A. EARTHWORK
1. Excavation work m3 32.73 108,000 3,534,300.00
2. Backfill filling with selected material m3 15.90 65,000 1,033,175.00
3. Sand layer ( compacted sand ) m3 9.24 478,000 4,416,720.00
4. Import Filling with selected Material m3 11.00 122,600 1,348,600.00
G. PAINTING WORK
Prepare and apply one coat alkali resistant primer
1. and three coats vinyl acrylic emulsion (wall & m2 334.50 35,750 11,958,375.00
celling)
Apply two coasts red lead primer, one coat alkyd
2. based undercoat and two coats alkyd gloss paint m2 - 83,910 -
on wood works
Dibuat oleh :
Kontraktor Pelaksana
PT. KARMATEK INDONESIA JAYA