Cite this article as: PETROL. EXPLOR. DEVELOP., 2009, 36 (6): 768-775 RESEARCH PAPER
Abstract: A new multilateral technology is developed based on the Solid Expandable Tubular (SET) fixing system. By this new
technology, every kinds of tool in drilling, completion, well repair, and oil-formation improvement are located and operated according to
down-hole SET-fixing equipment. This SET-fixing multilateral technology reaches the international Technology Advancement Multi
Laterals (TAML) 4 completion level and has such characteristics as simple procedure, big bore size after completion, and drilling several
branches in small-size casing. In this technology, whipstock is located reliably on down-hole SET-fixing equipment, which can stand
great drill pressure and torque to meet implementation requirements such as windows cutting, side drilling, and washover. The successful
application in 3 wells in offshore oil fields shows that the SET-fixing multilateral technology has low difficulty job procedure and
operation, high reliability of job security, and obvious implementation signal to make driller easy operation. Two series of SET-fixing
multilateral tools and technology have been developed with their respective main casings being 177.8 mm (7 in) and 244.5 mm (9 in).
Key words: multilateral well; SET fixing system; TAML 4; working principle; special tool; operation technology
development mainly depends on the advancement of or slip, anchored slip will cause tough damage to casing; and
completion technique. At present, in view of the multilateral long distance casing tie-back cannot bear large load and torque.
well completion, most of the multilateral wells in the world Therefore, these location technologies will result in inaccurate
adopt open well completion of Level 1 and 2 and slotted liner orientation and difficult line-in and location of the tripped
completion of Level 3, whereas less wells adopt tripping in lateral well tools.
casing and injecting cement, which is because Level 4 (3) Because of the increased research difficulty of drilling
multilateral technology and tool are complicated, and the and completion wells caused by small drift diameter, more than
construction risk is high, therefore it is still at the development three Level 4 branches are unsuitable to be drilled in the
stage. According to the statistics, among more than 8 000 small-size major casing.
multilateral wells in the world, only 351 wells adopt Level 4 The increasing maturation and improvement of SET makes
completion[8]. its application into multilateral drilling possible. As a
As to the Level 4 multilateral well completion, the supplement of multilateral technology, the SET-fixing
recoverable whipstock sidetrack cutting with forced bit is multilateral technology is developed. This technology is
mostly used to drill new borehole at home and abroad. This characterized by simple process, large drift diameter after
whipstock integrates the location and direction, when the completion and multibranches inside small-sized borehole,
whipstock is tripped into the preset position, the location is compared with the other TAML 4 multilateral technologies.
fixed through tubing packer and slip[1,9-11]. At present, these This paper introduces the technical scheme, construction
location technologies can bring about some bottleneck technique and technical characteristics in detail. The
problems of TAML 4 multilateral completion during the application effect in three wells demonstrates high reliability
multilateral borehole sidetrack: and practicability, broadens the application range of SET and
(1) After multilateral well completion, the major casing drift meanwhile provides a new design method and technical way
diameter will decrease greatly, which will cause some for multilateral drilling and completion technologies.
difficulties to the consequent oil production, workover, and
2 Application of SET in the multilateral well
oil-layer reformation.
(2) Lateral well “selective re-access” is difficult. The reason SET conception originates from 1990s. Since Shell
is that at present the international lateral well location Company, firstly, began to study SET throughout the world,
technology basically adopts tubing packer, slip location, or this technology has been applied in many aspects of drilling
long-distance tie-back location from top to bottom with casing engineering and has effectively solved many problems in the
because of weak axial force resistance and large torque drilling process. It is a revolutionary technology in the
resistance, and poor high-pressure sealability of tubing packer petroleum drilling and production[12,13]. The principle is to
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775
improve the multilateral well production. Finally, the technology can drill many branches in a main
(3) With the downhole-expandable setting and locating borehole, which is still suitable in a small-sized borehole. This
equipment, the multilateral well can be drilled in a small-size technology can greatly save drilling cost and each ton oil cost
casing, for example, the multilateral well can be drilled in of single well; meanwhile, in the offshore or the limited area,
139.7 mm (5 1/2 in) casing. the occupying area can be reduced through increasing branch
(4) According to the multilateral drilling order from base to number and decreasing wellhead number.
top, the SET-locating equipment, multilateral drilling and
3.3 Special tools
branch borehole cementing are successively placed in the main
borehole. After each branch borehole successively completes On the basis of SET-fixing way, the recoverable integrated
all construction sequences, the major casing drift diameter still drilling and completion whipstock is independently designed
reduces the thickness of the two SET. Therefore, the with the mechanism matching the SET-fixing equipment. After
technology can be used to drill many branches in the major the whipstock and the SET-fixing equipment complete the
casing (Fig. 2), and the major casing drift diameter is not matching lock, the drill tool assembly can be tripped in for
affected by the branch well number, meanwhile the branch conventional sidetrack lateral borehole, and the completion
number is not limited by major casing drift diameter. string can be tripped in for cementation and completion.
On the basis of oblique plane locating of the recoverable
3 SET-fixing multilateral technology integrated drilling and completion whipstock, the special
3.1 Working principle release tools of the liner cementation for lateral well is
designed. Through this tool, the completion string can be
The major working principle of SET-fixing multilateral-
smoothly tripped into the branch borehole, and release is
drilling technology is as follows: SET technology realizes the
performed by hydraulic pressure. After the releasing, the bit
downhole permanent and reliable positioning, the whipstock
may not be tripped out to carry out the conventional cement
realizes the window-cutting sidetrack and branch liner string
injection, and this tool can be milled and recovered.
tripping in, the cementing tool realizes branch well
With the specially designed mill-recovery tool, the branch
cementation and cement squeezing at window, the casing– well completion string overlapped with the major casing can be
milling tool realizes liner overlapping section and milling and milled and fished along with the whipstock.
recovery of whipstock, cone milling shoe realizes the With the specially designed mill shoe, the base seal of the
connection between the main and branch boreholes, branch SET-fixing equipment can be milled out, and the metal seal
re-access whipstock and recovery tool realizes the selective ring of the fixing equipment is not destroyed to connect the
access into branch. major boreholes and the branch boreholes[17].
3.2 Major technical characteristics 3.4 Special techniques introduction
Multilateral technology is a new technology developed in Aiming at the working principle and major technical
the past decade abroad, many problems are not actually solved, characteristics of the SET multilateral technology, the
especially the success rate of sidetracking for old slim-hole particular drilling, completion, and workover techniques are
wells is not high. developed.
The SET technology is applied to the multilateral drilling to
replace the conventional positioning method, the downhole 3.4.1 Drilling and completion technique
location is reliably fixed, and “selective re-access of The major procedure of the drilling and completion
multilateral well” of each tool in the consequent oil recovery, technique is as follows:
workover, and oil-layer reformation is realized. It should be (1) The SET-fixing equipment is tripped into the downhole
pointed out that after the oversea special companies complete preset position by the drill pipe, and when the pressure inside
the multilateral drilling, the specially made tool by that the pressure chamber rises to a certain value, the expandable
company is required to carry out the consequent operations, cone begins to move upward, the SET section expands and
such as workover. As a result of the simple borehole then attaches to the inside casing wall. At this time, the
configuration, small drift diameter change of main bore, and SET-fixing equipment and casing internal wall forms hanging
direct access of conventional workover tools, the SET-fixing and sealing. The expandable cone continues moving upward
multilateral technology can greatly lessen the construction under the hydraulic pressure, when the pressure suddenly drops
difficulty of workover and consequent maintenance cost of to zero, there is liquid returned to the wellhead, which shows
multilateral well. that the SET expansion ceases. The drill string is tripped out,
In addition, the conventional multilateral operation is and the release tool is pulled to the wellhead, then the
complicated and has a large construction risk, which results in permanent locating equipment is kept downhole (Figs. 5a and
low operation–success ratio, whereas SET-fixing multilateral- 5b).
drilling operation is simple with less tools and less trip times, (2) The whipstock is tripped in by the drill pipe when the
which greatly improves the construction success rate. SET-fixing equipment is met; the drilling pressure begins to
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775
rise when the drill pipe is slackingoff; and the drilling pressure drilled in a same main borehole. The drift diameter of drilled
suddenly back to zero shows that the shear pin bolt has been multilateral main borehole still reduces only the thickness of
cut and the running tools have been released. At this time, drill two fixing-equipment walls, and the branch number is not
tools are picked up, running tools are pulled out to the limited (Fig. 5i).
wellhead, and the whipstock and the SET-fixing equipment (7) Trip in drill tools: mill shoe+trip-in string. The special
are locked and matched (Figs. 5c and 5d). mill-shoe tool drills the sealing parts inside each fixing
(3) The conventional window-cutting operation is carried equipment, connects the major and branch boreholes, and
out when the window-cutting tool assembly is tripped into the completes the drilling and completion technique of
whipstock top, the bit is pulled out and the rotary steering multilateral well (Fig. 5j).
drilling assembly is tripped in to keep drilling (Fig. 5e).
3.4.2 Workover technique
(4) Trip in the special release tool for liner cementation of
lateral well + liner string assembly, hold the pressure by The major procedures of the workover technique are as
throwing small ball after tripping in to the bottom; perform follows:
release; keep pressurizing, shear ball carrier, get circulation (1) Trip in re-access whipstock tool assembly: re-access
through, and enter the conventional cement injection. After whipstock assembly + bearing pup joint + trip-in string. The
tripping out, only the external wall of milling aluminum re-access whipstock is tripped into the depth between the
centralizer and release tool for liner cementation are left (Fig. workover branch and upper branch in the main borehole, and
5f). pressurizing is performed. After setting key bouncing off,
(5) Trip in milling-drill tools: mill shoe + mill centralizer+ continue tripping in, and set on the SET-fixing equipment
mill shaft + crossover + trip-in string. The special milling corresponding to operation branch. After reaching the position,
tools after cementation recovers the external wall of liner slowly decrease pressure, when the drill pressure suddenly
cementing and releasing tool, liner overlapping section and drops to zero, it indicates that the shear pin bolt is cut, and the
whipstock in the main borehole, and the SET-fixing running tool is released (Figs. 6a and 6b).
equipment is still in the main borehole (Fig. 5g and 5h). (2) Trip in conventional workover tools for workover (Fig.
(6) Repeat the above procedures, through the lower-to- 6c).
upper lateral drilling, a permanent positioning device is (3) Trip in re-access whipstock to recover drill tool
tripped in and sealed, respectively, at the window position of assembly: re-access whipstock recovery assembly + trip-in
other lateral boreholes, and many branch boreholes can be string. Slowly trip in the re-access whipstock recovery tool,
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775
drilling and completion techniques for coalbed methane in well—retrievable whipstock. Drilling & Production
southern Qinshui Basin, Central China. Petroleum Exploration Technology, 1998, 21 (3): 45-47.
and Development, 2008, 35 (4): 482-486. [12] Dupal K K, Campo D B, Lofton J E, et al. Solid expandable
[3] Yi Faxin, Yu Chen, Li songbin, et al. Application of tubular technologyüA year of case histories in the drilling
herringbone multilateral horizontal well in heavy oil reservoirs. environment. SPE 67770, 2001.
Petroleum Exploration and Development, 2008, 35 (4): [13] Meng Qingkun, Xie Zhengkai, Feng Lai, et al. Summary of
487-491. expandable tubular technology. Oil Drilling & Production
[4] Zhou Shouwei, Sun Fujie, Zeng Xianglin, et al. Application of Technology, 2003, 26 (4): 67-68, 74.
multilateral wells with limited sand production to heavy oil [14] Zhang Jianbin, Shi Taihe, Lian Zhanghua. Drilling solid
reservoirs. Petroleum Exploration and Development, 2008, 35 expandable tubular technology. China Petroleum Machinery,
(5): 630-635. 2003, 31 (supp.): 128-131.
[5] Zhang Shaohuai. The development trend of drilling & [15] Zhao Wei, Liu Yecheng, Liu Yiqiang, et al. New development
completion technology ü the information from Fifth World of expandable technology abroad. Oil Production Engineering,
Petroleum Meeting. Library & Petroleum Science-Technology 2007, 3: 40-44.
Information, 1998, 12 (1): 45-60. [16] Fuentes J A, Economides M J, Carbonell R S. Stability of
[6] Wan Renpu. Advanced well completion engineering (Edition junctures for multilateral/multibranched wells. SPE 57279,
Ċ). Beijing: Petroleum Industry Press, 2000. 1999.
[7] Westgard D. Multilateral TAML levels reviewed, slightly [17] Ren Rongquan, Gao Xiangqian, Chen Jian, et al. FMECA
modified. JPT, 2002, 54 (9): 24-28. analysis of the too1 series used for multi-branch well.
[8] TAML. TAML level 3-6 multilateral junction installations Technology Supervision in Petroleum Industry, 2005, 21 (7):
through December 2006. http://taml-intl.org/uploads/images/ 26-27.
docs/ junction_ installation_122006.gif, 2008. [18] Jiang Wei, Jiang Shiquan, Chen Jian, et al. Application of
[9] Yang Daoping, Wang Fengping. Several key technologies of expansion positioning multilateral well technology in Chengbei
multilateral drilling. Xinjiang Petroleum Science & technology, oilfield, Bohai Sea. China Offshore Oil and Gas, 2004, 16 (3):
2003, 13 (3): 1-4. 188-192.
[10] Pu Jiankang, Sun Erjun. Retrievable whipstock applied in [19] Jiang Wei, Jiang Shiquan, Chen Jian, et al. Application of a new
multiple wells. Oil Drilling & Production Technology, 1989, 11 technique of expandable tubular setting branch well in NB35-2
(5): 17-18, 22. oilfield, Bohai sea. China Offshore Oil and Gas, 2006, 18 (1):
[11] Song Yuling, Dong Lijuan. Drilling tools of multi-lateral 36-40.