Sunteți pe pagina 1din 1

H V A C REQUIREMENTS

PROJECT NAME

LOCATION/AREA
PIN NUMBER

CONSULTANT NAME

CONSULTANT DETAILS

OWNER NAME :

BUILDING TYPE A. RESIDENTIAL o B.COMMERCIAL o C.INDUSTRIAL o

PROJECT DESCRIPTION :
Brief description about
mechanical system type
,features and Energy
Conservation measures.

EQUIPMENT SCHEDULE

AIR COOLED CHILLER SCHEDULE.


Minimum efficiency (KM
Condenser
Entering Leaving Rated Regulation section 13
Entering Air Power Input
Ref No Model Number Chilled water Chilled water Equipment COP IPLV Table 13.3) Test Standard
temperature (kW)
temperature °C temperature °C Capacity (ton)
°C COP IPLV

S-ar putea să vă placă și