Documente Academic
Documente Profesional
Documente Cultură
Progress As of 17-Oct-18
Page 1
Statue & Exhibition –Core
Statue Hall Wallfrom Dam)
(View
Page 2
Exhibition Hall Garden Roof
Main Approach Bridge
Exhibition Hall – Zone 4A/4B
Page 4
Main Approach Bridge
Exhibition Hall – Drum Wall Cladding
Page 5
Main Approach Bridge
Exhibition Hall –Internal Cladding
Page 6
Main Approach Bridge
Exhibition Hall – Baffle Ceiling
Page 7
Main Approach Bridge
Exhibition Hall –Finishes @+78.0 m Lvl
Page 8
Main Approach Bridge
Viewing Gallery– Finishes
Page 9
Main Approach Bridge
UNITY WALL
Page 10
MainAPPROACH
MAIN ApproachBRIDGE
Bridge
Page 11
MainMAIN
VIEW FROM Approach Bridge
APPROACH BRIDGE
Page 12
MEMORIAL & VISITOR CENTER , TICKETING BOOTH
Page 13
SIGNAGE at ENTRANCE
Page 14
SIGNAGE at M & VC TICKETING BOOTH
Page 15
FAÇADE LIGHTING
Page 16
MEMORIAL & VISITOR CENTER
Page 17
MEMORIAL & VISITOR CENTER
Page 18
MEMORIAL & VISITOR CENTER – NIGHT VIEW
Page 19
MEMORIAL & VISITOR CENTER – INTERNAL FINISHES
Page 20
M& VC– EXTERNAL LAND SCAPE WORKS
Page 21
M& VC– EXTERNAL LAND SCAPE WORKS
Page 22
STP & Service Building
Page 23
M&VC Area Slope Protection Work
Page 24
Shrestha Bharat Bhavan Building
ROAD WORKS
Page 25
Shrestha Bharat
MINOR Bhavan Building
BRIDGE-SURYAKUND
Page 26
Shrestha
MINOR BRIDGE-Bharat Bhavan
APPROACH Building
ROAD SURYAKUND
Page 27
Shrestha
SBB - CARBharat
PARK A,BBhavan Building
& BUS SHUTTLE
Page 28
Shrestha Bharat
SBB HOTEL Bhavan
BUILDING- FRONTBuilding
SIDE
Page 29
Shrestha Bharat
SBB HOTEL Bhavan
BUILDING- REAR Building
SIDE
Page 30
Shrestha Bharat
SBB HOTEL Bhavan
BUILDING Building
Page 31
Shrestha
SBBBharat Bhavan
- SERVICE BUILDINGBuilding
Page 32
Shrestha Bharat
SBB HOTEL Bhavan
BUILDING- Building
FINISHES
Page 33
Page 34