REHABILITATION OF
ACCESS ROADS
Detailed design
Rev 1.1.0
March 2004
Rehabilitation of access roads
REHABILITATION OF
ACCESS ROADS
Detailed design
C O N T E N T S:
1. DESIGNER DOCUMENTATION
2. DESIGN BRIEF
3. TECHNICAL DESCRIPTION
5. TECHNICAL CONDITIONS
7. NUMERIC DATA
7.1. HORIZONTAL CURVES DATA
7.2. DATA FOR LAYING OUT AXLES
7.3. DATA ON SURFACE WATER GULLIES
7.4. DATA ON ROAD MANHOLES
7.5. DATA FOR LAYING OUT TUNNEL AXLES
8. BILL OF QUANTITIES
7.1. QUANTITIES CALCULLATION
8.2. BILL OF QUANTITIES
9. DRAWINGS
2
Rehabilitation of access roads
3
Rehabilitation of access roads
2.1. INTRODUCTION
After all Novi Sad bridges were destroyed in 1999, bridges are only partly
renewed. Still a very important bridge is pontoon bridge which is a temporary
bridge and causes great problems for Danube water transport. Reconstruction
of the Sloboda Bridge is on the way, financed by European Agency for
Reconstruction. For this, key City Bridge, to be in full operation, access roads
are to be renewed to insure safe traffic. This design is part of the Project for
tunnel “Miseluk” and Access Roads to the Sloboda Bridge Rehabilitation
tender preparation.
Operational polygon is to be laid out along route of existing roads planned for
rehabilitation. On laying topographic marks, they should be on places that will
not be destroyed or damaged during works execution.
Width of surveyed zone must be in accordance with the road width on cross
sections, and relevant density of surveying has to be executed. Distance
between measured profiles should not exceed 20.00 m. All relevant spots are
to be surveyed (manholes, drainage, lighting poles etc). Damaged parts of
tunnel tubes are to be surveyed as well.
Site plan must be in appropriate computer design format and should enable
forming of plans on scales 1:250 to 1:2500.
4
Rehabilitation of access roads
5
Rehabilitation of access roads
2.5.2. TEXTS
Technical report consists of all details necessary for global view of design
documents and description of all details concerning roads rehabilitation. It has
to cover following:
Topographic plan:
- List of operating plan spots
- list of permanent marks
6
Rehabilitation of access roads
Other works
- Traffic regulation during work execution
- As built design
Format type”1"
- Length = 420 mm
- Height = 297 mm
Format type”2"
- Length to = 1 200 mm
- Height = 594 mm
7
Rehabilitation of access roads
Key plan should have all data on terrain, especially connection to existing
objects and conflict spots in the area.
Key plan should be easy for use and to consist of all data relevant to the
design.
Site plan must consists of all relevant data on curves and connecting
elements, data on polls and sub polls polygon, topographical plan and
operational polygon.
Even buildings that are not covered by this design are to be shown on site
plan.
- Terrain line,
- Change of grade,
- Level of grade,
- Data on curve elements,
- Data on pavement warping,
- Buildings under roads with relevant chainages,
- Drainage buildings that are covered with the design.
Road cross sections should be drawn for all typical solutions, with all physical
data on road profile and necessary other data.
Usual cross sections will be done for all types of roads. Cross sections should
have at least following data:
8
Rehabilitation of access roads
9
Rehabilitation of access roads
3.1. GENERAL
Works on this section first started on Bridge and after that on Tunnel. All
works were finished in autumn 1981.
10
Rehabilitation of access roads
No real maintenance works were done on access roads after Sloboda Bridge
destruction, so works on roads rehabilitations are to be carried out.
Beside these damages, certain damages are done on purpose, because from
time to time, parts of this road system are used for motor races.
11
Rehabilitation of access roads
----------------------------------------------
Altogether : 27.60 m
12
Rehabilitation of access roads
- Berm 1.00 m
- Pedestrian line 2.00 m
- Roadway 6.00 m
- Berm 1.00 m
----------------------------------------------
Altogether : 10.00 m
Visual and laboratory checking of road structure are done to examine present
state.
13
Rehabilitation of access roads
Original design documentation for roads, tunnel and bridge are studied for
defining design solution on access roads rehabilitation.
A. From 1981 till 1999 maximal traffic was between 15000 to 20000
vehicles a day. Traffic consisted of mainly individual vehicles and
only about 150 busses. Heavy traffic was not allowed and only a
few trucks were allowed on this route.
Systematic cracks
Netlike cracks
Netlike cracks are mainly with similar intensity and minimal distance
could be even only 10 cm. These cracks are result of rheological
changes and the fact that relaxation of material did not have any
influence of traffic so there was no traffic pressure to prevent
occurrence of these cracks.
14
Rehabilitation of access roads
For testing the actual state of asphalt core, necessary laboratory testing was
carried out, as follows:
Basic conditions for uninterrupted and secured traffic on all access roads to
Sloboda Bridge are followed during designing work. All solutions are based on
min. 5 years of exploitation period with only ordinary maintenance.
Parts of access roads constructed originally are not in use because the whole
system, as designed was not finished. Those roads are not part of this design
solution.
Because not being in use for a long period and not maintained properly,
almost all horizontal and vertical signalisation is missing. Some parts are
renewed for motor races and that was not done according to designs and
proper permissions. Interventions done for motor races could not be taken in
account because they are not in accordance with traffic security measures.
15
Rehabilitation of access roads
Bitumen is tested for penetration, ductility and ring and ball. Rheological changes
were find, but bearing capacity of road structure is not damaged.
It is found that systematic cracks are deeper than bitumen course all the way to
cement stabilisation course and that netlike cracks are result of temperature changes
and rheological changes in binder.
To insure maximum works from the approved budget and setting exploitation period
on 5 years resulted in following works needed to achieve this:
16
Rehabilitation of access roads
If netlike cracks are nearer than 40 cm and in cases where some parts of wearing
course are missing, wearing course must be taken off by milling and changed with
new wearing asphalt course.
On all road surfaces except for the Axle 2 that will be rebuilt, surface dressing is
designed. This will insure stabile and good traffic conditions on all sections.
Thickness of surface dressing will be between 15 and 20 mm. Areas around gully will
be treated separately. This surface dressing will not change influence of critic
temperatures during summer period.
Where existing kerb stones are damaged, they will be changed by new of same
shape, outer look and characteristics. Details for curbs changing are given on
drawings.
Where gullies and manholes are filled with soil and other materials, they will be
cleaned together with drainage pipes that connect them.
On Axle 12 heavy destruction of gutter are fount. This section will be sanated by
building new kerb stones and gutter finished in asphaltic material, over existing
gutter.
Drainage channels beside roads will only be cleaned of dust and waste materials.
In road body, drainage pipes for unique drainage system are laid. This system is in
good condition and only cleaning will be done if necessary..
Works are grouped according to the kind of works and technology applied.
17
Rehabilitation of access roads
Disposition of main work items is given on appropriate drawings and site plan.
Contractor will obtain all necessary documentation and approval for traffic
management during works execution.
Design consists of all necessary data and instructions for works designed. This
design is only for road rehabilitation and only for roads it is aimed for.
18
Rehabilitation of access roads
During work execution and during usage period, certain measures on labour
and road user’s protection and protection of equipment, materials and fuel are
to be carried out. All measures must be in accordance with relevant
regulations on this matter.
During execution of works, different kind of dangers that could cause workers
injuring or destruction of materials and equipment, could occur. By carrying
out certain measures, it is possible to minimize these threats.
Site premises must be organized prior to works execution stats with all
sanitary and technical installations. Materials must be stored according to
relevant regulations and standards. All dangerous places must be clearly
marked and plates with appropriate warning messages, and permanent
guarding is to be organized for the most dangerous places.
Plant and equipment are to have organized areas for maintenance and
revision and for minor repairs. All machinery must be technically correct and
19
Rehabilitation of access roads
with appropriate signals (lights and sound signals) for warning during in work.
After work finishing, all machines will be checked and parked on appropriate
and for that prepared places.
Skill level of workers must be according to complicity and kind of jobs they are
to execute. All working places must be equipped with personal protection
equipment concerning all possible incidents even concerning air and ground
pollution and all working areas must be properly ventilated. Workers that are
executing works in open areas must be equipped with proper rain and cold
protection. All workers must ware protecting helmets and marking jackets.
Transport equipment must be registrated for public roads using. All transport
must be in accordance with legal regulations on transport execution.
All self propelled vehicles on the site must move according to traffic
management plan.
On all places with fire danger, appropriate fire protection equipment will be
installed. Tools and equipment for fire protection must be marked and
accessible. Appropriate fire warning system must be established.
First aid must be organized on the site during all work execution time.
Access roads to Sloboda Bridge must be used only for the purpose they are
designed for and in accordance to relevant laws on traffic. All horizontal and
vertical signalisation must be maintained and in perfect condition. Crash
barriers must be kept in perfect conditions.
20
Rehabilitation of access roads
Description
The Contractor shall employ professional personnel to perform all necessary
surveying and setting out in accordance with the references points, curve
elements and co-ordinates as shown on the drawings.
Prior to beginning of works, Contractor is obliged to execute necessary
marking of all road centre lines, crossroads and building. Marking is to be
done according to the Design The Contractor shall establish all detailed
setting out and provide, establish and maintain benchmarks and a schedule of
their corresponding levels at intervals agreed with the Engineer.. During
execution of works all relevant marks are to be kept as originally set out. Any
missing data on traverse points and bench marks are to be obtained from the
local surveying authority.
Description
Before the Contractor has been given possession of site by the Employer, he
shall, through the offices of his appointed Accident Prevention Officer, lease
with the appropriate traffic police and the maintenance section of the City
Secretariat of Traffic with respect to traffic management and intended lane
closures for the purposes of the Works, providing advance notice and a copy
of the proposed traffic management plan. If there is a need for regulation of
public transport, this is to be done by traffic management plan approved traffic
authority mentioned above.
Whilst in possession of site, the Contractor shall be responsible for operation
of the approved traffic management plan, including erection of temporary
traffic warning signs, lighting, traffic cones, traffic control equipment, flagmen,
protection barriers and other measures to ensure safety for the public and
road users. Traffic management shall be in accordance with international
standards.
21
Rehabilitation of access roads
Description
Existing roads that are designed to be completely renewed, are to be
demolished by appropriate mechanical tools, including road bed, average
depth of d=25-40 cm, of different structures. All waste materials after
demolition are to be transported to the destination approved by the Engineer.
If there is any need, this material will be reused for filling.
Description
Existing kerb stones that must be changed shall be carefully dismantled,
using manual tools and pneumatic hammers taking care to protect
neighbouring kerbs against damage. Concrete bedding shall be removed, sub
surface shall be cleaned, and debris shall be hauled to spoil. Dismantled
curbs shall be sorted, damaged ones shall be hauled to spoil as directed by
Engineer, and usable curbs shall be steel-brushed and placed with structure
vicinity, when should be placed on structure.
Description
Pavements that are to be eliminated will be demolished. Average pavement
structure depth is 20-30 cm. If pavement is made of concrete tiles, it will be
dismantled manually. All unusable materials are to be transported to approved
destination.
Description
22
Rehabilitation of access roads
Where joints for widening or joining are designed, step side cutting is to be
executed (d=6-10 cm) by pneumatic hammer or by circular cutter. Cutting line
must be straight. Steps on surface are in accordance with the depth of asphalt
coats, with horizontal step of cc 10 cm for asphalt layers. All unusable
materials are to be transported to approve destination.
5.1.7. MILLING
Description
On sections where level is higher or on other places, milling of asphalt core is
to be done in depth of cc 4 cm. On these places, milling is to be done in a way
that will insure appropriate joint between old and new asphalt layer. Milled
material will be transported to approve place.
Description
All waste material and debris found in the work area, independently of this
Design, must be cleaned and transported from the area of rehabilitation.
Description
If there are any changes on designed items, Contractor is obliged to make As
Built Design. If no changes are made, Contractor will certify that original
design is as built.
Description
Damaged and deformed steel safety fence is to be dismantled and
transported to defined place in Novi Sad.
23
Rehabilitation of access roads
Description
Dismantling of traffic signs and posts will be done according to this design and
design on traffic signalisation. Posts are to be dismantled together with
foundations. Transport to approved places.
Description
Gully that is designed to be demolished during work execution must be
demolished according to this description. Gully grating, together with grating
frame are to be dismantled and cleaned. During gully demolition, connecting
pipes to manholes will be also dismantled. Average length of gully pipe
connections is 15.0 m. Before pipe dismantling, excavation works are to be
carried out. All waste material will be collected, loaded and transported to the
place approved by Engineer.
Description
Manhole that is designed to be demolished during work execution must be
demolished according to this description. Manhole cover, together with the
frame is to be dismantled and cleaned. Prior to manhole demolition,
excavation around manhole is to be carried out. All waste material will be
collected, loaded and transported to the place approved by Engineer.
24
Rehabilitation of access roads
Description
This work consists of drainage pipes demolition, no matter diameter or
material pipe is produced of. On connections with manholes that will be kept
as they are, pipe demolition is to be executed carefully so as not to demolish
the manhole. All waste material will be collected, loaded and transported to
the place approved by Engineer.
Description
Humus excavation is to be done 95% mechanically and 5% manually,
according to designed depth and width.
Dumping of humus is to be done in a way that will not allow mixing with other
kinds of soil materials, to insure possibility for reuse.
Description
This work shall comprise with all excavation in all soil determined with Design.
It could be executed only by trencher in side cuts, cuts, borrow pits and
opened areas. Bulk excavation will be done up to 80% mechanically and the
rest manually. Excavated soil is to be stored or transported to approved
location.
25
Rehabilitation of access roads
Description
This work consists of filling of soil material from cuts or from borrows pits,
spreading, moisturizing or drying, planning compacting and control. Filling is
to be executed according to designed cross sections, levels and inclinations
with allowed tolerance of 5 cm. Filling is to be done in 30 cm layers, with
inclination for water evacuation. Compacting with vibrate equipment and
rollers, to designed density. Control of density with testing round plate d=30
cm, with min. density Ms=25 MN/m2.
5.2.4. SUBGRADE
Description
With the subject road, subbase shall be considered surface that will be
exposed after pavement structure removal, on location where proposed with
Design, and with levels as designed, i.e. the subbase shall be the surface
over which gravel shall be placed up to the subgrade level, and pavement
structure construction afterwards, as proposed with Design. This item shall
include soil grading in conformity with designed levels and slopes, and soil
compaction as to achieve the required density.
Levels will be measured by 4 m long rod and allowed tolerance is +, - 2 cm.
Compacting to designed density of Ms min=25k MN/m2 will be checked with
test plate d=30 cm.
Description
This work covers humusing of flat and inclined areas and shoulders in 15 – 30
cm layers. Humusing is to be done with humus previously excavated and kept
separately. During refilling, dry humus is to be treated with water. After filling,
levelling and smooth compacting are necessary. If there is not enough humus
26
Rehabilitation of access roads
Description
Surplus soil materials after finishing works must be loaded and transported to
destinations not farer than those from bill of quantities. This item covers
loading, transport and levelling on approved place.
Description
Surplus of humus and other soil materials will be transported to City depot
and und handed over for future use
Description
This work covers delivery and building in of stone materials in base course.
Works could begin only after bed layer (subbase) is stabilized, levelled and
accepted by Engineer. Materials for base course must be: natural gravel
crashed stone, mixture of natural and crashed stone and multi fraction
materials. All mentioned materials must fulfil certain conditions on mechanical
characteristics, grain size characteristics, bearing and other conditions in
accordance with relevant standards.
27
Rehabilitation of access roads
Description
This work consists of material supplying, grained mixture for stabilization
prepare, lying out in layers according to design and curing. Work is to be done
according to relevant domestic standards: JUS.U.B1.010, JUS.U.B1.012,
JUS.U.B1.016, JUS.U.B1.024, JUS.B.B8.042, JUS.U.B1.030, JUS.U.B1.048,
JUS.U.B1.050, JUS.B.C1.010, JUS.B.C1.011, and JUS.U.E9.024. Stone
aggregate, hydraulic binder, water, quality control, preliminary tests and mix
formula and control during work execution must all be according to regulation
for this kind of works. Concerning thickness, evenness and level all must be
as designed. Compressive strength after 7 days must be min. 2.5-5.5 MN/m2,
and after 28 days 3.0-6.5 MN/m2.
Description
Upper bituminous course (BNS) pavement course made of stone mixture,
rock flour and bitumen as a binder. According to grain dimensions this course
is determined as BNS 22, BNS 32 and BNS 45.
According to the kind of used material it could be:
- BNS A, crashed screened stone according to JUS-U.B.B3.100 (stone
gravel), with rock flour if necessary;
28
Rehabilitation of access roads
- BNS B, crashed screened stone with min. three fractions and max. grain of
45 mm , with rock flour if necessary;
- BNS C, virgin crashed stone material corrected with screened stone or
virgin grained material with adding min. 30% stone mixture of over 4 mm and
up to 45 mm, with sand or rock flour if necessary;
- BNS D, virgin gravel material with max. diameter of 45 mm, with correction
of sand or rock flour.
Stone material, sand and rock flour must fulfil conditions from relevant JUS
standard. No organic materials are allowed. Granulometric composition of
mixture must be in accordance with granulometric curves from the Standard.
For binder bitumen BIT 60 and BIT 90 are to be used. Exact percentage of
bitumen is to be checked by tests, but it should be between 3,3-5,2%
depending of type of mixture.
Before beginning of works all necessary laboratory tests are to be done and
all materials must be of characteristics according to JUS.U.E9.020. Mixing of
this course shall be in an approved type batch mixing plant or pug mill. Mixed
materials shall be transported to the Site in tight vehicles, constructed so as to
prevent loss or undue segregation of materials after loading. Course shall be
spread and finished using approved type self-contained, power-propelled
pavers or motor graders. Rollers shall be self-propelled. Sampling and testing
shall confirm with the relevant requirements of JUS Standards.
All layers will be executed in designed thickness and designed crossfalls.
Control testing of asphalt mixture is to be executed on each 1500 T produced:
percentage of bitumen, granulometric composition, stability, relation between
stability and deformation, volume of pores and level of filling pores with
bitumen. Control testing of executed course is to be executed on each 2.000
m2 of course: quantity of pores, level of compaction and thickness of course.
Description
Wearing course is built of crashed rock mixture, rock flour and bitumen as a
binder. According to nominal dimensions of grain, there are: AB 4, AB 8, AB
11, AB 16 and AB 22 (asphaltic concrete).
According to granulometric composition, asphaltic concretes are defined as:
- Wearing course of wider granulometric composition of stones: AB4 - AB16
- Wearing course of narrowed granulometric composition of stones: AB11s -
AB22s
Stone material, sand and rock flour must fulfil conditions from relevant JUS
standard. For roads with heavy traffic load, rock material must be of eruptive
29
Rehabilitation of access roads
Description
Longitudinal and transverse cracks wider than 15 mm are to be repaired
before building asphalt courses. Engineer will mark all cracks that are to be
treated according to this procedure. Existing asphalt course is to be taken off
by appropriate technology in width of min. 0.50 m , to depth of wearing upper
course 4 - 5 cm (5 cm on main roads and 4 cm on other). Waste material is to
be loaded and transported. After detailed cleaning with compressed hot air, all
cracks will be treated by joint filler. Before asphalt course laying, this area is to
be sprayed with emulsion according to JUS U.M3.24 in quantity of min. 300
g/m². After this wearing course could be built by AB16s.
30
Rehabilitation of access roads
Description
Netlike and other cracks opened <15 mm must be prepared before laying new
asphalt courses.
Engineer will mark all cracks that are to be treated according to this
procedure.
Cleaning of cracks wider than 5 mm will be done by washing with water under
pressure and with compressed hot air (T>300°C) pressure min. 5 bar.
After cleaning, crack area must be sprayed with polymer modified bitumen
emulsion PMB 60. Emulsion is to be prepared according to JUS U.M3.024
(1997).
Description
Before new wearing course (surface dressing), pot holes will be repaired.
Engineer will mark all pot holes to be treated according to this procedure.
After marking, vertical rectangle cut cc. 30 cm from the hole edge is to be
done. Depth of cutting is determined by the depth of every hole and depth of
destruction. After detailed cleaning with compressed air, bitumen emulsion is
sprayed. Emulsion must be according to JUS U.M3 024 and to be equally
sprayed in quantity of min. 300 gr/m². Only after this, works on new asphalt
courses could be resumed.
All waste material is to be collected, loaded and transported according to
Engineer's instructions.
Description
Before works on surface dressing, existing road surface is to be prepared:
repair of damaged places, pot holes, transverse and longitudinal cracks,
netlike cracks and individual small cracks.
First surface spraying with binder emulsion quantity of min. 1.4 - 1.9 kg/m²
Laying of aggregate with fractions 4/8 mm in quantity of 10 - 12 kg/m²
31
Rehabilitation of access roads
Device for spraying binder emulsion with tank, heaters, control valves, pump
and processor for process controlling. This equipment is self-propelled.
Device for gritting with hopper, transport belt from hopper to grittier, and
possibility for controlled dosage part, computer controlled.
Self propelled cleaner with steel rotating brush.
Pneumatic-tired roller for courses rolling.
Description
Damaged terrazzo finished kerb stones will be changed with new of same
quality and outer dimensions. Work shall consists of demolition of damaged
kerb stones with concrete bed, casting of new concrete bed with concrete
Class MB20 and joint sealing mixture repair of damaged asphalt surface. All
works will be executed according to details from this design. Sealing of 1 cm
joints will be by cement mortar 1:3. Levelling and fixing of kerb stones will be
according to the design. Kerb stones must be concrete Class MB40 and with
appropriate attests. Usable will be only that with no visible damages.
32
Rehabilitation of access roads
Description
Damaged concrete, terrazzo finished kerb tiles 40/50/24 will be changed by
new of the same dimensions. Work shall consists of demolition of damaged
kerb tiles with concrete bed, casting of new concrete bed with concrete Class
MB20 and joint sealing mixture repair of damaged asphalt surface. All works
will be executed according to details from this design. Sealing of 1 cm joints
will be by cement mortar 1:3. Levelling and fixing of kerb tiles will be
according to the design. Kerb tiles must be concrete Class MB 40 and with
appropriate attests. Usable will be only that with no visible damages.
Description
All damaged concrete tiles 40/40/4 cm will be changed by new of the same
dimensions. Work shall consist of demolition of damaged tiles with concrete
bed, casting of new concrete bed with concrete Class MB20. Tiles will be
produced of concrete Class MB 30 with terrazzo finish of all visible sides.
Description
Tiles 40/40/4 cm are to be laid according to design specifications.
Construction will be on concrete Class MB 20 layer. Description of tiles as per
5.3.11.
33
Rehabilitation of access roads
Description
This work shall comprise construction of elevated curbs 18/24 and 12/18,
terrazzo finished. Curbs will be laid on concrete Class MB 20 bedding,
according to design details. Sealing of 1 cm joints will be by cement mortar
1:3. Levelling and fixing of kerb stones will be according to the design. Kerb
stones must be concrete Class MB40 and with appropriate attests. Usable will
be only that with no visible damages.
5.4. PAVEMENTS
Description
Pavements will be constructed according to details from this design and works
will consist of following:
Blinding layer15.0 cm
Bituminised rock aggregate course 7.0 cm
Wearing course 3.0 cm
Edge terrazzo tiles 40x40x4 on concrete bed Class MB 20
Prefabricated drainage channel on concrete bed, Class MB 20
5.5. DRAINAGE
Description
This item of work includes excavations for drainage ditches according to
detailed drawings from Design or Engineer's instructions in all soil categories.
This work also includes temporally disposal of excavated material near ditch,
placing and grading of that material or hauling of that material to disposal with
disposal arrangement. All Excavation areas must be plain and with designed
34
Rehabilitation of access roads
Description
All existing drainage manholes and gullies that are or will not be levelled after
road rehabilitation are to be levelled. This will be done by using iron frames of
appropriate height (10-20 cm), with demolition and rebuilding concrete frame
bed.
Description
On manholes where covers are missing or where iron frames are demolished,
new frames with covers. Manhole frames and covers must be of identical
dimensions as existing ones.
Description
On gullies where iron grid is missing or grid frame is damaged, new grid or
frame and grid will be mounted. Gully grids and frames must be of identical
dimensions as existing ones.
.
Measurement and payment
Measurement and payment will be per renewed gully, material and work
included.
35
Rehabilitation of access roads
Description
Renewal of road side gutters is to be executed according to details from
Design. Renewal of gutters will be done on places where levelling is not
according to design and where concrete gutters are destructed. Gutter
renewal consists of cleaning of surface, laying of new kerb stones 18/24 cm
and laying of asphalt concrete layer over cleaned and prepared surface of
gutter. Before asphalt works, existing cleaned concrete surface will be
sprayed with emulsion, insuring good connection with asphalt. All waste
material will be loaded and transported on the place approved by Engineer.
Description
All surface water gullies that are filled with soil and other materials will be
cleaned and their pipe connections as well. Cleaning must be done
mechanically, using special vehicle (BOMA type or other). All waste material
will be loaded and transported to the place approved by Engineer.
Description
Concrete gutters beside roads and pavements are to be cleaned of deposits
and waste. Cleaning will be done manually. All waste material will be
transported to the place approved by Engineer.
Description
36
Rehabilitation of access roads
On all places where culverts are filled, they will be cleaned. Cleaning is to be
done manually or mechanically and all waste material loaded and transported
on the place approved by Engineer.
Description
After finishing blinding layer, gully place is to be marked and gully is to be
rebuilt according to Design detail, using concrete Class MB 20 and with steel
grid. Gully is 1.5 m deep, inner diameter 40 - 45 cm. Manhole is to be
connected with drainage pipes. Unit price includes all mentioned works.
Description
After inspection hole position marking, manhole is to be rebuilt according to
Design details, using concrete Class MB 20. After this, frame and cover are to
be mounted. Used material for manhole and for cover must be according to
regulations.
Description
Works for relaying drainage pipes consists of ditch excavation, pipes laying
and refilling of ditch, all according to the Design details and these technical
conditions. Depending on ditch depth, planking and strutting are to be carried
out, according to Engineer’s instructions. If there is need, pumping of water is
to be carried out. For drainage pipes, types and diameters defined in the
Design are to be used. All used pipes must be with appropriate attests and
approved by the Engineer. Drainage pipes will be laid on ditch bottom
previously covered with a layer of sand. Pipes will be connected according to
Design details. Testing of drainage pipes must be carried out before refilling.
After testing, drainage pipes will be covered with refilling. Refilling is to be
37
Rehabilitation of access roads
Description
During execution of tunnel reconstruction works, temporary drainage system
will be established. Place for drainage will be defined by the Engineer,
depending on the situation after tunnel bulk excavation. Work consists of
drainage ditch excavation, laying of pipes or laying of pipes on the ground
surface. During work execution, pumping of water is to be possible. For
temporary drainage system, light PVC pipes will be used; diameter up to 400
mm. Pipe usage is to be approved by the Engineer. Pipe connecting
according to designed details. Temporary drainage system will be tested
before use. If pipes are to be underground, material for refilling must be with
no stones or sharp materials.
Description
On places defined with Design, new steel crash barriers are to be erected.
38
Rehabilitation of access roads
Barrier will be steel, zinc coated all in accordance with existing undamaged
barrier. End section of crash barrier shall be finished according to the
manufacturer's drawing and be identical for all crash barriers.
Description
Work consists of removal of wearing asphalt layer, 2 cm thick and renewal of
this layer. Poured asphalt is laid on reinforced concrete structure. Demolition
is to be done manually by pneumatic hammer and appropriate tools. After
cleaning, surface is to be sprayed with joint emulsion and new asphalt course
laid. Only manual tools will be used. Waste asphalt will be transported
according to Engineer’s instructions.
39
Rehabilitation of access roads
Description
Parapets are steel sheet elements on both sides of the main bridge approach
structures. Work covers cleaning (sand blasting or appropriate approved by
the Engineer), anticorrosive 2 time painting and final 2 time painting with oil
colour in white. Minor deformations are to be repaired. Detail of this parapet is
on drawing SBR-DFT-049-9a.
Description
Existing steel crash barriers (safety fences) are to be changed according to
Bridge Reconstruction Project. As this part is still not designed by the
Contractor for Reconstruction Project, All technical details concerning type
and anchoring system are to be taken over from the Reconstruction Design.
Instead, file SBR-DFT-041-9a.dwg from Reconstruction Tender is added to
the drawings.
Description
Pedestrian fences on Sloboda Bridge and on viaduct will be cleaned and
painted 2 times by anticorrosive paint and 2 times by oil metal paint. Cleaning
is to be done by sand blasting or in other way approved by the Engineer.
Minor deformations are to be repaired.
Description
On the right river side, pedestrian fences on approach ramps and on main
bridge construction, suffered some demolition that could not be repaired, but
these parts of fences are to be renewed. Fence sections to be renewed will be
defined by the Engineer and are to be renewed according to original
dimensions and shape. Mounted fence is to be cleaned and painted in the
same way as described for fence repainting. Dismantling of existing fence
must be executed carefully to prevent damages on other fence sections.
40
Rehabilitation of access roads
41
Rehabilitation of access roads
Standard Description
-------------------------------------------------------------------------------------------------------
JUS B.B0.001 Virgin aggregate and stone - taking samples
JUS B.B8.002 Checking stone freezing resistance
JUS B.B8.010 Natural stone - water sucking tests
JUS B.B8.012 Natural stone - pressure strength tests
JUS B.B8.030 Volume mass tasting for aggregate
JUS B.B8.031 Water sucking of stone aggregate
JUS B.B8.032 Volume mass, porous and density
JUS B.B8.036 Amount of grains smaller than 0.02 mm in aggregate
JUS B.B8.037 Weak grains in aggregate testing
JUS B.B8.038 Content of clay and mud particles
JUS B.B8.045 Wearing resistance (Los Angeles)
JUS B.B8.047 Defining shape and look of grain surface for stone
JUS B.B8.048 Testing of grain shape for stone aggregate
JUS U.B1.012 Moisture determining
JUS U.B1.016 Determination of Soil Volume Weight
JUS U.B1.018 Testing granulometric composition and grains <0.08 mm
JUS U.B1.038 Optimal moisture determining
JUS U.B1.042 California bearing ratio
JUS U.M3.095 Bituminous joint filler
JUS U.M3.024 Spraying emulsion characteristics
JUS U.M3.022 Spraying emulsion characteristics
JUS U.E4.014 Components and asphalt characteristics
JUS U.E9.021 Components and asphalt characteristics
-------------------------------------------------------------------------------------------------------
Standard Description
------------------------------------------------------------------------------------------------------
JUS U.B1.038 Optimal moisture and max. volume weight
JUS U.B1.018 Granulometric composition determining
JUS U.B1.036 Clay and mud particles determining
-------------------------------------------------------------------------------------------------------
Standard Description
-------------------------------------------------------------------------------------------------------
JUS B.B0.001 Virgin aggregate and stone - sampling
42
Rehabilitation of access roads
Standard Description
-------------------------------------------------------------------------------------------------------
JUS U.M3.010 Bitumen for paving
JUS U.M3.020 Bituminous emulsion for paving
JUS U.M3.090 Asphalt mix samples taking and joint filler samples
JUS U.M8.010 Methods for bitumen testing
JUS U.M8.081 Bitumen mixture, volume mass determining
JUS U.M8.082 Bitumen mixture, volume mass determining
JUS U.M8.090 Asphalt mixtures, Marshal testing
JUS U.M8.092 Asphalt road structure, samples taking
JUS U.M8.093 Bitumen mixture, volume mass and pores determining
JUS U.M8.094 Asphalt road structures, water sucking testing
JUS U.M8.099 Bitumen mixture, water content determining
JUS U.M8.100 Bitumen mixture, binder content determining
JUS U.M8.605 Bitumen, paraffin content determining
Standard Description
-------------------------------------------------------------------------------------------------------
JUS U. B1.010 Sampling
JUS U. B1.012 Moisture determining
43
Rehabilitation of access roads
44
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
------------------------------------------------------------
Apex: 2043
1 .00 409575.19 11436.69 249 26 00
Apex: 2004
2 PPK 281.40 409674.04 11173.22 249 26 00
3 PKK 421.40 409726.26 11043.36 245 25 22
4 KKK 689.17 409868.71 10817.57 230 04 49
5 KPK 829.17 409963.44 10714.52 226 04 11
Apex: 2001
6 PPK 1413.82 410369.06 10293.47 226 04 11
7 PKK 1553.82 410468.49 10194.96 222 03 32
8 KKK 1990.03 410844.92 9981.45 197 03 56
9 KPK 2130.03 410980.50 9946.66 193 03 17
Apex: 2002
10 PPK 2209.72 411058.13 9928.66 193 03 17
11 PKK 2329.72 411174.58 9899.76 195 41 57
12 KKK 3092.07 411808.37 9496.01 229 17 55
45
Rehabilitation of access roads
Apex: 8611
14 3212.06 411883.78 9402.68 231 56 35
-----------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 8.70 409578.25 11428.54 249 26 00
2 22.00 409582.92 11416.09 249 26 00
3 55.00 409594.51 11385.20 249 26 00
4 83.50 409604.52 11358.51 249 26 00
5 99.00 409609.97 11344.00 249 26 00
6 113.00 409614.89 11330.89 249 26 00
7 128.00 409620.16 11316.85 249 26 00
8 143.00 409625.43 11302.80 249 26 00
9 158.00 409630.69 11288.76 249 26 00
10 173.50 409636.14 11274.25 249 26 00
11 188.00 409641.23 11260.67 249 26 00
12 203.00 409646.50 11246.63 249 26 00
13 217.00 409651.42 11233.52 249 26 00
14 233.50 409657.22 11218.07 249 26 00
15 248.00 409662.31 11204.50 249 26 00
16 265.00 409668.28 11188.58 249 26 00
17 281.00 409673.90 11173.60 249 26 00
18 296.00 409679.18 11159.56 249 23 23
19 311.00 409684.47 11145.52 249 15 15
20 326.00 409689.81 11131.50 249 01 35
21 341.60 409695.43 11116.95 248 41 31
22 356.30 409700.82 11103.28 248 17 08
23 371.00 409706.32 11089.64 247 47 26
24 385.50 409711.87 11076.25 247 12 57
25 400.50 409717.76 11062.45 246 31 51
26 415.60 409723.86 11048.64 245 44 53
27 431.00 409730.29 11034.65 244 52 22
28 445.70 409736.63 11021.39 244 01 49
29 462.00 409743.89 11006.79 243 05 47
30 476.00 409750.31 10994.35 242 17 40
31 491.00 409757.38 10981.12 241 26 06
32 506.00 409764.66 10968.00 240 34 32
33 521.00 409772.12 10954.99 239 42 58
34 535.50 409779.53 10942.53 238 53 07
35 552.50 409788.43 10928.05 237 54 40
36 568.50 409797.04 10914.56 236 59 40
37 583.70 409805.42 10901.88 236 07 25
38 598.50 409813.76 10889.65 235 16 32
39 614.00 409822.69 10876.98 234 23 15
40 628.50 409831.21 10865.25 233 33 24
41 643.30 409840.09 10853.41 232 42 32
42 658.50 409849.39 10841.39 231 50 16
43 673.40 409858.69 10829.74 230 59 03
44 688.00 409867.96 10818.47 230 08 52
45 702.60 409877.40 10807.33 229 20 53
46 718.30 409887.70 10795.48 228 35 07
47 732.00 409896.82 10785.26 228 00 07
48 746.78 409906.76 10774.32 227 27 32
49 1458.00 410399.79 10261.73 225 40 13
46
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
53 1516.00 410440.86 10220.77 223 55 59
54 1530.00 410450.99 10211.12 223 18 27
55 1546.00 410462.71 10200.22 222 29 40
56 1560.00 410473.10 10190.84 221 42 17
57 1575.50 410484.75 10180.61 220 49 00
58 1597.00 410501.17 10166.74 219 35 05
59 1617.00 410516.71 10154.15 218 26 20
60 1631.00 410527.73 10145.52 217 38 12
61 1926.50 410784.82 10002.01 200 42 21
62 1932.20 410790.15 10000.01 200 22 45
63 1938.00 410795.60 9998.01 200 02 49
64 1944.00 410801.24 9995.97 199 42 11
65 1979.16 410834.54 9984.70 197 41 19
66 2000.83 410855.26 9978.33 196 28 15
67 2019.65 410873.35 9973.15 195 32 53
68 2031.67 410884.94 9969.98 195 02 05
69 2054.35 410906.89 9964.26 194 13 37
70 2078.20 410930.04 9958.53 193 36 17
71 2102.02 410953.21 9953.01 193 12 56
72 2123.64 410974.27 9948.10 193 03 48
73 2147.21 410997.23 9942.78 193 03 17
74 2169.46 411018.90 9937.75 193 03 17
75 2192.42 411041.27 9932.57 193 03 17
76 2216.13 411064.37 9927.21 193 03 45
77 2239.66 411087.28 9921.87 193 13 10
78 2261.99 411109.01 9916.70 193 33 23
79 2284.39 411130.76 9911.36 194 04 43
80 2307.66 411153.30 9905.56 194 48 59
81 2333.55 411178.27 9898.72 195 52 05
82 2353.73 411197.63 9893.05 196 45 26
83 2376.42 411219.30 9886.32 197 45 27
84 2400.00 411241.69 9878.92 198 47 48
85 2423.17 411263.56 9871.26 199 49 04
86 2443.89 411282.99 9864.08 200 43 52
87 2467.17 411304.69 9855.65 201 45 25
88 2492.80 411328.40 9845.91 202 53 12
89 2522.53 411355.66 9834.04 204 11 49
90 2541.78 411373.16 9826.02 205 02 43
91 2564.82 411393.94 9816.08 206 03 39
92 2581.37 411408.76 9808.72 206 47 25
93 2605.91 411430.56 9797.45 207 52 19
94 2626.00 411448.25 9787.92 208 45 26
95 2652.82 411471.63 9774.78 209 56 22
96 2672.26 411488.40 9764.95 210 47 46
97 2696.59 411509.18 9752.30 211 52 06
98 2720.15 411529.08 9739.68 212 54 25
99 2742.81 411547.99 9727.20 213 54 20
100 2766.21 411567.29 9713.97 214 56 13
101 2790.85 411587.36 9699.67 216 01 22
102 2812.29 411604.59 9686.92 216 58 04
103 2838.45 411625.34 9670.98 218 07 15
104 2858.00 411640.62 9658.80 218 58 57
47
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
109 2972.17 411726.11 9583.17 224 00 51
110 2996.38 411743.36 9566.19 225 04 53
111 3017.77 411758.34 9550.92 226 01 27
112 3041.32 411774.54 9533.82 227 03 43
113 3060.58 411787.55 9519.63 227 54 39
114 3085.58 411804.13 9500.91 229 00 46
----------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 823
1 .00 411741.98 9548.63 247 10 07
Apex: 824
2 PK 6.75 411744.60 9542.41 247 10 07
3 KKK 49.45 411744.42 9500.85 293 19 49
4 KPK 99.45 411711.70 9463.70 320 21 24
Apex: 1341
5 PPK 163.81 411662.14 9422.64 320 21 24
6 PKK 246.81 411608.91 9360.25 290 38 04
7 KKK 308.86 411610.59 9299.77 246 11 46
8 KPK 358.86 411639.67 9259.36 228 17 28
Apex: 1340
9 401.72 411668.19 9227.36 228 17 28
48
Rehabilitation of access roads
------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 411741.98 9548.63 247 10 07
2 11.30 411746.18 9538.14 252 05 06
3 23.52 411748.57 9526.19 265 17 44
4 38.58 411747.67 9511.21 281 34 34
5 50.40 411744.04 9499.99 294 20 40
6 65.00 411736.46 9487.54 307 31 28
7 77.00 411728.52 9478.56 314 54 24
8 88.30 411720.23 9470.88 319 00 43
9 101.00 411710.51 9462.71 320 21 24
10 112.70 411701.50 9455.24 320 21 24
11 128.00 411689.72 9445.48 320 21 24
12 143.50 411677.78 9435.59 320 21 24
13 154.00 411669.70 9428.89 320 21 24
14 173.60 411654.62 9416.37 319 56 35
15 204.30 411632.08 9395.56 313 17 00
16 218.70 411622.73 9384.61 307 21 27
17 231.70 411615.46 9373.84 300 28 16
18 252.50 411607.10 9354.86 286 33 33
19 260.40 411605.22 9347.18 280 54 04
20 271.40 411603.89 9336.27 273 01 23
21 289.20 411604.93 9318.54 260 16 29
22 303.80 411608.69 9304.46 249 49 06
23 316.00 411613.74 9293.36 241 26 46
24 330.00 411621.24 9281.55 234 15 19
25 343.40 411629.50 9271.00 230 00 08
26 356.50 411638.10 9261.12 228 19 51
27 371.60 411648.15 9249.85 228 17 28
28 386.20 411657.86 9238.95 228 17 28
29 401.72 411668.19 9227.36 228 17 28
----------------------------------------------------
49
Rehabilitation of access roads
-------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 1344
1 .00 412157.27 9476.87 055 26 34
Apex: 1345
2 PPK 69.75 412117.70 9534.31 055 26 34
3 PKK 159.75 412058.20 9601.08 033 57 25
4 KKK 258.02 411964.25 9618.49 347 02 17
5 KPK 328.02 411900.60 9590.01 330 19 37
Apex: 822
6 PPK 371.95 411862.42 9568.26 330 19 37
7 PKK 431.95 411806.86 9547.22 357 11 03
8 KK 462.06 411777.54 9552.74 024 08 08
Apex: 821
9 462.99 411776.69 9553.12 024 08 08
-----------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 412157.27 9476.87 055 26 34
2 3.50 412155.28 9479.75 055 26 34
3 17.20 412147.51 9491.04 055 26 34
4 28.30 412141.22 9500.18 055 26 34
5 45.00 412131.74 9513.93 055 26 34
6 60.00 412123.24 9526.28 055 26 34
7 75.30 412114.56 9538.88 055 21 40
8 88.00 412107.28 9549.29 054 33 34
9 103.00 412098.38 9561.37 052 30 38
10 115.00 412090.89 9570.74 050 00 43
11 128.50 412081.89 9580.80 046 17 16
12 143.50 412071.06 9591.17 041 00 57
13 158.00 412059.64 9600.09 034 47 06
14 173.00 412046.82 9607.86 027 37 53
15 187.00 412034.07 9613.62 020 56 48
16 202.00 412019.76 9618.09 013 47 05
17 215.00 412006.99 9620.50 007 34 40
18 230.00 411992.04 9621.54 000 24 57
19 244.00 411978.06 9620.83 353 43 53
20 258.00 411964.27 9618.49 347 02 48
21 271.50 411951.30 9614.78 341 13 15
22 283.00 411940.55 9610.69 337 14 19
23 297.00 411927.83 9604.84 333 36 29
24 309.30 411916.92 9599.16 331 31 18
25 321.50 411906.26 9593.23 330 28 18
26 335.50 411894.10 9586.30 330 19 37
50
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
30 389.50 411847.06 9559.78 332 37 27
31 403.20 411834.66 9553.96 337 36 41
32 417.30 411821.31 9549.47 345 40 07
33 431.95 411806.86 9547.22 357 10 57
34 443.28 411795.55 9547.66 007 19 32
35 462.99 411776.69 9553.12 024 08 08
----------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 1103
1 .00 410669.77 9821.19 114 01 13
Apex: 1101
2 PK .08 410669.80 9821.26 114 01 13
3 KK 391.06 410930.23 10103.59 151 21 24
Apex: 1100
4 458.56 410989.47 10135.95 151 21 24
-----------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410669.77 9821.19 114 01 13
2 4.20 410671.49 9825.02 114 24 50
3 20.60 410678.47 9839.86 115 58 48
4 33.20 410684.11 9851.12 117 11 00
5 45.40 410689.80 9861.92 118 20 54
6 60.20 410696.98 9874.86 119 45 42
51
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
9 91.00 410712.95 9901.19 122 42 10
10 101.00 410718.42 9909.56 123 39 28
11 108.40 410722.56 9915.69 124 21 52
12 125.30 410732.30 9929.51 125 58 42
13 137.50 410739.56 9939.31 127 08 36
14 153.00 410749.08 9951.54 128 37 24
15 167.40 410758.20 9962.68 129 59 54
16 183.00 410768.39 9974.50 131 29 17
17 197.00 410777.78 9984.88 132 49 30
18 212.50 410788.46 9996.11 134 18 19
19 227.70 410799.22 10006.85 135 45 24
20 242.60 410810.02 10017.11 137 10 46
21 257.70 410821.22 10027.24 138 37 17
22 273.60 410833.29 10037.59 140 08 23
23 289.80 410845.87 10047.80 141 41 12
24 305.40 410858.23 10057.31 143 10 35
25 320.50 410870.43 10066.21 144 37 06
26 336.70 410883.76 10075.41 146 09 56
27 352.30 410896.83 10083.93 147 39 18
28 366.30 410908.75 10091.28 148 59 31
29 380.00 410920.57 10098.20 150 18 01
30 397.50 410935.88 10106.68 151 21 24
31 410.40 410947.20 10112.86 151 21 24
32 428.00 410962.65 10121.30 151 21 24
33 447.00 410979.32 10130.41 151 21 24
34 458.56 410989.47 10135.95 151 21 24
----------------------------------------------------
52
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 929
1 .00 410898.37 10155.07 206 51 13
Apex: 930
2 190.78 411068.58 10068.89 206 51 13
Apex: 931
3 213.44 411090.84 10064.67 190 44 04
-----------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410898.37 10155.07 206 51 13
2 19.10 410915.41 10146.44 206 51 13
3 40.10 410934.15 10136.96 206 51 13
4 56.80 410949.04 10129.41 206 51 13
5 71.50 410962.16 10122.77 206 51 13
6 91.58 410980.07 10113.70 206 51 13
7 104.70 410991.78 10107.78 206 51 13
8 124.40 411009.35 10098.88 206 51 13
9 135.40 411019.17 10093.91 206 51 13
10 145.00 411027.73 10089.57 206 51 13
11 157.60 411038.97 10083.88 206 51 13
12 179.60 411058.60 10073.94 206 51 13
13 197.60 411075.28 10067.62 190 44 04
14 213.44 411090.84 10064.67 190 44 04
----------------------------------------------------
53
Rehabilitation of access roads
-------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 306
1 .00 410999.44 10093.85 207 02 19
Apex: 311
2 PPK 1.43 411000.71 10093.20 207 02 19
3 PKK 41.43 411031.29 10068.50 242 50 54
4 KKK 56.30 411034.82 10054.18 269 28 55
5 KPK 99.30 411016.88 10016.05 307 58 39
Apex: 1314
6 PPK 99.36 411016.84 10016.01 307 58 39
7 PKK 129.36 410997.02 9993.55 318 19 56
8 KKK 176.90 410954.61 9973.54 351 09 09
9 KPK 251.90 410881.09 9984.43 017 02 21
Apex: 825
10 254.20 410878.89 9985.10 017 02 21
-----------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410999.44 10093.85 207 02 19
2 16.20 411013.67 10086.12 211 55 16
3 25.00 411020.84 10081.02 219 28 20
4 34.70 411027.65 10074.14 231 48 44
5 40.50 411030.85 10069.32 241 12 10
6 51.80 411034.46 10058.67 261 24 57
7 70.00 411032.35 10040.79 290 05 53
8 86.70 411024.44 10026.13 304 40 11
9 98.70 411017.25 10016.52 307 58 12
10 107.00 411012.12 10010.00 308 39 00
11 122.10 411002.24 9998.58 313 55 45
12 132.20 410994.87 9991.69 320 17 45
13 151.00 410979.17 9981.42 333 16 25
14 161.80 410969.24 9977.20 340 43 44
15 177.00 410954.51 9973.52 351 13 18
16 197.60 410933.97 9972.69 003 28 12
17 222.00 410909.87 9976.35 012 55 30
18 244.00 410888.65 9982.12 016 45 07
19 254.20 410878.89 9985.10 017 02 21
----------------------------------------------------
54
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 933
1 .00 411078.68 9937.43 013 48 40
Apex: 1234
2 PPK .00 411078.68 9937.43 013 48 40
3 PKK 80.00 411021.14 9983.80 090 12 20
4 KKK 89.53 411022.67 9993.16 108 24 19
5 KPK 109.53 411032.96 10010.20 127 30 14
Apex: 932
6 181.55 411076.81 10067.33 127 30 14
-----------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 411078.68 9937.43 013 48 40
2 9.20 411069.76 9939.68 014 49 14
3 35.20 411045.44 9948.70 028 35 52
4 46.00 411036.46 9954.67 039 03 53
5 56.40 411029.15 9962.04 051 46 33
6 72.40 411022.08 9976.25 076 22 24
7 82.40 411021.24 9986.19 094 46 54
8 96.65 411025.60 9999.63 119 34 44
9 104.00 411029.63 10005.78 126 02 31
10 117.40 411037.75 10016.44 127 30 14
11 135.00 411048.47 10030.40 127 30 14
12 150.00 411057.60 10042.30 127 30 14
13 164.75 411066.58 10054.00 127 30 14
14 181.55 411076.81 10067.33 127 30 14
----------------------------------------------------
55
Rehabilitation of access roads
56
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 614
1 .00 410462.94 10030.20 207 17 55
Apex: 500
2 45.05 410502.97 10009.54 207 17 55
Apex: 708
3 281.66 410713.23 9901.01 207 18 05
Apex: 502
4 463.72 410875.00 9817.50 207 18 14
Apex: 900
5 501.17 410908.36 9800.48 207 01 49
-----------------------------------------------------------
57
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410462.94 10030.20 207 17 55
2 10.41 410472.19 10025.43 207 17 55
3 24.01 410484.28 10019.19 207 17 55
4 38.35 410497.02 10012.61 207 17 55
5 43.57 410501.66 10010.22 207 17 55
6 64.10 410519.90 10000.80 207 18 05
7 77.96 410532.22 9994.44 207 18 05
8 89.95 410542.87 9988.94 207 18 05
9 103.29 410554.73 9982.83 207 18 05
10 116.50 410566.46 9976.77 207 18 05
11 132.56 410580.73 9969.40 207 18 05
12 145.39 410592.14 9963.52 207 18 05
13 159.30 410604.50 9957.14 207 18 05
14 171.10 410614.98 9951.72 207 18 05
15 190.63 410632.34 9942.77 207 18 05
16 207.32 410647.17 9935.11 207 18 05
17 223.74 410661.76 9927.58 207 18 05
18 238.15 410674.56 9920.97 207 18 05
19 264.60 410698.07 9908.84 207 18 05
20 271.16 410703.90 9905.83 207 18 05
21 280.15 410711.88 9901.70 207 18 05
22 290.82 410721.37 9896.81 207 18 14
23 297.52 410727.32 9893.74 207 18 14
24 322.30 410749.34 9882.37 207 18 14
25 328.65 410754.98 9879.46 207 18 14
26 345.50 410769.95 9871.73 207 18 14
27 356.34 410779.59 9866.76 207 18 14
28 371.56 410793.11 9859.77 207 18 14
29 388.71 410808.35 9851.91 207 18 14
30 402.06 410820.21 9845.78 207 18 14
31 417.30 410833.75 9838.79 207 18 14
32 431.53 410846.40 9832.27 207 18 14
33 446.33 410859.55 9825.48 207 18 14
34 463.20 410874.54 9817.74 207 18 14
35 478.60 410888.26 9810.74 207 01 49
36 489.70 410898.14 9805.69 207 01 49
37 501.17 410908.36 9800.48 207 01 49
----------------------------------------------------
58
Rehabilitation of access roads
Apex: 3004
2 PK .01 410364.14 9917.99 134 12 11
3 KK 75.42 410389.42 9986.70 086 11 48
Apex: 3003
4 PK 75.41 410389.42 9986.70 086 11 48
5 KK 187.43 410466.61 10037.31 207 17 55
Apex: 3002
6 187.43 410466.61 10037.31 207 17 55
------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410364.13 9917.98 134 12 11
2 7.00 410368.81 9923.18 129 45 09
3 19.00 410375.85 9932.89 122 06 47
4 35.00 410383.11 9947.13 111 55 38
5 52.00 410387.93 9963.40 101 06 17
6 67.50 410389.60 9978.79 091 14 13
7 86.00 410389.77 9997.26 097 38 50
8 100.50 410393.63 10011.19 113 19 21
9 117.00 410402.40 10025.09 131 09 35
10 131.60 410413.39 10034.63 146 56 35
11 148.70 410428.97 10041.51 165 25 45
12 164.00 410444.12 10043.18 181 58 09
13 176.40 410456.36 10041.31 195 22 28
59
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
------------------------------------------------------------
Apex: 619
1 .00 410422.45 9969.63 019 13 03
Apex: 1333
2 PK -.01 410422.46 9969.63 019 13 03
3 KK 37.24 410406.49 9999.53 104 34 31
Apex: 3006
4 PK 37.24 410406.49 9999.52 104 34 31
5 KK 103.57 410459.27 10023.09 207 17 55
Apex: 1334
6 103.58 410459.27 10023.09 207 17 55
------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410422.45 9969.63 019 13 51
2 12.70 410412.01 9976.62 048 20 14
3 22.00 410407.24 9984.54 069 39 04
4 36.50 410406.31 9998.81 102 52 58
5 45.49 410409.44 10007.22 117 21 19
6 55.00 410414.84 10015.01 132 04 55
7 67.00 410424.17 10022.47 150 39 51
8 76.90 410433.34 10026.11 165 59 41
9 87.80 410444.15 10027.17 182 52 26
10 99.40 410455.46 10024.79 200 50 12
11 103.58 410459.27 10023.09 207 17 55
----------------------------------------------------
60
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
-----------------------------------------------------------
Apex: 100
1 .00 410618.06 9960.26 027 18 39
Apex: 1336
2 PK .01 410618.05 9960.26 027 18 39
3 KK 47.99 410581.48 9990.74 052 18 19
Apex: 1337
4 PK 48.00 410581.48 9990.74 052 18 19
5 KK 105.38 410574.04 10045.05 112 05 14
Apex: 102
6 105.39 410574.04 10045.06 112 05 14
-----------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410618.06 9960.26 027 18 39
2 9.00 410610.24 9964.71 031 59 41
3 24.00 410598.10 9973.50 039 48 28
4 37.50 410588.28 9982.76 046 50 22
5 47.99 410581.48 9990.74 052 18 12
6 53.00 410578.61 9994.84 057 31 06
7 57.32 410576.43 9998.57 062 01 07
8 65.50 410573.14 10006.05 070 32 25
9 76.40 410570.55 10016.62 081 53 42
10 87.00 410570.07 10027.19 092 56 15
11 95.20 410571.10 10035.32 101 28 48
61
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
------------------------------------------------------------
Apex: 173
1 .00 410449.21 9952.28 151 19 03
Apex: 1335
2 PK .00 410449.21 9952.28 151 19 03
3 KKK 126.55 410571.66 9961.94 199 39 26
4 KPK 166.55 410607.96 9945.21 207 17 48
Apex: 177
5 166.58 410607.98 9945.20 207 17 48
------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410449.21 9952.28 151 19 03
2 23.00 410470.15 9961.73 160 06 10
3 32.00 410478.70 9964.54 163 32 26
4 43.00 410489.36 9967.27 167 44 32
5 53.60 410499.79 9969.15 171 47 28
6 64.30 410510.42 9970.30 175 52 41
7 73.50 410519.61 9970.68 179 23 32
8 83.70 410529.81 9970.44 183 17 18
9 93.50 410539.57 9969.56 187 01 54
10 104.40 410550.33 9967.83 191 11 43
11 117.00 410562.57 9964.87 196 00 29
12 132.00 410576.76 9960.02 201 35 46
13 144.00 410587.77 9955.27 204 52 05
14 158.40 410600.71 9948.94 206 58 46
15 166.55 410607.96 9945.21 207 17 48
62
Rehabilitation of access roads
----------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
------------------------------------------------------------
Apex: 763
1 .00 410844.02 9966.10 193 10 16
Apex: 1304
2 PPK 2.51 410846.47 9965.53 193 10 16
3 PKK 80.51 410912.91 9929.21 239 55 07
4 KK 136.83 410909.51 9876.20 307 25 17
Apex: 211
5 PPK 141.27 410906.81 9872.68 307 25 17
6 PKK 177.27 410881.37 9847.60 331 24 21
7 KKK 197.72 410861.80 9842.36 358 39 37
8 KPK 240.72 410821.30 9855.35 027 18 30
Apex: 150
9 240.72 410821.31 9855.35 027 18 30
------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410844.02 9966.10 193 10 16
2 22.90 410866.23 9960.51 196 21 54
3 38.20 410880.65 9955.45 202 57 26
4 47.80 410889.29 9951.26 208 55 49
63
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
------------------------------------------------------------
Apex: 925
1 .00 410881.94 9813.96 127 33 26
Apex: 926
2 PPK 45.08 410909.42 9849.70 127 33 26
3 PKK 120.08 410961.49 9903.10 147 43 55
4 KKK 167.31 411005.63 9918.79 173 08 25
5 KPK 242.31 411079.72 9910.22 193 18 53
Apex: 928
6 245.76 411083.08 9909.42 193 18 53
------------------------------------------------------------
64
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410881.94 9813.96 127 33 26
2 5.25 410885.14 9818.12 127 33 26
3 15.40 410891.33 9826.17 127 33 26
4 29.30 410899.80 9837.19 127 33 26
5 50.80 410912.91 9854.23 127 40 28
6 70.20 410924.99 9869.41 129 49 13
7 76.10 410928.81 9873.90 131 00 29
8 82.00 410932.74 9878.30 132 26 45
9 92.00 410939.67 9885.51 135 27 10
10 107.50 410951.25 9895.81 141 31 52
11 112.60 410955.30 9898.90 143 54 28
12 124.80 410965.53 9905.53 150 16 14
13 133.60 410973.35 9909.58 155 00 17
14 141.50 410980.62 9912.65 159 15 18
15 151.50 410990.13 9915.74 164 38 05
16 158.00 410996.44 9917.27 168 07 54
17 166.40 411004.72 9918.68 172 39 03
18 178.40 411016.69 9919.57 178 39 56
19 200.00 411038.24 9918.41 186 53 40
20 245.76 411061.88 9914.31 192 06 45
----------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
------------------------------------------------------------
Apex: 816
1 .00 410363.73 10289.45 226 04 11
Apex: 813
2 PPK 130.59 410454.33 10195.40 226 04 11
3 PKK 250.59 410540.38 10111.83 220 20 24
4 KKK 461.32 410721.43 10006.13 200 13 01
5 KPK 611.32 410865.92 9966.22 193 03 17
Apex: 818
65
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410363.73 10289.45 226 04 11
2 45.00 410394.95 10257.04 226 04 11
3 59.00 410404.67 10246.96 226 04 11
4 73.00 410414.38 10236.87 226 04 11
5 86.50 410423.74 10227.15 226 04 11
6 103.00 410435.19 10215.27 226 04 11
7 117.00 410444.90 10205.19 226 04 11
8 132.50 410455.66 10194.02 226 04 05
9 145.50 410464.68 10184.67 225 58 52
10 163.00 410476.88 10172.11 225 39 06
11 184.70 410492.14 10156.68 224 54 17
12 200.00 410503.04 10145.95 224 09 10
13 220.00 410517.54 10132.17 222 53 20
14 228.00 410523.43 10126.76 222 17 40
15 240.00 410532.37 10118.76 221 18 25
16 249.96 410539.90 10112.24 220 24 01
17 270.00 410555.38 10099.51 218 29 12
18 290.00 410571.24 10087.33 216 34 37
19 307.50 410585.44 10077.11 214 54 21
20 314.00 410590.79 10073.42 214 17 06
21 320.00 410595.77 10070.06 213 42 43
22 340.00 410612.58 10059.24 211 48 08
23 360.00 410629.75 10048.99 209 53 32
24 380.00 410647.26 10039.31 207 58 57
25 400.00 410665.07 10030.22 206 04 21
26 420.00 410683.18 10021.73 204 09 46
27 422.80 410685.74 10020.59 203 53 43
28 428.60 410691.05 10018.27 203 20 29
29 432.00 410694.18 10016.93 203 01 01
30 440.00 410701.56 10013.85 202 15 10
31 460.88 410721.02 10006.28 200 15 32
32 481.93 410740.88 9999.32 198 23 03
33 482.20 410741.14 9999.24 198 21 43
34 485.35 410744.13 9998.25 198 06 22
35 487.64 410746.31 9997.55 197 55 27
36 489.93 410748.49 9996.84 197 44 44
37 495.90 410754.18 9995.05 197 17 44
38 512.00 410769.60 9990.41 196 11 42
39 535.00 410791.76 9984.26 194 54 32
40 560.86 410816.81 9977.85 193 51 55
41 574.58 410830.15 9974.61 193 29 04
42 575.00 410830.55 9974.51 193 28 29
43 614.00 410868.53 9965.61 193 03 17
44 630.00 410884.11 9962.00 193 03 17
45 652.00 410905.54 9957.03 193 03 17
46 675.00 410927.95 9951.83 193 03 17
47 700.00 410952.30 9946.19 193 03 17
48 721.00 410972.76 9941.44 193 03 17
49 744.00 410995.17 9936.25 193 03 17
50 766.00 411016.60 9931.28 193 03 17
51 789.00 411039.00 9926.08 193 03 17
52 806.80 411056.35 9922.06 193 03 17
----------------------------------------------------
66
Rehabilitation of access roads
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER ELEMENT CHAINAGE Y X deg min sec
------------------------------------------------------------
Apex: 817
1 .00 410351.40 10321.57 226 04 09
Apex: 808
2 PPK .80 410351.96 10320.99 226 04 09
3 PKK 140.80 410451.19 10222.26 222 25 23
4 KKK 634.63 410877.14 9980.66 196 42 03
5 KPK 774.63 411012.79 9946.16 193 03 17
Apex: 819
6 822.89 411059.80 9935.26 193 03 17
------------------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
1 .00 410351.40 10321.57 226 04 09
2 77.00 410405.17 10266.45 224 59 21
3 91.00 410415.11 10256.59 224 33 21
4 105.00 410425.13 10246.81 224 02 58
5 118.50 410434.87 10237.47 223 29 32
6 135.00 410446.92 10226.19 222 43 09
7 149.00 410457.26 10216.76 221 59 46
8 164.00 410468.48 10206.80 221 12 53
9 177.00 410478.31 10198.29 220 32 16
10 195.00 410492.08 10186.70 219 36 00
11 216.00 410508.39 10173.47 218 30 23
12 220.00 410511.53 10170.99 218 17 53
13 240.00 410527.33 10158.74 217 15 22
14 255.00 410539.33 10149.74 216 28 30
15 260.00 410543.36 10146.77 216 12 52
16 280.00 410559.60 10135.10 215 10 22
17 300.00 410576.06 10123.73 214 07 51
18 320.00 410592.71 10112.66 213 05 21
67
Rehabilitation of access roads
----------------------------------------------------
ORDINAL C O O R D I N A T E S AZIMUTH
NUMBER CHAINAGE Y X deg min sec
----------------------------------------------------
19 340.00 410609.57 10101.90 212 02 51
20 347.14 410615.63 10098.13 211 40 32
21 360.00 410626.61 10091.44 211 00 21
22 380.00 410643.85 10081.29 209 57 50
23 400.00 410661.27 10071.46 208 55 20
24 417.00 410676.21 10063.35 208 02 12
25 420.20 410679.04 10061.85 207 52 12
26 426.30 410684.44 10059.02 207 33 08
27 440.00 410696.62 10052.76 206 50 20
28 460.00 410714.55 10043.89 205 47 49
29 480.00 410732.63 10035.35 204 45 19
30 500.00 410750.87 10027.14 203 42 49
31 516.80 410766.30 10020.50 202 50 19
32 521.00 410770.18 10018.88 202 37 11
33 523.20 410772.21 10018.04 202 30 18
34 525.00 410773.87 10017.35 202 24 41
35 526.60 410775.35 10016.74 202 19 41
36 528.80 410777.39 10015.90 202 12 48
37 534.00 410782.21 10013.95 201 56 33
38 542.00 410789.64 10010.99 201 31 33
39 580.00 410825.22 9997.66 199 32 48
40 592.70 410837.21 9993.48 198 53 06
41 631.70 410874.33 9981.51 196 51 13
42 647.70 410889.67 9976.98 196 03 07
43 669.70 410910.87 9971.08 195 06 11
44 692.70 410933.12 9965.25 194 18 13
45 717.70 410957.38 9959.22 193 39 28
46 738.70 410977.80 9954.33 193 17 42
47 761.70 411000.19 9949.09 193 05 09
48 782.70 411020.65 9944.34 193 03 17
49 806.00 411043.35 9939.08 193 03 17
50 822.89 411059.80 9935.26 193 03 17
----------------------------------------------------
68
Rehabilitation of access roads
No DESCRIPTION
----------------------------------------------
1. LAYING OUT AXLE 1
2. LAYING OUT AXLE 11
3. LAYING OUT AXLE 12
4. LAYING OUT AXLE 2
5. LAYING OUT AXLE 3
6. LAYING OUT AXLE 31
7. LAYING OUT AXLE 32
8. LAYING OUT AXLE 4
9. LAYING OUT AXLE 41
10. LAYING OUT AXLE 42
11. LAYING OUT AXLE 43
12. LAYING OUT AXLE 44
13. LAYING OUT AXLE 45
14. LAYING OUT AXLE 46
-----------------------------------------------
1.LAYING OUT AXLE 1
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10025 409583.600 11462.710
-----------------------------------------------------------------------------
10023 409738.190 11026.320 462.963 160 29 36
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
8.70 409578.246 11428.544 34.582 188 54 21 30.417 16.455
22.00 409582.918 11416.092 46.623 180 50 15 43.715 16.209
55.00 409594.511 11385.195 78.279 171 59 15 76.709 15.598
83.50 409604.523 11358.512 106.278 168 38 45 105.204 15.071
99.00 409609.968 11344.000 121.603 167 28 36 120.701 14.784
113.00 409614.886 11330.892 135.480 166 38 53 134.699 14.525
128.00 409620.156 11316.848 150.373 165 55 49 149.696 14.248
143.00 409625.425 11302.804 165.285 165 20 31 164.694 13.971
158.00 409630.694 11288.760 180.212 164 51 4 179.691 13.693
173.50 409636.140 11274.248 195.648 164 25 21 195.189 13.406
188.00 409641.233 11260.672 210.097 164 4 43 209.686 13.138
203.00 409646.503 11246.628 225.051 163 46 9 224.684 12.861
217.00 409651.421 11233.520 239.014 163 30 56 238.681 12.602
233.50 409657.217 11218.072 255.474 163 15 8 255.178 12.296
248.00 409662.311 11204.496 269.944 163 2 50 269.676 12.028
265.00 409668.283 11188.580 286.912 162 49 59 286.673 11.714
281.00 409673.904 11173.599 302.886 162 39 13 302.670 11.418
296.00 409679.177 11159.557 317.863 162 30 4 317.668 11.137
311.00 409684.471 11145.522 332.841 162 21 30 332.665 10.832
326.00 409689.811 11131.505 347.818 162 13 12 347.660 10.480
341.60 409695.435 11116.954 363.393 162 4 34 363.254 10.037
356.30 409700.823 11103.277 378.065 161 56 13 377.945 9.525
371.00 409706.319 11089.643 392.732 161 47 29 392.632 8.897
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
385.50 409711.866 11076.246 407.193 161 38 21 407.112 8.142
400.50 409717.755 11062.451 422.143 161 28 13 422.082 7.197
415.60 409723.861 11048.641 437.180 161 17 12 437.138 6.053
431.00 409730.293 11034.648 452.499 161 5 1 452.475 4.663
445.70 409736.633 11021.386 467.104 160 52 32 467.094 3.115
462.00 409743.890 11006.790 483.276 160 37 46 483.274 1.149
476.00 409750.312 10994.350 497.145 160 24 24 497.145 -.751
491.00 409757.385 10981.123 511.984 160 9 27 511.975 -3.001
506.00 409764.656 10968.003 526.798 159 53 53 526.770 -5.474
69
Rehabilitation of access roads
70
Rehabilitation of access roads
71
Rehabilitation of access roads
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10004 410794.470 9986.630
-----------------------------------------------------------------------------
10009 411016.700 9955.440 224.408 97 59 21
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
1926.50 410784.817 10002.010 18.158 327 53 10 -11.697 -13.889
1932.20 410790.155 10000.010 14.058 342 7 26 -6.133 -12.650
1938.00 410795.598 9998.006 11.431 5 39 37 -.465 -11.422
1944.00 410801.240 9995.966 11.532 35 56 55 5.407 -10.186
1979.16 410834.543 9984.696 40.120 92 45 46 39.953 -3.654
2000.83 410855.258 9978.334 61.351 97 46 15 61.351 -.234
2019.65 410873.349 9973.148 80.023 99 41 58 79.987 2.388
2031.67 410884.944 9969.979 91.993 100 25 42 91.910 3.915
2054.35 410906.890 9964.257 114.624 101 15 20 114.438 6.531
2078.20 410930.041 9958.529 138.453 101 42 37 138.161 8.986
2102.02 410953.214 9953.012 162.264 101 57 25 161.876 11.228
2123.64 410974.269 9948.103 183.881 102 5 39 183.409 13.163
2147.21 410997.230 9942.779 207.448 102 12 12 206.887 15.244
2169.46 411018.905 9937.753 229.695 102 17 9 229.050 17.209
2192.42 411041.271 9932.567 252.653 102 21 21 251.920 19.236
2216.13 411064.369 9927.211 276.362 102 24 57 275.537 21.330
2239.66 411087.284 9921.868 299.890 102 28 17 298.973 23.436
2261.99 411109.008 9916.703 322.218 102 32 2 321.205 25.531
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10009 411016.700 9955.440
-----------------------------------------------------------------------------
10007 411319.610 9864.360 316.307 106 44 6
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
2078.20 410930.041 9958.529 86.714 272 2 28 -83.878 21.995
2102.02 410953.214 9953.012 63.533 267 48 35 -60.098 20.606
2123.64 410974.269 9948.103 43.060 260 11 24 -38.521 19.244
2147.21 410997.230 9942.779 23.225 236 57 52 -15.000 17.731
2169.46 411018.905 9937.753 17.824 172 53 39 7.204 16.303
2192.42 411041.271 9932.567 33.570 132 57 1 30.117 14.829
2216.13 411064.369 9927.211 55.400 120 38 2 53.778 13.308
2239.66 411087.284 9921.868 78.161 115 26 14 77.261 11.826
2261.99 411109.008 9916.703 100.107 112 45 54 99.553 10.516
2284.39 411130.762 9911.359 122.283 111 7 47 121.924 9.370
2307.66 411153.297 9905.560 145.419 110 3 36 145.175 8.434
2333.55 411178.266 9898.718 171.234 109 20 41 171.056 7.796
2353.73 411197.634 9893.050 191.388 109 1 30 191.236 7.648
2376.42 411219.302 9886.319 214.069 108 50 16 213.924 7.855
2400.00 411241.692 9878.924 237.647 108 46 56 237.496 8.489
2423.17 411263.559 9871.263 260.816 108 49 44 260.642 9.529
2443.89 411282.995 9864.084 281.530 108 56 7 281.322 10.808
2467.17 411304.693 9855.648 304.792 109 6 41 304.530 12.638
72
Rehabilitation of access roads
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
2492.80 411328.402 9845.914 330.384 109 21 37 330.038 15.133
2522.53 411355.656 9834.039 360.041 109 42 19 359.557 18.657
2541.78 411373.156 9826.020 379.224 109 57 16 378.625 21.298
2564.82 411393.942 9816.081 402.160 110 16 29 401.393 24.830
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10007 411319.610 9864.360
-----------------------------------------------------------------------------
10008 411611.270 9698.970 335.290 119 33 21
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
2376.42 411219.302 9886.319 102.683 282 20 53 -98.087 30.378
2400.00 411241.692 9878.924 79.267 280 35 14 -74.963 25.766
2423.17 411263.559 9871.263 56.475 277 1 16 -52.163 21.644
2443.89 411282.995 9864.084 36.616 269 34 2 -31.714 18.302
2467.17 411304.693 9855.648 17.275 239 42 55 -8.679 14.936
2492.80 411328.402 9845.914 20.434 154 31 1 16.747 11.709
2522.53 411355.656 9834.039 47.103 130 4 8 46.312 8.594
2541.78 411373.156 9826.020 65.857 125 36 13 65.491 6.938
2564.82 411393.942 9816.081 88.635 123 0 13 88.474 5.330
2581.37 411408.763 9808.716 105.093 121 58 11 104.999 4.426
2605.91 411430.563 9797.449 129.567 121 5 32 129.521 3.474
2626.00 411448.249 9787.920 149.637 120 43 10 149.606 3.039
2652.82 411471.627 9774.775 176.450 120 30 40 176.425 2.941
2672.26 411488.399 9764.948 195.889 120 29 49 195.863 3.217
2696.59 411509.181 9752.296 220.217 120 35 21 220.181 3.971
2720.15 411529.076 9739.676 243.766 120 45 46 243.712 5.135
2742.81 411547.992 9727.201 266.403 120 59 16 266.320 6.657
2766.21 411567.294 9713.973 289.765 121 15 53 289.636 8.641
2790.85 411587.359 9699.672 314.343 121 35 42 314.144 11.184
2812.29 411604.594 9686.921 335.709 121 54 27 335.426 13.774
2838.45 411625.335 9670.980 361.751 122 18 52 361.332 17.410
2858.00 411640.624 9658.796 381.191 122 38 1 380.641 20.467
2882.00 411659.140 9643.526 405.028 123 2 25 404.280 24.616
2903.85 411675.749 9629.330 426.702 123 25 20 425.731 28.772
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10008 411611.270 9698.970
-----------------------------------------------------------------------------
10015 411798.020 9533.000 249.843 131 37 42
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
2720.15 411529.076 9739.676 91.722 296 20 48 -88.479 24.175
2742.81 411547.992 9727.201 69.290 294 2 35 -66.052 20.934
2766.21 411567.294 9713.973 46.465 288 50 17 -42.837 17.998
2790.85 411587.359 9699.672 23.922 271 40 55 -18.340 15.359
2812.29 411604.594 9686.921 13.775 208 59 19 3.014 13.441
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
2838.45 411625.335 9670.980 31.326 153 19 11 29.107 11.578
2858.00 411640.624 9658.796 49.756 143 50 43 48.629 10.529
2882.00 411659.140 9643.526 73.250 139 11 33 72.612 9.642
2903.85 411675.749 9629.330 94.907 137 12 13 94.458 9.220
2926.52 411692.727 9614.308 117.486 136 6 19 117.128 9.171
2950.24 411710.208 9598.275 141.167 135 30 15 140.844 9.542
2972.17 411726.107 9583.171 163.086 135 14 20 162.762 10.270
2996.38 411743.360 9566.188 187.294 135 8 58 186.940 11.503
3017.77 411758.339 9550.918 208.683 135 11 27 208.280 12.967
3041.32 411774.536 9533.823 232.227 135 19 40 231.743 14.985
3060.58 411787.551 9519.627 251.474 135 29 35 250.902 16.950
3085.58 411804.129 9500.914 276.443 135 45 41 275.724 19.925
73
Rehabilitation of access roads
-----------------------------------------------------------------------------
2.LAYING OUT AXLE 11
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10015 411798.020 9533.000
-----------------------------------------------------------------------------
10017 411594.560 9352.170 272.205 228 22 12
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
.00 411741.980 9548.630 58.179 285 35 3 31.504 48.911
11.30 411746.183 9538.145 52.092 275 40 4 35.328 38.282
23.52 411748.574 9526.189 49.913 262 9 24 41.483 27.757
38.58 411747.674 9511.206 54.860 246 35 34 52.109 17.156
50.40 411744.036 9499.986 63.279 238 33 6 62.282 11.186
65.00 411736.464 9487.541 76.523 233 33 14 76.210 6.914
77.00 411728.522 9478.556 88.284 231 55 31 88.115 5.475
88.30 411720.234 9470.879 99.548 231 23 18 99.410 5.242
101.00 411710.511 9462.709 112.244 231 13 38 112.105 5.595
112.70 411701.501 9455.244 123.943 231 8 42 123.797 6.000
128.00 411689.720 9445.483 139.242 231 3 30 139.088 6.531
143.50 411677.784 9435.594 154.740 230 59 17 154.579 7.068
154.00 411669.699 9428.895 165.240 230 56 53 165.073 7.432
173.60 411654.621 9416.372 184.839 230 52 41 184.662 8.088
204.30 411632.076 9395.561 215.469 230 22 3 215.338 7.510
218.70 411622.733 9384.611 229.662 229 45 1 229.595 5.532
231.70 411615.462 9373.845 242.194 228 55 4 242.183 2.315
252.50 411607.099 9354.856 261.125 226 58 58 261.048 -6.322
260.40 411605.224 9347.185 267.764 226 3 22 267.545 -10.811
271.40 411603.892 9336.275 276.381 224 37 9 275.789 -18.080
289.20 411604.930 9318.542 288.576 221 59 55 286.793 -32.025
303.80 411608.692 9304.456 296.778 219 38 18 293.339 -45.052
316.00 411613.743 9293.362 302.298 217 33 34 296.933 -56.699
330.00 411621.236 9281.547 307.378 215 6 32 299.181 -70.508
343.40 411629.500 9271.003 311.515 212 44 58 300.010 -83.880
356.50 411638.100 9261.122 315.423 210 27 51 300.145 -96.979
371.60 411648.147 9249.849 320.369 207 53 32 300.125 -112.078
386.20 411657.861 9238.950 325.746 205 29 5 300.105 -126.678
401.72 411668.190 9227.360 332.072 203 0 53 300.083 -142.203
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10017 411594.560 9352.170
-----------------------------------------------------------------------------
10015 411798.020 9533.000 272.205 48 22 12
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
.00 411741.980 9548.630 245.620 36 53 2 240.701 -48.911
11.30 411746.183 9538.145 239.950 39 11 23 236.877 -38.282
23.52 411748.574 9526.189 232.385 41 30 36 230.721 -27.757
38.58 411747.674 9511.206 220.764 43 54 47 220.096 -17.156
50.40 411744.036 9499.986 210.220 45 19 12 209.923 -11.186
65.00 411736.464 9487.541 196.117 46 20 59 195.995 -6.914
77.00 411728.522 9478.556 184.172 46 40 0 184.090 -5.475
88.30 411720.234 9470.879 172.875 46 37 57 172.795 -5.242
101.00 411710.511 9462.709 160.198 46 22 7 160.100 -5.595
112.70 411701.501 9455.244 148.529 46 3 17 148.407 -6.000
128.00 411689.720 9445.483 133.277 45 33 40 133.117 -6.531
143.50 411677.784 9435.594 117.838 44 55 52 117.626 -7.068
154.00 411669.699 9428.895 107.390 44 24 5 107.132 -7.432
173.60 411654.621 9416.372 87.916 43 5 29 87.543 -8.088
204.30 411632.076 9395.561 57.360 40 50 47 56.866 -7.510
218.70 411622.733 9384.611 42.967 40 58 21 42.609 -5.532
231.70 411615.462 9373.845 30.111 43 57 35 30.022 -2.315
252.50 411607.099 9354.856 12.823 77 54 30 11.156 6.322
260.40 411605.224 9347.185 11.772 115 3 13 4.659 10.811
74
Rehabilitation of access roads
75
Rehabilitation of access roads
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
76
Rehabilitation of access roads
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10001 410692.570 9913.260
-----------------------------------------------------------------------------
10004 410794.470 9986.630 125.566 54 14 43
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
.00 410669.769 9821.187 94.854 193 54 31 -72.303 61.397
4.20 410671.492 9825.017 90.725 193 26 3 -68.667 59.295
20.60 410678.474 9839.856 74.745 190 52 14 -54.330 51.332
33.20 410684.112 9851.124 62.709 187 45 6 -43.171 45.483
45.40 410689.795 9861.919 51.416 183 5 37 -32.251 40.043
60.20 410696.983 9874.856 38.656 173 26 43 -18.859 33.744
76.70 410705.369 9889.066 27.371 152 7 14 -3.750 27.113
81.50 410707.882 9893.155 25.272 142 42 25 .678 25.262
91.00 410712.951 9901.190 23.687 120 38 7 9.487 21.704
101.00 410718.424 9909.559 26.117 98 8 46 18.818 18.110
108.40 410722.563 9915.693 30.091 85 21 43 25.762 15.551
125.30 410732.297 9929.507 42.921 67 45 24 41.733 10.028
137.50 410739.565 9939.306 53.730 61 0 10 53.357 6.322
153.00 410749.082 9951.540 68.257 55 53 14 68.229 1.956
167.40 410758.205 9962.681 82.161 53 1 16 82.142 -1.755
183.00 410768.386 9974.500 97.460 51 4 14 97.310 -5.397
197.00 410777.782 9984.878 111.311 49 57 14 110.999 -8.329
212.50 410788.464 9996.109 126.727 49 10 27 126.231 -11.202
227.70 410799.218 10006.851 141.891 48 43 51 141.234 -13.635
242.60 410810.020 10017.113 156.780 48 30 57 155.997 -15.652
257.70 410821.224 10027.236 171.879 48 27 42 171.004 -17.320
273.60 410833.292 10037.587 187.776 48 32 22 186.846 -18.669
289.80 410845.866 10047.801 203.963 48 43 41 203.018 -19.610
305.40 410858.231 10057.312 219.532 48 59 28 218.610 -20.104
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10004 410794.470 9986.630
-----------------------------------------------------------------------------
10006 410937.470 10122.210 197.056 46 31 32
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
60.20 410696.983 9874.856 148.314 221 5 40 -147.648 14.038
76.70 410705.369 9889.066 132.128 222 24 14 -131.786 9.497
81.50 410707.882 9893.155 127.417 222 48 35 -127.149 8.258
91.00 410712.951 9901.190 118.091 223 39 16 -117.942 5.915
101.00 410718.424 9909.559 108.273 224 36 59 -108.213 3.607
108.40 410722.563 9915.693 101.008 225 23 21 -100.988 2.004
125.30 410732.297 9929.507 84.430 227 25 26 -84.420 -1.324
137.50 410739.565 9939.306 72.485 229 14 29 -72.404 -3.435
153.00 410749.082 9951.540 57.371 232 17 29 -57.080 -5.764
167.40 410758.205 9962.681 43.459 236 33 35 -42.795 -7.572
183.00 410768.386 9974.500 28.766 245 3 33 -27.275 -9.144
197.00 410777.782 9984.878 16.780 264 0 23 -13.316 -10.210
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
212.50 410788.464 9996.109 11.221 327 38 29 2.163 -11.011
227.70 410799.218 10006.851 20.771 13 12 48 17.358 -11.407
242.60 410810.020 10017.113 34.220 27 1 37 32.257 -11.422
257.70 410821.224 10027.236 48.627 33 22 45 47.353 -11.060
273.60 410833.292 10037.587 64.061 37 18 8 63.232 -10.268
289.80 410845.866 10047.801 79.896 40 2 14 79.384 -9.029
305.40 410858.231 10057.312 95.191 42 3 10 94.901 -7.423
320.50 410870.431 10066.209 110.013 43 40 2 109.876 -5.486
336.70 410883.764 10075.410 125.917 45 9 55 125.882 -2.989
352.30 410896.833 10083.926 141.226 46 27 13 141.226 -.177
366.30 410908.748 10091.278 154.953 47 31 7 154.930 2.685
380.00 410920.569 10098.201 168.372 48 29 53 168.272 5.795
397.50 410935.878 10106.679 185.494 49 40 13 185.214 10.176
410.40 410947.200 10112.862 198.144 50 25 33 197.685 13.478
428.00 410962.646 10121.299 215.450 51 18 48 214.698 17.983
77
Rehabilitation of access roads
78
Rehabilitation of access roads
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10009 411016.700 9955.440
-----------------------------------------------------------------------------
10006 410937.470 10122.210 184.634 334 35 17
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
.00 411078.679 9937.430 64.542 106 12 9 -42.863 48.254
9.20 411069.758 9939.679 55.349 106 32 38 -37.004 41.161
35.20 411045.443 9948.704 29.522 103 11 21 -18.418 23.071
46.00 411036.460 9954.672 19.775 92 13 30 -9.173 17.519
56.40 411029.147 9962.037 14.088 62 4 31 .618 14.074
72.40 411022.079 9976.254 21.498 14 29 20 16.492 13.790
82.40 411021.240 9986.191 31.084 8 23 52 25.828 17.296
96.65 411025.605 9999.633 45.081 11 23 32 36.096 27.007
104.00 411029.632 10005.777 51.972 14 24 27 39.918 33.281
117.40 411037.752 10016.436 64.527 19 2 29 46.061 45.190
135.00 411048.467 10030.398 81.412 22 58 1 54.074 60.860
150.00 411057.600 10042.298 96.006 25 12 53 60.903 74.215
164.75 411066.580 10053.999 110.462 26 50 36 67.619 87.347
181.55 411076.810 10067.330 127.014 28 14 44 75.270 102.308
-----------------------------------------------------------------------------
8.LAYING OUT AXLE 4
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10003 410424.230 10040.520
-----------------------------------------------------------------------------
10002 410575.610 9980.580 162.815 111 36 5
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
.00 410462.940 10030.200 40.062 104 55 39 39.791 -4.656
10.41 410472.191 10025.426 50.280 107 28 12 50.149 -3.622
24.01 410484.276 10019.188 63.722 109 33 28 63.682 -2.272
38.35 410497.019 10012.611 77.956 110 58 39 77.951 -.849
43.57 410501.657 10010.217 83.146 111 22 25 83.145 -.330
64.10 410519.901 10000.801 103.588 112 32 47 103.574 1.709
77.96 410532.217 9994.444 117.406 113 6 25 117.365 3.085
89.95 410542.871 9988.944 129.367 113 29 44 129.296 4.276
103.29 410554.725 9982.826 142.680 113 51 4 142.570 5.601
116.50 410566.463 9976.767 155.868 114 8 36 155.715 6.913
132.56 410580.735 9969.400 171.906 114 26 17 171.695 8.508
145.39 410592.135 9963.515 184.721 114 38 13 184.462 9.782
159.30 410604.496 9957.135 198.617 114 49 24 198.303 11.164
171.10 410614.981 9951.723 210.407 114 57 45 210.045 12.336
190.63 410632.336 9942.765 229.922 115 9 40 229.478 14.275
207.32 410647.167 9935.110 246.601 115 18 21 246.086 15.933
223.74 410661.758 9927.579 263.012 115 25 49 262.425 17.564
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10002 410575.610 9980.580
-----------------------------------------------------------------------------
10001 410692.570 9913.260 134.950 119 55 26
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
24.01 410484.276 10019.188 99.159 292 54 52 -98.418 12.101
38.35 410497.019 10012.611 84.868 292 10 27 -84.093 11.444
43.57 410501.657 10010.217 79.670 291 50 20 -78.878 11.205
64.10 410519.901 10000.801 59.266 289 56 58 -58.370 10.265
77.96 410532.217 9994.444 45.554 287 43 5 -44.524 9.631
89.95 410542.871 9988.944 33.791 284 19 53 -32.547 9.083
103.29 410554.725 9982.826 21.005 276 8 13 -19.221 8.472
116.50 410566.463 9976.767 9.910 247 22 1 -6.025 7.868
79
Rehabilitation of access roads
80
Rehabilitation of access roads
81
Rehabilitation of access roads
82
Rehabilitation of access roads
83
Rehabilitation of access roads
84
Rehabilitation of access roads
85
Rehabilitation of access roads
---------------------------------------------------------------------
Gully Spot COORDINATES Level of
number number Y X gully grating
---------------------------------------------------------------------
G45 760 411138.62 9910.87 135.57
G46 1364 411153.46 9906.79 135.82
86
Rehabilitation of access roads
87
Rehabilitation of access roads
88
Rehabilitation of access roads
---------------------------------------------------------------------
89
Rehabilitation of access roads
2. Manholes in axle 2
REMARK:
Manhole M10will be demolished during tunnel renewal and rebuilt
again.
90
Rehabilitation of access roads
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------
487.64 410746.310 9997.545 425.717 126 13 2 425.563 11.430
489.93 410748.490 9996.844 427.890 126 7 14 427.755 10.767
495.90 410754.183 9995.047 433.553 125 52 8 433.459 9.005
512.00 410769.601 9990.412 448.794 125 11 42 448.775 4.044
535.00 410791.762 9984.256 470.515 124 15 8 470.502 -3.502
560.86 410816.815 9977.847 494.908 123 13 59 494.751 -12.485
574.58 410830.146 9974.605 507.857 122 42 53 507.558 -17.405
91
Rehabilitation of access roads
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
481.93 410740.884 9999.324 294.362 127 13 14 293.748 19.007
482.20 410741.141 9999.239 294.618 127 12 13 294.009 18.936
485.35 410744.133 9998.254 297.599 127 0 23 297.047 18.106
487.64 410746.310 9997.545 299.765 126 51 50 299.254 17.494
489.93 410748.490 9996.844 301.931 126 43 20 301.459 16.875
495.90 410754.183 9995.047 307.575 126 21 23 307.197 15.229
512.00 410769.601 9990.412 322.785 125 23 48 322.611 10.579
535.00 410791.762 9984.256 344.503 124 5 46 344.486 3.474
560.86 410816.815 9977.847 368.946 122 44 22 368.912 -5.016
574.58 410830.146 9974.605 381.939 122 4 0 381.816 -9.675
575.00 410830.555 9974.507 382.337 122 2 48 382.211 -9.819
614.00 410868.526 9965.611 419.432 120 19 27 418.781 -23.371
630.00 410884.113 9961.997 434.737 119 41 53 433.771 -28.965
652.00 410905.544 9957.028 455.859 118 54 22 454.383 -36.656
92
Rehabilitation of access roads
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
380.00 410647.256 10039.308 156.355 289 41 20 -153.107 -31.706
400.00 410665.071 10030.220 136.544 288 37 1 -134.202 -25.182
420.00 410683.179 10021.731 116.695 287 30 18 -115.090 -19.292
422.80 410685.736 10020.591 113.914 287 20 42 -112.399 -18.519
428.60 410691.050 10018.267 108.151 287 0 34 -106.813 -16.956
432.00 410694.176 10016.929 104.771 286 48 34 -103.532 -16.065
440.00 410701.560 10013.850 96.816 286 19 44 -95.792 -14.043
460.88 410721.018 10006.281 76.035 284 58 39 -75.470 -9.251
481.93 410740.884 9999.324 55.069 283 19 39 -54.830 -5.123
482.20 410741.141 9999.239 54.800 283 18 10 -54.564 -5.075
485.35 410744.133 9998.254 51.662 283 0 9 -51.464 -4.515
487.64 410746.310 9997.545 49.381 282 46 13 -49.209 -4.116
489.93 410748.490 9996.844 47.101 282 31 28 -46.953 -3.724
495.90 410754.183 9995.047 41.157 281 48 3 -41.066 -2.736
512.00 410769.601 9990.412 25.154 278 38 51 -25.153 -.289
535.00 410791.762 9984.256 3.601 228 46 0 -2.352 2.727
560.86 410816.815 9977.847 24.009 111 27 34 23.348 5.593
574.58 410830.146 9974.605 37.648 108 37 35 37.001 6.950
575.00 410830.555 9974.507 38.066 108 34 11 37.419 6.990
614.00 410868.526 9965.611 76.981 105 50 41 76.259 10.522
630.00 410884.113 9961.997 92.966 105 21 53 92.196 11.934
93
Rehabilitation of access roads
94
Rehabilitation of access roads
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10020 410506.480 10177.380
-----------------------------------------------------------------------------
10004 410794.470 9986.630 345.433 123 31 6
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
.00 410351.405 10321.566 211.750 312 54 58 -208.908 -34.576
77.00 410405.170 10266.447 134.895 311 19 12 -133.646 -18.311
91.00 410415.107 10256.585 120.923 310 55 11 -119.916 -15.578
105.00 410425.125 10246.806 106.951 310 28 35 -106.163 -12.957
118.50 410434.873 10237.466 93.477 310 0 1 -92.879 -10.552
135.00 410446.918 10226.189 77.006 309 20 0 -76.610 -7.802
149.00 410457.263 10216.756 63.030 308 39 41 -62.777 -5.650
164.00 410468.479 10206.796 48.057 307 44 34 -47.926 -3.540
177.00 410478.308 10198.289 35.083 306 34 56 -35.033 -1.875
195.00 410492.083 10186.702 17.152 302 55 22 -17.151 .178
216.00 410508.390 10173.471 4.350 153 57 9 3.751 2.204
220.00 410511.525 10170.987 8.144 141 43 21 7.736 2.544
240.00 410527.333 10158.735 27.973 131 48 2 27.681 4.029
255.00 410539.333 10149.736 42.936 130 4 42 42.655 4.905
260.00 410543.361 10146.773 47.927 129 41 21 47.649 5.152
280.00 410559.603 10135.104 67.892 128 30 47 67.634 5.911
300.00 410576.056 10123.732 87.857 127 38 5 87.630 6.306
320.00 410592.712 10112.662 107.816 126 53 19 107.630 6.339
340.00 410609.567 10101.896 127.768 126 12 47 127.627 6.007
347.14 410615.631 10098.127 134.889 125 58 59 134.764 5.800
360.00 410626.614 10091.438 147.710 125 34 45 147.615 5.312
380.00 410643.849 10081.292 167.640 124 58 20 167.586 4.253
400.00 410661.266 10071.461 187.557 124 23 1 187.535 2.832
417.00 410676.208 10063.354 204.474 123 53 37 204.470 1.339
420.20 410679.035 10061.854 207.657 123 48 8 207.655 1.029
426.30 410684.435 10059.018 213.724 123 37 43 213.723 .412
440.00 410696.621 10052.756 227.342 123 14 30 227.340 -1.097
460.00 410714.548 10043.889 247.208 122 40 59 247.182 -3.604
480.00 410732.632 10035.350 267.053 122 7 47 266.975 -6.471
500.00 410750.870 10027.141 286.877 121 34 52 286.713 -9.698
516.80 410766.302 10020.502 303.510 121 7 23 303.245 -12.685
521.00 410770.176 10018.879 307.666 121 0 32 307.371 -13.471
523.20 410772.208 10018.035 309.842 120 56 57 309.530 -13.889
525.00 410773.871 10017.347 311.622 120 54 1 311.297 -14.235
526.60 410775.351 10016.738 313.205 120 51 25 312.867 -14.544
528.80 410777.387 10015.905 315.380 120 47 50 315.025 -14.973
534.00 410782.205 10013.950 320.521 120 39 22 320.121 -16.004
542.00 410789.637 10010.988 328.427 120 26 23 327.953 -17.638
580.00 410825.220 9997.658 365.917 119 24 59 364.980 -26.174
592.70 410837.212 9993.478 378.423 119 4 33 377.286 -29.312
631.70 410874.329 9981.511 416.746 118 2 2 414.838 -39.831
647.70 410889.674 9976.982 432.432 117 36 29 430.133 -44.528
669.70 410910.867 9971.079 453.970 117 1 43 451.061 -51.311
692.70 410933.116 9965.248 476.464 116 26 15 472.830 -58.735
717.70 410957.377 9959.216 500.903 115 49 11 496.388 -67.103
738.70 410977.800 9954.327 521.435 115 19 33 516.114 -74.305
761.70 411000.195 9949.085 543.942 114 48 57 537.679 -82.301
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
95
Rehabilitation of access roads
-----------------------------------------------------------------------------
782.70 411020.651 9944.339 564.517 114 22 54 557.355 -89.641
806.00 411043.349 9939.076 587.381 113 56 7 579.185 -97.787
822.89 411059.803 9935.261 603.977 113 37 58 595.009 -103.692
-----------------------------------------------------------------------------
SETTING OUT DATA P O L A R ORTHOGONAL
-----------------------------------------------------------------------------
SPOT C O O R D I N A T E S
NUMBER Y X LENGTH BEARING ABSCISSA ORDINATE
-----------------------------------------------------------------------------
10004 410794.470 9986.630
-----------------------------------------------------------------------------
10009 411016.700 9955.440 224.408 97 59 21
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
77.00 410405.170 10266.447 479.429 305 42 26 -424.413 -222.993
91.00 410415.107 10256.585 465.609 305 26 8 -413.201 -214.608
105.00 410425.125 10246.806 451.782 305 9 42 -401.921 -206.316
118.50 410434.873 10237.466 438.439 304 53 51 -390.970 -198.422
135.00 410446.918 10226.189 422.115 304 34 39 -377.475 -188.929
149.00 410457.263 10216.756 408.249 304 18 41 -365.919 -181.025
164.00 410468.479 10206.796 393.375 304 2 2 -353.428 -172.721
177.00 410478.308 10198.289 380.470 303 48 3 -342.511 -165.662
195.00 410492.083 10186.702 362.584 303 29 25 -327.260 -156.102
216.00 410508.390 10173.471 341.689 303 8 56 -309.272 -145.266
220.00 410511.525 10170.987 337.706 303 5 12 -305.822 -143.241
240.00 410527.333 10158.735 317.777 302 47 31 -288.465 -133.306
255.00 410539.333 10149.736 302.817 302 35 25 -275.330 -126.062
260.00 410543.361 10146.773 297.828 302 31 38 -270.930 -123.687
280.00 410559.603 10135.104 277.861 302 17 58 -253.223 -114.389
300.00 410576.056 10123.732 257.880 302 7 1 -235.350 -105.415
320.00 410592.712 10112.662 237.887 301 59 29 -217.317 -96.766
340.00 410609.567 10101.896 217.889 301 56 19 -199.129 -88.448
347.14 410615.631 10098.127 210.749 301 56 28 -192.600 -85.558
360.00 410626.614 10091.438 197.889 301 58 49 -180.794 -80.461
380.00 410643.849 10081.292 177.897 302 8 54 -162.316 -72.809
400.00 410661.266 10071.461 157.923 302 29 27 -143.702 -65.494
417.00 410676.208 10063.354 140.970 302 58 27 -127.777 -59.543
420.20 410679.035 10061.854 137.782 303 5 26 -124.770 -58.450
426.30 410684.435 10059.018 131.710 303 20 22 -119.028 -56.392
440.00 410696.621 10052.756 118.098 304 3 2 -106.090 -51.885
460.00 410714.548 10043.889 98.317 305 37 9 -87.105 -45.595
480.00 410732.632 10035.350 78.724 308 14 0 -68.009 -39.652
500.00 410750.870 10027.141 59.515 312 53 46 -48.808 -34.057
516.80 410766.302 10020.502 44.054 320 15 11 -32.602 -29.628
521.00 410770.176 10018.879 40.376 323 0 30 -28.540 -28.560
523.20 410772.208 10018.035 38.495 324 40 4 -26.411 -28.006
525.00 410773.871 10017.347 36.985 326 9 16 -24.668 -27.556
526.60 410775.351 10016.738 35.666 327 35 2 -23.118 -27.159
528.80 410777.387 10015.905 33.895 329 44 2 -20.986 -26.616
534.00 410782.205 10013.950 29.947 335 49 24 -15.943 -25.350
542.00 410789.637 10010.988 24.833 348 46 34 -8.172 -23.450
580.00 410825.220 9997.658 32.668 70 16 13 28.919 -15.195
592.70 410837.212 9993.478 43.287 80 53 51 41.376 -12.722
631.70 410874.329 9981.511 80.023 93 40 2 79.795 -6.031
647.70 410889.674 9976.982 95.692 95 47 12 95.621 -3.678
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
KILOMET. Y X LENGTH DEF.ANGLE ABSCISSA ORDINATE
-----------------------------------------------------------------------------
669.70 410910.867 9971.079 117.431 97 36 34 117.429 -.778
692.70 410933.116 9965.248 140.285 98 46 1 140.272 1.904
717.70 410957.377 9959.216 165.197 99 33 7 165.136 4.505
738.70 410977.800 9954.327 186.154 99 59 34 186.040 6.509
761.70 411000.195 9949.085 209.122 100 20 33 208.946 8.587
782.70 411020.651 9944.339 230.101 100 35 26 229.864 10.444
96
Rehabilitation of access roads
97
Rehabilitation of access roads
Remark:
Total length of all axles is calculated, but on part of destroyed Bridge and through
Tunnel, setting out will not be executed.
- Axle 1:
from km 2+147.21 to km 3+041.32 = 894.11 m¹
- Axle 11 = 401.72 m¹
- Axle 12 = 462.99 m¹
- Axle 2 = 458.56 m¹
- Axle 3 = 213.44 m¹
- Axle 32 = 181.55 m¹
- Axle 4 = 501.17 m¹
- Axle 41 = 187.43 m¹
- Axle 42 = 103.58 m¹
- Axle 43 = 105.39 m¹
- Axle 44 = 166.58 m¹
- Axle 46 = 245.76 m¹
------------------------------------------------------------------------
Item 1.02.................................... = 3,922.28 m¹
98
Rehabilitation of access roads
- Axle 4 :
5.70 x 1.50 = 8.55 m²
------------------------------------------------------------------------
Item 1.05.................................... = 232.65 m²
- Axle 1:
On km 0+022.00 9.86 + 12.06 = 21.92 m¹
On km 0+747.00 9.74 + 9.72 = 19.46 m¹
On km 1+458.00 9.73 + 9.68 = 19.41 m¹
On km 1+597.00 9.68 + 9.68 = 19.36 m¹
On km 1+957.16 9.72 + 9.66 = 19.38 m¹
On km 3+041.32 10.93 + 10.51 = 21.44 m¹
- Axle 11:
On km 0+401.72 7.03 + 21.15 = 28.18 m¹
- Axle 12:
On km 0+000.00 28.07 + 7.07 = 35.14 m¹
- Axle 2:
On km 0+000.00 7.00 + 7.00 = 14.00 m¹
On km 0+183,00 7.00 + 7.00 = 14.00 m¹
On km 0+257,70 7.00 + 7.00 = 14.00 m¹
- Axle 3:
On km 0+000.00 6.97 + 8.59 = 15.56 m¹
- Axle 41:
On km 0+000.00 36.83 = 36.83 m¹
- Axle 42:
On km 0+000.00 28.17 = 28.17 m¹
99
Rehabilitation of access roads
- Axle 43:
On km 0+105.39 37.21 = 37.21 m¹
- Axle 44:
On km 0+000.00 32.12 = 32.12 m¹
------------------------------------------------------------------------------
Item 1.06................................. = 376.18 m¹
8.1.1.7 MILLING
According to measurement:
5.00 x 3.00 x 1.20 =18.00 m³
------------------------------------------------------------------------
Item 1.08.................................... = 18.00 m³
100
Rehabilitation of access roads
- Axle 1 = 9 Pcs
- Axle 11 = 1 Pc
- Axle 12 = 2 Pcs
- Axle 2 = 2 Pcs
- Axle 3 = 1 Pc
- Axle 31 = 1 Pc
- Axle 32 = 1 Pc
- Axle 4 = 5 Pcs
- Axle 41 = 1 Pc
- Axle 42 = 1 Pc
- Axle 43 = 2 Pcs
- Axle 44 = 2 Pcs
- Axle 45 = 1 Pc
- Axle 46 = 1 Pc
------------------------------------------------------------------------
Item 1.11.................................... = 30 Pcs
- Manhole M10 = 1 Pc
------------------------------------------------------------------------
Item 1.13.................................... = 1 Pc
101
Rehabilitation of access roads
8.1.2.3 FILLING
On Axle 2, filling with fine soil from km 0+183.00 to km 0+257.70, length L=74.70 m
8.1.2.4 SUBGRADE
102
Rehabilitation of access roads
103
Rehabilitation of access roads
- Axle 1:
11.50 x 64.00 = 736.00 m¹
11.50 x 77.00 = 885.50 m¹
- Axle 11:
6.00 x 35.00 = 210.00 m¹
- Axle 12:
6.00 x 37.00 = 222.00 m¹
- Axle 2:
10.00 x 3.00 = 30.00 m¹
10.00 x 3.00 = 30.00 m¹
- Axle 3:
7.00 x 4.00 = 28.00 m¹
7.00 x 6.00 = 42.00 m¹
- Axle 31:
7.00 x 6.00 = 42.00 m¹
- Axle 32:
7.00 x 6.00 = 42.00 m¹
- Axle 4:
7.00 x 6.00 = 42.00 m¹
7.00 x 7.00 = 49.00 m¹
- Axle 41:
7.00 x 3.00 = 21.00 m¹
- Axle 42:
7.00 x 2.00 = 14.00 m¹
- Axle 43:
7.00 x 6.00 = 42.00 m¹
- Axle 44:
7.00 x 4.00 = 28.00 m¹
- Axle 45:
7.00 x 13.00 = 91.00 m¹
- Axle 46:
7.00 x 6.00 = 42.00 m¹
-----------------------------------------------------------
Item 3.05.............. =2,596.50 m¹
104
Rehabilitation of access roads
- Axle 1:
5,00 x 20,00+5,00x3,00+36,00x1,50+
15,00x2,00+3,00x1,00+20,00x2,00+
4,00x2,00+15,00x4,00+35,00x5,00+
16,00x2,00+50,00x3,00+80,00x6,00+
42,00x11,50+30,00x5,00+68,00x11,50+
40,00x11,00+50,00x5,00+200,00x5,00 = 4.252,00 m²
3,00x2,00+2,00x4,00+100,00x3,00+
10,00x3,00+100,00x2,00+90,00x3,00+
50,00x2,00+11,50x20,00+4,00x5,00+
20,00x3,00+10,00x3,00+50,00x2,00 = 1.354,00 m²
- Axle 11:
49,00x1,00+11,00x3,00+10,00x3,00+
33,00x6,00+32,00x6,00+50,00x6,00+
10,00x6,00 = 862,00 m²
- Axle 12:
50,00x2,00+50,00x2,00+30,00x3,00+
+60,00x3,00+25,00x2,00+100,00x1,00 = 620,00 m²
- Axle 2:
30,00x1,00+20,00x1,00+
86x1,00+125,00x2,00 = 386,00 m²
25,00 x 1,00+50,00x1,00+110x1.0 = 185,00 m²
- Axle 3:
10,00x3,00+20,00x1,00+30,00x10,00 = 350,00 m²
75,00 x 1,00 = 75,00 m²
- Axle 31:
76,00 x 1,00+30,00x1,00 = 106,00 m²
- Axle 32:
70,00 x 1,00 = 70,00 m²
- Axle 4:
50,00x1,00+10,00x1,00 = 60,00 m²
20,00x1,00+40,00x1,00 = 60,00 m²
- Axle 41:
10,00x1,00+10,00x1,00 = 20,00 m²
- Axle 42:
5,00x1,00+10,00x1,00 = 15,00 m²
- Axle 43:
4,00x1,00+10,00x1,00 = 14,00 m²
- Axle 44:
25,00x1,00+50,00x1,00 = 75,00 m²
- Axle 45:
10,00x5,00 = 50,00 m²
- Axle 46:
50,00 x 1,00+70,00x1,00 = 120,00 m²
------------------------------------------------------------------------
Item 3.06............................... = 8,674.00 m²
- Axle 1:
20.00 x 0.40 x 0.40 = 4.88 m²
- Axle 11:
5.00 x 0.60 x 0.50 = 1.80 m²
- Axle 12:
5.00 x 0.60 x 0.50 = 1.50 m²
- Axle 2:
10.00 x 0.50 x 0.40 = 2.00 m²
- Axle 3:
105
Rehabilitation of access roads
Axle 1:
From km 0+266.00 to km 0+747.00
2 x 481.00x 9.25 = 8898.50 m2
From km 1+458.00 to km 1+578.00
2 x 120.00 x 9.25 = 2220.00 m2
Right side from portal to km 2+239.66 = 2785.58 m2
Left side from portal to km 2+239.66 = 2734.12 m2
From km 2+239.55 to km 3+017.77
2 x 778.11 x 11.00 = 17118.48 m2
Axle 11:
Planimetric quantities = 3330.03 m2
Axle 12:
Planimetric quantities = 3877.36 m2
Axle 2:
Planimetric quantities left
743.41 +701.30 +1204.96 = 2649.67 m2
Planimetric quantities left
666.45 +569.78 +1361.45 = 2597.68 m2
Axle 3:
Planimetric quantities left: = 1722.72 m2
Planimetric quantities right = 1630.91 m2
Axle 31:
Planimetric quantities = 1040.90 m2
Axle 32:
Planimetric quantities = 865.16 m2
Axle 4:
Planimetric quantities left: = 3843.40 m2
Planimetric quantities right = 3591.75 m2
Axle 41:
Planimetric quantities = 1107.11 m2
Axle 42:
Planimetric quantities = 781.24 m2
Axle 43:
Planimetric quantities = 682.68 m2
106
Rehabilitation of access roads
Axle 44:
Planimetric quantities = 748.72 m2
Axle 45:
Planimetric quantities = 1003.23 m2
Axle 46:
Planimetric quantities = 1100.86 m2
----------------------------------------------------------------------------------
Item 3.08..................................... = 64,330.10 m²
- Axle 4 :
20.00 = 20.00 m¹
--------------------------------------------------------------------------------
Item 3.12.................................... = 20.00 m¹
107
Rehabilitation of access roads
8.1.4. PAVEMENTS
Quantities as per 8.1.1.5:
- Axle 4 :
5.70 x 1.50 = 8.55 m²
------------------------------------------------------------------------
Item 4......................................... = 232.65 m²
8.1.5. DRAINAGE
8.1.5.1 EXCAVATION OF NEW DITCHES
- Axle 11 = 25.00 m¹
------------------------------------------------------------------------
Item 5.01.................................... = 25.00 m¹
- Axle 1 = 6 Pcs
- Axle 2 = 4 Pcs
------------------------------------------------------------------------
Item 5.02....................................= 16 Pcs
- Axle 1 = 2 Pcs
- Axle 11 = 1 Pc
- Axle 12 = 3 Pcs
-----------------------------------------------
Item 5.03........................ = 6 Pcs
108
Rehabilitation of access roads
- Axle 1 = 6 Pcs
- Axle 2 = 2 Pcs
- Axle 3 = 3 Pcs
- Axle 4 = 4 Pcs
- Axle 41 = 2 Pcs
- Axle 42 = 2 Pcs
---------------------------------------------------------
Item 5.04....................... = 19 Pcs
Axle 1:
From km 2+216.13 to km 2+377.00
2 x 160.87 = 321.74 m1
From km 2+470.00 To km 2+996.00
2 x 526.00 = 1052.00 m1
Axle 11:
From km 0+231.20 to km 0+401.72 = 170.52 m1
Axle 12:
From km 0+029.00 to km 0+283.00 = 254.00 m1
------------------------------------------------------------------------
Item 5.07.................................... = 1,798.26 m1
On Axle 12 = 2 Pcs
------------------------------------------------------
Item 5.08................... = 2 Pcs
109
Rehabilitation of access roads
- Manhole M10 = 1 Pc
--------------------------------------------------------
Item 5.10....................... = 1 Pc
Only on Axle 1:
110
Rehabilitation of access roads
111
Rehabilitation of access roads
112
Rehabilitation of access roads
1 Preliminary Works
113
Rehabilitation of access roads
2 Earth Works
114
Rehabilitation of access roads
4 Pavements
115
Rehabilitation of access roads
Summary
Schedule Amount
Description of Works
No. (in Euro)
1 Preliminary Works
2 Earth Works
4 Pavements
5 Drainage
7 Other works
PRICE €
116
Rehabilitation of access roads
SECTION 9: DRAWINGS