Sunteți pe pagina 1din 8

PETROLEUM EXPLORATION AND DEVELOPMENT

Volume 36, Issue 6, December 2009


Online English edition of the Chinese language journal

Cite this article as: PETROL. EXPLOR. DEVELOP., 2009, 36 (6): 768-775 RESEARCH PAPER

Multilateral drilling & completion technology based on


Solid Expandable Tubular fixing system
Zhang Yanping1,*, Ren Rongquan, Wang Hui, Wang Jun
CNPC Drilling Research Institute, Beijing 100195, China

Abstract: A new multilateral technology is developed based on the Solid Expandable Tubular (SET) fixing system. By this new
technology, every kinds of tool in drilling, completion, well repair, and oil-formation improvement are located and operated according to
down-hole SET-fixing equipment. This SET-fixing multilateral technology reaches the international Technology Advancement Multi
Laterals (TAML) 4 completion level and has such characteristics as simple procedure, big bore size after completion, and drilling several
branches in small-size casing. In this technology, whipstock is located reliably on down-hole SET-fixing equipment, which can stand
great drill pressure and torque to meet implementation requirements such as windows cutting, side drilling, and washover. The successful
application in 3 wells in offshore oil fields shows that the SET-fixing multilateral technology has low difficulty job procedure and
operation, high reliability of job security, and obvious implementation signal to make driller easy operation. Two series of SET-fixing
multilateral tools and technology have been developed with their respective main casings being 177.8 mm (7 in) and 244.5 mm (9 in).

Key words: multilateral well; SET fixing system; TAML 4; working principle; special tool; operation technology

Level 1: the major and lateral boreholes both adopts open


1 Multilateral technology overview and introduction
hole completion, the completion operation doesn’t isolate each
of Expandable Tubular Technology technologies
net pay and cannot carry out any treatment on the intrabed
Multilateral drilling is a new technology developed after pressure difference (Fig. 1a).
directional drilling, sidetrack, and horizontal drilling[1-4]. The Level 2: the main borehole casing injects cement for
technology can increase oil-drainage area, improve oil well completion, lateral borehole trips in completion string but
production, and greatly reduce reservoir development cost doesn’t tie back the main borehole, and the cementation are not
through drilling several lateral wells in one borehole. Up to conducted (Fig. 1b).
December 2006, there were more than 8 000 multilateral wells Level 3: on the basis of Level 2, the lateral borehole trips in
all over the world, and remarkable economic profit has been completion string and ties back the main borehole, which
obtained[5-8]. provides connectivity and accessibility (Fig. 1c).
Along with the rapid development of multilateral technology, Level 4: the major and lateral borehole both injects cement
in March 1997, the global major oil companies held the first into casing for completion, which provides mechanical support
multilateral technology conference “Technology Advancement and connection, the interface between the multilateral and
Multi Laterals (TAML)” in Aberdeen, Scotland. The major casings relies on the cement for sealing (Fig. 1d).
conference created the TAML classification system according Level 5: on the basis of Level 4, the pressure integrity at the
to three characteristics of multilateral well, that is, connectivity, interface is realized through the tripped production string and
isolation, and accessibility (connectivity refers to the packer (Fig. 1e).
connecting ability between the major and lateral boreholes; Level 6: the pressure integrity at the interface is realized
isolation refers to the isolating ability between the multilateral through the prefabricated “pant-like” casing (Fig. 1f).
well and formation after completion; and accessibility refers to Level 6S: a large main borehole is separated into two small
the repeated accessing ability into the multilateral well), the lateral boreholes, which is equivalent to the downhole
TAML classification system is set up and the TAML double-casing wellhead (Fig. 1g).
complexity ranking which decide to the completion method of Like the development of horizontal well depends on the
multilateral well is divided into Level 1-6S[7] (Fig. 1). advancement of drilling technique, the multilateral technology

Received date: 07 March 2008; Revised date: 25 July 2009.


* Corresponding author: Zhang Yanping. E-mail: zypdri@cnpc.com.cn
Foundation item: Supported by the CNPC Program “Special Technology Drilling and Drilling Techniques for Improving Single Well Production”.
Copyright © 2009, Research Institute of Petroleum Exploration and Development, PetroChina. Published by Elsevier BV. All rights reserved.
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775

Fig. 1 TAML classification system

development mainly depends on the advancement of or slip, anchored slip will cause tough damage to casing; and
completion technique. At present, in view of the multilateral long distance casing tie-back cannot bear large load and torque.
well completion, most of the multilateral wells in the world Therefore, these location technologies will result in inaccurate
adopt open well completion of Level 1 and 2 and slotted liner orientation and difficult line-in and location of the tripped
completion of Level 3, whereas less wells adopt tripping in lateral well tools.
casing and injecting cement, which is because Level 4 (3) Because of the increased research difficulty of drilling
multilateral technology and tool are complicated, and the and completion wells caused by small drift diameter, more than
construction risk is high, therefore it is still at the development three Level 4 branches are unsuitable to be drilled in the
stage. According to the statistics, among more than 8 000 small-size major casing.
multilateral wells in the world, only 351 wells adopt Level 4 The increasing maturation and improvement of SET makes
completion[8]. its application into multilateral drilling possible. As a
As to the Level 4 multilateral well completion, the supplement of multilateral technology, the SET-fixing
recoverable whipstock sidetrack cutting with forced bit is multilateral technology is developed. This technology is
mostly used to drill new borehole at home and abroad. This characterized by simple process, large drift diameter after
whipstock integrates the location and direction, when the completion and multibranches inside small-sized borehole,
whipstock is tripped into the preset position, the location is compared with the other TAML 4 multilateral technologies.
fixed through tubing packer and slip[1,9-11]. At present, these This paper introduces the technical scheme, construction
location technologies can bring about some bottleneck technique and technical characteristics in detail. The
problems of TAML 4 multilateral completion during the application effect in three wells demonstrates high reliability
multilateral borehole sidetrack: and practicability, broadens the application range of SET and
(1) After multilateral well completion, the major casing drift meanwhile provides a new design method and technical way
diameter will decrease greatly, which will cause some for multilateral drilling and completion technologies.
difficulties to the consequent oil production, workover, and
2 Application of SET in the multilateral well
oil-layer reformation.
(2) Lateral well “selective re-access” is difficult. The reason SET conception originates from 1990s. Since Shell
is that at present the international lateral well location Company, firstly, began to study SET throughout the world,
technology basically adopts tubing packer, slip location, or this technology has been applied in many aspects of drilling
long-distance tie-back location from top to bottom with casing engineering and has effectively solved many problems in the
because of weak axial force resistance and large torque drilling process. It is a revolutionary technology in the
resistance, and poor high-pressure sealability of tubing packer petroleum drilling and production[12,13]. The principle is to
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775

Fig. 4 SET metal-ring setting and sealing configuration

its functions is location fixing: it is equivalent to isolating the


Fig.2 SET-fixing multilateral technology anchoring function of the traditional whipstock, with SET
technology the downhole-expandable setting and locating
equipment is tripped into the lower cutting window in the
major well bore, the equipment expands under the hydraulic
pressure and attaches the internal casing wall to form
permanent and reliable location (Fig. 3). This function replaces
the conventional slip anchoring way in the consequent
operations of multilateral drilling, all kinds of tools conduct
location fixing and operation according to the downhole
SET-fixing equipment; the second function is orientation: with
oblique mouth orientation, the phase difference between the
Fig. 3 Downhole-expandable setting and locating equipment whipstock and oblique mouth can be figured out according to
the azimuth regulated by directional sidetrack, the adjustment
make a section of tube made from special material produce of relative angle between the whipstock and downhole-
plastic deformation to change the OD and ID and material expandable setting and locating equipment can realize the
intensity with expansion cone, and the objective is to meet the orientation function[16].
downhole technical requirements. The largest advantage of The SET technology can apply to multilateral downhole
SET is that the string with OD less than upper casing ID can location fixing, solve the bottleneck problems caused by
conduct downhole radial expansion, to make the difference conventional slip location fixing to a large extent and result in
between the ID and upper casing ID be zero or just a wall a series of advantages:
thickness, which is equivalent to “save” the borehole diameter. (1) Compared with conventional multilateral downhole
Therefore, SET technology can greatly improve the existing location fixing, the SET metal ring setting and sealing location
hole structure[14]. According to the investigation into the SET has a larger axial load resistance, large torque resistance, shock
researches in the companies of Weatherford, Baker Oil Tools, endurance, and high pressure sealing ability, which greatly
Halliburton, READ, TIW, and Enventure, the SET technology improves the multilateral downhole locating ability and
is, at present, mainly used for liner cementing. The total length reliability and solves the problem of “difficult re-access of
of expandable tubular construction implemented by the lateral well.” Fig. 4 is the SET metal-ring setting and sealing
Enventure Company exceeds 115.8 km[15]. configuration.
Through testing and research for many years, CNPC grasps (2) The downhole-expandable location equipment produces
the SET technology that is firstly applied to multilateral a large drift diameter after multilateral well completion, which
drilling and completion, thus a new multilateral technology is is because the expandable tubular with locating equipment is
developed—SET-fixing multilateral technology (Fig. 2). The attached on the internal casing wall (Fig. 3), the major casing
technology uses all kinds of tools to fix with the diameter only reduces the thickness of two SET, the 177.8 mm
downhole-expandable setting and locating equipment during (7 in) major casing drift diameter can reach 138-140 mm after
the operation of multilateral drilling, completion, consequent completion. Therefore, the regular workover tools can carry
oil recovery, workover, and oil-layer reformation. And the out conventional workover jobs directly through these
technology reaches the international TAML 4-completion downhole-expandable tubular-locating equipment, even carry
level. out the downhole operations of washover, sand washing, break
The key of SET-fixing multilateral technology is the down, and paraffin removal combined with the “re-access
downhole-expandable setting and locating equipment. One of lateral well” tools to postpone the multilateral well life and
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775

improve the multilateral well production. Finally, the technology can drill many branches in a main
(3) With the downhole-expandable setting and locating borehole, which is still suitable in a small-sized borehole. This
equipment, the multilateral well can be drilled in a small-size technology can greatly save drilling cost and each ton oil cost
casing, for example, the multilateral well can be drilled in of single well; meanwhile, in the offshore or the limited area,
139.7 mm (5 1/2 in) casing. the occupying area can be reduced through increasing branch
(4) According to the multilateral drilling order from base to number and decreasing wellhead number.
top, the SET-locating equipment, multilateral drilling and
3.3 Special tools
branch borehole cementing are successively placed in the main
borehole. After each branch borehole successively completes On the basis of SET-fixing way, the recoverable integrated
all construction sequences, the major casing drift diameter still drilling and completion whipstock is independently designed
reduces the thickness of the two SET. Therefore, the with the mechanism matching the SET-fixing equipment. After
technology can be used to drill many branches in the major the whipstock and the SET-fixing equipment complete the
casing (Fig. 2), and the major casing drift diameter is not matching lock, the drill tool assembly can be tripped in for
affected by the branch well number, meanwhile the branch conventional sidetrack lateral borehole, and the completion
number is not limited by major casing drift diameter. string can be tripped in for cementation and completion.
On the basis of oblique plane locating of the recoverable
3 SET-fixing multilateral technology integrated drilling and completion whipstock, the special
3.1 Working principle release tools of the liner cementation for lateral well is
designed. Through this tool, the completion string can be
The major working principle of SET-fixing multilateral-
smoothly tripped into the branch borehole, and release is
drilling technology is as follows: SET technology realizes the
performed by hydraulic pressure. After the releasing, the bit
downhole permanent and reliable positioning, the whipstock
may not be tripped out to carry out the conventional cement
realizes the window-cutting sidetrack and branch liner string
injection, and this tool can be milled and recovered.
tripping in, the cementing tool realizes branch well
With the specially designed mill-recovery tool, the branch
cementation and cement squeezing at window, the casing– well completion string overlapped with the major casing can be
milling tool realizes liner overlapping section and milling and milled and fished along with the whipstock.
recovery of whipstock, cone milling shoe realizes the With the specially designed mill shoe, the base seal of the
connection between the main and branch boreholes, branch SET-fixing equipment can be milled out, and the metal seal
re-access whipstock and recovery tool realizes the selective ring of the fixing equipment is not destroyed to connect the
access into branch. major boreholes and the branch boreholes[17].
3.2 Major technical characteristics 3.4 Special techniques introduction
Multilateral technology is a new technology developed in Aiming at the working principle and major technical
the past decade abroad, many problems are not actually solved, characteristics of the SET multilateral technology, the
especially the success rate of sidetracking for old slim-hole particular drilling, completion, and workover techniques are
wells is not high. developed.
The SET technology is applied to the multilateral drilling to
replace the conventional positioning method, the downhole 3.4.1 Drilling and completion technique
location is reliably fixed, and “selective re-access of The major procedure of the drilling and completion
multilateral well” of each tool in the consequent oil recovery, technique is as follows:
workover, and oil-layer reformation is realized. It should be (1) The SET-fixing equipment is tripped into the downhole
pointed out that after the oversea special companies complete preset position by the drill pipe, and when the pressure inside
the multilateral drilling, the specially made tool by that the pressure chamber rises to a certain value, the expandable
company is required to carry out the consequent operations, cone begins to move upward, the SET section expands and
such as workover. As a result of the simple borehole then attaches to the inside casing wall. At this time, the
configuration, small drift diameter change of main bore, and SET-fixing equipment and casing internal wall forms hanging
direct access of conventional workover tools, the SET-fixing and sealing. The expandable cone continues moving upward
multilateral technology can greatly lessen the construction under the hydraulic pressure, when the pressure suddenly drops
difficulty of workover and consequent maintenance cost of to zero, there is liquid returned to the wellhead, which shows
multilateral well. that the SET expansion ceases. The drill string is tripped out,
In addition, the conventional multilateral operation is and the release tool is pulled to the wellhead, then the
complicated and has a large construction risk, which results in permanent locating equipment is kept downhole (Figs. 5a and
low operation–success ratio, whereas SET-fixing multilateral- 5b).
drilling operation is simple with less tools and less trip times, (2) The whipstock is tripped in by the drill pipe when the
which greatly improves the construction success rate. SET-fixing equipment is met; the drilling pressure begins to
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775

Fig. 5 Major drilling and completion technique of SET multilateral technology

rise when the drill pipe is slackingoff; and the drilling pressure drilled in a same main borehole. The drift diameter of drilled
suddenly back to zero shows that the shear pin bolt has been multilateral main borehole still reduces only the thickness of
cut and the running tools have been released. At this time, drill two fixing-equipment walls, and the branch number is not
tools are picked up, running tools are pulled out to the limited (Fig. 5i).
wellhead, and the whipstock and the SET-fixing equipment (7) Trip in drill tools: mill shoe+trip-in string. The special
are locked and matched (Figs. 5c and 5d). mill-shoe tool drills the sealing parts inside each fixing
(3) The conventional window-cutting operation is carried equipment, connects the major and branch boreholes, and
out when the window-cutting tool assembly is tripped into the completes the drilling and completion technique of
whipstock top, the bit is pulled out and the rotary steering multilateral well (Fig. 5j).
drilling assembly is tripped in to keep drilling (Fig. 5e).
3.4.2 Workover technique
(4) Trip in the special release tool for liner cementation of
lateral well + liner string assembly, hold the pressure by The major procedures of the workover technique are as
throwing small ball after tripping in to the bottom; perform follows: 
release; keep pressurizing, shear ball carrier, get circulation (1) Trip in re-access whipstock tool assembly: re-access
through, and enter the conventional cement injection. After whipstock assembly + bearing pup joint + trip-in string. The
tripping out, only the external wall of milling aluminum re-access whipstock is tripped into the depth between the
centralizer and release tool for liner cementation are left (Fig. workover branch and upper branch in the main borehole, and
5f). pressurizing is performed. After setting key bouncing off,
(5) Trip in milling-drill tools: mill shoe + mill centralizer+ continue tripping in, and set on the SET-fixing equipment
mill shaft + crossover + trip-in string. The special milling corresponding to operation branch. After reaching the position,
tools after cementation recovers the external wall of liner slowly decrease pressure, when the drill pressure suddenly
cementing and releasing tool, liner overlapping section and drops to zero, it indicates that the shear pin bolt is cut, and the
whipstock in the main borehole, and the SET-fixing running tool is released (Figs. 6a and 6b).
equipment is still in the main borehole (Fig. 5g and 5h). (2) Trip in conventional workover tools for workover (Fig.
(6) Repeat the above procedures, through the lower-to- 6c).
upper lateral drilling, a permanent positioning device is (3) Trip in re-access whipstock to recover drill tool
tripped in and sealed, respectively, at the window position of assembly: re-access whipstock recovery assembly + trip-in
other lateral boreholes, and many branch boreholes can be string. Slowly trip in the re-access whipstock recovery tool,
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775

Fig. 6 Major workover process

Well CB-A22 at platform A in Chengbei Oilfield, Bonan


west sea area was put into production in February, 1987, and
up to 2003, the well had produced for 17 years and faces the
possibly deforming and corroded casing, and possibly water
production after window cutting. Aiming at these conditions,
in November, 2003, the well adopted SET technology to finish
a Level 4 bilateral horizontal well (CB-A22hs) (Fig. 7).
The production casing diameter of main borehole of this
well is 177.8 mm (7 in), and before sidetracking, the well
produced fluid 108.7 m3/d and oil 11.1 m3/d, with water cut of
89.8%. The sidetracking point depth of Well CB-A22hs is 1
555 m, deviation is 32.5°, and the whipstock face angle is 65°.
The design depth is 2 246 m (truly 2 226 m), vertical depth is
1 666 m, the sidetracking length is 691 m (truly 671 m) among
which the deviation length is 391 m, and the horizontal length
is 300 m. The initial production is forecasted of 100 m3/d oil
and 280 m3/d fluid[18].
The newly drilled CB-A22hs was put into production with
electric pump in November, 2003, and the daily oil production
is 112t that is 10.1 times of the production before sidetracking,
the water cut is about 3%[14].

4.2 Well CB-A10hs: one Level 4 bilateral horizontal well

Well CB-A10 at platform A in Chengbei Oilfield, Bonan


west sea area is put into production in May, 1987, up to 2004
Fig. 7 Schematic diagram of Well CB-A22hs the well had produced for 17 years with the fluid production
of 127.0 m3/d, oil production of 15.0 m3/d, and water cut of
after reaching the position, pressurize to bounce off the fishing 88.2% and faces the possibly deforming and corroded casing,
key, and hook the re-access whipstock. Trip out the string, and and possibly water production after window cutting. Aiming at
the setting key of re-access whipstock returns to the body these conditions, in November, 2004, the well adopted SET
when meeting resistance, meanwhile, the re-access whipstock technology to finish a Level 4 bilateral horizontal well
fishing tool and re-access whipstock are fished out, (CB-A10hs) (Fig. 8). The production casing diameter of main
simultaneously (Fig. 6d). borehole of this well is 177.8 mm (7 in). The sidetracking
4 Application cases point depth of well CB-A22hs is 1 230 m, deviation is 30°,
and the whipstock face angle is 60°. The design well depth is
SET-fixing multilateral drilling is successfully applied in
2 231 m, vertical depth is 1 665 m, the sidetracking length is 1
the offshore construction of three multilateral horizontal wells.
001 m among which the deviation length is 743 m and the
4.1 Well CB-A22hs: one Level 4 bilateral horizontal well horizontal length is 258 m. The initial production of new
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775

Fig. 8 Schematic diagram of Well CB-A10hs

drilled well CB-A10hs is forecasted of 71 m3/d oil and 94


m3/d fluid with water cut of 24.5%. Fig. 9 Schematic diagram of Well NB35-2-A6mh
The construction of each sequence is very smooth, half of
SET, and whipstock operation time is saved on the basis of the 114.3 mm (41/2 in) sand screen inside 152.4 mm (6 in) borehole
planned operation time. But because of great difference for simple sand control at open hole. After commissioning, Well
between the reservoir design and actual condition, the well NB35-2-A6mh produces oil of about 60 m3 /d [19].
enters mudstone interval after entering horizontal section and 5 Conclusions
drilling bottom water, the production effect is not very
satisfactory. The SET multilateral technology developed by CNPC
Drilling Engineer Technology Institute realizes reliable
4.3 Well NB35-2-A6mh: one Level 4 multilateral well with location fixing of the whipstock through permanent location
“2+3” bottoms of the branch well; and it can bear large drill pressure and
Bohai NB35-2 Oilfield lies at the southwestern end of torque, and fully meet the demands of window cutting,
Bohai Shijiutuo Uplift as a complex nose structure cut by one sidetracking, and milling. The construction process and
NE-SW trending fault, the major reservoirs are lower operation difficulty of the technology is low, and the safety
Minghuazhen Formation and Guantao Formation. The reliability is high, the construction signal of each work
oil–water relation is relatively complicated, and the sequence is obvious for the easy operation of the driller, and
conventional 350-m well space and injection–production well the technology is very suitable for the side tracking of lateral
pattern has great difficulty and risk on the reservoir wells in the small-size casing.
development and single well reserve control[18]. In November, The successful application of SET-fixing multilateral
2005, SET-fixing technology is adopted to finish multilateral technology in three offshore oilfield wells demonstrates the
horizontal well NB35-2-A6mh of Level 4 with “2+3” bottoms reliability of the technology and equipment, and initially
(Fig. 9). forms the SET-fixing multilateral well tools and techniques of
The original well NB35-2-A6 is a production well, the oil two series: 177.8 mm (7 in) (Figs. 7, 8) and 244.5 mm (95/8 in)
production is 40-145 m3/d, the casing diameter is 245 mm (9 (Fig. 9).
5
/8 in) on which two fishbone boreholes are drilled. To keep The successful development of SET-fixing multilateral
the oil production of the oilfield, the multilateral drilling based technology, initially, introduces the SET technology into
on SET-fixing system is used to side track branch borehole at multilateral domain, broadens the application of SET, and
244.5 mm (9 5/8 in) of Well NB35-2-A6, the planned daily meanwhile provides a new design ideology and technical
production is 85 m3; meanwhile, one more fishbone borehole method of multilateral drilling and completion.
is drilled in the upper branch (Fig. 9) to guarantee the
realization of production allocation. References
The sidetrack point depth of Well NB35-2-A6mh is 934 m,
the deviation is 35.84°, the design depth is 1 775 m, the [1] Zhang Shaohuai. New development on multi-lateral drilling and
vertical depth is 1 102 m, the sidetrack length is 841 m among completion technologies. Oil Drilling & Production
which the horizontal length is 334 m. The completion requires Technology, 2001, 23 (2): 1-3.
to trip in 177.8 mm (7 in) liner to the oil layer top, and trip in [2] Qiao Lei, Shen Ruichen, Huang Hongchun, et al. Low-cost
Zhang Yanping et al. / Petroleum Exploration and Development, 2009, 36(6): 768-775

drilling and completion techniques for coalbed methane in well—retrievable whipstock. Drilling & Production
southern Qinshui Basin, Central China. Petroleum Exploration Technology, 1998, 21 (3): 45-47.
and Development, 2008, 35 (4): 482-486. [12] Dupal K K, Campo D B, Lofton J E, et al. Solid expandable
[3] Yi Faxin, Yu Chen, Li songbin, et al. Application of tubular technologyüA year of case histories in the drilling
herringbone multilateral horizontal well in heavy oil reservoirs. environment. SPE 67770, 2001.
Petroleum Exploration and Development, 2008, 35 (4): [13] Meng Qingkun, Xie Zhengkai, Feng Lai, et al. Summary of
487-491. expandable tubular technology. Oil Drilling & Production
[4] Zhou Shouwei, Sun Fujie, Zeng Xianglin, et al. Application of Technology, 2003, 26 (4): 67-68, 74.
multilateral wells with limited sand production to heavy oil [14] Zhang Jianbin, Shi Taihe, Lian Zhanghua. Drilling solid
reservoirs. Petroleum Exploration and Development, 2008, 35 expandable tubular technology. China Petroleum Machinery,
(5): 630-635. 2003, 31 (supp.): 128-131.
[5] Zhang Shaohuai. The development trend of drilling & [15] Zhao Wei, Liu Yecheng, Liu Yiqiang, et al. New development
completion technology ü the information from Fifth World of expandable technology abroad. Oil Production Engineering,
Petroleum Meeting. Library & Petroleum Science-Technology 2007, 3: 40-44.
Information, 1998, 12 (1): 45-60. [16] Fuentes J A, Economides M J, Carbonell R S. Stability of
[6] Wan Renpu. Advanced well completion engineering (Edition junctures for multilateral/multibranched wells. SPE 57279,
Ċ). Beijing: Petroleum Industry Press, 2000. 1999.
[7] Westgard D. Multilateral TAML levels reviewed, slightly [17] Ren Rongquan, Gao Xiangqian, Chen Jian, et al. FMECA
modified. JPT, 2002, 54 (9): 24-28. analysis of the too1 series used for multi-branch well.
[8] TAML. TAML level 3-6 multilateral junction installations Technology Supervision in Petroleum Industry, 2005, 21 (7):
through December 2006. http://taml-intl.org/uploads/images/ 26-27.
docs/ junction_ installation_122006.gif, 2008. [18] Jiang Wei, Jiang Shiquan, Chen Jian, et al. Application of
[9] Yang Daoping, Wang Fengping. Several key technologies of expansion positioning multilateral well technology in Chengbei
multilateral drilling. Xinjiang Petroleum Science & technology, oilfield, Bohai Sea. China Offshore Oil and Gas, 2004, 16 (3):
2003, 13 (3): 1-4. 188-192.
[10] Pu Jiankang, Sun Erjun. Retrievable whipstock applied in [19] Jiang Wei, Jiang Shiquan, Chen Jian, et al. Application of a new
multiple wells. Oil Drilling & Production Technology, 1989, 11 technique of expandable tubular setting branch well in NB35-2
(5): 17-18, 22. oilfield, Bohai sea. China Offshore Oil and Gas, 2006, 18 (1):
[11] Song Yuling, Dong Lijuan. Drilling tools of multi-lateral 36-40.