Sunteți pe pagina 1din 15

REFERENCES

[1] Adamyan, A., and He, D., (2004), “System failure analysis through counters
of Petri net models,” Quality and Reliability Engineering International,
20(4), pp.317-335.

[2] Aksu, S., and Turan, O., (2006), “Reliability and availability of Pod
Propulsion System,” Journal of Quality and Reliability Engineering
International, 22, pp. 41-58.

[3] Alfares, H., (1999), “A simulation model for determining inspection


frequency,” Computers and Industrial Engineering, 36(3), pp. 685-696.

[4] Ardakan, M., and Hamadani, A., (2014), “Reliability optimization of


series–parallel systems with mixed redundancy strategy in subsystems,”
Reliability Engineering and System Safety, 130, pp. 132-139.

[5] Arien, B., Lamy, D., Devooght, J., and Smidts, C., (1992), “Reliability
analysis of large systems by the Markovian technique,” Development of the
Camera Software-Use of Probabilistic Safety Assessment for Operational
Safety, PSA, IAEA, 1, pp. 47-59.

[6] Arora, N., and Kumar, D., (1997), “Availability analysis of steam and power
generation system in the thermal power plant”, Microelectronics and
Reliability, 37(5), pp. 795-800.

[7] Arora, N., and Kumar, D., (2000), “System analysis and maintenance
management for the coal handling system in the paper plant”, International
Journal of Management and System (IJOMAS), 16(2), pp. 137-156.

[8] Aslett, L., Nagapetyan, T., and Vollmer, S., (2017), “Multilevel Monte
Carlo for Reliability Theory,” Reliability Engineering and System Safety,
165, pp. 188-196.

[9] Au, S., Ching, J., and Beck, J., (2007) , “Application of subset simulation
methods to reliability benchmark problems,” Structural Safety, 29(3),
pp.183-193.

234
[10] Azaron, A., Katagiri, H., Kato, K., and Sakawa, M., (2005), “Reliability
evaluation and optimization dissimilar component cold standby redundant
systems,” Journal of Operation Research, 48(1), pp. 71-88.

[11] Badia, F., Berrade, M., and Campos, C., (2002), “Optimal inspection and
preventive maintenance of units with revealed and unrevealed failures,”
Reliability Engineering and System Safety, 78(2), pp. 157-163.

[12] Balagurusamy, E., (1984), “Reliability Engineering (1st ed.),” New Delhi,
India: Tata Mcgraw Hill.

[13] Barabady, J., (2005), “Reliability and maintainability analysis of crushing


plants in Jajarm bauxite mine of Iran,” Proc. IEEE Annual Reliability and
Maintainability Symposium, pp. 109-115.

[14] Barlow, R., and Hunter, L., (1960), “Optimum preventive maintenance
policies,” Operation Research, 8(1), pp. 90-100.

[15] Barlow, R., Proschan, F., and Hunter, L., (1965), “Mathematical Theory of
Reliability,” New York,: John Wiley and Sons, Inc.

[16] Basri, E., Razak, I., Ab-Samat, H., and Kamaruddin, S., (2017), “Preventive
maintenance (PM) planning: a review,” Journal of Quality in Maintenance
Engineering, 23(2), pp. 114-143.

[17] Bellman, R.E., and Dreyfus, S.E., (1962), “Applied Dynamic Programming,”
Princeton University Press, New Jersey.

[18] Bhamare, S., Yadav, O., and Rathore, A., (2008), “Evolution of Reliability
Engineering discipline over the last six decades: A Comprehensive Review,”
International Journal of Reliability and Safety, 1(4), pp. 377-410.

[19] Bing, L., Meilin, Z., and Kai, X., (2000), “A Practical Engineering Method
for Fuzzy Reliability Analysis of Mechanical Structures,” Reliability
Engineering and System Safety, 67(3), pp. 311-315.

[20] Bistouni, F., and Jahanshahi, M., (2014), “Analyzing the reliability of shuffle
exchange networks using reliability block diagrams,” Reliability Engineering
and System Safety, 132, pp. 97-106.

235
[21] Borgonovo, E., Marsaguerra, M., and Zio, E., (2000), “A Monte Carlo
Methodological Approach to Plant Availability Modelling with Maintenance,
Aging and Obsolescence,” Reliability Engineering and System Safety, 67(1),
pp. 61-73.

[22] Buzacott, J., (1970), “Markov Approach to finding the Failure times of
Repairable Systems,” IEEE Transactions on Reliability, R-19(4), pp. 128-
134.

[23] Cafaro, G., Corsi, F., and Vacca, F., (1986), “Multistate Markov Models and
Structural Properties of the Transition-Rate Matrix,” IEEE Transactions on
Reliability, 35(2), pp. 192-200.

[24] Cantoni, M., Marseguerra, M., and Zio, E., (2000), “Genetic Algorithm and
Monte Carlo simulation for optimal plant design,” Reliability Engineering and
System Safety, 68, pp. 29-38.

[25] Castro, H.F.D., and Cavalca, K.L., (2006), “Maintenance resources


optimization applied to a manufacturing system,” Reliability Engineering and
System Safety, 91, pp. 413-420.

[26] Chen, Z., and Wang, D., (2010), “Research on Preventive Maintenance period
of Hydroelectric Power Equipments,” 2010 Prognostics and System Health
Management Conference. Macao.

[27] Cherry, D., (1978), “Availability analysis for chemical plants,” Chemical
Engineering Progress, 74, pp. 55-60.

[28] Chung, W., (1987), “Reliability analysis of a repairable parallel system with
standby units involving human error and common cause failures,” IEEE
Transactions on Reliability, 27(2), pp. 269-271.

[29] Chunning, Y., and Dinghua, S., (1990), “Classification of fault trees and
algorithms of fault tree analysis,” Microelectronics Reliability, 30(5), pp. 891-
895.

236
[30] Cochran, J., M. A., and Krishnamurthy, V., (2000), “Generic Markov models
for availability estimation and failure characterization in petroleum
refineries,” Computers and Operation Research, 28(1), pp. 1-12.

[31] Coit, D.W., and Smith, A.E., (1994), “Use of genetic algorithm to optimize a
combinatorial reliability design problem,” Proc. 3rd IIE Research Conference,
pp. 467-472.

[32] Coit, D.W., and Smith, A.E., (1996), “Reliability optimization of series-
parallel systems using a genetic algorithm,” IEEE Transactions on Reliability,
45(2), pp. 254-260.

[33] Coit, D.W., and Smith, A.E., (1997), “Considering risk profiles in design
optimization for series-parallel systems,” Proc. IEEE Annual Reliability
Maintainability Symposium, pp. 271-277.

[34] Coit, D.W., and Zio, E., (2018), “The evolution of system reliability
optimization,” Reliability Engineering & System Safety, (in Press).

[35] Copik, M., and Javlosky, J., (2012), “Utilization of Petri Nets for the Analysis
of Production Systems,” Procedia Engineering, 48, pp. 56-64.

[36] Dai, Y.S., and Wang, X.L., (2006), “Optimal resource allocation on grid
systems for maximizing service reliability using a Genetic Algorithm,”
Reliability Engineering and System Safety, 91, pp. 1071-1082.

[37] David, P., Idasiak, V., and Kratz, F., (2010), “Reliability study of complex
physical systems using SysML,” Reliability Engineering and System Safety,
95(4), pp. 431-450.

[38] Dekker, R., (1996), “Applications of maintenance optimization: a review and


analysis,” Reliability Engineering and System Safety, 51, pp. 229-240.

[39] Dekker, R., and Groenendijk, W., (1995), “Availability Assessment methods
their application in Industry,” Microelectronics and Reliability, 35(9), pp.
1257-1274.

[40] Dhillon, B., (1977), “A 4-unit redundant system with common cause failures,”
IEEE Transactions on Reliability, 26, pp. 373-374.

237
[41] Dhillon, B., (1999), “Design Reliability- Fundamentals and Applications,”
USA: CRC Press.

[42] Dijkhuizen, V., and Heijden, M.C., (1999), “Preventive maintenance and the
interval availability distribution of an unreliable production system,”
Reliability Engineering and System Safety, 6(1), pp. 13-27.

[43] Dodson, B., and Nolan, D., (2002), “Reliability Enginering Handbook,”
Tuscon, USA: QA Publishing, LLC.

[44] Drekic, S., and Woolford, D., (2005), “A preemptive priority queue with
balking,” European Journal of Operational Research, 21(5), pp. 387-401.

[45] Dutuit, Y., and Rauzy, A., (2005), “Approximate estimation of system
reliability via fault trees,” Reliability Engineering and System Safety, 87, pp.
163-172.

[46] Edwards, J., Alifantis, T., Hurrion, R., Ladbrook, J., Robinson, S., and Waller,
A., (2004), “Using a simulation model for knowledge elicitation and
knowledge management,” Simulation Modelling Practice and Theory, 12(7-
8), pp. 527-540.

[47] Endharta, A., and Yun, W., (2017), “A preventive maintenance of circular
consecutive-k-out-of-n: F systems,” International Journal of Quality and
Reliability Management, 34(6), pp. 752-769.

[48] Eryilmaz, S., (2017), “The effectiveness of adding cold standby redundancy
to a coherent system at system and component levels,” Reliability Engineering
and System Safety, 165, pp. 331-335.

[49] Faddoul, R., Raphael, W., and Chateauneuf, A., (2018), “Maintenance
optimization of series systems subject to reliability constraints,” Reliability
Engineering & System Safety, 180, pp. 179-188.

[50] Figiel, K., and Sule, D., (1990), “A generalized reliability block diagram
(RBD) simulation,” 1990 Winter Simulation Conference Proceedings, New
Orleans, LA, pp. 551-556.

238
[51] Fonseca, C., Fleming, P.J., (1995), “An overview of evolutionary algorithms
in multi objective optimization,” Evolutionary Computer, 3(1), pp. 1-16.

[52] Fricks, R., and Trivedi, K., (1997), “Modeling failure dependencies in
reliability analysis using stochastic Petri-Nets,” Proc. of European Simulation
Multi Conference (ESM-97). Istanbul.

[53] Fricks, R., and Trivedi, K., (2017), “Automated life cycle processing for
complex medical imaging devices,” 2017 Annual Reliability and
Maintainability Symposium (RAMS).

[54] Fu, J., and Hu, B., (1987), “On reliability of large consecutive-k-out-of-n: F
systems with k-1 step Markov dependence,” IEEE Transactions on
Reliability, 36, pp. 75-77.

[55] Fukuta, J., and Kodama, M., (1974), “Renewal theoretical approach to the
mission reliability of redundant system with two dissimilar units,” IEEE
Transactions on Reliability, R-23(4), pp. 280-282.

[56] Gandhi, O., and Agrawal, V., (1992), “FMEA—A diagraph and matrix
approach,” Reliability Engineering and System Safety, 35(2), pp. 147-158.

[57] Gangloft, W. , (1975), “Common mode failure analysis,” IEEE Transactions


on Power Apparatus System, 94, pp. 27-30.

[58] Garg, D., Kumar, K., and Singh, J., (2010), “Decision Support System of a
Tab Manufacturing Plant,” Journal of Mechanical Engineering, 41(1),
pp. 71-79.

[59] Garg, S., Singh, J., and Singh, D., (2010), “Availability and Maintenance
scheduling of a repairable block-board manufacturing system,” International
Journal of Reliability and Safety, 4(1), pp. 104-118.

[60] Gen, M., and Kim, J, R., (1999), “GA based reliability design state of the art
survey,” Computer and Engineering, 37(1/2), pp. 151-155.

[61] Gen, M., and Yun, Y., (2006), “Soft computing approach for reliability
optimization: State-of-the-art survey,” Reliability Engineering and System
Safety, 91, pp. 1008-1026.
239
[62] Gen, M., Ida, K., and Taguchi, T., (1993), “Reliability optimization problems:
a novel Genetic Algorithm approach,” Technical Report, ISE93-5, Ashikaga
Institute of Technology, Ashikaga, Japan.

[63] Giuggioli, B.P., Marsenguera, M., and Zio, E., (2001), “Multi objective
optimization by genetic algorithms: applications to safety systems,”
Reliability Engineering and System Safety, 72, pp. 59-74.

[64] Gnedenko, B., and Ushakov, I., (2007), “Probabilistic Reliability


Engineering,” John Wiley & Sons.

[65] Goldberg, D.E., (1989), “Genetic Algorithm in Search, Optimization and


Machine Learning,” Addison-Wesley, Reading, MA.

[66] Goyal, A., and Gupta, P., (2012), “Performance Evaluation of a Multi-State
Repairable Production System – A Case Study,” International Journal of
Performability Engineering, 8(3), pp. 330-338.

[67] Goyal, A., Sharma, S., and Gupta, P., (2009), “Availability analysis of a part
of rubber tube production system under preemptive resume priority repair,”
International Journal of Industrial Engineering : Theory Applications and
Practice, 16, pp. 260-269.

[68] Gupta, P., and Sharma, R., (1987), “An algebraic method for reliability
calculation,” Microelectronics and Reliability, 27(1), pp. 19-23.

[69] Gupta, P., Lal, A., Sharma, R., and Singh, J., (2005), “Numerical analysis of
reliability and availability of the series processes in butter oil processing
plant,” International Journal of Quality and reliability Management, 22(3), pp.
303-316.

[70] Holland, J., (1975), “Adaptation in natural and artificial systems,” Annual
Arbor, University of Michigan press.

[71] Honjo, Y., (2008), “Monte Carlo Simulation in Reliability Analysis, ” In K.


K. Phoon (Ed.), Reliability-Based design in Geotechnical Engineering,
Computation and Applications. London and New York: Taylor and Francis,
pp. 169-191

240
[72] Hura, G., (1993), “Use of Petri Nets for System Reliability Evaluation,” In
Fundamental Studies in Engineering, 16, pp. 339-368

[73] Jain, M. and Rani, S., (2013), “Availability analysis for repairable system with
warm standby, switching failure and reboot delay,” International Journal of
Mathematics in Operational Research, 5, pp. 19-39.

[74] Jayabalan, V., and Chaudhuri, D., (1992), “Optimal maintenance replacement
policy under imperfect maintenance,” Reliability Engineering and System
Safety, 36(2), pp. 165-169.

[75] Kahle, W., (2007), “Maintenance policies in incomplete repair models,”


Reliability Engineering and System Safety, 92, pp. 563-565.

[76] Kaushik, S., and Singh, I., (1994), “Reliability analysis of a naphtha fuel oil
system in a thermal power plant,” Microelectronics and Reliability, 34(2), pp.
757-759.

[77] Kim, H., and Kim, P., (2017), “Reliability–redundancy allocation problem
considering optimal redundancy strategy using parallel genetic algorithm,”
Reliability Engineering & System Safety, 159, pp. 153-160.

[78] Kloul, L., and Rauzy, A., (2017), “Production trees: A new modeling
methodology for production availability analyses,” Reliability Engineering
and System Safety, 167, pp. 561-571.

[79] Knezevic, J., and Odoom, E., (2001), “Reliability modelling of repairable
systems using Petri nets and fuzzy Lambda–Tau methodology,” Reliability
Engineering and System Safety, 73(1), pp. 1-17.

[80] Konak, A., Coit, D. W., and Smith, A. E., (2006). “Multi-objective
optimization using genetic algorithms: A tutorial,” Reliability Engineering
and System Safety, 91(9), pp. 992-1007.

[81] Kumamoto, H., and Henley, E. J., (1996), “Probabilistic risk assessment and
management for Engineers and Scientists. IEEE Press New York.

241
[82] Kumar, D., Singh, I., and Pandey, P., (1989), “Maintenance planning of
pulping system in paper industry,” Reliability Engineering and System Safety,
25(4), pp. 293-302.

[83] Kumar, D., Singh, I., and Singh, J., (1988), “Reliability analysis of the feeding
system in paper industry,” Microelectronics Reliability, 28(2), pp. 213-215.

[84] Kumar, D., Singh, J., and Pandey, P., (1990), “Design and cost analysis of
refining system in sugar industry,” Microelectronics and Reliability, 30(6),
pp. 1025-1028.

[85] Kumar, D., Singh, J., and Pandey, P., (1991), “Behavior analysis of urea
decomposition system with general repair policy in fertilizer industry,”
Microelectronics and Reliability, 31(5), pp. 851-854.

[86] Kumar, D., Singh, J., and Pandey, P., (1992), “Availability analysis of a
crystallization system in the sugar industry under common cause failure,”
IEEE Transactions on Reliability, 41(1), pp. 85-91.

[87] Kumar, G., Jain, V., and Gandhi, O.P., (2013), “Availability analysis of
repairable mechanical systems using analytical Semi-Markov approach,”
Quality Engineering, 25(2), pp. 97-107.

[88] Kuo, W., Lin, H., Xu, Z., and Zhang, W., (1987), “Reliability optimization
with the Lagrange multiplier and branch and bound technique,” IEEE
Transactions on Reliability, 36(5), pp. 624-630.

[89] Kuo, W., Prassad, V.R., Tillman, F.A. and Hwang, C., (2001), “Optimal
reliability design,” Cambridge University Press.

[90] Lambert, B.K., Walvekar, A.G., and Hirmas, J.P., (1971), “Optimal
redundancy and availability allocation in multistage system,” IEEE
Transactions on Reliability, R-20, pp. 182-185.

[91] Lapa, C., Pereira, C., and De Barros, M., (2006), “A model for preventive
maintenance planning by genetic algorithms based in cost and reliability,”
Reliability Engineering and System Safety, 91, pp. 233-240.

242
[92] Lenz, R., (1970), “Reliability design in process plant,” The Chemical
Engineering Progress, 66, pp. 42-44.

[93] Levitin, G., and Lisnianski, A., (2001), “A new approach to solving problems
of multistate system Reliability Optimization,” Quality and Reliability
Engineering International, 17, pp. 93-104.

[94] Levitin, G., Jia, H., Ding, Y., Song, Y., and Dai, Y., (2017), “Reliability of
multi-state systems with free access to repairable standby elements,”
Reliability Engineering and System Safety, 167, pp. 192-197.

[95] Lin, C.Y, and Hajela, P., (1992), “Genetic algorithms in optimization
problems with discrete and integer design variables,” Engineering
Optimization, pp. 309-327.

[96] Liu, Z., Liu, Y., Li, X., and Tian, X., (2015), “Application of Petri nets to
performance evaluation of subsea blowout preventer system,” ISA
Transactions, 54, pp. 240-259.

[97] Liudong, X., Meshkat, A., and Wang, W. ,(2009), “Incorporating common-
cause failures into the modular hierarchical systems analysis,” IEEE
Transactions on Reliability, 58(1), pp. 10-19.

[98] Marseguerra, M., and Zio, E., (2000), “Optimizing maintenance and repair
policies via a combination of genetic algorithm and Monte Carlo simulation,”
Reliability Engineering and System Safety, 68(1), pp. 69-83.

[99] Medhi, J., (1994), “Stochastic Processes,” New Age International, New Delhi.

[100] Mettas, A., (2000), “Reliability allocation and optimization for complex
systems,” Proceedings Annual Reliability and Maintainability Symposium,
pp. 216-221.

[101] Misra, K.B., (1971), “Dynamic programming formulation of the redundancy


allocation problem,” Math Education Science Technology, 2, pp. 207-215.

[102] Misra, K.B., (1973), “A simple approach for constrained redundancy


optimization problems,” IEEE Transactions on Reliability, 21, pp. 30-34.

243
[103] Misra, K.B., (1986), “An optimal reliability design: a review,” System
Science, 12, pp.5-30.

[104] Morse, P., (1958), “Queues, inventories and maintenance,” Wiley, New York.

[105] Munoz, A., Martorell, S., and Serradell, V., (1997), “Genetic algorithms in
optimizing surveillance and maintenance of components,” Reliability
Engineering and System Safety, 57, pp. 107-120.

[106] Murthy, D., Bulmer, M., and Eccleston, J., (2004), “Weibull model selection
for Reliability modelling,” Reliability Engineering and System Safety, 87,
pp. 257-267.

[107] Nahas, N., and Nourelfath, M., (2005), “Ant system for reliability
optimization of a series system with multiple-choice and budget constraints,”
Reliability Engineering and System Safety, 87, pp. 1-12.

[108] Nakagawa, T., and Mizutani, S., (2009), “Optimum problems in backward
times of models,” IEEE Transactions on Reliability, 41, pp. 65-71.

[109] Nourelfath, M., Nahas, N., and Zeblah, A., (2003), “An Ant colony approach
to redundancy optimization for multi-state system,” Proceedings of
International Conference on Industrial Engineering and Production
Management, Porto-Portugal.

[110] Ntuen, C., (1991), “An economic preventive maintenance scheduling model
with truncated gamma function,” Reliability Engineering and System Safety,
31(1), pp. 31-38.

[111] Ocon, R., and Cazorla, D., (2004), “A multiple system governed by a quasi-
birth death process,” Reliability Engineering and System Safety, 84(2), pp.
187-196.

[112] Ravi, K., Murty, K., and Reddy, K., (1997), “Non equilibrium simulated
annealing algorithm applied to reliability optimization of complex systems,”
IEEE Transactions on Reliability, 46, pp. 233-239.

244
[113] Rotab Khan, M.R., and Kabir, K.A.B.M., (1995), “Availability simulation of
an ammonia plant,” Reliability Engineering and System Safety, 48, pp. 217-
227.

[114] Sachdeva, A., Kumar, D., and Kumar,P., (2008), “Availability modelling of
screening system of a apaper plant using GSPN,” Journal of modelling in
management, 3(1), pp. 26-39.

[115] Sandler, H., (1963), “System Reliabilty Engineering,” Prentice-Hall,


Englewood Cliffs, New Jersey.

[116] Sarkar, J., and Sarkar, S. ,(2001), “Availability of a periodically inspected


system supported by a spare unit, under perfect repair or perfect upgrade,”
Statistics and Probability Letters, 53(2), pp. 207-217.

[117] Sasaki, M., Kaburaki, S., and Yanagi, S., (1977), “System reliability and
optimum spare parts,” IEEE Transactions on Reliability, R-26, pp. 182-188.

[118] Shijia, D., Zhugua, Z., Lirong, C., and Rui, K., (2017), “Reliability analysis
of Markov history-dependent repairable systems with neglected failures,”
Reliability Engineering and System Safety, 159, pp. 134-142.

[119] Singer, D., (1990), “A fuzzy set approach to fault tree and reliability
analysis,” Journal of Fuzzy set and System, 34, pp. 145-155.

[120] Singh, I.P., (1991), “Pre-emptive repeat priority repairs and failure of non-
failed component during system failure of a complex system,”
Microelectronics and Reliability, 31(2-3), pp. 261-264.

[121] Singh, J., (1980), “Priority concept in fertilizer supply”, Proceedings of


INSCA., pp. 1-5.

[122] Singh, J., (1982), “A DDP approach to reliability optimization of a fertilizer


supply system,” Silver Jubilee Research Bulletin, IIT Bombay.

[123] Singh, J., (1989), “Reliability analysis of a biogas plant having two dissimilar
units,” Microelectronics Reliability, 29, pp. 779-781.

245
[124] Singh, J., and Garg, S., (2005), “Availability analysis of the core vaneer
manufacturing system in a ply wood industry,” International Conference on
Reliability and Safety Engineering,Indian Institute of Technology, Karagpur,
pp. 497-508.

[125] Srinivas, N. and Deb, K., (1995), “Multi objective optimization using non
dominated sorting in genetic algorithms,” Evolution of Competition, 2(3), pp.
221-248.

[126] Srinivasan, V.S., (1966), “The Effect of Standby Redundancy in System's


Failure with Repair Maintenance,” Operations Research, 14, pp. 1024-1036.

[127] Subramanian, R., and Anantharaman, V., (1995), “Reliability analysis of a


complex standby redundant system,” Reliability Engineering and System
Safety, 48, pp. 57-70.

[128] Sung, C.S., and Lee, H.K., (1994), “A branch and bound approach for spare
unit allocation in a series system,” European Journal Operation Research, pp.
217-232.

[129] Sung, C.S., Cho, Y.K., (2000), “Reliability optimization of a series system
with multiple-choice and budget constraints,” European Journal Operation
Research, pp.159-171..

[130] Tewari, P., Kumar, D., and Mehta, N. P., (2002), “Decision support system of
refining system of sugar plant,” Journal of Institution of Engineers (India), 84,
pp. 41-44.

[131] Tewari, P.C., (2003), “Design, development and analysis of various


performance evaluating systems for process industries”, Ph.D. Thesis,
Kurukshetra University, Kurukshetra, India.

[132] Tillman, F., Hwang, C.L., and Kuo, W., (1985), “Optimization of systems
reliability,” New York, Marcel Dekker.

[133] Trivedi, K., (2002), “Probability and Statistics with Reliability”, Queuing
and Computer Science Applications (2nd ed.). New York: John Wiley and
Sons.

246
[134] Twum, S.B., Aspinwall, E., and Fliege, J., (2012), “A Multicriteria
Optimisation Model for Reliability Design of Series-Parallel Systems,”
International Journal of Quality and Reliability Management, 29(9), pp. 1-21.

[135] Vaurio, J., (2001), “Fault tree analysis of phased mission systems with
repairable and non-repairable components,” Reliability Engineering and
System Safety, 74(2), pp. 169-180.

[136] Vaurio, J., (2002), “Extensions of the uncertainty quantification of common


cause failure rates,” Reliability Engineering and System Safety, 78, pp. 63-
69.

[137] Vesely, W., and Narum, R., (1970), “PREP and KITT computer code for the
automatic evaluation of a fault tree,” Idaho Nuclear Corporation, IO(IN-
1349).

[138] Villemeur, A., (1992), “Reliability, availability, maintainability and safety


assessment: methods and techniques,” Wiley, New York

[139] Wallisch, P., Lusignan, M., Benayoun, M., Baker, T., Dickey, A., and
Hatsopoulos, N. (2009), “MATLAB for Neuroscientists (1st ed.),” Academic
Press,London, U.K.

[140] Wessiani, N., and Sarwoko, S., (2015), “Risk Analysis of Poultry Feed
Production Using Fuzzy FMEA,” Procedia Manufacturing, 4, pp. 270-281.

[141] Yokota, T., Gen, M., and Ida, K., (1995), “System reliability of optimization
problems with several failure modes by genetic algorithm,” Japanese Journal
of Fuzzy Theory and Systems, 7(1), pp. 117-135.

[142] Young, K., and Savage, G., (2008), “New sample based approach to predict
system performance reliability,” IEEE Transactions on Reliability, 57(2), pp.
322-330.

[143] Zhang, Y., (1996), “Reliability analysis of an (N+1)-unit standby system with
preemptive priority rule,” Microelectronics and Reliability, 36(1), pp. 19-26.

247
[144] Zhang, Y., Andrews, J., Reed, S., and Karlberg, M., (2017), “Maintenance
processes modelling and optimization,” Reliability Engineering and System
Safety, 158, pp. 150-160.

[145] Zhang,Y., and Zhang,Y., (2016), “Reliability analysis of a parallel dependent


system with a single cold standby unit,” International Journal of Industrial and
Systems Engineering, 23(2), pp.166-180.

[146] Zio, E., and Cadini, F., (2007), “A Monte Carlo method for the model-based
estimation of nuclear reactor dynamics,” Annals of Nuclear Energy, 34(10),
pp. 773-781.

248

S-ar putea să vă placă și