

HMH CRANE DOOR Limit Switch

Motor Windings

Slip Rings

Resistance Box
Carbon Brush

Terminal Box

SFU, 400 A

Power Contactor (Hoist and Lower)

Resistance Contactor (Hoist and Lower)

Stator Overload Relay with Kit


Rotor Overload Relay with Kit

Electronic Timer ON / OFF Delay

Rotary Limit Switch

Main Hoist Gravity Limit Switch

Main Hoist Master Controller Joystic

Thruster brake 1 Power Contactor

Thruster brake 1 Overload Relay

Thrustor Motor
Brake Shoe and Liner

Thruster brake 2 Power Contactor

Thruster brake 2 Overload Relay

Thrustor Motor

Brake Shoe and Liner


Motor Windings

Slip Rings

Resistance Box

Carbon Brush

Terminal Box

SFU, 160 A
Power Contactor (Hoist and Lower)

Resistance Contactor (Hoist and Lower)

Stator Overload Relay

Rotor Overload Relay

Electronic Timer ON / OFF Delay

Rotary Limit Switch

AH Gravity Limit Switch

AH Master Controller Joystic


Thruster brake 1 Power Contactor

Thruster brake 1 Overload Relay

Thrustor Motor

Brake Shoe and Liner

Thruster brake 2 Power Contactor


Thruster brake 2 Overload Relay

Thrustor Motor

Brake Shoe and Liner

Motor Windings LT 1

Slip Rings LT 1
Motor Windings LT 2

Slip Rings LT 2

Slip Rings CT

Resistance Box LT 1

Resistance Box LT 2
Resistance Box CT

Carbon Brush LT1

Carbon Brush LT2

Carbon Brush CT

Terminal Box LT1

Terminal Box LT2

Terminal Box CT
LT SFU, 160 A

Power Contactor LT1 (Forward & Reverse)

Power Contactor LT2 (Forward & Reverse)

Resistance Contactor LT1 (Forward &


Reverse)
Resistance Contactor LT2 (Forward &
Reverse)

Stator Overload Relay LT1

Rotor Overload Relay LT1

Rotor Overload Relay LT2

Stator Overload Relay LT2

Electronic Timer ON / OFF Delay

Lever type LT Forward / Reverse Limit


Switch

CT SFU, 63 A
Power Contactor CT (Forward & Reverse)

Resistance Contactor CT (Forward &


Reverse)

Rotor Overload Relay CT

Stator Overload Relay CT

Electronic Timer ON / OFF Delay

Lever type CT Forward / Reverse Limit


Switch

CT Master Controller Joystick


Thruster brake Power Contactor

Thruster brake Overload Relay

Thrustor Motor LT1

Thruster brake Power Contactor

Thruster brake Overload Relay


Thrustor Motor LT2

Thruster brake Power Contactor

Thruster brake Overload Relay

Brake Shoe and Liner LT1

Brake Shoe and Liner LT2


Thruster brake Power Contactor

Thruster brake Overload Relay

Thrustor Motor CT

Brake Shoe and Liner CT


TOOLS
DESCRIPTION / DIMENSION
REQUIRED

CHECK FOR CRAKS AND DAMAGE IN SHAFT VISUAL

CHECK FOR CRAKS AND DAMAGE IN SHAFT


VISUAL
AND BODY

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR CRACKS AND DAMAGE VISUAL

CHECK FOR BASE WELDING CONDITION VISUAL

CHECK FOR INTERNAL GEAR DAMAGES BY


SPANNERS
OPENING TOP COVER

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR INTERNAL GEAR DAMAGES BY


SPANNERS
OPENING TOP COVER

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL


CHECK FOR INTERNAL GEAR DAMAGES BY
SPANNERS
OPENING TOP COVER

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR INTERNAL GEAR DAMAGES BY


SPANNERS
OPENING TOP COVER

CHECK FOR PHYSICAL DAMAGE VISUAL

CHECK FOR PHYSICAL DAMAGE VISUAL

VISUAL /
Check for fuse rating and continuity of input /
MULTIMETE
output terminals.
R

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Check for indication of input voltage of the


VISUAL
panel.
Check for tighteness of connections and measure
VISUAL
the correct current shown in the meter.

To check for connections and power rating of


Spanners /
transformer. Input and output voltage should be
Multimeter
415 / 110 VAC

VISUAL /
Check for switching NO / NC Contact as per set
MULTIMETE
value during Crane operation.
R

To form magnetic field when energized with Megger &


current to produce torque. Multimeter

To allow the transmission of power and electrical


signals from a stationary to a rotating structure.
It can be used in any electromechanical system Visual
that requires rotation while transmitting power
or signals.

To check for multiple resistors hooked up to one


or multiple switches and is designed to provide
Megger &
multiple electrical resistances. To vary desired
Multimeter
speed by varying the resistances. Also, to provide
initial torque to the motor.
To conduct current between stationary wires and
moving parts, most commonly in a rotating Visual
shaft.

Allows the power cable to be fixed with the


motor windings cable properly insulated,
clamped and sealed connector to provide greater
Spanners
protecton from short circuiting of cables.
Check for cable termination tighteness and
properly glanding done.

VISUAL /
Check for fuse rating and continuity of input /
MULTIMETE
output terminals.
R

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.
Check for overload relay range and setting of
Visual
relay current for motor tripping.

Check for Timer ON / OFF switching as per set


Visual
value.

VISUAL /
Check for switching NO / NC Contact as per set
MULTIMETE
value during hoisting and lowering operation.
R

VISUAL /
Check for switching NO / NC Contact as per set
MULTIMETE
value during hoisting operation.
R

Check for switching NO / NC Contact as per set VISUAL /


value during hoisting operation. Check for wear MULTIMETE
and tear of contacts. R

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

To drive the pump and delivers working fluid


under the piston axially in the guided path, and
Megger &
delivers thrust or force required to operate the
Multimeter
attached devise (like thruster brake) via the
piston rod and the eye-lug attached to it.
Spanners,
Screw Driver,
To provide friction for braking of rotary drum
Plier, Vernier
when motor is stopped.
Calliper
Visual

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

To drive the pump and delivers working fluid


under the piston axially in the guided path, and
Megger &
delivers thrust or force required to operate the
Multimeter
attached devise (like thruster brake) via the
piston rod and the eye-lug attached to it.

Spanners,
Screw Driver,
To provide friction for braking of rotary drum
Plier, Vernier
when motor is stopped.
Calliper
Visual
To form magnetic field when energized with Megger &
current to produce torque. Multimeter

To allow the transmission of power and electrical


signals from a stationary to a rotating structure.
It can be used in any electromechanical system Visual
that requires rotation while transmitting power
or signals.

To check for multiple resistors hooked up to one


or multiple switches and is designed to provide
Megger &
multiple electrical resistances. To vary desired
Multimeter
speed by varying the resistances. Also, to provide
initial torque to the motor.

To conduct current between stationary wires and


moving parts, most commonly in a rotating Visual
shaft.

Allows the power cable to be fixed with the


motor windings cable properly insulated,
clamped and sealed connector to provide greater
Spanners
protecton from short circuiting of cables.
Check for cable termination tighteness and
properly glanding done.

VISUAL /
Check for fuse rating and continuity of input /
MULTIMETE
output terminals.
R
Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

Check for overload relay range and setting of Megger &


relay current for motor tripping. Multimeter

Check for Timer ON / OFF switching as per set


Visual
value.

VISUAL /
Check for switching NO / NC Contact as per set
MULTIMETE
value during hoisting and lowering operation.
R

VISUAL /
Check for switching NO / NC Contact as per set
MULTIMETE
value during hoisting operation.
R

Check for switching NO / NC Contact as per set VISUAL /


value during hoisting operation. Check for wear MULTIMETE
and tear of contacts. R
Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

To drive the pump and delivers working fluid


under the piston axially in the guided path, and
Megger &
delivers thrust or force required to operate the
Multimeter
attached devise (like thruster brake) via the
piston rod and the eye-lug attached to it.

Spanners,
Screw Driver,
To provide friction for braking of rotary drum
Plier, Vernier
when motor is stopped.
Calliper
Visual

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter
Check for overload relay range and setting of
Visual
relay current for motor tripping.

To drive the pump and delivers working fluid


under the piston axially in the guided path, and
Megger &
delivers thrust or force required to operate the
Multimeter
attached devise (like thruster brake) via the
piston rod and the eye-lug attached to it.

Spanners,
Screw Driver,
To provide friction for braking of rotary drum
Plier, Vernier
when motor is stopped.
Calliper
Visual

To form magnetic field when energized with Megger &


current to produce torque. Multimeter

To allow the transmission of power and electrical


signals from a stationary to a rotating structure.
It can be used in any electromechanical system Visual
that requires rotation while transmitting power
or signals.
To form magnetic field when energized with Megger &
current to produce torque. Multimeter

To allow the transmission of power and electrical


signals from a stationary to a rotating structure.
It can be used in any electromechanical system Visual
that requires rotation while transmitting power
or signals.

To allow the transmission of power and electrical


signals from a stationary to a rotating structure.
It can be used in any electromechanical system Visual
that requires rotation while transmitting power
or signals.

It is an equipment that contains multiple


resistors hooked up to one or multiple switches
and is designed to provide multiple electrical Megger &
resistances. To vary desired speed by varying the Multimeter
resistances. Also, to provide initial torque to the
motor.

It is an equipment that contains multiple


resistors hooked up to one or multiple switches
and is designed to provide multiple electrical Megger &
resistances. To vary desired speed by varying the Multimeter
resistances. Also, to provide initial torque to the
motor.
It is an equipment that contains multiple
resistors hooked up to one or multiple switches
and is designed to provide multiple electrical Megger &
resistances. To vary desired speed by varying the Multimeter
resistances. Also, to provide initial torque to the
motor.

To conduct current between stationary wires and


moving parts, most commonly in a rotating Visual
shaft.
To conduct current between stationary wires and
moving parts, most commonly in a rotating Visual
shaft.
To conduct current between stationary wires and
moving parts, most commonly in a rotating Visual
shaft.

Allows the power cable to be fixed with the


motor windings cable properly insulated,
clamped and sealed connector to provide greater
Spanners
protecton from short circuiting of cables.
Check for cable termination tighteness and
properly glanding done.

Allows the power cable to be fixed with the


motor windings cable properly insulated,
clamped and sealed connector to provide greater
Spanners
protecton from short circuiting of cables.
Check for cable termination tighteness and
properly glanding done.

Allows the power cable to be fixed with the


motor windings cable properly insulated,
clamped and sealed connector to provide greater
Spanners
protecton from short circuiting of cables.
Check for cable termination tighteness and
properly glanding done.
VISUAL /
Check for fuse rating and continuity of input /
MULTIMETE
output terminals.
R

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter
Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

Check for overload relay range and setting of Megger &


relay current for motor tripping. Multimeter

Relays are protective devices that are designed to


cut power if the motor draws too much current Visual
for an extended period of time.

Relays are protective devices that are designed to


cut power if the motor draws too much current Visual
for an extended period of time.

Check for Timer ON / OFF switching as per set


Visual
value.

VISUAL /
Check for switching NO / NC Contact as per set
MULTIMETE
value during hoisting operation.
R

VISUAL /
Check for fuse rating and continuity of input /
MULTIMETE
output terminals.
R
Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Spanners,
For switching a power circuit with higher current Screw Drivers,
ratings Allen Key,
Multimeter

Relays are protective devices that are designed to


cut power if the motor draws too much current Visual
for an extended period of time.

Relays are protective devices that are designed to


cut power if the motor draws too much current Visual
for an extended period of time.

Check for Timer ON / OFF switching as per set


Visual
value.

VISUAL /
Check for switching NO / NC Contact as per set
MULTIMETE
value during hoisting operation.
R

Check for switching NO / NC Contact as per set VISUAL /


value during hoisting operation. Check for wear MULTIMETE
and tear of contacts. R
Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

To drive the pump and delivers working fluid


under the piston axially in the guided path, and
Megger &
delivers thrust or force required to operate the
Multimeter
attached devise (like thruster brake) via the
piston rod and the eye-lug attached to it.

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.
To drive the pump and delivers working fluid
under the piston axially in the guided path, and
Megger &
delivers thrust or force required to operate the
Multimeter
attached devise (like thruster brake) via the
piston rod and the eye-lug attached to it.

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

Spanners,
Screw Driver,
To provide friction for braking of rotary drum
Plier, Vernier
when motor is stopped.
Calliper
Visual

Spanners,
Screw Driver,
To provide friction for braking of rotary drum
Plier, Vernier
when motor is stopped.
Calliper
Visual
Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance of
Allen Key,
the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

To drive the pump and delivers working fluid


under the piston axially in the guided path, and
Megger &
delivers thrust or force required to operate the
Multimeter
attached devise (like thruster brake) via the
piston rod and the eye-lug attached to it.

Spanners,
Screw Driver,
To provide friction for braking of rotary drum
Plier, Vernier
when motor is stopped.
Calliper
Visual
date

TYPE OF CHECK
(RUN CHECK /
IDEAL CONDITION
STOP CHECK /
SHUTDOWN)

NO CRACKS AND
STOP CHECK
DAMAGE

NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE

NO CRACKS AND
STOP CHECK
DAMAGE

NO CRACKS AND
STOP CHECK
DAMAGE
NO DAMAGES IN GEAR
STOP CHECK
TEETHS
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO DAMAGES IN GEAR
STOP CHECK
TEETHS
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO DAMAGES IN GEAR
STOP CHECK
TEETHS
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE
NO DAMAGES IN GEAR
STOP CHECK
TEETHS
NO CRACKS AND
STOP CHECK
DAMAGE
NO CRACKS AND
STOP CHECK
DAMAGE

SFU Unit should be clean.


SHUTDOWN Check for fuse taing and
CHECK continuity of fuse input /
output terminals.

Contactor rating to be
3TF68, 630 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Indication lamp should


RUN CHECK indicate input phase voltage
of HMH crane.
CT connections should be
tight and should measure
RUN CHECK
current accurately on the
ammeter.

Control transformer
SHUTDOWN connections should be tight.
CHECK Input and output voltage
should be 415 / 110 VAC

HMH Crane should stop


RUN CHECK during operation when limit
switch operated.

Winding Resistances should


be balanced of all three
phases, i.e., less than 1
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Should be uniform
throughout surface without
SHUTDOWN
wear and cuts. Slip ring
CHECK
should be 10mm. It should
not less than 2mm.

Condition of the resistance


plates should be good and
the values of the resistance
SHUTDOWN box should match with rotor
CHECK rating plate.
Power = 110 KW
Rotor Voltage = 388V AC
Rotor Current = 172A
Thickness and smooth
SHUTDOWN surface at the contact with
CHECK the slipring. No wear and
tear.

SHUTDOWN Tightened with 10mm


CHECK Chrome Vanadium Bolts.

SFU Unit should be clean.


SHUTDOWN Check for fuse taing and
CHECK continuity of fuse input /
output terminals.

Contactor rating to be
3TF56, 400 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Contactor rating to be
3TF53, 205 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(160 - 250)A
RUN CHECK
Relay settings = 160A
FLC = 172A
Relay Range :
(160 - 250)A
RUN CHECK
Relay settings = 200A
FLC = 209A
Timer should change its
RUN CHECK contact NO / NC as per time
set. Time set 1 sec
Main Hoist Motor should
stop running during
RUN CHECK
hoisting and lowering
operation.

Main Hoist Motor should


RUN CHECK stop running during
hoisting operation.

Master controller
connections should be tight
RUN CHECK
and contacts should be
healthy.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(1 - 1.6)A
RUN CHECK
Relay settings = 1.4A
FLC = 1.0A

Winding Resistances should


be balanced of all three
phases, i.e., less than 10
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.
Check for proper allignment
of both sides brake shoes.
Thickness of Brake liner is
SHUTDOWN
12mm. It should not be less
CHECK
than 9 mm. If it is less, then
it should go for
replacement.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(1 - 1.6)A
RUN CHECK
Relay settings = 1.4A
FLC = 1.0A

Winding Resistances should


be balanced of all three
phases, i.e., less than 10
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Check for proper allignment


of both sides brake shoes.
Thickness of Brake liner is
SHUTDOWN
12mm. It should not be less
CHECK
than 9 mm. If it is less, then
it should go for
replacement.
Winding Resistances should
be balanced of all three
phases, i.e., less than 1
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Should be uniform
throughout surface without
SHUTDOWN
wear and cuts. Slip ring
CHECK
should be 10mm. It should
not less than 2mm.

Condition of the resistance


plates should be good and
the values of the resistance
SHUTDOWN box should match with rotor
CHECK rating plate.
Power = 37 KW
Rotor Voltage = 335V AC
Rotor Current = 70A

Thickness and smooth


SHUTDOWN
surface at the contact with
CHECK
the slipring.

SHUTDOWN Tightened with 10mm


CHECK Chrome Vanadium Bolts.

SFU Unit should be clean.


SHUTDOWN Check for fuse taing and
CHECK continuity of fuse input /
output terminals.
Contactor rating to be
3TF50, 110 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Contactor rating to be
3TF49, 85 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(70 - 90)A
RUN CHECK
Relay settings = 70A
FLC = 70A
Relay Range :
(70 - 90)A
RUN CHECK
Relay settings = 72A
FLC = 70A
Timer should change its
RUN CHECK contact NO / NC as per time
set. Time set 1 sec
Aux. Hoist Motor should
stop running during
RUN CHECK
hoisting and lowering
operation.
Aux. Hoist Motor should
RUN CHECK stop running during
hoisting operation.
Master controller
connections should be tight
RUN CHECK
and contacts should be
healthy.
Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(1 - 1.6)A
RUN CHECK
Relay settings = 1.4A
FLC = 1.0A

Winding Resistances should


be balanced of all three
phases, i.e., less than 10
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Check for proper allignment


of both sides brake shoes.
Thickness of Brake liner is
SHUTDOWN
10mm. It should not be less
CHECK
than 8 mm. If it is less, then
it should go for
replacement.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.
Relay Range :
(1 - 1.6)A
RUN CHECK
Relay settings = 1.4A
FLC = 1.0A

Winding Resistances should


be balanced of all three
phases, i.e., less than 10
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Check for proper allignment


of both sides brake shoes.
Thickness of Brake liner is
SHUTDOWN
10mm. It should not be less
CHECK
than 8 mm. If it is less, then
it should go for
replacement.

Winding Resistances should


be balanced of all three
phases, i.e., less than 1
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Should be uniform
throughout surface without
SHUTDOWN
wear and cuts. Slip ring
CHECK
should be 8mm. It should
not less than 2mm.
Winding Resistances should
be balanced of all three
phases, i.e., less than 1
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Should be uniform
throughout surface without
SHUTDOWN
wear and cuts. Slip ring
CHECK
should be 8mm. It should
not less than 2mm.

Should be uniform
throughout surface without
SHUTDOWN
wear and cuts. Slip ring
CHECK
should be 8mm. It should
not less than 2mm.

Condition of the resistance


plates should be good and
the values of the resistance
SHUTDOWN box should match with rotor
CHECK rating plate.
Power = 30 KW
Rotor Voltage = 212V AC
Rotor Current = 68.8A

Condition of the resistance


plates should be good and
the values of the resistance
SHUTDOWN box should match with rotor
CHECK rating plate.
Power = 30 KW
Rotor Voltage = 212V AC
Rotor Current = 68.8A
Condition of the resistance
plates should be good and
the values of the resistance
SHUTDOWN box should match with rotor
CHECK rating plate.
Power = 15 KW
Rotor Voltage = 218V AC
Rotor Current = 46.5A

Thickness and smooth


SHUTDOWN
surface at the contact with
CHECK
the slipring.
Thickness and smooth
SHUTDOWN
surface at the contact with
CHECK
the slipring.
Thickness and smooth
SHUTDOWN
surface at the contact with
CHECK
the slipring.

SHUTDOWN Tightened with 10mm


CHECK Chrome Vanadium Bolts.

SHUTDOWN Tightened with 10mm


CHECK Chrome Vanadium Bolts.

SHUTDOWN Tightened with 10mm


CHECK Chrome Vanadium Bolts.
SFU Unit should be clean.
SHUTDOWN Check for fuse taing and
CHECK continuity of fuse input /
output terminals.

Contactor rating to be
3TF50, 110 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Contactor rating to be
3TF50, 110 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Contactor rating to be
3TF49, 85 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.
Contactor rating to be
3TF49, 85 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(50 - 63)A
RUN CHECK
Relay settings = 58A
FLC = 58.4A
Relay Range :
(63-80)A
RUN CHECK
Relay settings = 68A
FLC = 68.5A
Relay Range :
(63-80)A
Run check
Relay settings = 68A
FLC = 68.5A
Relay Range :
(50 - 63)A
Run check
Relay settings = 58A
FLC = 58.4A
Timer should change its
RUN CHECK contact NO / NC as per time
set. Time set 1 sec
Motor should stop running
RUN CHECK during limit switch
operation.

SFU Unit should be clean.


SHUTDOWN Check for fuse taing and
CHECK continuity of fuse input /
output terminals.
Contactor rating to be
3TF47, 63 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Contactor rating to be
3TF47, 63 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(40 - 57)A
Run check
Relay settings = 46A
FLC = 46.5A
Relay Range :
(25 - 40)A
Run check
Relay settings = 25A
FLC = 30.85A
Timer should change its
RUN CHECK contact NO / NC as per time
set. Time set 1 sec
Motor should stop running
RUN CHECK during limit switch
operation.
Master controller
connections should be tight
RUN CHECK
and contacts should be
healthy.
Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(0.4 - 0.63 ) A
RUN CHECK
Relay settings = 0.8A
FLC = 0.6A

Winding Resistances should


be balanced of all three
phases, i.e., less than 10
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(0.4 - 0.63 ) A
RUN CHECK
Relay settings = 0.8A
FLC = 0.6A
Winding Resistances should
be balanced of all three
phases, i.e., less than 10
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(0.4 - 0.63 ) A
RUN CHECK
Relay settings = 0.8A
FLC = 0.6A

Check for proper allignment


of both sides brake shoes.
Thickness of Brake liner is
SHUTDOWN
8mm. It should not be less
CHECK
than 6 mm. If it is less, then
it should go for
replacement.

Check for proper allignment


of both sides brake shoes.
Thickness of Brake liner is
SHUTDOWN
8mm. It should not be less
CHECK
than 6 mm. If it is less, then
it should go for
replacement.
Contactor rating to be
3TF31, 12 A. Proper
tighteness of foundation of
contactor.
SHUTDOWN
No abnormalities to be seen
CHECK
for the contacts and proper
fitting to be done.
Coil resistance should be
20-30 ohms.

Relay Range :
(0.4 - 0.63 ) A
RUN CHECK
Relay settings = 0.8A
FLC = 0.6A

Winding Resistances should


be balanced of all three
phases, i.e., less than 10
SHUTDOWN
ohms.
CHECK
Megger values shouldbe
above 5 megaohms from all
three phases to ground.

Check for proper allignment


of both sides brake shoes.
Thickness of Brake liner is
SHUTDOWN
8mm. It should not be less
CHECK
than 6 mm. If it is less, then
it should go for
replacement.
17.04.2018

ACTUAL CONDITION
ACTION REQUIRED
OBSERVED

no cracks

top pully groove damaged top pulley to be changed

pulley damaged from side Snatch box pully to be replaced

no damage

J-hook getting rotated from its


position , locking arrangement J-hook to be replaced
damaged

no damage

no damage
SFU Unit is clean. Fuse taing and
continuity of fuse input / output
terminals are normal

Contactor rating is 3TF68, 630 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 30 ohms.

Indication lamp indicates input


phase voltage of HMH crane.
CT connections are tight and display
accurate current on the ammeter.

Control transformer connections are


tight. Input and output voltage
measured is 415 / 110 VAC

HMH Crane stop during operation


when limit switch operated.

No abnormal difference in winding


resistances.
Winding resistances of all three are
0.5 ohms. Megger values are 1000
mega ohms phase to ground and are
in healthy condition.

Throughout Smooth surface of the


ring inspected. Thickness 8mm.

Condition of the resistance plates


and resistance values are in healthy
condition.
Power = 110 KW
Rotor Voltage = 388V AC
Rotor Current = 172A
Throughout Smooth surface and
thickness of the ring seen visually.

No looseness of 10mm Chrome


Vanadium bolts and connecting
links.

SFU Unit is clean. Fuse taing and


continuity of fuse input / output
terminals are normal

Contactor rating is 3TF56, 400 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Contactor rating is 3TF53, 205 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(160 - 250)A
Relay settings = 160A
RC = 95A
Relay Range :
(160 - 250)A
Relay settings = 200A
RC = 145A

Timer change its contact NO / NC as


per time set. Time set 1 sec

Main Hoist Motor stop running


during hoisting and lowering
operation.

Main Hoist Motor stop running


during hoisting operation.

Master controller connections are


tight and contacts are healthy.

Contactor rating is 3TF31, 12 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(1 - 1.6)A
Relay settings = 1.4A
RC = 1.2A

No abnormal difference in winding


resistances.
Winding resistances of all three are 9
ohms. Megger values are 1000 mega
ohms phase to ground and are in
healthy condition.
No any abnormalities found in the
allignment of brake shoe and
decaying of liner. Condition of the
revit is checked weekly which is fitted
4mm gap from liner.

Contactor rating is 3TF31, 12 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(1 - 1.6)A
Relay settings = 1.4A
RC = 0.8A

No abnormal difference in winding


resistances.
Winding resistances of all three are 9
ohms. Megger values are 1000 mega
ohms phase to ground and are in
healthy condition.

No any abnormalities found in the


allignment of brake shoe and
decaying of liner. Condition of the
revit is checked weekly which is fitted
4mm gap from liner.
No abnormal difference in winding
resistances.
Winding resistances of all three are
0.9 ohms. Megger values are 800
mega ohms phase to ground and are
in healthy condition.

Throughout Smooth surface of the


ring inspected. Thickness 8mm.

Condition of the resistance plates


and resistance values are in healthy
condition.
Power = 37 KW
Rotor Voltage = 335V AC
Rotor Current = 70A

Throughout Smooth surface and


thickness of the ring seen visually.

No looseness of 10mm Chrome


Vanadium bolts and connecting
links.

SFU Unit is clean. Fuse taing and


continuity of fuse input / output
terminals are normal
Contactor rating is 3TF50, 110 A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 28 ohms.

Contactor rating is 3TF49, 85 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 29 ohms.

Relay Range :
(70 - 90)A
Relay settings = 70A
RC = 39A
Relay Range :
(70 - 90)A
Relay settings = 72A
RC = 41.2A

Timer change its contact NO / NC as


per time set. Time set 1 sec

Aux. Hoist Motor stop running


during hoisting and lowering
operation.

Aux. Hoist Motor stop running


during hoisting operation.

Master controller connections are


tight and contacts are healthy.
Contactor rating is 3TF31, 12 A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(1 - 1.6)A
Relay settings = 1.4A
RC = 1.2A

No abnormal difference in winding


resistances.
Winding resistances of all three are
8.2 ohms. Megger values are 800
mega ohms phase to ground and are
in healthy condition.

No any abnormalities found in the


allignment of brake shoe and
decaying of liner. Condition of the
revit is checked weekly which is fitted
4mm gap from liner.

Contactor rating is 3TF31, 12 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.
Relay Range :
(1 - 1.6)A
Relay settings = 1.4A
RC = 1.2A

No abnormal difference in winding


resistances.
Winding resistances of all three are
8.2 ohms. Megger values are 800
mega ohms phase to ground and are
in healthy condition.

No any abnormalities found in the


allignment of brake shoe and
decaying of liner. Condition of the
revit is checked weekly which is fitted
4mm gap from liner.

No abnormal difference in winding


resistances.
Winding resistances of all three are
0.93 ohms. Megger values are 800
mega ohms phase to ground and are
in healthy condition.

Throughout Smooth surface of the


ring inspected. Thickness 6mm.
No abnormal difference in winding
resistances.
Winding resistances of all three are
0.95 ohms. Megger values are 800
mega ohms phase to ground and are
in healthy condition.

Throughout Smooth surface of the


ring inspected. Thickness 6mm.

Throughout Smooth surface of the


ring inspected. Thickness 6mm.

Condition of the resistance plates


and resistance values are in healthy
condition.
Power = 30 KW
Rotor Voltage = 212V AC
Rotor Current = 68.8A

Condition of the resistance plates


and resistance values are in healthy
condition.
Power = 30 KW
Rotor Voltage = 212V AC
Rotor Current = 68.8A
Condition of the resistance plates
and resistance values are in healthy
condition.
Power = 15 KW
Rotor Voltage = 218V AC
Rotor Current = 46.5A

Throughout Smooth surface and


thickness of the ring seen visually.

Throughout Smooth surface and


thickness of the ring seen visually.

Throughout Smooth surface and


thickness of the ring seen visually.

No looseness of 10mm Chrome


Vanadium bolts and connecting
links.

No looseness of 10mm Chrome


Vanadium bolts and connecting
links.

No looseness of 10mm Chrome


Vanadium bolts and connecting
links.
SFU Unit is clean. Fuse taing and
continuity of fuse input / output
terminals are normal

Contactor rating is 3TF50, 110 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 28 ohms.

Contactor rating is 3TF50, 110 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 28 ohms.

Contactor rating is 3TF49, 85 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 29 ohms.
Contactor rating is 3TF49, 85 A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 29 ohms.

Relay Range :
(50 - 63)A
Relay settings = 58A
RC = 36A
Relay Range :
(63-80)A
Relay settings = 68A
RC = 36.5A
Relay Range :
(63-80)A
Relay settings = 68A
RC = 36.5A
Relay Range :
(50 - 63)A
Relay settings = 58A
RC = 36A

Timer change its contact NO / NC as


per time set. Time set 1 sec

Motor stop running during limit


switch operation.

SFU Unit is clean. Fuse taing and


continuity of fuse input / output
terminals are normal
Contactor rating is 3TF47, 63 A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 28 ohms.

Contactor rating is 3TF47, 63 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 29 ohms.

Relay Range :
(40 - 57)A
Relay settings = 46A
RC = 25A
Relay Range :
(25 - 40)A
Relay settings = 25A
RC = 19A

Timer change its contact NO / NC as


per time set. Time set 1 sec

Motor stop running during limit


switch operation.

Master controller connections are


tight and contacts are healthy.
Contactor rating is 3TF31, 12 A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(0.4 - 0.63 ) A
Relay settings = 0.8A
RC = 0.6A

No abnormal difference in winding


resistances.
Winding resistances of all three are 9
ohms. Megger values are 800 mega
ohms phase to ground and are in
healthy condition.

Contactor rating is 3TF31, 12 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(0.4 - 0.63 ) A
Relay settings = 0.8A
RC = 0.6A
No abnormal difference in winding
resistances.
Winding resistances of all three are 9
ohms. Megger values are 800 mega
ohms phase to ground and are in
healthy condition.

Contactor rating is 3TF31, 12 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(0.4 - 0.63 ) A
Relay settings = 0.8A
RC = 0.6A

No any abnormalities found in the


allignment of brake shoe and
decaying of liner. Condition of the
revit is checked weekly which is fitted
4mm gap from liner.

No any abnormalities found in the


allignment of brake shoe and
decaying of liner. Condition of the
revit is checked weekly which is fitted
4mm gap from liner.
Contactor rating is 3TF31, 12 A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 25 ohms.

Relay Range :
(0.4 - 0.63 ) A
Relay settings = 0.8A
RC = 0.6A

No abnormal difference in winding


resistances.
Winding resistances of all three are 9
ohms. Megger values are 800 mega
ohms phase to ground and are in
healthy condition.

No any abnormalities found in the


allignment of brake shoe and
decaying of liner. Condition of the
revit is checked weekly which is fitted
4mm gap from liner.
CONDITION APPR

EQUIPMENT: Sub Equipments COMPONENT

BF3-RMHS-C7 Head Drum HEAD DRUM BEARING

BF3-RMHS-C7 Head Drum PLUMMER BLOCK FOR HEAD DRUM

BF3-RMHS-C7 Head snub pulley HEAD END SNUB PULLEY BEARING

BF3-RMHS-C7 Head snub pulley PLUMMER BLOCK FOR HEAD END SNUB PULLEY

BF3-RMHS-C7 GTU BEND PULLEY GTU BEND PULLEY BEARING

BF3-RMHS-C7 GTU BEND PULLEY PLUMMER BLOCK FOR GTU BEND PULLEY

BF3-RMHS-C7 GTU BEND PULLEY GTU BEND PULLEY#2 BEARING

BF3-RMHS-C7 GTU BEND PULLEY PLUMMER BLOCK FOR GTU BEND PULLEY#2

BF3-RMHS-C7 GTU PULLEY GTU PULLEY BEARING

BF3-RMHS-C7 GTU PULLEY PLUMMER BLOCK FOR GTU PULLEY

BF3-RMHS-C7 PRESS DRUM BEARING FOR PRESS DRUM 22312

BF3-RMHS-C7 PRESS DRUM PLUMMER BLOCK FOR PRESS DRUM

BF3-RMHS-C7 TAIL DRUM TAIL DRUM BEARING


BF3-RMHS-C7 TAIL DRUM PLUMMER BLOCK FOR TAIL DRUM

BF3-RMHS-C7 PRESS PULLEY TEND PRESS PULLEY BEARING

BF3-RMHS-C7 INPUT COUPLING TEFLON BUSH - COUPLING PIN

BF3-RMHS-C7 INPUT COUPLING INPUT COUPLING SPIDER OF CONVEYOR 7 -BF3

BF3-RMHS-C7 INPUT COUPLING COUPLING, YOX II Z 500

BF3-RMHS-C7 OUTPUT COUPLING OUTPUT COUPLING

BF3-RMHS-C7 OUTPUT COUPLING Pin bush for coupling

BF3-RMHS-C7 GEARBOX GEAR BOX

RMHS CB#7
BF3-RMHS-C7 RMHS CB#7 Motor Windings
MOTOR DRIVE 1

RMHS CB#7
BF3-RMHS-C7 RMHS CB#7 Terminal Box
MOTOR DRIVE 1
BF3-RMHS-C7 RMHS CB#7 Soft Starter

RMHS CB#7 BELT


PANEL DRIVE 1

BF3-RMHS-C7 RMHS CB#7 Power Contactor

BF3-RMHS-C7 Speed sensor probe

ZERO SPEED
SWITCH
BF3-RMHS-C7 Zero speed device
BF3-RMHS-C7 BELT SWAY BELT SWAY SWITCH

BF3-RMHS-C7 PULL CORD PULL CORD SWITCH

RMHS CB#7
BF3-RMHS-C7 RMHS CB#7 Motor Windings
MOTOR DRIVE 2

RMHS CB#7
BF3-RMHS-C7 RMHS CB#7 Terminal Box
MOTOR DRIVE 2
BF3-RMHS-C7 RMHS CB#7 Soft Starter

RMHS CB#7 BELT


PANEL DRIVE 2

BF3-RMHS-C7 RMHS CB#7 Power Contactor

Command and Feed back cable

Relay

BF3-RMHS-C7
DI ,DOCard,PLC , IM modules

SMPS

Profibus Cable
CONDITION APPRAISAL OF CONVEYOR CB#7 (BF3-RMHS-C7)

Item Code SPECIFICATION DESCRIPTION / DIMENSION

0921020076 /BEARING,ROLLER,22232 CHECK FOR BEARING CLEARANCE


CA/W33

0941010128 (PLUMMER BLOCK CNVYR CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
DRUM-TYPE 2, SL NO 1, OF
DRAWING 2220-02404 B)
0921020062 CHECK FOR BEARING CLEARANCE
22224 CA/W33

(PLUMMER BLOCK
5231990093 F/DRUM OF CONVEYOR-SL CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
NO 8, OF DRAWING 2220-
02404 B)
0901020009 CHECK FOR BEARING CLEARANCE
/BEARING BALL 1316

(PLUMMER BLOCK
5231990088 F/DRUM OF CONVEYOR-SL CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
NO 3, OF DRAWING 2220-
02404 B)
CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS

0921010008 CHECK FOR BEARING CLEARANCE


/BEARING BALL 21316

(PLUMMER BLOCK
5231990088 F/DRUM OF CONVEYOR-SL CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
NO 3, OF DRAWING 2220-
02404 B)
0921030052 CHECK FOR BEARING CLEARANCE

(PLUMMER BLOCK
5231990094 F/DRUM OF CONVEYOR-SL CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
NO 9, OF DRAWING 2220-
02404 B)
0921020062 CHECK FOR BEARING CLEARANCE
22224 CA
(PLUMMER BLOCK
5231990093 F/DRUM OF CONVEYOR-SL CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
NO 8, OF DRAWING 2220-
02404 B)
/
0921030052 BEARING,22312,SPHERICA CHECK FOR BEARING CLEARANCE
L ROLLER

Ø40XL64-SP, PIN FOR


0806990036 OUTPUT COUPLING OF CHECK FOR BUSH WEAR AND DAMAGE
CONVEYOR GEAR BOX AS
PER DRG NO 2220-
01697B
0804990109 CHECK FOR SPIDER WEAR AND DAMAGE

ф75 ф55 Z0110101176,


0804090056
TYPE: FLUID INPUT SPIDER CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
COUPLING.
0804030060 CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
( UB630)
CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
UB 630
CHECK FOR PHYSICAL DAMAGE AND BOLTS TIGHTNESS
ZSY400-40-IV (90 KW)

To form magnetic field when energized with


current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor
To drive the motor smoothly without inrush
flow of current during starting.

Check for contactor rating and tighteness of


contactor terminals. Check for coil
resistance of the contactor.

To detect the speed of the conveyor and


provides a pulse to the zero speed switch.

To detect the stoppage or unacceptably slow


movement of a rotating conveyor tail end
pulley.
For detecting the sway or deviation of belt
conveyors, and sends out an alarm signal
and an emergency stop signal.
Suited to be used for belt breakage and
materials falling prevention due to the belt
sway.

Check rope when operated for safety


tripping switch for conveyor belts. When the
rope is pulled the lever of the pc unit is
operated which in turn, actuates a switch,
thereby the conveyor is stopped.

To form magnetic field when energized with


current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor
To drive the motor smoothly without inrush
flow of current during starting.

Check for contactor rating and tighteness of


contactor terminals. Check for coil
resistance of the contactor.

checking healthyness by Run the Belt


Conveyor

checking healthyness by operating DOL


starter of conveyor.

checking healthyness by operating DOL


starter of conveyor/ by activating pull cord,
BSS, ZSS and LCS Box.

check supply voltage and output Voltage

checking healthyness by operating valve.


TYPE OF CHECK
(RUN CHECK / STOP
TOOLS REQUIRED IDEAL CONDITION
CHECK /
SHUTDOWN)
SPANNERS AND FILLER STOP CHECK CLEARANCE <0.70MM
GAUGE

NO PHYSICAL DAMAGE AND BOLTS


SPANNERS STOP CHECK SHOULD NOT BE RUSTED

SPANNERS AND FILLER STOP CHECK CLEARANCE <0.70MM


GAUGE

NO PHYSICAL DAMAGE AND BOLTS


SPANNERS STOP CHECK SHOULD NOT BE RUSTED

SPANNERS AND FILLER STOP CHECK CLEARANCE <0.50MM


GAUGE

NO PHYSICAL DAMAGE AND BOLTS


SPANNERS STOP CHECK SHOULD NOT BE RUSTED

SPANNERS AND FILLER STOP CHECK CLEARANCE <0.70MM


GAUGE
NO PHYSICAL DAMAGE AND BOLTS
SPANNERS STOP CHECK SHOULD NOT BE RUSTED
SPANNERS AND FILLER STOP CHECK CLEARANCE <0.50MM
GAUGE

NO PHYSICAL DAMAGE AND BOLTS


SPANNERS STOP CHECK SHOULD NOT BE RUSTED

SPANNERS AND FILLER STOP CHECK CLEARANCE <0.70MM


GAUGE

NO PHYSICAL DAMAGE AND BOLTS


SPANNERS STOP CHECK SHOULD NOT BE RUSTED

SPANNERS AND FILLER STOP CHECK CLEARANCE <0.70MM


GAUGE
NO PHYSICAL DAMAGE AND BOLTS
SPANNERS STOP CHECK SHOULD NOT BE RUSTED

SPANNERS AND FILLER STOP CHECK CLEARANCE <0.70MM


GAUGE

SPANNERS STOP CHECK NO WEAR AND DAMAGE

SPANNERS STOP CHECK NO WEAR AND DAMAGE

SPANNERS STOP CHECK NO DAMAGE

SPANNERS STOP CHECK NO DAMAGE BOLTS NOT RUSTED

SPANNERS STOP CHECK NO DAMAGE BOLTS NOT RUSTED

SPANNERS STOP CHECK NO DAMAGE BOLTS NOT RUSTED

Winding Resistances
should be balanced of all
three phases, i.e., less
Megger & Shut Down than 1 ohms.
Multimeter check Megger values shouldbe
above 5 megaohms from
all three phases to
ground.

Shut Down Tightened with spanner


Spanners
check set.
To check for power
connections tighteness,
Clamp Meter load monitoring and
Shut Down
Screw Drivers drive cooling fan
check
Visual abnormal sound and
vibration.
Motor FLC = 153 A

Proper tighteness of
foundation of contactor.
Spanners, Screw No abnormalities to be
SHUTDOWN
Drivers, Allen Key, seen for the contacts and
CHECK
Multimeter proper fitting to be done.
Coil resistance should be
42-43 ohms.

To check for continuous


SHUTDOWN
Visual sensing of the speed of
CHECK
the conveyor.

To check for NO - NC
Multimeter, Screw SHUTDOWN contacts through a relay
Driver CHECK according to Time and
Speed adjustable settings.
To check for healthiness
Multimeter, Screw SHUTDOWN
of NO - NC contacts
Driver CHECK
during operation.

To check for healthiness


Multimeter, Screw SHUTDOWN
of NO - NC contacts
Driver CHECK
during operation.

Winding Resistances
should be balanced of all
three phases, i.e., less
Megger & Shut Down than 1 ohms.
Multimeter check Megger values shouldbe
above 5 megaohms from
all three phases to
ground.

Shut Down Tightened with spanner


Spanners
check set.
To check for power
connections tighteness,
Clamp Meter load monitoring and
Shut Down
Screw Drivers drive cooling fan
check
Visual abnormal sound and
vibration.
Motor FLC = 153 A

Proper tighteness of
foundation of contactor.
Spanners, Screw No abnormalities to be
SHUTDOWN
Drivers, Allen Key, seen for the contacts and
CHECK
Multimeter proper fitting to be done.
Coil resistance should be
42-43 ohms.

Physical check or damage


Multimeter,Tester Run check
of cable

Check for healthiness of


Multimeter,Tester Run check NO - NC contacts during
operation.

Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check


ACTUAL CONDITION ACTION REQUIRED
OBSERVED
No abnormal
difference in winding
resistances. Winding
resistance of all three
phases is 1.8 ohms.
Megger values are
1000 mega ohms and
in healthy condition.

No looseness of the
bolts and connecting
links.
Power connections
tighteness on the
drive, load checking
and drive cooling fan
vibration and
abnormal sound
checked. No
abnormalities found.
Running Current =
61.0 A

No looseness in
fitting of contactor
and connection of
cables to power
contactor and its
contacts. Coil
resistance is 42
ohms.

No abnormalities
found in sensing of
speed probe.

No any abnormalities
found in open - close
contacts through
relay during running
of conveyor
according to speed
and time settings.
No abnormalities
found in switching of
contacts during
operation.

No abnormalities
found in switching of
contacts during
operation.

No abnormal
difference in winding
resistances. Winding
resistance of all three
phases is 0.8 ohms.
Megger values are
800 mega ohms and
in healthy condition.

No looseness of the
bolts and connecting
links.
Power connections
tighteness on the
drive, load checking
and drive cooling fan
vibration and
abnormal sound
checked. No
abnormalities found.
Running Current =
100.5 A

No looseness in
fitting of contactor
and connection of
cables to power
contactor and its
contacts. Coil
resistance is 40
ohms.

No abnormalities
found
No abnormalities
found in switching of
contacts during
operation.
No abnormalities
found
No abnormalities
found
No abnormalities
found
EQUIPMENT: Sub Equipments

BF3-BL-BL1
INLET V/V
BF3-BL-BL1

BF3-BL-BL1
ANTI SURGE V/V
BF3-BL-BL1

BF3-BL-BL1
BLEEDER V/V
BF3-BL-BL1

BF3-BL-BL1
OUTLET V/V
BF3-BL-BL1

BF3-BL-BL1
NRV
BF3-BL-BL1

BF3-BL-BL1

BF3-BL-BL1
SNORT V/V

BF3-BL-BL1

BF3-BL-BL1 HEAT EXCHANGER

BF3-BL-BL1
COUPLINGS
BF3-BL-BL1

BF3-BL-BL1 BLOWER EQUIPMENTS

BF3-BL-BL1 BLOWER EQUIPMENTS


COMMISSIONING
BF3-BL-BL1
SPARES
COMMISSIONING
BF3-BL-BL1
SPARES

MAIN MOTOR- BLOWER


BF3-BL-BL1
1

MAIN MOTOR- BLOWER


BF3-BL-BL1
1

MAIN MOTOR- BLOWER


BF3-BL-BL1
1 HT CABLE
MAIN MOTOR- BLOWER
1 HT PANEL
MAIN MOTOR- BLOWER
1 SOFT STARTER PANEL
BF3-BL-BL1

MAIN MOTOR- BLOWER


1 BYPASS BREAKER
PANEL
MAIN MOTOR- BLOWER
1 OUTLET DISCHARGE
VALVE MOTOR
MAIN MOTOR- BLOWER
1 OUTLET DISCHARGE
VALVE MOTOR

MAIN MOTOR- BLOWER


1 OUTLET DISCHARGE
VALVE PANEL

MAIN MOTOR- BLOWER


1 OUTLET DISCHARGE
VALVE PANEL

MAIN MOTOR- BLOWER


1 OUTLET DISCHARGE
VALVE PANEL

MAIN MOTOR- BLOWER


1 INLET VALVE MOTOR

MAIN MOTOR- BLOWER


1 INLET VALVE MOTOR

MAIN MOTOR- BLOWER


1 INLET VALVE PANEL

MAIN MOTOR- BLOWER


1 INLET VALVE PANEL

MAIN MOTOR- BLOWER


1 BLEED VALVE MOTOR
MAIN MOTOR- BLOWER
1 BLEED VALVE MOTOR

MAIN MOTOR- BLOWER


1 BLEED VALVE PANEL

MAIN MOTOR- BLOWER


1 BLEED VALVE PANEL

BLOWER #1 LUBE OIL


PUMP #1 Motor

BLOWER #1 LUBE OIL


PUMP #1 Motor

BLOWER #1 LUBE OIL


PUMP #1 Panel

BLOWER #1 LUBE OIL


PUMP #1 Panel

BLOWER #1 LUBE OIL


PUMP #1 Panel

BLOWER #1 LUBE OIL


PUMP #2 Motor

BLOWER #1 LUBE OIL


PUMP #2 Motor
BLOWER #1 LUBE OIL
PUMP 2 Panel

BLOWER #1 LUBE OIL


PUMP #2 Panel

BLOWER #1 LUBE OIL


PUMP #2 Panel

Blower #1Barring Gear


Motor

Blower #1Barring Gear


Motor

Blower #1Barring Gear

Blower #1Barring Gear


Motor

Blower #1Barring Gear


Panel

BLOWER #1 MOTOR
SPACE HEATER
COMPONENT Item Code SPECIFICATION

INLET VALVE FOR BLOWER DN 1400 (IVC) 5044810037


ACTUATOR FOR INLET VALVE FOR
DN 1400
BLOWER
ANTISURGE VALVE 5044810033 DN 400

ACTUATOR FOR ANTISURGE VALVE DN 400

BLEEDER VALVE FOR BLOWER DN 450 5044810036


ACTUATOR FOR BLEEDER VALVE FOR
DN 450
BLOWER
OUTLET VALVE FOR BLOWER 5044810034 DN 1000
ACTUATOR FOR OUTLET VALVE FOR
BLOWER
NON RETURN VALVE FOR BLOWER 5044810035 DN 1000
ACTUATOR FOR NON RETURN VALVE
FOR BLOWER
SNORT VALVE 5109000051 DN 1000 ASSEMBLY

ACTUATOR FOR SNORT VALVE

GEAR BOX FOR SNORT VALVE ACTUATOR 5088110165

HEAT EXCHANGER FOR BLOWER OIL


COOLING

PIN-BUSH F/BLOWER OUTPUT COUPLING 0804030095 HS6280

PIN-BUSH F/BLOWER INPUT COUPLING 0804030096 HB1520

3WAY VALVE FOR BLOWER OIL STATION 7129030107

BARRING GEAR ASSEMBLY 5961010011


BLOWER BEARING DE

BLOWER BEARING NDE

HT Motor Windings

Terminal Box

HT CABLES

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING
HT PANEL SPACE HEATER

HT PANEL BUSBAR HORIZONTAL AND


VERTICAL INSULATOR

HT BREAKER

HT NUMERICAL PROTECTIVE RELAY


HT CABLES

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTHING

HT PANEL SPACE HEATER


HT PANEL BUSBAR HORIZONTAL AND
VERTICAL INSULATOR

HT SOFTSTARTER

HT NUMERICAL PROTECTIVE RELAY

HT CABLES

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR HORIZONTAL AND


VERTICAL INSULATOR

HT BREAKER
HT NUMERICAL PROTECTIVE RELAY

HT CABLES

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

LT Motor Windings
Terminal Box

Power Contactor

Overload Relay

Internal OPEN / CLOSE Limit Switch 10 A

LT Motor Windings

Terminal Box

Power Contactor

Internal OPEN / CLOSE Limit Switch 10 A

LT Motor Windings
Terminal Box

Power Contactor

Internal OPEN / CLOSE Limit Switch 10 A

LT Motor Windings

Terminal Box

BLOWER #1 LUBE OIL PUMP #1


CONTACTOR

BLOWER #1 LUBE OIL PUMP #1


OVERLOAD RELAY

BLOWER #1 LUBE OIL PUMP #1


AUXILIARY CONTACTOR

LT Motor Windings

Terminal Box
BLOWER #1 LUBE OIL PUMP #2
CONTACTOR

BLOWER #1 LUBE OIL PUMP #2


OVERLOAD RELAY

BLOWER #1 LUBE OIL PUMP #2


AUXILIARY CONTACTOR

LT Motor Windings

Terminal Box

Blower Barring gear Engage /


10 A
Disengage Lever type Limit Switch

BLOWER #1 BARRING GEAR MOTOR


CONTACTOR

BLOWER #1 BARRING GEAR MOTOR


SOFTSTARTER

BLOWER #1 MOTOR SPACE HEATER


CONTACTOR
CONDITION APPRAISAL OF BLOWER#1
TYPE OF CHECK
(RUN CHECK /
DESCRIPTION / DIMENSION TOOLS REQUIRED
STOP CHECK /
SHUTDOWN)
CHECK FOR VALVE BODY AND
SPANNERS STOP CHECK
DISC DAMAGE
CHECK FOR OPERATION OF
VISUAL RUN CHECK
ACTUATOR BY OPERATING
CHECK FOR VALVE BODY AND
SPANNERS STOP CHECK
DISC DAMAGE
CHECK FOR OPERATION OF
VISUAL RUN CHECK
ACTUATOR BY OPERATING
CHECK FOR VALVE BODY AND
SPANNERS STOP CHECK
DISC DAMAGE
CHECK FOR OPERATION OF
VISUAL RUN CHECK
ACTUATOR BY OPERATING
CHECK FOR VALVE BODY AND
SPANNERS STOP CHECK
DISC DAMAGE
CHECK FOR OPERATION OF
VISUAL RUN CHECK
ACTUATOR BY OPERATING
CHECK FOR VALVE BODY AND
SPANNERS STOP CHECK
DISC DAMAGE
CHECK FOR OPERATION OF
VISUAL RUN CHECK
ACTUATOR BY OPERATING
CHECK FOR VALVE BODY AND
SPANNERS STOP CHECK
DISC DAMAGE
CHECK FOR OPERATION OF
VISUAL RUN CHECK
ACTUATOR BY OPERATING
CHECK FOR PHYSICAL DAMAGE
VISUAL STOP CHECK
OF GEARBOX AND BOLTS

CHECK FOR THE PRESSURE AND


TEMPERATURE AT INLET AND VISUAL RUN CHECK
OUTLET OF OIL AND WATER

CHECK FOR PHYSICAL DAMAGE


SPANNERS STOP CHECK
OF COUPLING AND PIN BUSH

CHECK FOR PHYSICAL DAMAGE


SPANNERS STOP CHECK
OF COUPLING AND PIN BUSH
CHECK FOR OPERATION AND
VISUAL RUN CHECK
LEAKAGE OF VALVE
CHECK FOR OIL LEVEL OF
BARRING GEAR ASSEMBLY BY SPANNERS STOP CHECK
OPENING
CHECK FOR BEARING
WITH SPANNER STOP CHECK
CLEARANCE
CHECK FOR BEARING
WITH SPANNER STOP CHECK
CLEARANCE
To form magnetic field when
energized with current to produce
Megger &
torque. Check for winding Shut Down check
Multimeter
resistance and megger value of
Motor.
Check for TAN DELTA of the TAN-DELTA TEST
SHUTDOWN CHECK
motor. KIT

Check for proper tigteness of the


Spanners Shut Down check
power cable to the HT Motor

Check for proper tigteness of the


SPANNERS /
power cable and HT Breaker SHUTDOWN CHECK
TORQUE WRENCH
Terminals.

SHUTDOWN CHECK
Check for megger value of HT Cable
MEGGER
phase to phae and phase to earth.
SHUTDOWN CHECK

Check for partial discharge test of HT TAN-DELTA TEST


SHUTDOWN CHECK
Cable for HT Cable insualtion testing. KIT

Check for proper tigteness of the


busbar and busbar support insulator. It SPANNERS /
SHUTDOWN CHECK
should have sufficient stiffness to be TORQUE WRENCH
supported in air by insulated pillars.

Check for proper cleanliness of the


busbar insulator and panel body. It
should be generally uninsulated, and VISUAL / COTTON
SHUTDOWN CHECK
should be proper insulation between CLOTHE
busbar and switchgear panel through
busbar insualtor.
Check for megger value of Busbar
HT MEGGER SHUTDOWN CHECK
and panel body.

Check for proper interlocking of earth


switch and HT Breaker. Also, check
VISUAL SHUTDOWN CHECK
for interlocking of earth switch and
panel back door.

Check for earthing of the Panel body. VISUAL RUN CHECK


Check for Oxydation of busbars and
LEAKAGE TESTER RUN CHECK
insulators due to moisture content.

Check for high electrical &


mechanical strength used in electrical
panels to support the copper busbar. VISUAL SHUTDOWN CHECK
Check for megger value between
insulator and panel body.

VISUAL, COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current
DIELECTRIC
from an overload or short circuit. Its SHUTDOWN CHECK
ISOPLEX & SHELL
basic function is to interrupt current
TELLUS 32 GREASE,
flow after a fault is detected.
HT MEGGER

To detect the fault and initiates the SECONDARY


operation of circuit breaker to isolate INJECTION
SHUTDOWN CHECK
the defective element from the rest of CURRENT AND
the system. VOLTAGE TEST KIT
Check for proper tigteness of the
SPANNERS /
power cable and HT Breaker SHUTDOWN CHECK
TORQUE WRENCH
Terminals.

Check for megger value of HT Cable


MEGGER SHUTDOWN CHECK
phase to phae and phase to earth.

Check for partial discharge test of HT TAN-DELTA TEST


SHUTDOWN CHECK
Cable for HT Cable insualtion testing. KIT

Check for tighteness of connections


VISUAL /
and measure the correct voltage and
SECONDARY
indication shown in the meter.
INJECTION SHUTDOWN CHECK
Also, check for tripping of the HT
CURRENT AND
Numerical Relay by Secondary
VOLTAGE TEST KIT
Injection kit.

Check for tighteness of connections


VISUAL /
and measure the correct current
SECONDARY
shown in the meter.
INJECTION SHUTDOWN CHECK
Also, check for tripping of the HT
CURRENT AND
Numerical Relay by Secondary
VOLTAGE TEST KIT
Injection kit.

Check for proper tigteness of the


busbar and busbar support insulator. It SPANNERS /
SHUTDOWN CHECK
should have sufficient stiffness to be TORQUE WRENCH
supported in air by insulated pillars.

Check for proper cleanliness of the


busbar insulator and panel body. It
should be generally uninsulated, and VISUAL / COTTON
SHUTDOWN CHECK
should be proper insulation between CLOTHE
busbar and switchgear panel through
busbar insualtor.
Check for megger value of Busbar
HT MEGGER SHUTDOWN CHECK
and panel body.
Check for proper interlocking of earth
switch and HT Breaker. Also, check
VISUAL RUN CHECK
for interlocking of earth switch and
panel back door.

Check for earthing of the Panel body. LEAKAGE TESTER RUN CHECK
Check for high electrical &
mechanical strength used in electrical
panels to support the copper busbar. VISUAL SHUTDOWN CHECK
Check for megger value between
insulator and panel body.
To protect an electrical circuit from
damage caused by excess current VISUAL, COTTON
from an overload or short circuit. Its CLOTHE, SHUTDOWN CHECK
basic function is to interrupt current MULTIMETER
flow after a fault is detected.
To detect the fault and initiates the SECONDARY
operation of circuit breaker to isolate INJECTION
SHUTDOWN CHECK
the defective element from the rest of CURRENT AND
the system. VOLTAGE TEST KIT
Check for proper tigteness of the
SPANNERS /
power cable and HT Breaker SHUTDOWN CHECK
TORQUE WRENCH
Terminals.

Check for megger value of HT Cable


MEGGER SHUTDOWN CHECK
phase to phae and phase to earth.

Check for partial discharge test of HT TAN-DELTA TEST


SHUTDOWN CHECK
Cable for HT Cable insualtion testing. KIT

Check for tighteness of connections


VISUAL /
and measure the correct voltage and
SECONDARY
indication shown in the meter.
INJECTION SHUTDOWN CHECK
Also, check for tripping of the HT
CURRENT AND
Numerical Relay by Secondary
VOLTAGE TEST KIT
Injection kit.

Check for tighteness of connections


VISUAL /
and measure the correct current
SECONDARY
shown in the meter.
INJECTION SHUTDOWN CHECK
Also, check for tripping of the HT
CURRENT AND
Numerical Relay by Secondary
VOLTAGE TEST KIT
Injection kit.

Check for proper tigteness of the


busbar and busbar support insulator. It SPANNERS /
SHUTDOWN CHECK
should have sufficient stiffness to be TORQUE WRENCH
supported in air by insulated pillars.
Check for proper cleanliness of the
busbar insulator and panel body. It
should be generally uninsulated, and VISUAL / COTTON
SHUTDOWN CHECK
should be proper insulation between CLOTHE
busbar and switchgear panel through
busbar insualtor.
Check for megger value of Busbar
HT MEGGER SHUTDOWN CHECK
and panel body.

Check for proper interlocking of earth


switch and HT Breaker. Also, check
VISUAL SHUTDOWN CHECK
for interlocking of earth switch and
panel back door.

Check for earthing of the Panel body. VISUAL RUN CHECK

Check for Oxydation of busbars and


LEAKAGE TESTER RUN CHECK
insulators due to moisture content.

Check for high electrical &


mechanical strength used in electrical
panels to support the copper busbar. VISUAL SHUTDOWN CHECK
Check for megger value between
insulator and panel body.

VISUAL, COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current
DIELECTRIC
from an overload or short circuit. Its SHUTDOWN CHECK
ISOPLEX & SHELL
basic function is to interrupt current
TELLUS 32 GREASE,
flow after a fault is detected.
HT MEGGER
TELLUS 32 GREASE,
flow after a fault is detected.
HT MEGGER

To detect the fault and initiates the SECONDARY


operation of circuit breaker to isolate INJECTION
SHUTDOWN CHECK
the defective element from the rest of CURRENT AND
the system. VOLTAGE TEST KIT
Check for proper tigteness of the
SPANNERS /
power cable and HT Breaker SHUTDOWN CHECK
TORQUE WRENCH
Terminals.

Check for megger value of HT Cable


MEGGER SHUTDOWN CHECK
phase to phae and phase to earth.

Check for partial discharge test of HT TAN-DELTA TEST


SHUTDOWN CHECK
Cable for HT Cable insualtion testing. KIT

Check for tighteness of connections


VISUAL /
and measure the correct voltage and
SECONDARY
indication shown in the meter.
INJECTION SHUTDOWN CHECK
Also, check for tripping of the HT
CURRENT AND
Numerical Relay by Secondary
VOLTAGE TEST KIT
Injection kit.

Check for tighteness of connections


VISUAL /
and measure the correct current
SECONDARY
shown in the meter.
INJECTION SHUTDOWN CHECK
Also, check for tripping of the HT
CURRENT AND
Numerical Relay by Secondary
VOLTAGE TEST KIT
Injection kit.

To form magnetic field when


energized with current to
Megger &
produce torque. Check for Shut Down check
Multimeter
winding resistance and megger
value of Motor.
Check for proper tigteness of
Spanners Shut Down check
the power cable to the LT Motor

Check for contactor rating and


Spanners, Screw
tighteness of contactor SHUTDOWN
Drivers, Allen Key,
terminals. Check for coil CHECK
Multimeter
resistance of the contactor.

Check for overload relay range


SHUTDOWN
and setting of relay current for Visual
CHECK
motor tripping.

Check for switching NO / NC


VISUAL /
Contact as per set value during RUN CHECK
MULTIMETER
hoisting operation.

To form magnetic field when


energized with current to
Megger &
produce torque. Check for Shut Down check
Multimeter
winding resistance and megger
value of Motor.

Check for proper tigteness of


Spanners Shut Down check
the power cable to the LT Motor

Check for contactor rating and


Spanners, Screw
tighteness of contactor SHUTDOWN
Drivers, Allen Key,
terminals. Check for coil CHECK
Multimeter
resistance of the contactor.

Check for switching NO / NC


VISUAL /
Contact as per set value during RUN CHECK
MULTIMETER
hoisting operation.
To form magnetic field when
energized with current to
Megger &
produce torque. Check for Shut Down check
Multimeter
winding resistance and megger
value of Motor.
Check for proper tigteness of
Spanners Shut Down check
the power cable to the LT Motor

Check for contactor rating and


Spanners, Screw
tighteness of contactor SHUTDOWN
Drivers, Allen Key,
terminals. Check for coil CHECK
Multimeter
resistance of the contactor.

Check for switching NO / NC


VISUAL /
Contact as per set value during RUN CHECK
MULTIMETER
hoisting operation.
To form magnetic field when
energized with current to
Megger &
produce torque. Check for Shut Down check
Multimeter
winding resistance and megger
value of Motor.

Check for proper tigteness of


Spanners Shut Down check
the power cable to the LT Motor

Check for contactor rating and


Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key, SHUTDOWN CHECK
Check for coil resistance of the
Multimeter
contactor.

Check for overload relay range and


setting of relay current for motor Visual RUN CHECK
tripping.

The auxiliary contactor is often used


in a logic circuit, or for some other Visual SHUTDOWN CHECK
part of the control scheme.

To form magnetic field when


energized with current to
Megger &
produce torque. Check for Shut Down check
Multimeter
winding resistance and megger
value of Motor.

Check for proper tigteness of


Spanners Shut Down check
the power cable to the LT Motor
Check for contactor rating and
Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key, SHUTDOWN CHECK
Check for coil resistance of the
Multimeter
contactor.

Check for overload relay range and


setting of relay current for motor Visual SHUTDOWN CHECK
tripping.

The auxiliary contactor is often used


in a logic circuit, or for some other Visual SHUTDOWN CHECK
part of the control scheme.

To form magnetic field when


energized with current to
Megger &
produce torque. Check for Shut Down check
Multimeter
winding resistance and megger
value of Motor.

Check for proper tigteness of


Spanners Shut Down check
the power cable to the LT Motor

Check for switching NO / NC


VISUAL /
Contact as per set value during RUN CHECK
MULTIMETER
hoisting operation.

Check for contactor rating and


Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key, SHUTDOWN CHECK
Check for coil resistance of the
Multimeter
contactor.

Softstarter is a device which controls


the acceleration of an electric motor Cotton clothe,
SHUTDOWN CHECK
by means of controlling the applied spanners, Screw driver
voltage.

Check for contactor rating and


Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key, SHUTDOWN CHECK
Check for coil resistance of the
Multimeter
contactor.
IDEAL CONDITION

NO DAMAGE IN DISC AND BODY OF VALVE


SHOULD BE OPERATION SMOOTHLY WITHIN
OPEN AND CLOSE LIMITS
NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN
OPEN AND CLOSE LIMITS
NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN
OPEN AND CLOSE LIMITS
NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN
OPEN AND CLOSE LIMITS
NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN
OPEN AND CLOSE LIMITS
NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN
OPEN AND CLOSE LIMITS

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

INLET TEMP <30*C, OUT LET TEMP <45*C WATER,

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SHOULD BE OPERATIONG WITHIN RANGE AND


NO LEAKGE

OIL SHOULD BE WITHIN INDICATED LIMIT


CLEARANCE <0.15MM

CLEARANCE <0.15MM

Winding Resistances should be balanced of all


three phases, i.e., less than 5 ohms.
Megger values shouldbe above 5 megaohms from
all three phases to ground.

TAN-DELTA test of HT Motor should be < 0.04


absolute.

Tightened with 16mm Chrome Vanadium Bolts.

Tightened with 12mm high tensile stainless steel bolts


with flat washers and nuts by Torque Wrench.

Insulation resistance between Phase to Phase should be


> 20 Mega Ohms
Insulation resistance between Phase to Earth should be
> 20 Mega Ohms

TAN-DELTA test of HT Cable should be < 0.004


absolute.

Tightened with 12mm high tensile stainless steel bolts


with flat washers and nuts by Torque Wrench.

Insulators should be installed properly to hold and


support busbars. Insulators should be clean.

Resistance between panel to busbar should be ˃ 20


mega ohms.
Interlock of Earth Switch and HT Breaker should be
healthy. HT Breaker should not Rack In during Earth
Switch operated condition. Also, Back Door of HT
Panel should not be open when earth switch is not
operated.

Earthing should be healthy.


No oxydation and moisture inside panel. Space Heater
current should be < 1 A

Vertical and Horizontal insulators should provide high


electrical and mechanical strength to the busbars. Also,
megger value should be ˃ 20 mega Ohms.

HT Breaker should be clean. There should not be any


moisture or wear and rusting of contacts.
Proper lubrication of all moving parts of mechanism.
Proper operation of gear box mechanism.
Proper operation of Test / Service auxiliary switch
operation.
Proper closing and tripping mechanism of breaker both
electrically and manually.
Proper spring charging operation of limit switch.
Condition of contact arm assembly of breaker should
be proper.
Vacuum inside bottles should be normal.
Insulation resistance between Upper & Lower contacts
should be > 1 T Ohms
Insulation resistance between Phase to Phase should be
> 1 T Ohms
Insulation resistance between Phase to Earth should be
> 1 T Ohms
Timing of CB during Close should be in ms of all three
phases.
Timing of CB during Open should be in ms of all three
phases.
Timing of CB during Close / Open should be in ms of
all three phases.

Contact Resistance between Upper and Lower contacts


should be in micro ohms of all three phases.

HVAC Test for 15 KV should withstand for min. of all


three phases.

HT Breaker Numerical Relay tripping should be


healthy to trip the breaker on the faults described in the
relay on prescribed values.
Tightened with 12mm high tensile stainless steel bolts
with flat washers and nuts by Torque Wrench.

Insulation resistance between Phase to Phase should be


> 20 Mega Ohms
Insulation resistance between Phase to Earth should be
> 20 Mega Ohms

TAN-DELTA test of HT Cable should be < 0.004


absolute.

PT connections should be tight and should


1. measure correct voltage on the relay or meter.
2. provide indication of voltage on the panel.
3. trip the HT Breaker through HT Relay on Over
voltage / Under Voltage.

CT connections should be tight and should


1. measure current accurately on the relay or meter.
2. trip the HT Breaker through HT Relay on Over
curent / CIR / ITOC / DMT.

Tightened with 12mm high tensile stainless steel bolts


with flat washers and nuts by Torque Wrench.

Insulators should be installed properly to hold and


support busbars. Insulators should be clean.

Resistance between panel to busbar should be ˃ 20


mega ohms.

Earthing should be healthy.

No oxydation and moisture inside panel. Space Heater


current should be < 1 A
Vertical and Horizontal insulators should provide high
electrical and mechanical strength to the busbars. Also,
megger value should be ˃ 20 mega Ohms.

HT Softstarter should be clean. There should not be any


moisture or wear and rusting of contacts.
Thyristors Resistances of all three phases of HT
Softstarter should be in 2 digit nos.

HT Breaker Numerical Relay tripping should be


healthy to trip the breaker on the faults described in the
relay on prescribed values.

Tightened with 12mm high tensile stainless steel bolts


with flat washers and nuts by Torque Wrench.

Insulation resistance between Phase to Phase should be


> 20 Mega Ohms
Insulation resistance between Phase to Earth should be
> 20 Mega Ohms

TAN-DELTA test of HT Cable should be < 0.004


absolute.

PT connections should be tight and should


1. measure correct voltage on the relay or meter.
2. provide indication of voltage on the panel.
3. trip the HT Breaker through HT Relay on Over
voltage / Under Voltage.

CT connections should be tight and should


1. measure current accurately on the relay or meter.
2. trip the HT Breaker through HT Relay on Over
curent / CIR / ITOC / DMT.

Tightened with 12mm high tensile stainless steel bolts


with flat washers and nuts by Torque Wrench.
Insulators should be installed properly to hold and
support busbars. Insulators should be clean.

Resistance between panel to busbar should be ˃ 20


mega ohms.
Interlock of Earth Switch and HT Breaker should be
healthy. HT Breaker should not Rack In during Earth
Switch operated condition. Also, Back Door of HT
Panel should not be open when earth switch is not
operated.

Earthing should be healthy.

No oxydation and moisture inside panel. Space Heater


current should be < 1 A

Vertical and Horizontal insulators should provide high


electrical and mechanical strength to the busbars. Also,
megger value should be ˃ 20 mega Ohms.

HT Breaker should be clean. There should not be any


moisture or wear and rusting of contacts.
Proper lubrication of all moving parts of mechanism.
Proper operation of gear box mechanism.
Proper operation of Test / Service auxiliary switch
operation.
Proper closing and tripping mechanism of breaker both
electrically and manually.
Proper spring charging operation of limit switch.
Condition of contact arm assembly of breaker should
be proper.
Vacuum inside bottles should be normal.
Insulation resistance between Upper & Lower contacts
should be > 1 T Ohms
Insulation resistance between Phase to Phase should be
> 1 T Ohms
Insulation resistance between Phase to Earth should be
> 1 T Ohms
Timing of CB during Close should be in ms of all three
phases.
Timing of CB during Open should be in ms of all three
phases.
Timing of CB during Close / Open should be in ms of
all three phases.

Contact Resistance between Upper and Lower contacts


should be in micro ohms of all three phases.

HVAC Test for 15 KV should withstand for min. of all


three phases.

HT Breaker Numerical Relay tripping should be


healthy to trip the breaker on the faults described in the
relay on prescribed values.

Tightened with 12mm high tensile stainless steel bolts


with flat washers and nuts by Torque Wrench.

Insulation resistance between Phase to Phase should be


> 20 Mega Ohms
Insulation resistance between Phase to Earth should be
> 20 Mega Ohms

TAN-DELTA test of HT Cable should be < 0.004


absolute.

PT connections should be tight and should


1. measure correct voltage on the relay or meter.
2. provide indication of voltage on the panel.
3. trip the HT Breaker through HT Relay on Over
voltage / Under Voltage.

CT connections should be tight and should


1. measure current accurately on the relay or meter.
2. trip the HT Breaker through HT Relay on Over
curent / CIR / ITOC / DMT.

Winding Resistances should be balanced of all


three phases, i.e., less than 10 ohms.
Megger values shouldbe above 5 megaohms
from all three phases to ground.
Tightened with 10 mm Chrome Vanadium
Bolts.

Proper tighteness of foundation of contactor.


No abnormalities to be seen for the contacts
and proper fitting to be done.
Coil resistance should be between 20 ohms -
30 ohms.

Relay settings:
Relay Range = 4-10A
Relay setting = 6.4A

Motor should stop running during limit switch


operation.

Winding Resistances should be balanced of all


three phases, i.e., less than 10 ohms.
Megger values shouldbe above 5 megaohms
from all three phases to ground.

Tightened with 10 mm Chrome Vanadium


Bolts.

Proper tighteness of foundation of contactor.


No abnormalities to be seen for the contacts
and proper fitting to be done.
Coil resistance should be between 15 ohms - 30
ohms.

Motor should stop running during limit switch


operation.

Winding Resistances should be balanced of all


three phases, i.e., less than 10 ohms.
Megger values shouldbe above 5 megaohms
from all three phases to ground.
Tightened with 10 mm Chrome Vanadium
Bolts.

Proper tighteness of foundation of contactor.


No abnormalities to be seen for the contacts
and proper fitting to be done.
Coil resistance should be between 15 ohms - 30
ohms.

Motor should stop running during limit switch


operation.

Winding Resistances should be balanced of all


three phases, i.e., less than 10 ohms.
Megger values shouldbe above 5 megaohms
from all three phases to ground.

Tightened with 10 mm Chrome Vanadium


Bolts.

Contactor rarting to be 32A. Proper tighteness of


foundation of contactor.
No abnormalities to be seen for the contacts and
proper fitting to be done.
Coil resistance should be 35-45 ohms.
Relay Range :
23 A - 32 A
Relay settings = 23A
FLC = 27.5A

The auxiliary contctactor is used to provide tripping


indication whenever the lube oil pump will trip or
power fails.

Winding Resistances should be balanced of all


three phases, i.e., less than 10 ohms.
Megger values shouldbe above 5 megaohms
from all three phases to ground.

Tightened with 10 mm Chrome Vanadium


Bolts.
Contactor rarting to be 32A. Proper tighteness of
foundation of contactor.
No abnormalities to be seen for the contacts and
proper fitting to be done.
Coil resistance should be 35-45 ohms.

Relay Range :
23 A - 32 A
Relay settings = 23A
FLC = 27.5A

The auxiliary contctactor is used to provide tripping


indication whenever the lube oil pump will trip or
power fails.

Winding Resistances should be balanced of all


three phases, i.e., less than 10 ohms.
Megger values shouldbe above 5 megaohms
from all three phases to ground.

Tightened with 10 mm Chrome Vanadium


Bolts.

Motor should stop running during limit switch


operation.

Contactor rarting to be 22A. Proper tighteness of


foundation of contactor.
No abnormalities to be seen for the contacts and
proper fitting to be done.
Coil resistance should be 35-45 ohms.

Softstarter should clean. Check the tighteness of the


power and control cable.

Contactor rarting to be 65A. Proper tighteness of


foundation of contactor.
No abnormalities to be seen for the contacts and
proper fitting to be done.
Coil resistance should be 25-35 ohms.
ACTION
ACTUAL CONDITION OBSERVED
REQUIRED
No abnormal difference in winding
resistances. Winding resistance of all three
phases is 0.7 ohms. Megger values are 2 Giga
ohms and in healthy condition.

TAN-DELTA test of HT Motor is 0.0028

No looseness of 16 mm Chrome Vanadium


bolts and connecting links.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulation resistance between Phase to Phase is


1000 Ohms
Insulation resistance between Phase to Earth is
1000Mega Ohms

TAN-DELTA test of HT Cable is 0.0018

No looseness of the bolts and connecting links


checked by torque wrench.

Insulators were installed properly and was clean.


No oxydation observed between insulator and
bubar.

Resistance between panel to busbar is 1000 mega


ohms.
Interlock of Earth Switch and HT Breaker is
healthy. HT Breaker do not Rack In during Earth
Switch operated condition. Also, Back Door of HT
Panel has not been open when earth switch is not
operated.
Earthing is connected to the body and to the Earth
Pit.
No oxydation and moisture inside panel. Space
Heater current is 0.3 A

Vertical and Horizontal insulators strength to the


busbars are good. Also, megger value is 1000 mega
Ohms.

HT Breaker found clean. There is no moisture or


wear and rusting of contacts.
Lubrication of all moving parts of mechanism is
normal.
Operation of gear box mechanism is normal.
Operation of Test / Service auxiliary switch
operation is proper.
Closing and tripping mechanism of breaker both
electrically and manually is proper.
Spring charging operation of limit switch is
normal.
Condition of contact arm assembly of breaker is
proper.
Vacuum inside bottles is normal.
Insulation resistance between Upper & Lower
contacts is > 1 T Ohms
Insulation resistance between Phase to Phase is > 1
T Ohms
Insulation resistance between Phase to Earth is > 1
T Ohms
Timing of CB during Close is 48 ms of all three
phases.
Timing of CB during Open is 41 ms of all three
phases.
Timing of CB during Close / Open is 21 ms of all
three phases.

Contact Resistance between Upper and Lower


contacts is 45 micro ohms of all three phases.

HVAC Test for 15 KV withstand for min. of all


three phases.

HT Breaker Numerical Relay tripping is healthy to


trip the breaker on the faults described in the relay
on prescribed values.
No looseness of the bolts and connecting links
checked by torque wrench.

Insulation resistance between Phase to Phase is


1100 Ohms
Insulation resistance between Phase to Earth is
1000Mega Ohms

TAN-DELTA test of HT Cable is 0.0017

PT connections are tight and display correct


voltage on the relay. Indication of voltage on the
panel is shown. Trippig of the HT Breaker through
HT Relay on Over voltage / Under Voltage is
healthy.

CT connections are tight and display accurate


current on the relay. Trippig of the HT Breaker
through HT Relay on Over curent / CIR / ITOC /
DMT is healthy.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulators were installed properly and was clean.


No oxydation observed between insulator and
bubar.

Resistance between panel to busbar is 1000 mega


ohms.

Earthing is connected to the body and to the Earth


Pit.

No oxydation and moisture inside panel. Space


Heater current is 0.3 A
Vertical and Horizontal insulators strength to the
busbars are good. Also, megger value is 1000 mega
Ohms.

HT Softstarter found clean. There is no moisture or


wear and rusting of contacts.
All thyristors resistances are in double digit nos.
between 11 to 13 ohms.

HT Breaker Numerical Relay tripping is healthy to


trip the breaker on the faults described in the relay
on prescribed values.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulation resistance between Phase to Phase is


1000 Ohms
Insulation resistance between Phase to Earth is
1000Mega Ohms

TAN-DELTA test of HT Cable is 0.0029

PT connections are tight and display correct


voltage on the relay. Indication of voltage on the
panel is shown. Trippig of the HT Breaker through
HT Relay on Over voltage / Under Voltage is
healthy.

CT connections are tight and display accurate


current on the relay. Trippig of the HT Breaker
through HT Relay on Over curent / CIR / ITOC /
DMT is healthy.

No looseness of the bolts and connecting links


checked by torque wrench.
Insulators were installed properly and was clean.
No oxydation observed between insulator and
bubar.

Resistance between panel to busbar is 1000 mega


ohms.
Interlock of Earth Switch and HT Breaker is
healthy. HT Breaker do not Rack In during Earth
Switch operated condition. Also, Back Door of HT
Panel has not been open when earth switch is not
operated.
Earthing is connected to the body and to the Earth
Pit.

No oxydation and moisture inside panel. Space


Heater current is 0.3 A

Vertical and Horizontal insulators strength to the


busbars are good. Also, megger value is 1000 mega
Ohms.

HT Breaker found clean. There is no moisture or


wear and rusting of contacts.
Lubrication of all moving parts of mechanism is
normal.
Operation of gear box mechanism is normal.
Operation of Test / Service auxiliary switch
operation is proper.
Closing and tripping mechanism of breaker both
electrically and manually is proper.
Spring charging operation of limit switch is
normal.
Condition of contact arm assembly of breaker is
proper.
Vacuum inside bottles is normal.
Insulation resistance between Upper & Lower
contacts is > 1 T Ohms
Insulation resistance between Phase to Phase is > 1
T Ohms
Insulation resistance between Phase to Earth is > 1
T Ohms
Timing of CB during Close is 48 ms of all three
phases.
Timing of CB during Open is 41 ms of all three
phases.
Timing of CB during Close / Open is 21 ms of all
three phases.

Contact Resistance between Upper and Lower


contacts is 45 micro ohms of all three phases.

HVAC Test for 15 KV withstand for min. of all


three phases.

HT Breaker Numerical Relay tripping is healthy to


trip the breaker on the faults described in the relay
on prescribed values.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulation resistance between Phase to Phase is


1100 Ohms
Insulation resistance between Phase to Earth is
1000Mega Ohms

TAN-DELTA test of HT Cable is 0.0017

PT connections are tight and display correct


voltage on the relay. Indication of voltage on the
panel is shown. Trippig of the HT Breaker through
HT Relay on Over voltage / Under Voltage is
healthy.

CT connections are tight and display accurate


current on the relay. Trippig of the HT Breaker
through HT Relay on Over curent / CIR / ITOC /
DMT is healthy.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 7.1 ohms. Megger values are 500
mega ohms and in healthy condition.
No looseness of 10 mm Chrome Vanadium
bolts and connecting links.

No looseness in fitting of contactor and


connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 25 ohms.

Inspected Relay Range = 4-10A


Relay setting = 6.0A
Running Current = 5.2 A

Motor stop running during limit switch


operation.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 7.1 ohms. Megger values are 500
mega ohms and in healthy condition.

No looseness of 10 mm Chrome Vanadium


bolts and connecting links.

No looseness in fitting of contactor and


connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 22 ohms.

Motor stop running during limit switch


operation.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 7.1 ohms. Megger values are 500
mega ohms and in healthy condition.
No looseness of 10 mm Chrome Vanadium
bolts and connecting links.

No looseness in fitting of contactor and


connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 22 ohms.

Motor stop running during limit switch


operation.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 9.5 ohms. Megger values are
1000 mega ohms and in healthy condition.

No looseness of 10 mm Chrome Vanadium


bolts and connecting links.

Contactor rarting is 32A. No looseness in fitting of


contactor and connection of cables to power
contactor and its contacts. Coil resistance is 39
ohms.

Checked Relay Range :


23 A - 32 A
Relay settings = 23A
RC = 12.2A

Indication for tripping of lube oil pump is healthy.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 9.7 ohms. Megger values are 1100
mega ohms and in healthy condition.

No looseness of 10 mm Chrome Vanadium


bolts and connecting links.
Contactor rarting is 32A. No looseness in fitting of
contactor and connection of cables to power
contactor and its contacts. Coil resistance is 39.5
ohms.

Checked Relay Range :


23 A - 32 A
Relay settings = 23A
RC = 14.2A

Indication for tripping of lube oil pump is healthy.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 9.7 ohms. Megger values are 1100
mega ohms and in healthy condition.

No looseness of 10 mm Chrome Vanadium


bolts and connecting links.

Motor stop running during limit switch


operation.

Contactor rarting is 22A. No looseness in fitting of


contactor and connection of cables to power
contactor and its contacts. Coil resistance is 41
ohms.

Softstarter is clean. Tighteness of the power and


control cable is normal.

Contactor rarting is 65A. No looseness in fitting of


contactor and connection of cables to power
contactor and its contacts. Coil resistance is 29.2
ohms.
Equipment Sub Equipments COMPONENT

INLET VALVE FOR BLOWER DN


1400 (IVC)
INLET V/V
ACTUATOR FOR INLET VALVE
FOR BLOWER
ANTISURGE VALVE
ANTI SURGE V/V ACTUATOR FOR ANTISURGE
VALVE
BLEEDER VALVE FOR BLOWER
DN 450
BLEEDER V/V
ACTUATOR FOR BLEEDER VALVE
FOR BLOWER
OUTLET VALVE FOR BLOWER
OUTLET V/V ACTUATOR FOR OUTLET VALVE
FOR BLOWER
NON RETURN VALVE FOR
BLOWER
NRV
ACTUATOR FOR NON RETURN
VALVE FOR BLOWER

SNORT VALVE
ACTUATOR FOR SNORT VALVE
SNORT V/V
GEAR BOX FOR SNORT VALVE
ACTUATOR

HEAT EXCHANGER HEAT EXCHANGER FOR BLOWER


OIL COOLING
PIN-BUSH F/BLOWER OUTPUT
COUPLING
COUPLINGS
PIN-BUSH F/BLOWER INPUT
COUPLING
3WAY VALVE FOR BLOWER OIL
BLOWER EQUIPMENTS STATION
BLOWER EQUIPMENTS BARRING GEAR ASSEMBLY
COMMISSIONING SPARES BLOWER BEARING DE
COMMISSIONING SPARES BLOWER BEARING NDE
MAIN MOTOR- BLOWER
HT Motor Windings
2

MAIN MOTOR- BLOWER


Terminal Box
2

MAIN MOTOR- BLOWER


HT CABLES
2 HT CABLE

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER


HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER
MAIN MOTOR-
BLOWER 2 HT PANEL

HT NUMERICAL
PROTECTIVE RELAY
HT CABLES

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT SOFTSTARTER

MAIN MOTOR-
BLOWER 2 SOFT HT NUMERICAL
STARTER PANEL PROTECTIVE RELAY

HT CABLES

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

BF3-BL-BL2
HT PANEL BUSBARS
HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER
MAIN MOTOR-
BLOWER 2 BYPASS
BREAKER PANEL
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

MAIN MOTOR-
BLOWER 2 OUTLET
DISCHARGE VALVE
LT Motor Windings
MOTOR
MAIN MOTOR-
BLOWER 2 OUTLET
DISCHARGE VALVE
Terminal Box
MOTOR

MAIN MOTOR-
BLOWER 2 OUTLET
DISCHARGE VALVE
Power Contactor
PANEL

MAIN MOTOR-
BLOWER 2 OUTLET
DISCHARGE VALVE
Overload Relay
PANEL
MAIN MOTOR-
BLOWER 2 OUTLET Internal OPEN / CLOSE
DISCHARGE VALVE Limit Switch
PANEL

MAIN MOTOR-
BLOWER 2 INLET LT Motor Windings
VALVE MOTOR

MAIN MOTOR-
BLOWER 2 INLET Terminal Box
VALVE MOTOR

MAIN MOTOR-
BLOWER 2 INLET Power Contactor
VALVE PANEL

MAIN MOTOR-
Internal OPEN / CLOSE
BLOWER 2 INLET
VALVE PANEL Limit Switch
MAIN MOTOR-
BLOWER 2 BLEED LT Motor Windings
VALVE MOTOR

MAIN MOTOR-
BLOWER 2 BLEED Terminal Box
VALVE MOTOR

MAIN MOTOR-
BLOWER 2 BLEED Power Contactor
VALVE PANEL

MAIN MOTOR-
Internal OPEN / CLOSE
BLOWER 2 BLEED
VALVE PANEL Limit Switch

BLOWER #2 LUBE OIL


PUMP #2 Motor
LT Motor Windings

BLOWER #2 LUBE OIL


PUMP #2 Motor
Terminal Box

BLOWER #2 LUBE OIL BLOWER #2 LUBE OIL PUMP


PUMP 2 Panel #2 CONTACTOR

BLOWER #2 LUBE OIL BLOWER #2 LUBE OIL PUMP


PUMP #2 Panel #2 OVERLOAD RELAY

BLOWER #2 LUBE OIL BLOWER #2 LUBE OIL PUMP


PUMP #2 Panel #2 AUXILIARY CONTACTOR
Blower #2 Barring Gear
Motor
LT Motor Windings

Blower #2 Barring Gear


Motor
Terminal Box

Blower #2 Barring Gear BLOWER #2 BARRING GEAR


Motor MOTOR CONTACTOR

Blower Barring gear


Blower #2 Barring Gear Engage / Disengage Lever
type Limit Switch

Blower #2 Barring Gear BLOWER #2 BARRING GEAR


Panel MOTOR SOFTSTARTER

BLOWER #2 MOTOR BLOWER #2 MOTOR SPACE


SPACE HEATER HEATER CONTACTOR
CON

Item Code SPECIFICATION

5044810037

DN 1400
5044810033 DN 400

DN 400

5044810036

DN 450
5044810034 DN 1000

5044810035
DN 1000

5109000051 DN 1000 ASSEMBLY

5088110165

0804030095 HS6280

0804030096 HB1520

7129030107
5961010011
10 A

10 A
10 A
10 A
CONDITION APPRAISAL OF BLOWER#2

DESCRIPTION / DIMENSION TOOLS REQUIRED

CHECK FOR VALVE BODY AND DISC DAMAGE SPANNERS

CHECK FOR OPERATION OF ACTUATOR BY OPERATING VISUAL


CHECK FOR VALVE BODY AND DISC DAMAGE SPANNERS

CHECK FOR OPERATION OF ACTUATOR BY OPERATING VISUAL

CHECK FOR VALVE BODY AND DISC DAMAGE SPANNERS

CHECK FOR OPERATION OF ACTUATOR BY OPERATING VISUAL


CHECK FOR VALVE BODY AND DISC DAMAGE SPANNERS

CHECK FOR OPERATION OF ACTUATOR BY OPERATING VISUAL

CHECK FOR VALVE BODY AND DISC DAMAGE SPANNERS

CHECK FOR OPERATION OF ACTUATOR BY OPERATING VISUAL


CHECK FOR VALVE BODY AND DISC DAMAGE SPANNERS

CHECK FOR OPERATION OF ACTUATOR BY OPERATING VISUAL

CHECK FOR PHYSICAL DAMAGE OF GEARBOX AND BOLTS VISUAL


CHECK FOR THE PRESSURE AND TEMPERATURE AT INLET AND OUTLET
OF OIL AND WATER VISUAL

CHECK FOR PHYSICAL DAMAGE OF COUPLING AND PIN BUSH SPANNERS

CHECK FOR PHYSICAL DAMAGE OF COUPLING AND PIN BUSH SPANNERS

CHECK FOR OPERATION AND LEAKAGE OF VALVE VISUAL


CHECK FOR OIL LEVEL OF BARRING GEAR ASSEMBLY BY OPENING SPANNERS
CHECK FOR BEARING CLEARANCE WITH SPANNER
CHECK FOR BEARING CLEARANCE WITH SPANNER
To form magnetic field when energized with current to
produce torque. Check for winding resistance and Megger & Multimeter
megger value of Motor.

Check for TAN DELTA of the motor. TAN-DELTA TEST KIT

Check for proper tigteness of the power cable to the HT


Spanners
Motor

Check for proper tigteness of the power cable and HT SPANNERS / TORQUE
Breaker Terminals. WRENCH

Check for megger value of HT Cable phase to phae and


MEGGER
phase to earth.

Check for partial discharge test of HT Cable for HT Cable


TAN-DELTA TEST KIT
insualtion testing.
Check for proper tigteness of the busbar and busbar support
SPANNERS / TORQUE
insulator. It should have sufficient stiffness to be supported
WRENCH
in air by insulated pillars.
Check for proper cleanliness of the busbar insulator and
panel body. It should be generally uninsulated, and should VISUAL / COTTON
be proper insulation between busbar and switchgear panel CLOTHE
through busbar insualtor.

Check for megger value of Busbar and panel body. HT MEGGER

Check for proper interlocking of earth switch and HT


Breaker. Also, check for interlocking of earth switch and VISUAL
panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and insulators due to


LEAKAGE TESTER
moisture content.
Check for high electrical & mechanical strength used in
electrical panels to support the copper busbar. Check for VISUAL
megger value between insulator and panel body.

VISUAL, COTTON
To protect an electrical circuit from damage caused by CLOTHE, CRC,
excess current from an overload or short circuit. Its basic DIELECTRIC ISOPLEX
function is to interrupt current flow after a fault is detected. & SHELL TELLUS 32
GREASE, HT MEGGER

SECONDARY
To detect the fault and initiates the operation of circuit
INJECTION CURRENT
breaker to isolate the defective element from the rest of the
AND VOLTAGE TEST
system.
KIT
Check for proper tigteness of the power cable and HT SPANNERS / TORQUE
Breaker Terminals. WRENCH

Check for megger value of HT Cable phase to phae and


MEGGER
phase to earth.

Check for partial discharge test of HT Cable for HT Cable


TAN-DELTA TEST KIT
insualtion testing.

Check for tighteness of connections and measure the correct VISUAL / SECONDARY
voltage and indication shown in the meter. INJECTION CURRENT
Also, check for tripping of the HT Numerical Relay by AND VOLTAGE TEST
Secondary Injection kit. KIT

Check for tighteness of connections and measure the correct VISUAL / SECONDARY
current shown in the meter. INJECTION CURRENT
Also, check for tripping of the HT Numerical Relay by AND VOLTAGE TEST
Secondary Injection kit. KIT

Check for proper tigteness of the busbar and busbar support


SPANNERS / TORQUE
insulator. It should have sufficient stiffness to be supported
WRENCH
in air by insulated pillars.
Check for proper cleanliness of the busbar insulator and
panel body. It should be generally uninsulated, and should VISUAL / COTTON
be proper insulation between busbar and switchgear panel CLOTHE
through busbar insualtor.

Check for megger value of Busbar and panel body. HT MEGGER

Check for proper interlocking of earth switch and HT


Breaker. Also, check for interlocking of earth switch and VISUAL
panel back door.

Check for earthing of the Panel body. LEAKAGE TESTER

Check for high electrical & mechanical strength used in


electrical panels to support the copper busbar. Check for VISUAL
megger value between insulator and panel body.
To protect an electrical circuit from damage caused by VISUAL, COTTON
excess current from an overload or short circuit. Its basic CLOTHE,
function is to interrupt current flow after a fault is detected. MULTIMETER

SECONDARY
To detect the fault and initiates the operation of circuit
INJECTION CURRENT
breaker to isolate the defective element from the rest of the
AND VOLTAGE TEST
system.
KIT

Check for proper tigteness of the power cable and HT SPANNERS / TORQUE
Breaker Terminals. WRENCH

Check for megger value of HT Cable phase to phae and


MEGGER
phase to earth.

Check for partial discharge test of HT Cable for HT Cable


TAN-DELTA TEST KIT
insualtion testing.

Check for tighteness of connections and measure the correct VISUAL / SECONDARY
voltage and indication shown in the meter. INJECTION CURRENT
Also, check for tripping of the HT Numerical Relay by AND VOLTAGE TEST
Secondary Injection kit. KIT

Check for tighteness of connections and measure the correct VISUAL / SECONDARY
current shown in the meter. INJECTION CURRENT
Also, check for tripping of the HT Numerical Relay by AND VOLTAGE TEST
Secondary Injection kit. KIT

Check for proper tigteness of the busbar and busbar support


SPANNERS / TORQUE
insulator. It should have sufficient stiffness to be supported
WRENCH
in air by insulated pillars.
Check for proper cleanliness of the busbar insulator and
panel body. It should be generally uninsulated, and should VISUAL / COTTON
be proper insulation between busbar and switchgear panel CLOTHE
through busbar insualtor.

Check for megger value of Busbar and panel body. HT MEGGER


Check for proper interlocking of earth switch and HT
Breaker. Also, check for interlocking of earth switch and VISUAL
panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and insulators due to


LEAKAGE TESTER
moisture content.

Check for high electrical & mechanical strength used in


electrical panels to support the copper busbar. Check for VISUAL
megger value between insulator and panel body.

VISUAL, COTTON
To protect an electrical circuit from damage caused by CLOTHE, CRC,
excess current from an overload or short circuit. Its basic DIELECTRIC ISOPLEX
function is to interrupt current flow after a fault is detected. & SHELL TELLUS 32
GREASE, HT MEGGER
SECONDARY
To detect the fault and initiates the operation of circuit
INJECTION CURRENT
breaker to isolate the defective element from the rest of the
AND VOLTAGE TEST
system.
KIT

Check for proper tigteness of the power cable and HT SPANNERS / TORQUE
Breaker Terminals. WRENCH

Check for megger value of HT Cable phase to phae and


MEGGER
phase to earth.

Check for partial discharge test of HT Cable for HT Cable


TAN-DELTA TEST KIT
insualtion testing.

Check for tighteness of connections and measure the correct VISUAL / SECONDARY
voltage and indication shown in the meter. INJECTION CURRENT
Also, check for tripping of the HT Numerical Relay by AND VOLTAGE TEST
Secondary Injection kit. KIT

Check for tighteness of connections and measure the correct VISUAL / SECONDARY
current shown in the meter. INJECTION CURRENT
Also, check for tripping of the HT Numerical Relay by AND VOLTAGE TEST
Secondary Injection kit. KIT

To form magnetic field when energized with


current to produce torque. Check for winding Megger & Multimeter
resistance and megger value of Motor.
Check for proper tigteness of the power cable to
Spanners
the LT Motor

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter

Check for overload relay range and setting of relay


Visual
current for motor tripping.

Check for switching NO / NC Contact as per set VISUAL /


value during hoisting operation. MULTIMETER

To form magnetic field when energized with


current to produce torque. Check for winding Megger & Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter

Check for switching NO / NC Contact as per set VISUAL /


value during hoisting operation. MULTIMETER
To form magnetic field when energized with
current to produce torque. Check for winding Megger & Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor

Check for contactor rating and tighteness of Spanners, Screw


contactor terminals. Check for coil resistance of Drivers, Allen Key,
the contactor. Multimeter

Check for switching NO / NC Contact as per set VISUAL /


value during hoisting operation. MULTIMETER

To form magnetic field when energized with


current to produce torque. Check for winding Megger & Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor

Check for contactor rating and tighteness of contactor Spanners, Screw Drivers,
terminals. Check for coil resistance of the contactor. Allen Key, Multimeter

Check for overload relay range and setting of relay current


Visual
for motor tripping.

The auxiliary contactor is often used in a logic circuit, or for


Visual
some other part of the control scheme.
To form magnetic field when energized with
current to produce torque. Check for winding Megger & Multimeter
resistance and megger value of Motor.

Check for proper tigteness of the power cable to


Spanners
the LT Motor

Check for contactor rating and tighteness of contactor Spanners, Screw Drivers,
terminals. Check for coil resistance of the contactor. Allen Key, Multimeter

Check for switching NO / NC Contact as per set VISUAL /


value during hoisting operation. MULTIMETER

Softstarter is a device which controls the acceleration of an Cotton clothe, spanners,


electric motor by means of controlling the applied voltage. Screw driver

Check for contactor rating and tighteness of contactor Spanners, Screw Drivers,
terminals. Check for coil resistance of the contactor. Allen Key, Multimeter
OWER#2

TYPE OF CHECK (RUN CHECK / IDEAL CONDITION


STOP CHECK / SHUTDOWN)

NO DAMAGE IN DISC AND BODY OF VALVE


STOP CHECK
SHOULD BE OPERATION SMOOTHLY WITHIN OPEN
RUN CHECK AND CLOSE LIMITS
STOP CHECK NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN OPEN
RUN CHECK AND CLOSE LIMITS

NO DAMAGE IN DISC AND BODY O VALVE


STOP CHECK
SHOULD BE OPERATION SMOOTHLY WITHIN OPEN
RUN CHECK AND CLOSE LIMITS
STOP CHECK NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN OPEN
RUN CHECK AND CLOSE LIMITS

NO DAMAGE IN DISC AND BODY O VALVE


STOP CHECK

SHOULD BE OPERATION SMOOTHLY WITHIN OPEN


AND CLOSE LIMITS
RUN CHECK
STOP CHECK NO DAMAGE IN DISC AND BODY O VALVE
SHOULD BE OPERATION SMOOTHLY WITHIN OPEN
RUN CHECK AND CLOSE LIMITS

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS


STOP CHECK

INLET TEMP <30*C, OUT LET TEMP <45*C WATER,


RUN CHECK

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS


STOP CHECK

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS


STOP CHECK
SHOULD BE OPERATIONG WITHIN RANGE AND NO
RUN CHECK LEAKGE
STOP CHECK OIL SHOULD BE WITHIN INDICATED LIMIT
STOP CHECK CLEARANCE <0.15MM
STOP CHECK CLEARANCE <0.15MM
Winding Resistances should be balanced
of all three phases, i.e., less than 5 ohms.
Shut Down check Megger values shouldbe above 5
megaohms from all three phases to
ground.

TAN-DELTA test of HT Motor should be <


SHUTDOWN CHECK
0.04 absolute.

Tightened with 16mm Chrome


Shut Down check
Vanadium Bolts.

Tightened with 12mm high tensile stainless


SHUTDOWN CHECK steel bolts with flat washers and nuts by
Torque Wrench.
Insulation resistance between Phase to Phase
SHUTDOWN CHECK
should be > 20 Mega Ohms

Insulation resistance between Phase to Earth


SHUTDOWN CHECK
should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should be <


SHUTDOWN CHECK
0.004 absolute.
Tightened with 12mm high tensile stainless
SHUTDOWN CHECK steel bolts with flat washers and nuts by
Torque Wrench.

Insulators should be installed properly to


SHUTDOWN CHECK hold and support busbars. Insulators should
be clean.

Resistance between panel to busbar should


SHUTDOWN CHECK
be ˃ 20 mega ohms.
Interlock of Earth Switch and HT Breaker
should be healthy. HT Breaker should not
Rack In during Earth Switch operated
SHUTDOWN CHECK
condition. Also, Back Door of HT Panel
should not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside panel.


RUN CHECK
Space Heater current should be < 1 A
Vertical and Horizontal insulators should
provide high electrical and mechanical
SHUTDOWN CHECK
strength to the busbars. Also, megger value
should be ˃ 20 mega Ohms.
HT Breaker should be clean. There should
not be any moisture or wear and rusting of
contacts.
Proper lubrication of all moving parts of
mechanism.
Proper operation of gear box mechanism.
Proper operation of Test / Service auxiliary
switch operation.
Proper closing and tripping mechanism of
breaker both electrically and manually.
Proper spring charging operation of limit
switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be normal.
SHUTDOWN CHECK Insulation resistance between Upper &
Lower contacts should be > 1 T Ohms
Insulation resistance between Phase to Phase
should be > 1 T Ohms
Insulation resistance between Phase to Earth
should be > 1 T Ohms
Timing of CB during Close should be in ms
of all three phases.
Timing of CB during Open should be in ms
of all three phases.
Timing of CB during Close / Open should
be in ms of all three phases.
Contact Resistance between Upper and
Lower contacts should be in micro ohms of
all three phases.
HVAC Test for 15 KV should withstand for
min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker on the
SHUTDOWN CHECK
faults described in the relay on prescribed
values.
Tightened with 12mm high tensile stainless
SHUTDOWN CHECK steel bolts with flat washers and nuts by
Torque Wrench.
Insulation resistance between Phase to Phase
should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase to Earth
should be > 20 Mega Ohms
TAN-DELTA test of HT Cable should be <
SHUTDOWN CHECK
0.004 absolute.

PT connections should be tight and should


1. measure correct voltage on the relay or
meter.
SHUTDOWN CHECK
2. provide indication of voltage on the panel.
3. trip the HT Breaker through HT Relay on
Over voltage / Under Voltage.

CT connections should be tight and should


1. measure current accurately on the relay or
SHUTDOWN CHECK meter.
2. trip the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT.

Tightened with 12mm high tensile stainless


SHUTDOWN CHECK steel bolts with flat washers and nuts by
Torque Wrench.

Insulators should be installed properly to


SHUTDOWN CHECK hold and support busbars. Insulators should
be clean.

Resistance between panel to busbar should


SHUTDOWN CHECK
be ˃ 20 mega ohms.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside panel.


RUN CHECK
Space Heater current should be < 1 A
Vertical and Horizontal insulators should
provide high electrical and mechanical
SHUTDOWN CHECK
strength to the busbars. Also, megger value
should be ˃ 20 mega Ohms.
HT Softstarter should be clean. There should
not be any moisture or wear and rusting of
SHUTDOWN CHECK contacts.
Thyristors Resistances of all three phases of
HT Softstarter should be in 2 digit nos.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker on the
SHUTDOWN CHECK
faults described in the relay on prescribed
values.
Tightened with 12mm high tensile stainless
SHUTDOWN CHECK steel bolts with flat washers and nuts by
Torque Wrench.
Insulation resistance between Phase to Phase
should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase to Earth
should be > 20 Mega Ohms
TAN-DELTA test of HT Cable should be <
SHUTDOWN CHECK
0.004 absolute.

PT connections should be tight and should


1. measure correct voltage on the relay or
meter.
SHUTDOWN CHECK
2. provide indication of voltage on the panel.
3. trip the HT Breaker through HT Relay on
Over voltage / Under Voltage.

CT connections should be tight and should


1. measure current accurately on the relay or
SHUTDOWN CHECK meter.
2. trip the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT.

Tightened with 12mm high tensile stainless


SHUTDOWN CHECK steel bolts with flat washers and nuts by
Torque Wrench.

Insulators should be installed properly to


SHUTDOWN CHECK hold and support busbars. Insulators should
be clean.

Resistance between panel to busbar should


SHUTDOWN CHECK
be ˃ 20 mega ohms.
Interlock of Earth Switch and HT Breaker
should be healthy. HT Breaker should not
Rack In during Earth Switch operated
SHUTDOWN CHECK
condition. Also, Back Door of HT Panel
should not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside panel.


RUN CHECK
Space Heater current should be < 1 A
Vertical and Horizontal insulators should
provide high electrical and mechanical
SHUTDOWN CHECK
strength to the busbars. Also, megger value
should be ˃ 20 mega Ohms.
HT Breaker should be clean. There should
not be any moisture or wear and rusting of
contacts.
Proper lubrication of all moving parts of
mechanism.
Proper operation of gear box mechanism.
Proper operation of Test / Service auxiliary
switch operation.
Proper closing and tripping mechanism of
breaker both electrically and manually.
Proper spring charging operation of limit
switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be normal.
SHUTDOWN CHECK Insulation resistance between Upper &
Lower contacts should be > 1 T Ohms
Insulation resistance between Phase to Phase
should be > 1 T Ohms
Insulation resistance between Phase to Earth
should be > 1 T Ohms
Timing of CB during Close should be in ms
of all three phases.
Timing of CB during Open should be in ms
of all three phases.
Timing of CB during Close / Open should
be in ms of all three phases.
Contact Resistance between Upper and
Lower contacts should be in micro ohms of
all three phases.
HVAC Test for 15 KV should withstand for
min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker on the
SHUTDOWN CHECK
faults described in the relay on prescribed
values.
Tightened with 12mm high tensile stainless
SHUTDOWN CHECK steel bolts with flat washers and nuts by
Torque Wrench.
Insulation resistance between Phase to Phase
should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase to Earth
should be > 20 Mega Ohms
TAN-DELTA test of HT Cable should be <
SHUTDOWN CHECK
0.004 absolute.

PT connections should be tight and should


1. measure correct voltage on the relay or
meter.
SHUTDOWN CHECK
2. provide indication of voltage on the panel.
3. trip the HT Breaker through HT Relay on
Over voltage / Under Voltage.

CT connections should be tight and should


1. measure current accurately on the relay or
SHUTDOWN CHECK meter.
2. trip the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT.

Winding Resistances should be


balanced of all three phases, i.e., less
than 10 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases to
ground.
Tightened with 10 mm Chrome
Shut Down check
Vanadium Bolts.

Proper tighteness of foundation of


contactor.
No abnormalities to be seen for the
SHUTDOWN CHECK contacts and proper fitting to be
done.
Coil resistance should be between 20
ohms - 30 ohms.

Relay settings:
SHUTDOWN CHECK Relay Range = 4-10A
Relay setting = 6.4A

Motor should stop running during


RUN CHECK
limit switch operation.

Winding Resistances should be


balanced of all three phases, i.e., less
than 10 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases to
ground.

Tightened with 10 mm Chrome


Shut Down check
Vanadium Bolts.

Proper tighteness of foundation of


contactor.
No abnormalities to be seen for the
SHUTDOWN CHECK contacts and proper fitting to be
done.
Coil resistance should be between 15
ohms - 30 ohms.

Motor should stop running during


RUN CHECK
limit switch operation.
Winding Resistances should be
balanced of all three phases, i.e., less
than 10 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases to
ground.

Tightened with 10 mm Chrome


Shut Down check
Vanadium Bolts.

Proper tighteness of foundation of


contactor.
No abnormalities to be seen for the
SHUTDOWN CHECK contacts and proper fitting to be
done.
Coil resistance should be between 15
ohms - 30 ohms.

Motor should stop running during


RUN CHECK
limit switch operation.

Winding Resistances should be


balanced of all three phases, i.e., less
than 10 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases to
ground.

Tightened with 10 mm Chrome


Shut Down check
Vanadium Bolts.

Contactor rarting to be 32A. Proper


tighteness of foundation of contactor.
SHUTDOWN CHECK No abnormalities to be seen for the contacts
and proper fitting to be done.
Coil resistance should be 35-45 ohms.
Relay Range :
23 A - 32 A
SHUTDOWN CHECK
Relay settings = 23A
FLC = 27.5A
The auxiliary contctactor is used to provide
SHUTDOWN CHECK tripping indication whenever the lube oil
pump will trip or power fails.
Winding Resistances should be
balanced of all three phases, i.e., less
than 10 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases to
ground.

Tightened with 10 mm Chrome


Shut Down check
Vanadium Bolts.

Contactor rarting to be 22A. Proper


tighteness of foundation of contactor.
SHUTDOWN CHECK No abnormalities to be seen for the contacts
and proper fitting to be done.
Coil resistance should be 35-45 ohms.

Motor should stop running during


RUN CHECK
limit switch operation.

Softstarter should clean. Check the


SHUTDOWN CHECK
tighteness of the power and control cable.

Contactor rarting to be 32A. Proper


tighteness of foundation of contactor.
SHUTDOWN CHECK No abnormalities to be seen for the contacts
and proper fitting to be done.
Coil resistance should be 25-35 ohms.
ACTUAL CONDITION OBSERVED ACTION REQUIRED
No abnormal difference in winding
resistances. Winding resistance of all three
phases is 0.7 ohms. Megger values are 5
Giga ohms and in healthy condition.

TAN-DELTA test of HT Motor is 0.0022

No looseness of 16 mm Chrome Vanadium


bolts and connecting links.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulation resistance between Phase to Phase is


1000 Ohms

Insulation resistance between Phase to Earth is


1000Mega Ohms

TAN-DELTA test of HT Cable is 0.0028

No looseness of the bolts and connecting links


checked by torque wrench.

Insulators were installed properly and was


clean. No oxydation observed between
insulator and bubar.

Resistance between panel to busbar is 1000


mega ohms.

Interlock of Earth Switch and HT Breaker is


healthy. HT Breaker do not Rack In during
Earth Switch operated condition. Also, Back
Door of HT Panel has not been open when
earth switch is not operated.

Earthing is connected to the body and to the


Earth Pit.
No oxydation and moisture inside panel. Space
Heater current is 0.3 A
Vertical and Horizontal insulators strength to
the busbars are good. Also, megger value is
1000 mega Ohms.

HT Breaker found clean. There is no moisture


or wear and rusting of contacts.

Lubrication of all moving parts of mechanism


is normal.
Operation of gear box mechanism is normal.
Operation of Test / Service auxiliary switch
operation is proper.
Closing and tripping mechanism of breaker
both electrically and manually is proper.
Spring charging operation of limit switch is
normal.
Condition of contact arm assembly of breaker
is proper.
Vacuum inside bottles is normal.
Insulation resistance between Upper & Lower
contacts is > 1 T Ohms
Insulation resistance between Phase to Phase is
> 1 T Ohms
Insulation resistance between Phase to Earth is
> 1 T Ohms
Timing of CB during Close is 48 ms of all
three phases.
Timing of CB during Open is 41 ms of all
three phases.
Timing of CB during Close / Open is 21 ms of
all three phases.

Contact Resistance between Upper and Lower


contacts is 45 micro ohms of all three phases.

HVAC Test for 15 KV withstand for min. of all


three phases.

HT Breaker Numerical Relay tripping is


healthy to trip the breaker on the faults
described in the relay on prescribed values.
No looseness of the bolts and connecting links
checked by torque wrench.

Insulation resistance between Phase to Phase is


1100 Ohms
Insulation resistance between Phase to Earth is
1000Mega Ohms
TAN-DELTA test of HT Cable is 0.0017

PT connections are tight and display correct


voltage on the relay. Indication of voltage on
the panel is shown. Trippig of the HT Breaker
through HT Relay on Over voltage / Under
Voltage is healthy.

CT connections are tight and display accurate


current on the relay. Trippig of the HT Breaker
through HT Relay on Over curent / CIR /
ITOC / DMT is healthy.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulators were installed properly and was


clean. No oxydation observed between
insulator and bubar.

Resistance between panel to busbar is 1000


mega ohms.

Earthing is connected to the body and to the


Earth Pit.

No oxydation and moisture inside panel. Space


Heater current is 0.3 A

Vertical and Horizontal insulators strength to


the busbars are good. Also, megger value is
1000 mega Ohms.
HT Softstarter found clean. There is no
moisture or wear and rusting of contacts.

All thyristors resistances are in double digit


nos. between 11 to 13 ohms.

HT Breaker Numerical Relay tripping is


healthy to trip the breaker on the faults
described in the relay on prescribed values.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulation resistance between Phase to Phase is


1000 Ohms
Insulation resistance between Phase to Earth is
1000Mega Ohms
TAN-DELTA test of HT Cable is 0.0029

PT connections are tight and display correct


voltage on the relay. Indication of voltage on
the panel is shown. Trippig of the HT Breaker
through HT Relay on Over voltage / Under
Voltage is healthy.

CT connections are tight and display accurate


current on the relay. Trippig of the HT Breaker
through HT Relay on Over curent / CIR /
ITOC / DMT is healthy.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulators were installed properly and was


clean. No oxydation observed between
insulator and bubar.

Resistance between panel to busbar is 1000


mega ohms.
Interlock of Earth Switch and HT Breaker is
healthy. HT Breaker do not Rack In during
Earth Switch operated condition. Also, Back
Door of HT Panel has not been open when
earth switch is not operated.

Earthing is connected to the body and to the


Earth Pit.
No oxydation and moisture inside panel. Space
Heater current is 0.3 A

Vertical and Horizontal insulators strength to


the busbars are good. Also, megger value is
1000 mega Ohms.

HT Breaker found clean. There is no moisture


or wear and rusting of contacts.

Lubrication of all moving parts of mechanism


is normal.
Operation of gear box mechanism is normal.
Operation of Test / Service auxiliary switch
operation is proper.
Closing and tripping mechanism of breaker
both electrically and manually is proper.
Spring charging operation of limit switch is
normal.
Condition of contact arm assembly of breaker
is proper.
Vacuum inside bottles is normal.
Insulation resistance between Upper & Lower
contacts is > 1 T Ohms
Insulation resistance between Phase to Phase is
> 1 T Ohms
Insulation resistance between Phase to Earth is
> 1 T Ohms
Timing of CB during Close is 48 ms of all
three phases.
Timing of CB during Open is 41 ms of all
three phases.
Timing of CB during Close / Open is 21 ms of
all three phases.

Contact Resistance between Upper and Lower


contacts is 45 micro ohms of all three phases.

HVAC Test for 15 KV withstand for min. of all


three phases.

HT Breaker Numerical Relay tripping is


healthy to trip the breaker on the faults
described in the relay on prescribed values.

No looseness of the bolts and connecting links


checked by torque wrench.

Insulation resistance between Phase to Phase is


1100 Ohms
Insulation resistance between Phase to Earth is
1000Mega Ohms
TAN-DELTA test of HT Cable is 0.0017

PT connections are tight and display correct


voltage on the relay. Indication of voltage on
the panel is shown. Trippig of the HT Breaker
through HT Relay on Over voltage / Under
Voltage is healthy.

CT connections are tight and display accurate


current on the relay. Trippig of the HT Breaker
through HT Relay on Over curent / CIR /
ITOC / DMT is healthy.

No abnormal difference in winding


resistances. Winding resistance of all
three phases is 7.1 ohms. Megger values
are 500 mega ohms and in healthy
condition.
No looseness of 10 mm Chrome
Vanadium bolts and connecting links.

No looseness in fitting of contactor and


connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 25 ohms.

Inspected Relay Range = 4-10A


Relay setting = 6.0A
Running Current = 5.0 A

Motor stop running during limit switch


operation.

No abnormal difference in winding


resistances. Winding resistance of all
three phases is 7.1 ohms. Megger values
are 500 mega ohms and in healthy
condition.

No looseness of 10 mm Chrome
Vanadium bolts and connecting links.

No looseness in fitting of contactor and


connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 20 ohms.

Motor stop running during limit switch


operation.
No abnormal difference in winding
resistances. Winding resistance of all
three phases is 7.1 ohms. Megger values
are 500 mega ohms and in healthy
condition.

No looseness of 10 mm Chrome
Vanadium bolts and connecting links.

No looseness in fitting of contactor and


connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 20 ohms.

Motor stop running during limit switch


operation.

No abnormal difference in winding


resistances. Winding resistance of all
three phases is 9.5 ohms. Megger
values are 1000 mega ohms and in
healthy condition.

No looseness of 10 mm Chrome
Vanadium bolts and connecting links.

Contactor rarting is 32A. No looseness in


fitting of contactor and connection of cables to
power contactor and its contacts. Coil
resistance is 39.5 ohms.

Checked Relay Range :


23 A - 32 A
Relay settings = 23A
RC = 13.7A

Indication for tripping of lube oil pump is


healthy.
No abnormal difference in winding
resistances. Winding resistance of all
three phases is 9.5 ohms. Megger
values are 1000 mega ohms and in
healthy condition.

No looseness of 10 mm Chrome
Vanadium bolts and connecting links.

Contactor rarting is 22A. No looseness in


fitting of contactor and connection of cables to
power contactor and its contacts. Coil
resistance is 41.8 ohms.

Motor stop running during limit switch


operation.

Softstarter is clean. Tighteness of the power


and control cable is normal.

Contactor rarting is 65A. No looseness in


fitting of contactor and connection of cables to
power contactor and its contacts. Coil
resistance is 29 ohms.
EQUIPMENT: Sub Equipments COMPONENT

SP-SS-MAIN-FAN LUBRICATION ASSEMBLY FILTER SPL -50

SP-SS-MAIN-FAN LUBRICATION ASSEMBLY TUBE TYPE OIL COOLER,

SP-SS-MAIN-FAN LUBRICATION ASSEMBLY LABYRINTH SEAL


SP-SS-MAIN-FAN LUBRICATION ASSEMBLY OIL PUMP MAIN FAN
SP-SS-MAIN-FAN FAN ROTATNG ASMBLY EXHAUST FAN
SP-SS-MAIN-FAN FAN FIXED (THRUST)BEARING
SP-SS-MAIN-FAN FAN FREE(SUPPORT) BEARING
SP-SS-MAIN-FAN FAN COUPLING BOLT W/NUT

SP-SS-MAIN-FAN FAN RELAY


SP-SS-MAIN-FAN FAN CAMMAND & FEEDBACK CABLE

SP-SS-MAIN-FAN FAN DI ,DO, AI, AO Card, PLC , IM modules


SP-SS-MAIN-FAN FAN SMPS
SP-SS-MAIN-FAN FAN Profibus Cable
SP-SS-MAIN-FAN FAN VIBRATION TRANSMITTER
SP-SS-MAIN-FAN FAN RTD
SP-SS-MAIN-FAN FAN PRESSURE TRANSMITTER
CONDITION APPRAISAL OF MAIN

Item Code SPECIFICATIONS

5114000016 , LATUS RECTUM (MM)-50


5114010008 MODEL-2CFE-14

5114000039 SP DRG NO 2220-02131 B


5114000128 POWER PACK - SP
5114040001 HEAD END ESP
0940000038 Φ180 FAN 7500JZ-SP
0940000039 Φ 180 FAN7500JZ-SP
804990093 FOR HEAD ESP FAN
CONDITION APPRAISAL OF MAIN EXHAUST FAN

DESCRIPTION / DIMENSION TOOLS REQUIRED

CHECK FOR CLOGGING SPANNERS


CHECK FOR INLET TEMP AND OUTLET TEMP OF WATER VISUAL AT GAUGE
CHECK FOR INLET TEMP AND OUTLET TEMP OF OIL VISUAL AT GAUGE
CHECK FOR LEAKAGE FROM SEAL VISUAL
CHECK FOR PRESSURE AT OUTLET OF PUMP VISUAL AT GAUGE
CHECK FOR IMPELLOR WEAROUT & DAMAGE VISUAL
CHECK FOR CLEARANCE OF BEARING LEAD WIRE
CHECK FOR CLEARANCE OF BEARING LEAD WIRE
CHECK FOR CRACKS AND DAMAGE SPANNERS

checking healthyness by operating DOL starter of motor. Multimeter,Tester


checking healthyness by Run the motor Multimeter,Tester

checking healthyness by operating DOL starter of motor and run feedback. Multimeter,Tester
check supply voltage and output Voltage Multimeter,Tester
checking of commnunication on SCADA sytem and on PLC card Multimeter,Tester
checking of fan beraing vibration Multimeter,Tester
checking of motor winding, moter bearing & fan bearing temperature Multimeter,Tester
checking of fan bearing lubrication oil pressure Multimeter,Tester
TYPE OF CHECK
(RUN CHECK / IDEAL CONDITION
STOP CHECK /
SHUTDOWN)

STOP CHECK NO CLOGGING IN FILTER


RUN CHECK INLET <31*C OUTLET TEMP <40*C
RUN CHECK INLET <45*C OUTLET TEMP <35*C
RUN CHECK NO LEAKAGE FROM SEAL
RUN CHECK BETWEEN 0.10mpa TO 0.30mPA
STOP CHECK NO WEAROUT AND DAMAGE AT FINS
STOP CHECK CLEARANCE <0.15MM
STOP CHECK CLEARANCE <0.15MM
STOP CHECK NO CRACKS AND DAMAGE
Check for healthiness of NO - NC contacts during
Run check operation.
Run check Physical check or damage of cable

Run check Physical check


Run check Physical check
Run check Physical check
Run check Physical check
Run check Physical check
Run check Physical check
ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormalities found in switching of contacts during operation.


No abnormalities found

No abnormalities found
No abnormalities found
No abnormalities found
No abnormalities found
No abnormalities found
No abnormalities found
APPRAISAL OF SINTER MACHINE
EQUIPMENT: Sub
Equipments COMPONENT Item Code
SP-SS-SM SP-SS-SM GEARBOX SINTER M/C, RDC TRIPLE RING RED 5114000006
SP-SS-SM SP-SS-SM Drive Sprocket journal bearing 0940000021
SP-SS-SM SP-SS-SM HEAD END BEARING BLOCK 5114000122
SP-SS-SM SP-SS-SM Driven Sprocket Journal bearing 0940000022
SP-SS-SM SP-SS-SM TAIL END BEARING BLOCK 5114000123
SP-SS-SM SP-SS-SM SPROCKET TEETH 75M2 SINTER MACHINE 5114000001
SP-SS-SM SP-SS-SM SINTER PALLET PRESSURE ROLLER 5114000035
SP-SS-SM SP-SS-SM SINTER PALLET CARS 5114000030
SP-SS-SM SP-SS-SM SINTER PALLET CARS
SP-SS-SM SP-SS-SM HEAD N TAIL END SEALING PLATE F/ SP 5114040023
SP-SS-SM SP-SS-SM Rail Clamp Fastner 0601010186
SP-SS-SM SP-SS-SM ROTARY CHUTE FOR SINTER MACHINE 75M3-SP 5114000115
SP-SS-SM SP-SS-SM Pulley of tensioning device 0811900014

SP-SS-SM SP-SS-SM
RELAY
SP-SS-SM SP-SS-SM CAMMAND & FEEDBACK CABLE
SP-SS-SM SP-SS-SM
DI ,DO, AI, AO Card, PLC , IM modules
SP-SS-SM SP-SS-SM SMPS
SP-SS-SM SP-SS-SM Profibus Cable
SPECIFICATION DESCRIPTION / DIMENSION

CHECK FOR PHYSICAL DAMAGE


( dia-400,L-350,T-20) CHECK FOR CLEARANCE OF BEARING
CHECK FOR PHYSICAL DAMAGE
(dia-280,L-280,T-20) CHECK FOR CLEARANCE OF BEARING
CHECK FOR PHYSICAL DAMAGE
CHECK FOR FACE WIDTH WEAR OUT
CHECK FOR FREE MOVEMENT OF ROLLERS
CHECK FOR WHEEL MOVEMENT
CHECK FOR SIDE WALL COND.
CHECK FOR WEAROUT AND DAMAGE
M24x150 CHECK FOR BOLT TIGHTNESS AND RUSTING
CHECK FOR WHEEL MOVEMENT
CHECK FOR CRACKS AND DAMAGE

checking healthyness by operating DOL starter of motor.


checking healthyness by Run the motor

checking healthyness by operating DOL starter of motor and run feedback.


check supply voltage and output Voltage
checking of commnunication on SCADA sytem and on PLC card
TOOLS REQUIRED TYPE OF CHECK (RUN CHECK / IDEAL CONDITION
STOP CHECK / SHUTDOWN)
VISUAL STOP CHECK NO PHYSICAL DAMAGE TO BODY
LEAD WIRE STOP CHECK CLEARANCE <1MM
VISUAL STOP CHECK NO PHYSICAL DAMAGE TO BODY
LEAD WIRE STOP CHECK CLEARANCE <1MM
VISUAL STOP CHECK NO PHYSICAL DAMAGE TO BODY
VISUAL STOP CHECK FACE WIDTH SHOULD BE 230MM-250MM
VISUAL RUN CHECK ROLLERS SHOULD BE ROTATING
VISUAL RUN CHECK WHEEL SHOULD BE ROTATING
VISUAL RUN CHECK SIDE WALL SHOULD NOT BE BEND
VISUAL STOP CHECK SHOULD NOT BE DAMAGED AND WORNOUT
SPANNERS STOP CHECK BOLTS SHOULD BE TIGHT AND RUSTFREE
VISUAL STOP CHECK WHEEL SHOULD BE ROTATING
VISUAL STOP CHECK SHOULD NOT BE DAMAGE
Check for healthiness of NO - NC contacts during
Multimeter,Tester Run check operation.
Multimeter,Tester Run check Physical check or damage of cable

Multimeter,Tester Run check Physical check


Multimeter,Tester Run check Physical check
Multimeter,Tester Run check Physical check
ACTION
ACTUAL CONDITION OBSERVED REQUIRED

No abnormalities found in switching of


contacts during operation.
No abnormalities found

No abnormalities found
No abnormalities found
No abnormalities found
EQUIPMENT: Sub Equipments COMPONENT Item Code

SP-SS-SRC SP-SS-SRC GRIZZLY BAR 5114000011


SP-SS-SRC SP-SS-SRC GEARBOX 5114050016
SP-SS-SRC SP-SS-SRC SINGLE ROLL CRUSHER BEARING ASSEMBLEY,SP 5114050018

RIBBED V BELT 0802990030


SP-SS-SRC SP-SS-SRC
SP-SS-SRC SP-SS-SRC SINGLE ROLL CRUSHER DRIVE PULLEY 0812900003
SP-SS-SRC SP-SS-SRC SINGLE ROLL CRUSHER DRIVEN PULLEY 0812900004

CPLG 0804030067
SP-SS-SRC SP-SS-SRC
SP-SS-SRC SP-SS-SRC BUSH FOR PIN BUSH COUPLING 0804030094
SP-SS-SRC SP-SS-SRC MECHANICAL SEAL FOR ROATRY CATCHER 2516000010
SP-SS-SRC SP-SS-SRC SIDE LINER FOR SINGLE ROLL CRUSHER LHS 5114050043
SP-SS-SRC SP-SS-SRC SIDE LINER FOR SINGLE ROLL CRUSHER RHS 5114050044
SP-SS-SRC SP-SS-SRC CRUSH DECK FOR SINTER MACHINE 75M3-SP 5114000116

SP-SS-SRC SP-SS-SRC RELAY

SP-SS-SRC SP-SS-SRC CAMMAND & FEEDBACK CABLE

SP-SS-SRC SP-SS-SRC DI ,DO, AI Card, PLC , IM modules

SP-SS-SRC SP-SS-SRC SMPS

SP-SS-SRC SP-SS-SRC Profibus Cable


CONDITION APPRAISAL OF SINGLE ROLL CRUSH

Specification DESCRIPTION / DIMENSION

CHECK FOR DAMAGE/WEAR OUT


,MODEL ZL115-14-II CHECK FOR PHYSICAL DAMAGE
CHECK FOR CLEARANCE OF BEARING
20 PM 3350, SP(20 M-3350, V ribbed
belt m section, no of ribs -20) CHECK FOR DEFORMATOIN/DAMAGE
CHECK FOR GROOVE
CHECK FOR GROOVE
,PIN AND BUSH FLEXIBLE,UB 710,
(optional) CHECK FOR DAMAGE
UB 710 CHECK FOR WEAR OUT
CHECK FOR DISLODGE
CHECK FOR DAMAGE/WEAR OUT
CHECK FOR DAMAGE/WEAR OUT
CHECK FOR DAMAGE/WEAR OUT

checking healthyness by operating DOL starter of motor.

checking healthyness by Run the motor


checking healthyness by operating DOL starter of motor and run
feedback.

check supply voltage and output Voltage

checking of commnunication on SCADA sytem and on PLC card


INGLE ROLL CRUSHER
TYPE OF CHECK
(RUN CHECK / STOP
TOOLS REQUIRED IDEAL CONDITION
CHECK /
SHUTDOWN)
VISUAL STOP CHECK NO DAMAGE/NO WEAR OUT
VISUAL STOP CHECK NO PHYSICAL DAMAGE TO BODY
FILLER GUAGE STOP CHECK CLEARANCE <0.35MM

VISUAL STOP CHECK NO DEFORMATION/DAMAGE


VISUAL STOP CHECK NO DAMAGE TO GROOVE
VISUAL STOP CHECK NO DAMAGE TO GROOVE

VISUAL STOP CHECK NO DAMAGE


VERNIER STOP CHECK DIA SHOLD BE 38-40MM
SPANNER STOP CHECK SHOULD BE IN POSITOIN
VISUAL STOP CHECK NO DAMAGE/NO WEAR OUT
VISUAL STOP CHECK NO DAMAGE/NO WEAR OUT
VISUAL STOP CHECK NO DAMAGE/NO WEAR OUT
Check for healthiness of NO - NC contacts
Multimeter,Tester Run check during operation.

Multimeter,Tester Run check Physical check or damage of cable

Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check


ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormalities found in switching of contacts during


operation.

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found
CONDITIO
EQUIPMENT: Sub Equipments COMPONENT

LT WHEEL DRIVE BEARING


BF3-CH-CRANE LT GB#1
LT WHEEL NON DRIVE
BF3-CH-CRANE LT GB#1 BEARING

GEAR BOX FOR LT


BF3-CH-CRANE LT GB#1
BF3-CH-CRANE LT GB#1 WHEEL INPUT SHAFT

Extention shaft
BF3-CH-CRANE LT GB#1
G.B.INPUT SHAFT
BF3-CH-CRANE LT GB#1
BF3-CH-CRANE LT GB#1 G.B, OUT PUT SHAFT

Extention shaft
BF3-CH-CRANE LT GB#1
COUPLING MOTOR TO GB
BF3-CH-CRANE LT GB#1
BF3-CH-CRANE LT GB#1 COUPLING GB TO WHEEL

LT WHEEL DRIVE BEARING


BF3-CH-CRANE LT GB#2
LT WHEEL NON DRIVE
BF3-CH-CRANE LT GB#2 BEARING

GEAR BOX FOR LT


BF3-CH-CRANE LT GB#2
WHEEL INPUT SHAFT
BF3-CH-CRANE LT GB#2 LHG106,
Extention shaft (G B OUT
BF3-CH-CRANE LT GB#2 wheel.INPut) LHG106,
G.B.INPUT SHAFT
BF3-CH-CRANE LT GB#2 ,RIGID,FS,RGR 102,
G.B, OUT PUT SHAFT
BF3-CH-CRANE LT GB#2 ,LHG106
Extention shaft (Motor OUT
BF3-CH-CRANE LT GB#2 G.B.INPut), LHG102
COUPLING MOTOR TO GB
BF3-CH-CRANE LT GB#2
BF3-CH-CRANE LT GB#2 COUPLING GB TO WHEEL

GEAR BOX FOR CT


BF3-CH-CRANE CT-GB
G.B, OUT PUT SHAFT
BF3-CH-CRANE CT-GB ,RGR 103,
WHEEL INPUT SHAFT ,
BF3-CH-CRANE CT-GB RGR 103,
Extention shaft G.B.Out TO
BF3-CH-CRANE CT-GB Wheel INput) LHG103

G.B.IN PUT SHAFT LHG103


BF3-CH-CRANE CT-GB
COUPLING MOTOR TO GB
BF3-CH-CRANE CT-GB
BF3-CH-CRANE CT-GB COUPLING GB TO WHEEL
BF3-CH-CRANE MAIN HOIST GB TOP PULLEY ASSEMBLY

16T MAIN HOIST GEARBOX


WITH DRUM
BF3-CH-CRANE MAIN HOIST GB

Extention shaft (Motor


OUTTO G.B.INPut) LHG103
BF3-CH-CRANE MAIN HOIST GB
BF3-CH-CRANE MAIN HOIST GB COUPLING

CH CRANE
BF3-CH-CRANE PROTECTIVE SFU, 250 A
PANEL
CH CRANE
MAIN POWER
BF3-CH-CRANE PROTECTIVE
CONTACTOR
PANEL

CH CRANE
PHASE INDICATION
BF3-CH-CRANE PROTECTIVE
LAMP
PANEL

CH CRANE
CURRENT
BF3-CH-CRANE PROTECTIVE
TRANSFORMER
PANEL

CH CRANE
CONTROL
BF3-CH-CRANE PROTECTIVE
TRANSFORMER
PANEL

CH CRANE
CH CRANE DOOR
BF3-CH-CRANE PROTECTIVE
Limit Switch
PANEL
CH-CRANE-MH-
BF3-CH-CRANE Motor Windings
MTR

CH-CRANE-MH-
BF3-CH-CRANE Slip Rings
MTR

CH-CRANE-MH-
BF3-CH-CRANE Resistance Box
MTR

CH-CRANE-MH-
BF3-CH-CRANE Carbon Brush
MTR
CH-CRANE-MH-
BF3-CH-CRANE Terminal Box
MTR

BF3-CH-CRANE-
BF3-CH-CRANE SFU, 160 A
PNL

BF3-CH-CRANE- Power Contactor


BF3-CH-CRANE
PNL (Hoist and Lower)
BF3-CH-CRANE- Resistance Contactor
BF3-CH-CRANE
PNL (Hoist and Lower)

BF3-CH-CRANE- Stator Overload Relay


BF3-CH-CRANE
PNL with Kit

BF3-CH-CRANE- Rotor Overload Relay


BF3-CH-CRANE
PNL with Kit

BF3-CH-CRANE- Electronic Timer ON /


BF3-CH-CRANE
PNL OFF Delay

BF3-CH-CRANE-
BF3-CH-CRANE Rotary Limit Switch
PNL

BF3-CH-CRANE- Main Hoist Gravity


BF3-CH-CRANE
PNL Limit Switch
BF3-CH-CRANE- Main Hoist Master
BF3-CH-CRANE
PNL Controller Joystic

BF3-CH-MH- Thruster brake 1


BF3-CH-CRANE
BRK1 Power Contactor

CH-CRANE-MH- Thruster brake 1


BF3-CH-CRANE
BRK1 Overload Relay

CH-CRANE-MH-
BF3-CH-CRANE Thrustor Motor
BRK1
CH-CRANE-MH-
BF3-CH-CRANE Brake Shoe and Liner
BRK1

CH-CRANE-MH- Thruster brake 2


BF3-CH-CRANE
BRK2 Power Contactor

CH-CRANE-MH- Thruster brake 2


BF3-CH-CRANE
BRK2 Overload Relay

CH-CRANE-MH-
BF3-CH-CRANE Thrustor Motor
BRK2
CH-CRANE-MH-
BF3-CH-CRANE Brake Shoe and Liner
BRK2

CH-CRANE-LT-
BF3-CH-CRANE Motor Windings LT 1
MTR1

CH-CRANE-LT-
BF3-CH-CRANE Slip Rings LT 1
MTR1
CH-CRANE-LT-
BF3-CH-CRANE Motor Windings LT 2
MTR2

CH-CRANE-LT-
BF3-CH-CRANE Slip Rings LT 2
MTR2

CH-CRANE-CT-
BF3-CH-CRANE Slip Rings CT
MTR
CH-CRNE-LT-
BF3-CH-CRANE Resistance Box LT 1
MTR-RB

CH-CRNE-LT-
BF3-CH-CRANE Resistance Box LT 2
MTR-RB
CH-CRNE-CT-
BF3-CH-CRANE Resistance Box CT
MTR-RB

CH-CRANE-LT-
BF3-CH-CRANE Carbon Brush LT1
MTR1

CH-CRANE-LT-
BF3-CH-CRANE Carbon Brush LT2
MTR2

CH-CRANE-CT-
BF3-CH-CRANE Carbon Brush CT
MTR
CH-CRANE-LT-
BF3-CH-CRANE Terminal Box LT1
MTR1

CH-CRANE-LT-
BF3-CH-CRANE Terminal Box LT2
MTR2
CH-CRANE-CT-
BF3-CH-CRANE Terminal Box CT
MTR

CH-CRANE-LT-
BF3-CH-CRANE LT SFU, 63 A
PNL

CH-CRANE-LT- Power Contactor LT1


BF3-CH-CRANE
PNL (Forward & Reverse)
CH-CRANE-LT- Power Contactor LT2
BF3-CH-CRANE
PNL2 (Forward & Reverse)

Resistance Contactor
CH-CRANE-LT-
BF3-CH-CRANE LT1 (Forward &
PNL
Reverse)

Resistance Contactor
CH-CRANE-LT-
BF3-CH-CRANE LT2 (Forward &
PNL2
Reverse)
CH-CRANE-LT- Stator Overload Relay
BF3-CH-CRANE
PNL LT1

CH-CRANE-LT- Rotor Overload Relay


BF3-CH-CRANE
PNL1 LT1

CH-CRANE-LT- Rotor Overload Relay


BF3-CH-CRANE
PNL LT2

CH-CRANE-LT- Stator Overload Relay


BF3-CH-CRANE
PNL LT2

CH-CRANE-LT- Electronic Timer ON /


BF3-CH-CRANE
PNL OFF Delay

Lever type LT
CH-CRANE-LT-
BF3-CH-CRANE Forward / Reverse
PNL
Limit Switch

CH-CRANE-CT-
BF3-CH-CRANE CT SFU, 32 A
PNL
CH-CRANE-CT- Power Contactor CT
BF3-CH-CRANE
PNL (Forward & Reverse)

Resistance Contactor
CH-CRANE-CT-
BF3-CH-CRANE CT (Forward &
PNL
Reverse)

CH-CRANE-CT- Rotor Overload Relay


BF3-CH-CRANE
PNL CT

CH-CRANE-CT- Stator Overload Relay


BF3-CH-CRANE
PNL CT
CH-CRANE-CT- Electronic Timer ON /
BF3-CH-CRANE
PNL OFF Delay

Lever type CT
CH-CRANE-CT-
BF3-CH-CRANE Forward / Reverse
PNL
Limit Switch

CH-CRANE-CT- CT Master Controller


BF3-CH-CRANE
PNL Joystick

CH-CRANE-LT- Thruster brake Power


BF3-CH-CRANE
BRK1 Contactor

CH-CRANE-LT- Thruster brake


BF3-CH-CRANE
BRK1 Overload Relay
CH-CRANE-LT-
BF3-CH-CRANE Thrustor Motor LT1
BRK1

CH-CRANE-LT- Thruster brake Power


BF3-CH-CRANE
BRK1 Contactor

CH-CRANE-LT- Thruster brake


BF3-CH-CRANE
BRK1 Overload Relay
CH-CRANE-LT-
BF3-CH-CRANE Thrustor Motor LT2
BRK2

CH-CRANE-LT- Thruster brake Power


BF3-CH-CRANE
BRK2 Contactor

CH-CRANE-LT- Thruster brake


BF3-CH-CRANE
BRK2 Overload Relay

CH-CRANE-LT- Brake Shoe and Liner


BF3-CH-CRANE
BRK1 LT1
CH-CRANE-LT- Brake Shoe and Liner
BF3-CH-CRANE
BRK2 LT2

CH-CRANE-CT- Thruster brake Power


BF3-CH-CRANE
BRK Contactor

CH-CRANE-CT- Thruster brake


BF3-CH-CRANE
BRK Overload Relay

CH-CRANE-CT-
BF3-CH-CRANE Thrustor Motor CT
BRK
CH-CRANE-CT- Brake Shoe and Liner
BF3-CH-CRANE
BRK CT
CONDITION APPRAISAL OF CAST HOUSE CRANE 16T
TYPE OF CHECK
SPECIFICATI DESCRIPTION / DIMENSION (RUN CHECK / STOP
Item Code TOOLS REQUIRED
ON CHECK /
SHUTDOWN)

BEARING TO BE CHECKED FOR


CLEARANCE FILLER GAUGE STOP CHECK
BEARING TO BE CHECKED FOR
CLEARANCE FILLER GAUGE STOP CHECK

5116060034 CHECK FOR INTERNAL GEAR COND.


BY OPENING TOP FLANGE SPANNERS STOP CHECK
0804070061 LHG106, CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

(G B OUT
wheel.INPut)
0804070061 LHG106, CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK
,
RIGID,FS,RGR
0804030072 102, CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK
0844070061 ,LHG106 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

(Motor OUT
G.B.INPut),
0804070030 LHG102 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK


CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
BEARING TO BE CHECKED FOR
CLEARANCE FILLER GAUGE STOP CHECK
BEARING TO BE CHECKED FOR
CLEARANCE FILLER GAUGE STOP CHECK

5116060034 CHECK FOR INTERNAL GEAR COND.


BY OPENING TOP FLANGE SPANNERS STOP CHECK

0804070061 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

0804070061 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

0804030072 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

0844070061 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

0804070030 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK


CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

5116060030 CHECK FOR INTERNAL GEAR COND.


BY OPENING TOP FLANGE SPANNERS STOP CHECK

0804030073 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

0804030073 CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

0804070031
CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

0804070031
CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK


CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
5116060096 CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

5116060059 CHECK FOR INTERNAL GEAR COND.


BY OPENING TOP FLANGE SPANNERS STOP CHECK

0804070031
CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

Check for fuse rating and VISUAL /


SHUTDOWN
250 A continuity of input / MULTIMETE
CHECK
output terminals. R
Spanners,
For switching a power
3TF54 Screw Drivers, SHUTDOWN
circuit with higher
00-0A Allen Key, CHECK
current ratings
Multimeter

Check for indication of


240 VAC VISUAL RUN CHECK
input voltage of the panel.

Check for tighteness of


connections and measure
150 / 5 A VISUAL RUN CHECK
the correct current shown
in the meter.

To check for connections


2 KVA, and power rating of
Spanners / SHUTDOWN
415 / 110 transformer. Input and
Multimeter CHECK
VAC output voltage should be
415 / 110 VAC

Check for switching NO /


VISUAL /
NC Contact as per set
10 A MULTIMETE RUN CHECK
value during Crane
R
operation.
To form magnetic field
when energized with Megger & SHUTDOWN
current to produce Multimeter CHECK
torque.

To allow the transmission


of power and electrical
signals from a stationary
to a rotating structure. It
SHUTDOWN
can be used in any Visual
CHECK
electromechanical system
that requires rotation
while transmitting power
or signals.

To check for multiple


resistors hooked up to
one or multiple switches
and is designed to provide
multiple electrical Megger & SHUTDOWN
resistances. To vary Multimeter CHECK
desired speed by varying
the resistances. Also, to
provide initial torque to
the motor.

To conduct current
between stationary wires
SHUTDOWN
and moving parts, most Visual
CHECK
commonly in a rotating
shaft.
Allows the power cable to
be fixed with the motor
windings cable properly
insulated, clamped and
sealed connector to
provide greater protecton SHUTDOWN
Spanners
from short circuiting of CHECK
cables.
Check for cable
termination tighteness
and properly glanding
done.

Check for fuse rating and VISUAL /


SHUTDOWN
160 A continuity of input / MULTIMETE
CHECK
output terminals. R

Spanners,
For switching a power
Screw Drivers, SHUTDOWN
110 A circuit with higher
Allen Key, CHECK
current ratings
Multimeter
Spanners,
For switching a power
Screw Drivers, SHUTDOWN
63 A circuit with higher
Allen Key, CHECK
current ratings
Multimeter

Check for overload relay


range and setting of relay
Visual RUN CHECK
current for motor
tripping.
Check for overload relay
range and setting of relay
Visual RUN CHECK
current for motor
tripping.

Check for Timer ON /


0.5 - 10
OFF switching as per set Visual RUN CHECK
sec
value.

Check for switching NO /


VISUAL /
NC Contact as per set
40 A MULTIMETE RUN CHECK
value during hoisting and
R
lowering operation.

Check for switching NO /


VISUAL /
NC Contact as per set
40 A MULTIMETE RUN CHECK
value during hoisting
R
operation.
Check for switching NO /
NC Contact as per set VISUAL /
10 A value during hoisting MULTIMETE RUN CHECK
operation. Check for wear R
and tear of contacts.

Check for contactor rating


Spanners,
and tighteness of
Screw Drivers, SHUTDOWN
contactor terminals.
Allen Key, CHECK
Check for coil resistance
Multimeter
of the contactor.

Check for overload relay


range and setting of relay
(1 - 1.6 ) A Visual RUN CHECK
current for motor
tripping.

To drive the pump and


delivers working fluid
under the piston axially in
the guided path, and
delivers thrust or force Megger & SHUTDOWN
required to operate the Multimeter CHECK
attached devise (like
thruster brake) via the
piston rod and the eye-lug
attached to it.
Spanners,
To provide friction for Screw Driver,
SHUTDOWN
braking of rotary drum Plier, Vernier
CHECK
when motor is stopped. Calliper
Visual

Check for contactor rating


Spanners,
and tighteness of
Screw Drivers, SHUTDOWN
contactor terminals.
Allen Key, CHECK
Check for coil resistance
Multimeter
of the contactor.

Check for overload relay


range and setting of relay
Visual RUN CHECK
current for motor
tripping.

To drive the pump and


delivers working fluid
under the piston axially in
the guided path, and
delivers thrust or force Megger & SHUTDOWN
required to operate the Multimeter CHECK
attached devise (like
thruster brake) via the
piston rod and the eye-lug
attached to it.
Spanners,
To provide friction for Screw Driver,
SHUTDOWN
braking of rotary drum Plier, Vernier
CHECK
when motor is stopped. Calliper
Visual

To form magnetic field


when energized with Megger & SHUTDOWN
current to produce Multimeter CHECK
torque.

To allow the transmission


of power and electrical
signals from a stationary
to a rotating structure. It
SHUTDOWN
can be used in any Visual
CHECK
electromechanical system
that requires rotation
while transmitting power
or signals.
To form magnetic field
when energized with Megger & SHUTDOWN
current to produce Multimeter CHECK
torque.

To allow the transmission


of power and electrical
signals from a stationary
to a rotating structure. It
SHUTDOWN
can be used in any Visual
CHECK
electromechanical system
that requires rotation
while transmitting power
or signals.

To allow the transmission


of power and electrical
signals from a stationary
to a rotating structure. It
SHUTDOWN
can be used in any Visual
CHECK
electromechanical system
that requires rotation
while transmitting power
or signals.
It is an equipment that
contains multiple
resistors hooked up to
one or multiple switches
and is designed to provide
Megger & SHUTDOWN
multiple electrical
Multimeter CHECK
resistances. To vary
desired speed by varying
the resistances. Also, to
provide initial torque to
the motor.

It is an equipment that
contains multiple
resistors hooked up to
one or multiple switches
and is designed to provide
Megger & SHUTDOWN
multiple electrical
Multimeter CHECK
resistances. To vary
desired speed by varying
the resistances. Also, to
provide initial torque to
the motor.
It is an equipment that
contains multiple
resistors hooked up to
one or multiple switches
and is designed to provide
Megger & SHUTDOWN
multiple electrical
Multimeter CHECK
resistances. To vary
desired speed by varying
the resistances. Also, to
provide initial torque to
the motor.

To conduct current
between stationary wires
SHUTDOWN
and moving parts, most Visual
CHECK
commonly in a rotating
shaft.
To conduct current
between stationary wires
SHUTDOWN
and moving parts, most Visual
CHECK
commonly in a rotating
shaft.
To conduct current
between stationary wires
SHUTDOWN
and moving parts, most Visual
CHECK
commonly in a rotating
shaft.
Allows the power cable to
be fixed with the motor
windings cable properly
insulated, clamped and
sealed connector to
provide greater protecton SHUTDOWN
Spanners
from short circuiting of CHECK
cables.
Check for cable
termination tighteness
and properly glanding
done.

Allows the power cable to


be fixed with the motor
windings cable properly
insulated, clamped and
sealed connector to
provide greater protecton SHUTDOWN
Spanners
from short circuiting of CHECK
cables.
Check for cable
termination tighteness
and properly glanding
done.
Allows the power cable to
be fixed with the motor
windings cable properly
insulated, clamped and
sealed connector to
provide greater protecton SHUTDOWN
Spanners
from short circuiting of CHECK
cables.
Check for cable
termination tighteness
and properly glanding
done.

Check for fuse rating and VISUAL /


SHUTDOWN
63 A continuity of input / MULTIMETE
CHECK
output terminals. R

Spanners,
For switching a power
Screw Drivers, SHUTDOWN
circuit with higher
Allen Key, CHECK
current ratings
Multimeter
Spanners,
For switching a power
Screw Drivers, SHUTDOWN
circuit with higher
Allen Key, CHECK
current ratings
Multimeter

Spanners,
For switching a power
Screw Drivers, SHUTDOWN
circuit with higher
Allen Key, CHECK
current ratings
Multimeter

Spanners,
For switching a power
Screw Drivers, SHUTDOWN
circuit with higher
Allen Key, CHECK
current ratings
Multimeter
Check for overload relay
range and setting of relay
Visual RUN CHECK
current for motor
tripping.
Check for overload relay
range and setting of relay Megger &
RUN CHECK
current for motor Multimeter
tripping.

Relays are protective


devices that are designed
to cut power if the motor
Visual Run check
draws too much current
for an extended period of
time.

Relays are protective


devices that are designed
to cut power if the motor
Visual Run check
draws too much current
for an extended period of
time.

Check for Timer ON /


0.5 - 10
OFF switching as per set Visual RUN CHECK
sec
value.

Check for switching NO /


VISUAL /
NC Contact as per set
40 A MULTIMETE RUN CHECK
value during hoisting
R
operation.

Check for fuse rating and VISUAL /


SHUTDOWN
32 A continuity of input / MULTIMETE
CHECK
output terminals. R
Spanners,
For switching a power
Screw Drivers, SHUTDOWN
circuit with higher
Allen Key, CHECK
current ratings
Multimeter

Spanners,
For switching a power
Screw Drivers, SHUTDOWN
circuit with higher
Allen Key, CHECK
current ratings
Multimeter

Relays are protective


devices that are designed
to cut power if the motor
Visual Run check
draws too much current
for an extended period of
time.

Relays are protective


devices that are designed
to cut power if the motor
Visual Run check
draws too much current
for an extended period of
time.
Check for Timer ON /
0.5 - 10
OFF switching as per set Visual RUN CHECK
sec
value.

Check for switching NO /


VISUAL /
NC Contact as per set
40 A MULTIMETE RUN CHECK
value during hoisting
R
operation.

Check for switching NO /


NC Contact as per set VISUAL /
10 A value during hoisting MULTIMETE RUN CHECK
operation. Check for wear R
and tear of contacts.

Check for contactor rating


Spanners,
and tighteness of
Screw Drivers, SHUTDOWN
contactor terminals.
Allen Key, CHECK
Check for coil resistance
Multimeter
of the contactor.

Check for overload relay


(0.4 - range and setting of relay
Visual RUN CHECK
0.63 ) A current for motor
tripping.
To drive the pump and
delivers working fluid
under the piston axially in
the guided path, and
delivers thrust or force Megger & SHUTDOWN
required to operate the Multimeter CHECK
attached devise (like
thruster brake) via the
piston rod and the eye-lug
attached to it.

Check for contactor rating


Spanners,
and tighteness of
Screw Drivers, SHUTDOWN
contactor terminals.
Allen Key, CHECK
Check for coil resistance
Multimeter
of the contactor.

Check for overload relay


(0.4 - range and setting of relay
Visual RUN CHECK
0.63 ) A current for motor
tripping.
To drive the pump and
delivers working fluid
under the piston axially in
the guided path, and
delivers thrust or force Megger & SHUTDOWN
required to operate the Multimeter CHECK
attached devise (like
thruster brake) via the
piston rod and the eye-lug
attached to it.

Check for contactor rating


Spanners,
and tighteness of
Screw Drivers, SHUTDOWN
contactor terminals.
Allen Key, CHECK
Check for coil resistance
Multimeter
of the contactor.

Check for overload relay


(0.4 - range and setting of relay
Visual RUN CHECK
0.63 ) A current for motor
tripping.

Spanners,
To provide friction for Screw Driver,
SHUTDOWN
braking of rotary drum Plier, Vernier
CHECK
when motor is stopped. Calliper
Visual
Spanners,
To provide friction for Screw Driver,
SHUTDOWN
braking of rotary drum Plier, Vernier
CHECK
when motor is stopped. Calliper
Visual

Check for contactor rating


Spanners,
and tighteness of
Screw Drivers, SHUTDOWN
contactor terminals.
Allen Key, CHECK
Check for coil resistance
Multimeter
of the contactor.

Check for overload relay


(0.4 - range and setting of relay
Visual RUN CHECK
0.63 ) A current for motor
tripping.

To drive the pump and


delivers working fluid
under the piston axially in
the guided path, and
delivers thrust or force Megger & SHUTDOWN
required to operate the Multimeter CHECK
attached devise (like
thruster brake) via the
piston rod and the eye-lug
attached to it.
Spanners,
To provide friction for Screw Driver,
SHUTDOWN
braking of rotary drum Plier, Vernier
CHECK
when motor is stopped. Calliper
Visual
IDEAL CONDITION ACTUAL CONDITION OBSERVED ACTION REQUIRED

CLEARANCE <0.6MM

CLEARANCE <0.6MM

NO INTERNAL GEAR DAMAGE


NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO CRACKS AND DAMAGE


NO CRACKS AND DAMAGE

CLEARANCE <0.6MM

CLEARANCE <0.6MM

NO INTERNAL GEAR DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE
NO CRACKS AND DAMAGE
NO CRACKS AND DAMAGE

NO INTERNAL GEAR DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE
NO CRACKS AND DAMAGE
NO CRACKS AND DAMAGE

NO INTERNAL GEAR DAMAGE

NO PHYSICAL DAMAGE
NO CRACKS AND DAMAGE
SFU Unit should be
SFU Unit is clean. Fuse
clean. Check for fuse
taing and continuity of
taing and continuity of
fuse input / output
fuse input / output
terminals are normal
terminals.
Contactor rating to be
3TF54, 250 A. Proper
tighteness of Contactor rating is 3TF54,
foundation of 250 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 30 ohms.
Coil resistance should
be 20-30 ohms.

Indication lamp should Indication lamp indicates


indicate input phase input phase voltage of
voltage of HMH crane. HMH crane.

CT connections should
be tight and should CT connections are tight
measure current and display accurate
accurately on the current on the ammeter.
ammeter.

Control transformer
Control transformer
connections should be
connections are tight.
tight. Input and output
Input and output voltage
voltage should be 415 /
measured is 415 / 110 VAC
110 VAC

CH Crane should stop CH Crane stop during


during operation when operation when limit
limit switch operated. switch operated.
Winding Resistances No abnormal difference in
should be balanced of winding resistances.
all three phases, i.e., Winding resistances of all
less than 5 ohms. three are 3.5 ohms.
Megger values Megger values are 1000
shouldbe above 5 mega ohms phase to
megaohms from all ground and are in healthy
three phases to ground. condition.

Should be uniform
throughout surface Throughout Smooth
without wear and cuts. surface of the ring
Slip ring should be inspected. Thickness
10mm. It should not 8mm.
less than 2mm.

Condition of the
resistance plates Condition of the resistance
should be good and the plates and resistance
values of the resistance values are in healthy
box should match with condition.
rotor rating plate.

Thickness and smooth


Throughout Smooth
surface at the contact
surface and thickness of
with the slipring. No
the ring seen visually.
wear and tear.
Tightened with 10mm No looseness of 10mm
Chrome Vanadium Chrome Vanadium bolts
Bolts. and connecting links.

SFU Unit should be


SFU Unit is clean. Fuse
clean. Check for fuse
taing and continuity of
taing and continuity of
fuse input / output
fuse input / output
terminals are normal
terminals.

Contactor rating to be
3TF50, 110 A. Proper
tighteness of Contactor rating is 3TF50,
foundation of 110 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.
Contactor rating to be
3TF47, 63 A. Proper
tighteness of Contactor rating is 3TF47,
foundation of 63 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 28 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(25-36)A (25-36)A
Relay settings = 20A Relay settings = 20A
FLC = 22.6A RC = 14.1A
Relay Range : Relay Range :
(50-63)A (50-63)A
Relay settings = 25A Relay settings = 25A
FLC = 28.1A RC = 13.9A
Timer should change
Timer change its contact
its contact NO / NC as
NO / NC as per time set.
per time set. Time set 1
Time set 1 sec
sec

Main Hoist Motor


Main Hoist Motor stop
should stop running
running during hoisting
during hoisting and
and lowering operation.
lowering operation.

Main Hoist Motor


Main Hoist Motor stop
should stop running
running during hoisting
during hoisting
operation.
operation.
Master controller
Master controller
connections should be
connections are tight and
tight and contacts
contacts are healthy.
should be healthy.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of Contactor rating is 3TF31,
foundation of 12 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(1 - 1.6)A (1 - 1.6)A
Relay settings = 1.4A Relay settings = 1.4A
FLC = 1.0A RC = 1.2A

Winding Resistances
No abnormal difference in
should be balanced of
winding resistances.
all three phases, i.e.,
Winding resistances of all
less than 10 ohms.
three are 9 ohms. Megger
Megger values
values are 1000 mega
shouldbe above 5
ohms phase to ground and
megaohms from all
are in healthy condition.
three phases to ground.
Check for proper
allignment of both No any abnormalities
sides brake shoes. found in the allignment of
Thickness of Brake brake shoe and decaying of
liner is 12mm. It should liner. Condition of the
not be less than 9 mm. revit is checked weekly
If it is less, then it which is fitted 4mm gap
should go for from liner.
replacement.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of Contactor rating is 3TF31,
foundation of 12 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(1 - 1.6)A (1 - 1.6)A
Relay settings = 1.4A Relay settings = 1.4A
FLC = 1.0A RC = 0.8A

Winding Resistances
No abnormal difference in
should be balanced of
winding resistances.
all three phases, i.e.,
Winding resistances of all
less than 10 ohms.
three are 9 ohms. Megger
Megger values
values are 1000 mega
shouldbe above 5
ohms phase to ground and
megaohms from all
are in healthy condition.
three phases to ground.
Check for proper
allignment of both No any abnormalities
sides brake shoes. found in the allignment of
Thickness of Brake brake shoe and decaying of
liner is 12mm. It should liner. Condition of the
not be less than 9 mm. revit is checked weekly
If it is less, then it which is fitted 4mm gap
should go for from liner.
replacement.

Winding Resistances No abnormal difference in


should be balanced of winding resistances.
all three phases, i.e., Winding resistances of all
less than 5 ohms. three are 3.93 ohms.
Megger values Megger values are 800
shouldbe above 5 mega ohms phase to
megaohms from all ground and are in healthy
three phases to ground. condition.

Should be uniform
throughout surface Throughout Smooth
without wear and cuts. surface of the ring
Slip ring should be inspected. Thickness
8mm. It should not less 6mm.
than 2mm.
Winding Resistances No abnormal difference in
should be balanced of winding resistances.
all three phases, i.e., Winding resistances of all
less than 1 ohms. three are 0.95 ohms.
Megger values Megger values are 800
shouldbe above 5 mega ohms phase to
megaohms from all ground and are in healthy
three phases to ground. condition.

Should be uniform
throughout surface Throughout Smooth
without wear and cuts. surface of the ring
Slip ring should be inspected. Thickness
8mm. It should not less 6mm.
than 2mm.

Should be uniform
throughout surface Throughout Smooth
without wear and cuts. surface of the ring
Slip ring should be inspected. Thickness
8mm. It should not less 6mm.
than 2mm.
Condition of the
resistance plates Condition of the resistance
should be good and the plates and resistance
values of the resistance values are in healthy
box should match with condition.
rotor rating plate.

Condition of the
resistance plates
Condition of the resistance
should be good and the
plates and resistance
values of the resistance
values are in healthy
box should match with
condition.
rotor rating plate.
Power = 30 KW
Power = 30 KW
Rotor Voltage = 212V AC
Rotor Voltage = 212V
Rotor Current = 68.8A
AC
Rotor Current = 68.8A
Condition of the
resistance plates
Condition of the resistance
should be good and the
plates and resistance
values of the resistance
values are in healthy
box should match with
condition.
rotor rating plate.
Power = 15 KW
Power = 15 KW
Rotor Voltage = 218V AC
Rotor Voltage = 218V
Rotor Current = 46.5A
AC
Rotor Current = 46.5A

Thickness and smooth Throughout Smooth


surface at the contact surface and thickness of
with the slipring. the ring seen visually.

Thickness and smooth Throughout Smooth


surface at the contact surface and thickness of
with the slipring. the ring seen visually.

Thickness and smooth Throughout Smooth


surface at the contact surface and thickness of
with the slipring. the ring seen visually.
Tightened with 10mm No looseness of 10mm
Chrome Vanadium Chrome Vanadium bolts
Bolts. and connecting links.

Tightened with 10mm No looseness of 10mm


Chrome Vanadium Chrome Vanadium bolts
Bolts. and connecting links.
Tightened with 10mm No looseness of 10mm
Chrome Vanadium Chrome Vanadium bolts
Bolts. and connecting links.

SFU Unit should be


SFU Unit is clean. Fuse
clean. Check for fuse
taing and continuity of
taing and continuity of
fuse input / output
fuse input / output
terminals are normal
terminals.

Contactor rating to be
3TF47, 70 A. Proper
tighteness of Contactor rating is 3TF47,
foundation of 70 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 28 ohms.
Coil resistance should
be 20-30 ohms.
Contactor rating to be
3TF47, 70 A. Proper
tighteness of Contactor rating is 3TF47,
foundation of 70 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 28.9 ohms.
Coil resistance should
be 20-30 ohms.

Contactor rating to be
3TF34, 32 A. Proper
tighteness of Contactor rating is 3TF34,
foundation of 32 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 29 ohms.
Coil resistance should
be 20-30 ohms.

Contactor rating to be
3TF34, 32 A. Proper
tighteness of Contactor rating is 3TF34,
foundation of 32 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 28.5 ohms.
Coil resistance should
be 20-30 ohms.
Relay Range : Relay Range :
(12.5 - 20)A (12.5 - 20)A
Relay settings = 20A Relay settings = 20A
FLC = 22.5A RC = 5.4A
Relay Range : Relay Range :
(20-32)A (20-32)A
Relay settings = 25A Relay settings = 25A
FLC = 27.6A RC = 5.1A

Relay Range : Relay Range :


(20-32)A (20-32)A
Relay settings = 25A Relay settings = 25A
FLC = 27.6A RC = 7.8A

Relay Range : Relay Range :


(12.5 - 20)A (12.5 - 20)A
Relay settings = 20A Relay settings = 20A
FLC = 22.5A RC = 9.4A

Timer should change


Timer change its contact
its contact NO / NC as
NO / NC as per time set.
per time set. Time set 1
Time set 1 sec
sec

Motor should stop


Motor stop running during
running during limit
limit switch operation.
switch operation.

SFU Unit should be


SFU Unit is clean. Fuse
clean. Check for fuse
taing and continuity of
taing and continuity of
fuse input / output
fuse input / output
terminals are normal
terminals.
Contactor rating to be
3TF33, 22 A. Proper
tighteness of Contactor rating is 3TF33,
foundation of 22 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 28 ohms.
Coil resistance should
be 20-30 ohms.

Contactor rating to be
3TF33, 22 A. Proper
tighteness of Contactor rating is 3TF33,
foundation of 22 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(12.5-20)A (12.5-20)A
Relay settings = 12A Relay settings = 12A
FLC = 14.2A RC = 5.6A

Relay Range : Relay Range :


(6.3-10)A (6.3-10)A
Relay settings = 8A Relay settings = 8A
FLC = 9.03A RC = 5.4A
Timer should change
Timer change its contact
its contact NO / NC as
NO / NC as per time set.
per time set. Time set 1
Time set 1 sec
sec

Motor should stop


Motor stop running during
running during limit
limit switch operation.
switch operation.

Master controller
Master controller
connections should be
connections are tight and
tight and contacts
contacts are healthy.
should be healthy.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of Contactor rating is 3TF31,
foundation of 12 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(0.4 - 0.63 ) A (0.4 - 0.63 ) A
Relay settings = 0.8A Relay settings = 0.8A
FLC = 0.6A RC = 0.6A
Winding Resistances
No abnormal difference in
should be balanced of
winding resistances.
all three phases, i.e.,
Winding resistances of all
less than 10 ohms.
three are 9 ohms. Megger
Megger values
values are 800 mega ohms
shouldbe above 5
phase to ground and are in
megaohms from all
healthy condition.
three phases to ground.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of Contactor rating is 3TF31,
foundation of 12 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(0.4 - 0.63 ) A (0.4 - 0.63 ) A
Relay settings = 0.8A Relay settings = 0.8A
FLC = 0.6A RC = 0.6A
Winding Resistances
No abnormal difference in
should be balanced of
winding resistances.
all three phases, i.e.,
Winding resistances of all
less than 10 ohms.
three are 9 ohms. Megger
Megger values
values are 800 mega ohms
shouldbe above 5
phase to ground and are in
megaohms from all
healthy condition.
three phases to ground.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of Contactor rating is 3TF31,
foundation of 12 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(0.4 - 0.63 ) A (0.4 - 0.63 ) A
Relay settings = 0.8A Relay settings = 0.8A
FLC = 0.6A RC = 0.6A

Check for proper


allignment of both No any abnormalities
sides brake shoes. found in the allignment of
Thickness of Brake brake shoe and decaying of
liner is 8mm. It should liner. Condition of the
not be less than 6 mm. revit is checked weekly
If it is less, then it which is fitted 4mm gap
should go for from liner.
replacement.
Check for proper
allignment of both No any abnormalities
sides brake shoes. found in the allignment of
Thickness of Brake brake shoe and decaying of
liner is 8mm. It should liner. Condition of the
not be less than 6 mm. revit is checked weekly
If it is less, then it which is fitted 4mm gap
should go for from liner.
replacement.

Contactor rating to be
3TF31, 12 A. Proper
tighteness of Contactor rating is 3TF31,
foundation of 12 A. No looseness in
contactor. fitting of contactor and
No abnormalities to be connection of cables to
seen for the contacts power contactor and its
and proper fitting to be contacts. Coil resistance is
done. 25 ohms.
Coil resistance should
be 20-30 ohms.

Relay Range : Relay Range :


(0.4 - 0.63 ) A (0.4 - 0.63 ) A
Relay settings = 0.8A Relay settings = 0.8A
FLC = 0.6A RC = 0.6A

Winding Resistances
No abnormal difference in
should be balanced of
winding resistances.
all three phases, i.e.,
Winding resistances of all
less than 10 ohms.
three are 9 ohms. Megger
Megger values
values are 800 mega ohms
shouldbe above 5
phase to ground and are in
megaohms from all
healthy condition.
three phases to ground.
Check for proper
allignment of both No any abnormalities
sides brake shoes. found in the allignment of
Thickness of Brake brake shoe and decaying of
liner is 8mm. It should liner. Condition of the
not be less than 6 mm. revit is checked weekly
If it is less, then it which is fitted 4mm gap
should go for from liner.
replacement.
CONDITIO

COMPONEN
EQUIPMENT: Sub Equipments Item Code
T

BF3-CH- CSTH-MUDPWPK- Heat Exchanger 7701000328


MUDPWPK PMP1

Return line
BF3-CH- CSTH-MUDPWPK- filtre 7701000258
MUDPWPK PMP1

BF3-CH- CSTH-MUDPWPK- Coupling 5422020001


MUDPWPK PMP1

BF3-CH- CSTH-MUDPWPK- Flexible bellow 5395000013


MUDPWPK PMP1

BF3-CH-
Motor
BF3-CH-MUDGUN MUDPWPK-PMP-
Windings
MTR1

BF3-CH-
BF3-CH-MUDGUN MUDPWPK-PMP- Terminal Box
MTR1
BF3-CH- Power
BF3-CH-MUDGUN
MUDPWPK-PNL Contactor

BF3-CH-
BF3-CH-MUDGUN Overload Relay
MUDPWPK-PNL

BF3-CH-
Motor
BF3-CH-MUDGUN MUDPWPK-PMP-
Windings
MTR2

BF3-CH-
BF3-CH-MUDGUN MUDPWPK-PMP- Terminal Box
MTR2
BF3-CH- Power
BF3-CH-MUDGUN
MUDPWPK-PNL Contactor

BF3-CH-
BF3-CH-MUDGUN Overload Relay
MUDPWPK-PNL

BF3-CH-
Motor
BF3-CH-MUDGUN MUDPWPK-PMP-
Windings
MTR3

BF3-CH-
BF3-CH-MUDGUN MUDPWPK-PMP- Terminal Box
MTR3
BF3-CH- Power
BF3-CH-MUDGUN
MUDPWPK-PNL Contactor

BF3-CH-
BF3-CH-MUDGUN Overload Relay
MUDPWPK-PNL

BF3-CH-
BF3-CH-MUDGUN MUDPWPK- HOOTER
HOOTER

power and feed back


cable

pressure switch

Relay
BF3-CH-MUDGUN
DI ,DOCard,PLC ,
IM modules
SMPS failure

PLC , IM modules
Profibus Cable
CONDITION APPRAISAL OF MUDGUN POWER PACK
TYPE OF CHECK
DESCRIPTION / TOOLS (RUN CHECK / STOP
DIMENSION REQUIRED CHECK /
SHUTDOWN)

CHECK FOR TUBES


JAMMING SPANNER STOP CHECK

CHECK FOR FILTER


CHOKE VISUAL STOP CHECK

CHECK FOR
COUPLING DAMAGE SPANNER STOP CHECK

CHECK FOR BELLOW


DAMAGE VISUAL RUN CHECK

To form magnetic field


when energized with
current to produce Megger &
Shut Down check
torque. Check for Multimeter
winding resistance and
megger value of Motor.

Check for proper


tigteness of the power Spanners Shut Down check
cable to the LT Motor
Check for contactor
rating and tighteness Spanners,
of contactor terminals. Screw Drivers,
Shut Down check
Check for coil Allen Key,
resistance of the Multimeter
contactor.

Check for overload


relay range and setting
Visual Shut Down check
of relay current for
motor tripping.

To form magnetic field


when energized with
current to produce Megger &
Shut Down check
torque. Check for Multimeter
winding resistance and
megger value of Motor.

Check for proper


tigteness of the power Spanners Shut Down check
cable to the LT Motor
Check for contactor
rating and tighteness Spanners,
of contactor terminals. Screw Drivers,
Shut Down check
Check for coil Allen Key,
resistance of the Multimeter
contactor.

Check for overload


relay range and setting
Visual Shut Down check
of relay current for
motor tripping.

To form magnetic field


when energized with
current to produce Megger &
Shut Down check
torque. Check for Multimeter
winding resistance and
megger value of Motor.

Check for proper


tigteness of the power Spanners Shut Down check
cable to the LT Motor
Check for contactor
rating and tighteness Spanners,
of contactor terminals. Screw Drivers,
Shut Down check
Check for coil Allen Key,
resistance of the Multimeter
contactor.

Check for overload


relay range and setting
Visual Shut Down check
of relay current for
motor tripping.

Check for hooter motor


windings resistance Screw Driver /
STOP CHECK
and terminal Multimeter
tighteness connection.

checking healthyness Multimeter,Tes


Run check
by operating valve. ter
check healthyness of
Multimeter,Tes
contact change over by Run check
ter
operaing with pressure

checking healthyness Multimeter,Tes


Run check
by operating valve. ter

checking healthyness Multimeter,Tes


Run check
by operating valve. ter
check supply voltage Multimeter,Tes
Run check
and output Voltage ter
checking healthyness Multimeter,Tes
Run check
by operating valve. ter
checking healthyness Multimeter,Tes
Run check
by operating valve. ter
ACTUAL CONDITION ACTION
IDEAL CONDITION
OBSERVED REQUIRED

NO TUBES JAMMING &


DAMAGE

NO FILTER CHOKE

NO COUPLING
DAMAGE OR CRACK

NO BELLOW DAMAGE

Winding Resistances
No abnormal difference in
should be balanced of all
winding resistances.
three phases, i.e., less
Winding resistance of all
than 10 ohms.
three phases is 5.6 ohms.
Megger values shouldbe
Megger values are 1000
above 5 megaohms from
mega ohms and in healthy
all three phases to
condition.
ground.

No looseness of 10mm
Tightened with 10mm
Chrome Vanadium bolts
Chrome Vanadium Bolts.
and connecting links.
Contactor rarting to be
150 A. Proper tighteness
Contactor rarting is 150 A.
of foundation of
No looseness in fitting of
contactor.
contactor and connection
No abnormalities to be
of cables to power
seen for the contacts and
contactor and its contacts.
proper fitting to be done.
Coil resistance is 42 ohms.
Coil resistance should be
35-45 ohms.

Relay Range : Checked Relay Range :


(90 - 150)A (90 - 150)A
Relay settings = 90A Relay settings = 90A
FLC = 103A RC = 69.3A

Winding Resistances
No abnormal difference in
should be balanced of all
winding resistances.
three phases, i.e., less
Winding resistance of all
than 10 ohms.
three phases is 6.2 ohms.
Megger values shouldbe
Megger values are 1000
above 5 megaohms from
mega ohms and in healthy
all three phases to
condition.
ground.

No looseness of 10mm
Tightened with 10mm
Chrome Vanadium bolts
Chrome Vanadium Bolts.
and connecting links.
Contactor rarting to be
150 A. Proper tighteness Contactor rarting is 150 A.
of foundation of No looseness in fitting of
contactor. contactor and connection
No abnormalities to be of cables to power
seen for the contacts and contactor and its contacts.
proper fitting to be done. Coil resistance is 43.2
Coil resistance should be ohms.
35-45 ohms.

Relay Range : Checked Relay Range :


(90 - 150)A (90 - 150)A
Relay settings = 90A Relay settings = 90A
FLC = 103A RC = 68.0A

Winding Resistances
No abnormal difference in
should be balanced of all
winding resistances.
three phases, i.e., less
Winding resistance of all
than 10 ohms.
three phases is 5.8 ohms.
Megger values shouldbe
Megger values are 1200
above 5 megaohms from
mega ohms and in healthy
all three phases to
condition.
ground.

No looseness of 10mm
Tightened with 10mm
Chrome Vanadium bolts
Chrome Vanadium Bolts.
and connecting links.
Contactor rarting to be
150 A. Proper tighteness Contactor rarting is 150 A.
of foundation of No looseness in fitting of
contactor. contactor and connection
No abnormalities to be of cables to power
seen for the contacts and contactor and its contacts.
proper fitting to be done. Coil resistance is 44.6
Coil resistance should be ohms.
35-45 ohms.

Relay Range : Checked Relay Range :


(90 - 150)A (90 - 150)A
Relay settings = 90A Relay settings = 90A
FLC = 103A RC = 69.4A

Winding Resistances
No abnormal difference in
should be balanced of all
winding resistances.
three phases, i.e., less
Winding resistance of all
than 40 ohms.
three phases is 38 ohms.
Megger values shouldbe
Megger values are 100
above 5 megaohms from
mega ohms and in healthy
all three phases to
condition.
ground.

Physical check or damage


No damage
of cable

Physical check or damage


No damage
of coil

Physical check or contact


damage of coil using No damage
multimeter

Physical check No damage

Physical check No damage

Physical check No damage


Physical check No damage
EQUIPMENT: Sub Equipments
BF3-HBS-HBS1
BF3-HBS-HBS1 HOT BLAST VALVE
BF3-HBS-HBS1
BF3-HBS-HBS1 HOT BLAST VALVE

BF3-HBS-HBS1 HOT BLAST VALVE


BF3-HBS-HBS1 HOT BLAST VALVE
BF3-HBS-HBS1 HOT BLAST VALVE
BF3-HBS-HBS1 HOT BLAST VALVE
BF3-HBS-HBS1 HOT BLAST VALVE
BF3-HBS-HBS1 HOT BLAST VALVE
BF3-HBS-HBS1 HOT BLAST VALVE
BF3-HBS-HBS1 HOT BLAST VALVE

BF3-HBS-HBS1 BACK DRAFT VALVE

BF3-HBS-HBS1 BACK DRAFT VALVE

BF3-HBS-HBS1 BACK DRAFT VALVE


BF3-HBS-HBS1 BACK DRAFT VALVE
BF3-HBS-HBS1 BACK DRAFT VALVE
BF3-HBS-HBS1 BACK DRAFT VALVE
BF3-HBS-HBS1 BACK DRAFT VALVE
BF3-HBS-HBS1 BACK DRAFT VALVE
BF3-HBS-HBS1 BACK DRAFT VALVE
BF3-HBS-HBS1 BURNER VALVE
BF3-HBS-HBS1 BURNER VALVE
BF3-HBS-HBS1 BURNER VALVE

BF3-HBS-HBS1 BURNER VALVE


BF3-HBS-HBS1 BURNER VALVE
BF3-HBS-HBS1 BURNER VALVE
BF3-HBS-HBS1 BURNER VALVE
BF3-HBS-HBS1 BURNER VALVE
BF3-HBS-HBS1 Cold blast Valve
BF3-HBS-HBS1 Cold blast Valve
BF3-HBS-HBS1 Cold blast Valve
BF3-HBS-HBS1 Cold blast Valve
BF3-HBS-HBS1 Cold Blast bypass valve

BF3-HBS-HBS1 Cold Blast bypass valve

BF3-HBS-HBS1 CHIMNEY VALVE


BF3-HBS-HBS1 CHIMNEY VALVE
BF3-HBS-HBS1 CHIMNEY VALVE
BF3-HBS-HBS1 CHIMNEY VALVE
BF3-HBS-HBS1 CHIMNEY Bypass VALVE
BF3-HBS-HBS1 CHIMNEY Bypass VALVE
BF3-HBS-HBS1 Air/Gas shut off valve
BF3-HBS-HBS1 Air/Gas shut off valve
BF3-HBS-HBS1 Air/Gas shut off valve
BF3-HBS-HBS1 Air/Gas shut off valve
BF3-HBS-HBS1 Regulating valve
BF3-HBS-HBS1 Regulating valve
BF3-HBS-HBS1 Regulating valve
BF3-HBS-HBS1 Mixture Shut off valve
BF3-HBS-HBS1 Mixture Shut off valve
BF3-HBS-HBS1 Mixture Shut off valve

BF3-HBS-HBS1 Mixture Shut off valve

BF3-HBS-HBS1 Mixture Shut off valve


BF3-HBS-HBS1 Mixture Shut off valve
BF3-HBS-HBS1 Mixture regulating valve
BF3-HBS-HBS1 Goggle Valve
BF3-HBS-HBS1 Goggle Valve
BF3-HBS-HBS1 HBS
HBS #1 AIR SHUT-OFF
BF3-HBS-HBS1
VALVE MOTOR

HBS #1 AIR SHUT-OFF


BF3-HBS-HBS1
VALVE MOTOR

HBS #1 AIR SHUT-OFF


BF3-HBS-HBS1
VALVE PANEL

HBS #1 AIR SHUT-OFF


BF3-HBS-HBS1
VALVE PANEL

HBS #1 AIR SHUT-OFF


BF3-HBS-HBS1
VALVE PANEL

HBS #1 GAS SHUT-OFF


BF3-HBS-HBS1
VALVE MOTOR

HBS #1 GAS SHUT-OFF


BF3-HBS-HBS1
VALVE MOTOR
HBS #1 GAS SHUT-OFF
BF3-HBS-HBS1
VALVE PANEL

HBS #1 GAS SHUT-OFF


BF3-HBS-HBS1
VALVE PANEL

HBS #1 GAS SHUT-OFF


BF3-HBS-HBS1
VALVE PANEL

BF3-HBS-HBS1 HBS SHELL

BF3-HBS-HBS1 HBS SHELL


COMPONENT

HOT BLAST VALVE,

DISC FOR HOT BLAST VALVE

METAL JACKETED GASKET


CYLINDER FOR HOT BLAST VALVE -HBS,BF3
CHAIN FOR HBS VALVES
Simplex chain masterlink
Sprocket
Guide wheel
HT BOLT FOR FLANGE
METAL JACKETED GASKET-BONNET OF HBV-HBS

BACK DRAFT VALVE

METAL GASKET

CYLINDER FOR BACK DRAFT VALVE -HBS,BF3


HT BOLT FOR FLANGE
Simplex chain
Simplex chain masterlink
Sprocket
Guide wheel
HT BOLTS
BURNER VALVE;
HYD.CYLINDER F/BURNER VALVE -HBS,BF3
METAL GASKET, GAS COMBUSTION VALVE, HBS

METAL JACKETED GASKET-BONNET-BURNER VALVE


Simplex chain
Simplex chain masterlink
Sprocket
Guide wheel
COLD BLAST VALVE
HYD.CYLINDER F/COLD BLAST VALVE -HBS,BF3
METAL GASKET, COLD BLAST VALVE, HBS BF3
HT BOLTS FOR FLANGE
COLD BLAST bypass VALVE

HYD.CYLINDER F/COLD BLAST Bypass VALVE -HBS,BF3

CHIMNEY VALVE,
HYD.CYLINDER F/CHIMNEY VALVE -HBS,BF3
METAL CORE GASKET- CHIMNEY VALVE,HBS-BF3
HT BOLT
CHIMNEY bypass VALVE,
HYD.CYLINDER F/CHIMNEY bypassVALVE -HBS,BF3
SHUT OFF VALVE FOR AIR & GAS
ACTUATOR,FOR 700MM GAS/AIR SHUTOFF VALVE
SEAL OF GAS SHUTOF VALVE HBS BF3
HT BOLT & NUT
Gas / Air Regulating valve
HT BOLT & NUT
Metal GASKET,AIR/GAS REG. VLVE
MIXING AIR SHUTOFF VALVE,
Hydraulic cylinder MIXING AIR SHUTOFF VALVE
Bonnet gasket MIXING AIR SHUTOFF VALVE,DN700, BF3

GASKET,MIXING AIR SHUT OFF VALVE-HOT,HBS

GASKET,MIXING AIR SHUTOFF VALVE-COLD,HBS


HT BOLT & NUT
MIXING AIR REGULATING VALVE,
Goggle valve DN 1000
U Seal for Goggle valve
HBS burner bleeder valve
LT Motor Windings

Terminal Box

Power Contactor

Overload Relay

Internal OPEN / CLOSE Limit Switch

LT Motor Windings

Terminal Box
Power Contactor

Overload Relay

Internal OPEN / CLOSE Limit Switch

HBS SHELL

REFRACTORY BRICKS CONDITION


CONDITION APPRAISAL OF HBS #1 EQUIPMENTS
DESCRIPTION / DIMENSION
CHECK FOR BODY DAMAGE
CHECK FOR BODY TEMPERATURE
CHECK FOR DP OF STOVE
CHECK FOR DISC OUTLET WATER TEMP.

CHECK FOR LEAKAGE FROM GASKET SEATING


CHECK FOR CYLINDER LEAKAGE
CHECK FOR DAMAGE
CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
CHECK FOR RUSTING
CHECK FOR LEAKAGE FROM GASKET SEATING

CHECK FOR BODY DAMAGE

CHECK FOR LEAKAGE FROM GASKET SEATING

CHECK FOR CYLINDER LEAKAGE


CHECK FOR RUSTING
CHECK FOR DAMAGE
CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
CHECK FOR RUSTING
CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING

CHECK FOR LEAKAGE FROM GASKET SEATING


CHECK FOR DAMAGE
CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING
CHECK FOR RUSTING
CHECK FOR BODY DAMAGE

CHECK FOR CYLINDER LEAKAGE

CHECK FOR VALVE LEAKAGE


CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING
CHECK FOR RUSTING
CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR BODY DAMAGE
CHECK FOR OPERATION OF ACTUATOR
CHECK FOR LEAKAGE FROM SEAL SEATING
CHECK FOR RUSTING
CHECK FOR BODY DAMAGE
CHECK FOR RUSTING
CHECK FOR LEAKAGE FROM GASKET SEATING
CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING

CHECK FOR LEAKAGE FROM GASKET SEATING

CHECK FOR LEAKAGE FROM GASKET SEATING


CHECK FOR RUSTING
CHECK FOR BODY DAMAGE
CHECK FOR BODY DAMAGE
CHECK FOR CORROSION
CHECK FOR OPEARTION OF VALVE
To form magnetic field when energized with
current to produce torque. Check for winding
resistance and megger value of Motor.

Check for proper tigteness of the power cable


to the LT Motor

Check for contactor rating and tighteness of


contactor terminals. Check for coil resistance
of the contactor.

Check for overload relay range and setting of


relay current for motor tripping.

Check for switching NO / NC Contact as per set


value during hoisting operation.

To form magnetic field when energized with


current to produce torque. Check for winding
resistance and megger value of Motor.

Check for proper tigteness of the power cable


to the LT Motor
Check for contactor rating and tighteness of
contactor terminals. Check for coil resistance
of the contactor.

Check for overload relay range and setting of


relay current for motor tripping.

Check for switching NO / NC Contact as per set


value during hoisting operation.

CHECK FOR HOT AREAS FOR INTERNAL


CASTING/REFRACTORY LAYER DEPLITION

CHECK FOR CHOAKING OF BRICKS


NDITION APPRAISAL OF HBS #1 EQUIPMENTS
TYPE OF CHECK (RUN CHECK /
TOOLS REQUIRED
STOP CHECK / SHUTDOWN)
VISUAL RUN CHECK
TEMPERATURE GUN RUN CHECK
VISUAL FROM PLC RUN CHECK
TEMPERATURE GUN RUN CHECK

VISUAL RUN CHECK


VISUAL RUN CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK

VISUAL RUN CHECK

VISUAL RUN CHECK

VISUAL RUN CHECK


VISUAL RUN CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK

VISUAL RUN CHECK


VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL STOP CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK

VISUAL RUN CHECK

VISUAL RUN CHECK


VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK

VISUAL RUN CHECK

VISUAL RUN CHECK


VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
VISUAL RUN CHECK
Megger & Multimeter Shut Down check

Spanners Shut Down check

Spanners, Screw Drivers, Allen


SHUTDOWN CHECK
Key, Multimeter

Visual SHUTDOWN CHECK

VISUAL / MULTIMETER RUN CHECK

Megger & Multimeter Shut Down check

Spanners Shut Down check


Spanners, Screw Drivers, Allen
SHUTDOWN CHECK
Key, Multimeter

Visual SHUTDOWN CHECK

VISUAL / MULTIMETER RUN CHECK

THERMAL IMAGING CAMERS RUN CHECK

VISUAL INSPECTION S/D INSPECTION


IDEAL CONDITION ACTUAL CONDITION OBSERVED
NO BODY DAMAGE
TEMP <250*C
DP SHOULD BE
TEMP <45*C

NO LEAKAGE
NO LEAKAGE FROM CYLINDER
NO DAMAGE
NO DAMAGE
NO TEETH DAMAGE
NO DAMAGE
NO RUSTING
NO LEAKAGE

NO BODY DAMAGE

NO LEAKAGE

NO LEAKAGE FROM CYLINDER


NO RUSTING
NO DAMAGE
NO DAMAGE
NO TEETH DAMAGE
NO DAMAGE
NO RUSTING
NO BODY DAMAGE
NO LEAKAGE FROM CYLINDER
NO LEAKAGE

NO LEAKAGE
NO DAMAGE
NO DAMAGE
NO TEETH DAMAGE
NO DAMAGE
NO BODY DAMAGE
NO LEAKAGE FROM CYLINDER
NO LEAKAGE
NO RUSTING
NO BODY DAMAGE

NO LEAKAGE FROM CYLINDER

NO LEAKAGE
NO LEAKAGE FROM CYLINDER
NO LEAKAGE
NO RUSTING
NO BODY DAMAGE
NO LEAKAGE FROM CYLINDER
NO BODY DAMAGE
ACTUATOR SHOULD BE OPEARTING
WITHOUT JERKS
NO LEAKAGE
NO RUSTING
NO BODY DAMAGE
NO RUSTING
NO LEAKAGE
NO BODY DAMAGE
NO LEAKAGE FROM CYLINDER
NO LEAKAGE

NO LEAKAGE

NO LEAKAGE
NO RUSTING
NO BODY DAMAGE
NO BODY DAMAGE
NO CORROSION
VALVE SHOULD NOT BE PASSING ON
CLOSING
Winding Resistances should be
No abnormal difference in winding
balanced of all three phases, i.e., less
resistances. Winding resistance of all
than 10 ohms.
three phases is 9.4 ohms. Megger
Megger values shouldbe above 5
values are 500 mega ohms and in
megaohms from all three phases to
healthy condition.
ground.

Tightened with 8 mm Chrome No looseness of 8 mm Chrome


Vanadium Bolts. Vanadium bolts and connecting links.

Contactor rating to be LCID09, 09 A.


Contactor rating is LCID09, 09 A. No
Proper tighteness of foundation of
looseness in fitting of contactor and
contactor.
connection of cables to power
No abnormalities to be seen for the
contactor and its contacts. Coil
contacts and proper fitting to be done.
resistance of contactor checked 25
Coil resistance should be between 20
ohms.
ohms - 30 ohms.

Relay settings: Relay settings:


Relay Range = 2.5-4A Relay Range = 2.5-4A
Relay setting = 2.5A Relay setting = 2.5A
FC = 3 A Running Current = 2.2 A
Motor should stop running during Motor stop running during limit
limit switch operation. switch operation.
Winding Resistances should be
No abnormal difference in winding
balanced of all three phases, i.e., less
resistances. Winding resistance of all
than 10 ohms.
three phases is 9.4 ohms. Megger
Megger values shouldbe above 5
values are 500 mega ohms and in
megaohms from all three phases to
healthy condition.
ground.

Tightened with 8 mm Chrome No looseness of 8 mm Chrome


Vanadium Bolts. Vanadium bolts and connecting links.
Contactor rating to be LCID09, 09 A.
Contactor rating is LCID09, 09 A. No
Proper tighteness of foundation of
looseness in fitting of contactor and
contactor.
connection of cables to power
No abnormalities to be seen for the
contactor and its contacts. Coil
contacts and proper fitting to be done.
resistance of contactor checked 25
Coil resistance should be between 20
ohms.
ohms - 30 ohms.

Relay settings: Relay settings:


Relay Range = 2.5-4A Relay Range = 2.5-4A
Relay setting = 2.5A Relay setting = 2.5A
FC = 3 A Running Current = 2.2 A
Motor should stop running during Motor stop running during limit
limit switch operation. switch operation.

THERMOGRAPHY REPORT
SHOULD BE NORMAL

BRICKS SHOULD NOT BE


CHOAKED
ACTION REQUIRED
EQUIPMENT: Sub Equipments
BF3-HBS-HBS2
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 HOT BLAST VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BACK DRAFT VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 BURNER VALVE
BF3-HBS-HBS2 Cold blast Valve
BF3-HBS-HBS2 Cold blast Valve
BF3-HBS-HBS2 Cold blast Valve
BF3-HBS-HBS2 Cold blast Valve
BF3-HBS-HBS2 Cold Blast bypass valve
BF3-HBS-HBS2 Cold Blast bypass valve
BF3-HBS-HBS2 CHIMNEY VALVE
BF3-HBS-HBS2 CHIMNEY VALVE
BF3-HBS-HBS2 CHIMNEY VALVE
BF3-HBS-HBS2 CHIMNEY VALVE
BF3-HBS-HBS2 CHIMNEY Bypass VALVE
BF3-HBS-HBS2 CHIMNEY Bypass VALVE
BF3-HBS-HBS2 Air/Gas shut off valve
BF3-HBS-HBS2 Air/Gas shut off valve
BF3-HBS-HBS2 Air/Gas shut off valve
BF3-HBS-HBS2 Air/Gas shut off valve
BF3-HBS-HBS2 Regulating valve
BF3-HBS-HBS2 Regulating valve
BF3-HBS-HBS2 Regulating valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture regulating valve
BF3-HBS-HBS2 Goggle Valve
BF3-HBS-HBS2 Goggle Valve
BF3-HBS-HBS2 HBS
BF3-HBS-HBS2 Regulating valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture Shut off valve
BF3-HBS-HBS2 Mixture regulating valve
BF3-HBS-HBS2 Goggle Valve
BF3-HBS-HBS2 Goggle Valve
BF3-HBS-HBS2 HBS

BF3-HBS-HBS2
HBS #2 AIR SHUT-OFF
VALVE MOTOR

BF3-HBS-HBS2
HBS #2 AIR SHUT-OFF
VALVE MOTOR

BF3-HBS-HBS2
HBS #2 AIR SHUT-OFF
VALVE PANEL

BF3-HBS-HBS2
HBS #2 AIR SHUT-OFF
VALVE PANEL

BF3-HBS-HBS2
HBS #2 AIR SHUT-OFF
VALVE PANEL

BF3-HBS-HBS2
HBS #2 GAS SHUT-OFF
VALVE MOTOR

BF3-HBS-HBS2
HBS #2 GAS SHUT-OFF
VALVE MOTOR
BF3-HBS-HBS2
HBS #2 GAS SHUT-OFF
VALVE PANEL

BF3-HBS-HBS2
HBS #2 GAS SHUT-OFF
VALVE PANEL

BF3-HBS-HBS2
HBS #2 GAS SHUT-OFF
VALVE PANEL

BF3-HBS-HBS2 HBS SHELL

BF3-HBS-HBS2 HBS SHELL


CONDIT
COMPONENT Item Code

HOT BLAST VALVE, 5109000105

DISC FOR HOT BLAST VALVE 5109000106


METAL JACKETED GASKET 2502060005
CYLINDER FOR HOT BLAST VALVE -HBS,BF3 5109000060
CHAIN FOR HBS VALVES 5103020123
Simplex chain masterlink 5103020131
Sprocket
Guide wheel
HT BOLT FOR FLANGE 0601120201
METAL JACKETED GASKET-BONNET OF HBV- 2501030008
HBS
BACK DRAFT VALVE 5109000039
METAL GASKET 2501030003
CYLINDER FOR BACK DRAFT VALVE -HBS,BF3
HT BOLT FOR FLANGE 0601120201
Simplex chain 2116000028
Simplex chain masterlink
Sprocket
Guide wheel
HT BOLTS 0601120184
BURNER VALVE; 5109000044
HYD.CYLINDER F/BURNER VALVE -HBS,BF3
METAL GASKET, GAS COMBUSTION VALVE, HBS 2501030004
METAL JACKETED GASKET-BONNET-BURNER VAL 2501030009
Simplex chain
Simplex chain masterlink
Sprocket
Guide wheel
COLD BLAST VALVE 5109000041
HYD.CYLINDER F/COLD BLAST VALVE -HBS,BF3 5109000062
METAL GASKET, COLD BLAST VALVE, HBS BF3 2501030011
HT BOLTS FOR FLANGE 0601120181
COLD BLAST bypass VALVE 5014030010
HYD.CYLINDER F/COLD BLAST Bypass VALVE
-HBS,BF3
CHIMNEY VALVE, 5109000047
HYD.CYLINDER F/CHIMNEY VALVE -HBS,BF3
METAL CORE GASKET- CHIMNEY VALVE,HBS- 2502060007
BF3
HT BOLT 0601120201
CHIMNEY bypass VALVE, 5109000048
HYD.CYLINDER F/CHIMNEY bypassVALVE
-HBS,BF3
SHUT OFF VALVE FOR AIR & GAS 5109000046
ACTUATOR,FOR 700MM GAS/AIR SHUTOFF 5088000117
VALVE
SEAL OF GAS SHUTOF VALVE HBS BF3 5088000119
HT BOLT & NUT 0601120174
Gas / Air Regulating valve 5109000050
HT BOLT & NUT 5088110118
Metal GASKET,AIR/GAS REG. VLVE 2502060012
MIXING AIR SHUTOFF VALVE, 5109000042
Hydraulic cylinder MIXING AIR SHUTOFF VALVE
Bonnet gasket MIXING AIR SHUTOFF
VALVE,DN700, BF3
GASKET,MIXING AIR SHUT OFF VALVE-HOT,HBS 2501030002
GASKET,MIXING AIR SHUTOFF VALVE-COLD,HBS 2501030007
HT BOLT & NUT 0601120201
MIXING AIR REGULATING VALVE, 5109000043
Goggle valve DN 1000 5107000039
U Seal for Goggle valve
HBS burner bleeder valve 5109000014
Metal GASKET: 770X700X4.5MM, AIR/GAS REG. 2502060012
VLVE
MIXING AIR SHUTOFF VALVE,DN700, BF3 5109000042
Hydraulic cylinder MIXING AIR SHUTOFF VALVE
Bonnet gasket MIXING AIR SHUTOFF
VALVE,DN700, BF3
GASKET,MIXING AIR SHUT OFF VALVE-HOT,HBS 2501030002
GASKET,MIXING AIR SHUTOFF VALVE-COLD,HBS 2501030007
Disc COOLING HOSE 2" X 2.5 mtr 1702010742
M24X120 HT BOLT & NUT 0601120182
M30X130 HT BOLT & NUT 0601120201
MIXING AIR REGULATING VALVE,DN600, BF3 5109000043
Goggle valve DN 1000 5107000039
U Seal for Goggle valve DN 1000
HBS burner bleeder valve 5109000014

LT Motor Windings

Terminal Box

Power Contactor

Overload Relay

Internal OPEN / CLOSE Limit Switch

LT Motor Windings

Terminal Box
Power Contactor

Overload Relay

Internal OPEN / CLOSE Limit Switch

HBS SHELL

REFRACTORY BRICKS CONDITION


CONDITION APPRAISAL OF HBS #2 EQUIPMEN
DESCRIPTION / DIMENSION TOOLS REQUIRED
CHECK FOR BODY DAMAGE
DN1000,ASSEMBLYBF3(IND CHECK FOR BODY TEMPERATURE
IAN-FOURESS) CHECK FOR DP OF STOVE
DN1000(INDIAN-FOURESS) CHECK FOR DISC OUTLET WATER TEMP.
,1980X1895,HBV,HBS CHECK FOR LEAKAGE FROM GASKET SEATING
CHECK FOR CYLINDER LEAKAGE
PITCH 31.75mm CHECK FOR DAMAGE
31.75mm CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
CHECK FOR RUSTING
CHECK FOR LEAKAGE FROM GASKET SEATING
TYPE:GATE, DN700, BF3 CHECK FOR BODY DAMAGE
,BACK FLOW/DRAUGHT CHECK FOR LEAKAGE FROM GASKET SEATING
VALVE,HBS
CHECK FOR CYLINDER LEAKAGE
CHECK FOR RUSTING
1" CHECK FOR DAMAGE
1" CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
CHECK FOR RUSTING
TYPE:GATE; SIZE:700, BF3 CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING
CHECK FOR LEAKAGE FROM GASKET SEATING
1" CHECK FOR DAMAGE
1" CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
;TYPE:BTLF, DN900, BF3 CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING
M24x110 CHECK FOR RUSTING
;TYPE:gate, DN250, BF3 CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
TYPE:CONNECTING, BF3 CHECK FOR VALVE LEAKAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING
M30X160 CHECK FOR RUSTING
TYPE:gate, DN250 BF3 CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
;DN 700, BF3 CHECK FOR BODY DAMAGE
CHECK FOR OPERATION OF ACTUATOR
CHECK FOR LEAKAGE FROM SEAL SEATING
M20X90 CHECK FOR RUSTING
Type: BTLF DN700, BF4 CHECK FOR BODY DAMAGE
M24X300 CHECK FOR RUSTING
: 770X700X4.5MM, CHECK FOR LEAKAGE FROM GASKET SEATING
DN700, BF3 CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING
CHECK FOR LEAKAGE FROM GASKET SEATING
CHECK FOR LEAKAGE FROM GASKET SEATING
M30X130 CHECK FOR RUSTING
DN600, BF3 CHECK FOR BODY DAMAGE
CHECK FOR BODY DAMAGE
DN 1000 CHECK FOR CORROSION
CHECK FOR OPEARTION OF VALVE
To form magnetic field when
energized with current to produce
torque. Check for winding resistance
and megger value of Motor.

Check for proper tigteness of the


power cable to the LT Motor

Check for contactor rating and


tighteness of contactor terminals.
Check for coil resistance of the
contactor.

Check for overload relay range and


setting of relay current for motor
tripping.

Check for switching NO / NC Contact


10 A as per set value during hoisting
operation.

To form magnetic field when


energized with current to produce
torque. Check for winding resistance
and megger value of Motor.

Check for proper tigteness of the


power cable to the LT Motor
Check for contactor rating and
tighteness of contactor terminals.
Check for coil resistance of the
contactor.

Check for overload relay range and


setting of relay current for motor
tripping.

Check for switching NO / NC Contact


10 A as per set value during hoisting
operation.

CHECK FOR HOT AREAS FOR


INTERNAL CASTING/REFRACTORY
LAYER DEPLITION

CHECK FOR CHOAKING OF BRICKS


F HBS #2 EQUIPMENTS
TYPE OF CHECK (RUN CHECK / IDEAL CONDITION ACTUAL CONDITION OBSERVED
STOP CHECK / SHUTDOWN)
VISUAL RUN CHECK NO BODY DAMAGE
TEMPERATURE GUN RUN CHECK TEMP <250*C
VISUAL FROM PLC RUN CHECK DP SHOULD BE
TEMPERATURE GUN RUN CHECK TEMP <45*C
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO TEETH DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO RUSTING
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO TEETH DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO TEETH DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK ACTUATOR SHOULD BE OPEARTING WITHOUT JERKS
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO CORROSION
VISUAL RUN CHECK VALVE SHOULD NOT BE PASSING ON CLOSING
Winding Resistances should be
balanced of all three phases, i.e., less
Shut Down than 10 ohms.
Megger & Multimeter
check Megger values shouldbe above 5
megaohms from all three phases to
ground.

Shut Down Tightened with 8 mm Chrome


Spanners
check Vanadium Bolts.

Contactor rating to be LCID09, 09 A.


Proper tighteness of foundation of
Spanners, Screw contactor.
SHUTDOWN
Drivers, Allen Key, No abnormalities to be seen for the
CHECK
Multimeter contacts and proper fitting to be done.
Coil resistance should be between 20
ohms - 30 ohms.

Relay settings:
SHUTDOWN Relay Range = 2.5-4A
Visual
CHECK Relay setting = 2.5A
FC = 3 A

VISUAL / Motor should stop running during


RUN CHECK
MULTIMETER limit switch operation.

Winding Resistances should be


balanced of all three phases, i.e., less
Shut Down than 10 ohms.
Megger & Multimeter
check Megger values shouldbe above 5
megaohms from all three phases to
ground.

Shut Down Tightened with 8 mm Chrome


Spanners
check Vanadium Bolts.
Contactor rating to be LCID09, 09 A.
Proper tighteness of foundation of
Spanners, Screw contactor.
SHUTDOWN
Drivers, Allen Key, No abnormalities to be seen for the
CHECK
Multimeter contacts and proper fitting to be done.
Coil resistance should be between 20
ohms - 30 ohms.

Relay settings:
SHUTDOWN Relay Range = 2.5-4A
Visual
CHECK Relay setting = 2.5A
FC = 3 A

VISUAL / Motor should stop running during


RUN CHECK
MULTIMETER limit switch operation.

THERMAL IMAGING THERMOGRAPHY REPORT


RUN CHECK
CAMERS SHOULD BE NORMAL

S/D BRICKS SHOULD NOT BE


VISUAL INSPECTION
INSPECTION CHOAKED
ACTION REQUIRED
No abnormal difference in winding
resistances. Winding resistance of all
three phases is 9.4 ohms. Megger
values are 500 mega ohms and in
healthy condition.

No looseness of 8 mm Chrome
Vanadium bolts and connecting links.

Contactor rating is LCID09, 09 A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance of contactor checked 25
ohms.

Relay settings:
Relay Range = 2.5-4A
Relay setting = 2.5A
Running Current = 2.1 A

Motor stop running during limit


switch operation.

No abnormal difference in winding


resistances. Winding resistance of all
three phases is 9.4 ohms. Megger
values are 500 mega ohms and in
healthy condition.

No looseness of 8 mm Chrome
Vanadium bolts and connecting links.
Contactor rating is LCID09, 09 A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance of contactor checked 25
ohms.

Relay settings:
Relay Range = 2.5-4A
Relay setting = 2.5A
Running Current = 2.0 A

Motor stop running during limit


switch operation.
EQUIPMENT: Sub Equipments COMPONENT
BF3-HBS-HBS3
BF3-HBS-HBS3 HOT BLAST VALVE HOT BLAST VALVE,
BF3-HBS-HBS3
BF3-HBS-HBS3 HOT BLAST VALVE DISC FOR HOT BLAST VALVE
BF3-HBS-HBS3 HOT BLAST VALVE METAL JACKETED GASKET
CYLINDER FOR HOT BLAST
BF3-HBS-HBS3 HOT BLAST VALVE VALVE -HBS,BF3
BF3-HBS-HBS3 HOT BLAST VALVE CHAIN FOR HBS VALVES
BF3-HBS-HBS3 HOT BLAST VALVE Simplex chain masterlink
BF3-HBS-HBS3 HOT BLAST VALVE Sprocket
BF3-HBS-HBS3 HOT BLAST VALVE Guide wheel
BF3-HBS-HBS3 HOT BLAST VALVE HT BOLT FOR FLANGE
METAL JACKETED GASKET-
BF3-HBS-HBS3 HOT BLAST VALVE BONNET OF HBV-HBS
BF3-HBS-HBS3 BACK DRAFT VALVE BACK DRAFT VALVE
BF3-HBS-HBS3 BACK DRAFT VALVE METAL GASKET
CYLINDER FOR BACK
BF3-HBS-HBS3 BACK DRAFT VALVE DRAFT VALVE -HBS,BF3
BF3-HBS-HBS3 BACK DRAFT VALVE HT BOLT FOR FLANGE
BF3-HBS-HBS3 BACK DRAFT VALVE Simplex chain
BF3-HBS-HBS3 BACK DRAFT VALVE Simplex chain masterlink
BF3-HBS-HBS3 BACK DRAFT VALVE Sprocket
BF3-HBS-HBS3 BACK DRAFT VALVE Guide wheel
BF3-HBS-HBS3 BACK DRAFT VALVE HT BOLTS
BF3-HBS-HBS3 BURNER VALVE BURNER VALVE;
HYD.CYLINDER F/BURNER
BF3-HBS-HBS3 BURNER VALVE
VALVE
METAL-HBS,BF3
GASKET, GAS COMB
BF3-HBS-HBS3 BURNER VALVE USTION VALVE, HBS
BF3-HBS-HBS3 BURNER VALVE METAL JACKETED GASKET-B
BF3-HBS-HBS3 BURNER VALVE Simplex chain
BF3-HBS-HBS3 BURNER VALVE Simplex chain masterlink
BF3-HBS-HBS3 BURNER VALVE Sprocket
BF3-HBS-HBS3 BURNER VALVE Guide wheel
BF3-HBS-HBS3 Cold blast Valve COLD BLAST VALVE
HYD.CYLINDER F/COLD
BF3-HBS-HBS3 Cold blast Valve BLAST
METALVALVE
GASKET,-HBS,BF3
COLD
BF3-HBS-HBS3 Cold blast Valve
BLAST VALVE, HBS BF3
BF3-HBS-HBS3 Cold blast Valve HT BOLTS FOR FLANGE
BF3-HBS-HBS3 Cold Blast bypass valve COLD BLAST bypass
HYD.CYLINDER VALVE
F/COLD
BF3-HBS-HBS3 Cold Blast bypass valve BLAST Bypass VALVE
BF3-HBS-HBS3 CHIMNEY VALVE -HBS,BF3
CHIMNEY VALVE,
HYD.CYLINDER F/CHIMNEY
BF3-HBS-HBS3 CHIMNEY VALVE VALVE
METAL-HBS,BF3
CORE GASKET-
BF3-HBS-HBS3 CHIMNEY VALVE CHIMNEY VALVE,HBS-BF3
BF3-HBS-HBS3 CHIMNEY VALVE HT BOLT
BF3-HBS-HBS3 CHIMNEY Bypass VALVE CHIMNEY bypass VALVE,
HYD.CYLINDER F/CHIMNEY
BF3-HBS-HBS3 CHIMNEY Bypass VALVE bypassVALVE
SHUT OFF VALVE -HBS,BF3
FOR AIR &
BF3-HBS-HBS3 Air/Gas shut off valve ACTUATOR,FOR 700MM
GAS
BF3-HBS-HBS3 Air/Gas shut off valve GAS/AIR SHUTOFF
BF3-HBS-HBS3 Air/Gas shut off valve VALVE
SEAL OF GAS SHUTOF VALVE
BF3-HBS-HBS3 Air/Gas shut off valve HT BOLT & NUT
BF3-HBS-HBS3 Regulating valve Gas / Air Regulating valve
BF3-HBS-HBS3 Regulating valve HT BOLT & NUT
Metal GASKET,AIR/GAS REG.
BF3-HBS-HBS3 Regulating valve VLVE
BF3-HBS-HBS3 Mixture Shut off valve MIXING AIR SHUTOFF VALVE,
Hydraulic cylinder MIXING
BF3-HBS-HBS3 Mixture Shut off valve Bonnet gasket VALVE
MIXING AIR
AIR SHUTOFF
BF3-HBS-HBS3 Mixture Shut off valve SHUTOFF VALVE,DN700,
BF3-HBS-HBS3 Mixture Shut off valve BF3
GASKET,MIXING AIR SHUT OF
BF3-HBS-HBS3 Mixture Shut off valve GASKET,MIXING AIR SHUTOF
BF3-HBS-HBS3 Mixture Shut off valve HT BOLT & NUT
BF3-HBS-HBS3 Mixture regulating valve MIXING AIR REGULATING VAL
BF3-HBS-HBS3 Goggle Valve Goggle valve DN 1000
BF3-HBS-HBS3 Goggle Valve U Seal for Goggle valve
BF3-HBS-HBS3 HBS HBS
Metalburner
GASKET:bleeder valve
BF3-HBS-HBS3 Regulating valve 770X700X4.5MM, AIR/GAS
BF3-HBS-HBS3 Mixture Shut off valve REG. VLVE
MIXING AIR SHUTOFF VALVE,
Hydraulic cylinder MIXING
BF3-HBS-HBS3 Mixture Shut off valve Bonnet gasket VALVE
MIXING AIR
AIR SHUTOFF
BF3-HBS-HBS3 Mixture Shut off valve SHUTOFF VALVE,DN700,
BF3-HBS-HBS3 Mixture Shut off valve BF3
GASKET,MIXING AIR SHUT OF
BF3-HBS-HBS3 Mixture Shut off valve GASKET,MIXING AIR SHUTOF
Disc COOLING HOSE 2" X 2.5
BF3-HBS-HBS3 Mixture Shut off valve
mtr
BF3-HBS-HBS3 Mixture Shut off valve M24X120 HT BOLT & NUT
BF3-HBS-HBS3 Mixture Shut off valve M30X130 HT BOLT & NUT
BF3-HBS-HBS3 Mixture regulating valve MIXING AIR REGULATING VAL
BF3-HBS-HBS3 Goggle Valve Goggle valve DN 1000
U Seal for Goggle valve DN
BF3-HBS-HBS3 Goggle Valve 1000
BF3-HBS-HBS3 HBS HBS burner bleeder valve

HBS #3 AIR SHUT-OFF


BF3-HBS-HBS3
VALVE MOTOR
LT Motor Windings

HBS #3 AIR SHUT-OFF


BF3-HBS-HBS3
VALVE MOTOR
Terminal Box

HBS #3 AIR SHUT-OFF


BF3-HBS-HBS3
VALVE PANEL
Power Contactor

HBS #3 AIR SHUT-OFF


BF3-HBS-HBS3
VALVE PANEL
Overload Relay

BF3-HBS-HBS3
HBS #3 AIR SHUT-OFF Internal OPEN / CLOSE
VALVE PANEL Limit Switch

HBS #3 GAS SHUT-OFF


BF3-HBS-HBS3
VALVE MOTOR
LT Motor Windings

HBS #3 GAS SHUT-OFF


BF3-HBS-HBS3
VALVE MOTOR
Terminal Box
HBS #3 GAS SHUT-OFF
BF3-HBS-HBS3
VALVE PANEL
Power Contactor

HBS #3 GAS SHUT-OFF


BF3-HBS-HBS3
VALVE PANEL
Overload Relay

BF3-HBS-HBS3
HBS #3 GAS SHUT-OFF Internal OPEN / CLOSE
VALVE PANEL Limit Switch

BF3-HBS-HBS3 HBS SHELL HBS SHELL

REFRACTORY BRICKS
BF3-HBS-HBS3 HBS SHELL
CONDITION
CONDITION APPRAISAL OF H
DESCRIPTION /
Item Code TOOLS REQUIRED
DIMENSION
CHECK FOR BODY DAMAGE
5109000105 DN1000,ASSEMBLYBF CHECK FOR BODY TEMPERATURE
3(INDIAN-FOURESS) CHECK FOR DP OF STOVE
DN1000(INDIAN-
5109000106 CHECK FOR DISC OUTLET WATER TEMP.
FOURESS)
2502060005 ,1980X1895,HBV,HBS CHECK FOR LEAKAGE FROM GASKET SEATING
5109000060 CHECK FOR CYLINDER LEAKAGE
5103020123 PITCH 31.75mm CHECK FOR DAMAGE
5103020131 31.75mm CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
0601120201 CHECK FOR RUSTING
2501030008 CHECK FOR LEAKAGE FROM GASKET SEATING
TYPE:GATE, DN700,
5109000039 ,BACK
CHECK FOR BODY DAMAGE
BF3
2501030003 FLOW/DRAUGHT CHECK FOR LEAKAGE FROM GASKET SEATING
VALVE,HBS CHECK FOR CYLINDER LEAKAGE
0601120201 CHECK FOR RUSTING
2116000028 1" CHECK FOR DAMAGE
1" CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
0601120184 CHECK FOR RUSTING
TYPE:GATE; SIZE:700, CHECK FOR BODY DAMAGE
5109000044 BF3
CHECK FOR CYLINDER LEAKAGE
2501030004 CHECK FOR LEAKAGE FROM GASKET SEATING
2501030009 CHECK FOR LEAKAGE FROM GASKET SEATING
1" CHECK FOR DAMAGE
1" CHECK FOR LINKS DAMAGE
CHECK FOR SPROCKET TEETH DAMAGE
CHECK FOR GUIDE WHEEL GROOVE DAMAGE
;TYPE:BTLF, DN900,
5109000041 CHECK FOR BODY DAMAGE
BF3
5109000062 CHECK FOR CYLINDER LEAKAGE
2501030011 CHECK FOR LEAKAGE FROM GASKET SEATING
0601120181 M24x110 CHECK FOR RUSTING
;TYPE:gate, DN250,
5014030010 CHECK FOR BODY DAMAGE
BF3
CHECK FOR CYLINDER LEAKAGE
TYPE:CONNECTING,
5109000047 CHECK FOR VALVE LEAKAGE
BF3
CHECK FOR CYLINDER LEAKAGE
2502060007 CHECK FOR LEAKAGE FROM GASKET SEATING
0601120201 M30X160 CHECK FOR RUSTING
5109000048 TYPE:gate, DN250 BF3 CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
5109000046 ;DN 700, BF3 CHECK FOR BODY DAMAGE
5088000117 CHECK FOR OPERATION OF ACTUATOR
5088000119 CHECK FOR LEAKAGE FROM SEAL SEATING
0601120174 M20X90 CHECK FOR RUSTING
Type: BTLF DN700,
5109000050 CHECK FOR BODY DAMAGE
BF4
5088110118 M24X300 CHECK FOR RUSTING
2502060012 : 770X700X4.5MM, CHECK FOR LEAKAGE FROM GASKET SEATING
5109000042 DN700, BF3 CHECK FOR BODY DAMAGE
CHECK FOR CYLINDER LEAKAGE
CHECK FOR LEAKAGE FROM GASKET SEATING
2501030002 CHECK FOR LEAKAGE FROM GASKET SEATING
2501030007 CHECK FOR LEAKAGE FROM GASKET SEATING
0601120201 M30X130 CHECK FOR RUSTING
5109000043 DN600, BF3 CHECK FOR BODY DAMAGE
5107000039 CHECK FOR BODY DAMAGE
DN 1000 CHECK FOR CORROSION
5109000014 CHECK FOR OPEARTION OF VALVE
2502060012
5109000042

2501030002
2501030007
1702010742
0601120182
0601120201
5109000043
5107000039

5109000014

To form magnetic field when energized


with current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor

Check for contactor rating and tighteness


of contactor terminals. Check for coil
resistance of the contactor.

Check for overload relay range and setting


of relay current for motor tripping.

Check for switching NO / NC Contact as


10 A
per set value during hoisting operation.

To form magnetic field when energized


with current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor
Check for contactor rating and tighteness
of contactor terminals. Check for coil
resistance of the contactor.

Check for overload relay range and setting


of relay current for motor tripping.

Check for switching NO / NC Contact as


10 A
per set value during hoisting operation.

CHECK FOR HOT AREAS FOR


INTERNAL CASTING/REFRACTORY
LAYER DEPLITION

CHECK FOR CHOAKING OF BRICKS


AISAL TYPE
OFOFHBS #1 EQUIPMENTS
CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION ACTUAL CONDITION OBSERVED
SHUTDOWN)
VISUAL RUN CHECK NO BODY DAMAGE
TEMPERATURE GUN RUN CHECK TEMP <250*C
VISUAL FROM PLC RUN CHECK DP SHOULD BE
TEMPERATURE GUN RUN CHECK TEMP <45*C
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO TEETH DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO RUSTING
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO TEETH DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL STOP CHECK NO TEETH DAMAGE
VISUAL STOP CHECK NO DAMAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK ACTUATOR SHOULD BE OPEARTING WITHOUT JERKS
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO LEAKAGE FROM CYLINDER
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO LEAKAGE
VISUAL RUN CHECK NO RUSTING
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO BODY DAMAGE
VISUAL RUN CHECK NO CORROSION
VISUAL RUN CHECK VALVE SHOULD NOT BE PASSING ON CLOSING
Winding Resistances should be balanced
of all three phases, i.e., less than 10
Megger & ohms.
Shut Down check
Multimeter Megger values shouldbe above 5
megaohms from all three phases to
ground.
Tightened with 8 mm Chrome
Spanners Shut Down check
Vanadium Bolts.

Contactor rating to be LCID09, 09 A.


Proper tighteness of foundation of
Spanners, Screw contactor.
SHUTDOWN
Drivers, Allen Key, No abnormalities to be seen for the
CHECK
Multimeter contacts and proper fitting to be done.
Coil resistance should be between 20
ohms - 30 ohms.

Relay settings:
SHUTDOWN Relay Range = 2.5-4A
Visual
CHECK Relay setting = 2.5A
FC = 3 A

VISUAL / Motor should stop running during limit


RUN CHECK
MULTIMETER switch operation.

Winding Resistances should be balanced


of all three phases, i.e., less than 10
Megger & ohms.
Shut Down check
Multimeter Megger values shouldbe above 5
megaohms from all three phases to
ground.
Tightened with 8 mm Chrome
Spanners Shut Down check
Vanadium Bolts.
Contactor rating to be LCID09, 09 A.
Proper tighteness of foundation of
Spanners, Screw contactor.
SHUTDOWN
Drivers, Allen Key, No abnormalities to be seen for the
CHECK
Multimeter contacts and proper fitting to be done.
Coil resistance should be between 20
ohms - 30 ohms.

Relay settings:
SHUTDOWN Relay Range = 2.5-4A
Visual
CHECK Relay setting = 2.5A
FC = 3 A

VISUAL / Motor should stop running during limit


RUN CHECK
MULTIMETER switch operation.

THERMAL THERMOGRAPHY REPORT SHOULD


RUN CHECK
IMAGING CAMERS BE NORMAL

VISUAL S/D
BRICKS SHOULD NOT BE CHOAKED
INSPECTION INSPECTION
ACTION REQUIRED
No abnormal difference in winding
resistances. Winding resistance of all
three phases is 9.4 ohms. Megger values
are 500 mega ohms and in healthy
condition.

No looseness of 8 mm Chrome Vanadium


bolts and connecting links.

Contactor rating is LCID09, 09 A. No


looseness in fitting of contactor and
connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 25 ohms.

Relay settings:
Relay Range = 2.5-4A
Relay setting = 2.5A
Running Current = 2.1 A

Motor stop running during limit switch


operation.

No abnormal difference in winding


resistances. Winding resistance of all
three phases is 9.4 ohms. Megger values
are 500 mega ohms and in healthy
condition.

No looseness of 8 mm Chrome Vanadium


bolts and connecting links.
Contactor rating is LCID09, 09 A. No
looseness in fitting of contactor and
connection of cables to power contactor
and its contacts. Coil resistance of
contactor checked 25 ohms.

Relay settings:
Relay Range = 2.5-4A
Relay setting = 2.5A
Running Current = 2.0 A

Motor stop running during limit switch


operation.
CONDITION

EQUIPMENT: Sub Equipments COMPONENT Item Code

Low Pressure pump PUMP PUMP DISCHARGE FLOW


Low Pressure pump PUMP PUMP DISCHARGE PRESSURE
Low Pressure pump PUMP Coupling(Indian) 0804070056

Low Pressure pump PUMP Pin bush assembly(Indian) 0804990103


Low Pressure pump PUMP Coupling bolt
Low Pressure pump PUMP Coupling bush
Low Pressure pump PUMP Bearing NDE/DE 0904030035
Low Pressure pump PUMP Impeller & Shaft
Low Pressure pump PUMP Mechanical seal
Low Pressure pump PUMP External circlip
Low Pressure pump PUMP MPP line filter
Low Pressure pump PUMP Wear ring
Low Pressure pump PUMP Outer spacer
Low Pressure pump PUMP Bearing sleeve

Low Pressure pump PUMP SUCTION VALVE

Low Pressure pump PUMP DISCHARGE VALVE

Low Pressure pump


Low Pressure pump SFU, 150 A
Panel

Low Pressure pump


Low Pressure pump MAIN POWER CONTACTOR
Panel

Low Pressure pump


Low Pressure pump CURRENT TRANSFORMER
Panel
Low Pressure pump
Low Pressure pump Motor Windings
Motor

Low Pressure pump


Low Pressure pump Terminal Box
Motor

Low Pressure pump


Low Pressure pump Overload Relay
Panel
CONDITION APPRAISAL OF LOW PRESSURE PUMP #01
TYPE OF CHECK
(RUN CHECK /
DESCRIPTION / DIMENSION TOOLS REQUIRED
STOP CHECK /
SHUTDOWN)
DISCHARGE FLOW CHECKING VISUAL/TRIAL RUN CHECK
DISCHARGE PRESSURE CHECKING VISUAL/TRIAL RUN CHECK

CHECK FOR DAMAGE VISUAL STOP CHECK

CHECK FOR DAMAGE VISUAL STOP CHECK

check for wear and damage VISUAL STOP CHECK


Check for damage VISUAL STOP CHECK

CHECK FOR CLEARANCE USING FILLER GAUGE STOP CHECK

check for wear and damage VISUAL STOP CHECK


CHECK FOR CLEARANCE VERNIER STOP CHECK
Check for damage VISUAL STOP CHECK
check for clogging and leakage VISUAL STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CLOSING I/L V/V AND
check for passing CHECKING AT DRAIN STOP CHECK
VALVE

CLOSING O/L V/V AND


check for passing CHECKING AT DRAIN STOP CHECK
POINT

Check for fuse rating and continuity VISUAL / SHUTDOWN


of input / output terminals. MULTIMETER CHECK

Spanners, Screw
For switching a power circuit with SHUTDOWN
Drivers, Allen Key,
higher current ratings CHECK
Multimeter

Check for tighteness of connections


and measure the correct current VISUAL RUN CHECK
shown in the meter.
To form magnetic field when
SHUTDOWN
energized with current to produce Megger & Multimeter
CHECK
torque.

Allows the power cable to be fixed


with the motor windings cable
properly insulated, clamped and
sealed connector to provide greater
SHUTDOWN
protecton from short circuiting of Spanners
CHECK
cables.
Check for cable termination
tighteness and properly glanding
done.

Check for overload relay range and


setting of relay current for motor Visual Shut Down check
tripping.
PUMP #01

ACTION
IDEAL CONDITION ACTUAL CONDITION OBSERVED
REQUIRED

NO CRACKS

no damage

NO THREAD AND BODY DAMAGE


no damage

CLEARANCE <0.5MM

NO CAVITATION
2<DL<4
NO CRACKS
NO LEAKAGES

CLEARANCE <

NO PASSING

NO PASSING

SFU Unit should be clean. Check for fuse


SFU Unit is clean. Fuse taing and continuity of
taing and continuity of fuse input /
fuse input / output terminals are normal
output terminals.

Contactor rating to be LCID11, 11 A.


Proper tighteness of foundation of Contactor rating is LCID11, 11 A. No looseness
contactor. in fitting of contactor and connection of cables
No abnormalities to be seen for the to power contactor and its contacts. Coil
contacts and proper fitting to be done. resistance is 40 ohms.
Coil resistance should be 20-40 ohms.

CT connections should be tight and


should measure current accurately on CT connections are tight and display accurate
the ammeter. CT rating should be 150 / current on the ammeter. CT rating is 150 / 5.
5.
Winding Resistances should be balanced
No abnormal difference in winding
of all three phases, i.e., less than 10
resistances.
ohms.
Winding resistances of all three are 8.5 ohms.
Megger values shouldbe above 5
Megger values are 1000 mega ohms phase to
megaohms from all three phases to
ground and are in healthy condition.
ground.

Tightened with 8mm Chrome Vanadium No looseness of 8mm Chrome Vanadium bolts
Bolts. and connecting links.

Relay Range : Relay Range :


(1-3.5)A (1-3.5)A
Relay settings = 2A Relay settings = 2A
FLC = 62.5A RC = 60.0A
CONDITION APPRAISAL OF LOW

Sub
EQUIPMENT: Equipments COMPONENT Item Code

Low Pressure pump PUMP PUMP DISCHARGE FLOW


Low Pressure pump PUMP PUMP DISCHARGE PRESSURE
Low Pressure pump PUMP Coupling(Indian) 0804070056
Low Pressure pump PUMP Pin bush assembly(Indian) 0804990103
Low Pressure pump PUMP Coupling bolt
Low Pressure pump PUMP Coupling bush
Low Pressure pump PUMP Bearing NDE/DE 0904030035
Low Pressure pump PUMP Impeller & Shaft
Low Pressure pump PUMP Mechanical seal
Low Pressure pump PUMP External circlip
Low Pressure pump PUMP MPP line filter
Low Pressure pump PUMP Wear ring
Low Pressure pump PUMP Outer spacer
Low Pressure pump PUMP Bearing sleeve
Low Pressure pump PUMP SUCTION VALVE
Low Pressure pump PUMP DISCHARGE VALVE

Low Pressure
Low Pressure pump pump Panel SFU, 150 A

Low Pressure
Low Pressure pump pump Panel MAIN POWER CONTACTOR
Low Pressure
Low Pressure pump pump Panel CURRENT TRANSFORMER

Low Pressure
Low Pressure pump pump Motor Motor Windings

Low Pressure
Low Pressure pump pump Motor Terminal Box

Low Pressure
Low Pressure pump pump Panel Overload Relay
NDITION APPRAISAL OF LOW PRESSURE PUMP #02

TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION IDEAL CONDITION
REQUIRED STOP CHECK /
SHUTDOWN)

DISCHARGE FLOW CHECKING VISUAL/TRIAL RUN CHECK


DISCHARGE PRESSURE CHECKING VISUAL/TRIAL RUN CHECK
CHECK FOR DAMAGE VISUAL STOP CHECK NO CRACKS
CHECK FOR DAMAGE VISUAL STOP CHECK no damage
check for wear and damage VISUAL STOP CHECK NO THREAD AND BODY DAMAGE
Check for damage VISUAL STOP CHECK no damage
CHECK FOR CLEARANCE USING FILLER GAU STOP CHECK CLEARANCE <0.5MM
check for wear and damage VISUAL STOP CHECK NO CAVITATION
CHECK FOR CLEARANCE VERNIER STOP CHECK 2<DL<4
Check for damage VISUAL STOP CHECK NO CRACKS
check for clogging and leakage VISUAL STOP CHECK NO LEAKAGES
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK CLEARANCE <
check for passing CLOSING I/L V/V A STOP CHECK NO PASSING
check for passing CLOSING O/L V/V ASTOP CHECK NO PASSING

SFU Unit should be clean.


Check for fuse rating and
VISUAL / SHUTDOWN Check for fuse taing and
continuity of input / output
MULTIMETER CHECK continuity of fuse input /
terminals.
output terminals.

Contactor rating to be LCID11,


11 A. Proper tighteness of
foundation of contactor.
Spanners, Screw
For switching a power circuit SHUTDOWN No abnormalities to be seen for
Drivers, Allen
with higher current ratings CHECK the contacts and proper fitting
Key, Multimeter
to be done.
Coil resistance should be 20-40
ohms.
Check for tighteness of CT connections should be tight
connections and measure the and should measure current
VISUAL RUN CHECK
correct current shown in the accurately on the ammeter. CT
meter. rating should be 150 / 5.

Winding Resistances should be


balanced of all three phases,
To form magnetic field when
Megger & SHUTDOWN i.e., less than 10 ohms.
energized with current to
Multimeter CHECK Megger values shouldbe above
produce torque.
5 megaohms from all three
phases to ground.

Allows the power cable to be


fixed with the motor windings
cable properly insulated, clamped
and sealed connector to provide
SHUTDOWN Tightened with 8mm Chrome
greater protecton from short Spanners
CHECK Vanadium Bolts.
circuiting of cables.
Check for cable termination
tighteness and properly glanding
done.

Relay Range :
Check for overload relay range
Shut Down (1-3.5)A
and setting of relay current for Visual
check Relay settings = 3.1A
motor tripping.
FLC = 91.5A
ACTUAL CONDITION ACTION
OBSERVED REQUIRED

SFU Unit is clean.


Fuse taing and
continuity of fuse
input / output
terminals are normal

Contactor rating is
LCID11, 11 A. No
looseness in fitting of
contactor and
connection of cables
to power contactor
and its contacts. Coil
resistance is 39.7
ohms.
CT connections are
tight and display
accurate current on
the ammeter. CT
rating is 150 / 5.

No abnormal
difference in winding
resistances.
Winding resistances
of all three are 8.5
ohms. Megger values
are 1000 mega ohms
phase to ground and
are in healthy
condition.

No looseness of 8mm
Chrome Vanadium
bolts and connecting
links.

Relay Range :
(1-3.5)A
Relay settings = 3.1A
RC = 90.0A
CONDITION APPRAISAL OF LOW

Sub
EQUIPMENT: Equipments COMPONENT Item Code

Low Pressure pump PUMP PUMP DISCHARGE FLOW


Low Pressure pump PUMP PUMP DISCHARGE PRESSURE
Low Pressure pump PUMP Coupling(Indian) 0804070056
Low Pressure pump PUMP Pin bush assembly(Indian) 0804990103
Low Pressure pump PUMP Coupling bolt
Low Pressure pump PUMP Coupling bush
Low Pressure pump PUMP Bearing NDE/DE 0904030035
Low Pressure pump PUMP Impeller & Shaft
Low Pressure pump PUMP Mechanical seal
Low Pressure pump PUMP External circlip
Low Pressure pump PUMP MPP line filter
Low Pressure pump PUMP Wear ring
Low Pressure pump PUMP Outer spacer
Low Pressure pump PUMP Bearing sleeve
Low Pressure pump PUMP SUCTION VALVE
Low Pressure pump PUMP DISCHARGE VALVE

Low Pressure
Low Pressure pump pump Panel SFU, 150 A

Low Pressure
Low Pressure pump pump Panel MAIN POWER CONTACTOR

Low Pressure
Low Pressure pump pump Panel CURRENT TRANSFORMER
Low Pressure
Low Pressure pump pump Motor Motor Windings

Low Pressure
Low Pressure pump pump Motor Terminal Box

Low Pressure
Low Pressure pump pump Panel Overload Relay
NDITION APPRAISAL OF LOW PRESSURE PUMP #03

TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION IDEAL CONDITION
REQUIRED STOP CHECK /
SHUTDOWN)

DISCHARGE FLOW CHECKING VISUAL/TRIAL RUN CHECK


DISCHARGE PRESSURE CHECKING VISUAL/TRIAL RUN CHECK
CHECK FOR DAMAGE VISUAL STOP CHECK NO CRACKS
CHECK FOR DAMAGE VISUAL STOP CHECK no damage
check for wear and damage VISUAL STOP CHECK NO THREAD AND BODY DAMAGE
Check for damage VISUAL STOP CHECK no damage
CHECK FOR CLEARANCE USING FILLER GAU STOP CHECK CLEARANCE <0.5MM
check for wear and damage VISUAL STOP CHECK NO CAVITATION
CHECK FOR CLEARANCE VERNIER STOP CHECK 2<DL<4
Check for damage VISUAL STOP CHECK NO CRACKS
check for clogging and leakage VISUAL STOP CHECK NO LEAKAGES
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK CLEARANCE <
check for passing CLOSING I/L V/V A STOP CHECK NO PASSING
check for passing CLOSING O/L V/V ASTOP CHECK NO PASSING
SFU Unit should be clean.
Check for fuse rating and
VISUAL / SHUTDOWN Check for fuse taing and
continuity of input / output
MULTIMETER CHECK continuity of fuse input /
terminals.
output terminals.

Contactor rating to be LCID11,


11 A. Proper tighteness of
foundation of contactor.
Spanners, Screw
For switching a power circuit SHUTDOWN No abnormalities to be seen for
Drivers, Allen
with higher current ratings CHECK the contacts and proper fitting
Key, Multimeter
to be done.
Coil resistance should be 20-40
ohms.

Check for tighteness of CT connections should be tight


connections and measure the and should measure current
VISUAL RUN CHECK
correct current shown in the accurately on the ammeter. CT
meter. rating should be 150 / 5.
Winding Resistances should be
balanced of all three phases,
To form magnetic field when
Megger & SHUTDOWN i.e., less than 10 ohms.
energized with current to
Multimeter CHECK Megger values shouldbe above
produce torque.
5 megaohms from all three
phases to ground.

Allows the power cable to be


fixed with the motor windings
cable properly insulated, clamped
and sealed connector to provide
SHUTDOWN Tightened with 8mm Chrome
greater protecton from short Spanners
CHECK Vanadium Bolts.
circuiting of cables.
Check for cable termination
tighteness and properly glanding
done.

Relay Range :
Check for overload relay range
Shut Down (1-3.5)A
and setting of relay current for Visual
check Relay settings = 2A
motor tripping.
FLC = 62.5A
ACTUAL CONDITION ACTION
OBSERVED REQUIRED
CONDITION APPRAISAL O

Sub
EQUIPMENT: Equipments COMPONENT Item Code

Medium Pressure pump PUMP PUMP DISCHARGE FLOW


Medium Pressure pump PUMP PUMP DISCHARGE PRESSURE
Medium Pressure pump PUMP Coupling(Indian) 0804070054
Medium Pressure pump PUMP Pin bush assembly(Indian) 0804990102
Medium Pressure pump PUMP Coupling bolt 0804990114
Medium Pressure pump PUMP Coupling bush 0804990078
Medium Pressure pump PUMP Bearing NDE/DE 0904030062
Medium Pressure pump PUMP Impeller & Shaft 5499000454
Medium Pressure pump PUMP Mechanical seal 5499000453
Medium Pressure pump PUMP External circlip 0652090037
Medium Pressure pump PUMP MPP line filter 0615020020
Medium Pressure pump PUMP Wear ring 5476020001
Medium Pressure pump PUMP Outer spacer 5476020002
Medium Pressure pump PUMP Bearing sleeve 5476020003
Medium Pressure pump PUMP SUCTION VALVE
Medium Pressure pump PUMP DISCHARGE VALVE

HT PANEL BUSBARS
HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
OUTGOIN HT BREAKER
G TO
MEDIUM
PRESSUR
E PUMP 1
PANEL

MEDIUM
PRESSURE PUMP
#1
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

CURRENT TRANSDUCER

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER
MAIN
MOTOR- HT Motor Windings
MPP 1

MAIN
MOTOR- Terminal Box
MPP 1
CONDITION APPRAISAL OF MEDIUM PRESSURE PUMP #01
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
DISCHARGE FLOW CHECKING VISUAL/TRIAL RUN CHECK
DISCHARGE PRESSURE CHECKING VISUAL/TRIAL RUN CHECK
CHECK FOR DAMAGE VISUAL STOP CHECK
CHECK FOR DAMAGE VISUAL STOP CHECK
check for wear and damage VISUAL STOP CHECK
Check for damage VISUAL STOP CHECK
CHECK FOR CLEARANCE USING FILLER GAU STOP CHECK
check for wear and damage VISUAL STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
Check for damage VISUAL STOP CHECK
check for clogging and leakage VISUAL STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
check for passing CLOSING I/L V/V A STOP CHECK
check for passing CLOSING O/L V/V ASTOP CHECK
Check for proper tigteness of the
busbar and busbar support insulator. SPANNERS /
SHUTDOWN
It should have sufficient stiffness to TORQUE
CHECK
be supported in air by insulated WRENCH
pillars.

Check for proper cleanliness of the


busbar insulator and panel body. It
VISUAL /
should be generally uninsulated, and SHUTDOWN
COTTON
should be proper insulation between CHECK
CLOTHE
busbar and switchgear panel
through busbar insualtor.

Check for megger value of Busbar SHUTDOWN


HT MEGGER
and panel body. CHECK
Check for proper interlocking of
earth switch and HT Breaker. Also, SHUTDOWN
VISUAL
check for interlocking of earth CHECK
switch and panel back door.

Check for earthing of the Panel


VISUAL RUN CHECK
body.

Check for Oxydation of busbars and LEAKAGE


RUN CHECK
insulators due to moisture content. TESTER

Check for high electrical &


mechanical strength used in
electrical panels to support the SHUTDOWN
VISUAL
copper busbar. Check for megger CHECK
value between insulator and panel
body.

VISUAL,
COTTON
VISUAL,
COTTON
CLOTHE,
To protect an electrical circuit from
CRC,
damage caused by excess current
DIELECTRIC SHUTDOWN
from an overload or short circuit. Its
ISOPLEX & CHECK
basic function is to interrupt current
SHELL
flow after a fault is detected.
TELLUS 32
GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the INJECTION
operation of circuit breaker to CURRENT SHUTDOWN
isolate the defective element from AND CHECK
the rest of the system. VOLTAGE
TEST KIT

Check for proper tigteness of the SPANNERS /


SHUTDOWN
power cable and HT Breaker TORQUE
CHECK
Terminals. WRENCH

Check for megger value of HT


SHUTDOWN
Cable phase to phae and phase to MEGGER
CHECK
earth.

Check for partial discharge test of


TAN-DELTA SHUTDOWN
HT Cable for HT Cable insualtion
TEST KIT CHECK
testing.

Check for output current shown on VISUAL /


RUN CHECK
SCADA in Control Room. MULTIMTER

VISUAL /
Check for tighteness of connections
SECONDARY
and measure the correct voltage and
INJECTION
indication shown in the meter. SHUTDOWN
CURRENT
Also, check for tripping of the HT CHECK
AND
Numerical Relay by Secondary
VOLTAGE
Injection kit.
TEST KIT

VISUAL /
Check for tighteness of connections
SECONDARY
and measure the correct current
INJECTION
shown in the meter. SHUTDOWN
CURRENT
Also, check for tripping of the HT CHECK
AND
Numerical Relay by Secondary
VOLTAGE
Injection kit.
TEST KIT
To form magnetic field when
energized with current to
Megger & Shut Down
produce torque. Check for
Multimeter check
winding resistance and megger
value of Motor.

Check for TAN DELTA of the TAN-DELTA SHUTDOWN


motor. TEST KIT CHECK

Check for proper tigteness of the Shut Down


Spanners
power cable to the HT Motor check
UMP #01

ACTUAL CONDITION ACTION


IDEAL CONDITION OBSERVED REQUIRED

NO CRACKS
no damage
NO THREAD AND BODY DAMAGE
no damage
CLEARANCE <0.5MM
NO CAVITATION
2<DL<4
NO CRACKS
NO LEAKAGES

CLEARANCE <
NO PASSING
NO PASSING

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.

Insulators should be installed Insulators were installed


properly to hold and support properly and was clean. No
busbars. Insulators should be oxydation observed between
clean. insulator and bubar.

Resistance between panel to Resistance between panel to


busbar should be ˃ 20 mega ohms. busbar is 1000 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In
Breaker should not Rack In
during Earth Switch operated
during Earth Switch operated
condition. Also, Back Door
condition. Also, Back Door of HT
of HT Panel has not been
Panel should not be open when
open when earth switch is not
earth switch is not operated.
operated.

Earthing is connected to the


Earthing should be healthy.
body and to the Earth Pit.

No oxydation and moisture inside No oxydation and moisture


panel. Space Heater current inside panel. Space Heater
should be < 1 A current is 0.3 A

Vertical and Horizontal insulators Vertical and Horizontal


should provide high electrical and insulators strength to the
mechanical strength to the busbars are good. Also,
busbars. Also, megger value megger value is 1000 mega
should be ˃ 20 mega Ohms. Ohms.

HT Breaker should be clean. HT Breaker found clean.


There should not be any moisture There is no moisture or wear
or wear and rusting of contacts. and rusting of contacts.

Lubrication of all moving


Proper lubrication of all moving
parts of mechanism is
parts of mechanism.
normal.
Proper operation of gear box Operation of gear box
mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation Spring charging operation of
of limit switch. limit switch is normal.
Condition of contact arm Condition of contact arm
assembly of breaker should be assembly of breaker is
proper. proper.
Vacuum inside bottles should be Vacuum inside bottles is
normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should Upper & Lower contacts is >
be > 1 T Ohms 1 T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms
Timing of CB during Close
Timing of CB during Close is
should be in ms of all three
42 ms of all three phases.
phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 39 ms of all three phases.

Timing of CB during Close / Timing of CB during Close /


Open should be in ms of all three Open is 18 ms of all three
phases. phases.
Contact Resistance between Contact Resistance between
Upper and Lower contacts should Upper and Lower contacts is
be in micro ohms of all three 45 micro ohms of all three
phases. phases.
HVAC Test for 15 KV should HVAC Test for 15 KV
withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults
the breaker on the faults described
described in the relay on
in the relay on prescribed values.
prescribed values.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1200 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 1000Mega
Mega Ohms Ohms

TAN-DELTA test of HT Cable TAN-DELTA test of HT


should be < 0.004 absolute. Cable is 0.0010

Output ma is checked on
To check for ma output of Current
transducer and showing
Transducer and should display on
current display on SCADA
SCADA in Control Room.
correctly.

PT connections should be tight


PT connections are tight and
and should
display correct voltage on the
1. measure correct voltage on the
relay. Indication of voltage
relay or meter.
on the panel is shown.
2. provide indication of voltage on
Trippig of the HT Breaker
the panel.
through HT Relay on Over
3. trip the HT Breaker through HT
voltage / Under Voltage is
Relay on Over voltage / Under
healthy.
Voltage.

CT connections should be tight


CT connections are tight and
and should
display accurate current on
1. measure current accurately on
the relay. Trippig of the HT
the relay or meter.
Breaker through HT Relay on
2. trip the HT Breaker through HT
Over curent / CIR / ITOC /
Relay on Over curent / CIR /
DMT is healthy.
ITOC / DMT.
No abnormal difference in
Winding Resistances should be
winding resistances.
balanced of all three phases,
Winding resistance of all
i.e., less than 5 ohms.
three phases is 0.7 ohms.
Megger values shouldbe above
Megger values are 2 Giga
5 megaohms from all three
ohms and in healthy
phases to ground.
condition.

TAN-DELTA test of HT Motor TAN-DELTA test of HT


should be < 0.04 absolute. Motor is 0.0018

No looseness of 16 mm
Tightened with 16mm Chrome
Chrome Vanadium bolts
Vanadium Bolts.
and connecting links.
CONDITION APP

EQUIPMENT: Sub Equipments COMPONENT Item Code

Medium Pressure pump PUMP PUMP DISCHARGE FLOW


Medium Pressure pump PUMP PUMP DISCHARGE PRESSURE
Medium Pressure pump PUMP Coupling(Indian) 0804070054
Medium Pressure pump PUMP Pin bush assembly(Indian) 0804990102
Medium Pressure pump PUMP Coupling bolt 0804990114
Medium Pressure pump PUMP Coupling bush 0804990078
Medium Pressure pump PUMP Bearing NDE/DE 0904030062
Medium Pressure pump PUMP Impeller & Shaft 5499000454
Medium Pressure pump PUMP Mechanical seal 5499000453
Medium Pressure pump PUMP External circlip 0652090037
Medium Pressure pump PUMP MPP line filter 0615020020
Medium Pressure pump PUMP Wear ring 5476020001
Medium Pressure pump PUMP Outer spacer 5476020002
Medium Pressure pump PUMP Bearing sleeve 5476020003

Medium Pressure pump PUMP SUCTION VALVE

Medium Pressure pump PUMP DISCHARGE VALVE

HT PANEL BUSBARS
HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

OUTGOING TO HT BREAKER
MEDIUM
PRESSURE
PUMP 2 PANEL

MEDIUM PRESSURE
PUMP #2
OUTGOING TO HT BREAKER
MEDIUM
PRESSURE
PUMP 2 PANEL

MEDIUM PRESSURE
PUMP #2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

CURRENT TRANSDUCER
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

MAIN MOTOR-
HT Motor Windings
MPP 2

MAIN MOTOR-
Terminal Box
MPP 2
CONDITION APPRAISAL OF MEDIUM PRESSURE PUMP #02
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
DISCHARGE FLOW CHECKING VISUAL/TRIAL RUN CHECK
DISCHARGE PRESSURE CHECKING VISUAL/TRIAL RUN CHECK
CHECK FOR DAMAGE VISUAL STOP CHECK
CHECK FOR DAMAGE VISUAL STOP CHECK
check for wear and damage VISUAL STOP CHECK
Check for damage VISUAL STOP CHECK
USING FILLER
CHECK FOR CLEARANCE STOP CHECK
GAUGE
check for wear and damage VISUAL STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
Check for damage VISUAL STOP CHECK
check for clogging and leakage VISUAL STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CHECK FOR CLEARANCE VERNIER STOP CHECK
CLOSING I/L V/V
check for passing AND CHECKING AT STOP CHECK
DRAIN VALVE

CLOSING O/L V/V


check for passing AND CHECKING AT STOP CHECK
DRAIN POINT

Check for proper tigteness of the


busbar and busbar support
SPANNERS /
insulator. It should have SHUTDOWN
TORQUE
sufficient stiffness to be CHECK
WRENCH
supported in air by insulated
pillars.

Check for proper cleanliness of


the busbar insulator and panel
body. It should be generally VISUAL /
SHUTDOWN
uninsulated, and should be COTTON
CHECK
proper insulation between busbar CLOTHE
and switchgear panel through
busbar insualtor.
Check for megger value of SHUTDOWN
HT MEGGER
Busbar and panel body. CHECK
Check for proper interlocking of
earth switch and HT Breaker.
SHUTDOWN
Also, check for interlocking of VISUAL
CHECK
earth switch and panel back
door.

Check for earthing of the Panel


VISUAL RUN CHECK
body.
Check for Oxydation of busbars
LEAKAGE
and insulators due to moisture RUN CHECK
TESTER
content.
Check for high electrical &
mechanical strength used in
electrical panels to support the SHUTDOWN
VISUAL
copper busbar. Check for megger CHECK
value between insulator and
panel body.

VISUAL,
COTTON
To protect an electrical circuit CLOTHE,
from damage caused by excess CRC,
current from an overload or short DIELECTRIC SHUTDOWN
circuit. Its basic function is to ISOPLEX & CHECK
interrupt current flow after a SHELL
fault is detected. TELLUS 32
GREASE, HT
MEGGER
current from an overload or short DIELECTRIC SHUTDOWN
circuit. Its basic function is to ISOPLEX & CHECK
interrupt current flow after a SHELL
fault is detected. TELLUS 32
GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates INJECTION
the operation of circuit breaker CURRENT SHUTDOWN
to isolate the defective element AND CHECK
from the rest of the system. VOLTAGE
TEST KIT
Check for proper tigteness of the SPANNERS /
SHUTDOWN
power cable and HT Breaker TORQUE
CHECK
Terminals. WRENCH
Check for megger value of HT
SHUTDOWN
Cable phase to phae and phase to MEGGER
CHECK
earth.

Check for partial discharge test


TAN-DELTA SHUTDOWN
of HT Cable for HT Cable
TEST KIT CHECK
insualtion testing.

Check for output current shown VISUAL /


RUN CHECK
on SCADA in Control Room. MULTIMTER
Check for tighteness of VISUAL /
connections and measure the SECONDARY
correct voltage and indication INJECTION
SHUTDOWN
shown in the meter. CURRENT
CHECK
Also, check for tripping of the AND
HT Numerical Relay by VOLTAGE
Secondary Injection kit. TEST KIT

Check for tighteness of VISUAL /


connections and measure the SECONDARY
correct current shown in the INJECTION
SHUTDOWN
meter. CURRENT
CHECK
Also, check for tripping of the AND
HT Numerical Relay by VOLTAGE
Secondary Injection kit. TEST KIT

To form magnetic field when


energized with current to
Megger & Shut Down
produce torque. Check for
Multimeter check
winding resistance and
megger value of Motor.

Check for TAN DELTA of the TAN-DELTA SHUTDOWN


motor. TEST KIT CHECK
Check for proper tigteness of
Shut Down
the power cable to the HT Spanners
check
Motor
PUMP #02

ACTION
IDEAL CONDITION ACTUAL CONDITION OBSERVED REQUIRED

NO CRACKS
no damage
NO THREAD AND BODY DAMAGE
no damage

CLEARANCE <0.5MM

NO CAVITATION
2<DL<4
NO CRACKS
NO LEAKAGES

CLEARANCE <

NO PASSING

NO PASSING

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

Insulators should be installed properly Insulators were installed properly and


to hold and support busbars. Insulators was clean. No oxydation observed
should be clean. between insulator and bubar.

Resistance between panel to busbar Resistance between panel to busbar is


should be ˃ 20 mega ohms. 1000 mega ohms.
Interlock of Earth Switch and HT Interlock of Earth Switch and HT
Breaker should be healthy. HT Breaker Breaker is healthy. HT Breaker do not
should not Rack In during Earth Rack In during Earth Switch operated
Switch operated condition. Also, Back condition. Also, Back Door of HT
Door of HT Panel should not be open Panel has not been open when earth
when earth switch is not operated. switch is not operated.

Earthing is connected to the body and


Earthing should be healthy.
to the Earth Pit.
No oxydation and moisture inside
No oxydation and moisture inside
panel. Space Heater current should be
panel. Space Heater current is 0.3 A
< 1A

Vertical and Horizontal insulators


Vertical and Horizontal insulators
should provide high electrical and
strength to the busbars are good.
mechanical strength to the busbars.
Also, megger value is 1000 mega
Also, megger value should be ˃ 20 Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There is no


should not be any moisture or wear moisture or wear and rusting of
and rusting of contacts. contacts.
Proper lubrication of all moving parts Lubrication of all moving parts of
of mechanism. mechanism is normal.
Proper operation of gear box Operation of gear box mechanism is
mechanism. normal.

Proper operation of Test / Service Operation of Test / Service auxiliary


auxiliary switch operation. switch operation is proper.

Proper closing and tripping mechanism Closing and tripping mechanism of


of breaker both electrically and breaker both electrically and
manually. manually is proper.
Proper spring charging operation of Spring charging operation of limit
limit switch. switch is normal.
Condition of contact arm assembly of Condition of contact arm assembly of
breaker should be proper. breaker is proper.
Vacuum inside bottles should be
Vacuum inside bottles is normal.
normal.

Insulation resistance between Upper & Insulation resistance between Upper


Lower contacts should be > 1 T Ohms & Lower contacts is > 1 T Ohms
Insulation resistance between Phase to Insulation resistance between Phase
Phase should be > 1 T Ohms to Phase is > 1 T Ohms
Insulation resistance between Phase to Insulation resistance between Phase
Earth should be > 1 T Ohms to Earth is > 1 T Ohms
Timing of CB during Close should be Timing of CB during Close is 42 ms
in ms of all three phases. of all three phases.
Timing of CB during Open should be Timing of CB during Open is 39 ms
in ms of all three phases. of all three phases.
Timing of CB during Close / Open Timing of CB during Close / Open is
should be in ms of all three phases. 18 ms of all three phases.
Contact Resistance between Upper and Contact Resistance between Upper
Lower contacts should be in micro and Lower contacts is 45 micro ohms
ohms of all three phases. of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV withstand for


withstand for min. of all three phases. min. of all three phases.

HT Breaker Numerical Relay tripping HT Breaker Numerical Relay tripping


should be healthy to trip the breaker on is healthy to trip the breaker on the
the faults described in the relay on faults described in the relay on
prescribed values. prescribed values.

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

Insulation resistance between Phase to Insulation resistance between Phase


Phase should be > 20 Mega Ohms to Phase is 1200 Ohms

Insulation resistance between Phase to Insulation resistance between Phase


Earth should be > 20 Mega Ohms to Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable should TAN-DELTA test of HT Cable is


be < 0.004 absolute. 0.0018

To check for ma output of Current Output ma is checked on transducer


Transducer and should display on and showing current display on
SCADA in Control Room. SCADA correctly.
PT connections should be tight and
should
PT connections are tight and display
1. measure correct voltage on the relay
correct voltage on the relay.
or meter.
Indication of voltage on the panel is
2. provide indication of voltage on the
shown. Trippig of the HT Breaker
panel.
through HT Relay on Over voltage /
3. trip the HT Breaker through HT
Under Voltage is healthy.
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should CT connections are tight and display
1. measure current accurately on the accurate current on the relay. Trippig
relay or meter. of the HT Breaker through HT Relay
2. trip the HT Breaker through HT on Over curent / CIR / ITOC / DMT
Relay on Over curent / CIR / ITOC / is healthy.
DMT.

Winding Resistances should be


No abnormal difference in
balanced of all three phases, i.e.,
winding resistances. Winding
less than 5 ohms.
resistance of all three phases is 0.7
Megger values shouldbe above 5
ohms. Megger values are 2 Giga
megaohms from all three phases to
ohms and in healthy condition.
ground.
TAN-DELTA test of HT Motor should TAN-DELTA test of HT Motor is
be < 0.04 absolute. 0.0021
No looseness of 16 mm Chrome
Tightened with 16mm Chrome
Vanadium bolts and connecting
Vanadium Bolts.
links.
COND

Sub
EQUIPMENT: Equipments COMPONENT Item Code

Medium Pressure pump PUMP PUMP DISCHARGE FLOW


Medium Pressure pump PUMP PUMP DISCHARGE PRESSURE
Medium Pressure pump PUMP Coupling(Indian) 0804070054
Medium Pressure pump PUMP Pin bush assembly(Indian) 0804990102
Medium Pressure pump PUMP Coupling bolt 0804990114
Medium Pressure pump PUMP Coupling bush 0804990078
Medium Pressure pump PUMP Bearing NDE/DE 0904030062
Medium Pressure pump PUMP Impeller & Shaft 5499000454
Medium Pressure pump PUMP Mechanical seal 5499000453
Medium Pressure pump PUMP External circlip 0652090037
Medium Pressure pump PUMP MPP line filter 0615020020
Medium Pressure pump PUMP Wear ring 5476020001
Medium Pressure pump PUMP Outer spacer 5476020002
Medium Pressure pump PUMP Bearing sleeve 5476020003
Medium Pressure pump PUMP SUCTION VALVE
Medium Pressure pump PUMP DISCHARGE VALVE

HT PANEL BUSBARS
HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND VERTICAL
INSULATOR
HT BREAKER
OUTGOIN
G TO
MEDIUM
PRESSUR
E PUMP 3
PANEL

MEDIUM PRESSURE
PUMP #3
HT NUMERICAL PROTECTIVE
RELAY

HT CABLES
CURRENT TRANSDUCER

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

MAIN
MOTOR- HT Motor Windings
MPP 3
MAIN
MOTOR- Terminal Box
MPP 3
CONDITION APPRAISAL OF MEDIUM PRESSURE PUMP #02

DESCRIPTION / DIMENSION TOOLS REQUIRED

DISCHARGE FLOW CHECKING VISUAL/TRIAL


DISCHARGE PRESSURE CHECKING VISUAL/TRIAL
CHECK FOR DAMAGE VISUAL
CHECK FOR DAMAGE VISUAL
check for wear and damage VISUAL
Check for damage VISUAL
CHECK FOR CLEARANCE USING FILLER GAUGE
check for wear and damage VISUAL
CHECK FOR CLEARANCE VERNIER
Check for damage VISUAL
check for clogging and leakage VISUAL
CHECK FOR CLEARANCE VERNIER
CHECK FOR CLEARANCE VERNIER
CHECK FOR CLEARANCE VERNIER
check for passing CLOSING I/L V/V AND CHECKING AT DRAIN VALVE
check for passing CLOSING O/L V/V AND CHECKING AT DRAIN POINT
Check for proper tigteness of the
busbar and busbar support insulator.
It should have sufficient stiffness to SPANNERS / TORQUE WRENCH
be supported in air by insulated
pillars.

Check for proper cleanliness of the


busbar insulator and panel body. It
should be generally uninsulated, and
VISUAL / COTTON CLOTHE
should be proper insulation between
busbar and switchgear panel
through busbar insualtor.

Check for megger value of Busbar


HT MEGGER
and panel body.
Check for proper interlocking of
earth switch and HT Breaker. Also,
VISUAL
check for interlocking of earth
switch and panel back door.

Check for earthing of the Panel


VISUAL
body.

Check for Oxydation of busbars and


LEAKAGE TESTER
insulators due to moisture content.

Check for high electrical &


mechanical strength used in
electrical panels to support the
VISUAL
copper busbar. Check for megger
value between insulator and panel
body.
To protect an electrical circuit from
damage caused by excess current VISUAL, COTTON CLOTHE, CRC,
from an overload or short circuit. Its DIELECTRIC ISOPLEX & SHELL TELLUS 32
basic function is to interrupt current GREASE, HT MEGGER
flow after a fault is detected.
To detect the fault and initiates the
operation of circuit breaker to SECONDARY INJECTION CURRENT AND
isolate the defective element from VOLTAGE TEST KIT
the rest of the system.

Check for proper tigteness of the


power cable and HT Breaker SPANNERS / TORQUE WRENCH
Terminals.

Check for megger value of HT


Cable phase to phae and phase to MEGGER
earth.

Check for partial discharge test of


HT Cable for HT Cable insualtion TAN-DELTA TEST KIT
testing.
Check for output current shown on
VISUAL / MULTIMTER
SCADA in Control Room.

Check for tighteness of connections


and measure the correct voltage and
indication shown in the meter. VISUAL / SECONDARY INJECTION
Also, check for tripping of the HT CURRENT AND VOLTAGE TEST KIT
Numerical Relay by Secondary
Injection kit.

Check for tighteness of connections


and measure the correct current
shown in the meter. VISUAL / SECONDARY INJECTION
Also, check for tripping of the HT CURRENT AND VOLTAGE TEST KIT
Numerical Relay by Secondary
Injection kit.

To form magnetic field when


energized with current to
produce torque. Check for Megger & Multimeter
winding resistance and megger
value of Motor.
Check for TAN DELTA of the
TAN-DELTA TEST KIT
motor.

Check for proper tigteness of the


Spanners
power cable to the HT Motor
UMP #02

TYPE OF CHECK (RUN CHECK / ACTUAL CONDITION


IDEAL CONDITION
STOP CHECK / SHUTDOWN) OBSERVED

RUN CHECK
RUN CHECK
STOP CHECK NO CRACKS
STOP CHECK no damage
STOP CHECK NO THREAD AND BODY DAMAGE
STOP CHECK no damage
STOP CHECK CLEARANCE <0.5MM
STOP CHECK NO CAVITATION
STOP CHECK 2<DL<4
STOP CHECK NO CRACKS
STOP CHECK NO LEAKAGES
STOP CHECK
STOP CHECK
STOP CHECK CLEARANCE <
STOP CHECK NO PASSING
STOP CHECK NO PASSING
No looseness of the
Tightened with 12mm high
bolts and
tensile stainless steel bolts with
SHUTDOWN CHECK connecting links
flat washers and nuts by Torque
checked by torque
Wrench.
wrench.

Insulators were
Insulators should be installed installed properly
properly to hold and support and was clean. No
SHUTDOWN CHECK
busbars. Insulators should be oxydation observed
clean. between insulator
and bubar.

Resistance between panel to Resistance between


SHUTDOWN CHECK busbar should be ˃ 20 mega panel to busbar is
ohms. 1000 mega ohms.
Interlock of Earth
Switch and HT
Interlock of Earth Switch and Breaker is healthy.
HT Breaker should be healthy. HT Breaker do not
HT Breaker should not Rack In Rack In during
during Earth Switch operated Earth Switch
SHUTDOWN CHECK
condition. Also, Back Door of operated condition.
HT Panel should not be open Also, Back Door of
when earth switch is not HT Panel has not
operated. been open when
earth switch is not
operated.

Earthing is
connected to the
RUN CHECK Earthing should be healthy.
body and to the
Earth Pit.

No oxydation and
No oxydation and moisture
moisture inside
RUN CHECK inside panel. Space Heater
panel. Space Heater
current should be < 1 A
current is 0.3 A

Vertical and
Vertical and Horizontal
Horizontal
insulators should provide high
insulators strength
electrical and mechanical
SHUTDOWN CHECK to the busbars are
strength to the busbars. Also,
good. Also, megger
megger value should be ˃ 20
mega Ohms.
value is 1000 mega
Ohms.

HT Breaker found
HT Breaker should be clean.
clean. There is no
There should not be any
moisture or wear
moisture or wear and rusting of
and rusting of
contacts.
contacts.
Lubrication of all
Proper lubrication of all moving moving parts of
parts of mechanism. mechanism is
normal.
Operation of gear
Proper operation of gear box
box mechanism is
mechanism.
normal.
Operation of Test /
Proper operation of Test /
Service auxiliary
Service auxiliary switch
switch operation is
operation.
proper.

Closing and tripping


Proper closing and tripping mechanism of
mechanism of breaker both breaker both
electrically and manually. electrically and
manually is proper.

Spring charging
Proper spring charging operation
operation of limit
of limit switch.
switch is normal.

Condition of contact arm Condition of contact


assembly of breaker should be arm assembly of
proper. breaker is proper.

Vacuum inside bottles should be Vacuum inside


normal. bottles is normal.

SHUTDOWN CHECK Insulation resistance


Insulation resistance between
between Upper &
Upper & Lower contacts should
Lower contacts is >
be > 1 T Ohms
1 T Ohms

Insulation resistance
Insulation resistance between
between Phase to
Phase to Phase should be > 1 T
Phase is > 1 T
Ohms
Ohms

Insulation resistance between Insulation resistance


Phase to Earth should be > 1 T between Phase to
Ohms Earth is > 1 T Ohms

Timing of CB
Timing of CB during Close
during Close is 42
should be in ms of all three
ms of all three
phases.
phases.
Timing of CB
Timing of CB during Open
during Open is 39
should be in ms of all three
ms of all three
phases.
phases.
Timing of CB
Timing of CB during Close /
during Close / Open
Open should be in ms of all
is 18 ms of all three
three phases.
phases.

Contact Resistance
Contact Resistance between
between Upper and
Upper and Lower contacts
Lower contacts is
should be in micro ohms of all
45 micro ohms of
three phases.
all three phases.

HVAC Test for 15


HVAC Test for 15 KV should
KV withstand for
withstand for min. of all three
min. of all three
phases.
phases.

HT Breaker
Numerical Relay
HT Breaker Numerical Relay
tripping is healthy
tripping should be healthy to trip
to trip the breaker
SHUTDOWN CHECK the breaker on the faults
on the faults
described in the relay on
described in the
prescribed values.
relay on prescribed
values.

No looseness of the
Tightened with 12mm high
bolts and
tensile stainless steel bolts with
SHUTDOWN CHECK connecting links
flat washers and nuts by Torque
checked by torque
Wrench.
wrench.

Insulation resistance between Insulation resistance


SHUTDOWN CHECK Phase to Phase should be > 20 between Phase to
Mega Ohms Phase is 1200 Ohms

Insulation resistance
Insulation resistance between
between Phase to
Phase to Earth should be > 20
Earth is 1000Mega
Mega Ohms
Ohms

TAN-DELTA test of HT Cable TAN-DELTA test of


SHUTDOWN CHECK
should be < 0.004 absolute. HT Cable is 0.0018
Output ma is
To check for ma output of checked on
Current Transducer and should transducer and
RUN CHECK
display on SCADA in Control showing current
Room. display on SCADA
correctly.

PT connections are
PT connections should be tight tight and display
and should correct voltage on
1. measure correct voltage on the relay. Indication
the relay or meter. of voltage on the
SHUTDOWN CHECK 2. provide indication of voltage panel is shown.
on the panel. Trippig of the HT
3. trip the HT Breaker through Breaker through HT
HT Relay on Over voltage / Relay on Over
Under Voltage. voltage / Under
Voltage is healthy.

CT connections are
CT connections should be tight tight and display
and should accurate current on
1. measure current accurately on the relay. Trippig of
SHUTDOWN CHECK the relay or meter. the HT Breaker
2. trip the HT Breaker through through HT Relay
HT Relay on Over curent / CIR / on Over curent /
ITOC / DMT. CIR / ITOC / DMT
is healthy.

No abnormal
difference in
winding
Winding Resistances should
resistances.
be balanced of all three
Winding
phases, i.e., less than 5 ohms.
Shut Down check resistance of all
Megger values shouldbe
three phases is 0.7
above 5 megaohms from all
ohms. Megger
three phases to ground.
values are 2 Giga
ohms and in
healthy condition.
TAN-DELTA test of HT Motor TAN-DELTA test of
SHUTDOWN CHECK
should be < 0.04 absolute. HT Motor is 0.0021

No looseness of 16
mm Chrome
Tightened with 16mm
Shut Down check Vanadium bolts
Chrome Vanadium Bolts.
and connecting
links.
ACTION
REQUIRED
EQUIPMENT: Sub Equipments COMPONENT

SP-COOL-ABC SP-COOL-ABC GEAR BOX SINTER COOLER


SP-COOL-ABC SP-COOL-ABC SINTER COOLER PALLET WHEEL
SP-COOL-ABC SP-COOL-ABC SINTER COOLER GUIDE WHEEL
SP-COOL-ABC SP-COOL-ABC SPROCKET,
SP-COOL-ABC SP-COOL-ABC SPROCKET
SP-COOL-ABC SP-COOL-ABC SINTER COOLER SUPPORT WHEEL
SP-COOL-ABC SP-COOL-ABC ROLLER CHAIN
SP-COOL-ABC SP-COOL-ABC SINTER COOLER SEALING RUBBER
SP-COOL-ABC SP-COOL-ABC SINTER COOLER SEALING RUBBER
SP-COOL-ABC SP-COOL-ABC FRICTION ROLLER
SP-COOL-ABC SP-COOL-ABC PALLET CAR ASSEMBLY FOR SINTER COOLER
SP-COOL-ABC SP-COOL-ABC PALLET CAR ASSEMBLY FOR SINTER COOLER
SP-COOL-ABC SP-COOL-ABC DRIVE FRICTION SPRING ASEMBLY
SP-COOL-ABC SP-COOL-ABC DEEPRAIL

SP-COOL-ABC SP-COOL-ABC
RELAY
SP-COOL-ABC SP-COOL-ABC CAMMAND & FEEDBACK CABLE
SP-COOL-ABC SP-COOL-ABC
DI ,DO, AI, AO Card, PLC , IM modules
SP-COOL-ABC SP-COOL-ABC SMPS
SP-COOL-ABC SP-COOL-ABC Profibus Cable
SP-COOL-ABC SP-COOL-ABC proximity switches
CONDITION APPRAISAL OF AIR BLAST COOLER

DESCRIPTION / DIMENSION TOOLS REQUIRED

CHECK FOR PHYSICAL DAMAGE VISUAL


CHECK FOR JAMMING OF WHEEL VISUAL
CHECK FOR JAMMING OF WHEEL VISUAL
CHECK FOR TEETH DAMAGE SPANNERS
CHECK FOR JAMMING OF WHEEL SPANNERS
CHECK FOR JAMMING OF WHEEL VISUAL
CHECK FOR CHAIN LINKS DEFORMATION SPANNERS
CHECK FOR DAMAGE/WEAR OUT VISUAL
CHECK FOR DAMAGE/WEAR OUT VISUAL
CHECK FOR JAMMING OF ROLLER VISUAL
CHECK FOR WHEEL MOVEMENT VISUAL
CHECK FOR SIDE WALL COND. VISUAL
CHECK FOR ANY CRACK/DAMAGE TO SPRING VISUAL
CHECK FOR CRACKS AND WEAROUT VISUAL

checking healthyness by operating DOL starter of motor. Multimeter,Tester


checking healthyness by Run the motor Multimeter,Tester
checking healthyness by operating DOL starter of motor and run
feedback. Multimeter,Tester
check supply voltage and output Voltage Multimeter,Tester
checking of commnunication on SCADA sytem and on PLC card Multimeter,Tester
check supply voltage and output Voltage Multimeter,Tester
ON APPRAISAL OF AIR BLAST COOLER

TYPE OF CHECK (RUN


CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

STOP CHECK NO PHYSICAL DAMAGE TO BODY


RUN CHECK WHEEL SHOULD NOT BE JAMMED
RUN CHECK WHEEL SHOULD NOT BE JAMMED
STOP CHECK NO DAMAGE TO TEETH
STOP CHECK NO DAMAGE TO TEETH
RUN CHECK WHEEL SHOULD NOT BE JAMMED
STOP CHECK NO DEFORMED LINKS
RUN CHECK NO DAMAGE/WORN OUT
RUN CHECK NO DAMAGE/WORN OUT
RUN CHECK ROLLER SHOULD NOT BE JAMMED
RUN CHECK WHEEL SHOULD BE ROTATING
RUN CHECK SIDE WALL SHOULD NOT BE BEND
STOP CHECK NO DAMAGE TO SPRING
STOP CHECK NO CRACKS AND WEAR TO THE RAIL

Run check Check for healthiness of NO - NC contacts during operation.


Run check Physical check or damage of cable

Run check Physical check


Run check Physical check
Run check Physical check
Run check Physical check
ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormalities found in switching of contacts during


operation.
No abnormalities found

No abnormalities found
No abnormalities found
No abnormalities found
No abnormalities found
CONDITION APPRAISAL OF RM

EQUIPMENT: Sub Equipments COMPONENT

HEAD DRUM BEARING


HEAD DRUM
PLUMMER BLOCK FOR HEAD DRUM

HEAD END SNUB PULLEY BEARING


HEAD SNUB
PLUMMER BLOCK FOR HEAD END SNUB PULLEY

GTU BEND PULLEY BEARING


GTU BEND 1
PLUMMER BLOCK FOR GTU BEND PULLEY

GTU BEND PULLEY BEARING


GTU BEND 2
PLUMMER BLOCK FOR GTU BEND PULLEY

GTU PULLEY BEARING


GTU PULLEY
BF3-RMHS-C1 PLUMMER BLOCK FOR GTU PULLEY

TAIL DRUM BEARING


TAIL DRUM
PLUMMER BLOCK FOR TAIL DRUM

TEFLON BUSH / COUPLING

SPIDER FOR CONVEYOR


COUPLING INPUT COUPLING
INPUT COUPLING
OUTPUT COUPLING
Tyre for coupling
Pin bush for UB 360
GEARBOX GEAR BOX

RMHS CB#01
RMHS CB#01 Motor Windings
MOTOR
RMHS CB#01
RMHS CB#01 Terminal Box
MOTOR

RMHS CB#01
MOTOR Power Contactor
PANEL

RMHS CB#01
MOTOR Overload Relay with Kit
PANEL

Speed sensor probe

ZERO SPEED
SWITCH

Zero speed device

BF3-RMHS-
CB01
BF3-RMHS-
CB01

BELT SWAY BELT SWAY SWITCH

PULL CORD PULL CORD SWITCH

RMHS CB#01
HOOTER CONTACTOR
Hooter
RMHS CB#01
HOOTER
Hooter

Command and Feed back cable

Relay

BF3-RMHS-CB1 DI ,DOCard,PLC , IM modules

SMPS

PLC , IM modules

Profibus Cable
CONDITION APPRAISAL OF RMHS CB#1 (BF3-RMHS-C1)

TYPE OF CHECK (RUN CHECK /


DESCRIPTION / DIMENSION TOOLS REQUIRED STOP CHECK / SHUTDOWN)

CHECK FOR BEARING CLEARANCE SAPNNERS AND FILLER GAUGE STOP CHECK

CHECK FOR PHYSICAL DAMAGE AND BOLSPANNERS STOP CHECK


CHECK FOR BEARING CLEARANCE SAPNNERS AND FILLER GAUGE STOP CHECK

CHECK FOR PHYSICAL DAMAGE AND BOLSPANNERS STOP CHECK


CHECK FOR BEARING CLEARANCE SAPNNERS AND FILLER GAUGE STOP CHECK

CHECK FOR PHYSICAL DAMAGE AND BOLSPANNERS STOP CHECK


CHECK FOR BEARING CLEARANCE SAPNNERS AND FILLER GAUGE STOP CHECK

CHECK FOR PHYSICAL DAMAGE AND BOLSPANNERS STOP CHECK


CHECK FOR BEARING CLEARANCE SAPNNERS AND FILLER GAUGE STOP CHECK

CHECK FOR PHYSICAL DAMAGE AND BOLSPANNERS STOP CHECK


CHECK FOR BEARING CLEARANCE SAPNNERS AND FILLER GAUGE STOP CHECK

CHECK FOR PHYSICAL DAMAGE AND BOLSPANNERS STOP CHECK

CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK


CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK
CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

To form magnetic field


when energized with current
to produce torque. Check for Megger & Multimeter Shut Down check
winding resistance and
megger value of Motor.
Check for proper tigteness of
the power cable to the LT Spanners Shut Down check
Motor

Check for contactor rating


and tighteness of contactor Spanners, Screw Drivers,
SHUTDOWN CHECK
terminals. Check for coil Allen Key, Multimeter
resistance of the contactor.

Check for overload relay


range and setting of relay Visual RUN CHECK
current for motor tripping.

To detect the speed of the


conveyor and provides a
Visual SHUTDOWN CHECK
pulse to the zero speed
switch.

To detect the stoppage or


unacceptably slow
Multimeter, Screw Driver SHUTDOWN CHECK
movement of a rotating
conveyor tail end pulley.
For detecting the sway or
deviation of belt conveyors,
and sends out an alarm
signal and an emergency
stop signal. Multimeter, Screw Driver SHUTDOWN CHECK
Suited to be used for belt
breakage and materials
falling prevention due to the
belt sway.

Check rope when operated


for safety tripping switch for
conveyor belts. When the
rope is pulled the lever of the
Multimeter, Screw Driver SHUTDOWN CHECK
pc unit is operated which in
turn, actuates a switch,
thereby the conveyor is
stopped.

Check for contactor rating


and tighteness of contactor Spanners, Screw Drivers,
SHUTDOWN CHECK
terminals. Check for coil Allen Key, Multimeter
resistance of the contactor.
Check for hooter motor
windings resistance and Screw Driver /
STOP CHECK
terminal tighteness Multimeter
connection.

checking healthyness by Run


Multimeter,Tester Run check
the Belt Conveyor
checking healthyness by
operating DOL starter of Multimeter,Tester Run check
conveyor.
checking healthyness by
operating DOL starter of
conveyor/ by activating pull Multimeter,Tester Run check
cord, BSS, ZSS and LCS
Box.
check supply voltage and
Multimeter,Tester Run check
output Voltage
checking healthyness by
Multimeter,Tester Run check
operating valve.
checking healthyness by
Multimeter,Tester Run check
operating valve.
IDEAL CONDITION ACTUAL CONDITION OBSERVED ACTION REQUIRED

CLEARANCE <0.70MM
NO PHYSICAL DAMAGE AND NO
RUSTED BOLTS
CLEARANCE <0.70MM
NO PHYSICAL DAMAGE AND NO
RUSTED BOLTS
CLEARANCE <0.70MM
NO PHYSICAL DAMAGE AND NO
RUSTED BOLTS
CLEARANCE <0.70MM
NO PHYSICAL DAMAGE AND NO
RUSTED BOLTS
CLEARANCE <0.70MM
NO PHYSICAL DAMAGE AND NO
RUSTED BOLTS
CLEARANCE <0.70MM
NO PHYSICAL DAMAGE AND NO
RUSTED BOLTS

NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE

Winding Resistances
should be balanced of No abnormal difference in
all three phases, i.e., winding resistances.
less than 20 ohms. Winding resistance of all
Megger values three phases is 12.4 ohms.
shouldbe above 5 Megger values are 1200
megaohms from all mega ohms and in healthy
three phases to condition.
ground.
Tightened with No looseness of the bolts
spanner set. and connecting links.

Contactor rating to be
LC1D40, 40 A. Proper
tighteness of Contactor rating is
foundation of LC1D40, 40 A. No
contactor. looseness in fitting of
No abnormalities to be contactor and connection
seen for the contacts of cables to power
and proper fitting to be contactor and its contacts.
done. Coil resistance is 42 ohms.
Coil resistance should
be 42-43 ohms.

Relay Range : Relay Range :


(23-32)A (23-32)A
Relay settings = 23 A Relay settings = 23 A
FLC = 27.4 A RC = 10.3 A

To check for
continuous sensing of No abnormalities found in
the speed of the sensing of speed probe.
conveyor.
No any abnormalities
To check for NO - NC
found in open - close
contacts through a
contacts through relay
relay according to
during running of conveyor
Time and Speed
according to speed and
adjustable settings.
time settings.
To check for
No abnormalities found in
healthiness of NO - NC
switching of contacts
contacts during
during operation.
operation.

To check for
No abnormalities found in
healthiness of NO - NC
switching of contacts
contacts during
during operation.
operation.

Contactor rating to be
LC1D09, 09 A. Proper
tighteness of Contactor rating is
foundation of LC1D09, 09 A. No
contactor. looseness in fitting of
No abnormalities to be contactor and connection
seen for the contacts of cables to power
and proper fitting to be contactor and its contacts.
done. Coil resistance is 42 ohms.
Coil resistance should
be 42-43 ohms.
Winding Resistances
should be balanced of No abnormal difference in
all three phases, i.e., winding resistances.
less than 40 ohms. Winding resistance of all
Megger values three phases is 38 ohms.
shouldbe above 5 Megger values are 100
megaohms from all mega ohms and in healthy
three phases to condition.
ground.

Physical check or
No abnormalities found
damage of cable
Check for healthiness No abnormalities found in
of NO - NC contacts switching of contacts
during operation. during operation.

Physical check No abnormalities found

Physical check No abnormalities found

Physical check No abnormalities found

Physical check No abnormalities found


CONDITION APP
EQUIPMENT: Sub Equipments COMPONENT Item Code

HEAD DRUM BEARING 0921020120

HEAD DRUM
PLUMMER BLOCK FOR HEAD DRUM 5231990092

HEAD END SNUB PULLEY BEARING 0921020121

HEAD SNUB
PLUMMER BLOCK FOR HEAD END SNUB PULLEY 5231990089

TAIL DRUM BEARING 0921020062

BF3-RMHS-C9
TAIL DRUM
PLUMMER BLOCK FOR TAIL DRUM 5231990093

INPUT COUPLING 0804040045

PIN AND BUSH OF I/P COUPLING

COUPLING OUTPUT COUPLING 0804030060

PIN AND BUSH OF O/P COUPLING

tyre for coupling

GEARBOX GEAR BOX

RMHS CB#9
RMHS CB#9 Motor Windings
MOTOR

RMHS CB#9
RMHS CB#9 Terminal Box
MOTOR
RMHS CB#9
MOTOR Power Contactor
PANEL

RMHS CB#9
MOTOR Overload Relay with Kit
PANEL

Speed sensor probe

ZERO SPEED
SWITCH

Zero speed device


BF3-RMHS-CB09

BELT SWAY BELT SWAY SWITCH


PULL CORD PULL CORD SWITCH

RMHS CB#9
HOOTER CONTACTOR
Hooter

RMHS CB#9
HOOTER
Hooter

Command and Feed back cable

Relay

BF3-RMHS-CB9 DI ,DOCard,PLC , IM modules

SMPS

PLC , IM modules

Profibus Cable
ONDITION APPRAISAL OF RMHS CB#9(BF3-RMHS-C9)
SPECIFICATION DESCRIPTION / DIMENSION TOOLS REQUIRED

22220 CA CHECK FOR BEARING CLEARANCE SPANNERS AND FILLER GAUGE

(PLUMMER BLOCK
F/DRUM OF CONVEYOR- CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS
SL NO 7, OF DRAWING
2220-02404 B)

22210 CHECK FOR BEARING CLEARANCE SPANNERS AND FILLER GAUGE


02404 B)(PLUMMER
BLOCK F/DRUM OF CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS
CONVEYOR-SL NO 4, OF
DRAWING 2220-
22224 CA CHECK FOR BEARING CLEARANCE SPANNERS AND FILLER GAUGE

(PLUMMER BLOCK
F/DRUM OF CONVEYOR- CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS
SL NO 8, OF DRAWING
2220-02404 B)

(UT0080) CHECK FOR PHYSICAL DAMAGE SPANNERS


CHECK FOR PHYSICAL DAMAGE OF BUSH AND SPANNERS
PINS
(UB285) CHECK FOR PHYSICAL DAMAGE SPANNERS
CHECK FOR PHYSICAL DAMAGE OF BUSH AND SPANNERS
PINS
CHECK FOR PHYSICAL DAMAGE SPANNERS

ZSY180-25 (11 KW) CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS

To form magnetic field when


energized with current to produce
torque. Check for winding Megger & Multimeter
resistance and megger value of
Motor.

Check for proper tigteness of the


Spanners
power cable to the LT Motor
Check for contactor rating and
Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key,
Check for coil resistance of the
Multimeter
contactor.

Check for overload relay range


and setting of relay current for Visual
motor tripping.

To detect the speed of the


conveyor and provides a pulse to Visual
the zero speed switch.

To detect the stoppage or


Multimeter, Screw
unacceptably slow movement of a
Driver
rotating conveyor tail end pulley.

For detecting the sway or


deviation of belt conveyors, and
sends out an alarm signal and an
Multimeter, Screw
emergency stop signal.
Driver
Suited to be used for belt breakage
and materials falling prevention
due to the belt sway.
Check rope when operated for
safety tripping switch for conveyor
belts. When the rope is pulled the Multimeter, Screw
lever of the pc unit is operated Driver
which in turn, actuates a switch,
thereby the conveyor is stopped.

Check for contactor rating and


Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key,
Check for coil resistance of the
Multimeter
contactor.

Check for hooter motor windings


Screw Driver /
resistance and terminal tighteness
Multimeter
connection.

checking healthyness by Run the


Multimeter,Tester
Belt Conveyor

checking healthyness by operating


Multimeter,Tester
DOL starter of conveyor.

checking healthyness by operating


DOL starter of conveyor/ by
Multimeter,Tester
activating pull cord, BSS, ZSS and
LCS Box.
check supply voltage and output
Multimeter,Tester
Voltage
checking healthyness by operating
Multimeter,Tester
valve.
checking healthyness by operating
Multimeter,Tester
valve.
TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)
STOP CHECK CLEARANCE <0.50MM

STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

STOP CHECK CLEARANCE <0.50MM

STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

STOP CHECK CLEARANCE <0.50MM

STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

Winding Resistances should be


balanced of all three phases, i.e.,
less than 20 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases
to ground.

Shut Down check Tightened with spanner set.


Contactor rating to be LC1D50, 50
A. Proper tighteness of foundation
of contactor.
SHUTDOWN No abnormalities to be seen for
CHECK the contacts and proper fitting to
be done.
Coil resistance should be 42-43
ohms.

Relay Range :
(37-50)A
RUN CHECK
Relay settings = 30 A
FLC = 39.6A

SHUTDOWN To check for continuous sensing


CHECK of the speed of the conveyor.

To check for NO - NC contacts


SHUTDOWN
through a relay according to Time
CHECK
and Speed adjustable settings.

SHUTDOWN To check for healthiness of NO -


CHECK NC contacts during operation.
SHUTDOWN To check for healthiness of NO -
CHECK NC contacts during operation.

Contactor rating to be LC1D09, 09


A. Proper tighteness of foundation
of contactor.
SHUTDOWN No abnormalities to be seen for
CHECK the contacts and proper fitting to
be done.
Coil resistance should be 42-43
ohms.

Winding Resistances should be


balanced of all three phases, i.e.,
less than 40 ohms.
STOP CHECK
Megger values shouldbe above 5
megaohms from all three phases
to ground.

Run check Physical check or damage of cable

Check for healthiness of NO - NC


Run check
contacts during operation.

Run check Physical check

Run check Physical check

Run check Physical check

Run check Physical check


ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormal difference in
winding resistances. Winding
resistance of all three phases is
12.4 ohms. Megger values are
1200 mega ohms and in healthy
condition.

No looseness of the bolts and


connecting links.
Contactor rating is LC1D50, 50 A.
No looseness in fitting of
contactor and connection of
cables to power contactor and its
contacts. Coil resistance is 42
ohms.

Relay Range :
(37-50)A
Relay settings = 30 A
RC = 18.2 A

No abnormalities found in
sensing of speed probe.

No any abnormalities found in


open - close contacts through
relay during running of conveyor
according to speed and time
settings.

No abnormalities found in
switching of contacts during
operation.
No abnormalities found in
switching of contacts during
operation.

Contactor rating is LC1D09, 09 A.


No looseness in fitting of
contactor and connection of
cables to power contactor and its
contacts. Coil resistance is 42
ohms.

No abnormal difference in
winding resistances. Winding
resistance of all three phases is 38
ohms. Megger values are 100
mega ohms and in healthy
condition.

No abnormalities found
No abnormalities found in
switching of contacts during
operation.

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found
CONDITION APPRAISA
EQUIPMENT: Sub Equipments COMPONENT Item Code

HEAD DRUM BEARING 0921020120

HEAD DRUM
PLUMMER BLOCK FOR HEAD DRUM 5231990092

HEAD END SNUB PULLEY BEARING 0921020121

HEAD SNUB PLUMMER BLOCK FOR HEAD END SNUB 5231990089


PULLEY

TAIL DRUM BEARING 0921020062

BF3-RMHS-C10
TAIL DRUM
PLUMMER BLOCK FOR TAIL DRUM 5231990093

INPUT COUPLING 0804040045

PIN AND BUSH OF I/P COUPLING

COUPLING OUTPUT COUPLING 0804030060

PIN AND BUSH OF O/P COUPLING

tyre for coupling

GEARBOX GEAR BOX

RMHS CB#10 RMHS CB#10 Motor


MOTOR Windings

RMHS CB#10 RMHS CB#10 Terminal


MOTOR Box
RMHS CB#10
MOTOR Power Contactor
PANEL

RMHS CB#10
MOTOR Overload Relay with Kit
PANEL

Speed sensor probe

ZERO SPEED
SWITCH
Zero speed device

BF3-RMHS-CB10

BELT SWAY BELT SWAY SWITCH

PULL CORD PULL CORD SWITCH


RMHS CB#10
HOOTER CONTACTOR
Hooter

RMHS CB#10
HOOTER
Hooter

Command and Feed back


cable

Relay

BF3-RMHS-CB9 DI ,DOCard

SMPS

PLC , IM modules

Profibus Cable
CONDITION APPRAISAL OF RMHS CB#10(BF3-RMHS-C10)
SPECIFICATION DESCRIPTION / DIMENSION TOOLS REQUIRED

22220 CA CHECK FOR BEARING CLEARANCE SPANNERS AND FILLER GAUGE

(PLUMMER BLOCK
F/DRUM OF CONVEYOR- CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS
SL NO 7, OF DRAWING
2220-02404 B)

22210 CHECK FOR BEARING CLEARANCE SPANNERS AND FILLER GAUGE


02404 B)(PLUMMER
BLOCK F/DRUM OF
CONVEYOR-SL NO 4, OF CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS
DRAWING 2220-
22224 CA CHECK FOR BEARING CLEARANCE SPANNERS AND FILLER GAUGE

(PLUMMER BLOCK
F/DRUM OF CONVEYOR- CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS
SL NO 8, OF DRAWING
2220-02404 B)

(UT0080) CHECK FOR PHYSICAL DAMAGE SPANNERS

CHECK FOR PHYSICAL DAMAGE OF BUSH AND PINS SPANNERS

(UB285) CHECK FOR PHYSICAL DAMAGE SPANNERS

CHECK FOR PHYSICAL DAMAGE OF BUSH AND PINS SPANNERS

CHECK FOR PHYSICAL DAMAGE SPANNERS

ZSY180-25 (11 KW) CHECK FOR PHYSICAL DAMAGE AND BOLTS SPANNERS

To form magnetic field when


energized with current to produce
Megger & Multimeter
torque. Check for winding resistance
and megger value of Motor.

Check for proper tigteness of the


Spanners
power cable to the LT Motor
Check for contactor rating and
Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key,
Check for coil resistance of the
Multimeter
contactor.

Check for overload relay range and


setting of relay current for motor Visual
tripping.

To detect the speed of the conveyor


and provides a pulse to the zero speed Visual
switch.

To detect the stoppage or


Multimeter, Screw
unacceptably slow movement of a
Driver
rotating conveyor tail end pulley.

For detecting the sway or deviation of


belt conveyors, and sends out an
alarm signal and an emergency stop
Multimeter, Screw
signal.
Driver
Suited to be used for belt breakage
and materials falling prevention due
to the belt sway.

Check rope when operated for safety


tripping switch for conveyor belts.
When the rope is pulled the lever of Multimeter, Screw
the pc unit is operated which in turn, Driver
actuates a switch, thereby the
conveyor is stopped.
Check for contactor rating and
Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key,
Check for coil resistance of the
Multimeter
contactor.

Check for hooter motor windings


Screw Driver /
resistance and terminal tighteness
Multimeter
connection.

checking healthyness by Run the Belt


Multimeter,Tester
Conveyor

checking healthyness by operating


Multimeter,Tester
DOL starter of conveyor.

checking healthyness by operating


DOL starter of conveyor/ by activating Multimeter,Tester
pull cord, BSS, ZSS and LCS Box.
check supply voltage and output
Multimeter,Tester
Voltage
checking healthyness by operating
Multimeter,Tester
valve.
checking healthyness by operating
Multimeter,Tester
valve.
10)
TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)
STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO RUSTED


STOP CHECK BOLTS

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE


NO PHYSICAL DAMAGE AND NO RUSTED
STOP CHECK BOLTS

Winding Resistances should be


balanced of all three phases, i.e.,
less than 20 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases
to ground.

Shut Down check Tightened with spanner set.


Contactor rating to be LC1D40,
40 A. Proper tighteness of
foundation of contactor.
SHUTDOWN No abnormalities to be seen for
CHECK the contacts and proper fitting to
be done.
Coil resistance should be 42-43
ohms.

Relay Range :
(17-25)A
RUN CHECK
Relay settings = 15 A
FLC = 20.4A

SHUTDOWN To check for continuous sensing


CHECK of the speed of the conveyor.

To check for NO - NC contacts


SHUTDOWN through a relay according to
CHECK Time and Speed adjustable
settings.

SHUTDOWN To check for healthiness of NO -


CHECK NC contacts during operation.

SHUTDOWN To check for healthiness of NO -


CHECK NC contacts during operation.
Contactor rating to be LC1D09,
09 A. Proper tighteness of
foundation of contactor.
SHUTDOWN No abnormalities to be seen for
CHECK the contacts and proper fitting to
be done.
Coil resistance should be 42-43
ohms.

Winding Resistances should be


balanced of all three phases, i.e.,
less than 40 ohms.
STOP CHECK
Megger values shouldbe above 5
megaohms from all three phases
to ground.

Physical check or damage of


Run check
cable

Check for healthiness of NO - NC


Run check
contacts during operation.

Run check Physical check

Run check Physical check

Run check Physical check

Run check Physical check


ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormal difference in
winding resistances. Winding
resistance of all three phases is
11.8 ohms. Megger values are
1200 mega ohms and in healthy
condition.

No looseness of the bolts and


connecting links.
Contactor rating is LC1D40, 40 A.
No looseness in fitting of
contactor and connection of
cables to power contactor and its
contacts. Coil resistance is 42
ohms.

Relay Range :
(17-25)A
Relay settings = 15 A
RC = 10.0 A

No abnormalities found in
sensing of speed probe.

No any abnormalities found in


open - close contacts through
relay during running of conveyor
according to speed and time
settings.

No abnormalities found in
switching of contacts during
operation.

No abnormalities found in
switching of contacts during
operation.
Contactor rating is LC1D09, 09 A.
No looseness in fitting of
contactor and connection of
cables to power contactor and its
contacts. Coil resistance is 42
ohms.

No abnormal difference in
winding resistances. Winding
resistance of all three phases is 38
ohms. Megger values are 100
mega ohms and in healthy
condition.

No abnormalities found

No abnormalities found in
switching of contacts during
operation.

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found
CONDITION AP

EQUIPMENT: Sub Equipments COMPONENT

HEAD DRUM BEARING

HEAD DRUM
PLUMMER BLOCK FOR HEAD DRUM

HEAD END SNUB PULLEY BEARING

HEAD SNUB
PLUMMER BLOCK FOR HEAD END SNUB PULLEY

GTU BEND PULLEY BEARING

GTU BEND
PLUMMER BLOCK FOR GTU BEND PULLEY

GTU BEND PULLEY#2 BEARING


GTU BEND 2
PLUMMER BLOCK FOR GTU BEND PULLEY#2

GTU PULLEY BEARING

GTU PULLEY
PLUMMER BLOCK FOR GTU PULLEY

TAIL DRUM BEARING

TAIL DRUM
PLUMMER BLOCK FOR TAIL DRUM

BF3-RMHS-C11
BF3-RMHS-C11
TEFLON BUSH / COUPLING OUTPUT

COUPLING
I/P COUPLING SPIDER

INPUT COUPLING

OUTPUT COUPLING

GEARBOX GEAR BOX

TRIPPER TROLLEY DRUM BEARING

PLUMMER BLOCK FOR TRIPPER TROLLEY DRUM

TRIPPER TROLLEY WHEEL WITH SHAFT

TRIPPER TROLLEY WHEEL BEARING

GEAR BOX

DRIVE CHAIN

SPROCKET FOR GEARBOX CHAIN


TROLLEY DRIVE
SPROCKER FOR WHEEL CHAIN

PRESS PULLEY ASSEMBLY

PRESS PULLEY BEARING

PLUMMER BLOCK FOR PRESS PULLEY

ROLLER CHAIN,

RMHS CB#11
RMHS CB#11 Motor Windings
MOTOR
RMHS CB#11
RMHS CB#11 Terminal Box
MOTOR

RMHS CB#11
Power Contactor
MOTOR PANEL

RMHS CB#11
Overload Relay with Kit
MOTOR PANEL

Speed sensor probe

ZERO SPEED
SWITCH

Zero speed device

BELT SWAY BELT SWAY SWITCH

BF3-RMHS-CB11
BF3-RMHS-CB11

PULL CORD PULL CORD SWITCH

RMHS CB#11
RMHS CB#11 Trolley Motor Windings
Trolley MOTOR

RMHS CB#11
RMHS CB#11 Trolley Terminal Box
Trolley MOTOR

RMHS CB#11
Power Contactor
panel

RMHS CB#11
Overload Relay with Kit
panel
RMHS CB#11
HOOTER CONTACTOR
Hooter

RMHS CB#11
HOOTER
Hooter

Command and Feed back cable

Relay

BF3-RMHS-CB9 DI ,DOCard

SMPS

PLC , IM modules

Profibus Cable
CONDITION APPRAISAL OF RMHS CB#11 (BF3-RMHS-C11)

Item Code SPECIFICATION DESCRIPTION / DIMENSION

0921020120 (22220 CA) CHECK FOR BEARING CLEARANCE

(PLUMMER BLOCK
F/DRUM OF
5231990092 CONVEYOR-SL NO 7, CHECK FOR PHYSICAL DAMAGE AND BOLTS
OF DRAWING 2220-
02404 B)

0921020123 (22212 CA) CHECK FOR BEARING CLEARANCE

(PLUMMER BLOCK
F/DRUM OF
5231990090 CONVEYOR-SL NO 5, CHECK FOR PHYSICAL DAMAGE AND BOLTS
OF DRAWING 2220-
02404 B)

0901020009 -1316 CHECK FOR BEARING CLEARANCE

(PLUMMER BLOCK
F/DRUM OF
5231990088 CONVEYOR-SL NO 3, CHECK FOR PHYSICAL DAMAGE AND BOLTS
OF DRAWING 2220-
02404 B)

CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND BOLTS

0901020009 -1316 CHECK FOR BEARING CLEARANCE

(PLUMMER BLOCK
F/DRUM OF
5231990088 CONVEYOR-SL NO 3, CHECK FOR PHYSICAL DAMAGE AND BOLTS
OF DRAWING 2220-
02404 B)

0921020120 (22220 CA) CHECK FOR BEARING CLEARANCE

(PLUMMER BLOCK
F/DRUM OF
5231990092 CONVEYOR-SL NO 7, CHECK FOR PHYSICAL DAMAGE AND BOLTS
OF DRAWING 2220-
02404 B)
PIN Ø30XL45-BF3,
PIN FOR OUTPUT
0806990032
COUPLING OF CHECK FOR PHYSICAL DAMAGE OF COUPLING
CONVEYOR GEAR BUSH
BOX AS PER DRG NO
2220- 01697B

0804990106
F/ CONVEYORS 6,9 CHECK FOR PHYSICAL DAMAGE OF COUPLING
&11 SPIDER

0804030056
TYPE PIN BUSH (UB CHECK FOR PHYSICAL DAMAGE OF COUPLING
162)

0804030064 (UB400) CHECK FOR PHYSICAL DAMAGE OF COUPLING

ZSY250-31.5 (30 KW) CHECK FOR PHYSICAL DAMAGE AND BOLTS

0921020053 CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND BOLTS

CHECK FOR WHEEL WEAR AND DAMAGE

CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND BOLTS

5105020009 CHECK FOR DAMAGED LINKS AND PINS


(DUPLEX027F0233
0808020006 CHECK FOR SPROCKET TEETH
NO. OF TEETH-33)
(DUPLEX,C.S.,027F02
0808020005 21 NO. OF TEETH- CHECK FOR SPROCKET TEETH
21)
CHECK FOR PULLEY PHYSICAL
0921020035
(8000045803) 22214 E CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND BOLTS

DUPLEX,PITCH-
5105020009 CHECK FOR PHYSICAL DAMAGE
31.75MM,STCKHS

To form magnetic field when


energized with current to
produce torque. Check for
winding resistance and megger
value of Motor.
Check for proper tigteness of the
power cable to the LT Motor

Check for contactor rating and


tighteness of contactor terminals.
Check for coil resistance of the
contactor.

Check for overload relay range


and setting of relay current for
motor tripping.

To detect the speed of the


conveyor and provides a pulse to
the zero speed switch.

To detect the stoppage or


unacceptably slow movement of a
rotating conveyor tail end pulley.

For detecting the sway or


deviation of belt conveyors, and
sends out an alarm signal and an
emergency stop signal.
Suited to be used for belt
breakage and materials falling
prevention due to the belt sway.
Check rope when operated for
safety tripping switch for
conveyor belts. When the rope is
pulled the lever of the pc unit is
operated which in turn, actuates
a switch, thereby the conveyor is
stopped.

To form magnetic field when


energized with current to
produce torque. Check for
winding resistance and megger
value of Motor.

Check for proper tigteness of the


power cable to the LT Motor

Check for contactor rating and


tighteness of contactor terminals.
Check for coil resistance of the
contactor.

Check for overload relay range


and setting of relay current for
motor tripping.
Check for contactor rating and
tighteness of contactor terminals.
Check for coil resistance of the
contactor.

Check for hooter motor windings


resistance and terminal
tighteness connection.

checking healthyness by Run the


Belt Conveyor
checking healthyness by
operating DOL starter of
conveyor.
checking healthyness by
operating DOL starter of
conveyor/ by activating pull cord,
BSS, ZSS and LCS Box.
check supply voltage and output
Voltage
checking healthyness by
operating valve.
checking healthyness by
operating valve.
3-RMHS-C11)

TYPE OF CHECK (RUN


TOOLS REQUIRED CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS


SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

VISUAL STOP CHECK NO ABNORMAL WEAR(GROOVES AND CRACKS)


AND DAMAGE
SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.30MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

VISUAL STOP CHECK NO DAMAGED LINKS AND PINS

VISUAL STOP CHECK NO BROKEN OR DAMAGED TEETHS

VISUAL STOP CHECK NO BROKEN OR DAMAGED TEETHS

VISUAL STOP CHECK NO PHYSICAL DAMAGE


SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

VISUAL STOP CHECK NO PHYSICAL DAMAGE

Winding Resistances should be


balanced of all three phases, i.e.,
less than 10 ohms.
Megger & Multimeter Shut Down check
Megger values shouldbe above 5
megaohms from all three phases
to ground.
Spanners Shut Down check Tightened with spanner set.

Contactor rating to be LC1D65, 65


A. Proper tighteness of foundation
of contactor.
Spanners, Screw Drivers, SHUTDOWN No abnormalities to be seen for
Allen Key, Multimeter CHECK the contacts and proper fitting to
be done.
Coil resistance should be 42-43
ohms.

Relay Range :
(48-65)A
Visual RUN CHECK
Relay settings = 40 A
FLC = 52.7A

SHUTDOWN To check for continuous sensing


Visual
CHECK of the speed of the conveyor.

To check for NO - NC contacts


SHUTDOWN
Multimeter, Screw Driver through a relay according to Time
CHECK
and Speed adjustable settings.

SHUTDOWN To check for healthiness of NO -


Multimeter, Screw Driver
CHECK NC contacts during operation.
SHUTDOWN To check for healthiness of NO -
Multimeter, Screw Driver
CHECK NC contacts during operation.

Winding Resistances should be


balanced of all three phases, i.e.,
less than 10 ohms.
Megger & Multimeter Shut Down check
Megger values shouldbe above 5
megaohms from all three phases
to ground.

Spanners Shut Down check Tightened with spanner set.

Contactor rating to be LC1D65, 65


A. Proper tighteness of foundation
of contactor.
Spanners, Screw Drivers, SHUTDOWN No abnormalities to be seen for
Allen Key, Multimeter CHECK the contacts and proper fitting to
be done.
Coil resistance should be 42-43
ohms.

Relay Range :
(23-32)A
Visual RUN CHECK
Relay settings = 25 A
FLC = 28.9A
Contactor rating to be LC1D09,
09 A. Proper tighteness of
foundation of contactor.
Spanners, Screw Drivers, SHUTDOWN No abnormalities to be seen for
Allen Key, Multimeter CHECK the contacts and proper fitting to
be done.
Coil resistance should be 42-43
ohms.

Winding Resistances should be


balanced of all three phases, i.e.,
Screw Driver / less than 40 ohms.
STOP CHECK
Multimeter Megger values shouldbe above 5
megaohms from all three phases
to ground.

Multimeter,Tester Run check Physical check or damage of cable

Check for healthiness of NO - NC


Multimeter,Tester Run check
contacts during operation.

Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check


ACTUAL CONDITION OBSERVED
No abnormal difference in winding
resistances. Winding resistance of all three
phases is 6.8 ohms. Megger values are 1000
mega ohms and in healthy condition.
No looseness of the bolts and connecting
links.

Contactor rating is LC1D65, 65 A. No


looseness in fitting of contactor and
connection of cables to power contactor and
its contacts. Coil resistance is 42 ohms.

Relay Range :
(48-65)A
Relay settings = 40 A
RC = 18.2 A

No abnormalities found in sensing of speed


probe.

No any abnormalities found in open - close


contacts through relay during running of
conveyor according to speed and time
settings.

No abnormalities found in switching of


contacts during operation.
No abnormalities found in switching of
contacts during operation.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 6.8 ohms. Megger values are 1000
mega ohms and in healthy condition.

No looseness of the bolts and connecting


links.

Contactor rating is LC1D65, 65 A. No


looseness in fitting of contactor and
connection of cables to power contactor and
its contacts. Coil resistance is 42 ohms.

Relay Range :
(23-32)A
Relay settings = 25 A
RC = 15A
Contactor rating is LC1D09, 09 A. No
looseness in fitting of contactor and
connection of cables to power contactor and
its contacts. Coil resistance is 42 ohms.

No abnormal difference in winding


resistances. Winding resistance of all three
phases is 38 ohms. Megger values are 100
mega ohms and in healthy condition.

No abnormalities found

No abnormalities found in switching of


contacts during operation.

No abnormalities found

No abnormalities found

No abnormalities found

No abnormalities found
ACTION REQUIRED
CONDITION

EQUIPMENT: Sub Equipments COMPONENT

HEAD DRUM BEARING


HEAD DRUM
PLUMMER BLOCK FOR HEAD DRUM

HEAD END SNUB PULLEY BEARING


HEAD SNUB
PLUMMER BLOCK FOR HEAD END SNUB PULLEY

GTU BEND PULLEY BEARING


GTU BEND
PLUMMER BLOCK FOR GTU BEND PULLEY

GTU BEND PULLEY#2 BEARING


GTU BEND 2
PLUMMER BLOCK FOR GTU BEND PULLEY#2

GTU PULLEY BEARING


GTU PULLEY
PLUMMER BLOCK FOR GTU PULLEY

TAIL DRUM BEARING


TAIL DRUM
PLUMMER BLOCK FOR TAIL DRUM

TEFLON BUSH / COUPLING OUTPUT

BF3-RMHS-C12
I/P COUPLING SPIDER
COUPLING

INPUT COUPLING

OUTPUT COUPLING

GEARBOX GEAR BOX

TRIPPER TROLLEY DRUM BEARING

PLUMMER BLOCK FOR TRIPPER TROLLEY DRUM

TRIPPER TROLLEY WHEEL WITH SHAFT


TRIPPER TROLLEY WHEEL BEARING

GEAR BOX
TROLLEY DRIVE
DRIVE CHAIN

SPROCKET FOR GEARBOX CHAIN


SPROCKER FOR WHEEL CHAIN
PRESS PULLEY ASSEMBLY

PRESS PULLEY BEARING

PLUMMER BLOCK FOR PRESS PULLEY

ROLLER CHAIN,

RMHS CB#12
RMHS CB#12 Motor Windings
MOTOR

RMHS CB#12
RMHS CB#12 Terminal Box
MOTOR

RMHS CB#12
Power Contactor
MOTOR PANEL
RMHS CB#12
Overload Relay with Kit
MOTOR PANEL

Speed sensor probe

ZERO SPEED
SWITCH

Zero speed device

BELT SWAY BELT SWAY SWITCH

BF3-RMHS-
CB12

PULL CORD PULL CORD SWITCH


RMHS CB#12
RMHS CB#12 Trolley Motor Windings
Trolley MOTOR

RMHS CB#12
RMHS CB#12 Trolley Terminal Box
Trolley MOTOR

RMHS CB#12
Power Contactor
panel

RMHS CB#12
Overload Relay with Kit
panel

RMHS CB#12
HOOTER CONTACTOR
panel
RMHS CB#12
RMHS CB#12 Hooter
panel
CONDITION APPRAISAL OF RMHS CB#12 (BF3-RMHS-C12)

Item Code SPECIFICATION DESCRIPTION / DIMENSION

0921020120 (22220 CA) CHECK FOR BEARING CLEARANCE

5231990092
(PLUMMER BLOCK F/DRUM OF CONVEYOR-SL NO 7, OF CHECK FOR PHYSICAL DAMAGE AND
DRAWING 2220-02404 B) BOLTS

0921020123 (22212 CA) CHECK FOR BEARING CLEARANCE

5231990090
(PLUMMER BLOCK F/DRUM OF CONVEYOR-SL NO 5, CHECK FOR PHYSICAL DAMAGE AND
OF DRAWING 2220-02404 B) BOLTS

0901020009 -1316 CHECK FOR BEARING CLEARANCE

5231990088
(PLUMMER BLOCK F/DRUM OF CONVEYOR-SL NO 3, CHECK FOR PHYSICAL DAMAGE AND
OF DRAWING 2220-02404 B) BOLTS

CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND


BOLTS

0901020009 -1316 CHECK FOR BEARING CLEARANCE

5231990088
(PLUMMER BLOCK F/DRUM OF CONVEYOR-SL NO 3, OF CHECK FOR PHYSICAL DAMAGE AND
DRAWING 2220-02404 B) BOLTS

0921020120 (22220 CA) CHECK FOR BEARING CLEARANCE

5231990092
(PLUMMER BLOCK F/DRUM OF CONVEYOR-SL NO 7, OF CHECK FOR PHYSICAL DAMAGE AND
DRAWING 2220-02404 B) BOLTS

0806990032
PIN Ø30XL45-BF3, PIN FOR OUTPUT COUPLING OF CHECK FOR PHYSICAL DAMAGE OF
CONVEYOR GEAR BOX AS PER DRG NO 2220- 01697B COUPLING BUSH

CHECK FOR PHYSICAL DAMAGE OF


0804990106 F/ CONVEYORS 6,9 &11 COUPLING SPIDER
CHECK FOR PHYSICAL DAMAGE OF
0804030056 TYPE PIN BUSH (UB 162) COUPLING
CHECK FOR PHYSICAL DAMAGE OF
0804030064 (UB400) COUPLING
CHECK FOR PHYSICAL DAMAGE AND
ZSY250-31.5 (30 KW) BOLTS

0921020053 CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND


BOLTS
CHECK FOR WHEEL WEAR AND
DAMAGE
CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND


BOLTS

5105020009
CHECK FOR DAMAGED LINKS AND
PINS
0808020006 (DUPLEX027F0233 NO. OF TEETH-33) CHECK FOR SPROCKET TEETH
0808020005 (DUPLEX,C.S.,027F0221 NO. OF TEETH-21) CHECK FOR SPROCKET TEETH
CHECK FOR PULLEY PHYSICAL
0921020035
(8000045803) 22214 E CHECK FOR BEARING CLEARANCE

CHECK FOR PHYSICAL DAMAGE AND


BOLTS
5105020009 DUPLEX,PITCH-31.75MM,STCKHS CHECK FOR PHYSICAL DAMAGE

To form magnetic field


when energized with
current to produce torque.
Check for winding
resistance and megger
value of Motor.

Check for proper tigteness


of the power cable to the
LT Motor

Check for contactor rating


and tighteness of
contactor terminals.
Check for coil resistance
of the contactor.
Check for overload relay
range and setting of relay
current for motor
tripping.

To detect the speed of the


conveyor and provides a
pulse to the zero speed
switch.

To detect the stoppage or


unacceptably slow
movement of a rotating
conveyor tail end pulley.

For detecting the sway or


deviation of belt
conveyors, and sends out
an alarm signal and an
emergency stop signal.
Suited to be used for belt
breakage and materials
falling prevention due to
the belt sway.

Check rope when


operated for safety
tripping switch for
conveyor belts. When the
rope is pulled the lever of
the pc unit is operated
which in turn, actuates a
switch, thereby the
conveyor is stopped.
To form magnetic field
when energized with
current to produce torque.
Check for winding
resistance and megger
value of Motor.

Check for proper tigteness


of the power cable to the
LT Motor

Check for contactor rating


and tighteness of
contactor terminals.
Check for coil resistance
of the contactor.

Check for overload relay


range and setting of relay
current for motor
tripping.

Check for contactor rating


and tighteness of
contactor terminals.
Check for coil resistance
of the contactor.
Check for hooter motor
windings resistance and
terminal tighteness
connection.
-C12)

TYPE OF CHECK (RUN


TOOLS REQUIRED CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO


SPANNERS STOP CHECK RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO


SPANNERS STOP CHECK RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO


SPANNERS STOP CHECK RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO


SPANNERS STOP CHECK RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO


SPANNERS STOP CHECK RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO


SPANNERS STOP CHECK RUSTED BOLTS

SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

NO PHYSICAL DAMAGE AND NO


SPANNERS STOP CHECK RUSTED BOLTS

VISUAL STOP CHECK NO ABNORMAL WEAR(GROOVES AND CRACKS) AND DAM


SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.30MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

VISUAL STOP CHECK NO DAMAGED LINKS AND PINS

VISUAL STOP CHECK NO BROKEN OR DAMAGED TEETHS


VISUAL STOP CHECK NO BROKEN OR DAMAGED TEETHS
VISUAL STOP CHECK NO PHYSICAL DAMAGE

SPANNERS AND FILLER GAUGE STOP CHECK CLEARANCE <0.50MM

SPANNERS STOP CHECK NO PHYSICAL DAMAGE AND NO


RUSTED BOLTS
VISUAL STOP CHECK NO PHYSICAL DAMAGE

Winding Resistances
should be balanced of
all three phases, i.e.,
less than 10 ohms.
Megger & Multimeter Shut Down check
Megger values shouldbe
above 5 megaohms
from all three phases to
ground.

Tightened with spanner


Spanners Shut Down check
set.

Contactor rating to be
LC1D50, 50 A. Proper
tighteness of foundation
of contactor.
Spanners, Screw Drivers, SHUTDOWN No abnormalities to be
Allen Key, Multimeter CHECK seen for the contacts
and proper fitting to be
done.
Coil resistance should
be 42-43 ohms.
Relay Range :
(30-40)A
Visual RUN CHECK
Relay settings = 25 A
FLC = 33.4 A

To check for continuous


SHUTDOWN
Visual sensing of the speed of
CHECK
the conveyor.

To check for NO - NC
contacts through a relay
SHUTDOWN
Multimeter, Screw Driver according to Time and
CHECK
Speed adjustable
settings.

To check for healthiness


SHUTDOWN
Multimeter, Screw Driver of NO - NC contacts
CHECK
during operation.

To check for healthiness


SHUTDOWN
Multimeter, Screw Driver of NO - NC contacts
CHECK
during operation.
Winding Resistances
should be balanced of
all three phases, i.e.,
less than 10 ohms.
Megger & Multimeter Shut Down check
Megger values shouldbe
above 5 megaohms
from all three phases to
ground.

Tightened with spanner


Spanners Shut Down check
set.

Contactor rating to be
LC1D65, 65 A. Proper
tighteness of foundation
of contactor.
Spanners, Screw Drivers, SHUTDOWN No abnormalities to be
Allen Key, Multimeter CHECK seen for the contacts
and proper fitting to be
done.
Coil resistance should
be 42-43 ohms.

Relay Range :
(23-32)A
Visual RUN CHECK
Relay settings = 25 A
FLC = 28.9A
Contactor rating to be
LC1D09, 09 A. Proper
tighteness of foundation
of contactor.
Spanners, Screw Drivers, SHUTDOWN No abnormalities to be
Allen Key, Multimeter CHECK seen for the contacts
and proper fitting to be
done.
Coil resistance should
be 42-43 ohms.
Winding Resistances
should be balanced of
all three phases, i.e.,
Screw Driver / less than 40 ohms.
STOP CHECK
Multimeter Megger values shouldbe
above 5 megaohms
from all three phases to
ground.
ACTUAL CONDITION OBSERVED

E AND NO RUSTED BOLTS

(GROOVES AND CRACKS) AND DAMAGE


E AND NO RUSTED BOLTS

AGED TEETHS
AGED TEETHS

No abnormal difference in winding


resistances. Winding resistance of all
three phases is 6.8 ohms. Megger
values are 1000 mega ohms and in
healthy condition.

No looseness of the bolts and


connecting links.

Contactor rating is LC1D50, 50 A. No


looseness in fitting of contactor and
connection of cables to power contactor
and its contacts. Coil resistance is 42
ohms.
Relay Range :
(30-40)A
Relay settings = 25 A
RC = 11.3 A

No abnormalities found in sensing of


speed probe.

No any abnormalities found in open -


close contacts through relay during
running of conveyor according to speed
and time settings.

No abnormalities found in switching of


contacts during operation.

No abnormalities found in switching of


contacts during operation.
No abnormal difference in winding
resistances. Winding resistance of all
three phases is 6.8 ohms. Megger
values are 1000 mega ohms and in
healthy condition.

No looseness of the bolts and


connecting links.

Contactor rating is LC1D65, 65 A. No


looseness in fitting of contactor and
connection of cables to power contactor
and its contacts. Coil resistance is 42
ohms.

Relay Range :
(23-32)A
Relay settings = 25 A
RC = 16.5A

Contactor rating is LC1D09, 09 A. No


looseness in fitting of contactor and
connection of cables to power contactor
and its contacts. Coil resistance is 42
ohms.
No abnormal difference in winding
resistances. Winding resistance of all
three phases is 37 ohms. Megger values
are 100 mega ohms and in healthy
condition.
ACTION REQUIRED
EQUIPMENT: Sub Equipments COMPONENT Item Code

LINK F/DRY BAG


BF3-GCS-SCRP BF3-GCS-SCRP FILTER SCRAPPER 5105020002
CONV
DRIVE CHAIN
BF3-GCS-SCRP BF3-GCS-SCRP 5105020010
ROLLER CHAIN,

SCRAPPER DRIVE
BF3-GCS-SCRP BF3-GCS-SCRP 5105020017
CHAIN MASTER LINK

SCRAPPER TAIL END


BF3-GCS-SCRP BF3-GCS-SCRP 0941010134
PLUMMER BLOCK

SCRAPPER GEAR
BF3-GCS-SCRP BF3-GCS-SCRP 0806750054
BOX

BF3-GCS-SCRP BF3-GCS-SCRP Head pulley bearing 0921020060

BF3-GCS-SCRP BF3-GCS-SCRP Tail pulley bearing 0921020014

GCS Scrapper
BF3-GCS-SCRP Motor Windings
Conveyor Motor
GCS Scrapper
BF3-GCS-SCRP Terminal Box
Conveyor Motor

GCS Scrapper
BF3-GCS-SCRP Power Contactor
Conveyor Panel

GCS Scrapper
BF3-GCS-SCRP Overload Relay with Kit
Conveyor Panel
CONDITION APPRAISAL OF GCP SCRAPPER CONVEYOR

SPECIFICATI DESCRIPTION /
TOOLS REQUIRED
ON DIMENSION

CHECK CONDITION OF LINKS


SPANNERS
BY OPENING TOP COVER

DUPLEX,PITCH
CHECK ROLLERS CONDITION SPANNERS
-38.1MM

CHECK FOR PHYSICAL


SPANNERS
CONDITION OF MASTER LINK

CHECK FOR PHYSICAL


SPANNERS
CONDITION OF MASTER LINK

CHECK FOR INTERNAL GEARS


SPANNERS
BY OPENING TOP COVER

22222 K + H322
CHECK FOR BEARING
(Bearing with FILLER GAUGE
CLEARANCE
sleeve)

22216K + H316 CHECK FOR BEARING


FILLER GAUGE
(Brg with sleeve) CLEARANCE

To form magnetic field when


energized with current to
produce torque. Check for Megger & Multimeter
winding resistance and megger
value of Motor.
Check for proper tigteness of the
Spanners
power cable to the LT Motor

Check for contactor rating and


Spanners, Screw
tighteness of contactor terminals.
Drivers, Allen Key,
Check for coil resistance of the
Multimeter
contactor.

Check for overload relay range


and setting of relay current for Visual
motor tripping.
PER CONVEYOR

TYPE OF
CHECK (RUN
CHECK / STOP IDEAL CONDITION
CHECK /
SHUTDOWN)

RUN
CHECK/STOP NO DAMAGED LINKS
CHECK

STOP CHECK NO DAMAGED CHAIN

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO WEAR AND BODY DAMAGE

STOP CHECK NO INTERNAL GEAR DAMAGE

STOP CHECK CLEARANCE <0.70MM

STOP CHECK CLEARANCE <0.70MM

Winding Resistances should be


balanced of all three phases, i.e., less
than 10 ohms.
Shut Down check
Megger values shouldbe above 5
megaohms from all three phases to
ground.
Shut Down check Tightened with spanner set.

Contactor rating to be LC1D40, 40 A.


Proper tighteness of foundation of
SHUTDOWN contactor.
CHECK No abnormalities to be seen for the
contacts and proper fitting to be done.
Coil resistance should be 42-43 ohms.

Relay Range :
(23-32)A
RUN CHECK
Relay settings = 23 A
FLC = 27.0 A
ACTUAL CONDITION ACTION
OBSERVED REQUIRED

No abnormal difference in
winding resistances. Winding
resistance of all three phases is
6.8 ohms. Megger values are
1000 mega ohms and in healthy
condition.
No looseness of the bolts and
connecting links.

Contactor rating is LC1D40, 40


A. No looseness in fitting of
contactor and connection of
cables to power contactor and its
contacts. Coil resistance is 42
ohms.

Relay Range :
(23-32)A
Relay settings = 23 A
RC = 9.4 A
EQUIPMENT: Sub Equipments COMPONENT Item Code

VANE FEEDER GCP ASH


BF3-GCP-SRW BF3-GCP-SRW 5105020015
BUNKER
BF3-GCP-SRW BF3-GCP-SRW
VANE FEEDER GCP ASH
BUNKER
BF3-GCP-SRW BF3-GCP-SRW HUMIDIFIER BLADE 5105020002
HUMIDIFIER COUPLING
BF3-GCP-SRW BF3-GCP-SRW 0804990083
BUSH

BF3-GCP-SRW BF3-GCP-SRW
SCREW CONVEYOR GEAR
BOX

GCS Screw
BF3-GCP-SRW Conveyor Motor Windings
Motor

GCS Screw
BF3-GCP-SRW Conveyor Terminal Box
Motor

GCS Screw
BF3-GCP-SRW Conveyor Power Contactor
Panel

GCS Screw
BF3-GCP-SRW Conveyor Overload Relay with Kit
Panel
CONDITION APPRAISAL OF GCP SCREW CONVEYOR
TYPE OF CHECK
(RUN CHECK /
DESCRIPTION / DIMENSION TOOLS REQUIRED STOP CHECK /
SHUTDOWN)

CHECK FOR BODY DAMAGE VISUAL RUN CHECK

CHECK FOR FINS DAMAGE SPANNERS STOP CHECK

CHECK FOR BLADE WEAROUT MEASURING TAPE STOP CHECK

CHECK FOR PHYSICAL DAMAGE OF BUSH SPANNERS STOP CHECK

CHECK FOR ABNORMAL SOUND AND


PHYSICAL DAMAGE VISUAL/AUDIO RUN CHECK

To form magnetic field when


energized with current to
Megger & Shut Down
produce torque. Check for
Multimeter check
winding resistance and megger
value of Motor.

Check for proper tigteness of the Shut Down


Spanners
power cable to the LT Motor check

Check for contactor rating and Spanners,


tighteness of contactor Screw Drivers, SHUTDOWN
terminals. Check for coil Allen Key, CHECK
resistance of the contactor. Multimeter

Check for overload relay range


and setting of relay current for Visual RUN CHECK
motor tripping.
YOR

IDEAL CONDITION ACTUAL CONDITION OBSERVED

NO PHYSICAL DAMAGE TO BODY

NO DAMAGED FINS

BLADE WIDTH SHOULD BE >35MM

NO PHYSICAL DAMAGE TO BUSH

NO ABNORMAL SOUND AND NO PHYSICAL DAMAGE TO


BODY

Winding Resistances should be balanced No abnormal difference in


of all three phases, i.e., less than 10 winding resistances. Winding
ohms. resistance of all three phases is
Megger values shouldbe above 5 6.8 ohms. Megger values are
megaohms from all three phases to 1000 mega ohms and in healthy
ground. condition.

No looseness of the bolts and


Tightened with spanner set.
connecting links.

Contactor rating to be LC1D40, 40 A. Contactor rating is LC1D40, 40


Proper tighteness of foundation of A. No looseness in fitting of
contactor. contactor and connection of
No abnormalities to be seen for the cables to power contactor and its
contacts and proper fitting to be done. contacts. Coil resistance is 42
Coil resistance should be 42-43 ohms. ohms.

Relay Range : Relay Range :


(17-25)A (17-25)A
Relay settings = 15 A Relay settings = 15 A
FLC = 20.7A RC = 10.7 A
ACTION REQUIRED
EQUIPMENT: Sub Equipments COMPONENT

BF3-GCS-GDCEQ BF3-GCS-GDCEQ V BELT


BF3-GCS-GDCEQ BF3-GCS-GDCEQ GDC UNLOAD
BF3-GCS-GDCEQ BF3-GCS-GDCEQ GDC UNLOAD
BF3-GCS-GDCEQ BF3-GCS-GDCEQ GDC Humidifier Bearing
BF3-GCS-GDCEQ BF3-GCS-GDCEQ
CLUTCH RING FOR GDC
ACTUATOR
BF3-GCS-GDCEQ BF3-GCS-GDCEQ Drive pulley B groove
BF3-GCS-GDCEQ BF3-GCS-GDCEQ Driven pulley B groove
BF3-GCS-GDCEQ BF3-GCS-GDCEQ GDC bleeder valve
BF3-GCS-GDCEQ BF3-GCS-GDCEQ GDC bleeder valve
BF3-GCS-GDCEQ BF3-GCS-GDCEQ GDC BUTTERFLY(BYPASS VALVE)

BF3-GCS-GDCEQ BF3-GCS-GDCEQ
Pneumatic cylinder for 400NB
valve

GDC DUST UNLOADING


BF3-GCS-GDCEQ
VALVE MOTOR
LT Motor Windings

GDC DUST UNLOADING


BF3-GCS-GDCEQ
VALVE MOTOR
Terminal Box
GDC DUST UNLOADING
BF3-GCS-GDCEQ
VALVE PANEL
Power Contactor

GDC DUST UNLOADING


BF3-GCS-GDCEQ
VALVE PANEL
Overload Relay

BF3-GCS-GDCEQ
GDC DUST UNLOADING Internal OPEN / CLOSE Limit
VALVE PANEL Switch

BF3-GCS-GDCEQ GDC Humidifier Motor Motor Windings

BF3-GCS-GDCEQ GDC Humidifier Motor Terminal Box

BF3-GCS-GDCEQ GDC Humidifier Panel Power Contactor

BF3-GCS-GDCEQ GDC Humidifier Panel Overload Relay with Kit


BF3-GCS-GDCEQ GDC Pulsator #1 Motor Motor Windings

BF3-GCS-GDCEQ GDC Pulsator #1 Motor Terminal Box

BF3-GCS-GDCEQ GDC Pulsator #2 Motor Motor Windings

BF3-GCS-GDCEQ GDC Pulsator #2 Motor Terminal Box

BF3-GCS-GDCEQ GDC Pulsator #1 Panel Power Contactor

BF3-GCS-GDCEQ GDC Pulsator #2 Panel Power Contactor


BF3-GCS-GDCEQ GDC Pulsator #1 Panel Overload Relay with Kit

BF3-GCS-GDCEQ GDC Pulsator #2 Panel Overload Relay with Kit

BF3-GCS-GDCEQ GDC Vane Feeder Motor Motor Windings

BF3-GCS-GDCEQ GDC Vane Feeder Motor Terminal Box

BF3-GCS-GDCEQ GDC Vane Feeder Panel Power Contactor

BF3-GCS-GDCEQ GDC Vane Feeder Panel Overload Relay with Kit

GDC Rupture Valve


BF3-GCS-GDCEQ Motor Windings
Winch Motor
GDC Rupture Valve
BF3-GCS-GDCEQ Terminal Box
Winch Motor

GDC Rupture Valve


BF3-GCS-GDCEQ Power Contactor
Winch Panel

GDC Rupture Valve


BF3-GCS-GDCEQ Overload Relay with Kit
Winch Panel

BF3-GCS-GDCEQ
GDC Rupture Valve Internal OPEN / CLOSE Limit
Winch Limit Switch Switch

Command and Feed back cable

Relay
GDC DUST UNLOADING VALVE
MOTOR
BF3-GCS-GDCEQ DI ,DOCard,PLC , IM modules

SMPS

Profibus Cable

GDC Pnematic Bypass valve solenoid coil


CONDITION APPRAISAL OF GDC EQUIPM

Item Code SPECIFICATION DESCRIPTION / DIMENSION

0802020120 , B-2159/B-85 CHECK FOR BELT WEAR AND CUTS


5107000048 DN 400 BALL VCHECK FOR SEALING OF VALVE BY OPERATION
5105020040 DN 400 BUTTER CHECK FOR SEALING OF VALVE BY OPERATION
0921010008 21316 CHECK FOR BEARING CLEARANCE

5088000111 CHECK FOR RING WERA/DMAGE

CHECK FOR PHYSICAL DAMAGE OF GROOVES


CHECK FOR PHYSICAL DAMAGE OF GROOVES
5107000028 DN 250 CHECK FOR SEALING OF VALVE BY OPERATION
5107000027 DN 400 CHECK FOR SEALING OF VALVE BY OPERATION

5105000069 DN 300 CHECK FOR SEALING OF VALVE BY OPERATION

7703000052 CHECK FOR LEAKAGE IN CYLINDER BY OPERATING

To form magnetic field when energized


with current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor
Check for contactor rating and tighteness
of contactor terminals. Check for coil
resistance of the contactor.

Check for overload relay range and setting


of relay current for motor tripping.

Check for switching NO / NC Contact as


10 A
per set value during hoisting operation.

To form magnetic field when energized


with current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor

Check for contactor rating and tighteness


of contactor terminals. Check for coil
resistance of the contactor.

Check for overload relay range and setting


of relay current for motor tripping.
To form magnetic field when energized
with current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor

To form magnetic field when energized


with current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor

Check for contactor rating and tighteness


of contactor terminals. Check for coil
resistance of the contactor.

Check for contactor rating and tighteness


of contactor terminals. Check for coil
resistance of the contactor.
Check for overload relay range and setting
of relay current for motor tripping.

Check for overload relay range and setting


of relay current for motor tripping.

To form magnetic field when energized


with current to produce torque. Check for
winding resistance and megger value of
Motor.

Check for proper tigteness of the power


cable to the LT Motor

Check for contactor rating and tighteness


of contactor terminals. Check for coil
resistance of the contactor.

Check for overload relay range and setting


of relay current for motor tripping.

To form magnetic field when energized


with current to produce torque. Check for
winding resistance and megger value of
Motor.
Check for proper tigteness of the power
cable to the LT Motor

Check for contactor rating and tighteness


of contactor terminals. Check for coil
resistance of the contactor.

Check for overload relay range and setting


of relay current for motor tripping.

Check for switching NO / NC Contact as


10 A
per set value during hoisting operation.

checking healthyness by Run the Belt


Conveyor

checking healthyness by operating DOL


starter of conveyor.

checking healthyness by operating DOL


starter of conveyor/ by activating pull cord,
BSS, ZSS and LCS Box.
check supply voltage and output Voltage

checking healthyness by operating valve.

check coil Resistance


OF GDC EQUIPMENTS
TYPE OF CHECK
(RUN CHECK /
TOOLS REQUIRED IDEAL CONDITION
STOP CHECK /
SHUTDOWN)
VISUAL STOP CHECK NO CUTS AND WEARS ON BELT
VISUAL RUN CHECK VALVE SHOULD NOT BE PASSING
VISUAL RUN CHECK VALVE SHOULD NOT BE PASSING
FILLER GAUGE STOP CHECK CLEARANCE SHOULD BE <0.50MM

SPANNERS STOP CHECK NO WEAR AND DAMAGE OF RINGS

VISUAL STOP CHECK NO PHYSICAL DAMAGE OF GROOVES


VISUAL STOP CHECK NO PHYSICAL DAMAGE OF GROOVES
VISUAL RUN CHECK VALVE SHOULD NOT BE PASSING
VISUAL RUN CHECK VALVE SHOULD NOT BE PASSING

VISUAL RUN CHECK VALVE SHOULD NOT BE PASSING

VISUAL RUN CHECK NO LEAKGE AND DAMAGE OF CYLINDER

Winding Resistances should be balanced of


Megger & Shut Down all three phases, i.e., less than 10 ohms.
Multimeter check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down Tightened with 8 mm Chrome Vanadium


Spanners
check Bolts.
Contactor rating to be LCID09, 09 A. Proper
Spanners, tighteness of foundation of contactor.
Screw Drivers, SHUTDOWN No abnormalities to be seen for the contacts
Allen Key, CHECK and proper fitting to be done.
Multimeter Coil resistance should be between 20 ohms -
30 ohms.

Relay settings:
SHUTDOWN Relay Range = 2.5-4A
Visual
CHECK Relay setting = 2.5A
FC = 3.3 A
VISUAL /
Motor should stop running during limit
MULTIMETE RUN CHECK
switch operation.
R

Winding Resistances should be balanced of


Megger & Shut Down all three phases, i.e., less than 10 ohms.
Multimeter check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down
Spanners Tightened with spanner set.
check

Contactor rating to be LC1D40, 40 A. Proper


Spanners,
tighteness of foundation of contactor.
Screw Drivers, SHUTDOWN
No abnormalities to be seen for the contacts
Allen Key, CHECK
and proper fitting to be done.
Multimeter
Coil resistance should be 30-43 ohms.

Relay Range :
(12-18)A
Visual RUN CHECK
Relay settings = 14.0 A
FLC = 15.6A
Winding Resistances should be balanced of
Megger & Shut Down all three phases, i.e., less than 10 ohms.
Multimeter check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down
Spanners Tightened with spanner set.
check

Winding Resistances should be balanced of


Megger & Shut Down all three phases, i.e., less than 10 ohms.
Multimeter check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down
Spanners Tightened with spanner set.
check

Contactor rating to be LC1D09, 09 A. Proper


Spanners,
tighteness of foundation of contactor.
Screw Drivers, SHUTDOWN
No abnormalities to be seen for the contacts
Allen Key, CHECK
and proper fitting to be done.
Multimeter
Coil resistance should be 30-43 ohms.

Contactor rating to be LC1D09, 09 A. Proper


Spanners,
tighteness of foundation of contactor.
Screw Drivers, SHUTDOWN
No abnormalities to be seen for the contacts
Allen Key, CHECK
and proper fitting to be done.
Multimeter
Coil resistance should be 30-43 ohms.
Relay Range :
(0.1-0.63)A
Visual RUN CHECK
Relay settings = 0.5 A
FLC = 0.5 A
Relay Range :
(0.1-0.63)A
Visual RUN CHECK
Relay settings = 0.5 A
FLC = 0.5 A

Winding Resistances should be balanced of


Megger & Shut Down all three phases, i.e., less than 10 ohms.
Multimeter check Megger values shouldbe above 5 megaohms
from all three phases to ground.

Shut Down
Spanners Tightened with spanner set.
check

Contactor rating to be LC1D40, 40 A. Proper


Spanners,
tighteness of foundation of contactor.
Screw Drivers, SHUTDOWN
No abnormalities to be seen for the contacts
Allen Key, CHECK
and proper fitting to be done.
Multimeter
Coil resistance should be 30-43 ohms.

Relay Range :
(2.5-4)A
Visual RUN CHECK
Relay settings = 3.5 A
FLC = 3.6A

Winding Resistances should be balanced of


Megger & Shut Down all three phases, i.e., less than 10 ohms.
Multimeter check Megger values shouldbe above 5 megaohms
from all three phases to ground.
Shut Down
Spanners Tightened with spanner set.
check

Contactor rating to be LC1D40, 40 A. Proper


Spanners,
tighteness of foundation of contactor.
Screw Drivers, SHUTDOWN
No abnormalities to be seen for the contacts
Allen Key, CHECK
and proper fitting to be done.
Multimeter
Coil resistance should be 30-43 ohms.

Relay Range :
(17-25)A
Visual RUN CHECK
Relay settings = 15.0 A
FLC = 20.6A
VISUAL /
Motor should stop running during limit
MULTIMETE RUN CHECK
switch operation.
R
Multimeter,Test
Run check Physical check or damage of cable
er

Multimeter,Test Check for healthiness of NO - NC contacts


Run check
er during operation.

Multimeter,Test
Run check Physical check
er
Multimeter,Test
Run check Physical check
er
Multimeter,Test
Run check Physical check
er
Multimeter,
Run check Physical check or damage of coil
Tester
ACTUAL CONDITION OBSERVED ACTION REQUIRED

No abnormal difference in winding


resistances. Winding resistance of
all three phases is 9.4 ohms.
Megger values are 500 mega ohms
and in healthy condition.

No looseness of 8 mm Chrome
Vanadium bolts and connecting
links.
Contactor rating is LCID09, 09 A.
No looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance of contactor checked 25
ohms.

Relay settings:
Relay Range = 2.5-4A
Relay setting = 2.5A
Running Current = 1.9 A

Motor stop running during limit


switch operation.

No abnormal difference in winding


resistances. Winding resistance of
all three phases is 6.8 ohms.
Megger values are 700 mega ohms
and in healthy condition.

No looseness of the bolts and


connecting links.

Contactor rating is LC1D40, 40 A.


No looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 38 ohms.

Relay Range :
(12-18)A
Relay settings = 14.0 A
RC = 9.0 A
No abnormal difference in winding
resistances. Winding resistance of
all three phases is 6.8 ohms.
Megger values are 100 mega ohms
and in healthy condition.

No looseness of the bolts and


connecting links.

No abnormal difference in winding


resistances. Winding resistance of
all three phases is 6.8 ohms.
Megger values are 150 mega ohms
and in healthy condition.

No looseness of the bolts and


connecting links.

Contactor rating is LC1D09, 09 A.


No looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 38 ohms.

Contactor rating is LC1D09, 09 A.


No looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 38 ohms.
Relay Range :
(0.1-0.63)A
Relay settings = 0.5 A
RC = 0.4 A
Relay Range :
(0.1-0.63)A
Relay settings = 0.5 A
RC = 0.39 A

No abnormal difference in winding


resistances. Winding resistance of
all three phases is 6.8 ohms.
Megger values are 700 mega ohms
and in healthy condition.

No looseness of the bolts and


connecting links.

Contactor rating is LC1D40, 40 A.


No looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 38 ohms.

Relay Range :
(2.5-4)A
Relay settings = 3.5 A
RC = 2.1 A

No abnormal difference in winding


resistances. Winding resistance of
all three phases is 6.8 ohms.
Megger values are 700 mega ohms
and in healthy condition.
No looseness of the bolts and
connecting links.

Contactor rating is LC1D40, 40 A.


No looseness in fitting of contactor
and connection of cables to power
contactor and its contacts. Coil
resistance is 38 ohms.

Relay Range :
(17-25)A
Relay settings = 15.0 A
RC = 10.1 A

Motor stop running during limit


switch operation.

No abnormalities found

No abnormalities found in
switching of contacts during
operation.

No abnormalities found

No abnormalities found

No abnormalities found

No damage
EQUIPMENT: Sub Equipments COMPONENT Item Code

BF3-FLST-EQP Bellow 5103990072

BF3-FLST-EQP MCV 5107000038

BF3-FLST-EQP Shut off valve 5107000037

BF3-FLST-EQP Goggle valve 5107000039

BF3-FLST-EQP Bypass valve 400 mm

BF3-FLST-EQP Burner Tip

MOTORISED
CONTROL VALVE
CONTACTOR

FLARESTACK
MOTORISED MOTORISED
CONTROL CONTROL VALVE
VALVE OVERLOAD RELAY

MOTORISED
CONTROL VALVE
AUXILIARY PLA
RELAYS

FLARESTACK
GOGGLE VALVE
OPEN CONTACTOR
FLARESTACK
GOGGLE VALVE
CLOSE
CONTACTOR

FLARESTACK
GOGGLE VALVE
OVERLOAD RELAY

FLARESTACK
GOGGLE VALVE
AUXILIARY PLA
RELAYS
FLARESTACK
GOGGLE
VALVE
FLARESTACK
GOGGLE VALVE
CLAMP
CONTACTOR

FLARESTACK
GOGGLE VALVE
DECLAMP
CONTACTOR

FLARESTACK
GOGGLE VALVE
OVERLOAD RELAY

FLARESTACK
GOGGLE VALVE
AUXILIARY PLA
RELAYS
FLARESTACK
SHUT-OFF VALVE
OPEN CONTACTOR

FLARESTACK
SHUT-OFF VALVE
FLARESTACK CLOSE
SHUT-OFF CONTACTOR
VALVE

FLARESTACK
SHUT-OFF VALVE
OVERLOAD RELAY

FLARESTACK
SHUT-OFF VALVE
AUXILIARY PLA
RELAYS

Positioner

AI Card

AO Card

FLARE STACK PLC


EQUIPMENTS

IM Module
FLARSTACK
CONTR0LVALVE
CONTRL ROOM S/D
SMPS
FLARSTACK
CONTR0LVALVE
CONTRL ROOM S/D

UPS

Signal Cable

Pressure Regulator

Compressor

Impulse line

Relay

DI Card

DO Card

PLC

FLARSTACK
CONTR0LVALVE
CONTRL ROOM S/D
IM Module

SMPS

UPS

Signal Cable

FLARESTACK BFG Pressure Transmitter


LINE PRESSURE

FLARESTACK BFG Pressure Transmitter


LINE PRESSURE
Relay

DI Card

DO Card

PLC

FLARESTACK QUICK
OPEN VALVE
IM Module

SMPS

UPS

Signal Cable

FLARESTACK Thermo couple


BURNER1 TEMP

FLARESTACK Thermo couple


BURNER2 TEMP
FLARESTACK FLAME Thermo couple
TEMP

ISOLATION Ignition Transformer


TRANSFORMER

FLARESTACK LONG Solenoid valve


LIGHT VALVE

FLARESTACK LPG Pressure Transmitter


PRESSURE

CPU

PLC S7 200
FLARESTACK PILOT
Solenoid valve
VALVE
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)

CHECK FOR PHYSICAL DAMAGE VISUAL RUN CHECK

CHECK FOR OPERATION VISUAL STOP CHECK

CHECK FOR OPERATION VISUAL STOP CHECK

CHECK FOR OPERATION VISUAL STOP CHECK

CHECK FOR OPERATION VISUAL STOP CHECK

CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK

Spanners,
Check for contactor rating
Screw
and tighteness of contactor SHUTDOWN
Drivers,
terminals. Check for coil CHECK
Allen Key,
resistance of the contactor.
Multimeter

Check for overload relay


SHUTDOWN
range and setting of relay Visual
CHECK
current for motor tripping.

The auxiliary PLA Relays


are often used in a logic SHUTDOWN
Visual
circuit, or for some other CHECK
part of the control scheme.

Spanners,
Check for contactor rating
Screw
and tighteness of contactor SHUTDOWN
Drivers,
terminals. Check for coil CHECK
Allen Key,
resistance of the contactor.
Multimeter
Spanners,
Check for contactor rating
Screw
and tighteness of contactor SHUTDOWN
Drivers,
terminals. Check for coil CHECK
Allen Key,
resistance of the contactor.
Multimeter

Check for overload relay


SHUTDOWN
range and setting of relay Visual
CHECK
current for motor tripping.

The auxiliary PLA Relays


are often used in a logic SHUTDOWN
Visual
circuit, or for some other CHECK
part of the control scheme.

Spanners,
Check for contactor rating
Screw
and tighteness of contactor SHUTDOWN
Drivers,
terminals. Check for coil CHECK
Allen Key,
resistance of the contactor.
Multimeter

Spanners,
Check for contactor rating
Screw
and tighteness of contactor SHUTDOWN
Drivers,
terminals. Check for coil CHECK
Allen Key,
resistance of the contactor.
Multimeter

Check for overload relay


SHUTDOWN
range and setting of relay Visual
CHECK
current for motor tripping.

The auxiliary PLA Relays


are often used in a logic SHUTDOWN
Visual
circuit, or for some other CHECK
part of the control scheme.
Spanners,
Check for contactor rating
Screw
and tighteness of contactor SHUTDOWN
Drivers,
terminals. Check for coil CHECK
Allen Key,
resistance of the contactor.
Multimeter

Spanners,
Check for contactor rating
Screw
and tighteness of contactor SHUTDOWN
Drivers,
terminals. Check for coil CHECK
Allen Key,
resistance of the contactor.
Multimeter

Check for overload relay


SHUTDOWN
range and setting of relay Visual
CHECK
current for motor tripping.

The auxiliary PLA Relays


are often used in a logic SHUTDOWN
Visual
circuit, or for some other CHECK
part of the control scheme.

check for Positioner to


rotate control valve
SHUTDOWN
according to command Multi meter
CHECK
given by the PLC Analog
input
check for Feedback postion
Multi meter RUN,
of the valve
check for set position of the
Multi meter RUN
valve
check to Execute command
and Feedback According to
Multi meter RUN
set point by progamming
Logic
check for Communication
between PLC and Analog Multi meter RUN
Input and output Cards
check for Supply to
Communication and I/O Multi meter RUN
Cards
check for supply to PLC
Multi meter RUN
And SMPS

check for Command to


Positioner and get Feedback Multi meter RUN
from positioner to PLC

check Sufficient Pressure to


VIsual RUN
Positioner
check sufficient air to
VIsual RUN
operate Positioner

check Pressure up to
Regulator of the Positioner VIsual RUN
From Air Receiving Tank

check for Open/ Close


Multi meter RUN
command

check for Feedback postion


Multi meter RUN
of the valve
Check for Open/ Close
Multi meter RUN
command
check to Execute command
and Feedback According to
Multi meter RUN
set point by progamming
Logic
check for Communication
between PLC and Analog Multi meter RUN
Input and output Cards
check for Supply to
Communication and I/O Multi meter RUN
Cards
check for supply to PLC
Multi meter RUN
And SMPS

check for Command to


Positioner and get Feedback Multi meter RUN
from positioner to PLC

To show the BFG Line Multi meter,


RUN
Pressure Spanner
To show the BFG Line Multi meter,
RUN
Pressure Spanner
check for Open/ Close
Multi meter RUN
command

check for Feedback postion


Multi meter RUN
of the valve
Check for Open/ Close
Multi meter RUN
command
check to Execute command
and Feedback According to
Multi meter RUN
set point by progamming
Logic
check for Communication
between PLC and Analog Multi meter RUN
Input and output Cards
check for Supply to
Communication and I/O Multi meter RUN
Cards
check for supply to PLC
Multi meter RUN
And SMPS

check for Command to


Positioner and get Feedback Multi meter RUN
from positioner to PLC

Check for Burner # 1


Multi meter RUN
Temparature
Check for Burner #
Multi meter RUN
2Temparature
Check for Burner Flame
Multi meter RUN
Temparature
To provide spark for LPG SHUTDOWN
Multi meter
Firing for BFG Flare CHECK
Check for Valve opening of
Multi meter RUN
LPG Line
check for LPG Line
Multi meter RUN
pressure
Check for Healthyness of
Operation of LPG Firing
through Ignition Multi meter RUN
Transformer and Burner
Temparartures.
Check for Valve opening of
Multi meter RUN
LPG Line
IDEAL CONDITION ACTUAL CONDITION OBSERVED

NO PHYSICAL DAMAGE TO BELLOW

SHOULD BE OPERATING WITHOUT JERKS WITHIN


LIMITS SMOOTHLY
SHOULD BE OPERATING WITHOUT JERKS WITHIN
LIMITS SMOOTHLY
SHOULD BE OPERATING WITHOUT JERKS WITHIN
LIMITS SMOOTHLY
SHOULD BE OPERATING WITHOUT JERKS WITHIN
LIMITS SMOOTHLY

NO DAMAGE TO TIPS

Contactor rarting to be 9A. Proper Contactor rarting is 9A. No


tighteness of foundation of contactor. looseness in fitting of contactor
No abnormalities to be seen for the and connection of cables to power
contacts and proper fitting to be done. contactor and its contacts. Coil
Coil resistance should be between 20 ohms resistance of contactor checked 25
- 30 ohms. ohms.

Relay settings: Relay settings:


Relay Range = 0.5-10A Relay Range = 0.5-10A
Relay setting = 8A Relay setting = 8A
FLC = 8.3 A RUNNING CURRENT = 7A

The auxiliary PLA Relays are used to provide The auxiliary PLA Relays are used to
logic for interlocking. provide logic for interlocking.

Contactor rarting to be 9A. Proper Contactor rarting to be 9A. No


tighteness of foundation of contactor. looseness in fitting of contactor
No abnormalities to be seen for the and connection of cables to power
contacts and proper fitting to be done. contactor and its contacts. Coil
Coil resistance should be between 20 ohms resistance of contactor checked 27
- 30 ohms. ohms.
Contactor rarting to be 9A. Proper Contactor rarting to be 9A. No
tighteness of foundation of contactor. looseness in fitting of contactor
No abnormalities to be seen for the and connection of cables to power
contacts and proper fitting to be done. contactor and its contacts. Coil
Coil resistance should be between 20 ohms resistance of contactor checked 21
- 30 ohms. ohms.
Relay settings: Relay settings:
Relay Range = 0.5-10A Relay Range = 0.5-10A
Relay setting = 3A Relay setting = 3A
FLC = 3.4 RUNNING CURRENT = 2.8A

The auxiliary PLA Relays are used to provide The auxiliary PLA Relays are used to
logic for interlocking. provide logic for interlocking.

Contactor rarting to be 9A. Proper Contactor rarting to be 9A. No


tighteness of foundation of contactor. looseness in fitting of contactor
No abnormalities to be seen for the and connection of cables to power
contacts and proper fitting to be done. contactor and its contacts. Coil
Coil resistance should be between 20 ohms resistance of contactor checked
- 30 ohms. 27.5 ohms.

Contactor rarting to be 9A. Proper Contactor rarting to be 9A. No


tighteness of foundation of contactor. looseness in fitting of contactor
No abnormalities to be seen for the and connection of cables to power
contacts and proper fitting to be done. contactor and its contacts. Coil
Coil resistance should be between 20 ohms resistance of contactor checked
- 30 ohms. 26.1 ohms.

Relay settings: Relay settings:


Relay Range = 0.5-10A Relay Range = 0.5-10A
Relay setting = 3A Relay setting = 3A
FLC = 3.4 RUNNING CURRENT = 2.5A

The auxiliary PLA Relays are used to provide The auxiliary PLA Relays are used to
logic for interlocking. provide logic for interlocking.
Contactor rarting to be 9A. Proper Contactor rarting to be 9A. No
tighteness of foundation of contactor. looseness in fitting of contactor
No abnormalities to be seen for the and connection of cables to power
contacts and proper fitting to be done. contactor and its contacts. Coil
Coil resistance should be between 20 ohms resistance of contactor checked
- 30 ohms. 25.5 ohms.

Contactor rarting to be 9A. Proper Contactor rarting to be 9A. No


tighteness of foundation of contactor. looseness in fitting of contactor
No abnormalities to be seen for the and connection of cables to power
contacts and proper fitting to be done. contactor and its contacts. Coil
Coil resistance should be between 20 ohms resistance of contactor checked
- 30 ohms. 26.2 ohms.
Relay settings: Relay settings:
Relay Range = 0.5-10A Relay Range = 0.5-10A
Relay setting = 3A Relay setting = 3A
FLC = 3.4 RUNNING CURRENT = 2.4A

The auxiliary PLA Relays are used to provide The auxiliary PLA Relays are used to
logic for interlocking. provide logic for interlocking.

No leakages found No leakages found

Get 4.00 mA Get 4.00 mA

Get 4.00 mA Get 4.00 mA

No fault LED will Glow No fault LED will Glow

No fault LED will Glow No fault LED will Glow

Get 24 Volt output Get 24 Volt output


Get 230 Volt Get 230 Volt

No damage No damage

Pressure Showing 4.0 Kg/cm2 Pressure Showing 4.0 Kg/cm3

Provide 5.0 Kg/Cm2 Provide 5.0 Kg/Cm2

No leakages found No leakages found

No abnormalities to be seen for the No abnormalities to be seen for the


contacts. contacts.

No fault LED will Glow No fault LED will Glow

No fault LED will Glow No fault LED will Glow

No fault LED will Glow No fault LED will Glow

No fault LED will Glow No fault LED will Glow

Get 24 Volt output Get 24 Volt output

Get 230 Volt Get 230 Volt

No damage No damage

pressure between6 to 13 Kpa pressure between6 to 13 Kpa

pressure between6 to 13 Kpa pressure between6 to 13 Kpa


No abnormalities to be seen for the No abnormalities to be seen for the
contacts. contacts.

No fault LED will Glow No fault LED will Glow

No fault LED will Glow No fault LED will Glow

No fault LED will Glow No fault LED will Glow

No fault LED will Glow No fault LED will Glow

Voltage Between 23 to 25 Volt Voltage Between 23 to 25 Volt

Volatage Between 220 to 240 Volt Volatage Between 220 to 240 Volt

No damage No damage

Temparature between 300 to 650


Temparature between 300 to 650 Degree
Degree
Temparature between 300 to 650
Temparature between 300 to 650 Degree
Degree
Tempararture between 50 to 100
Tempararture between 50 to 100 Degree
Degree
Spark healthy ness check Spark healthy ness check
Coil should Energige on Plant
Coil should Energige on Plant Ruuning
Ruuning
pressure Between 50 to 250 Kpa pressure Between 50 to 250 Kpa

No falult LED should Glow on CPU No falult LED should Glow on CPU
Coil should Energige on Plant startup
Coil should Energige on Plant startup and After
and After flame get coil should de-
flame get coil should de-energige
energige
ACTION
REQUIRED
CONDITIO
EQUIPMENT: Sub Equipments COMPONENT Item Code

LINK FOR BUCKETS OF


BF3-GCS-BKT BF3-GCS-BKT 5105020003
BUCKET ELEVATOR- DBF

BUCKET FR BUCKET
BF3-GCS-BKT BF3-GCS-BKT ELEVATOR-DRY BAG 5105020013
FILTER

PLUMMER BLOCK--TAIL
BF3-GCS-BKT BF3-GCS-BKT 0941010135
END BUCKET ELEVATOR

DRIVE
BF3-GCS-BKT BF3-GCS-BKT CHAIN,SIMPLEX,PITCH- 5112000094
38.1MM
Head pulley bearing
BF3-GCS-BKT BF3-GCS-BKT 0921020064
22224K
BF3-GCS-BKT BF3-GCS-BKT Tail pulley bearing item code
BF3-GCS-BKT BF3-GCS-BKT Bucket elevator Head drum item code

BF3-GCS-BKT BF3-GCS-BKT Bucket elevator Tail drum item code

GEAREDMOTOR GCP
BF3-GCS-BKT BF3-GCS-BKT 5107000058
BUCKET ELEVATOR
BF3-GCS-BKT BF3-GCS-BKT
Sprocket (drive) SPROCKET 0808010042
SIMPLEX
Sprocket (driven)
BF3-GCS-BKT BF3-GCS-BKT 0808010041
SPROCKET SIMPLEX

GCS Bucket
BF3-GCS-BKT Motor Windings
Elevator Motor
GCS Bucket
BF3-GCS-BKT Terminal Box
Elevator Motor

GCS Bucket
BF3-GCS-BKT Power Contactor
Elevator Panel

GCS Bucket
BF3-GCS-BKT Overload Relay with Kit
Elevator Panel

Command and Feed back


cable

Relay

BF3-GCS-BKT
DI ,DOCard,PLC , IM
modules

SMPS

Profibus Cable
CONDITION APPRAISAL OF GCP BUCKET ELEVATOR
TYPE OF CHECK
TOOLS (RUN CHECK / STOP
DESCRIPTION / DIMENSION REQUIRED CHECK /
SHUTDOWN)

CHECK FOR DAMAGED LINKS SPANNERS STOP CHECK

CHECK FOR DAMAGED BUCKET SPANNERS STOP CHECK

CHECK FOR PHYSICAL DAMAGE VISUAL RUN CHECK

CHECK FOR DAMAGED LINKS VISUAL STOP CHECK

CHECK FOR BEARING CLEARANCE FILLER GAUGE STOP CHECK

CHECK FOR BEARING CLEARANCE FILLER GAUGE STOP CHECK

CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

CHECK FOR PHYSICAL DAMAGE SPANNERS STOP CHECK

To form magnetic field when


energized with current to
Megger & Shut Down
produce torque. Check for
Multimeter check
winding resistance and megger
value of Motor.
Check for proper tigteness of the Shut Down
Spanners
power cable to the LT Motor check

Spanners,
Check for contactor rating and
Screw
tighteness of contactor SHUTDOWN
Drivers, Allen
terminals. Check for coil CHECK
Key,
resistance of the contactor.
Multimeter

Check for overload relay range


and setting of relay current for Visual RUN CHECK
motor tripping.

checking healthyness by Run the Multimeter,Te


Run check
Belt Conveyor ster

checking healthyness by
Multimeter,Te
operating DOL starter of Run check
ster
Elevator.

checking healthyness by
operating DOL starter of Multimeter,Te
Run check
conveyor/ by activating pull cord, ster
BSS, ZSS and LCS Box.
check supply voltage and output Multimeter,Te
Run check
Voltage ster
checking healthyness by Multimeter,Te
Run check
operating valve. ster
LEVATOR
IDEAL CONDITION ACTUAL CONDITION OBSERVED ACTION REQUIRED

NO DAMAGED LINKS

NO DAMAGED BUCKETS

NO PHYSICAL DAMAGE

NO DAMAGED LINKS

CLEARANCE <0.60MM

CLEARANCE <0.60MM

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

NO PHYSICAL DAMAGE

Winding Resistances should No abnormal difference


be balanced of all three in winding resistances.
phases, i.e., less than 10 Winding resistance of all
ohms. three phases is 6.8 ohms.
Megger values shouldbe Megger values are 1000
above 5 megaohms from all mega ohms and in
three phases to ground. healthy condition.
No looseness of the bolts
Tightened with spanner set.
and connecting links.

Contactor rating to be
Contactor rating is
LC1D32, 32 A. Proper
LC1D32, 32 A. No
tighteness of foundation of
looseness in fitting of
contactor.
contactor and connection
No abnormalities to be seen
of cables to power
for the contacts and proper
contactor and its
fitting to be done.
contacts. Coil resistance
Coil resistance should be
is 38 ohms.
30-43 ohms.

Relay Range : Relay Range :


(12-18)A (12-18)A
Relay settings = 14.0 A Relay settings = 14.0 A
FLC = 14.3A RC = 9.2 A
Physical check or damage of
No abnormalities found
cable

Check for healthiness of NO No abnormalities found


- NC contacts during in switching of contacts
operation. during operation.

Physical check No abnormalities found

Physical check No abnormalities found

Physical check No abnormalities found


EQUIPMENT: Sub Equipments COMPONENT Item Code
SP-SS-CA-FAN COMBUSTION FAN ASSEMLEY (SP) 5114000020
SP-SS-CA-FAN COMBUSTION FAN ASSEMLEY (SP)
SP-SS-CA-FAN RELAY
SP-SS-CA-FAN CAMMAND & FEEDBACK CABLE
SP-SS-CA-FAN DI ,DO Card, PLC , IM modules
SP-SS-CA-FAN SMPS,
SP-SS-CA-FAN PRESSURE TRANSMITTER

SP-SS-CA-FAN Profibus Cable


DESCRIPTION / DIMENSION TOOLS REQUIRED
NO DAMAGE/CRACK TO IMPELLER VISUAL
WIND VOLUME VISUAL AT PLC
checking healthyness by operating DOL starter of motor.
checking healthyness by Run the motor
checking healthyness by operating DOL starter of motor and run
check supply voltage and output Voltage, parameter setting,
checking of voltage & calibration

checking of commnunication on SCADA sytem and on PLC card


F CHECK (RUN CHECK / STOP CHECK / IDEAL
SHUTDOWN)
CONDITION ACTUAL CONDITION OBSERVED
STOP CHECK NO CRACKS AND DAMAGE ON IMPELLOR
RUN CHECK 3500-4000 M3/HR
Multimeter,Tester Run check Check for healthiness of NO - NC contacts during oper
Multimeter,Tester Run check Physical check or damage of cable
Multimeter,Tester Run check Physical check
Multimeter,Tester Run check Physical check
Multimeter,Tester Run check Physical check

Multimeter,Tester Run check Physical check


ACTION REQUIRED

No abnormalities found in switching of contacts during operation.


No abnormalities found
No abnormalities found
No abnormalities found
No abnormalities found

No abnormalities found
CONDITION APP

Sub
EQUIPMENT: Equipments COMPONENT Item Code

SP-SS-FEED DRUM SP-SS-FEED DR FEED DRUM GEAR BOX 0806760022


SP-SS-FEED DRUM SP-SS-FEED DR FEEDDRUM GEARBOX PINION-SP 0806990046
SP-SS-FEED DRUM SP-SS-FEED DR Gear for Feed drum driven 0806990066
SP-SS-FEED DRUM SP-SS-FEED DR BEARING, 0921020091
SP-SS-FEED DRUM SP-SS-FEED DR Coupling input 0804040043
SP-SS-FEED DRUM SP-SS-FEED DR Feed Drum liner 5222000087
SP-SS-FEED DRUM SP-SS-FEED DR Sector gate rope 2111000064
CONDITION APPRAISAL OF FEEDDRUM

TYPE OF
CHECK (RUN
TOOLS CHECK /
SPECIFICATION DESCRIPTION / DIMENSION REQUIRED STOP
CHECK /
SHUTDOWN)

MODEL NO -ZSY250-100-1, SP CHECK FOR PHYSICAL DAMAGE VISUAL STOP CHECK


CHECK FOR TOOTH THICKNESS VERNIER STOP CHECK
CHECK FOR TOOTH THICKNESS VERNIER STOP CHECK
ROLLER,22234CCK/W33 CHECK FOR BEARING CLEARANCE FILLER GAUG STOP CHECK
UT 60 CHECK FOR BOLT TIGHTNESS OF C SPANNERS STOP CHECK
CHECK FOR THICKNESS VERNIER STOP CHECK
6mm CHECK FOR ROPE THICKNESS VERNIER STOP CHECK
ACTUAL ACTION
IDEAL CONDITION CONDITION REQUIRED
OBSERVED

NO PHYSICAL DAMAGE TO BODY


SHOULD BE
SHOULD BE
SHOULD BE <0.70MM
BOLTS SHOULD BE TIGHT
SHOULD >08MM
SHOULD BE >5.4MM
CONDITION APPRAISAL OF

EQUIPMENT: Sub Equipments COMPONENT Item Code

SP-SS-WBOX SP-SS-WBOX Geared motor 5114000102


SINTER MACHINE WIND 5114000144
SP-SS-WBOX SP-SS-WBOX BOX BELLOW
SINTER MACHINE WIND 5114000143
SP-SS-WBOX SP-SS-WBOX BOX BELLOW
SP-SS-WBOX SP-SS-WBOX GLAND PACKING, 2505000065
SP-SS-WBOX SP-SS-WBOX ROPE 2510040015
CONDITION APPRAISAL OF WINDBOX

TYPE OF
CHECK
(RUN
TOOLS CHECK
SPECIFICATION DESCRIPTION / DIMENSION REQUIRE STOP /
D CHECK /
SHUTDO
WN)

CHECK FOR PHYSICAL DAMAGE VISUAL RUN CHECK

TYPE 1 CHECK FOR ANY LEAKAGE VISUAL RUN CHECK

TYPE 2 CHECK FOR ANY LEAKAGE VISUAL RUN CHECK


16 MM SQR,STYLE100 FXI CHECK FOR SHEARED/DAMAGEDSPANNER STOP CHEC
,ASBESTOS,SQUARE,12MM DIA,GRPHITED CHECK FOR SHEARED/DAMAGEDSPANNER STOP CHEC
ACTUAL
CONDITI ACTION
IDEAL CONDITION ON REQUIRE
OBSERVE D
D

NO PHYSICAL DAMAGE TO BODY

NO LEAKAGE

NO LEAKAGE
FLANGE BOLT SHOULD BE TIGHT
FLANGE BOLT SHOULD BE TIGHT
EQUIPMENT: Sub Equipments COMPONENT

SP-SS-7ROLL SP-SS-7ROLL ROLLERS OF 7 ROLL DISTRIBUTOR-SP

SP-SS-7ROLL SP-SS-7ROLL GEARED MOTOR OF 7 ROLL DISTRIBUTOR-SP

SP-SS-7ROLL SP-SS-7ROLL Spider of Coupling

SP-SS-7ROLL SP-SS-7ROLL COUPLING


CONDITION APPRAISAL OF 7ROLL DISTRIBUTOR

Item Code DESCRIPTION / DIMENSION TOOLS REQUIRED

5114000040 CHECK FOR SHELL DAMAGE VISUAL

3301020198 CHECK FOR PHYSICAL DAMAGE VISUAL

0804990108 CHECK FOR PHYSICAL DAMAGE SPANNERS

CHECK FOR CRACKS/DAMAGE IN HUB SPANNERS


DISTRIBUTOR
TYPE OF CHECK (RUN CHECK
/ STOP CHECK / IDEAL CONDITION
SHUTDOWN)
STOP CHECK NO DAMAGE TO SHELL OF ROLLERS

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE

STOP CHECK NO PHYSICAL DAMAGE


ACTUAL CONDITION OBSERVED ACTION REQUIRED
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

SP-PROP-BWF SP-PROP-BWF Weigh feeder Gear box 5114060004


SP-PROP-BWF SP-PROP-BWF Carrying idler 5231010064
SP-PROP-BWF SP-PROP-BWF Load cell idler 5222900379/5222900380
SP-PROP-BWF SP-PROP-BWF Digester gear box 5114060005

SP-PROP-BWF SP-PROP-BWF PILLOW BLOCK 5222900359/5222900358

SP-PROP-BWF SP-PROP-BWF RAV GEAR BOX 5105020019


SP-PROP-BWF SP-PROP-BWF Head pulley 0812900006/0812900005
SP-PROP-BWF SP-PROP-BWF Tail pulley 5114050055/0812900007
SP-PROP-BWF SP-PROP-BWF Ecentric Bearing 0923090002

SP-PROP-BWF SP-PROP-BWF
RELAY
SP-PROP-BWF SP-PROP-BWF CAMMAND & FEEDBACK CABLE

SP-PROP-BWF SP-PROP-BWF
DI ,AO Card, PLC , IM modules
SP-PROP-BWF SP-PROP-BWF SMPS, BT820 CONTROLER
SP-PROP-BWF SP-PROP-BWF can bus Cable
SP-PROP-BWF SP-PROP-BWF Load cell
SP-PROP-BWF SP-PROP-BWF speed senor
CONDITION APPRAISAL OF BELT WEIGH FEEDER

SPECIFICATION

(650MMBELT)
(650/800MM BELT)
BWY22A-SP

, UCHA 207/, UCF 208 CD

PROP BIN 7,12,13- BYW18A-SP


800/650 mm belt
800/650 mm belt
RN206 MV23A
NDITION APPRAISAL OF BELT WEIGH FEEDER

DESCRIPTION / DIMENSION

CHECK FOR PHYSICAL DAMAGE AND BOLTS


CHECK FOR PHYSICAL DAMAGE OF IDLER SHELL
CHECK FOR PHYSICAL DAMAGE OF IDLER SHELL
CHECK FOR PHYSICAL DAMAGE AND BOLTS

CHECK FOR PHYSICAL DAMAGE AND BOLTS

CHECK FOR PHYSICAL DAMAGE AND BOLTS


CHECK FOR PHYSICAL DAMAGE OF PULLEY SHELL
CHECK FOR PHYSICAL DAMAGE OF PULLEY SHELL
CHECK FOR BEARING CLEARANCE

checking healthyness by operating DOL starter of motor.


checking healthyness by Run the motor

checking healthyness by operating DOL starter of motor and run feedback.


check supply voltage and output Voltage, parameter setting,
checking of commnunication on SCADA sytem and on PLC card
check supply voltage and output Voltage and resistances
check supply voltage and output Voltage
ER

TYPE OF
CHECK (RUN
CHECK /
TOOLS REQUIRED
STOP
CHECK /
SHUTDOWN)

SPANNERS STOP CHECK


VISUAL STOP CHECK
VISUAL STOP CHECK
SPANNERS STOP CHECK

SPANNERS STOP CHECK

SPANNERS STOP CHECK


VISUAL STOP CHECK
VISUAL STOP CHECK
SPANNERS AND FILLER GAUG STOP CHECK

Multimeter,Tester Run check


Multimeter,Tester Run check

Multimeter,Tester Run check


Multimeter,Tester Run check
Multimeter,Tester Run check
Multimeter,Tester Run check
Multimeter,Tester Run check
IDEAL CONDITION ACTUAL CONDITION OBSERVED

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS


NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS

NO PHYSICAL DAMAGE AND NO RUSTED BOLTS


NO PHYSICAL DAMAGE
NO PHYSICAL DAMAGE
CLEARANCE < 0.40MM
No abnormalities found in switching of
Check for healthiness of NO - NC contacts during operation. contacts during operation.
Physical check or damage of cable No abnormalities found

Physical check No abnormalities found


Physical check No abnormalities found
Physical check No abnormalities found
Physical check No abnormalities found
Physical check No abnormalities found
ACTION REQUIRED
EQUIPMENT: Sub Equipments COMPONENT

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

OUTGOING TO
11 KV BF HT
O2N2 PLANT
PANEL ROOM
FROM PCC

HT NUMERICAL
PROTECTIVE RELAY
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

OUTGOING TO
11 KV BF HT 1000KVAR
PANEL ROOM CAPACITOR
BANK
OUTGOING TO
11 KV BF HT 1000KVAR
PANEL ROOM CAPACITOR
BANK

HT CAPACITOR 1000
KVAR

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

11 KV BF HT OUTGOING TO CA
PANEL ROOM FAN 1 FROM PCC

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH


HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

11 KV BF HT OUTGOING TO
PANEL ROOM CHDD FAN
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

11 KV BF HT OUTGOING TO
PANEL ROOM PCI ID FAN

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER


HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

OUTGOING TO
11 KV BF HT MAIN CONTROL
PANEL ROOM B/D 1250KVA
TRANSFORMER 1
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

OUTGOING TO
11 KV BF HT STOCK HOUSE
PANEL ROOM 1250KVA
TRANSFORMER 1
OUTGOING TO
11 KV BF HT STOCK HOUSE
PANEL ROOM 1250KVA
TRANSFORMER 1

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

OUTGOING TO
11 KV BF HT
CWPS PANEL
PANEL ROOM
SECTION 1

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH


HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

BF HT PCC PANEL
11 KV BF HT INCOMING
PANEL ROOM SUPPLY FROM
PP2
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER
11 KV BF HT PCC PANEL
PANEL ROOM BUSCOUPLER

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER


HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

OUTGOING TO
11 KV BF HT STOCK HOUSE
PANEL ROOM 1250KVA
TRANSFORMER 2
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

OUTGOING TO
11 KV BF HT MAIN CONTROL
PANEL ROOM B/D 1250KVA
TRANSFORMER 2
OUTGOING TO
11 KV BF HT MAIN CONTROL
PANEL ROOM B/D 1250KVA
TRANSFORMER 2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

OUTGOING TO
11 KV BF HT
STOCK HOUSE
PANEL ROOM
DD FAN

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH


HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

11 KV BF HT OUTGOING TO
PANEL ROOM HBS CA FAN 2
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

OUTGOING TO
11 KV BF HT
CWPS PANEL
PANEL ROOM
SECTION 2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER


HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

11 KV BF HT OUTGOING TO
PANEL ROOM SINTER PLANT
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER
11 KV BF HT INCOMING FROM
PANEL ROOM PIP DG SUPPLY
11 KV BF HT INCOMING FROM
PANEL ROOM PIP DG SUPPLY

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER
TOOLS
DESCRIPTION / DIMENSION
REQUIRED

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.

Check for proper cleanliness of the busbar


insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.

Check for megger value of Busbar and panel


HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT
SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

Check for megger value of HT Capacitor


HT MEGGER
terminal and panel body.

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH
Check for megger value of HT Cable phase
MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.
Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
Check for proper tigteness of the busbar and
SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER
Check for high electrical & mechanical
strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH
Check for megger value of HT Cable phase
MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.
Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
Check for proper tigteness of the busbar and
SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER
Check for high electrical & mechanical
strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH
Check for megger value of HT Cable phase
MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.
Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
Check for proper tigteness of the busbar and
SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER
Check for high electrical & mechanical
strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

Interlock of Earth Switch and HT


Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A

Vertical and Horizontal insulators


should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.

HT Breaker should be clean. There


should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.
Resistance between panel to busbar
SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms
Insulation resistance between Phase
to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.
Insulation resistance between Phase
to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.
RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.
Resistance between panel to busbar
SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms
Insulation resistance between Phase
to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.
Insulation resistance between Phase
to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.
RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.
Resistance between panel to busbar
SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms
Insulation resistance between Phase
to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.
Insulation resistance between Phase
to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.
RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.
Resistance between panel to busbar
SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms
Insulation resistance between Phase
to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.
ACTUAL CONDITION OBSERVED ACTION
ON 12.04.2018 REQUIRED

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 19
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 38 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0027

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.
Resistance between panel to busbar is
1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms
Insulation resistance between Phase to
Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 21
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 44 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

Resistance between panel to busbar is


1000 mega ohms.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 19
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 48 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.
Insulation resistance between Phase to
Phase is 1100 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0017

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.
Earthing is connected to the body and
to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 40 ms of


all three phases.
Timing of CB during Open is 37 ms of
all three phases.
Timing of CB during Close / Open is 21
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 41 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1800 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.00124

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 40 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 17
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 46 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0029
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A
Vertical and Horizontal insulators
strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 40 ms of


all three phases.
Timing of CB during Open is 37 ms of
all three phases.
Timing of CB during Close / Open is 25
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 44 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.
HT Breaker Numerical Relay tripping
is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1100 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0022

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.
Resistance between panel to busbar is
1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms
Insulation resistance between Phase to
Earth is > 1 T Ohms

Timing of CB during Close is 42 ms of


all three phases.
Timing of CB during Open is 39 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 45 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1100 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0029

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 40 ms of


all three phases.
Timing of CB during Open is 37 ms of
all three phases.
Timing of CB during Close / Open is 17
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 41 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.
Insulation resistance between Phase to
Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0028

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.
Earthing is connected to the body and
to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is39 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 45 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0031

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 22
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 41 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A
Vertical and Horizontal insulators
strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 41 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.
HT Breaker Numerical Relay tripping
is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1500 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0030

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.
Resistance between panel to busbar is
1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms
Insulation resistance between Phase to
Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 41 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1100Mega Ohms

TAN-DELTA test of HT Cable is


0.0020

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 40 ms of


all three phases.
Timing of CB during Open is 37 ms of
all three phases.
Timing of CB during Close / Open is 17
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 40 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.
Insulation resistance between Phase to
Phase is 1700 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.00173

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.
Earthing is connected to the body and
to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 37 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 46 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1000 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0019

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.52 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 21
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 38 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0021
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A
Vertical and Horizontal insulators
strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 37 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 35 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.
HT Breaker Numerical Relay tripping
is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1000 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0025

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.
Resistance between panel to busbar is
1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms
Insulation resistance between Phase to
Earth is > 1 T Ohms

Timing of CB during Close is 42 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 17
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 43 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.
Sub
EQUIPMENT: COMPONENT
Equipments

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

11 KV BF3 11KV
BLOWER HT BLOWER 1
PANEL ROOM OUTGOING

HT NUMERICAL
PROTECTIVE RELAY
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER
11 KV BF3 11KV
BLOWER HT BLOWER 2
PANEL ROOM OUTGOING
11 KV BF3 11KV
BLOWER HT BLOWER 2
PANEL ROOM OUTGOING

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

BF3 11KV
BLOWER
11 KV
PANEL
BLOWER HT
1600KVAR
PANEL ROOM
CAPACITOR
BANK

HT CAPACITOR 1600
KVAR

HT NUMERICAL
PROTECTIVE RELAY
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER
HT SOFTSTARTER

BF3 11KV
11 KV BLOWER 1
BLOWER HT SOFT
PANEL ROOM STARTER
PANEL

HT BYPASS BREAKER
HT BYPASS BREAKER

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER


HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

BF3 11KV
HT SOFTSTARTER
BF3 11KV
11 KV BLOWER 2
BLOWER HT SOFT
PANEL ROOM STARTER
PANEL

HT BYPASS BREAKER
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER
BLOWER
11KV HT
11 KV
PCC PANEL
BLOWER HT
INCOMING
PANEL ROOM
SUPPLY
FROM PP2
11KV HT
11 KV
PCC PANEL
BLOWER HT
INCOMING
PANEL ROOM
SUPPLY
FROM PP2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER
TOOLS
DESCRIPTION / DIMENSION
REQUIRED

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.

Check for proper cleanliness of the busbar


insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.

Check for megger value of Busbar and panel


HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT
SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

Check for megger value of HT Capacitor


HT MEGGER
terminal and panel body.

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT
SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.
Check for proper interlocking of earth switch
and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
Check for Resistance values of all thyristors Multimeter,
in each phase inside HT Softstarter. Lamp Test

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER
Check for high electrical & mechanical
strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
Check for Resistance values of all thyristors Multimeter,
in each phase inside HT Softstarter. Lamp Test

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

Interlock of Earth Switch and HT


Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A

Vertical and Horizontal insulators


should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.

HT Breaker should be clean. There


should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.
Resistance between panel to busbar
SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms
Insulation resistance between Phase
to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms
Timing of CB during Close should be
in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

All ten thyristors in each phase


SHUTDOWN CHECK resistance should be in two digits
between 10 to 50 ohms.

HT Breaker should be clean. There


should not be any moisture or wear
and rusting of contacts.

Proper lubrication of all moving parts


of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
SHUTDOWN CHECK Vacuum inside bottles should be
normal.
SHUTDOWN CHECK

Insulation resistance between Upper


& Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.
All ten thyristors in each phase
SHUTDOWN CHECK resistance should be in two digits
between 10 to 50 ohms.

HT Breaker should be clean. There


should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.
Resistance between panel to busbar
SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms
Insulation resistance between Phase
to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.
ACTUAL CONDITION OBSERVED ACTION
ON 12.04.2018 REQUIRED

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 48 ms of


all three phases.
Timing of CB during Open is 41 ms of
all three phases.
Timing of CB during Close / Open is 21
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 45 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1100 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0017

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.
Resistance between panel to busbar is
1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms
Insulation resistance between Phase to
Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 21
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 44 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 43 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 20
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 41 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

Resistance between panel to busbar is


1000 mega ohms.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1100 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.
Interlock of Earth Switch and HT
Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms
Timing of CB during Close is 46 ms of
all three phases.
Timing of CB during Open is 28 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 48 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

All ten thyristors in each phase


resistance are in two digits. All
thyristors are in range of 11 to 14 ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.

Lubrication of all moving parts of


mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.
Insulation resistance between Upper &
Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 28 ms of
all three phases.
Timing of CB during Close / Open is 17
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 45 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1800 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.00124
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A
Vertical and Horizontal insulators
strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 45 ms of


all three phases.
Timing of CB during Open is 28 ms of
all three phases.
Timing of CB during Close / Open is 17
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 44 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.
All ten thyristors in each phase
resistance are in two digits. All
thyristors are in range of 11 to 14 ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 45 ms of


all three phases.
Timing of CB during Open is 25 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 48 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.
HT Breaker Numerical Relay tripping
is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0029

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.
Resistance between panel to busbar is
1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms
Insulation resistance between Phase to
Earth is > 1 T Ohms

Timing of CB during Close is 42 ms of


all three phases.
Timing of CB during Open is 37 ms of
all three phases.
Timing of CB during Close / Open is 19
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 41 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0029

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.
Sub
EQUIPMENT: COMPONENT
Equipments

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
OUTGOING HT BREAKER
11 KV HT
TO MEDIUM
CWPS PANEL
PRESSURE
ROOM
PUMP 1
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

OUTGOING
11 KV HT
TO MEDIUM
CWPS PANEL
PRESSURE
ROOM
PUMP 2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER


HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

OUTGOING
11 KV HT
TO MEDIUM
CWPS PANEL
PRESSURE
ROOM
PUMP 3
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER

OUTGOING
11 KV HT
TO 2500KVA
CWPS PANEL
TRANSFOR
ROOM
MER 1
OUTGOING
11 KV HT
TO 2500KVA
CWPS PANEL
TRANSFOR
ROOM
MER 1

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

OUTGOING
11 KV HT
TO 2500KVA
CWPS PANEL
TRANSFOR
ROOM
MER 2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER
TOOLS
DESCRIPTION / DIMENSION
REQUIRED

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.

Check for proper cleanliness of the busbar


insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.

Check for megger value of Busbar and panel


HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
Check for proper tigteness of the busbar and
SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER
Check for high electrical & mechanical
strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH
Check for megger value of HT Cable phase
MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

Interlock of Earth Switch and HT


Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A

Vertical and Horizontal insulators


should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.
HT Breaker Numerical Relay tripping
should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.
Resistance between panel to busbar
SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms
Insulation resistance between Phase
to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.
Insulation resistance between Phase
to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.
ACTUAL CONDITION OBSERVED ACTION
ON 12.04.2018 REQUIRED

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.
HT Breaker found clean. There is no
moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 42 ms of


all three phases.
Timing of CB during Open is 39 ms of
all three phases.
Timing of CB during Close / Open is 18
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 45 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.
HT Breaker Numerical Relay tripping
is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0010

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 39 ms of
all three phases.
Timing of CB during Close / Open is 21
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 44 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1300 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0009
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A
Vertical and Horizontal insulators
strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 41 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 22
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 43 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.
HT Breaker Numerical Relay tripping
is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1700 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is 0.0011

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.
Resistance between panel to busbar is
1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms
Insulation resistance between Phase to
Earth is > 1 T Ohms

Timing of CB during Close is 42 ms of


all three phases.
Timing of CB during Open is 38 ms of
all three phases.
Timing of CB during Close / Open is 19
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 38 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1500 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0010

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 51 ms of


all three phases.
Timing of CB during Open is 39 ms of
all three phases.
Timing of CB during Close / Open is 22
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 42 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.
Insulation resistance between Phase to
Phase is 1700 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0031

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.
EQUIPMENT: Sub Equipments COMPONENT

BLOWER #1 LUBE OIL


PUMP #1 CONTACTOR

BLOWER #1 LUBE OIL


PUMP #1 OVERLOAD
RELAY

BLOWER #1 LUBE OIL


PUMP #1 AUXILIARY
CONTACTOR

BLOWER #1 LUBE OIL


PUMP #2 CONTACTOR

BLOWER #1 LUBE OIL


PUMP #2 OVERLOAD
RELAY

BLOWER #1 LUBE OIL


PUMP #2 AUXILIARY
CONTACTOR
BLOWER #1 BARRING
GEAR MOTOR
CONTACTOR

BLOWER #1 BARRING
GEAR MOTOR
SOFTSTARTER

BLOWER #2 LUBE OIL


PUMP #1 CONTACTOR
BLOWER
ACCESSORIES
PANEL

BLOWER #2 LUBE OIL


PUMP #1 OVERLOAD
RELAY

BLOWER #2 LUBE OIL


PUMP #1 AUXILIARY
CONTACTOR

BLOWER #2 LUBE OIL


PUMP #2 CONTACTOR

BLOWER #2 LUBE OIL


PUMP #2 OVERLOAD
RELAY

BLOWER #2 LUBE OIL


PUMP #2 AUXILIARY
CONTACTOR
BLOWER #2 BARRING
GEAR MOTOR
CONTACTOR

BLOWER #2 BARRING
GEAR MOTOR
SOFTSTARTER

BLOWER #1 MOTOR
SPACE HEATER
CONTACTOR

BLOWER #2 MOTOR
SPACE HEATER
CONTACTOR

HT PANEL BUSBARS
HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL BUSBAR
HORIZONTAL AND
HT CAPACITOR VERTICAL INSULATOR
PANEL

HT VACUUM CONTACTOR

HT CABLES
HT PANEL BUSBARS

HT PANEL EARTH SWITCH

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
BLOWER HT HT BREAKER
PANEL

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTHING
HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT SOFTSTARTER

BLOWER 1 SOFT
STARTER PANEL
HT NUMERICAL
PROTECTIVE RELAY

BLOWER
PANEL HT CABLES

POTENTIAL
TRANSFORMER
CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT SOFTSTARTER

BLOWER 2 SOFT
STARTER PANEL HT NUMERICAL
PROTECTIVE RELAY
STARTER PANEL

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

BLOWER SOFTSTARTER
UPS#1

BLOWER BLOWER SOFTSTARTER


SOFTSTARTER UPS#2
UPS
BLOWER
SOFTSTARTER
UPS

BLOWER SOFTSTARTER
CUBICLE CABINET

UNINTERRUPTIBLE
POWER SUPPLY

CENTRAL PROCESSING
UNIT

ON/OFF CONTROL
SYSTEM

OPEN LOOP CONTROL


SYSTEM

FEED FORWARD
CONTROL SYSTEM

CLOSE LOOP CONTROL


SYSTEM

BLOWER PLC
ANALOG INPUT MODULE
BLOWER PLC

ANALOG OUTPUT
MODULE

DIGITAL INPUT MODULE

DIGITAL OUTPUT
MODULE

COMMUNICATION
MODULE
HUMAN MACHINE
INTERFACE OR SCADA

UPS#1

BLOWER PLC
UPS

UPS#2

BLOWER #1 LUBE OIL


PUMP #1 RELAY

BLOWER #1 LUBE OIL


PUMP # 2 RELAY

BLOWER #1 BARRING
GEAR MOTOR RELAY

BLOWER #2 LUBE OIL


PUMP #1 RELAY

BLOWER #2 LUBE OIL


PUMP #2 RELAY

BLOWER #2 BARRING
GEAR MOTOR RELAY
BLOWER
ACCESSORIES
PANEL BLOWER #1 Bleed Valve
RELAY
ACCESSORIES
PANEL

BLOWER #2 Bleed Valve


RELAY

BLOWER #1 IGV RELAY

BLOWER #2 IGV RELAY

BLOWER #1OUTLET
VALVE RELAY

BLOWER #2 OUTLET
VALVE RELAY

Positioner

AI Card

AO Card

PLC

IM Module

SMPS
BLOWER # 1
ANTI SURGE
VALVE
UPS

Signal Cable

Pressure Regulator
Compressor

Impulse line

Relay

Relay

DI Card

DO Card

BLOWER # 1
BLEED VALVE PLC

IM Module

UPS

Signal Cable

Relay

DI Card

DO Card

BLOWER # 2
BLEED VALVE PLC

IM Module
UPS

Signal Cable

VIBRATION
TRANSMITTER
BLOWER
RTD
TOOLS
DESCRIPTION / DIMENSION
REQUIRED

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

The auxiliary contactor is often used in a


logic circuit, or for some other part of the Visual
control scheme.

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

The auxiliary contactor is often used in a


logic circuit, or for some other part of the Visual
control scheme.
Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Softstarter is a device which controls the Cotton clothe,


acceleration of an electric motor by means of spanners, Screw
controlling the applied voltage. driver

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

The auxiliary contactor is often used in a


logic circuit, or for some other part of the Visual
control scheme.

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Check for overload relay range and setting of


Visual
relay current for motor tripping.

The auxiliary contactor is often used in a


logic circuit, or for some other part of the Visual
control scheme.
Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Softstarter is a device which controls the Cotton clothe,


acceleration of an electric motor by means of spanners, Screw
controlling the applied voltage. driver

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Spanners,
Check for contactor rating and tighteness of
Screw Drivers,
contactor terminals. Check for coil resistance
Allen Key,
of the contactor.
Multimeter

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.

Check for proper cleanliness of the busbar


insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.

Check for megger value of Busbar and panel


HT MEGGER
body.
Check for proper interlocking of earth switch
and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.
Check for proper tigteness of the busbar and
SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.

Check for proper cleanliness of the busbar


insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.

Check for megger value of Busbar and panel


HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH
Check for megger value of HT Cable phase
MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.

Check for proper cleanliness of the busbar


insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.

Check for megger value of Busbar and panel


HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.
LEAKAGE
Check for earthing of the Panel body.
TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

To protect an electrical circuit from damage VISUAL,


caused by excess current from an overload or COTTON
short circuit. Its basic function is to interrupt CLOTHE,
current flow after a fault is detected. MULTIMETER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for proper interlocking of earth switch


and HT Breaker. Also, check for interlocking VISUAL
of earth switch and panel back door.

LEAKAGE
Check for earthing of the Panel body.
TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

To protect an electrical circuit from damage VISUAL,


caused by excess current from an overload or COTTON
short circuit. Its basic function is to interrupt CLOTHE,
current flow after a fault is detected. MULTIMETER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT
SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

UPS provides emergency power to a load


when the input power source or mains power VISUAL
fails.

UPS provides emergency power to a load


when the input power source or mains power VISUAL
fails.
Blower Cubicle cabinet helps to synchronize
Blower UPS #1 & UPS #2 and Bypass VISUAL
supply.

Power Supply Unit distributes energy to the


Processor card and the I/O modules. It has a
+5V DC output supply which together with VISUAL /
an input-voltage supply (AC ready) and an MULTIMETER
output-voltage supply (DC ready) provides
power back-up to the system.

CPU controls or monitors all the components


which are distributed throughout the system.
VISUAL
It generally composed of the main memory,
control unit, and arithmetic-logic unit.

MULTIMETER /
ON / OFF Control System is two states fully
SOURCE
ON and Fully OFF
METER
Open Loop Control is to produce desired MULTIMETER /
response to the actuators independently SOURCE
calculates control outputs. METER
Feed forward control is implemented to
reduce the effect of Input disturbance on MULTIMETER /
process. A sensor in this system detects the SOURCE
disturbances or any load changes in the METER
process.
Close loop control system is implementd in MULTIMETER /
the output measurement as a feedback signal SOURCE
is found. METER
Analog input modules facilitate connection
of the controller to the analog signals of a
process. They are suitable for connecting
VISUAL /
analog sensors such as voltage and current
MULTIMETER
sensors, thermocouples, resistors and
resistance thermometers as well as analog
actuators.

Analog output modules convert a 16-bit


digital value into a current or a voltage and
VISUAL /
output this to the process. They are suitable
MULTIMETER
for controlling proportional valves or small
servo drives.

Digital input modules contain digital inputs


for the automation system. Digital sensors VISUAL /
and actuators can be connected to the MULTIMETER
automation system via these modules.

This digital output module transmits control


VISUAL /
signals of 24 VDC from the automation
MULTIMETER
device to the connected actuators.

The communication cards OR Modules are


used to realize the generalpurpose
VISUAL /
communication of field control station and
SOFTWARE
subsystems via serial links, so that the
subsystem may be controlled or monitored.
HMI OR SCADA monitor entire plant
parameters graphically and to log the data in
VISUAL /
plant database systems. Trend display of
SOFTWARE
various process parameters provides the
effective display and easy monitoring.

UPS provides emergency power to a load


when the input power source or mains power VISUAL
fails.

UPS provides emergency power to a load


when the input power source or mains power VISUAL
fails.

check for Relay heathyness of oil pump to Screw Drivers,


start Multimeter

check for Relay heathyness of oil pump to Screw Drivers,


start Multimeter

check for Relay heathyness of Barring Gear Screw Drivers,


Motor to start Multimeter

check for Relay heathyness of oil pump to Screw Drivers,


start Multimeter

check for Relay heathyness of oil pump to Screw Drivers,


start Multimeter

check for Relay heathyness of Barring Gear Screw Drivers,


Motor to start Multimeter

check for Relay heathyness of Bleed Valve Screw Drivers,


Motor to start Multimeter
check for Relay heathyness of Bleed Valve Screw Drivers,
Motor to start Multimeter

check for Relay heathyness of IGV Motor to Screw Drivers,


start Multimeter

check for Relay heathyness of IGV Motor to Screw Drivers,


start Multimeter

check for Relay heathyness of OUTLET Screw Drivers,


VALVE Motor to start Multimeter

check for Relay heathyness of OUTLET Screw Drivers,


VALVE Motor to start Multimeter

check for Positioner to rotate control valve


according to command given by the PLC Multi meter
Analog input

check for Feedback postion of the valve Multi meter

check for set position of the valve Multi meter

check to Execute command and Feedback


Multi meter
According to set point by progamming Logic

check for Communication between PLC and


Multi meter
Analog Input and output Cards

check for Supply to Communication and I/O


Multi meter
Cards

check for supply to PLC And SMPS Multi meter

check for Command to Positioner and get


Multi meter
Feedback from positioner to PLC

check Sufficient Pressure to Positioner VIsual


check sufficient air to operate Positioner VIsual

check Pressure up to Regulator of the


VIsual
Positioner From Air Receiving Tank

check for Open/ Close command Multi meter

check for Open/ Close command Multi meter

check for Feedback postion of the valve Multi meter

Check for Open/ Close command Multi meter

check to Execute command and Feedback


Multi meter
According to set point by progamming Logic

check for Communication between PLC and


Multi meter
Analog Input and output Cards

check for supply to PLC And SMPS Multi meter

check for Command to Positioner and get


Multi meter
Feedback from positioner to PLC

check for Open/ Close command Multi meter

check for Feedback postion of the valve Multi meter

Check for Open/ Close command Multi meter

check to Execute command and Feedback


Multi meter
According to set point by progamming Logic

check for Communication between PLC and


Multi meter
Analog Input and output Cards
check for supply to PLC And SMPS Multi meter

check for Command to Positioner and get


Multi meter
Feedback from positioner to PLC

Check for vibration of compressor Multi meter

Check for Temparature of Motor winding,


Bearing of Blower,Gear Box and OIL Multi meter
Tempararture
TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

Contactor rarting to be 32A.


Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 35-45
ohms.

Relay Range :
23 A - 32 A
SHUTDOWN CHECK
Relay settings = 23A
FLC = 27.5A

The auxiliary contctactor is used to


provide tripping indication whenever
SHUTDOWN CHECK
the lube oil pump will trip or power
fails.

Contactor rarting to be 32A.


Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 35-45
ohms.
Relay Range :
23 A - 32 A
SHUTDOWN CHECK
Relay settings = 23A
FLC = 27.5A
The auxiliary contctactor is used to
provide tripping indication whenever
SHUTDOWN CHECK
the lube oil pump will trip or power
fails.
Contactor rarting to be 22A.
Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 35-45
ohms.
Softstarter should clean. Check the
SHUTDOWN CHECK tighteness of the power and
control cable.
Contactor rarting to be 32A.
Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 35-45
ohms.
Relay Range :
23 A - 32 A
SHUTDOWN CHECK
Relay settings = 23A
FLC = 27.5A
The auxiliary contctactor is used to
provide tripping indication whenever
SHUTDOWN CHECK
the lube oil pump will trip or power
fails.

Contactor rarting to be 32A.


Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 35-45
ohms.
Relay Range :
23 A - 32 A
SHUTDOWN CHECK
Relay settings = 23A
FLC = 27.5A
The auxiliary contctactor is used to
provide tripping indication whenever
SHUTDOWN CHECK
the lube oil pump will trip or power
fails.
Contactor rarting to be 22A.
Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 35-45
ohms.
Softstarter should clean. Check the
SHUTDOWN CHECK tighteness of the power and
control cable.
Contactor rarting to be 65A.
Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 25-35
ohms.

Contactor rarting to be 32A.


Proper tighteness of foundation of
contactor.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts and proper fitting to
be done.
Coil resistance should be 25-35
ohms.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.
Interlock of Earth Switch and HT
Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

Vertical and Horizontal insulators


should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.

HT Vacuum Contactor should be


clean. There should not be any
moisture or wear and rusting of
contacts.

Condition of contact should be proper.


Vacuum inside bottles should be
normal.
SHUTDOWN CHECK Insulation resistance between Upper
& Lower contacts should be OL
Ohms
Insulation resistance between Phase
to Phase should be OL Ohms
Insulation resistance between Phase
to Earth should be OL Ohms
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

Interlock of Earth Switch and HT


Breaker should be healthy. HT
Breaker should not Rack In during
SHUTDOWN CHECK Earth Switch operated condition.
Also, Back Door of HT Panel should
not be open when earth switch is not
operated.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A

Vertical and Horizontal insulators


should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.

HT Breaker should be clean. There


should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
SHUTDOWN CHECK & Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Timing of CB during Close should be


in ms of all three phases.
Timing of CB during Open should be
in ms of all three phases.
Timing of CB during Close / Open
should be in ms of all three phases.
Contact Resistance between Upper
and Lower contacts should be in
micro ohms of all three phases.

HVAC Test for 15 KV should


withstand for min. of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.
Insulation resistance between Phase
to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

RUN CHECK Earthing should be healthy.


No oxydation and moisture inside
RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.

HT Softstarter should be clean. There


should not be any moisture or wear
and rusting of contacts.
SHUTDOWN CHECK
Thyristors Resistances of all three
phases of HT Softstarter should be in
2 digit nos.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.
CT connections should be tight and
should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Softstarter should be clean. There
should not be any moisture or wear
and rusting of contacts.
SHUTDOWN CHECK
Thyristors Resistances of all three
phases of HT Softstarter should be in
2 digit nos.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.
Tightened with 12mm high tensile
SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Healthiness of Incoming Main Power,


Outgoing Power, Battery Voltage
SHUTDOWN CHECK Indication should be healthy.

Voltage should be 113 VDC and


Current should be <1.5 A

Healthiness of Incoming Main Power,


Outgoing Power, Battery Voltage
SHUTDOWN CHECK Indication should be healthy.

Voltage should be 113 VDC and


Current should be <1.5 A
Healthiness of Incoming Main Power
Supply of UPS #1, Incoming Main
Power Supply of UPS #2 and Bypass
SHUTDOWN CHECK supply Indication should be healthy.

Voltage should be 113 VDC and


Current should be <1.5 A

UPS should distribute voltage to CPU


STOP CHECK and I/O modules of +5 VDC and
should provide back up to the system.

CPU should control logic, monitor the


parameters and communicate to
different I/O modules. In
programming mode it should accept
the downloaded logic from a PC. In
RUN CHECK / STOP CHECK run mode, the GREEN LED should
continuously blink and it should
execute the program and operate the
process. It should be more reliable
and highly efficient to run the
program.

RUN CHECK Process System should be normal.

RUN CHECK Process System should be normal.

RUN CHECK Process System should be normal.

RUN CHECK Process System should be normal.


It should provide High-resolution and
high-precision module
for detecting currents and voltages It
should record temperatures
via resistance type
transmitters (RTD) including
characteristic-curve linearization.
RUN CHECK / STOP CHECK Analog input card should convert a
voltage or current (e.g. a signal that
can be anywhere from 0 to 20mA OR
0 to 10 VDC) into a digitally
equivalent number that can be
understood by the CPU. In run mode,
the GREEN LED should be
displayed.

It should provide High-speed


resolution and accuracy. It should
provide universal hybrid for the
RUN CHECK / STOP CHECK acquisition and output of currents
and voltages, i.e., 0 to 10 VDC OR 4
to 20 ma. In run mode, the GREEN
LED should be displayed.

It should record frequently required


signals of 24 VDC with high channel
RUN CHECK / STOP CHECK
density. In run mode, the GREEN
LED should be displayed.

It should have Very fast module,


especially for isochronous
applications. It should have
Comprehensive control functions,
RUN CHECK / STOP CHECK in particular for use in a
process-oriented environment;
integrated diode for
redundant interconnection of
the outputs.
It should exchange messages in or
between modules. It should be
operational immediately and do not
have to be rewritten when another
RUN CHECK reader type is used. Communications
protocols cover authentication, error
detection and correction, and
signaling. In run mode, the GREEN
LED should be displayed.
It should Control industrial processes
locally or at remote locations.
RUN CHECK
Monitor, gather, and process real-time
data very fast and accurate.

Healthiness of Incoming Main Power,


Outgoing Power, Battery Voltage
SHUTDOWN CHECK Indication should be healthy.

Voltage should be 113 VDC and


Current should be <1.5 A

Healthiness of Incoming Main Power,


Outgoing Power, Battery Voltage
SHUTDOWN CHECK Indication should be healthy.

Voltage should be 113 VDC and


Current should be <1.5 A

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.
No abnormalities to be seen for
SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

No abnormalities to be seen for


SHUTDOWN CHECK
the contacts.

SHUTDOWN CHECK No leakages found

RUN, Get 4.00 mA

RUN Get 4.00 mA

RUN No fault LED will Glow

RUN No fault LED will Glow

RUN Get 24 Volt output

RUN Get 230 Volt

RUN No damage

RUN Pressure Showing 4.0 Kg/cm2


RUN Provide 5.0 Kg/Cm2

RUN No leakages found

No abnormalities to be seen for


RUN the contacts.

No abnormalities to be seen for


RUN the contacts.

RUN No fault LED will Glow

RUN No fault LED will Glow

RUN No fault LED will Glow

RUN No fault LED will Glow

RUN Volatage Between 220 to 240 Volt

RUN No damage

No abnormalities to be seen for


RUN the contacts.

RUN No fault LED will Glow

RUN No fault LED will Glow

RUN No fault LED will Glow

RUN No fault LED will Glow


RUN Volatage Between 220 to 240 Volt

RUN No damage

SHUTDOWN CHECK No damage

SHUTDOWN CHECK No damage


ACTUAL CONDITION OBSERVED ACTION
ON 12.04.2018 REQUIRED

Contactor rarting is 32A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 39 ohms.

Checked Relay Range :


23 A - 32 A
Relay settings = 23A
RC = 12.2A

Indication for tripping of lube oil pump


is healthy.

Contactor rarting is 32A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 39.5 ohms.

Checked Relay Range :


23 A - 32 A
Relay settings = 23A
RC = 13.2A

Indication for tripping of lube oil pump


is healthy.
Contactor rarting is 22A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 41 ohms.

Softstarter is clean. Tighteness of


the power and control cable is
normal.

Contactor rarting is 32A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 39.5 ohms.

Checked Relay Range :


23 A - 32 A
Relay settings = 23A
RC = 13.2A

Indication for tripping of lube oil pump


is healthy.

Contactor rarting is 32A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 39.5 ohms.

Checked Relay Range :


23 A - 32 A
Relay settings = 23A
RC = 13.7A

Indication for tripping of lube oil pump


is healthy.
Contactor rarting is 22A. No
looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 41.8 ohms.

Softstarter is clean. Tighteness of


the power and control cable is
normal.

Contactor rarting is 65A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 29.2 ohms.

Contactor rarting is 65A. No


looseness in fitting of contactor and
connection of cables to power
contactor and its contacts. Coil
resistance is 29 ohms.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.
Interlock of Earth Switch and HT
Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Vacuum Contactor found clean.


There is no moisture or wear and
rusting of contacts.

Condition of contact is proper.

Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is OL Ohms

Insulation resistance between Phase to


Phase is OL Ohms
Insulation resistance between Phase to
Earth is OL Ohms
Contact Resistance between Upper and
Lower contacts is 44 micro ohms of all
three phases.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Interlock of Earth Switch and HT


Breaker is healthy. HT Breaker do not
Rack In during Earth Switch operated
condition. Also, Back Door of HT
Panel has not been open when earth
switch is not operated.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Timing of CB during Close is 48 ms of


all three phases.
Timing of CB during Open is 41 ms of
all three phases.
Timing of CB during Close / Open is 21
ms of all three phases.
Contact Resistance between Upper and
Lower contacts is 45 micro ohms of all
three phases.

HVAC Test for 15 KV withstand for


min. of all three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.
Insulation resistance between Phase to
Phase is 1100 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0017

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Earthing is connected to the body and


to the Earth Pit.
No oxydation and moisture inside
panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Softstarter found clean. There is no


moisture or wear and rusting of
contacts.

All thyristors resistances are in double


digit nos. between 11 to 13 ohms.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1000 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0029

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.
CT connections are tight and display
accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.25 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Softstarter found clean. There is no


moisture or wear and rusting of
contacts.

All thyristors resistances are in double


digit nos. between 11 to 13 ohms.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.
No looseness of the bolts and
connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1000 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0030

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

Incoming Main Power, Outgoing


Power, Battery Voltage Indication is
healthy.

Voltage is 113 VDC and Current is 0.5


A

Incoming Main Power, Outgoing


Power, Battery Voltage Indication is
healthy.

Voltage is 113 VDC and Current is 0.45


A
Incoming Main Power Supply of UPS
#1, Incoming Main Power Supply of
UPS #2 and Bypass supply Indication is
healthy.

Voltage is 113 VDC and Current is 0.5


A

UPS is healthy and distributes +5 VDC


and provides back up to the system.

CPU reads and control logic, monitor


the parameters and communicate to
different I/O modules. In programming
mode it accepts the downloaded logic
from a PC. In run mode, GREEN led is
blinking continuously and it execute the
program and operate the process. It is
reliable and highly efficient to run the
program.

Process system is normal.

Process system is normal.

Process system is normal.

Process system is normal.


It has High-resolution and high-
precision module for detecting currents
and voltages. It record temperatures via
resistance type
transmitters (RTD) including
characteristic-curve linearization.
Analog input card converts a voltage or
current (e.g. a signal that can be
anywhere from 0 to 20mA OR 0 to 10
VDC) into a digitally equivalent
number to the CPU. In run mode, the
GREEN LED is displayed.

It has High-speed resolution and


accuracy. It provides universal hybrid
for the acquisition and output of
currents and voltages, i.e., 0 to 10 VDC
OR 4 to 20 ma. In run mode, the
GREEN LED is displayed.

It records signals of 24 VDC with high


channel density. In run mode, the
GREEN LED is displayed.

It is very fast module, especially for


isochronous applications. It should
have Comprehensive control functions,
in particular for use in a
process-oriented environment.

It exchange messages in or between


modules. It operates immediately and
do not rewrite when another reader type
is used. Communications protocols
cover authentication, error detection
and correction, and signaling. In run
mode, the GREEN LED is displayed.
It controls industrial processes locally
or at remote locations. Monitor, gather,
and process real-time data very fast and
accurate.

Incoming Main Power, Outgoing


Power, Battery Voltage Indication is
healthy.

Voltage is 113 VDC and Current is 0.5


A

Incoming Main Power, Outgoing


Power, Battery Voltage Indication is
healthy.

Voltage is 113 VDC and Current is 0.45


A

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.
No abnormalities to be seen for the
contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

No abnormalities to be seen for the


contacts.

Condition to
No leakages found
be maintained

Condition to
Get 4.00 mA
be maintained

Condition to
Get 4.00 mA
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
Get 24 Volt output
be maintained

Condition to
Get 230 Volt
be maintained

Condition to
No damage
be maintained

Condition to
Pressure Showing 4.0 Kg/cm3
be maintained
Condition to
Provide 5.0 Kg/Cm2
be maintained

Condition to
No leakages found
be maintained

No abnormalities to be seen for the


Condition to
contacts.
be maintained

No abnormalities to be seen for the


Condition to
contacts.
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
Volatage Between 220 to 240 Volt
be maintained

Condition to
No damage
be maintained

No abnormalities to be seen for the


Condition to
contacts.
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
No fault LED will Glow
be maintained

Condition to
No fault LED will Glow
be maintained
Condition to
Volatage Between 220 to 240 Volt
be maintained

Condition to
No damage
be maintained

Condition to
No damage
be maintained

Condition to
No damage
be maintained
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

CWPS
CWPS
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
#1

CWPS
CWPS
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
#1

CWPS
CWPS
TRANSFORMER TRANSFORMER BREATHER 3101190015
#1

CWPS
CWPS
TRANSFORMER TRANSFORMER CONSERVATOR TANK
#1

CWPS
CWPS
TRANSFORMER TRANSFORMER BUCHOLTZ RELAY
#1

CWPS
CWPS
TRANSFORMER TRANSFORMER HT TERMINAL BOX
#1
CWPS
CWPS
TRANSFORMER TRANSFORMER LT TERMINAL BOX
#1

CWPS
CWPS
TRANSFORMER TRANSFORMER OFF LOAD TAP CHANGER
#1

CWPS
CWPS NEUTRAL EARTH ING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
#1

CWPS
CWPS BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
#1

CWPS
CWPS
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
#2

CWPS
CWPS
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
#2

CWPS
CWPS
TRANSFORMER TRANSFORMER BREATHER 3101190015
#2
CWPS
CWPS
TRANSFORMER TRANSFORMER CONSERVATOR TANK
#2

CWPS
CWPS
TRANSFORMER TRANSFORMER BUCHOLTZ RELAY
#2

CWPS
CWPS
TRANSFORMER TRANSFORMER HT TERMINAL BOX
#2

CWPS
CWPS
TRANSFORMER TRANSFORMER LT TERMINAL BOX
#2
TRANSFORMER #2

CWPS
CWPS
TRANSFORMER TRANSFORMER OFF LOAD TAP CHANGER
#2

CWPS
CWPS NEUTRAL EARTH ING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
#2

CWPS
CWPS BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
#2
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
VISUAL / OIL
TEMPERATURE &
FOR COOLING OF WINDING RUN CHECK
TRANSFORMER WINDINGS TEMPERATURE
GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

FOR PROTECTION OF VISUAL RUN CHECK


TRASFORMER

Allows the HT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SPANNERS /
protecton from short circuiting TORQUE
SHUTDOWN
of cables. CHECK
Check for cable termination
WRENCH
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide TAN-DELTA SHUTDOWN
uninterrupted power supply to TEST KIT CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK
HT cable lugs should be proper
tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

VOLTAGE TAP CHANGING OF SHUTDOWN


VISUAL
TRANSFORMER OFF LOAD CHECK

TO PROVIDE NEUTRAL
EARTHING OF THE VISUAL RUN CHECK
TRANSFORMER

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER

FOR COOLING AND INSULATION VISUAL / OIL


TEMPERATURE RUN CHECK
OF TRANSFORMER WINDINGS GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS
SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS
TO PROVIDE ADEQUATE SPACE
FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

FOR PROTECTION OF VISUAL RUN CHECK


TRASFORMER

Allows the HT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide TAN-DELTA SHUTDOWN
uninterrupted power supply to TEST KIT CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SHUTDOWN
protecton from short circuiting SPANNERS CHECK
of cables.
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK
LT cable lugs should be proper SPANNERS /
tight and condition should be SHUTDOWN
healthy. There should be no TORQUE
CHECK
worn out of lugs. WRENCH

VOLTAGE TAP CHANGING OF VISUAL


SHUTDOWN
TRANSFORMER OFF LOAD CHECK
TO PROVIDE NEUTRAL
EARTHING OF THE VISUAL RUN CHECK
TRANSFORMER

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON
IDEAL CONDITION 05.09.2018

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 2000 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.007

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

TRANSFORMER TRIPPING SHOULD BE TRANSFORMER TRIPPED BY BUCHOLTZ RELAY


HEALTHY BY BUCHOLTZ RELAY

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

TAN-DELTA test of HT Cable should TAN-DELTA test of HT Cable is


be < 0.004 absolute. 0.0017

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs
HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.

TAP CHANGER SHOULD BE IN WORKING TAP CHANGER IS IN WORKING CONDITION


CONDITION

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 1800 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.010

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE


OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

TRANSFORMER TRIPPING SHOULD BE TRANSFORMER TRIPPED BY BUCHOLTZ RELAY


HEALTHY BY BUCHOLTZ RELAY

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

TAN-DELTA test of HT Cable should TAN-DELTA test of HT Cable is


be < 0.004 absolute. 0.0010

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

NO LOOSENESS OF BOLTS BOLTS ARE ALL TIGHT BY SPANNERS

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs
Tightened with 10mm high tensile No looseness of the bolts and
stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

TAP CHANGER SHOULD BE IN WORKING TAP CHANGER IS IN WORKING CONDITION


CONDITION

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY
ACTION REQUIRED
EQUIPMENT: Sub Equipments COMPONENT

UNINTERRUPTIBLE
POWER SUPPLY

CENTRAL PROCESSING
UNIT

ON/OFF CONTROL
SYSTEM

OPEN LOOP CONTROL


SYSTEM

FEED FORWARD
CONTROL SYSTEM

CLOSE LOOP CONTROL


SYSTEM
ANALOG INPUT MODULE

DISTRIBUTED
CONTROL
SYSTEM

ANALOG OUTPUT
MODULE

DISTRIUTED
CONTROL
SYSTEM

DIGITAL INPUT MODULE


DIGITAL OUTPUT
MODULE

COMMUNICATION
MODULE

HUMAN MACHINE
INTERFACE OR SCADA

DCS HUMAN
HUMAN INTERFACE
INTERFACE
STATION
STATION

DCS UPS#1

DCS UPS

DCS UPS#2
DCS UPS#2

BF3-O2N2- O2N2-DCS-ANSR ONLINE ANALYSER-CO2


MAC
BF3-O2N2- O2N2-DCS-ANSR ONLINE ANALYSER-N2
MAC
BF3-O2N2- O2N2-DCS-ANSR ONLINE ANALYSER-O2
MAC
DESCRIPTION / DIMENSION TOOLS REQUIRED

Power Supply Unit distributes energy to the


Processor card and the I/O modules. It has a
+5V DC output supply which together with VISUAL /
an input-voltage supply (AC ready) and an MULTIMETER
output-voltage supply (DC ready) provides
power back-up to the system.

CPU controls or monitors all the components


which are distributed throughout the system.
VISUAL
It generally composed of the main memory,
control unit, and arithmetic-logic unit.

ON / OFF Control System is two states fully MULTIMETER /


ON and Fully OFF SOURCE METER

Open Loop Control is to produce desired


MULTIMETER /
response to the actuators independently
SOURCE METER
calculates control outputs.

Feed forward control is implemented to


reduce the effect of Input disturbance on
MULTIMETER /
process. A sensor in this system detects the
SOURCE METER
disturbances or any load changes in the
process.
Close loop control system is implementd in
MULTIMETER /
the output measurement as a feedback signal
SOURCE METER
is found.
Analog input modules facilitate connection
of the controller to the analog signals of a
process. They are suitable for connecting
VISUAL /
analog sensors such as voltage and current
MULTIMETER
sensors, thermocouples, resistors and
resistance thermometers as well as analog
actuators.

Analog output modules convert a 16-bit


digital value into a current or a voltage and
VISUAL /
output this to the process. They are suitable
MULTIMETER
for controlling proportional valves or small
servo drives.

Digital input modules contain digital inputs


for the automation system. Digital sensors VISUAL /
and actuators can be connected to the MULTIMETER
automation system via these modules.
This digital output module transmits control
VISUAL /
signals of 24 VDC from the automation
MULTIMETER
device to the connected actuators.

The communication cards OR Modules are


used to realize the generalpurpose
VISUAL /
communication of field control station and
SOFTWARE
subsystems via serial links, so that the
subsystem may be controlled or monitored.

HMI OR SCADA monitor entire plant


parameters graphically and to log the data in
VISUAL /
plant database systems. Trend display of
SOFTWARE
various process parameters provides the
effective display and easy monitoring.

The human interface system programmed


for a project/plan is designed in such a way
VISUAL /
that it would be easy for the operator to
SOFTWARE
understand all the operations occurred in the
plant.

UPS provides emergency power to a load


when the input power source or mains power VISUAL
fails.

UPS provides emergency power to a load


when the input power source or mains power VISUAL
fails.
UPS provides emergency power to a load
when the input power source or mains power VISUAL
fails.

CHECK FOR PPM OF CO2 IN DRY AIR Multimeter

CHECK FOR PPM O2 IN GAN PRODUCT Multimeter

CHECK FOR %O2 IN GOX PRODUCT Multimeter


TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

UPS should distribute voltage to CPU


STOP CHECK and I/O modules of +5 VDC and
should provide back up to the system.

CPU should control logic, monitor the


parameters and communicate to
different I/O modules. In
programming mode it should accept
the downloaded logic from a PC. In
RUN CHECK / STOP CHECK run mode, the GREEN LED should
continuously blink and it should
execute the program and operate the
process. It should be more reliable
and highly efficient to run the
program.

RUN CHECK Process System should be normal.

RUN CHECK Process System should be normal.

RUN CHECK Process System should be normal.

RUN CHECK Process System should be normal.


It should provide High-resolution and
high-precision module
for detecting currents and voltages It
should record temperatures
via resistance type
transmitters (RTD) including
characteristic-curve linearization.
RUN CHECK / STOP CHECK Analog input card should convert a
voltage or current (e.g. a signal that
can be anywhere from 0 to 20mA OR
0 to 10 VDC) into a digitally
equivalent number that can be
understood by the CPU. In run mode,
the GREEN LED should be
displayed.

It should provide High-speed


resolution and accuracy. It should
provide universal hybrid for the
RUN CHECK / STOP CHECK acquisition and output of currents
and voltages, i.e., 0 to 10 VDC OR 4
to 20 ma. In run mode, the GREEN
LED should be displayed.

It should record frequently required


signals of 24 VDC with high channel
RUN CHECK / STOP CHECK
density. In run mode, the GREEN
LED should be displayed.
It should have Very fast module,
especially for isochronous
applications. It should have
Comprehensive control functions,
RUN CHECK / STOP CHECK in particular for use in a
process-oriented environment;
integrated diode for
redundant interconnection of
the outputs.

It should exchange messages in or


between modules. It should be
operational immediately and do not
have to be rewritten when another
RUN CHECK reader type is used. Communications
protocols cover authentication, error
detection and correction, and
signaling. In run mode, the GREEN
LED should be displayed.

It should Control industrial processes


locally or at remote locations.
RUN CHECK
Monitor, gather, and process real-time
data very fast and accurate.

It should Control industrial processes


locally or at remote locations.
RUN CHECK
Monitor, gather, and process real-time
data very fast and accurate.

Healthiness of Incoming Main Power,


Outgoing Power, Battery Voltage
SHUTDOWN CHECK Indication should be healthy.

Voltage should be 113 VDC and


Current should be <1.5 A

Healthiness of Incoming Main Power,


Outgoing Power, Battery Voltage
SHUTDOWN CHECK Indication should be healthy.
SHUTDOWN CHECK
Voltage should be 113 VDC and
Current should be <1.5 A

RUN CHECK 0.0 PPM

RUN CHECK 240 PPM

RUN CHECK 90.00%


ACTUAL CONDITION OBSERVED ACTION
ON 15.04.2018 REQUIRED

UPS is healthy and distributes +5 VDC


and provides back up to the system.

CPU reads and control logic, monitor


the parameters and communicate to
different I/O modules. In programming
mode it accepts the downloaded logic
from a PC. In run mode, GREEN led is
blinking continuously and it execute the
program and operate the process. It is
reliable and highly efficient to run the
program.

Process system is normal.

Process system is normal.

Process system is normal.

Process system is normal.


It has High-resolution and high-
precision module for detecting currents
and voltages. It record temperatures via
resistance type
transmitters (RTD) including
characteristic-curve linearization.
Analog input card converts a voltage or
current (e.g. a signal that can be
anywhere from 0 to 20mA OR 0 to 10
VDC) into a digitally equivalent
number to the CPU. In run mode, the
GREEN LED is displayed.

It has High-speed resolution and


accuracy. It provides universal hybrid
for the acquisition and output of
currents and voltages, i.e., 0 to 10 VDC
OR 4 to 20 ma. In run mode, the
GREEN LED is displayed.

It records signals of 24 VDC with high


channel density. In run mode, the
GREEN LED is displayed.
It is very fast module, especially for
isochronous applications. It should
have Comprehensive control functions,
in particular for use in a
process-oriented environment.

It exchange messages in or between


modules. It operates immediately and
do not rewrite when another reader type
is used. Communications protocols
cover authentication, error detection
and correction, and signaling. In run
mode, the GREEN LED is displayed.

It controls industrial processes locally


or at remote locations. Monitor, gather,
and process real-time data very fast and
accurate.

It controls industrial processes locally


or at remote locations. Monitor, gather,
and process real-time data very fast and
accurate.

Incoming Main Power, Outgoing


Power, Battery Voltage Indication is
healthy.

Voltage is 113 VDC and Current is 0.5


A

Incoming Main Power, Outgoing


Power, Battery Voltage Indication is
healthy.
Voltage is 113 VDC and Current is 0.45
A

0.0 PPM

150 PPM

90.00%
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

MAIN CONTROL MAIN CONTROL


BUILDING
BUILDING TRANSFORMER OIL 102040004
TRANSFORMER TRANSFORMER
#1

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER HT AND LT WINDINGS
BUILDING
TRANSFORMER #1

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER BREATHER
BUILDING 3101190015
TRANSFORMER #1

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER CONSERVATOR TANK
BUILDING
TRANSFORMER #1

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER BUCHOLTZ RELAY
BUILDING
TRANSFORMER #1

MAIN CONTROL MAIN CONTROL


BUILDING
BUILDING HT TERMINAL BOX
TRANSFORMER TRANSFORMER
#1
MAIN CONTROL BUILDING
BUILDING TRANSFORMER HT TERMINAL BOX
TRANSFORMER #1

MAIN CONTROL MAIN CONTROL


BUILDING
BUILDING LT TERMINAL BOX
TRANSFORMER TRANSFORMER
#1

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER AIR BREAK SWITCH
BUILDING
TRANSFORMER #1

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER OFF LOAD TAP CHANGER
BUILDING
TRANSFORMER #1

MAIN CONTROL
MAIN CONTROL BUILDING NEUTRAL EARTH ING EARTH PIT
BUILDING TRANSFORMER CONNECTION
TRANSFORMER #1

MAIN CONTROL
MAIN CONTROL BUILDING BODY EARTHING EARTH PIT
BUILDING TRANSFORMER CONNECTION
TRANSFORMER #1
MAIN CONTROL MAIN CONTROL
BUILDING
BUILDING TRANSFORMER OIL 102040004
TRANSFORMER TRANSFORMER
#2

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER HT AND LT WINDINGS
BUILDING
TRANSFORMER #2

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER BREATHER
BUILDING 3101190015
TRANSFORMER #2

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER CONSERVATOR TANK
BUILDING
TRANSFORMER #2

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER BUCHOLTZ RELAY
BUILDING
TRANSFORMER #2

MAIN CONTROL MAIN CONTROL


BUILDING
BUILDING HT TERMINAL BOX
TRANSFORMER TRANSFORMER
#2
MAIN CONTROL MAIN CONTROL
BUILDING
BUILDING LT TERMINAL BOX
TRANSFORMER TRANSFORMER
#2

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER AIR BREAK SWITCH
BUILDING
TRANSFORMER #2

MAIN CONTROL
MAIN CONTROL BUILDING
TRANSFORMER OFF LOAD TAP CHANGER
BUILDING
TRANSFORMER #2

MAIN CONTROL
MAIN CONTROL BUILDING NEUTRAL EARTH ING EARTH PIT
BUILDING TRANSFORMER CONNECTION
TRANSFORMER #2

MAIN CONTROL
MAIN CONTROL BUILDING BODY EARTHING EARTH PIT
BUILDING TRANSFORMER CONNECTION
TRANSFORMER #2
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
FOR COOLING AND INSULATION VISUAL / OIL RUN CHECK
OF TRANSFORMER WINDINGS TEMPERATURE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

FOR PROTECTION OF VISUAL RUN CHECK


TRASFORMER

Allows the HT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide TAN-DELTA SHUTDOWN
uninterrupted power supply to TEST KIT CHECK
Power Transformer.
There should be no oxydation of VISUAL SHUTDOWN
bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

ISOLATION AS WELL AS
INTERLOCK BETWEEN SHUTDOWN
LIMIT SWITCH
TRANSFORMER AND HT CHECK
BREAKER

VOLTAGE TAP CHANGING OF SHUTDOWN


VISUAL
TRANSFORMER OFF LOAD CHECK

TO PROVIDE NEUTRAL
EARTHING OF THE VISUAL RUN CHECK
TRANSFORMER

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
FOR COOLING AND INSULATION VISUAL / OIL RUN CHECK
OF TRANSFORMER WINDINGS TEMPERATURE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS
SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

FOR PROTECTION OF VISUAL RUN CHECK


TRASFORMER

Allows the HT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide TAN-DELTA SHUTDOWN
uninterrupted power supply to TEST KIT CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK
HT cable lugs should be proper
tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

ISOLATION AS WELL AS
INTERLOCK BETWEEN SHUTDOWN
LIMIT SWITCH
TRANSFORMER AND HT CHECK
BREAKER

VOLTAGE TAP CHANGING OF SHUTDOWN


VISUAL
TRANSFORMER OFF LOAD CHECK

TO PROVIDE NEUTRAL
EARTHING OF THE VISUAL RUN CHECK
TRANSFORMER

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON ACTION
IDEAL CONDITION 05.09.2018 REQUIRED

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 41


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 1500 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.011

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

TRANSFORMER TRIPPING SHOULD BE TRANSFORMER TRIPPED BY BUCHOLTZ RELAY


HEALTHY BY BUCHOLTZ RELAY

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

TAN-DELTA test of HT Cable should TAN-DELTA test of HT Cable is


be < 0.004 absolute. 0.0031
No oxydation or moisture of bushings and No oxydation or moisture of bushings and
cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.

AIR BREAK SWITCH SHOULD BE IN WORKING AIR BREAK SWITCH IS IN WORKING


CONDITION CONDITION

TAP CHANGER SHOULD BE IN WORKING TAP CHANGER IS IN WORKING CONDITION


CONDITION

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY
OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 43
TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 1200 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.0112

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

TRANSFORMER TRIPPING SHOULD BE TRANSFORMER TRIPPED BY BUCHOLTZ RELAY


HEALTHY BY BUCHOLTZ RELAY

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

TAN-DELTA test of HT Cable should TAN-DELTA test of HT Cable is


be < 0.004 absolute. 0.0023

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs
HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.

AIR BREAK SWITCH SHOULD BE IN WORKING AIR BREAK SWITCH IS IN WORKING


CONDITION CONDITION

TAP CHANGER SHOULD BE IN WORKING


TAP CHANGER IS IN WORKING CONDITION
CONDITION

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY
EQUIPMENT: Sub Equipments COMPONENT

HT PANEL BUSBARS

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR

HT BREAKER
HT BREAKER

INCOMER OF
O2N2 MCC
O2N2 FROM 11KV
PANEL ROOM
HT BLOWER PCC

HT NUMERICAL
PROTECTIVE MICOM
RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

MAIN AIR
O2N2 MCC
COMPRESSOR HT
PANEL ROOM
BREAKER

HT NUMERICAL
PROTECTIVE MICOM
RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTHING

HT PANEL SPACE HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
HT BREAKER

OUTGOING TO
O2N2 MCC
O2N2 11KV
PANEL ROOM
TRANSFORMER

HT NUMERICAL
PROTECTIVE MICOM
RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

LT PANEL BUSBARS

LT PANEL EARTHING

LT PANEL SPACE HEATER

LT PANEL BUSBAR
HORIZONTAL AND
VERTICAL INSULATOR
LT SIEMENS BREAKER

O2N2 MCC LT INCOMER OF


PANEL ROOM O2N2 MCC PANEL

LT PROTECTIVE RELAY

INCOMING LT CABLE
FROM O2N2
TRANSFORMER TO LT
BREAKER
POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER

BATTERY CHARGER

BATTERIES 2V

BATTERY CHARGER
INCOMING POWER
SUPPLY INDICATOR
BATTERY CHARGER
ANALOG AMMETER

BATTERY CHARGER
ANALOG VOLTMETER

O2N2 MCC BATTERY


PANEL ROOM CHARGER PANEL
BATTERY CHARGER
O2N2 MCC BATTERY INCOMING VOLTAGE
PANEL ROOM CHARGER PANEL ANALOG VOLTMETER

LT PANEL EARTHING

LT PANEL BUSBAR
HORIZONTAL

PROTECTIVE RELAY

POTENTIAL
TRANSFORMER

CURRENT TRANSFORMER
TOOLS
DESCRIPTION / DIMENSION
REQUIRED

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.

Check for proper cleanliness of the busbar


insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.

Check for megger value of Busbar and panel


HT MEGGER
body.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.

VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
HT MEGGER
body.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and HT Breaker Terminals.
WRENCH

Check for megger value of HT Cable phase


MEGGER
to phae and phase to earth.

Check for partial discharge test of HT Cable TAN-DELTA


for HT Cable insualtion testing. TEST KIT
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the HT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Check for proper tigteness of the busbar and


SPANNERS /
busbar support insulator. It should have
TORQUE
sufficient stiffness to be supported in air by
WRENCH
insulated pillars.
Check for proper cleanliness of the busbar
insulator and panel body. It should be VISUAL /
generally uninsulated, and should be proper COTTON
insulation between busbar and switchgear CLOTHE
panel through busbar insualtor.
Check for megger value of Busbar and panel
LT MEGGER
body.

Check for earthing of the Panel body. VISUAL

Check for Oxydation of busbars and LEAKAGE


insulators due to moisture content. TESTER

Check for high electrical & mechanical


strength used in electrical panels to support
VISUAL
the copper busbar. Check for megger value
between insulator and panel body.
VISUAL,
COTTON
To protect an electrical circuit from damage CLOTHE, CRC,
caused by excess current from an overload or DIELECTRIC
short circuit. Its basic function is to interrupt ISOPLEX &
current flow after a fault is detected. SHELL TELLUS
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the operation INJECTION
of circuit breaker to isolate the defective CURRENT AND
element from the rest of the system. VOLTAGE TEST
KIT

SPANNERS /
Check for proper tigteness of the power
TORQUE
cable and LT Breaker Terminals.
WRENCH

Check for megger value of LT Cable phase


MEGGER
to phae and phase to earth.
VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct voltage and indication
INJECTION
shown in the meter.
CURRENT AND
Also, check for tripping of the LT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

VISUAL /
Check for tighteness of connections and
SECONDARY
measure the correct current shown in the
INJECTION
meter.
CURRENT AND
Also, check for tripping of the LT Numerical
VOLTAGE TEST
Relay by Secondary Injection kit.
KIT

Battery charger is a device used to charge the


VISUAL
batteries.

A battery is a source of energy which


provides a voltage to get the current flowing CLAMPMETER
in a circuit.

To provide indication of incoming power


VISUAL
supply on the panel.

To indicate charging current of the battery. VISUAL

To indicate charging voltage of the battery. VISUAL


To indicate incoming voltage on th panel. VISUAL

To provive earthng of the Panel body. VISUAL

Check for proper tigteness of the busbar and


busbar support insulator. It should have
sufficient stiffness to be supported in air by VISUAL
insulated pillars. Check for megger value of
Busbar and panel body.

To detect the fault and initiates the operation


of circuit breaker to isolate the defective MANUAL
element from the rest of the system.

Check for tighteness of connections and


measure the correct voltage and indication
VISUAL
shown in the meter. Check for tripping of
charger during overvoltage.

Check for tighteness of connections and


measure the correct current shown in the VISUAL
meter.
TYPE OF CHECK (RUN
CHECK / STOP CHECK / IDEAL CONDITION
SHUTDOWN)

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A

Vertical and Horizontal insulators


should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.

HT Breaker should be clean. There


should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.

SHUTDOWN CHECK
Proper spring charging operation of
limit switch.
SHUTDOWN CHECK Condition of contact arm assembly of
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
& Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Contact Resistance between Upper


and Lower contacts should be in
micro ohms of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
SHUTDOWN CHECK
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
& Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Contact Resistance between Upper


and Lower contacts should be in
micro ohms of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
SHUTDOWN CHECK
breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
& Lower contacts should be > 1 T
Ohms

Insulation resistance between Phase


to Phase should be > 1 T Ohms

Insulation resistance between Phase


to Earth should be > 1 T Ohms

Contact Resistance between Upper


and Lower contacts should be in
micro ohms of all three phases.

HT Breaker Numerical Relay tripping


should be healthy to trip the breaker
SHUTDOWN CHECK
on the faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms

TAN-DELTA test of HT Cable should


SHUTDOWN CHECK
be < 0.004 absolute.
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK 2. provide indication of voltage on the
panel.
3. trip the HT Breaker through HT
Relay on Over voltage / Under
Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK relay or meter.
2. trip the HT Breaker through HT
Relay on Over curent / CIR / ITOC /
DMT.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulators should be installed properly


SHUTDOWN CHECK to hold and support busbars.
Insulators should be clean.

Resistance between panel to busbar


SHUTDOWN CHECK
should be ˃ 20 mega ohms.

RUN CHECK Earthing should be healthy.

No oxydation and moisture inside


RUN CHECK panel. Space Heater current should be
< 1A
Vertical and Horizontal insulators
should provide high electrical and
SHUTDOWN CHECK mechanical strength to the busbars.
Also, megger value should be ˃ 20
mega Ohms.
HT Breaker should be clean. There
should not be any moisture or wear
and rusting of contacts.
Proper lubrication of all moving parts
of mechanism.
Proper operation of gear box
mechanism.
Proper operation of Test / Service
auxiliary switch operation.
Proper closing and tripping
mechanism of breaker both
electrically and manually.
Proper spring charging operation of
limit switch.
Condition of contact arm assembly of
SHUTDOWN CHECK breaker should be proper.
Vacuum inside bottles should be
normal.
Insulation resistance between Upper
& Lower contacts should be OL
Ohms

Insulation resistance between Phase


to Phase should be OL Ohms

Insulation resistance between Phase


to Earth should be OL Ohms

Contact Resistance between Upper


and Lower contacts should be in
micro ohms of all three phases.

LT Breaker Relay tripping should be


healthy to trip the breaker on the
SHUTDOWN CHECK
faults described in the relay on
prescribed values.

Tightened with 12mm high tensile


SHUTDOWN CHECK stainless steel bolts with flat washers
and nuts by Torque Wrench.

Insulation resistance between Phase


to Phase should be > 20 Mega Ohms
SHUTDOWN CHECK
Insulation resistance between Phase
to Earth should be > 20 Mega Ohms
PT connections should be tight and
should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK
2. provide indication of voltage on the
panel.
3. trip the LT Breaker through Relay
on Over voltage / Under Voltage.

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK
relay or meter.
2. trip the LT Breaker through Relay
on Over curent / CIR / Ie.

Battery charger should provide


Trickle charge and Boost charge.
Trickle charging current < 2A.
Trickle charging voltage should be for
110 VDC should be 112 VDC.
RUN CHECK
Boost charging current > 2A.
Boost charging voltage should be for
110 VDC should be 114 to 115 VDC
VDC.

To provide the voltage to the


electrical equipments. Also, to
RUN CHECK / STOP CHECK provide voltage backup during power
failure. Voltage should be 110 VDC
for 6 hrs. during power failure.

Indication of incoming power supply


RUN CHECK
on the panel should be healthy.

Indication of charging current on the


RUN CHECK
panel should be healthy.

Indication of charging voltage on the


RUN CHECK
panel should be healthy.
Indication of incoming voltage on the
RUN CHECK
panel should be healthy.

RUN CHECK Earthing should be healthy.

Horizontal insulators should provide


high electrical and mechanical
SHUTDOWN CHECK
strength to the busbars. Also, megger
value should be ˃ 20 mega Ohms.

Relay tripping should be healthy to


SHUTDOWN CHECK trip the charger on Overvoltage /
Overtemperature / Overcurrent.

PT connections should be tight and


should
1. measure correct voltage on the
relay or meter.
SHUTDOWN CHECK
2. provide indication of voltage on the
panel.
3. trip the charger through relay on
Over voltage

CT connections should be tight and


should
1. measure current accurately on the
SHUTDOWN CHECK
ammeter.
2. trip the charger through Relay on
Over curent.
ACTUAL CONDITION OBSERVED ACTION
ON 12.04.2018 REQUIRED

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1100 mega ohms.

Earthing is connected to the body and


to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Contact Resistance between Upper and


Lower contacts is 38 micro ohms of all
three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1100 mega ohms.
Earthing is connected to the body and
to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Contact Resistance between Upper and


Lower contacts is 44 micro ohms of all
three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1200 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0019
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.
Earthing is connected to the body and
to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is > 1 T Ohms

Insulation resistance between Phase to


Phase is > 1 T Ohms

Insulation resistance between Phase to


Earth is > 1 T Ohms

Contact Resistance between Upper and


Lower contacts is 48 micro ohms of all
three phases.

HT Breaker Numerical Relay tripping


is healthy to trip the breaker on the
faults described in the relay on
prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1100 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms

TAN-DELTA test of HT Cable is


0.0012
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the HT Breaker through HT
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Trippig of
the HT Breaker through HT Relay on
Over curent / CIR / ITOC / DMT is
healthy.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulators were installed properly and


was clean. No oxydation observed
between insulator and bubar.

Resistance between panel to busbar is


1000 mega ohms.
Earthing is connected to the body and
to the Earth Pit.

No oxydation and moisture inside


panel. Space Heater current is 0.3 A

Vertical and Horizontal insulators


strength to the busbars are good. Also,
megger value is 1000 mega Ohms.

HT Breaker found clean. There is no


moisture or wear and rusting of
contacts.
Lubrication of all moving parts of
mechanism is normal.
Operation of gear box mechanism is
normal.
Operation of Test / Service auxiliary
switch operation is proper.
Closing and tripping mechanism of
breaker both electrically and manually
is proper.
Spring charging operation of limit
switch is normal.
Condition of contact arm assembly of
breaker is proper.
Vacuum inside bottles is normal.

Insulation resistance between Upper &


Lower contacts is OL Ohms

Insulation resistance between Phase to


Phase is OL Ohms

Insulation resistance between Phase to


Earth is OL Ohms

Contact Resistance between Upper and


Lower contacts is 41 micro ohms of all
three phases.

LT Breaker Relay tripping is healthy to


trip the breaker on the faults described
in the relay on prescribed values.

No looseness of the bolts and


connecting links checked by torque
wrench.

Insulation resistance between Phase to


Phase is 1800 Ohms

Insulation resistance between Phase to


Earth is 1000Mega Ohms
PT connections are tight and display
correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the LT Breaker through
Relay on Over voltage / Under Voltage
is healthy.

CT connections are tight and display


accurate current on the relay. Tripping
of the LT Breaker through Relay on
Over curent / CIR / Ie is healthy.

Trickle charging current is 0.5A.


Trickle charging voltage is 112 VDC.

Boost charging current is 5A.


Boost charging voltage is 115 VDC.

Voltage is 110 VDC for 6 hrs. during


power failure.

Indication of incoming power supply on


the panel is healthy.

Indication of charging current on the


panel is healthy.

Indication of charging voltage on the


panel is healthy.
Indication of incoming voltage on the
panel is healthy.

Earthing is connected to the body and


to the Earth Pit.

Horizontal insulators strength to the


busbars are good. Also, megger value is
500 mega Ohms.

Relay tripping is healthy to trip the


charger on Overvoltage /
Overtemperature / Overcurrent.

PT connections are tight and display


correct voltage on the relay. Indication
of voltage on the panel is shown.
Trippig of the charger through Relay on
Over voltage is healthy.

CT connections are tight and display


accurate current on ammeter. Tripping
of the charger through Relay on Over
curent.
Sub
EQUIPMENT: Equipments COMPONENT Item Code

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER BREATHER 3101190015
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER CONSERVATOR TANK
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER BUCHOLTZ RELAY
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER HT TERMINAL BOX
#1
STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER LT TERMINAL BOX
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER AIR BREAK SWITCH
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER OFF LOAD TAP CHANGER
#1

STOCK HOUSE
STOCK HOUSE NEUTRAL EARTH ING EARTH PIT
TRANSFORMER
TRANSFORMER CONNECTION
#1

STOCK HOUSE
STOCK HOUSE BODY EARTHING EARTH PIT
TRANSFORMER
TRANSFORMER CONNECTION
#1

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
#2
STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
#2

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER BREATHER 3101190015
#2

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER CONSERVATOR TANK
#2

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER BUCHOLTZ RELAY
#2

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER HT TERMINAL BOX
#2

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER LT TERMINAL BOX
#2
STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER LT TERMINAL BOX
#2

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER AIR BREAK SWITCH
#2

STOCK HOUSE
STOCK HOUSE
TRANSFORMER TRANSFORMER OFF LOAD TAP CHANGER
#2

STOCK HOUSE
STOCK HOUSE NEUTRAL EARTH ING EARTH PIT
TRANSFORMER
TRANSFORMER CONNECTION
#2

STOCK HOUSE
STOCK HOUSE BODY EARTHING EARTH PIT
TRANSFORMER
TRANSFORMER CONNECTION
#2
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
FOR COOLING AND INSULATION VISUAL / OIL RUN CHECK
OF TRANSFORMER WINDINGS TEMPERATURE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

FOR PROTECTION OF VISUAL RUN CHECK


TRASFORMER

Allows the HT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide TAN-DELTA SHUTDOWN
uninterrupted power supply to TEST KIT CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK
HT cable lugs should be proper
tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

ISOLATION AS WELL AS
INTERLOCK BETWEEN SHUTDOWN
LIMIT SWITCH
TRANSFORMER AND HT CHECK
BREAKER

VOLTAGE TAP CHANGING OF SHUTDOWN


VISUAL
TRANSFORMER OFF LOAD CHECK

TO PROVIDE NEUTRAL
EARTHING OF THE VISUAL RUN CHECK
TRANSFORMER

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER

FOR COOLING AND INSULATION VISUAL / OIL RUN CHECK


OF TRANSFORMER WINDINGS TEMPERATURE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS
SHUTDOWN
DGA TEST KIT CHECK
To form magnetic field when MEGGER / TAN- SHUTDOWN
energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

FOR PROTECTION OF VISUAL RUN CHECK


TRASFORMER

Allows the HT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide TAN-DELTA SHUTDOWN
uninterrupted power supply to TEST KIT CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.
There should be no oxydation of VISUAL SHUTDOWN
bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

ISOLATION AS WELL AS
INTERLOCK BETWEEN SHUTDOWN
LIMIT SWITCH
TRANSFORMER AND HT CHECK
BREAKER

VOLTAGE TAP CHANGING OF SHUTDOWN


VISUAL
TRANSFORMER OFF LOAD CHECK

TO PROVIDE NEUTRAL
EARTHING OF THE VISUAL RUN CHECK
TRANSFORMER

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON ACTION
IDEAL CONDITION 05.09.2018 REQUIRED

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 1500 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.0012

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

TRANSFORMER TRIPPING SHOULD BE TRANSFORMER TRIPPED BY BUCHOLTZ RELAY


HEALTHY BY BUCHOLTZ RELAY

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

TAN-DELTA test of HT Cable should TAN-DELTA test of HT Cable is


be < 0.004 absolute. 0.0014

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs
HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.

AIR BREAK SWITCH SHOULD BE IN WORKING AIR BREAK SWITCH IS IN WORKING


CONDITION CONDITION

TAP CHANGER SHOULD BE IN WORKING TAP CHANGER IS IN WORKING CONDITION


CONDITION

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 43


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD
MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 1200 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.0019

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

TRANSFORMER TRIPPING SHOULD BE TRANSFORMER TRIPPED BY BUCHOLTZ RELAY


HEALTHY BY BUCHOLTZ RELAY

Tightened with 12mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

TAN-DELTA test of HT Cable should TAN-DELTA test of HT Cable is


be < 0.004 absolute. 0.0017

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.
No oxydation or moisture of bushings and No oxydation or moisture of bushings and
cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.

AIR BREAK SWITCH SHOULD BE IN WORKING AIR BREAK SWITCH IS IN WORKING


CONDITION CONDITION

TAP CHANGER SHOULD BE IN WORKING TAP CHANGER IS IN WORKING CONDITION


CONDITION

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
NO 1

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
NO 1

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER BREATHER 3101190015
NO 1

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER CONSERVATOR TANK
NO 1

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP CONTROLLER
NO 1

HEAD ESP
HEAD ESP ESP PANEL KEPAD DISPLAY
TRANSFORMER TRANSFORMER UNIT
NO 1
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP PANEL THYRISTOR
NO 1

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL INSULATOR
NO 1
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL BOX
NO 1

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER LT TERMINAL BOX
NO 1
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ELECTRODES
NO 1

HEAD ESP
HEAD ESP BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
NO 1
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
VISUAL / OIL
TEMPERATURE &
FOR COOLING OF WINDING RUN CHECK
TRANSFORMER WINDINGS TEMPERATURE
GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

Controls the firing angle of the


thyristors by taking feedbacks
from transformer output
voltage,transformer oil VISUAL RUN CHECK
temperature and the parameters
set in the display unit by the
user.

This unit is interfaced with the


ESP Controller. It acts exclusively
as a bistable switch, conducting
when the gate receives a current
trigger, and continuing to VISUAL RUN CHECK
conduct until the voltage across
the device is reversed biased, or
until the voltage is removed (by
some other means)
This device controls the primary
voltage which is to be fed to
transformer primary winding. SHUTDOWN
The thyristor is being controlled VISUAL/SPANNERS CHECK
by controlling its firing angle by
the ESP controller.

Cylindrical Support Insulator


find application for ESP and
feature high alumina content
that makes these sustain
operating temp above 500°c.
Further, these cylindrical
Insulator also feature high
compressive and tensile strength
and are made available in
brown/white glaze finish.
Finding application for high SHUTDOWN
voltage ESPS, these are VISUAL
CHECK
developed using glass reinforced
polyester as well as aluminum
threads that assures in these
optimum durability support. It
also provide mechanical support
as well as electrically isolating
discharge electrodes from
collecting curtains

Axis insulator provide


mechanical support as well as
electrically isolating discharge SHUTDOWN
electrodes from collecting VISUAL
curtains as well as grounded ESP CHECK
casing because of their high
voltage.
Allows the HT power cable to be
fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SPANNERS /
protecton from short circuiting TORQUE
SHUTDOWN
of cables. CHECK
Check for cable termination
WRENCH
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide SHUTDOWN
uninterrupted power supply to MEGGER
CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.
Collecting Electrodes are the
collection surface made of sheet
metal on which the particulate
mater is collected after being
negatively charged within the
gas passage of the ESP. Designs VISUAL SHUTDOWN
of the plates vary from CHECK
manufacturer to manufacturer.
These plates are secured to the
ESP shell at ground potential and
serve as the positive anode of
the gas passage.

Emitting Electrodes, also knows


as Discharge Electrodes is the
heart os the ESP. These are High
Voltage internal and ionizes the
gases and creates the electrical
field. When the voltage breaks SHUTDOWN
the gas down at the surface of VISUAL CHECK
the electrode, it generates
corona power. This leads to
creation of corona tufts on the
surface of the electrode.
Negative polariy voltage is
applied to the electrode.

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON
IDEAL CONDITION 18.08.2018

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 2000 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.007

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

Transformer output parameters i.e. KV , Ma


should be as per the required set values Transformer output parameters i.e. KV , Ma
which are set by the user . Hunting may are in the range of set values And are stable
occur of the set values if the load condition
varies

The display unit shows the transformer actual


values . Same compared with clamp meter
readings and the values are matching
The display unit should Display the actual primary voltage ----240V
values of transformer output parameters. primary current ---- 16
secondary voltage ----35 KV
secondary current ----350 mA
Thyristor is functioning correctly as the O/P
parameters are confirmed with clamp meters
Thyristor should conduct according to the primary voltage ----215V
input provided by the ESP Controller primary current ---- 48A
secondary voltage ----38 KV
secondary current ----304 mA

should be free from Excess Dust Dust accumulation cleaned . Insulator


accumulation and without any checked for any physical deformation .
physical deformation/damage Found ok

Insulator should be free from Excess Dust accumulation cleaned . Insulator


Dust accumulation and without any checked for any physical deformation .
physical deformation/damage. Found ok
Tightened with 12mm high tensile No looseness of the bolts and
stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

meggar value of HT Cable should be


meggar value of HT Cable > 5 mohm
> 5 mohm

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.
1. There should not be any physical 1. There is no physical deformation or damage
deformation or damage of electrodes of electrodes. ok
2. There should not be any Looseness of 2. All bolts tightness checked .ok.
Bolt. 3. Dust cleaned manually .ok.
3. free from Excess Dust Collection .

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY IE RESISTANCE SHOULD BE
LESS THAN 5 OHMS
ACTION REQUIRED
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
NO 2

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
NO 2

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER BREATHER 3101190015
NO 2

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER CONSERVATOR TANK
NO 2

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP CONTROLLER
NO 2

HEAD ESP
HEAD ESP ESP PANEL KEPAD DISPLAY
TRANSFORMER TRANSFORMER UNIT
NO 2
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP PANEL THYRISTOR
NO 2

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL INSULATOR
NO 2
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL BOX
NO 2

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER LT TERMINAL BOX
NO 2
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ELECTRODES
NO 2

HEAD ESP
HEAD ESP BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
NO 2
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
VISUAL / OIL
TEMPERATURE &
FOR COOLING OF WINDING RUN CHECK
TRANSFORMER WINDINGS TEMPERATURE
GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

Controls the firing angle of the


thyristors by taking feedbacks
from transformer output
voltage,transformer oil VISUAL RUN CHECK
temperature and the parameters
set in the display unit by the
user.

This unit is interfaced with the


ESP Controller. It acts exclusively
as a bistable switch, conducting
when the gate receives a current
trigger, and continuing to VISUAL RUN CHECK
conduct until the voltage across
the device is reversed biased, or
until the voltage is removed (by
some other means)
This device controls the primary
voltage which is to be fed to
transformer primary winding. SHUTDOWN
The thyristor is being controlled VISUAL/SPANNERS CHECK
by controlling its firing angle by
the ESP controller.

Cylindrical Support Insulator


find application for ESP and
feature high alumina content
that makes these sustain
operating temp above 500°c.
Further, these cylindrical
Insulator also feature high
compressive and tensile strength
and are made available in
brown/white glaze finish.
Finding application for high SHUTDOWN
voltage ESPS, these are VISUAL
CHECK
developed using glass reinforced
polyester as well as aluminum
threads that assures in these
optimum durability support. It
also provide mechanical support
as well as electrically isolating
discharge electrodes from
collecting curtains

Axis insulator provide


mechanical support as well as
electrically isolating discharge SHUTDOWN
electrodes from collecting VISUAL
curtains as well as grounded ESP CHECK
casing because of their high
voltage.
Allows the HT power cable to be
fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SPANNERS /
protecton from short circuiting TORQUE
SHUTDOWN
of cables. CHECK
Check for cable termination
WRENCH
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide SHUTDOWN
uninterrupted power supply to MEGGER
CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.
Collecting Electrodes are the
collection surface made of sheet
metal on which the particulate
mater is collected after being
negatively charged within the
gas passage of the ESP. Designs VISUAL SHUTDOWN
of the plates vary from CHECK
manufacturer to manufacturer.
These plates are secured to the
ESP shell at ground potential and
serve as the positive anode of
the gas passage.

Emitting Electrodes, also knows


as Discharge Electrodes is the
heart os the ESP. These are High
Voltage internal and ionizes the
gases and creates the electrical
field. When the voltage breaks SHUTDOWN
the gas down at the surface of VISUAL CHECK
the electrode, it generates
corona power. This leads to
creation of corona tufts on the
surface of the electrode.
Negative polariy voltage is
applied to the electrode.

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON
IDEAL CONDITION 18.08.2018

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 2000 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.007

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

Transformer output parameters i.e. KV , Ma


should be as per the required set values Transformer output parameters i.e. KV , Ma
which are set by the user . Hunting may are in the range of set values And are stable
occur of the set values if the load condition
varies

The display unit shows the transformer actual


values . Same compared with clamp meter
readings and the values are matching
The display unit should Display the actual primary voltage ----240V
values of transformer output parameters. primary current ---- 16
secondary voltage ----35 KV
secondary current ----350 mA
Thyristor is functioning correctly as the O/P
parameters are confirmed with clamp meters
Thyristor should conduct according to the primary voltage ----215V
input provided by the ESP Controller primary current ---- 48A
secondary voltage ----38 KV
secondary current ----304 mA

should be free from Excess Dust Dust accumulation cleaned . Insulator


accumulation and without any checked for any physical deformation .
physical deformation/damage Found ok

Insulator should be free from Excess Dust accumulation cleaned . Insulator


Dust accumulation and without any checked for any physical deformation .
physical deformation/damage. Found ok
Tightened with 12mm high tensile No looseness of the bolts and
stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

meggar value of HT Cable should be


meggar value of HT Cable > 5 mohm
> 5 mohm

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.
1. There should not be any physical 1. There is no physical deformation or damage
deformation or damage of electrodes of electrodes. ok
2. There should not be any Looseness of 2. All bolts tightness checked .ok.
Bolt. 3. Dust cleaned manually .ok.
3. free from Excess Dust Collection .

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY RESISTANCE SHOULD BE LESS
THAN 5 OHMS
ACTION REQUIRED
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
NO 3

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
NO 3

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER BREATHER 3101190015
NO 3

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER CONSERVATOR TANK
NO 3

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP CONTROLLER
NO 3

HEAD ESP
HEAD ESP ESP PANEL KEPAD DISPLAY
TRANSFORMER TRANSFORMER UNIT
NO 3
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP PANEL THYRISTOR
NO 3

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL INSULATOR
NO 3
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL BOX
NO 3

HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER LT TERMINAL BOX
NO 3
HEAD ESP
HEAD ESP
TRANSFORMER TRANSFORMER ELECTRODES
NO 3

HEAD ESP
HEAD ESP BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
NO 3
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
VISUAL / OIL
TEMPERATURE &
FOR COOLING OF WINDING RUN CHECK
TRANSFORMER WINDINGS TEMPERATURE
GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

Controls the firing angle of the


thyristors by taking feedbacks
from transformer output
voltage,transformer oil VISUAL RUN CHECK
temperature and the parameters
set in the display unit by the
user.

This unit is interfaced with the


ESP Controller. It acts exclusively
as a bistable switch, conducting
when the gate receives a current
trigger, and continuing to VISUAL RUN CHECK
conduct until the voltage across
the device is reversed biased, or
until the voltage is removed (by
some other means)
This device controls the primary
voltage which is to be fed to
transformer primary winding. SHUTDOWN
The thyristor is being controlled VISUAL/SPANNERS CHECK
by controlling its firing angle by
the ESP controller.

Cylindrical Support Insulator


find application for ESP and
feature high alumina content
that makes these sustain
operating temp above 500°c.
Further, these cylindrical
Insulator also feature high
compressive and tensile strength
and are made available in
brown/white glaze finish.
Finding application for high SHUTDOWN
voltage ESPS, these are VISUAL
CHECK
developed using glass reinforced
polyester as well as aluminum
threads that assures in these
optimum durability support. It
also provide mechanical support
as well as electrically isolating
discharge electrodes from
collecting curtains

Axis insulator provide


mechanical support as well as
electrically isolating discharge SHUTDOWN
electrodes from collecting VISUAL
curtains as well as grounded ESP CHECK
casing because of their high
voltage.
Allows the HT power cable to be
fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SPANNERS /
protecton from short circuiting TORQUE
SHUTDOWN
of cables. CHECK
Check for cable termination
WRENCH
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide SHUTDOWN
uninterrupted power supply to MEGGER
CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.
Collecting Electrodes are the
collection surface made of sheet
metal on which the particulate
mater is collected after being
negatively charged within the
gas passage of the ESP. Designs VISUAL SHUTDOWN
of the plates vary from CHECK
manufacturer to manufacturer.
These plates are secured to the
ESP shell at ground potential and
serve as the positive anode of
the gas passage.

Emitting Electrodes, also knows


as Discharge Electrodes is the
heart os the ESP. These are High
Voltage internal and ionizes the
gases and creates the electrical
field. When the voltage breaks SHUTDOWN
the gas down at the surface of VISUAL CHECK
the electrode, it generates
corona power. This leads to
creation of corona tufts on the
surface of the electrode.
Negative polariy voltage is
applied to the electrode.

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON
IDEAL CONDITION 18.08.2018

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 2000 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.007

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

Transformer output parameters i.e. KV , Ma


should be as per the required set values Transformer output parameters i.e. KV , Ma
which are set by the user . Hunting may are in the range of set values And are stable
occur of the set values if the load condition
varies

The display unit shows the transformer actual


values . Same compared with clamp meter
readings and the values are matching
The display unit should Display the actual primary voltage ----240V
values of transformer output parameters. primary current ---- 16
secondary voltage ----35 KV
secondary current ----350 mA
Thyristor is functioning correctly as the O/P
parameters are confirmed with clamp meters
Thyristor should conduct according to the primary voltage ----215V
input provided by the ESP Controller primary current ---- 48A
secondary voltage ----38 KV
secondary current ----304 mA

should be free from Excess Dust Dust accumulation cleaned . Insulator


accumulation and without any checked for any physical deformation .
physical deformation/damage Found ok

Insulator should be free from Excess Dust accumulation cleaned . Insulator


Dust accumulation and without any checked for any physical deformation .
physical deformation/damage. Found ok
Tightened with 12mm high tensile No looseness of the bolts and
stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

meggar value of HT Cable should be


meggar value of HT Cable > 5 mohm
> 5 mohm

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.
1. There should not be any physical 1. There is no physical deformation or damage
deformation or damage of electrodes of electrodes. ok
2. There should not be any Looseness of 2. All bolts tightness checked .ok.
Bolt. 3. Dust cleaned manually .ok.
3. free from Excess Dust Collection .

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY RESISTANCE SHOULD BE LESS
THAN 5 OHMS
ACTION REQUIRED
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
NO 1

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
NO 1

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER BREATHER 3101190015
NO 1

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER CONSERVATOR TANK
NO 1

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP CONTROLLER
NO 1

TAIL ESP
HEAD ESP ESP PANEL KEPAD DISPLAY
TRANSFORMER TRANSFORMER UNIT
NO 1
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP PANEL THYRISTOR
NO 1

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL INSULATOR
NO 1
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL BOX
NO 1

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER LT TERMINAL BOX
NO 1
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ELECTRODES
NO 1

TAIL ESP
HEAD ESP BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
NO 1
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
VISUAL / OIL
TEMPERATURE &
FOR COOLING OF WINDING RUN CHECK
TRANSFORMER WINDINGS TEMPERATURE
GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

Controls the firing angle of the


thyristors by taking feedbacks
from transformer output
voltage,transformer oil VISUAL RUN CHECK
temperature and the parameters
set in the display unit by the
user.

This unit is interfaced with the


ESP Controller. It acts exclusively
as a bistable switch, conducting
when the gate receives a current
trigger, and continuing to VISUAL RUN CHECK
conduct until the voltage across
the device is reversed biased, or
until the voltage is removed (by
some other means)
This device controls the primary
voltage which is to be fed to
transformer primary winding. SHUTDOWN
The thyristor is being controlled VISUAL/SPANNERS CHECK
by controlling its firing angle by
the ESP controller.

Cylindrical Support Insulator


find application for ESP and
feature high alumina content
that makes these sustain
operating temp above 500°c.
Further, these cylindrical
Insulator also feature high
compressive and tensile strength
and are made available in
brown/white glaze finish.
Finding application for high SHUTDOWN
voltage ESPS, these are VISUAL
CHECK
developed using glass reinforced
polyester as well as aluminum
threads that assures in these
optimum durability support. It
also provide mechanical support
as well as electrically isolating
discharge electrodes from
collecting curtains

Axis insulator provide


mechanical support as well as
electrically isolating discharge SHUTDOWN
electrodes from collecting VISUAL
curtains as well as grounded ESP CHECK
casing because of their high
voltage.
Allows the HT power cable to be
fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SPANNERS /
protecton from short circuiting TORQUE
SHUTDOWN
of cables. CHECK
Check for cable termination
WRENCH
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide SHUTDOWN
uninterrupted power supply to MEGGER
CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.
Collecting Electrodes are the
collection surface made of sheet
metal on which the particulate
mater is collected after being
negatively charged within the
gas passage of the ESP. Designs VISUAL SHUTDOWN
of the plates vary from CHECK
manufacturer to manufacturer.
These plates are secured to the
ESP shell at ground potential and
serve as the positive anode of
the gas passage.

Emitting Electrodes, also knows


as Discharge Electrodes is the
heart os the ESP. These are High
Voltage internal and ionizes the
gases and creates the electrical
field. When the voltage breaks SHUTDOWN
the gas down at the surface of VISUAL CHECK
the electrode, it generates
corona power. This leads to
creation of corona tufts on the
surface of the electrode.
Negative polariy voltage is
applied to the electrode.

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON
IDEAL CONDITION 18.08.2018

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 2000 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.007

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

Transformer output parameters i.e. KV , Ma


should be as per the required set values Transformer output parameters i.e. KV , Ma
which are set by the user . Hunting may are in the range of set values And are stable
occur of the set values if the load condition
varies

The display unit shows the transformer actual


values . Same compared with clamp meter
readings and the values are matching
The display unit should Display the actual primary voltage ----240V
values of transformer output parameters. primary current ---- 16
secondary voltage ----35 KV
secondary current ----350 mA
Thyristor is functioning correctly as the O/P
parameters are confirmed with clamp meters
Thyristor should conduct according to the primary voltage ----215V
input provided by the ESP Controller primary current ---- 48A
secondary voltage ----38 KV
secondary current ----304 mA

should be free from Excess Dust Dust accumulation cleaned . Insulator


accumulation and without any checked for any physical deformation .
physical deformation/damage Found ok

Insulator should be free from Excess Dust accumulation cleaned . Insulator


Dust accumulation and without any checked for any physical deformation .
physical deformation/damage. Found ok
Tightened with 12mm high tensile No looseness of the bolts and
stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

meggar value of HT Cable should be


meggar value of HT Cable > 5 mohm
> 5 mohm

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.
1. There should not be any physical 1. There is no physical deformation or damage
deformation or damage of electrodes of electrodes. ok
2. There should not be any Looseness of 2. All bolts tightness checked .ok.
Bolt. 3. Dust cleaned manually .ok.
3. free from Excess Dust Collection .

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY RESISTANCE SHOULD BE LESS
THAN 5 OHMS
ACTION REQUIRED
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
NO 2

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
NO 2

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER BREATHER 3101190015
NO 2

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER CONSERVATOR TANK
NO 2

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP CONTROLLER
NO 2

TAIL ESP
HEAD ESP ESP PANEL KEPAD DISPLAY
TRANSFORMER TRANSFORMER UNIT
NO 2
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP PANEL THYRISTOR
NO 2

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL INSULATOR
NO 2
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL BOX
NO 2

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER LT TERMINAL BOX
NO 2
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ELECTRODES
NO 2

TAIL ESP
HEAD ESP BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
NO 2
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
VISUAL / OIL
TEMPERATURE &
FOR COOLING OF WINDING RUN CHECK
TRANSFORMER WINDINGS TEMPERATURE
GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

Controls the firing angle of the


thyristors by taking feedbacks
from transformer output
voltage,transformer oil VISUAL RUN CHECK
temperature and the parameters
set in the display unit by the
user.

This unit is interfaced with the


ESP Controller. It acts exclusively
as a bistable switch, conducting
when the gate receives a current
trigger, and continuing to VISUAL RUN CHECK
conduct until the voltage across
the device is reversed biased, or
until the voltage is removed (by
some other means)
This device controls the primary
voltage which is to be fed to
transformer primary winding. SHUTDOWN
The thyristor is being controlled VISUAL/SPANNERS CHECK
by controlling its firing angle by
the ESP controller.

Cylindrical Support Insulator


find application for ESP and
feature high alumina content
that makes these sustain
operating temp above 500°c.
Further, these cylindrical
Insulator also feature high
compressive and tensile strength
and are made available in
brown/white glaze finish.
Finding application for high SHUTDOWN
voltage ESPS, these are VISUAL
CHECK
developed using glass reinforced
polyester as well as aluminum
threads that assures in these
optimum durability support. It
also provide mechanical support
as well as electrically isolating
discharge electrodes from
collecting curtains

Axis insulator provide


mechanical support as well as
electrically isolating discharge SHUTDOWN
electrodes from collecting VISUAL
curtains as well as grounded ESP CHECK
casing because of their high
voltage.
Allows the HT power cable to be
fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SPANNERS /
protecton from short circuiting TORQUE
SHUTDOWN
of cables. CHECK
Check for cable termination
WRENCH
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide SHUTDOWN
uninterrupted power supply to MEGGER
CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.
Collecting Electrodes are the
collection surface made of sheet
metal on which the particulate
mater is collected after being
negatively charged within the
gas passage of the ESP. Designs VISUAL SHUTDOWN
of the plates vary from CHECK
manufacturer to manufacturer.
These plates are secured to the
ESP shell at ground potential and
serve as the positive anode of
the gas passage.

Emitting Electrodes, also knows


as Discharge Electrodes is the
heart os the ESP. These are High
Voltage internal and ionizes the
gases and creates the electrical
field. When the voltage breaks SHUTDOWN
the gas down at the surface of VISUAL CHECK
the electrode, it generates
corona power. This leads to
creation of corona tufts on the
surface of the electrode.
Negative polariy voltage is
applied to the electrode.

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON
IDEAL CONDITION 18.08.2018

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 2000 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.007

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

Transformer output parameters i.e. KV , Ma


should be as per the required set values Transformer output parameters i.e. KV , Ma
which are set by the user . Hunting may are in the range of set values And are stable
occur of the set values if the load condition
varies

The display unit shows the transformer actual


values . Same compared with clamp meter
readings and the values are matching
The display unit should Display the actual primary voltage ----240V
values of transformer output parameters. primary current ---- 16
secondary voltage ----35 KV
secondary current ----350 mA
Thyristor is functioning correctly as the O/P
parameters are confirmed with clamp meters
Thyristor should conduct according to the primary voltage ----215V
input provided by the ESP Controller primary current ---- 48A
secondary voltage ----38 KV
secondary current ----304 mA

should be free from Excess Dust Dust accumulation cleaned . Insulator


accumulation and without any checked for any physical deformation .
physical deformation/damage Found ok

Insulator should be free from Excess Dust accumulation cleaned . Insulator


Dust accumulation and without any checked for any physical deformation .
physical deformation/damage. Found ok
Tightened with 12mm high tensile No looseness of the bolts and
stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

meggar value of HT Cable should be


meggar value of HT Cable > 5 mohm
> 5 mohm

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.
1. There should not be any physical 1. There is no physical deformation or damage
deformation or damage of electrodes of electrodes. ok
2. There should not be any Looseness of 2. All bolts tightness checked .ok.
Bolt. 3. Dust cleaned manually .ok.
3. free from Excess Dust Collection .

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY RESISTANCE SHOULD BE LESS
THAN 5 OHMS
ACTION REQUIRED
Sub
EQUIPMENT: COMPONENT Item Code
Equipments

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER TRANSFORMER OIL 102040004
NO 3

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT AND LT WINDINGS
NO 3

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER BREATHER 3101190015
NO 3

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER CONSERVATOR TANK
NO 3

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP CONTROLLER
NO 3

TAIL ESP
HEAD ESP ESP PANEL KEPAD DISPLAY
TRANSFORMER TRANSFORMER UNIT
NO 3
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ESP PANEL THYRISTOR
NO 3

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL INSULATOR
NO 3
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER HT TERMINAL BOX
NO 3

TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER LT TERMINAL BOX
NO 3
TAIL ESP
HEAD ESP
TRANSFORMER TRANSFORMER ELECTRODES
NO 3

TAIL ESP
HEAD ESP BODY EARTHING EARTH PIT
TRANSFORMER TRANSFORMER CONNECTION
NO 3
TYPE OF CHECK
TOOLS (RUN CHECK /
DESCRIPTION / DIMENSION REQUIRED STOP CHECK /
SHUTDOWN)
VISUAL / OIL
TEMPERATURE &
FOR COOLING OF WINDING RUN CHECK
TRANSFORMER WINDINGS TEMPERATURE
GUAGE

SHUTDOWN
BDV TEST KIT CHECK
FOR INSULATION OF
TRANSFORMER WINDINGS SHUTDOWN
DGA TEST KIT CHECK

To form magnetic field when MEGGER / TAN- SHUTDOWN


energized with current to DELTA TEST KIT CHECK
produce SECONDARY EMF.

FOR INDICATION OF VISUAL RUN CHECK


TRANSFORMER HEALTINESS

TO PROVIDE ADEQUATE SPACE


FOR EXPANSION OF OIL WITHIN
THE TRANSFORMER. IT ACTS AS VISUAL / MOG RUN CHECK
A RESERVOIR FOR
TRANSFORMER INSULATING OIL.

Controls the firing angle of the


thyristors by taking feedbacks
from transformer output
voltage,transformer oil VISUAL RUN CHECK
temperature and the parameters
set in the display unit by the
user.

This unit is interfaced with the


ESP Controller. It acts exclusively
as a bistable switch, conducting
when the gate receives a current
trigger, and continuing to VISUAL RUN CHECK
conduct until the voltage across
the device is reversed biased, or
until the voltage is removed (by
some other means)
This device controls the primary
voltage which is to be fed to
transformer primary winding. SHUTDOWN
The thyristor is being controlled VISUAL/SPANNERS CHECK
by controlling its firing angle by
the ESP controller.

Cylindrical Support Insulator


find application for ESP and
feature high alumina content
that makes these sustain
operating temp above 500°c.
Further, these cylindrical
Insulator also feature high
compressive and tensile strength
and are made available in
brown/white glaze finish.
Finding application for high SHUTDOWN
voltage ESPS, these are VISUAL
CHECK
developed using glass reinforced
polyester as well as aluminum
threads that assures in these
optimum durability support. It
also provide mechanical support
as well as electrically isolating
discharge electrodes from
collecting curtains

Axis insulator provide


mechanical support as well as
electrically isolating discharge SHUTDOWN
electrodes from collecting VISUAL
curtains as well as grounded ESP CHECK
casing because of their high
voltage.
Allows the HT power cable to be
fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed
connector to provide greater SPANNERS /
protecton from short circuiting TORQUE
SHUTDOWN
of cables. CHECK
Check for cable termination
WRENCH
tighteness and properly glanding
done.

HT power cable insulation


should be healthy to provide SHUTDOWN
uninterrupted power supply to MEGGER
CHECK
Power Transformer.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

HT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.

Allows the LT power cable to be


fixed with TRANSFORMER
windings cable properly
insulated, clamped and sealed SPANNERS /
connector to provide greater SHUTDOWN
protecton from short circuiting TORQUE CHECK
of cables. WRENCH
Check for cable termination
tighteness and properly glanding
done.

There should be no oxydation of VISUAL SHUTDOWN


bushings and cable lugs. CHECK

LT cable lugs should be proper


tight and condition should be SHUTDOWN
VISUAL
healthy. There should be no CHECK
worn out of lugs.
Collecting Electrodes are the
collection surface made of sheet
metal on which the particulate
mater is collected after being
negatively charged within the
gas passage of the ESP. Designs VISUAL SHUTDOWN
of the plates vary from CHECK
manufacturer to manufacturer.
These plates are secured to the
ESP shell at ground potential and
serve as the positive anode of
the gas passage.

Emitting Electrodes, also knows


as Discharge Electrodes is the
heart os the ESP. These are High
Voltage internal and ionizes the
gases and creates the electrical
field. When the voltage breaks SHUTDOWN
the gas down at the surface of VISUAL CHECK
the electrode, it generates
corona power. This leads to
creation of corona tufts on the
surface of the electrode.
Negative polariy voltage is
applied to the electrode.

TO PROVIDE BODY EARTHING OF VISUAL RUN CHECK


THE TRANSFORMER
ACTUAL CONDITION OBSERVED ON
IDEAL CONDITION 18.08.2018

OIL TEMPERATURE SHOULD BE WITHIN 30 OIL TEMPERATURE OF TRANSFORMER IS 42


TO 55 DEG CELCIUS DEG CELCIUS

BDV OF OIL SHOULD BE > 40 KV BDV OF OIL IS 65 KV

DISSOLVED GAS OF TRANSFORMER OIL DISSOLVED GAS OF TRANSFORMER OIL IS


SHOULD BE MINIMUM AS PER ISO MINIMUM AS PER ISO STANDARD
STANDARD

MEGGER VALUE SHOULD BE > 20 MEGA MEGGER VALUE IS 2000 MEGA OHMS AND
OHMS AND TAN-DELTA <0.02 absolute. TAN-DELTA 0.007

BREATHER COLOUR SHOULD BE BLUE BREATHER COLOUR IS BLUE

OIL LEVEL SHOULD BE WITHIN 55% TO 75% OIL LEVEL IS 70%

Transformer output parameters i.e. KV , Ma


should be as per the required set values Transformer output parameters i.e. KV , Ma
which are set by the user . Hunting may are in the range of set values And are stable
occur of the set values if the load condition
varies

The display unit shows the transformer actual


values . Same compared with clamp meter
readings and the values are matching
The display unit should Display the actual primary voltage ----240V
values of transformer output parameters. primary current ---- 16
secondary voltage ----35 KV
secondary current ----350 mA
Thyristor is functioning correctly as the O/P
parameters are confirmed with clamp meters
Thyristor should conduct according to the primary voltage ----215V
input provided by the ESP Controller primary current ---- 48A
secondary voltage ----38 KV
secondary current ----304 mA

should be free from Excess Dust Dust accumulation cleaned . Insulator


accumulation and without any checked for any physical deformation .
physical deformation/damage Found ok

Insulator should be free from Excess Dust accumulation cleaned . Insulator


Dust accumulation and without any checked for any physical deformation .
physical deformation/damage. Found ok
Tightened with 12mm high tensile No looseness of the bolts and
stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

meggar value of HT Cable should be


meggar value of HT Cable > 5 mohm
> 5 mohm

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

HT CABLE LUGS SHOULD BE PROPERLY HT CABLE LUGS ARE PROPERLY TIGHT AND
TIGHT AND CONDITION SHOULD BE CONDITION IS HEALTHY WITH NO WORN OUT.
HEALTHY WITH NO WORN OUT.

Tightened with 10mm high tensile No looseness of the bolts and


stainless steel bolts with flat washers connecting links checked by torque
and nuts by Torque Wrench. wrench.

No oxydation or moisture of bushings and No oxydation or moisture of bushings and


cable lugs cable lugs

LT CABLE LUGS SHOULD BE PROPERLY TIGHT LT CABLE LUGS ARE PROPERLY TIGHT AND
AND CONDITION SHOULD BE HEALTHY WITH CONDITION IS HEALTHY WITH NO WORN OUT.
NO WORN OUT.
1. There should not be any physical 1. There is no physical deformation or damage
deformation or damage of electrodes of electrodes. ok
2. There should not be any Looseness of 2. All bolts tightness checked .ok.
Bolt. 3. Dust cleaned manually .ok.
3. free from Excess Dust Collection .

EARTHING IS CONNECTED TO THE EARTH PIT


EARTHING SHOULD BE HEALTHY AND IS HEALTHY RESISTANCE SHOULD BE LESS
THAN 5 OHMS
ACTION REQUIRED
EQUIPMENT: Sub Equipments COMPONENT

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
SP 11KV
SINTER 11KV INCOMER NO 1
PANEL FROM PP-
2(NPP)
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
SINTER MAIN HT BREAKER
SINTER 11KV SHOP
PANEL TRANSFORMER
NO 1
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
PROPORTIONIN
SINTER 11KV G
PANEL TRANSFORMER
NO 1

HT NUMERICAL
PROTECTIVE RELAY
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS
HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

MAIN HT BREAKER
EXHAUST FAN
MAIN HT BREAKER
EXHAUST FAN
SINTER 11KV CHINESE
PANEL SOFTSTATER
OUTGOING
FEEDER

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH
HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SINTER 11KV CHILL FAN NO
PANEL 3
SINTER 11KV CHILL FAN NO
PANEL 3

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER
HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SINTER 11KV CHILL FAN NO
PANEL 1
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
SINTER 11KV PROPORTIONIN
PANEL G ID FAN
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
SINTER 11KV HAMMER
PANEL CRUSHER NO 1
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
MAIN HT BREAKER
EXHAUST FAN
SINTER 11KV INDIAN
PANEL SOFTSTATER
OUTGOING
FEEDER

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS
HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SINTER 11KV 11KV PT &
HT BREAKER
SINTER 11KV 11KV PT &
PANEL ARRESTER 1

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING
HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SP 11 KV
SINTER 11KV
BUSCOUPLER
PANEL
PANEL
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER
HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SP 11 KV
SINTER 11KV SUBSTATION
PANEL TRANSFORMER
NO 1
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
SP 11 KV
SINTER 11KV SUBSTATION
PANEL TRANSFORMER
NO 2
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
SINTER MAIN
SINTER 11KV SHOP
PANEL TRANSFORMER
NO 2
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS
HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
PROPORTIONIN
SINTER 11KV G
PANEL TRANSFORMER
NO 2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS
HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
HT BREAKER
SINTER 11KV CHILL FAN NO
PANEL 2

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH
HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SINTER 11KV SCREENING ID
PANEL FAN
PANEL FAN

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER
HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SINTER 11KV TAIL ESP ID
PANEL FAN
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER
CURRENT
TRANSFORMER

HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
HT BREAKER
SINTER 11KV HAMMER
PANEL CRUSHER NO 2
HT NUMERICAL
PROTECTIVE RELAY

HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER
HT PANEL BUSBARS

HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR
SP 11KV PT HT BREAKER
SINTER 11KV
AND
PANEL
ARRESTOR 2

HT NUMERICAL
PROTECTIVE RELAY
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER

HT PANEL BUSBARS
HT PANEL EARTH
SWITCH

HT PANEL EARTHING

HT PANEL SPACE
HEATER

HT PANEL BUSBAR
HORIZONTAL AND
VERTICAL
INSULATOR

HT BREAKER
SP 11 KV
HT BREAKER
SP 11 KV
11 KV BF HT BUSCOUPLER
PANEL ROOM CONNECT
SWITCH

HT NUMERICAL
PROTECTIVE RELAY

HT CABLES
HT CABLES

POTENTIAL
TRANSFORMER

CURRENT
TRANSFORMER
TYPE OF
CHECK (RUN
TOOLS CHECK /
DESCRIPTION / DIMENSION
REQUIRED STOP CHECK
/
SHUTDOWN)
SPANNERS /
Busbars typically housed inside switchgear SHUTDOWN
TORQUE
/ panel boards for local high current power CHECK
WRENCH
distribution. They are used to connect high
voltage equipment at electrical
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
insulated pillars. These features allow the SHUTDOWN
COTTON
ability to tap in at various points without CHECK
CLOTHE
creating a new joint. There should be
proper insulation between busbar and
switchgear panel through busbar Insulator.
SHUTDOWN
HT MEGGER
CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provide earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be
designed to control the high-voltage stress
to prevent breakdown of the insulation. SHUTDOWN
MEGGER
CHECK

TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system
CT used to reduce the current to lower
VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

Allows the electric power transmission at SPANNERS / SHUTDOWN


high voltage. Cable to be fixed with TORQUE
CHECK
Breaker Terminals properly insulated, WRENCH
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be SHUTDOWN
MEGGER
designed to control the high-voltage stress CHECK
to prevent breakdown of the insulation.

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system
Busbars typically housed inside switchgear
/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT
SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK
Earth Switch is designed to ground
electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.
To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK
PT used to reduce the voltage to lower
values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.
HT Panel Horizontal and Vertical
Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system
CT used to reduce the current to lower
VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system
Busbars typically housed inside switchgear
/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Allows the electric power transmission at
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK
Earth Switch is designed to ground
electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

Allows the electric power transmission at SPANNERS / SHUTDOWN


high voltage. Cable to be fixed with TORQUE
CHECK
Breaker Terminals properly insulated, WRENCH
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be SHUTDOWN
MEGGER
designed to control the high-voltage stress CHECK
to prevent breakdown of the insulation.
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be SHUTDOWN
MEGGER
designed to control the high-voltage stress CHECK
to prevent breakdown of the insulation.

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK


HT Panel Space Heaters are designed to
LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK
PT used to reduce the voltage to lower
values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.
HT Panel Horizontal and Vertical
Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system
CT used to reduce the current to lower
VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system
Busbars typically housed inside switchgear
/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Allows the electric power transmission at
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK
Earth Switch is designed to ground
electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.
To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

Allows the electric power transmission at SPANNERS / SHUTDOWN


high voltage. Cable to be fixed with TORQUE
CHECK
Breaker Terminals properly insulated, WRENCH
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be SHUTDOWN
MEGGER
designed to control the high-voltage stress CHECK
to prevent breakdown of the insulation.
PT used to reduce the voltage to lower
values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.
HT Panel Horizontal and Vertical
Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

Allows the electric power transmission at SPANNERS / SHUTDOWN


high voltage. Cable to be fixed with TORQUE
CHECK
Breaker Terminals properly insulated, WRENCH
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be SHUTDOWN
MEGGER
designed to control the high-voltage stress CHECK
to prevent breakdown of the insulation.

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system
CT used to reduce the current to lower
VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER
SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

Allows the electric power transmission at SPANNERS / SHUTDOWN


high voltage. Cable to be fixed with TORQUE
CHECK
Breaker Terminals properly insulated, WRENCH
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be SHUTDOWN
MEGGER
designed to control the high-voltage stress CHECK
to prevent breakdown of the insulation.

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system
Busbars typically housed inside switchgear
/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK

Earth Switch is designed to ground


electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT
Allows the electric power transmission at SPANNERS / SHUTDOWN
high voltage. Cable to be fixed with TORQUE
CHECK
Breaker Terminals properly insulated, WRENCH
clamped and sealed connector to provide
greater protecton from short circuiting of
cables.
Cable joints and terminals must be SHUTDOWN
MEGGER
designed to control the high-voltage stress CHECK
to prevent breakdown of the insulation.

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system

Busbars typically housed inside switchgear


/ panel boards for local high current power SPANNERS /
SHUTDOWN
distribution. They are used to connect high TORQUE
CHECK
voltage equipment at electrical WRENCH
switchyards, and low voltage equipments.
They are generally uninsulated, and have
sufficient stiffness to be supported in air by VISUAL /
SHUTDOWN
insulated pillars. These features allow the COTTON
CHECK
ability to tap in at various points without CLOTHE
creating a new joint. There should be
proper insulation between busbar and SHUTDOWN
HT MEGGER
switchgear panel through busbar Insulator. CHECK
Earth Switch is designed to ground
electrical circuit on both side of AC
Vacuum Circuit Breaker when the AC
SHUTDOWN
Vacuum Circuit Breaker is open. This VISUAL
CHECK
ensures the safety of the maintenance
personnel during maintenance and routine
checking.

To provive earthng of the Panel body. VISUAL RUN CHECK

HT Panel Space Heaters are designed to


LEAKAGE
maintain temperature and minimize RUN CHECK
TESTER
moisture inside electrical panel.

HT Panel Horizontal and Vertical


Insulators are for their high electrical &
mechanical strength used in electrical SHUTDOWN
VISUAL
panels to support the copper busbar. They CHECK
do not allow current to flow freely from
conductor (busbar) to body of the panel.

VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
VISUAL,
COTTON
To protect an electrical circuit from
CLOTHE, CRC,
damage caused by excess current from an
DIELECTRIC SHUTDOWN
overload or short circuit. Its basic function
ISOPLEX & CHECK
is to interrupt current flow after a fault is
SHELL TELLUS
detected.
32 GREASE, HT
MEGGER

SECONDARY
To detect the fault and initiates the
INJECTION
operation of circuit breaker to isolate the SHUTDOWN
CURRENT AND
defective element from the rest of the CHECK
VOLTAGE TEST
system.
KIT

SPANNERS /
SHUTDOWN
TORQUE
Allows the electric power transmission at WRENCH CHECK
high voltage. Cable to be fixed with
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
Breaker Terminals properly insulated,
clamped and sealed connector to provide
greater protecton from short circuiting of
cables. SHUTDOWN
MEGGER
Cable joints and terminals must be CHECK
designed to control the high-voltage stress
to prevent breakdown of the insulation.
TAN-DELTA SHUTDOWN
TEST KIT CHECK

PT used to reduce the voltage to lower


values and to provide isolation between VISUAL /
high voltage power network and the relays SECONDARY
and the other instruments that are INJECTION SHUTDOWN
connected to their secondaries. PT is used CURRENT AND CHECK
to measure voltage in high voltage circuits. VOLTAGE TEST
Also, it is used for protective purposes as KIT
input to relays in a power system

CT used to reduce the current to lower


VISUAL /
values and to provide isolation between
SECONDARY
high current and the relays and the other
INJECTION SHUTDOWN
instruments that are connected to their
CURRENT AND CHECK
secondaries. CT is used to measure current
VOLTAGE TEST
and also used for protective purposes as
KIT
input to relays in a power system
ACTUAL CONDITION ACTION
IDEAL CONDITION
OBSERVED ON 16.04.2018 REQUIRED

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.

Insulators were installed


Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.

Resistance between panel to busbar Resistance between panel to


should be ˃ 20 mega ohms. busbar is 100 mega ohms.

Interlock of Earth Switch and


Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.

Earthing is connected to the


Earthing should be healthy.
body and to the Earth Pit.

No oxydation and moisture inside No oxydation and moisture


panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.
HT Breaker should be clean. There HT Breaker found clean. There
should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 42 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 39 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.
Contact Resistance between Upper Contact Resistance between
and Lower contacts should be in Upper and Lower contacts is 44
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.

Insulation resistance between


Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0027

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.
CT connections should be tight and
CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.
HT Breaker should be clean. There HT Breaker found clean. There
should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 43 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 39 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.
Contact Resistance between Upper Contact Resistance between
and Lower contacts should be in Upper and Lower contacts is 40
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 41 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 40 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 20 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 41
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0017
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.
Vacuum inside bottles should be Vacuum inside bottles is
normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 40 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 37 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 21 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 41
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1800 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.00124
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 40 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 17 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 46
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0029
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A
Vertical and Horizontal insulators
Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 40 ms of all three phases.
Timing of CB during Open should Timing of CB during Open is
be in ms of all three phases. 37 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 25 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 44
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0022

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.
CT connections should be tight and
CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.
HT Breaker should be clean. There HT Breaker found clean. There
should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 42 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 39 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.
Contact Resistance between Upper Contact Resistance between
and Lower contacts should be in Upper and Lower contacts is 45
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0029

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 40 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 37 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 17 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 41
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0028
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is39


be in ms of all three phases. ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 45
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0031
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.
Vacuum inside bottles should be Vacuum inside bottles is
normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 41 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 22 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 41
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms
Timing of CB during Close should Timing of CB during Close is
be in ms of all three phases. 41 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 41
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1500 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0030
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A
Vertical and Horizontal insulators
Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 41 ms of all three phases.
Timing of CB during Open should Timing of CB during Open is
be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 41
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 1100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0020

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.
CT connections should be tight and
CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.
HT Breaker should be clean. There HT Breaker found clean. There
should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 40 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 37 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 17 ms of all three
should be in ms of all three phases.
phases.
Contact Resistance between Upper Contact Resistance between
and Lower contacts should be in Upper and Lower contacts is 40
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1700 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.00173

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 41 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 37 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 46
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0019
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.52 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 41 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 21 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 38
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0021
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.
Vacuum inside bottles should be Vacuum inside bottles is
normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 41 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 37 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 35
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0025
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 42 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 17 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 43
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A
Vertical and Horizontal insulators
Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 42 ms of all three phases.
Timing of CB during Open should Timing of CB during Open is
be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 17 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 43
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.
CT connections should be tight and
CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.
HT Breaker should be clean. There HT Breaker found clean. There
should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 42 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 17 ms of all three
should be in ms of all three phases.
phases.
Contact Resistance between Upper Contact Resistance between
and Lower contacts should be in Upper and Lower contacts is 43
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.

Vacuum inside bottles should be Vacuum inside bottles is


normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 42 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 17 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 43
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 100 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms

PT connections should be tight and


should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.

Tightened with 12mm high tensile


No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulators were installed
Insulators should be installed
properly and was clean. No
properly to hold and support
oxydation observed between
busbars. Insulators should be clean.
insulator and busbar.
Resistance between panel to busbar Resistance between panel to
should be ˃ 20 mega ohms. busbar is 100 mega ohms.
Interlock of Earth Switch and
Interlock of Earth Switch and HT
HT Breaker is healthy. HT
Breaker should be healthy. HT
Breaker do not Rack In during
Breaker should not Rack In during
Earth Switch operated
Earth Switch operated condition.
condition. Also, Back Door of
Also, Back Door of HT Panel
HT Panel has not been open
should not be open when earth
when earth switch is not
switch is not operated.
operated.
Earthing is connected to the
Earthing should be healthy.
body and to the Earth Pit.
No oxydation and moisture inside No oxydation and moisture
panel. Space Heater current should inside panel. Space Heater
be < 1 A current is 0.3 A

Vertical and Horizontal insulators


Vertical and Horizontal
should provide high electrical and
insulators strength to the
mechanical strength to the busbars.
busbars are good. Also, megger
Also, megger value should be ˃ 20
value is 100 mega Ohms.
mega Ohms.

HT Breaker should be clean. There HT Breaker found clean. There


should not be any moisture or wear is no moisture or wear and
and rusting of contacts. rusting of contacts.

Proper lubrication of all moving Lubrication of all moving parts


parts of mechanism. of mechanism is normal.

Proper operation of gear box Operation of gear box


mechanism. mechanism is normal.
Operation of Test / Service
Proper operation of Test / Service
auxiliary switch operation is
auxiliary switch operation.
proper.
Closing and tripping
Proper closing and tripping
mechanism of breaker both
mechanism of breaker both
electrically and manually is
electrically and manually.
proper.
Proper spring charging operation of Spring charging operation of
limit switch. limit switch is normal.

Condition of contact arm assembly Condition of contact arm


of breaker should be proper. assembly of breaker is proper.
Vacuum inside bottles should be Vacuum inside bottles is
normal. normal.
Insulation resistance between Insulation resistance between
Upper & Lower contacts should be Upper & Lower contacts is > 1
> 1 T Ohms T Ohms
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 1 T
Phase to Phase is > 1 T Ohms
Ohms
Insulation resistance between
Insulation resistance between
Phase to Earth should be > 1 T
Phase to Earth is > 1 T Ohms
Ohms

Timing of CB during Close should Timing of CB during Close is


be in ms of all three phases. 41 ms of all three phases.

Timing of CB during Open should Timing of CB during Open is


be in ms of all three phases. 38 ms of all three phases.

Timing of CB during Close /


Timing of CB during Close / Open
Open is 18 ms of all three
should be in ms of all three phases.
phases.

Contact Resistance between Upper Contact Resistance between


and Lower contacts should be in Upper and Lower contacts is 41
micro ohms of all three phases. micro ohms of all three phases.

HVAC Test for 15 KV should HVAC Test for 15 KV


withstand for min. of all three withstand for min. of all three
phases. phases.
HT Breaker Numerical Relay
HT Breaker Numerical Relay
tripping is healthy to trip the
tripping should be healthy to trip
breaker on the faults described
the breaker on the faults described
in the relay on prescribed
in the relay on prescribed values.
values.
Tightened with 12mm high tensile
No looseness of the bolts and
stainless steel bolts with flat
connecting links checked by
washers and nuts by Torque
torque wrench.
Wrench.
Insulation resistance between
Insulation resistance between
Phase to Phase should be > 20
Phase to Phase is 1500 Ohms
Mega Ohms
Insulation resistance between Insulation resistance between
Phase to Earth should be > 20 Phase to Earth is 100Mega
Mega Ohms Ohms
TAN-DELTA test of HT Cable TAN-DELTA test of HT Cable
should be < 0.004 absolute. is 0.0030
PT connections should be tight and
should PT connections are tight and
1. measure correct voltage on the display correct voltage on the
relay or meter. relay. Indication of voltage on
2. provide indication of voltage on the panel is shown. Trippig of
the panel. the HT Breaker through HT
3. trip the HT Breaker through HT Relay on Over voltage / Under
Relay on Over voltage / Under Voltage is healthy.
Voltage.

CT connections should be tight and


CT connections are tight and
should
display accurate current on the
1. measure current accurately on
relay. Trippig of the HT Breaker
the relay or meter.
through HT Relay on Over
2. trip the HT Breaker through HT
curent / CIR / ITOC / DMT is
Relay on Over curent / CIR / ITOC
healthy.
/ DMT.
Sub DESCRIPTION /
EQUIPMENT: COMPONENT
Equipments DIMENSION
switchgear / panel boards for
local high current power
distribution. They are used to
connect high voltage equipment
at electrical switchyards, and
low voltage equipments. They
are generally uninsulated, and
LT PANEL
have sufficient stiffness to be
BUSBARS
supported in air by insulated
pillars. These features allow the
ability to tap in at various points
without creating a new joint.
There should be proper
insulation between busbar and
switchgear panel through busbar

LT PANEL To provide earthng of the Panel


EARTHING body.

LT Panel Space Heaters are


LT PANEL SPACE designed to maintain
HEATER temperature and minimize
moisture inside electrical panel.

LT Panel Horizontal and Vertical


Insulators are for their high
LT PANEL
electrical & mechanical strength
BUSBAR
used in electrical panels to
HORIZONTAL
support the copper busbar. They
AND VERTICAL
do not allow current to flow
INSULATOR
freely from conductor (busbar)
to body of the panel.

SMS MCC
SMS MCC To protect an electrical circuit
PANEL
from damage caused by excess
current from an overload or
LT MCCB
short circuit. Its basic function is
to interrupt current flow after a
fault is detected.
SMS MCC
SMS MCC To protect an electrical circuit
PANEL
from damage caused by excess
current from an overload or
LT MCCB
short circuit. Its basic function is
to interrupt current flow after a
fault is detected.

Allows the electric power


transmission at low voltage.
Cable to be fixed with Breaker
Terminals properly insulated,
clamped and sealed connector to
LT CABLES provide greater protecton from
short circuiting of cables.
Cable joints and terminals must
be designed to control the low-
voltage stress to prevent
breakdown of the insulation.

Control transformer is used to


reduce the voltage to lower
values and to provide isolation
between different level of
voltage power network and the
CONTROL
relays and the other instruments
TRANSFORMER
that are connected to their
secondaries. it is used to
provide control supply
voltage(110Vac) to different
feeders connected to the MCC

CURRENT CT is used to measure current


TRANSFORMER and
TYPE OF CHECK
TOOLS (RUN CHECK / STOP
IDEAL CONDITION
REQUIRED CHECK /
SHUTDOWN)
Tightened with 12mm high
SPANNERS / tensile stainless steel bolts
SHUTDOWN CHECK
TORQUE WRENCH with flat washers and nuts by
Torque Wrench.

Insulators should be installed


VISUAL / COTTON properly to hold and support
SHUTDOWN CHECK
CLOTH busbars. Insulators should be
clean.

Resistance between panel to


LT MEGGER SHUTDOWN CHECK busbar should be ˃ 20 mega
ohms.

Panelshould be connected to
2 separate earth strips which
VISUAL RUN CHECK has to be connected to earth
pits having resistance less
than 5 ohms.

No oxydation and moisture


LEAKAGE TESTER RUN CHECK inside panel. Space Heater
current should be < 1 A

Vertical and Horizontal


insulators should provide
high electrical and
VISUAL SHUTDOWN CHECK
mechanical strength to the
busbars. Also, megger value
should be ˃ 20 mega Ohms.

LT MCCB should be clean.


There should not be any
moisture or wear and rusting
of contacts.
VISUAL, COTTON
SHUTDOWN CHECK
CLOTH, CRC,
VISUAL, COTTON Proper operation of MCCB
SHUTDOWN CHECK
CLOTH, CRC, for trip/close operation

Proper closing and tripping


mechanism of breaker both
electrically and manually.

Tightened with 12mm high


SPANNERS / tensile stainless steel bolts
SHUTDOWN CHECK
TORQUE WRENCH with flat washers and nuts by
Torque Wrench.
Insulation resistance between
Phase to Phase should be >
20 Mega Ohms
MEGGER SHUTDOWN CHECK
Insulation resistance between
Phase to Earth should be >
20 Mega Ohms

Control transformer
connections should be tight
and should
VISUAL / CLAMP 1. measure correct voltage on
SHUTDOWN CHECK
METER the meter.
2. provide indication of
voltage on the panel.

CT connections should be
tight and should measure
VISUAL SHUTDOWN CHECK current accurately on the
meter.
ACTUAL CONDITION
OBSERVED ON ACTION REQUIRED
16.04.2018

No looseness of the bolts


and connecting links
checked by torque wrench.

Insulators were installed


properly and was clean. No
oxydation observed between
insulator and busbar.

Resistance between panel to


busbar is >100 mega ohms.

Panel is connected to earth


pits (2 no) having resistance
value of 1 ohms with 2
separate earth strips

No oxydation and moisture


inside panel. Space Heater
current is 0.3 A

Vertical and Horizontal


insulators strength to the
busbars are good. Also,
megger value is >100 mega
Ohms.

HT Breaker found clean.


There is no moisture or wear
and rusting of contacts.
LT MCCB operation for
trip/close is proper
Closing and tripping
mechanism of breaker both
electrically and manually is
proper.

No looseness of the bolts


and connecting links
checked by torque wrench.

Insulation resistance
between Phase to Phase is
>100 Ohms
Insulation resistance
between Phase to Earth is >
100 Mega Ohms

Control transformer
connections are tight and
display correct voltage on
the relay. Indication of
voltage on the panel is
shown.

CT connections are tight and


display accurate current on
the meter.

S-ar putea să vă placă și