Sunteți pe pagina 1din 7

W a fi u l l a h C V , P a g e | 1

Letter of Interest

To: Afghanistan Urban Water Supply and Sewerage Corporation (AUWSSC)

From: Eng wafiullah

Vacancy No: 25/9SBUJ

Job Title: East Zone Director for Afghanistan Urban Water Supply and Sewerage Corporation
(AUWSSC)

Duty Station: Nangarhar , Afghanistan

To Whom It May Concern:

I am writing in response to your advertisement for the vacant position of East Zone Director for
Afghanistan Urban Water Supply and Sewerage Corporation (AUWSSC). After reading the job
description, I am confident that my educational background, skills and work experience are a perfect
match for this position.
The capabilities and competencies which make me suitable for this job can be described as bellow:

 Master degree in Civil Engineering from Cracow University of Technology in Poland

 Work experience with Afghan Government ( MoE, MAIL & MRRD) , World Bank and
USAID funded projects such as (EQUIP,OFWMP, DHPP Rehabilitation) in water
supply and irrigation projects

 Good understanding of Project Management ,Tendering , contract and Program


Management Fundamentals

 Good knowledge of local administrative, budgetary and financial practices.

 Technical management of water supply projects, including Engineering Design


(pressurized and gravity water supply schemes), Procurement, Monitoring and
evaluation, development of work plan, and reporting.

 Strong speaking and written communications skills in English, Dari, and Pashto.

 Knowledge of Environmental and social safeguard rules and regulations, and the ability to
manage Capacity Building initiatives in the area of project management.

 Strong Research, analytical and organizational skills.

 Strong Team Building , Management Skills, Technical Expertise, Administrative ,and


Coordination Abilities

I would welcome the opportunity to further discuss this position with you. If you have questions or
would like to schedule an interview, please contact me by phone on (0093)788052385 or by e-mail at
sayedwafiullah2017@gmail.com .I have enclosed my resume for your review, and I look forward to
hearing from you.
Sincerely,
Wafiullah
W a fi u l l a h C V , P a g e | 2

Primary: (0093)788052385
Alternate: (0093)700607779 / ( 0093)799888108
E-mail Address: sayedwafiullah2017@gmail.com

Professional Objective

As a technically proficient and educated Engineer coupled with my educational Background , I would
like to apply my professional managerial and analytical skills, effective communication abilities, and
dedicated work ethics combined with my commitment to perform a quality and productive service for
Rehabilitation of Afghanistan.

Personal Information

Family Name: Wafiullah


Nickname: Sayedi
Place of Birth: Jalalabad, Nangarhar, Afghanistan
Current Residence: Jalalabad, Afghanistan
Date of Birth: 02/01/1985
Nationality: Afghan
Gender: male
Marital Status: single
Native Language: Pashto

Formal Education

MSc Civil Engineering Cracow University of Technology,


Krakow, Poland
2010-2012

BSc Civil Engineering Nangarhar University 2003 – 2008

Baccalaureate
Certificate Saqafat High School Peshawar, Pakistan 1990– 2001

Overseas Training Courses:

 INTERNATIONAL PROGRAM ON PROCUREMENT


PROCEDURES FOR THE WORLD BANK AIDED PROJECTS
(In Association with the World Bank,
Global Procurement Consultants Limited,
Mumbai and the Department of Economic Affairs,
Ministry of Finance, Government of India)

 Preparation Course for PMP Certification


W a fi u l l a h C V , P a g e | 3

(Project management professional) Warsaw University


of technology,
Poland 2011

 Water supply and irrigation project Feasibility Studies:


Preparation, Analysis and Evaluation Indian institute of
technology , Rorkee 2013

 Contract management using FIDIC Forms of contract World Bank-Kabul, 2014

Professional community Membership

 American Concrete Institute (ACI) Voting member of ACI Committee 314,


Simplified Design of Concrete Buildings
 Civil Engineering Forum

Publications

 Strengthening construction monitoring and evaluation system for enhanced Quality


and timeliness
Kabul, Afghanistan 2015

 Earned value Method for Project Monitoring and Evaluation


Krakow, Poland ,2011

 Project Cost Control.


Krakow, Poland ,2011

 Program Evaluation Review Technique and Critical-Path Analysis for Construction


Project Scheduling.
Krakow, Poland ,2010

Academic Work Experience


Lecturer Sep-2013 to May-2014
Engineering faculty, Kardan University
Summary:
As a lecturer I am Responsible for teaching water supply, Project management , mentoring
Lab classes and giving assignments to the student

Construction Management Trainer (part time) Sep-2016 to june 2017


AMRAN, Afghanistan workforce development program, USAID
Summary:
As a trainer I was responsible for preparing teaching materials and lesson plans and delivering
the modules such as construction planning and WBS, construction scheduling using CPM ,
PERT and Line of balance techniques, construction resource planning, cash flow and control
using earned value management.

Industrial Work Experience


W a fi u l l a h C V , P a g e | 4

Deputy Director 11/Jan/2014 till now

Summary:

Infrastructure service department (ISD)-EQUIP, Ministry of Education, Kabul, Afghanistan

The Infrastructure Service Directorate (ISD) is one of the directorates of the ministry of education,
which is Responsible for overall management of building educational Infrastructures across the
country.

 Liaison with partner organization/Donor Agencies (WORLD BANK, GLOBAL


PARTNERSHIP FOR EDUCATION,DANIDA,UNICEIF) for implementing Development
programs of construction projects, this includes reviewing construction progress reports,
arranging regular progress monitoring meetings and representing ISD in working and senior
level discussions.
 Provide inputs to project implementation and monitoring and evaluation strategies, plans, and
specific activities.
 To ensure Development programs deliver expected results within the context they operate and
these are communicated internally and externally and to Take action to address any issues
 Developing procedures and guidelines for the planning, technical survey and feasibility
assessment of infrastructure projects.
 Establish proper information flow and reporting systems by the help of International TAs and
IPs of ISD.
 Leading Environmental and social safeguard team to develop the environmental and Social
management plan , and to oversee the implementation of ESMP during execution stage.
 Lead the existing technical board , outline the gaps in the present designs and approve the
technical changes in designs and support the planning and design section in preparation of
modern archive and modern database system
 Lead a team of engineers including water supply designer , draftsmen, structural engineers,
mechanical engineers, electrical engineers, and HVAC engineers
 Supervise the on-site monitoring and evaluation of infrastructure projects, ensuring that they
are being implemented according to designs, schedules, and budgets
 Providing technical support and guidance to staff in developing work plans, designing and
planning engineering structures.
 Provide overall financial oversight in coordination with the MOE Finance Department to
ensure that resources are managed in a efficient manner

Core Team Design Engineer


12/June/2012 to 3/Jan/2014
Ministry of Agriculture, irrigation and Livestock- On-Farm water management project
W a fi u l l a h C V , P a g e | 5

On-Farm water management project is a world bank funded project aimed to improve agricultural
productivity in project areas by enhancing the efficiency of water used.
Summary:
 Provide technical guidance to the Engineering team of On-Farm water management project and to
ensure execution is completed in accordance to approved international standards.
 Conduct necessary analytical, and feasibility studies of Infrastructure Project and Perform
Risk analysis on projects including structural option selection, economic viability and
environmental criteria.
 Responsible for support to project staff, manages the development of new construction programs and
participates in developing new initiatives and strategies.
 Review Work Plan and Construction Schedule with contractors and ensure that the work progresses in
accordance with Work Plan/Schedule
 Organize meetings and working sessions with Provincial irrigation Directorates to ensure proper
coordination at the working level.
 Coordinate and liaise with Sub project contractors for better implementation of construction projects
 Final technical Review of designs and providing comments to ensure compliance with established
standards
 Supervision and performance appraisal of staff in Project Implementation and Technical Unit
 Oversees implementation of construction projects at the regional level, including technical and
administrative aspects of program management
 Work closely with International consultants for project designs approval and incorporating the
comments on the designs
 Technical Evaluation of the Bids Received by the procurement department based on World Bank
Procurement guidelines

Research Officer 01/Jun/2010 to 01/July/2011


Construction Engineering Research institute, Krakow University of Technology, Krakow ,Poland
As a Research Associate , I have focused on the following research themes
Summary:
 Developing Advance water supply and irrigation management Techniques
 Guide undergraduate students for performing tests relevant to Civil engineering.
 Numerical Analysis of complicated Engineering Problems Using Finite Element Method
 Detailed review of OSHA regulations and standards critical to construction engineers and managers
who expect to design and administer safety related systems in a construction project
 disaster risk reduction and climate change adaptation in Buildings

Project Manager 16/Sep/2008 to 10/Jan/2010


Ministry of Rural Rehabilitation and Development (MRRD)/water supply and sanitation directorate

Summary:
W a fi u l l a h C V , P a g e | 6

 Undertaking technical and feasibility studies and site investigations for water supply and irrigation
projects
 Designed with water cad and epant program for designing pressurized and gravity water supply schemes
and to ensure standard design criteria
 Work collaboratively to establish and maintain effective working relationships with colleagues of
different Sections.
 coordination and control of planning, design, estimating, contracting and construction
 Monitored and controlled all technical and administration activities related the project
 Developed professional quarterly and six-month reports for project donors
 Developing and maintaining a system for archiving designs and related administrative
 Review of SOWs, BOQs, work plans, timelines (schedules), concepts and proposals for all
infrastructure related projects;.

Language Skills
Read Speak Write
Pashto Excellent Excellent Excellent
Dari Excellent Excellent Excellent
English Excellent(IELTS 6.5) Excellent(IELTS 7.0) Excellent(IELTS 6.5)

Training Courses
 Management and Leadership
International rescue Committee, Kabul, Afghanistan
 Construction quality management for contractors (Q.C.M)
Construction Training Trade Center (CTTC)
From IRD (USAID), Jalalabad,Nangarhar

 Best Practices For school buildings Design


Kfw,German Development Bank
Kabul, Afghanistan
 Result Based Management
Kfw,German Development Bank
Kabul, Afghanistan

Engineering Software’s and Programs

1. Autocad 2D/3D
2. MS Project
3. Primavera
4. BIM Modelling
5. MS Office Program

Professional References
 Abdul Momin Raad
Director of Infrastructure service department, Ministry of education, Kabul, Afghanistan
Email add: mominraad2002@googlemail.com
W a fi u l l a h C V , P a g e | 7

 Janusz Supernake
Professor and Chair at San Diego State University, civil engineering faculty, San Diego, USA
Email add: supernak@mail.sdsu.edu

 Prof.Andrzej Winnicki
Head of Department of structures , Cracow university of technology ,Krakow ,poland
Mobile:0048126282373
Email add:andrzej@dorabella.wil.pk.edu.pl

S-ar putea să vă placă și