01.05 SALA DE USO MULTIPLE, ALCALDIA, SECRETARIA Y TESORERIA DEL PRIMER Y SEGUNDO NIVEL
01.05.01 ESTRUCTURAS
01.05.01.01 TRABAJOS PRELIMINARES
01.05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2
Bloque 1.00
CIMIENTOS
EJE 1 ENTRE A-C' 1.00
EJE 2 ENTRE A-C' 1.00
EJE 3 ENTRE A-C' 1.00
EJE 4 ENTRE A-C' 1.00
EJE A ENTRE 1-4 1.00
EJE B ENTRE 1-4 1.00
EJE B´ ENTRE 2´-4 1.00
EJE C´ ENTRE 1-2´ 1.00
EJE A-C´ ENTRE 1-2´ 1.00
EJE 1-2´ ENTRE A-C´ 1.00
Tipo 01
EJE 1 ENTRE A-C' 1.00
Tipo 02
EJE 2 ENTRE A-C' 1.00
Tipo 03
EJE 2' ENTRE A-C' 1.00
Tipo 04
EJE 3 ENTRE A-C' 1.00
Tipo 05
EJE 4 ENTRE A-C' 1.00
1.00
01.05.01.04.01 ZAPATAS
01.05.01.04.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3
Tipo 01
EJE 1 ENTRE A-C' 1.00
Tipo 02
EJE 2 ENTRE A-C' 1.00
Tipo 03
EJE 2' ENTRE A-C' 1.00
Tipo 04
EJE 3 ENTRE A-C' 1.00
Tipo 05
EJE 4 ENTRE A-C' 1.00
1.00
01.05.01.04.03 COLUMNAS
01.05.01.04.03.01 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2
EJE 1 ENTRE A-C'
C-04 1.00
C-05 1.00
MUNICIPALIDAD DE CURAHUASI
“ Año del Diálogo y la Reconciliación Naciona l”
R1 1.00
R2 1.00
R3 1.00
PREUNTSR
SEGUNDO NIVEL
R1 1.00
R2 1.00
R3 1.00
R4 1.00
01.05.01.04.05 VIGAS
01.05.01.04.05.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2
PRIMARIAS
EJE 1-1/ A-C' 1.00
FONDO 1.00
VIGAS CHATAS
EJE 2'/A-B 1.00
FONDO 1.00
DOBLE VIGA
SECUNDARIAS
EJE A-A/ 1-4 1.00
FONDO 1.00
FONDO 1.00
VIGAS CHATAS
EJE 2'/A-B 2.00
DOBLE VIGA
EJE 2/C 2.00
SECUNDARIAS
EJE A-A/ 1-4 2.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
TERCER NIVEL 1.00
1.00
1.00
01.05.01.05 ESCALERA
01.05.01.05.01 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2
PLANO DE ESCALERAS Y DETALLES
1° TRAMO INCLINADO
CONTRAPASO 1.00
TRAMO INCLINADO 1.00
DESCANSO 1.00
2° TRAMO INCLINADO
CONTRAPASO 1.00
TRAMO INCLINADO 1.00
DESCANSO 1.00
01.05.02 ARQUITECTURA
01.05.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.05.02.01.01 MURO DE SOGA LADR. KK STANDARD 09X12X24 CON CEM-ARENA m2
PRIMER NIVEL
EJE A,B,B',C' / 1-4 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
EJE 1,2,2',3',3,4/ A-C' 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SEGUNDO NIVEL
EJE A,B,B',C' / 1-4 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
MUNICIPALIDAD DE CURAHUASI
“ Año del Diálogo y la Reconciliación Naciona l”
1.00
1.00
1.00
1.00
1.00
1.00
1.00
EJE 1,2,2',3',3,4/ A-C' 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TERCER NIVEL 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
EJE 1,2,2',3',3,4/ A-C' 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SEGUNDO NIVEL
EJE A,B,B',C' / 1-4 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
EJE 1,2,2',3',3,4/ A-C' 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
R1 1.00
R2 1.00
R3 1.00
MUNICIPALIDAD DE CURAHUASI
“ Año del Diálogo y la Reconciliación Naciona l”
P-1 1.00
P-2 1.00
P-3 1.00
P-7 1.00
V-1 1.00
V-2 1.00
V-3 1.00
V-4 1.00
V-5 1.00
V-6 1.00
V-7 1.00
V-8 1.00
MUNICIPALIDAD DE CURAHUASI
“ Año del Diálogo y la Reconciliación Naciona l”
V-9 1.00
V-10 1.00
V-11 1.00
V-12 1.00
V-13 1.00
1.00
1.00
1.00
1.00
1.00
1.00
01.05.02.03 CIELORRASOS
01.05.02.03.01 TARRAJEO DE CIELORRASO CON MEZCLA m2
PRIMER NIVEL
SALA DE USO MULTIPLE 1.00
DEPOSITO 1.00
CORREDOR 1.00
S.H VARONES 1.00
S.H MUJERES 1.00
SEGUNDO NIVEL
TESORERIA 1.00
CORREDOR 1.00
SECRETARIA 1.00
ALCALDIA 1.00
OFICINAS 1.00
S.H 03 1.00
BALCON 1.00
TESORERIA 1.00
CORREDOR 1.00
SECRETARIA 1.00
ALCALDIA 1.00
OFICINAS 1.00
S.H 03 1.00
BALCON 1.00
SEGUNDO NIVEL
TESORERIA 1.00
CORREDOR 1.00
SECRETARIA 1.00
ALCALDIA 1.00
OFICINAS 1.00
S.H 03 1.00
BALCON 1.00
PATIO 1.00
VEREDA 1.00
SEGUNDO NIVEL
TESORERIA 1.00
SECRETARIA 1.00
ALCALDIA 1.00
OFICINAS 1.00
BALCON 1.00
P-1 1.00
P-2 1.00
P-3 1.00
P-7 1.00
01.05.02.09 CERRAJERIA
01.05.02.09.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza
P-1 6.00
P-2 3.00
MUNICIPALIDAD DE CURAHUASI
“ Año del Diálogo y la Reconciliación Naciona l”
P-3 3.00
P-7 3.00
P-1 1.00
P-2 1.00
P-3 1.00
P-7 1.00
1.00
1.00
1.00
1.00
V-1 1.00
V-2 1.00
V-3 1.00
V-4 1.00
V-5 1.00
V-6 1.00
V-7 1.00
V-8 1.00
V-9 1.00
V-10 1.00
V-11 1.00
V-12 1.00
V-13 1.00
P-1 1.00
P-2 1.00
P-3 1.00
P-7 1.00
01.05.02.11 PINTURAS
01.05.02.11.01 PINTURA LATEX VINILICO EN MUROS EXTERIORES m2 1.00
01.05.02.11.02 PINTURA LATEX VINILICO EN MUROS INTERIORES m2 1.00
01.05.02.11.03 PINTURA LATEX VINILICO EN SUPERFICIE PLACAS Y COLUMNAS m2 1.00
1.00
01.05.02.11.04 PINTURA LATEX EN SUPERFICIE VIGAS INTERIOR - EXTERIOR m2 1.00
01.05.02.11.05 PINTURA LATEX EN CIELORRASO m2 1.00
MUNICIPALIDAD DE CURAHUASI
“ Año del Diálogo y la Reconciliación Naciona l”
01.05.04.03.02 CABLE ELECTRICO 50 mm2 NYY (ACOMETIDA AL TD-G ) INCLUYE PUESTA A TIERRA m 1.00
01.05.04.03.03 CABLE ELECTRICO TW Nº 08 AWG (ACOMETIDAS DEL TD-G A LOS TABLEROS TD-11) m 1.00
01.05.04.04 INTERRUPTORES.
01.05.04.04.01 INTERRUPTOR SIMPLE pza 1.00
01.05.04.04.02 INTERRUPTOR UNIPOLAR DOBLE pza 1.00
01.05.04.04.03 INTERRUPTOR TERMO MAGNETICO MONOFASICO 2x80AMP pza 1.00
01.05.04.04.04 INTERRUPTOR TERMO MAGNETICO MONOFASICO 2x60AMP pza 1.00
01.05.04.04.05 INTERRUPTOR TERMO MAGNETICO MONOFASICO 2x40AMP pza 1.00
01.05.04.05 ALIMENTADORES
01.05.04.05.01 TABLERO GENERAL
01.05.04.05.01.01 TABLERO GENERAL SISTEMA TRIFÁSICO 220 VOLTIOS DE 36 POLOS und 1.00
01.05.04.05.02 TABLERO DE DISTRIBUCION
01.05.04.05.02.01 TABLERO DE DISTRIBUCION DE TIPO ENGRAMPE DE 18 POLOS und 1.00
01.05.04.05.03 ARTEFACTOS DE ILUMINACIÓN.
01.05.04.05.03.01 FLUORESCENTE LINEAL 2x36 w CON REJILLA Y SISTEMA OPTICO SEMI PARABOLICO und 52.00
02 CERCO PERIMETRICO
02.01 ESTRUCTURAS
02.01.01 TRAZO Y REPLANTEO m2 1.00
02.01.02 LIMPIEZA DE TERRENO MANUAL m2 1.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE CIMIENTO CORRIDO m3 1.00
02.02.02 ELIMINACION DE MATERIAL PROVENIENTE DE EXCAVACION m3 1.00
02.03 CONCRETO SIMPLE
02.03.01 CIMIENTOS CORRIDOS MEZCLA C:H 1:10 +30% P.G m3 1.00
02.03.02 SOBRECIMIENTOS MEZCLA C:H 1:8+25% P.M. m3 1.00
02.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO m2 1.00
02.04 CONCRETO ARMADO
02.04.01 COLUMNAS
02.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.00
1.00
02.04.02 VIGAS
02.04.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.00
03.02 ARQUITECTURA
03.02.01 REVOQUES ENLUCIDOS Y MOLDURAS
03.02.01.01 TARRAJEO EN SARDINELES m2 1.00
1.00
1.00
03.02.02 PINTURAS
03.02.02.01 PINTURA EN SARDINEL C/ESMALTE m2 1.00
1.00
03.02.03 JUNTA DE DILATACION
03.02.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT m 1.00
03.02.03.02 SELLO ASFALTICO m 1.00
04 FLETE TERRESTRE
04.01 FLETE TERRESTRE GLB
FLETE TERRESTRE 1.00
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
CAL COMUNAL
0.00 0.00
1.00 AREA 0.00 0.00 0.00
178.15 178.15
1.00 AREA 178.15 178.15
121.59 121.59
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
105.99 105.99
11.09 11.09
1.00 0.30 10.16 0.50 1.52
1.00 0.30 10.06 0.50 1.51
1.00 0.30 2.72 0.50 0.41
1.00 0.30 6.93 0.50 1.04
1.00 0.30 6.81 0.50 1.02
1.00 0.30 12.73 0.50 1.91
1.00 0.30 11.52 0.50 1.73
1.00 0.30 6.80 0.50 1.02
1.00 0.30 6.22 0.50 0.93
29.36 29.36
1.00 0.60 10.16 0.60 3.66
1.00 0.60 10.06 0.60 3.62
1.00 0.60 4.58 0.60 1.65
1.00 0.60 6.93 0.60 2.49
1.00 0.60 12.73 0.60 4.58
1.00 0.60 11.52 0.60 4.15
1.00 0.60 6.80 0.60 2.45
1.00 0.60 6.22 0.60 2.24
1.00 0.60 7.27 0.60 2.62
1.00 0.60 5.28 0.60 1.90
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
Esponjamiento
Compactacion (0.80) 146.44 1.25 183.05
(1.25)
50.47
30.28
22.19
1.00 0.30 10.16 3.05
1.00 0.30 10.06 3.02
1.00 0.30 2.72 0.82
1.00 0.30 6.93 2.08
1.00 0.30 6.81 2.04
1.00 0.30 12.73 3.82
1.00 0.30 11.52 3.46
1.00 0.30 6.80 2.04
1.00 0.30 6.22 1.87
27.85
1.00 0.60 10.16 0.60 3.66
1.00 0.60 10.06 0.60 3.62
1.00 0.60 4.58 0.60 1.65
1.00 0.60 6.93 0.60 2.49
1.00 0.60 12.73 0.60 4.58
1.00 0.60 11.52 0.60 4.15
1.00 0.60 6.80 0.60 2.45
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 0.60 6.22 0.60 2.24
1.00 0.40 7.27 0.60 1.74
1.00 0.40 5.28 0.60 1.27
158.70
2.00 10.16 1.15 23.37
2.00 10.06 1.15 23.14
2.00 4.58 1.15 10.53
2.00 6.93 1.15 15.94
2.00 12.73 1.15 29.28
2.00 11.52 1.15 26.50
2.00 6.80 1.15 15.64
2.00 6.22 1.15 14.31
11.90
1.00 0.15 10.16 1.15 1.75
1.00 0.15 10.06 1.15 1.74
1.00 0.15 4.58 1.15 0.79
1.00 0.15 6.93 1.15 1.20
1.00 0.15 12.73 1.15 2.20
1.00 0.15 11.52 1.15 1.99
1.00 0.15 6.80 1.15 1.17
1.00 0.15 6.22 1.15 1.07
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
20.19
381.6636 381.66
73.95
2.00 10.16 0.50 10.16
2.00 10.06 0.50 10.06
2.00 2.72 0.50 2.72
2.00 6.93 0.50 6.93
2.00 6.81 0.50 6.81
2.00 12.73 0.50 12.73
2.00 11.52 0.50 11.52
2.00 6.80 0.50 6.80
2.00 6.22 0.50 6.22
11.09
1.00 0.30 10.16 0.50 1.52
1.00 0.30 10.06 0.50 1.51
1.00 0.30 2.72 0.50 0.41
1.00 0.30 6.93 0.50 1.04
1.00 0.30 6.81 0.50 1.02
1.00 0.30 12.73 0.50 1.91
1.00 0.30 11.52 0.50 1.73
1.00 0.30 6.80 0.50 1.02
1.00 0.30 6.22 0.50 0.93
646.6008 646.60
166.75
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
13.41
1037.29 2,074.58
42.68
1.90
2.00 0.15 0.33 2.45 0.49
7.00 0.10 0.15 2.45 0.26
4.00 0.15 0.40 2.45 0.59
9.00 0.15 0.15 2.45 0.50
1.00 0.15 0.20 2.45 0.07
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
158.15 158.15
174.22
174.22
1.00 10.57 0.60 6.34
1.00 0.20 9.37 1.87
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 7.45 0.60 4.47
1.00 0.25 8.15 2.04
82.69
1.00 11.83 0.40 4.73
1.00 0.25 9.93 2.48
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 0.25 10.32 2.58
28.26
28.26
1.00 0.20 10.57 0.60 2.54
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 0.25 8.50 0.20 0.85
1330.10 2,660.19
179.88
14.46
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 4.95 6.00 0.05 2.97
1.00 1.15 3.70 0.05 0.43
1.00 1.50 3.75 0.05 0.56
1.00 1.70 2.87 0.05 0.49
164.95 1,392.54
1.00 1.35 5.53 14.93
1.00 1.37 3.87 10.60
1.00 4.95 6.00 59.40
1.00 1.15 3.70 8.51
1.00 1.50 3.75 11.25
1.00 1.70 2.87 9.76
1.00 1.99 5.35 21.29
1.00 0.35 1.97 1.38
1.00 1.23 1.44 3.54
1.00 1.16 2.60 6.03
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 1.16 6.69 15.52
1.00 0.40 3.15 2.52
1.00 2.97 3.20 9.50
1.00 1.70 1.70 2.89
1.00 0.60 4.57 2.74
8.33 164.95
desperdicio 0.0135 1,373.99
18.55
59.20 59.20
39.93
3.99
24.14
1.88
#REF! 149.06
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
308.64
308.64
1.00 1.27 2.65 3.37
1.00 3.40 2.65 9.01
1.00 3.33 0.80 2.66
1.00 0.65 2.65 1.72
1.00 1.72 2.65 4.56
1.00 0.40 2.65 1.06
1.00 2.48 0.80 1.98
1.00 1.75 0.80 1.40
1.00 0.40 2.65 1.06
1.00 2.39 2.65 6.33
1.00 0.45 2.65 1.19
1.00 1.60 2.65 4.24
1.00 2.24 2.65 5.94
1.00 0.83 2.65 2.20
1.00 0.74 2.65 1.96
1.00 4.17 2.65 11.05
1.00 2.73 2.65 7.23
1.00 2.45 2.65 6.49
1.00 3.52 2.65 9.33
1.00 1.35 1.60 2.16
1.00 1.02 1.67 1.70
2.00 1.02 1.67 3.41
2.00 5.25 2.65 27.83
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 0.97 2.50 2.43
1.00 1.20 1.60 1.92
1.00 1.25 2.50 3.13
1.00 0.70 2.50 1.75
1.00 1.75 2.50 4.38
1.00 2.24 2.50 5.60
1.00 3.52 2.50 8.80
1.00 0.75 2.65 1.99
1.00 1.59 2.65 4.21
1.00 4.35 0.80 3.48
1.00 2.96 2.50 7.40
1.00 3.90 2.50 9.75
1.00 6.85 2.50 17.13
1.00 2.79 0.80 2.23
1.00 2.05 2.50 5.13
1.00 0.80 1.60 1.28
1.00 2.85 1.20 3.42
1.00 4.42 2.50 11.05
199.42
199.42
1.00 3.33 0.80 2.66
1.00 3.40 2.45 8.33
1.00 1.27 2.45 3.11
1.00 3.83 2.45 9.38
1.00 1.09 2.45 2.67
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 1.65 2.45 4.04
1.00 2.00 0.80 1.60
1.00 0.94 2.45 2.30
1.00 1.27 2.45 3.11
1.00 1.55 2.45 3.80
2.00 1.55 2.45 7.60
1.00 0.75 2.45 1.84
1.00 3.52 2.45 8.62
1.00 0.80 2.45 1.96
1.00 1.50 2.45 3.68
1.00 0.60 2.45 1.47
1.00 1.50 2.45 3.68
1.00 2.92 2.45 7.15
1.00 1.50 2.45 3.68
1.00 2.85 1.20 3.42
1.00 0.80 1.60 1.28
1.00 0.43 2.45 1.05
1.00 9.37 0.89 8.34
2.00 7.48 0.89 13.31
1.00 9.74 0.89 8.67
1.00 5.92 0.89 5.27
1.00 7.95 0.89 7.08
1.00 8.40 0.89 7.48
1.00 8.18 0.89 7.28
328.28
328.28
1.00 1.27 2.45 3.11
1.00 3.40 2.45 8.33
1.00 3.33 0.80 2.66
1.00 0.65 2.45 1.59
1.00 1.72 2.45 4.21
1.00 0.40 2.45 0.98
2.00 2.48 0.80 3.97
2.00 1.75 0.80 2.80
1.00 0.40 2.45 0.98
1.00 2.39 2.45 5.86
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 0.45 2.45 1.10
1.00 1.60 2.45 3.92
2.00 2.24 2.45 21.95
1.00 0.83 2.45 2.03
1.00 0.74 2.45 1.81
1.00 4.17 2.45 10.22
1.00 2.73 2.45 6.69
1.00 2.45 2.45 6.00
1.00 3.52 2.45 8.62
2.00 1.35 1.60 4.32
1.00 1.02 1.67 1.70
2.00 1.02 1.67 3.41
2.00 5.25 2.45 25.73
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
127.35
127.35
2.00 1.60 2.45 7.84
1.00 1.60 2.45 3.92
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
106.56
106.56
1.00 10.77 0.60 6.46
1.00 0.20 9.37 1.87
1.00 10.65 0.60 6.39
1.00 0.25 9.66 2.42
1.00 5.53 0.60 3.32
1.00 0.20 5.53 1.11
1.00 5.47 0.40 2.19
1.00 0.25 5.47 1.37
1.00 4.77 0.40 1.91
1.00 0.20 4.37 0.87
1.00 7.47 0.60 4.48
1.00 0.25 6.48 1.62
1.00 5.35 0.40 2.14
1.00 0.25 5.35 1.34
1.00 7.35 0.60 4.41
1.00 0.25 6.75 1.69
1.00 8.40 0.40 3.36
1.00 0.25 8.40 2.10
1.00 4.55 0.40 1.82
1.00 0.25 4.55 1.14
27.28
1.00 12.73 0.40 5.09
1.00 0.25 9.93 2.48
1.00 12.72 0.40 5.09
1.00 0.25 10.32 2.58
1.00 10.20 0.40 4.08
1.00 0.25 6.80 1.70
1.00 3.87 0.40 1.55
1.00 0.25 3.87 0.97
1.00 6.22 0.40 2.49
1.00 0.25 5.02 1.26
213.24
213.24
1.00 8.90 8.90
5.00 7.10 35.50
2.00 6.90 13.80
6.00 7.30 43.80
2.00 4.00 8.00
1.00 4.80 4.80
1.00 8.66 8.66
1.00 7.20 7.20
1.00 10.36 10.36
1.00 9.80 9.80
1.00 7.34 7.34
1.00 10.60 10.60
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
2.00 7.70 15.40
1.00 4.50 4.50
1.00 6.70 6.70
1.00 9.28 9.28
1.00 8.60 8.60
255.02
255.02
1.00 11.20 11.20
2.00 8.26 16.52
2.00 7.35 14.70
1.00 10.00 10.00
1.00 4.60 4.60
1.00 6.56 6.56
1.00 5.10 5.10
1.00 5.70 5.70
1.00 3.44 3.44
1.00 6.70 6.70
1.00 8.40 8.40
1.00 6.80 6.80
1.00 8.20 8.20
1.00 10.50 10.50
1.00 8.34 8.34
1.00 12.24 12.24
1.00 13.54 13.54
1.00 9.70 9.70
1.00 8.38 8.38
1.00 8.50 8.50
1.00 5.60 5.60
1.00 7.08 7.08
1.00 5.90 5.90
1.00 5.38 5.38
1.00 15.70 15.70
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 4.80 4.80
1.00 8.10 8.10
1.00 6.94 6.94
2.00 8.20 16.40
36.40
36.40
1.00 36.40 36.40
60.27
60.27
1.00 36.40 36.40
23.87
2.00 1.45 2.54 7.37
9.00 1.45 0.46 6.00
9.00 1.45 0.46 6.00
1.00 1.50 3.00 4.50
162.41
162.41
1.00 AREA 53.71 53.71
1.00 AREA 8.22 8.22
1.00 AREA 17.48 17.48
1.00 AREA 3.01 3.01
1.00 AREA 2.56 2.56
77.44
77.44
1.00 AREA 5.96 5.96
1.00 AREA 14.23 14.23
1.00 AREA 10.02 10.02
1.00 AREA 17.90 17.90
1.00 AREA 19.92 19.92
1.00 AREA 2.56 2.56
1.00 AREA 6.86 6.86
211.09 211.09
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 AREA 53.71 53.71
1.00 AREA 8.22 8.22
1.00 AREA 17.48 17.48
1.00 AREA 3.01 3.01
1.00 AREA 2.56 2.56
198.15
198.15
1.00 AREA 53.71 53.71
1.00 AREA 8.22 8.22
1.00 AREA 17.48 17.48
1.00 AREA 3.01 3.01
1.00 AREA 2.56 2.56
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
130.71
1.00 AREA 53.71 53.71
1.00 AREA 8.22 8.22
1.00 AREA 3.01 3.01
1.00 AREA 2.56 2.56
67.44
1.00 AREA 17.48 17.48
1.00 AREA 14.23 14.23
1.00 AREA 35.732 35.73
3.24
1.88
1.00 6.30 0.25 1.58
1.00 1.20 0.25 0.30
6.00
6.00 1.00 6.00
6.00
6.00 1.00 6.00
44.28
2.00 7.30 1.50 21.90
1.00 7.35 1.50 11.03
1.00 7.57 1.50 11.35
124.37
1.00 35.17 35.17
1.00 14.65 14.65
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
36.14
36.14
1.00 1.80 2.6 4.68
5.00 0.90 2.6 11.70
2.00 0.80 2.6 4.16
6.00 1.00 2.6 15.60
52.20
18.00 1.45 52.20
45.00
45.00
1.00 6.00
5.00 15.00
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
2.00 6.00
6.00 18.00
14.00
14.00
1.00 1.00
5.00 5.00
2.00 2.00
6.00 6.00
14.00
14.00
1.00 1.00
5.00 5.00
2.00 2.00
6.00 6.00
51.96
51.96
2.00 1.02 0.93 1.90
1.00 1.35 1.00 1.35
1.00 2.48 1.80 4.46
1.00 1.75 1.80 3.15
1.00 3.33 1.80 5.99
1.00 2.25 2.60 5.85
1.00 1.02 2.60 2.65
1.00 2.65 2.60 6.89
2.00 2.00 1.80 7.20
1.00 1.50 1.80 2.70
1.00 2.79 1.80 5.02
1.00 2.85 1.40 3.99
1.00 0.80 1.00 0.80
8.34
8.34
1.00 1.80 0.6 1.08
5.00 0.90 0.6 2.70
2.00 0.80 0.6 0.96
6.00 1.00 0.6 3.60
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00 M.L. 213.24 213.24
1.00 M.L. 255.02 255.02
2.00 Areas 72.28 72.28
1.00 Areas 23.87 23.87
1.00 M.L. 6.53 6.53
1.00 M.L. 5.08 5.08
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
52.00 52.00
13.00 13.00
2.00 2.00
44.00 44.00
4.00 4.00
252.40 252.40
198.00 198.00
30.25 30.25
25.00 25.00
504.80 504.80
396.00 396.00
85.50 85.50
13.00 13.00
2.00 2.00
5.00 5.00
2.00 2.00
2.00 2.00
2.00 2.00
4.00 4.00
52.00
52.00
20.00 20.00
onciliación Naciona l”
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
7.00 7.00
1.00 1.00
1.00 1.00
2.00 2.00
4.00 4.00
4.00 4.00
2 2.00 2.00
7 7.00 7.00
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
NERAL
DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
URA, INSTALACIONES
MAYO DE 2018
N° METRADOS
VECES ANCHO LARGO ALTO SUB. TOT TOTAL
1.00
1.00
HOJAS DE METRADOS ACEROS
PROYECTO : CREACIÓN DEL LOCAL COMUNAL MULTIUSOS DEL CENTRO POBLADO DE ANTILLA, DISTR
METRADO: ACEROS
ACERO
SECUNDARIAS
ACERO DE T°
EJE A-E / 1-4 1/4" 1.00 12.00
1/4" 1.00 15.00
1/4" 1.00 8.00
1/4" 1.00 17.00
1° TRAMO INCLINADO
Inclinado superior 3/8" 1.00 6.00
Transversal superior 3/8" 1.00 16.00
Inclinado inferior 1/2" 1.00 6.00
DESCANSO
Transversal superior 3/8" 1.00 6.00
Tansversal inferior 3/8" 1.00 6.00
2° TRAMO INCLINADO
Inclinado superior 3/8" 1.00 6.00
Transversal superior 3/8" 1.00 16.00
Inclinado inferior 1/2" 1.00 6.00
DESCANSO
Transversal superior 3/8" 1.00 6.00
Tansversal inferior 3/8" 1.00 6.00
CERCO PERIMETRICO
02.04.01.03 ACERO GRADO 60 EN COLUMNAS KG
1/2" 6.00 4.00
Transversal superior 3/8" 6.00 4.00
ESTRIBOS 1/4" 6.00 17.00 1.14
02.04.02.03 ACERO GRADO 60 EN VIGAS KG
1/2" 3.00 4.00
BALANCIN 3/8" 3.00 4.00
ESTRIBOS 1/4" 3.00 90.00 0.64
CEROS
DO DE ANTILLA, DISTRITO DE CURAHUASI - ABANCAY- APURÍMAC.
ROS
EL 2018
METRADOS
LONGITUD DE ACERO
PESO DE ACERO LONGITUDTOTAL ML. PESO TOTAL DE
PARCIAL KG
3/8" 1/2" 5/8" 3/4" KG/M. ACERO KG.
381.66
0.85 1.02 36.55 37.28
10.99 1.02 43.96 44.84
1.35 1.02 58.05 59.21
10.89 1.02 65.34 66.65
0.85 1.02 11.90 12.14
3.17 1.02 12.68 12.93
1.35 1.02 40.50 41.31
7.35 1.02 44.10 44.98
0.85 1.02 25.50 26.01
7.25 1.02 29.00 29.58
0.85 1.02 5.95 -
1.65 1.02 6.60 6.73
646.60
9.67 1.60 38.68 61.89
9.67 1.02 9.67 9.86
1.36 0.58 61.20 35.50
1,037.29
4.45 1.60 106.80 170.88
4.45 1.02 106.80 108.94
1.36 0.58 261.12 151.45
158.15
2.60 0.58 20.80 12.06
2.60 0.58 20.80 12.06
0.25 38.40 9.60
1,330.10
431.90
310.79
1.50 1.02 42.00 42.84
3.87 1.02 23.22 23.68
3.98 1.02 63.68 64.95
1.70 1.02 23.80 24.28
4.00 1.02 152.00 155.04
80.50
2.97 1.02 47.52 48.47
1.70 1.02 17.00 17.34
0.60 1.02 14.40 14.69
121.10
8.85 0.25 106.20 26.55
7.53 0.25 112.95 28.24
2.27 0.25 18.16 4.54
10.77 0.25 183.09 45.77
155.71
3.35 1.02 87.10 88.84
2.98 1.02 65.56 66.87
59.20
149.06
21.66
457.81
1.95 1.02 46.80 47.74
1.95 0.58 46.80 27.14
0.25 116.28 29.07
353.86
16.18 1.02 194.16 198.04
16.18 0.58 194.16 112.61
0.25 172.80 43.20
Obra: CONAFOVICER
Contrato:
Entidad Contratante:
Contratista:
HOJA DE METRADOS - A
EstrucMETRADO DE ACEROS
Obra: CONAFOVICER
Plano de Ref.: E-01
c
a a
b b
b
TIPO I
ZAPATA 01
ZAPATA 02
TIPO IV
308.88