INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM

A WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2


ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1 Cadangan Pembinaan Semula Giatmara Wilayah 11,274,995.20 708 days Thu 25/8/16 Thu 18/7/19 Thu 25/8/16 NA 70% 67%
Persekutuan Labuan
2 Construction Site Handover to Contractor 0.00 1 day Thu 25/8/16 Thu 25/8/16 Thu 25/8/16 Thu 25/8/16 100% 100% 100%
3 Apointment of NSC 0.00 2 days Mon 6/2/17 Tue 7/2/17 Mon 6/2/17 Tue 7/2/17 100% 100%
7 (Prelim. A1)Preliminaries Item & 290,327.00 492 days Thu 25/8/16 Fri 24/8/18 Thu 25/8/16 Fri 24/8/18 100% 100%
Documentation (non physical work)
379 Preliminaries NSC Mekanikal Aircond 23,400.00 234 days Tue 9/1/18 Fri 21/12/18 Tue 9/1/18 Fri 21/12/18 100% 100%
399 Preliminaries NSC Elektrik 110,500.00 168 days Thu 25/8/16 Thu 27/4/17 Thu 25/8/16 Thu 27/4/17 100% 100%
474 Site Preparation 716,193.30 484 days Thu 25/8/16 Tue 14/8/18 Thu 25/8/16 Tue 14/8/18 100% 100%
584 Piling Works 942,817.50 214 days Tue 29/11/16 Fri 13/10/17 Tue 29/11/16 Fri 13/10/17 100% 100%
634 Building Works 5,982,814.00 538 days Thu 23/3/17 Mon 10/6/19 Thu 23/3/17 NA 74% 69%
635 Submission Shop Drawing & Material 0.00 63 days Tue 25/4/17 Mon 31/7/17 Tue 25/4/17 Mon 31/7/17 100% 100%
Approval
644 C1 - Blok Pentadbiran 1,656,977.00 404.6 days Wed 5/7/17 Thu 28/2/19 Wed 5/7/17 NA 75% 68%
645 Structure Work 803,728.00 380 days Wed 5/7/17 Mon 21/1/19 Wed 5/7/17 NA 94% 98%
646 Work Below Lowest Floor Finish Level 260,253.40 182 days Wed 5/7/17 Thu 29/3/18 Wed 5/7/17 NA 98% 100%
647 Excavation 1,350.00 1 day Wed 5/7/17 Wed 5/7/17 Wed 5/7/17 Wed 5/7/17 100% 100% 100%
648 Pile Cap 48,644.80 38 days Thu 6/7/17 Mon 28/8/17 Thu 6/7/17 Mon 28/8/17 100% 100%
657 Stump 15,488.00 26 days Fri 18/8/17 Wed 27/9/17 Fri 18/8/17 Wed 27/9/17 100% 100%
662 Ground Beam 100,784.40 32 days Fri 22/9/17 Tue 7/11/17 Fri 22/9/17 Tue 7/11/17 100% 100%
671 Cable Trench 7,671.80 32 days Mon 25/9/17 Wed 8/11/17 Mon 25/9/17 Wed 8/11/17 100% 100%
680 Ground Slab 86,314.40 100 days Thu 2/11/17 Thu 29/3/18 Thu 2/11/17 NA 95% 100%
681 Soil Filling 0.00 1 day Thu 2/11/17 Thu 2/11/17 Thu 2/11/17 Thu 2/11/17 100% 100% 100%
682 Compacting 0.00 1 day Fri 3/11/17 Fri 3/11/17 Fri 3/11/17 Fri 3/11/17 100% 100% 100%
683 Levelling 0.00 1 day Mon 6/11/17 Mon 6/11/17 Mon 6/11/17 Mon 6/11/17 100% 100% 100%
684 Anti termite 1,500.00 1 day Tue 7/11/17 Tue 7/11/17 Tue 7/11/17 Tue 7/11/17 100% 100% 100%
685 Lean Concrete 8,050.00 2 days Wed 8/11/17 Thu 9/11/17 Wed 8/11/17 Thu 9/11/17 100% 100% 100%
686 Damp Proof 4,490.00 1 day Mon 13/11/17 Mon 13/11/17 Mon 13/11/17 Mon 13/11/17 100% 100% 100%
687 Bar Fabrication & Installation 11,942.40 20 days Tue 14/11/17 Mon 11/12/17 Tue 14/11/17 Mon 11/12/17 100% 100% 100%
688 Wire Mesh Installation 21,392.00 20 days Wed 29/11/17 Fri 5/1/18 Wed 29/11/17 Fri 5/1/18 100% 100% 100%
689 Electrical Works 6,300.00 80 days Thu 30/11/17 Thu 29/3/18 Thu 30/11/17 NA 91% 100%
690 Conduit 0.00 80 days Thu 30/11/17 Thu 29/3/18 Thu 30/11/17 NA 89% 100%
691 Electrical 0.00 20 days Thu 30/11/17 Fri 29/12/17 Thu 30/11/17 NA 70% 100%
692 Aras Bawah 0.00 20 days Thu 30/11/17 Fri 29/12/17 Thu 30/11/17 NA 70% 100% 70%
693 ICT 0.00 20 days Fri 2/3/18 Thu 29/3/18 Fri 2/3/18 Thu 29/3/18 100% 100%
694 Telephone system 0.00 20 days Fri 2/3/18 Thu 29/3/18 Fri 2/3/18 Thu 29/3/18 100% 100%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 1
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
695 Tingkat Bawah 0.00 20 days Fri 2/3/18 Thu 29/3/18 Fri 2/3/18 Thu 29/3/18 100% 100% 100%
696 Structured Cabling For 0.00 20 days Fri 2/3/18 Thu 29/3/18 Fri 2/3/18 Thu 29/3/18 100% 100% 100%
Computer&Networking

697 UnderFloor Ducting System 6,300.00 20 days Fri 2/3/18 Thu 29/3/18 Fri 2/3/18 Thu 29/3/18 100% 100%

698 Tingkat Bawah 6,300.00 20 days Fri 2/3/18 Thu 29/3/18 Fri 2/3/18 Thu 29/3/18 100% 100% 100%
699 Concreting 32,640.00 2 days Thu 30/11/17 Fri 1/12/17 Thu 30/11/17 Fri 1/12/17 100% 100% 100%
700 Formwork Striking 0.00 1 day Thu 21/12/17 Fri 22/12/17 Thu 21/12/17 Fri 22/12/17 100% 100% 100%
701 Ramp & Apron 27,106.80 36 days Thu 2/11/17 Fri 22/12/17 Thu 2/11/17 Fri 22/12/17 100% 100%
713 Frame 178,675.20 147 days Mon 4/12/17 Tue 10/7/18 Mon 4/12/17 Tue 10/7/18 100% 100%
734 Upper Floor 102,627.20 142 days Thu 11/1/18 Wed 8/8/18 Thu 11/1/18 NA 97% 100%
735 Upper Slab 102,627.20 142 days Thu 11/1/18 Wed 8/8/18 Thu 11/1/18 NA 97% 100%
736 Formwork 18,940.00 20 days Thu 11/1/18 Mon 16/7/18 Thu 11/1/18 Mon 16/7/18 100% 100% 100%
737 Bar Fabrication & Installation 11,899.20 20 days Tue 16/1/18 Wed 8/8/18 Tue 16/1/18 Wed 8/8/18 100% 100% 100%
738 Wire Mesh Installation 21,028.00 3 days Tue 16/1/18 Mon 29/1/18 Tue 16/1/18 Mon 29/1/18 100% 100% 100%
739 Electrical Works 18,600.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 NA 95% 100%
740 Conduit 0.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 NA 80% 100%
741 Tingkat Atas 0.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 NA 80% 100% 80%
742 ICT 0.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 Thu 1/3/18 100% 100%
743 Telephone system 0.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 Thu 1/3/18 100% 100%
744 Tingkat Atas 0.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 Thu 1/3/18 100% 100% 100%
745 Structured Cabling For 0.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 Thu 1/3/18 100% 100% 100%
Computer&Networking

746 UnderFloor Ducting System 18,600.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 Thu 1/3/18 100% 100%

747 Tingkat Atas 18,600.00 20 days Tue 30/1/18 Thu 1/3/18 Tue 30/1/18 Thu 1/3/18 100% 100% 100%
748 Concreting 22,512.00 1 day Tue 23/1/18 Tue 30/1/18 Tue 23/1/18 Tue 30/1/18 100% 100% 100%
749 Formwork Striking 9,648.00 1 day Wed 14/2/18 Thu 15/2/18 Wed 14/2/18 Thu 15/2/18 100% 100% 100%
750 Staircase 29,418.00 202 days Mon 19/3/18 Mon 14/1/19 Mon 19/3/18 NA 40% 60%
761 Roof 205,647.40 140 days Wed 27/6/18 Mon 21/1/19 Wed 27/6/18 NA 83% 92%
783 Architectural 820,249.00 213.6 days Thu 12/4/18 Thu 28/2/19 Thu 12/4/18 NA 45% 22%
784 Wall 145,935.00 201.6 days Thu 12/4/18 Tue 12/2/19 Thu 12/4/18 NA 53% 38%
785 External Wall & Balustrading 61,740.00 192 days Thu 12/4/18 Thu 24/1/19 Thu 12/4/18 NA 61% 71%
786 Precast Concrete 3,350.00 1 day Tue 22/1/19 Tue 22/1/19 NA NA 0% 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 2
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
787 Glass Fibre Reinforced Concrete 3,350.00 2 days Wed 23/1/19 Thu 24/1/19 NA NA 0% 0% 0%
788 Non Load Bearing Superstructure(60%) 20,768.00 2 days Thu 12/4/18 Fri 12/10/18 Thu 12/4/18 Fri 12/10/18 100% 100% 100%
789 Non Load Bearing Superstructure(40%) 14,762.00 10 days Fri 12/10/18 Fri 26/10/18 Fri 12/10/18 Fri 26/10/18 100% 100% 100%
790 Damp Proof(60%) 426.00 1 day Thu 12/4/18 Mon 15/10/18 Thu 12/4/18 Mon 15/10/18 100% 100% 100%
791 Damp Proof(40%) 284.00 1 day Mon 15/10/18 Tue 16/10/18 Mon 15/10/18 Tue 16/10/18 100% 100% 100%
792 Metal works 18,800.00 6 days Wed 2/1/19 Thu 10/1/19 NA NA 0% 40%
793 Railing 11,000.00 2 days Wed 2/1/19 Fri 4/1/19 NA NA 0% 100% 0%
794 Sun louvers 4,200.00 2 days Fri 4/1/19 Tue 8/1/19 NA NA 0% 20% 0%
795 Fixed glass panel 3,600.00 2 days Tue 8/1/19 Thu 10/1/19 NA NA 0% 0% 0%
796 Internal Walls Partition 84,195.00 201.6 days Thu 12/4/18 Tue 12/2/19 Thu 12/4/18 NA 50% 30%
797 Non Load Bearing 17,325.00 4 days Thu 12/4/18 Tue 9/10/18 Thu 12/4/18 Tue 9/10/18 100% 100% 100%
Superstructure(60%)
798 Non Load Bearing 11,550.00 10 days Tue 9/10/18 Tue 23/10/18 Tue 9/10/18 Tue 23/10/18 100% 100% 100%
Superstructure(40%)
799 Electrical Works 54,650.00 81.2 days Thu 11/10/18 Tue 12/2/19 Thu 11/10/18 NA 33% 4%
800 Wiring 54,650.00 81.2 days Thu 11/10/18 Tue 12/2/19 Thu 11/10/18 NA 33% 4%
801 Electrical 54,650.00 81.2 days Thu 11/10/18 Tue 12/2/19 Thu 11/10/18 NA 33% 4%
802 Concealed Conduit Wiring 31,970.00 10 days Thu 10/1/19 Thu 24/1/19 Thu 10/1/19 NA 50% 0%

803 Tingkat Bawah 13,000.00 10 days Thu 10/1/19 Thu 24/1/19 Thu 10/1/19 NA 50% 0% 50%
804 Tingkat Atas 18,970.00 10 days Thu 10/1/19 Thu 24/1/19 Thu 10/1/19 NA 50% 0% 50%
805 Surface Conduit Wiring 5,220.00 10 days Thu 24/1/19 Tue 12/2/19 NA NA 0% 0%

809 ICT 6,300.00 7 days Thu 24/1/19 Thu 7/2/19 Thu 24/1/19 NA 70% 0%
810 Telephone system 6,300.00 7 days Thu 24/1/19 Thu 7/2/19 Thu 24/1/19 NA 70% 0%
811 Tingkat Bawah 3,600.00 7 days Thu 24/1/19 Thu 7/2/19 Thu 24/1/19 NA 70% 0% 70%
812 Tingkat Atas 2,700.00 7 days Thu 24/1/19 Thu 7/2/19 Thu 24/1/19 NA 70% 0% 70%
813 Structured Cabling For 11,160.00 3 days Thu 11/10/18 Fri 26/10/18 Thu 11/10/18 NA 70% 100% 70%
Computer& Networking
814 Damp Proof(60%) 402.00 5 days Fri 26/10/18 Fri 2/11/18 Fri 26/10/18 Fri 2/11/18 100% 100% 100%
815 Damp Proof(40%) 268.00 5 days Fri 2/11/18 Mon 12/11/18 Fri 2/11/18 Mon 12/11/18 100% 100% 100%
816 Doors & Windows 143,366.00 66 days Mon 12/11/18 Wed 20/2/19 Mon 12/11/18 NA 60% 11%
817 Door 99,136.00 56 days Mon 12/11/18 Mon 4/2/19 Mon 12/11/18 NA 70% 12%
818 Precast Concrete 2,530.00 1 day Mon 12/11/18 Tue 13/11/18 Mon 12/11/18 Tue 13/11/18 100% 100%
819 Lintel 2,530.00 1 day Mon 12/11/18 Tue 13/11/18 Mon 12/11/18 Tue 13/11/18 100% 100% 100%
820 Metal Frame Door 5,268.00 18 days Wed 28/11/18 Mon 24/12/18 Wed 28/11/18 Mon 24/12/18 100% 100%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 3
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
830 Doors Leaves 22,680.00 9 days Wed 2/1/19 Tue 15/1/19 NA NA 0% 29%
840 Metal work 13,020.00 6 days Tue 15/1/19 Wed 23/1/19 NA NA 0% 0%
847 Ironmongery 15,640.00 4 days Tue 15/1/19 Mon 21/1/19 NA NA 0% 0%
862 Painting & Decorating 1,398.00 2 days Mon 21/1/19 Wed 23/1/19 NA NA 0% 0%
865 Electrical Works 38,600.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
866 Sub Switchboard 13,000.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
867 SUB SWITCHBOARD 'ADMIN' 13,000.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
as per Drawing No.
HQL.LV/117/2015/21(45)

868 Switch Panel 500.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
869 Tingkat Atas 500.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
870 Submains 9,900.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
871 Tingkat Bawah 2,700.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
872 SSB 'ADMIN' to DB 'GL' 350.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%

873 SSB 'ADMIN' to DB 'GP' 350.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%

874 SSB 'ADMIN' to 'GM' 500.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
875 SSB 'ADMIN' to 'ADMIN' 1,500.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%

876 Tingkat Satu 7,200.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
877 SSB 'ADMIN' to 1L' 1,350.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
878 SSB 'ADMIN' to 1P' 1,350.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
879 SSB 'ADMIN' to 'UFBK' 1,350.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
880 SSB 'ADMIN' to 'UFRK' 1,350.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
881 SSB 'ADMIN' to '1M' 1,800.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
882 Distribution Boards 15,200.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
883 Tingkat Bawah 5,650.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%
884 6 way TPN DB 'GL' Electro 1,850.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Galvanised
885 6 way TPN DB 'GP' Electro 1,950.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Galvanised
886 4 way TPN DB 'GM' 1,850.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Electro Galvanised
887 Tingkat Satu 9,550.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 4
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
888 4 way TPN DB '1L' Electro 1,850.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Galvanised
889 6 way TPN DB '1P' Electro 1,950.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Galvanised
890 6 way TPN DB 'UFBK' 1,950.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Electro Galvanised
891 6 way TPN DB 'UFRK' 1,950.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Electro Galvanised
892 4 way TPN DB '1M' Electro 1,850.00 7 days Wed 23/1/19 Mon 4/2/19 Wed 23/1/19 NA 80% 0% 80%
Galvanised
893 Windows 44,230.00 66 days Mon 12/11/18 Wed 20/2/19 Mon 12/11/18 NA 6% 8%
894 Precast Concrete 4,840.00 1 day Mon 12/11/18 Tue 13/11/18 Mon 12/11/18 Tue 13/11/18 100% 100%
895 lintel 2,640.00 1 day Mon 12/11/18 Tue 13/11/18 Mon 12/11/18 Tue 13/11/18 100% 100% 100%
896 Cill 2,200.00 1 day Mon 12/11/18 Tue 13/11/18 Mon 12/11/18 Tue 13/11/18 100% 100% 100%
897 Windows casement 39,390.00 30 days Fri 4/1/19 Wed 20/2/19 NA NA 0% 2%
904 Floor Finishes 79,090.00 10 days Fri 11/1/19 Fri 25/1/19 NA NA 0% 0%
912 Ceiling 57,308.00 4 days Wed 23/1/19 Tue 29/1/19 NA NA 0% 0%
919 Wall Finishes 224,005.00 206.6 days Sat 21/4/18 Thu 28/2/19 Sat 21/4/18 NA 39% 39%
920 External Wall Finishes 22,760.00 88.2 days Sat 21/4/18 Thu 30/8/18 Sat 21/4/18 Thu 30/8/18 100% 100%
921 Plastering (50%) 7,510.00 4 days Sat 21/4/18 Fri 10/8/18 Sat 21/4/18 Fri 10/8/18 100% 100% 100%
922 Plastering (50%) 7,510.00 10 days Tue 14/8/18 Tue 28/8/18 Tue 14/8/18 Tue 28/8/18 100% 100% 100%
923 Painting & Decorating 7,740.00 2 days Tue 28/8/18 Thu 30/8/18 Tue 28/8/18 Thu 30/8/18 100% 100% 100%
924 Internal Wall Finishes 201,245.00 206.6 days Sat 21/4/18 Thu 28/2/19 Sat 21/4/18 NA 31% 31%
925 Plastering (50%) 14,810.00 6 days Sat 21/4/18 Tue 21/8/18 Sat 21/4/18 Tue 21/8/18 100% 100% 100%
926 Plastering (50%) 14,810.00 10 days Wed 22/8/18 Wed 5/9/18 Wed 22/8/18 Wed 5/9/18 100% 100% 100%
927 Ceramic Wall Tiling 12,900.00 2 days Thu 10/1/19 Mon 14/1/19 NA NA 0% 0% 0%
928 Painting & Decorating 17,772.00 2 days Wed 20/2/19 Fri 22/2/19 NA NA 0% 0% 0%
929 AIR COOLED SPLIT UNIT SYSTEM 136,153.00 153.6 days Tue 10/7/18 Tue 26/2/19 Tue 10/7/18 NA 22% 22%

930 Sample Board 1,500.00 20 days Tue 10/7/18 Mon 6/8/18 Tue 10/7/18 Mon 6/8/18 100% 100% 100%
931 AIR COOLED SPLIT UNIT 106,853.00 19 days Mon 21/1/19 Wed 20/2/19 NA NA 0% 0%
932 BLOK PENTADBIRAN 32,927.00 10 days Mon 21/1/19 Thu 7/2/19 NA NA 0% 0%
(TINGKAT BAWAH)
933 Pejabat Am (FCU-TB-01) 5,454.50 5 days Mon 21/1/19 Mon 28/1/19 NA NA 0% 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 5
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
934 Bilik Pengurus (FCU-TB-02) 5,454.50 5 days Mon 21/1/19 Mon 28/1/19 NA NA 0% 0% 0%

935 Bilik Mesyuarat 10,909.00 10 days Mon 21/1/19 Thu 7/2/19 NA NA 0% 0%


936 FCU-TB-03 5,454.50 5 days Mon 21/1/19 Mon 28/1/19 NA NA 0% 0% 0%
937 FCU-TB-04 5,454.50 5 days Mon 28/1/19 Thu 7/2/19 NA NA 0% 0% 0%
938 Perpustakaan 11,109.00 4 days Mon 21/1/19 Fri 25/1/19 NA NA 0% 0%
939 FCU-TB-05 5,554.50 2 days Mon 21/1/19 Wed 23/1/19 NA NA 0% 0% 0%
940 FCU-TB-06 5,554.50 2 days Wed 23/1/19 Fri 25/1/19 NA NA 0% 0% 0%
941 BLOK PENTADBIRAN 73,926.00 9 days Thu 7/2/19 Wed 20/2/19 NA NA 0% 0%
(TINGKAT ATAS)
942 Bilik Kerja (FCU-TA-01) 4,850.00 2 days Thu 7/2/19 Mon 11/2/19 NA NA 0% 0% 0%

943 Ruang Kerja 42,300.00 4 days Mon 11/2/19 Fri 15/2/19 NA NA 0% 0%


944 FCU-TA-02 7,050.00 4 days Mon 11/2/19 Fri 15/2/19 NA NA 0% 0% 0%
945 FCU-TA-03 7,050.00 4 days Mon 11/2/19 Fri 15/2/19 NA NA 0% 0% 0%
946 FCU-TA-04 7,050.00 4 days Mon 11/2/19 Fri 15/2/19 NA NA 0% 0% 0%
947 FCU-TA-05 7,050.00 4 days Mon 11/2/19 Fri 15/2/19 NA NA 0% 0% 0%
948 FCU-TA-06 7,050.00 4 days Mon 11/2/19 Fri 15/2/19 NA NA 0% 0% 0%
949 FCU-TA-07 7,050.00 4 days Mon 11/2/19 Fri 15/2/19 NA NA 0% 0% 0%
950 Bilik Tenaga Pengajar 4,850.00 3 days Fri 15/2/19 Wed 20/2/19 NA NA 0% 0% 0%
(FCU-TA-01)
951 Bilik Kuliah 9,700.00 2 days Mon 11/2/19 Wed 13/2/19 NA NA 0% 0%
952 FCU-TA-09 4,850.00 2 days Mon 11/2/19 Wed 13/2/19 NA NA 0% 0% 0%
953 FCU-TA-010 4,850.00 2 days Mon 11/2/19 Wed 13/2/19 NA NA 0% 0% 0%
954 Bilik Komputer 12,226.00 1 day Mon 11/2/19 Tue 12/2/19 NA NA 0% 0%
955 FCU-TA-10 6,113.00 1 day Mon 11/2/19 Tue 12/2/19 NA NA 0% 0% 0%
956 FCU-TA-011 6,113.00 1 day Mon 11/2/19 Tue 12/2/19 NA NA 0% 0% 0%
957 ELECTRICAL WORKS 4,800.00 6 days Mon 11/2/19 Tue 19/2/19 NA NA 0% 0%
958 Power Cable From Electrical 1,600.00 3 days Mon 11/2/19 Thu 14/2/19 NA NA 0% 0%
Isolator/switch/socket to
AC Unit

959 Wall Mounted 800.00 2 days Mon 11/2/19 Wed 13/2/19 NA NA 0% 0% 0%


960 Ceiling Cassette 800.00 3 days Mon 11/2/19 Thu 14/2/19 NA NA 0% 0% 0%
961 Air Conditioning Power & 3,200.00 3 days Thu 14/2/19 Tue 19/2/19 NA NA 0% 0% 0%
Control/signal Wiring

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 6
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
962 MECHANICAL VENTILATION 23,000.00 4 days Wed 20/2/19 Tue 26/2/19 NA NA 0% 0%
SYSTEM
963 Fresh Air Duct (GI Duct) - 20,000.00 2 days Wed 20/2/19 Fri 22/2/19 NA NA 0% 0% 0%
Indoor Unit
964 Mechanical Ventilation Fan 3,000.00 2 days Fri 22/2/19 Tue 26/2/19 NA NA 0% 0% 0%

965 GENERAL WORKS 4,800.00 30 days Mon 14/1/19 Thu 28/2/19 NA NA 0% 0%


966 Installation of coring, haking, 2,400.00 5 days Mon 14/1/19 Mon 21/1/19 NA NA 0% 0% 0%
punching of holes in walls and
floors
967 Painting 2,400.00 2 days Tue 26/2/19 Thu 28/2/19 NA NA 0% 0% 0%
968 Electrical Works 87,465.00 14 days Thu 24/1/19 Mon 18/2/19 NA NA 0% 0%
991 Fitting & Furnishing 32,500.00 1 day Fri 22/2/19 Mon 25/2/19 NA NA 0% 0%
993 Sanitary Fitting 30,080.00 2 days Fri 22/2/19 Tue 26/2/19 NA NA 0% 0%
995 Sundries 20,500.00 1 day Fri 22/2/19 Mon 25/2/19 NA NA 0% 0%
997 Plumbing Installation 32,000.00 24 days Mon 12/11/18 Mon 17/12/18 Mon 12/11/18 NA 94% 100%
1002 Electrical Works 1,000.00 6 days Mon 18/2/19 Tue 26/2/19 NA NA 0% 0%
1007 Complete Internal Wiring Blok 0.00 0 days Tue 26/2/19 Tue 26/2/19 NA NA 0% 0% 26/2
Pentadbiran
1008 Completion of Blok Pentadbiran 0.00 0 days Tue 26/2/19 Tue 26/2/19 NA NA 0% 0% 26/2
1009 C2 - Bengkel Kursus Pendawaian Elektrik 864,913.60 391.4 days Fri 21/7/17 Wed 27/2/19 Fri 21/7/17 NA 82% 80%

1010 Structure Work 478,783.60 323 days Fri 21/7/17 Wed 14/11/18 Fri 21/7/17 NA 99% 100%
1011 Work Below Lowest Floor Finish Level 194,684.00 137 days Fri 21/7/17 Fri 9/2/18 Fri 21/7/17 NA 96% 100%
1012 Pile Cap 33,863.80 41 days Fri 21/7/17 Tue 19/9/17 Fri 21/7/17 Tue 19/9/17 100% 100%
1023 Stump 11,601.60 21 days Mon 11/9/17 Tue 10/10/17 Mon 11/9/17 Tue 10/10/17 100% 100%
1029 Ground Beam 100,850.60 50 days Wed 11/10/17 Thu 21/12/17 Wed 11/10/17 Thu 21/12/17 100% 100%
1040 Ground Slab 48,368.00 45 days Tue 5/12/17 Fri 9/2/18 Tue 5/12/17 NA 89% 100%
1041 Soil Filling 700.00 1 day Tue 5/12/17 Tue 5/12/17 Tue 5/12/17 Tue 5/12/17 100% 100% 100%
1042 Compacting 200.00 1 day Wed 6/12/17 Wed 6/12/17 Wed 6/12/17 Wed 6/12/17 100% 100% 100%
1043 Levelling 50.00 1 day Thu 7/12/17 Thu 7/12/17 Thu 7/12/17 Thu 7/12/17 100% 100% 100%
1044 Anti termite 50.00 1 day Fri 8/12/17 Fri 8/12/17 Fri 8/12/17 Fri 8/12/17 100% 100% 100%
1045 Lean Concrete 5,300.00 5 days Mon 11/12/17 Fri 15/12/17 Mon 11/12/17 Fri 15/12/17 100% 100% 100%
1046 Damp Proof 3,680.00 1 day Mon 18/12/17 Mon 18/12/17 Mon 18/12/17 Mon 18/12/17 100% 100% 100%
1047 Formwork 900.00 20 days Tue 19/12/17 Mon 15/1/18 Tue 19/12/17 Mon 15/1/18 100% 100% 100%
1048 Main Bar installation 3,811.20 20 days Thu 21/12/17 Tue 6/2/18 Thu 21/12/17 Tue 6/2/18 100% 100% 100%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 7
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1049 Fabric Reinforcement 6,316.80 20 days Thu 21/12/17 Fri 9/2/18 Thu 21/12/17 Fri 9/2/18 100% 100% 100%
1050 Electrical Works 0.00 20 days Fri 22/12/17 Mon 22/1/18 Fri 22/12/17 NA 50% 100%
1051 Conduit 0.00 20 days Fri 22/12/17 Mon 22/1/18 Fri 22/12/17 NA 50% 100% 50%
1052 Concreting 19,152.00 1 day Wed 27/12/17 Wed 27/12/17 Wed 27/12/17 Wed 27/12/17 100% 100% 100%
1053 Formwork Striking 8,208.00 1 day Tue 2/1/18 Thu 18/1/18 Tue 2/1/18 Thu 18/1/18 100% 100% 100%
1054 Ramp & Apron 31,684.60 40 days Wed 6/12/17 Mon 5/2/18 Wed 6/12/17 Mon 5/2/18 100% 100%
1068 Frame 86,926.40 95 days Tue 2/1/18 Fri 18/5/18 Tue 2/1/18 Fri 18/5/18 100% 100%
1087 Upper Floor 9,875.20 75 days Fri 16/3/18 Thu 5/7/18 Fri 16/3/18 Thu 5/7/18 100% 100%
1094 Roof 155,613.40 163 days Fri 16/3/18 Wed 14/11/18 Fri 16/3/18 Wed 14/11/18 100% 100%
1112 Architectural 356,730.00 198.4 days Thu 3/5/18 Wed 27/2/19 Thu 3/5/18 NA 50% 44%
1113 Wall 70,760.00 176.75 days Thu 3/5/18 Wed 23/1/19 Thu 3/5/18 NA 74% 98%
1114 External Wall & Balustrading 25,930.00 176.75 days Thu 3/5/18 Wed 23/1/19 Thu 3/5/18 NA 95% 95%
1123 Internal Walls 44,830.00 98 days Thu 3/5/18 Fri 28/9/18 Thu 3/5/18 NA 61% 100%
1124 Non Load Bearing Superstructure (90%) 6,513.68 2 days Thu 3/5/18 Fri 4/5/18 Thu 3/5/18 Fri 4/5/18 100% 100% 100%
1125 Non Load Bearing Superstructure (10%) 251.32 15 days Tue 14/8/18 Tue 4/9/18 Tue 14/8/18 Tue 4/9/18 100% 100% 100%
1126 Electrical Works 37,910.00 14 days Wed 5/9/18 Fri 28/9/18 Wed 5/9/18 NA 40% 100%
1127 Wiring 37,910.00 14 days Wed 5/9/18 Fri 28/9/18 Wed 5/9/18 NA 40% 100%
1128 Concealed Conduit wiring 5,460.00 14 days Wed 5/9/18 Fri 28/9/18 Wed 5/9/18 NA 40% 100% 40%
1129 Surface Conduit wiring 7,250.00 14 days Wed 5/9/18 Fri 28/9/18 Wed 5/9/18 NA 40% 100% 40%
1130 Isolator Wiring 25,200.00 14 days Wed 5/9/18 Fri 28/9/18 Wed 5/9/18 NA 40% 100% 40%
1131 Damp Proof (90%) 139.50 1 day Thu 3/5/18 Tue 19/6/18 Thu 3/5/18 Wed 17/10/18 100% 100% 100%
1132 Damp Proof (10%) 15.50 5 days Tue 14/8/18 Mon 20/8/18 Tue 14/8/18 Mon 20/8/18 100% 100% 100%
1133 Door and window 74,062.00 44 days Mon 10/12/18 Fri 15/2/19 Mon 10/12/18 NA 13% 24%
1159 Floor Finishes 97,730.00 23 days Thu 10/1/19 Fri 15/2/19 Mon 24/12/18 NA 40% 0%
1168 Ceiling Finishes 34,984.00 12 days Mon 11/2/19 Wed 27/2/19 NA NA 0% 0%
1169 External ceiling finishing 8,018.00 5 days Fri 15/2/19 Fri 22/2/19 NA NA 0% 0%
1173 Internal ceiling finishing 26,966.00 12 days Mon 11/2/19 Wed 27/2/19 NA NA 0% 0%
1174 skim coat 480.00 1 day Fri 22/2/19 Mon 25/2/19 NA NA 0% 0% 0%
1175 Ceiling board 1.2 x 0.6 2,820.00 1 day Mon 25/2/19 Tue 26/2/19 NA NA 0% 0% 0%
1176 AIR COOLED SPLIT UNIT SYSTEM 22,526.00 11 days Mon 11/2/19 Tue 26/2/19 NA NA 0% 0%

1177 AIR COOLED SPLIT UNIT 17,726.00 5 days Mon 11/2/19 Mon 18/2/19 NA NA 0% 0%
1178 BENGKEL KURSUS 17,726.00 5 days Mon 11/2/19 Mon 18/2/19 NA NA 0% 0%
PENDAWAIAN ELEKTRIK

1179 Bilik Kerja 12,226.00 5 days Mon 11/2/19 Mon 18/2/19 NA NA 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 8
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1180 FCU-B1-01 6,113.00 5 days Mon 11/2/19 Mon 18/2/19 NA NA 0% 0% 0%
1181 FCU-B1-02 6,113.00 5 days Mon 11/2/19 Mon 18/2/19 NA NA 0% 0% 0%
1182 Bilik Tenaga Pengajar 5,500.00 5 days Mon 11/2/19 Mon 18/2/19 NA NA 0% 0% 0%
(FCU-B1-03)

1183 ELECTRICAL WORKS 4,800.00 6 days Mon 18/2/19 Tue 26/2/19 NA NA 0% 0%


1184 Power Cable From Electrical 1,600.00 4 days Mon 18/2/19 Fri 22/2/19 NA NA 0% 0%
Isolator/switch/socket to
AC Unit

1185 Wall Mounted 800.00 2 days Mon 18/2/19 Wed 20/2/19 NA NA 0% 0% 0%


1186 Ceiling Cassette 800.00 2 days Wed 20/2/19 Fri 22/2/19 NA NA 0% 0% 0%
1187 Air Conditioning Power & 3,200.00 2 days Fri 22/2/19 Tue 26/2/19 NA NA 0% 0% 0%
Control/signal Wiring
1188 Painting and decorating 1,140.00 1 day Tue 26/2/19 Wed 27/2/19 NA NA 0% 0% 0%
1189 Wall Finishes 58,904.00 164.4 days Mon 28/5/18 Wed 30/1/19 Mon 28/5/18 NA 72% 38%
1214 Sanitary Item 7,240.00 12 days Mon 14/1/19 Tue 29/1/19 NA NA 0% 0%
1228 Sundries 13,050.00 2 days Wed 30/1/19 Fri 1/2/19 NA NA 0% 0%
1236 Plumbing installation 26,000.00 6 days Tue 21/8/18 Tue 28/8/18 Tue 21/8/18 Tue 28/8/18 100% 100%
1245 Electrical Works 3,400.00 7 days Wed 23/1/19 Thu 31/1/19 NA NA 0% 0%
1247 Complete Internel Wiring Bengkel 0.00 0 days Fri 15/2/19 Fri 15/2/19 NA NA 0% 0% 15/2
Pendawaian Elektrik
1248 Completion of Bengkel Kursus 0.00 0 days Fri 15/2/19 Fri 15/2/19 NA NA 0% 0% 1/2
Pendawaian Elektrik (Piling)
1249 C3 - Bengkel Kursus Teknologi Kimpalan & 892,658.60 386.5 days Tue 8/8/17 Fri 8/3/19 Tue 8/8/17 NA 64% 62%
Fabrikasi Logam (Piling)
1250 Structure Work 478,783.60 361.5 days Tue 8/8/17 Tue 29/1/19 Tue 8/8/17 NA 93% 95%
1251 Work Below Lowest Floor Finish Level 194,684.00 324.5 days Tue 8/8/17 Wed 5/12/18 Tue 8/8/17 NA 94% 100%

1252 Pile Cap 32,363.80 198 days Tue 8/8/17 Fri 25/5/18 Tue 8/8/17 Fri 25/5/18 100% 100%
1262 Stump 11,601.60 16 days Sat 5/5/18 Tue 29/5/18 Sat 5/5/18 Tue 29/5/18 100% 100%
1268 Ground Beam 100,850.60 77 days Mon 21/5/18 Wed 12/9/18 Mon 21/5/18 Wed 12/9/18 100% 100%
1288 Ground Slab 49,868.00 119.5 days Mon 11/6/18 Wed 5/12/18 Mon 11/6/18 NA 86% 100%
1289 Soil Filling (50%) 350.00 1 day Mon 11/6/18 Thu 9/8/18 Mon 11/6/18 Thu 9/8/18 100% 100% 100%
1290 Soil Filling (50%) 350.00 1 day Thu 16/8/18 Thu 16/8/18 Thu 16/8/18 Thu 16/8/18 100% 100% 100%
1291 Compacting (50%) 100.00 1 day Mon 11/6/18 Mon 13/8/18 Mon 11/6/18 Mon 13/8/18 100% 100% 100%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 9
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1292 Compacting (50%) 100.00 1 day Tue 14/8/18 Wed 15/8/18 Tue 14/8/18 Wed 15/8/18 100% 100% 100%
1293 Levelling (50%) 25.00 1 day Mon 11/6/18 Tue 14/8/18 Mon 11/6/18 Tue 14/8/18 100% 100% 100%
1294 Levelling (50%) 25.00 1 day Wed 15/8/18 Wed 15/8/18 Wed 15/8/18 Wed 15/8/18 100% 100% 100%
1295 Anti termite (50%) 775.00 1 day Mon 11/6/18 Thu 16/8/18 Mon 11/6/18 Thu 16/8/18 100% 100% 100%
1296 Anti termite (50%) 775.00 1 day Thu 16/8/18 Fri 17/8/18 Thu 16/8/18 Fri 17/8/18 100% 100% 100%
1297 Lean Concrete 5,300.00 10 days Fri 17/8/18 Fri 31/8/18 Fri 17/8/18 Fri 31/8/18 100% 100% 100%
1298 Damp Proof 3,680.00 1 day Fri 31/8/18 Mon 3/9/18 Fri 31/8/18 Mon 3/9/18 100% 100% 100%
1299 Formwork 900.00 10 days Mon 3/9/18 Mon 17/9/18 Mon 3/9/18 Mon 17/9/18 100% 100% 100%
1300 Main Bar installation 3,811.20 20 days Mon 17/9/18 Mon 15/10/18 Mon 17/9/18 Mon 15/10/18 100% 100% 100%
1301 Fabric Reinforcement 6,316.80 15 days Mon 15/10/18 Mon 5/11/18 Mon 15/10/18 Mon 5/11/18 100% 100% 100%
1302 Electrical Works 0.00 20 days Mon 5/11/18 Wed 5/12/18 Mon 5/11/18 NA 40% 100%
1303 Conduit 0.00 20 days Mon 5/11/18 Wed 5/12/18 Mon 5/11/18 NA 40% 100% 40%
1304 Concreting 19,152.00 1 day Mon 5/11/18 Tue 6/11/18 Mon 5/11/18 Tue 6/11/18 100% 100% 100%
1305 Formwork Striking 8,208.00 1 day Thu 8/11/18 Fri 9/11/18 Thu 8/11/18 Fri 9/11/18 100% 100% 100%
1306 Ramp & Apron 31,684.60 30 days Thu 6/9/18 Tue 23/10/18 Thu 6/9/18 Tue 23/10/18 100% 100%
1320 Frame 86,926.40 58.5 days Fri 14/9/18 Wed 12/12/18 Fri 14/9/18 Wed 12/12/18 100% 100%
1339 Upper Floor 9,875.20 22 days Wed 12/12/18 Tue 15/1/19 Thu 13/12/18 NA 83% 80%
1340 Formwork 2,160.00 10 days Wed 12/12/18 Wed 26/12/18 Thu 13/12/18 Mon 17/12/18 100% 100% 100%
1341 Main Bar installation 187.20 10 days Wed 26/12/18 Wed 9/1/19 Thu 13/12/18 Mon 17/12/18 100% 75% 17/12
1342 Wire Mesh 2,408.00 5 days Wed 26/12/18 Wed 2/1/19 Thu 13/12/18 Mon 17/12/18 100% 100% 17/12
1343 Concreting 3,528.00 1 day Wed 9/1/19 Thu 10/1/19 Thu 20/12/18 Thu 20/12/18 100% 0% 100%
1344 Formwork Striking 1,512.00 1 day Fri 11/1/19 Mon 14/1/19 Mon 24/12/18 Mon 24/12/18 100% 0% 100%
1345 Water Proofing 80.00 1 day Mon 14/1/19 Tue 15/1/19 NA NA 0% 0% 0%
1346 Roof 155,613.40 32 days Wed 12/12/18 Tue 29/1/19 Thu 13/12/18 NA 31% 61%
1347 Roof Slab 4,860.10 24 days Wed 12/12/18 Thu 17/1/19 Thu 13/12/18 NA 63% 77%
1348 Formwork 970.00 10 days Wed 12/12/18 Wed 26/12/18 Thu 13/12/18 Mon 17/12/18 100% 100% 100%
1349 Main Bar Installation 230.40 10 days Wed 26/12/18 Wed 9/1/19 Thu 13/12/18 Mon 17/12/18 100% 75% 17/12
1350 Wire Mesh 1,400.00 7 days Wed 26/12/18 Fri 4/1/19 Thu 13/12/18 Mon 17/12/18 100% 100% 17/12
1351 Concreting 672.00 1 day Wed 9/1/19 Thu 10/1/19 Thu 20/12/18 Thu 20/12/18 100% 0% 100%
1352 Formwork Striking 288.00 1 day Fri 11/1/19 Mon 14/1/19 Mon 24/12/18 Mon 24/12/18 100% 0% 100%
1353 Water Proof 1,040.00 1 day Mon 14/1/19 Tue 15/1/19 NA NA 0% 0% 0%
1354 Screeding 259.70 2 days Tue 15/1/19 Thu 17/1/19 NA NA 0% 0% 0%
1355 Roof 150,753.30 8 days Thu 17/1/19 Tue 29/1/19 NA NA 0% 0%
1364 Architectural 384,475.00 25 days Tue 29/1/19 Fri 8/3/19 Thu 10/1/19 NA 18% 0%
1474 Plumbing installation 26,000.00 8 days Thu 17/1/19 Tue 29/1/19 NA NA 0% 0%
1483 Electrical Works 3,400.00 3 days Tue 5/3/19 Fri 8/3/19 NA NA 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 10
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1485 Complete Internel Wiring Bengkel Kursus 0.00 0 days Fri 8/3/19 Fri 8/3/19 NA NA 0% 0% 8/3
Teknologi Kimpalan & Fabrikasi Logam

1486 Completion of Bengkel Kursus Teknologi 0.00 0 days Fri 8/3/19 Fri 8/3/19 NA NA 0% 0% 18/2
Kimpalan & Fabrikasi
1487 C4 - Blok Transit 1,090,366.60 310.5 days Mon 20/11/17 Thu 28/2/19 Mon 20/11/17 NA 81% 67%
1488 Structure Work 637,401.60 277.5 days Mon 20/11/17 Wed 9/1/19 Mon 20/11/17 NA 96% 99%
1489 Work Below Lowest Floor Finish Level 281,445.80 196 days Mon 20/11/17 Wed 5/9/18 Mon 20/11/17 NA 91% 100%

1490 Excavation 1,740.00 1 day Mon 20/11/17 Mon 20/11/17 Mon 20/11/17 Mon 20/11/17 100% 100% 100%
1491 Pile Cap 28,072.00 35 days Tue 21/11/17 Thu 11/1/18 Tue 21/11/17 Thu 11/1/18 100% 100%
1501 Stump 13,214.40 28 days Fri 1/12/17 Fri 12/1/18 Fri 1/12/17 Fri 12/1/18 100% 100%
1507 Ground Beam 131,365.40 39 days Mon 22/1/18 Tue 20/3/18 Mon 22/1/18 Tue 20/3/18 100% 100%
1517 Ground Slab 107,054.00 115 days Wed 21/3/18 Wed 5/9/18 Wed 21/3/18 NA 76% 100%
1518 Compacting 0.00 1 day Wed 21/3/18 Wed 21/3/18 Wed 21/3/18 Wed 21/3/18 100% 100% 100%
1519 Levelling 0.00 1 day Wed 21/3/18 Thu 22/3/18 Wed 21/3/18 Thu 22/3/18 100% 100% 100%
1520 Anti termite 1,500.00 1 day Wed 21/3/18 Fri 23/3/18 Wed 21/3/18 Fri 23/3/18 100% 100% 100%
1521 Lean Concrete 10,150.00 1 day Thu 22/3/18 Thu 22/3/18 Thu 22/3/18 Thu 22/3/18 100% 100% 100%
1522 Damp Proof 5,800.00 1 day Fri 23/3/18 Mon 26/3/18 Fri 23/3/18 Mon 26/3/18 100% 100% 100%
1523 Main Bar installation 20,880.00 6 days Mon 26/3/18 Mon 2/4/18 Mon 26/3/18 Mon 2/4/18 100% 100% 100%
1524 Wire Mesh 26,964.00 7 days Mon 26/3/18 Tue 3/4/18 Mon 26/3/18 Tue 3/4/18 100% 100% 100%
1525 Electrical Works 0.00 20 days Wed 4/4/18 Wed 2/5/18 Wed 4/4/18 NA 50% 100%
1526 Conduit 0.00 20 days Wed 4/4/18 Wed 2/5/18 Wed 4/4/18 NA 50% 100% 50%
1527 Concreting (90%) 37,584.00 2 days Wed 4/4/18 Thu 5/4/18 Wed 4/4/18 Thu 5/4/18 100% 100% 100%
1528 Concreting (10%) 4,176.00 1 day Tue 14/8/18 Tue 14/8/18 Tue 14/8/18 Tue 14/8/18 100% 100% 100%
1529 Formwork Striking 0.00 1 day Wed 5/9/18 Wed 5/9/18 Wed 5/9/18 Wed 5/9/18 100% 100% 100%
1530 Ramp & Apron 17,962.20 101.1 days Wed 21/3/18 Thu 16/8/18 Wed 21/3/18 Thu 16/8/18 100% 100%
1546 Frame 122,961.60 136 days Fri 6/4/18 Fri 26/10/18 Fri 6/4/18 Fri 26/10/18 100% 100%
1563 Roof 215,032.00 94.5 days Fri 17/8/18 Wed 9/1/19 Fri 17/8/18 NA 92% 98%
1564 Roof Slab 13,522.00 46 days Fri 17/8/18 Fri 26/10/18 Fri 17/8/18 Fri 26/10/18 100% 100%
1565 Formwork 2,370.00 20 days Fri 17/8/18 Thu 13/9/18 Fri 17/8/18 Thu 13/9/18 100% 100% 100%
1566 Main Bar Installation 1,368.00 20 days Fri 7/9/18 Wed 10/10/18 Fri 7/9/18 Wed 10/10/18 100% 100% 100%
1567 Wire Mesh 2,744.00 20 days Fri 7/9/18 Wed 10/10/18 Fri 7/9/18 Wed 10/10/18 100% 100% 100%
1568 Concreting 3,024.00 1 day Thu 4/10/18 Thu 4/10/18 Thu 4/10/18 Thu 4/10/18 100% 100% 100%
1569 Formwork Striking 336.00 1 day Thu 25/10/18 Thu 25/10/18 Thu 25/10/18 Thu 25/10/18 100% 100% 100%
1570 Water Proof 3,680.00 1 day Fri 26/10/18 Fri 26/10/18 Fri 26/10/18 Fri 26/10/18 100% 100% 100%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 11
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1571 Plinth 2,360.00 25 days Fri 17/8/18 Thu 27/9/18 Fri 17/8/18 Thu 27/9/18 100% 100%
1572 Wire Mesh 560.00 20 days Fri 17/8/18 Tue 18/9/18 Fri 17/8/18 Tue 18/9/18 100% 100% 100%
1573 Fomework 360.00 20 days Fri 31/8/18 Thu 27/9/18 Fri 31/8/18 Thu 27/9/18 100% 100% 100%
1574 Concreting 1,440.00 1 day Mon 24/9/18 Mon 24/9/18 Mon 24/9/18 Mon 24/9/18 100% 100% 100%
1575 Scupper Drain 2,650.00 1 day Wed 26/9/18 Wed 26/9/18 Wed 26/9/18 Wed 26/9/18 100% 100%
1576 Concreting 2,650.00 1 day Wed 26/9/18 Wed 26/9/18 Wed 26/9/18 Wed 26/9/18 100% 100% 100%
1577 Roof 196,500.00 9 days Wed 26/12/18 Wed 9/1/19 NA NA 0% 72%
1593 Architectural 411,915.00 37 days Thu 27/12/18 Fri 22/2/19 Fri 14/12/18 NA 51% 6%
1594 Wall 76,980.00 30 days Thu 27/12/18 Wed 13/2/19 Fri 14/12/18 NA 36% 26%
1595 External Wall & Balustrading 16,685.00 16 days Thu 27/12/18 Mon 21/1/19 Fri 14/12/18 Thu 27/12/18 100% 38%
1596 Non Load Bearing Superstructure 16,170.00 15 days Thu 27/12/18 Thu 17/1/19 Fri 14/12/18 Thu 27/12/18 100% 43% 100%

1597 Damp Proof 515.00 2 days Thu 17/1/19 Mon 21/1/19 Fri 14/12/18 Fri 14/12/18 100% 0% 100%
1598 Internal Walls 60,295.00 30 days Thu 27/12/18 Wed 13/2/19 Fri 14/12/18 NA 16% 20%
1599 Non Load Bearing Superstructure 39,985.00 10 days Thu 27/12/18 Thu 10/1/19 Fri 14/12/18 Mon 24/12/18 100% 65% 100%

1600 Electrical Works 18,680.00 21 days Thu 10/1/19 Wed 13/2/19 NA NA 0% 0%


1601 Wiring 18,680.00 21 days Thu 10/1/19 Wed 13/2/19 NA NA 0% 0%
1602 Concealed conduit wiring 18,510.00 14 days Thu 10/1/19 Wed 30/1/19 NA NA 0% 0% 0%
1603 Surface conduit wiring 170.00 7 days Wed 30/1/19 Wed 13/2/19 NA NA 0% 0% 0%
1604 Damp Proof 1,630.00 2 days Thu 10/1/19 Mon 14/1/19 Fri 14/12/18 Fri 14/12/18 100% 0% 14/12
1605 Doors & Windows 156,126.00 21 days Mon 21/1/19 Fri 22/2/19 Mon 17/12/18 NA 54% 0%
1606 Door 73,258.00 21 days Mon 21/1/19 Fri 22/2/19 Fri 28/12/18 NA 34% 0%
1607 Precast Concrete 2,145.00 1 day Mon 21/1/19 Tue 22/1/19 Fri 28/12/18 Sat 29/12/18 100% 0% 29/12
1608 Metal Work 4,304.00 5 days Tue 22/1/19 Tue 29/1/19 Mon 31/12/18 Fri 4/1/19 100% 0%
1609 5100 x 2100 P2lk 1,224.00 5 days Tue 22/1/19 Tue 29/1/19 Mon 31/12/18 Tue 1/1/19 100% 0% 100%
1610 900 x 2100 P2ca 312.00 5 days Tue 22/1/19 Tue 29/1/19 Mon 31/12/18 Fri 4/1/19 100% 0% 100%
1611 900 x 2100 P1ca 936.00 5 days Tue 22/1/19 Tue 29/1/19 Mon 31/12/18 Fri 4/1/19 100% 0% 100%
1612 900 x 2100 PR1a 312.00 5 days Tue 22/1/19 Tue 29/1/19 Mon 31/12/18 Fri 4/1/19 100% 0% 100%
1613 850 x 2100 P62 1,520.00 5 days Tue 22/1/19 Tue 29/1/19 Mon 31/12/18 Fri 4/1/19 100% 0% 100%
1614 Wrot Pressure Treated 21,740.00 1 day Tue 29/1/19 Wed 30/1/19 NA NA 0% 0%
1620 Ironmongery 45,069.00 14 days Wed 30/1/19 Fri 22/2/19 NA NA 0% 0%
1639 Windows 82,868.00 6 days Mon 21/1/19 Tue 29/1/19 Mon 17/12/18 NA 97% 0%
1640 Metal Work 36,068.00 5 days Mon 21/1/19 Mon 28/1/19 Mon 17/12/18 Wed 2/1/19 100% 0%
1641 2400 x 2600 (PK/1/e) 8,720.00 5 days Mon 21/1/19 Mon 28/1/19 Mon 31/12/18 Wed 2/1/19 100% 0% 100%
1642 2400 x 1800 (T1/24/a) 15,000.00 5 days Mon 21/1/19 Mon 28/1/19 Mon 17/12/18 Fri 21/12/18 100% 0% 100%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 12
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1643 1800 x 1800 (T1/23/a) 6,804.00 5 days Mon 21/1/19 Mon 28/1/19 Mon 17/12/18 Fri 21/12/18 100% 0% 100%
1644 1200 x 1800 (T1/23/a) 3,024.00 5 days Mon 21/1/19 Mon 28/1/19 Mon 17/12/18 Fri 21/12/18 100% 0% 100%
1645 1800 x 600 (T1/3/b) 1,520.00 5 days Mon 21/1/19 Mon 28/1/19 Mon 17/12/18 Fri 21/12/18 100% 0% 100%
1646 1200 x 600 (T1/2/b) 1,000.00 5 days Mon 21/1/19 Mon 28/1/19 Mon 17/12/18 Fri 21/12/18 100% 0% 100%
1647 Glazing 46,800.00 1 day Mon 28/1/19 Tue 29/1/19 NA NA 0% 0%
1649 Floor Finishes 47,345.00 3.5 days Tue 29/1/19 Wed 6/2/19 NA NA 0% 0%
1657 Ceiling Finishes 41,184.00 5.5 days Wed 6/2/19 Thu 14/2/19 NA NA 0% 0%
1666 Wall Finishes 58,300.00 11.5 days Wed 6/2/19 Fri 22/2/19 Thu 20/12/18 NA 71% 0%
1686 Sanitary Fitting 20,980.00 1 day Fri 15/2/19 Mon 18/2/19 NA NA 0% 0%
1688 Sundries 11,000.00 1 day Mon 18/2/19 Tue 19/2/19 NA NA 0% 0%
1690 Plumbing Installation 39,000.00 24 days Mon 14/1/19 Wed 20/2/19 NA NA 0% 0%
1696 Electrical Works 2,050.00 4 days Fri 22/2/19 Thu 28/2/19 NA NA 0% 0%
1698 Complete Internel Wiring Blok Transit 0.00 0 days Thu 28/2/19 Thu 28/2/19 NA NA 0% 0% 28/2
1699 Completion of Blok Transit 0.00 0 days Wed 20/2/19 Wed 20/2/19 NA NA 0% 0% 25/1
1700 C10 - Pencawang Elektrik 332,479.40 431 days Wed 30/8/17 Mon 10/6/19 Wed 30/8/17 NA 73% 63%
1701 Structure Work 143,506.40 271 days Wed 30/8/17 Wed 10/10/18 Wed 30/8/17 NA 92% 100%
1702 Work Below Lowest Floor Finish Level 64,252.40 115 days Wed 30/8/17 Tue 20/2/18 Wed 30/8/17 NA 84% 100%
1703 Pile Cap 8,437.50 22 days Wed 30/8/17 Tue 3/10/17 Wed 30/8/17 Tue 3/10/17 100% 100%
1714 Stump 2,819.00 18 days Wed 4/10/17 Mon 30/10/17 Wed 4/10/17 Mon 30/10/17 100% 100%
1720 Ground Beam 41,190.90 48 days Tue 31/10/17 Tue 9/1/18 Tue 31/10/17 Tue 9/1/18 100% 100%
1731 Ground Slab 11,805.00 27 days Wed 10/1/18 Tue 20/2/18 Wed 10/1/18 NA 66% 100%
1732 Compacting 700.00 1 day Wed 10/1/18 Wed 10/1/18 Wed 10/1/18 Wed 10/1/18 100% 100% 100%
1733 Levelling 200.00 1 day Wed 10/1/18 Thu 11/1/18 Wed 10/1/18 Thu 11/1/18 100% 100% 100%
1734 Anti termite 100.00 1 day Wed 10/1/18 Fri 12/1/18 Wed 10/1/18 Fri 12/1/18 100% 100% 100%
1735 Lean Concrete 1,050.00 1 day Thu 11/1/18 Mon 15/1/18 Thu 11/1/18 Mon 15/1/18 100% 100% 100%
1736 Damp Proof 560.00 1 day Fri 12/1/18 Tue 16/1/18 Fri 12/1/18 Tue 16/1/18 100% 100% 100%
1737 Formwork 300.00 1 day Sat 13/1/18 Wed 17/1/18 Sat 13/1/18 Wed 17/1/18 100% 100% 100%
1738 Main Bar installation 3,615.00 1 day Mon 15/1/18 Thu 18/1/18 Mon 15/1/18 Thu 18/1/18 100% 100% 100%
1739 Electrical Works 0.00 20 days Fri 19/1/18 Tue 20/2/18 Fri 19/1/18 NA 50% 100%
1740 Conduit 0.00 20 days Fri 19/1/18 Tue 20/2/18 Fri 19/1/18 NA 50% 100% 50%
1741 Concreting 4,752.00 1 day Fri 12/1/18 Fri 19/1/18 Fri 12/1/18 Fri 19/1/18 100% 100% 100%
1742 Formwork Striking 528.00 1 day Wed 14/2/18 Wed 14/2/18 Wed 14/2/18 Wed 14/2/18 100% 100% 100%
1743 Ramp & Apron 16,535.00 89 days Mon 9/4/18 Thu 16/8/18 Mon 9/4/18 Thu 16/8/18 100% 100%
1758 Frame 18,950.40 39 days Mon 23/4/18 Thu 21/6/18 Mon 23/4/18 Thu 21/6/18 100% 100%
1771 Roof 43,768.60 90 days Fri 25/5/18 Wed 10/10/18 Fri 25/5/18 Wed 10/10/18 100% 100%
1783 Architectural 181,973.00 158 days Thu 21/6/18 Wed 13/2/19 Thu 21/6/18 NA 48% 16%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 13
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1784 Wall 12,160.00 73 days Thu 21/6/18 Mon 8/10/18 Thu 21/6/18 NA 85% 100%
1785 External Wall & Balustrading 5,135.00 73 days Thu 21/6/18 Mon 8/10/18 Thu 21/6/18 Mon 8/10/18 100% 100%
1786 Non Load Bearing Superstructure 4,840.00 3 days Thu 21/6/18 Mon 8/10/18 Thu 21/6/18 Mon 8/10/18 100% 100% 100%
1787 Damp Proof 155.00 1 day Tue 26/6/18 Tue 26/6/18 Tue 26/6/18 Tue 26/6/18 100% 100% 100%
1788 Cement Vent Block 140.00 1 day Tue 14/8/18 Tue 14/8/18 Tue 14/8/18 Tue 14/8/18 100% 100% 100%
1789 Internal Walls 7,025.00 45 days Thu 21/6/18 Wed 22/8/18 Thu 21/6/18 NA 74% 100%
1790 Non Load Bearing Superstructure 2,860.00 3 days Thu 21/6/18 Fri 17/8/18 Thu 21/6/18 Fri 17/8/18 100% 100% 100%
1791 Electrical Works 4,090.00 3 days Mon 20/8/18 Wed 22/8/18 Mon 20/8/18 NA 40% 100%
1792 Wiring 4,090.00 3 days Mon 20/8/18 Wed 22/8/18 Mon 20/8/18 NA 40% 100%
1793 Surface conduit wiring 4,090.00 3 days Mon 20/8/18 Wed 22/8/18 Mon 20/8/18 NA 40% 100% 40%
1794 Damp Proof 75.00 1 day Tue 26/6/18 Tue 26/6/18 Tue 26/6/18 Tue 26/6/18 100% 100% 100%
1795 Doors & Windows 139,695.00 82 days Mon 8/10/18 Thu 7/2/19 Mon 8/10/18 NA 57% 2%
1796 Door 139,695.00 82 days Mon 8/10/18 Thu 7/2/19 Mon 8/10/18 NA 57% 2%
1797 Precast Concrete 495.00 1 day Mon 8/10/18 Mon 8/10/18 Mon 8/10/18 Mon 8/10/18 100% 100% 100%
1798 Acoustic Door 11,500.00 14 days Mon 7/1/19 Thu 24/1/19 NA NA 0% 0%
1801 Electrical Works 127,700.00 7 days Fri 25/1/19 Thu 7/2/19 Fri 25/1/19 NA 74% 0%
1802 Main Switchboard 123,750.00 7 days Fri 25/1/19 Thu 7/2/19 Fri 25/1/19 NA 80% 0%
1803 Pre MSB 25,000.00 7 days Fri 25/1/19 Thu 7/2/19 Fri 25/1/19 NA 80% 0% 80%
1804 Main switchboard 60,000.00 7 days Fri 25/1/19 Thu 7/2/19 Fri 25/1/19 NA 80% 0% 80%
1805 Power factor correction board 30,000.00 7 days Fri 25/1/19 Thu 7/2/19 Fri 25/1/19 NA 80% 0% 80%
1806 Submain cable MSB 1,000.00 7 days Fri 25/1/19 Thu 7/2/19 Fri 25/1/19 NA 80% 0% 80%
1807 Earthing system 7,750.00 3 days Fri 25/1/19 Tue 29/1/19 Fri 25/1/19 NA 80% 0% 80%
1808 Submains 900.00 3 days Fri 25/1/19 Tue 29/1/19 Fri 25/1/19 NA 80% 0%
1809 DB 'PM' at Bilik PRE MSB to PRE MSB 900.00 3 days Fri 25/1/19 Tue 29/1/19 Fri 25/1/19 NA 80% 0% 80%
1810 Distribution boards 2,050.00 3 days Fri 25/1/19 Tue 29/1/19 Fri 25/1/19 NA 80% 0%
1811 8 way SPN Electro Galvanised DB 'PM' 1,000.00 3 days Fri 25/1/19 Tue 29/1/19 Fri 25/1/19 NA 80% 0% 80%
1812 10 way SPN Electro Galvanised DB 'PE' 1,050.00 3 days Fri 25/1/19 Tue 29/1/19 Fri 25/1/19 NA 80% 0% 80%
1813 Meter Kiosk 1,000.00 3 days Fri 25/1/19 Tue 29/1/19 NA NA 0% 0% 0%
1814 Floor Finishes 1,840.00 2 days Fri 25/1/19 Mon 28/1/19 Thu 20/12/18 Thu 20/12/18 100% 0% 20/12
1819 Ceiling Finishes 7,864.00 9 days Tue 29/1/19 Wed 13/2/19 Thu 27/12/18 NA 8% 0%
1820 External Ceiling Finishes 2,592.00 2 days Tue 29/1/19 Wed 30/1/19 Thu 27/12/18 NA 50% 0%
1821 Cement Board Ceiling 2,160.00 1 day Tue 29/1/19 Tue 29/1/19 Thu 27/12/18 Thu 27/12/18 100% 0% 100%
1822 Painting and Decorating 432.00 1 day Wed 30/1/19 Wed 30/1/19 NA NA 0% 0% 0%
1823 Internal Ceiling Finishes 5,272.00 7 days Thu 31/1/19 Wed 13/2/19 Thu 27/12/18 NA 0% 0%
1824 Ceiling Board 3,360.00 1 day Thu 31/1/19 Thu 31/1/19 Thu 27/12/18 Thu 27/12/18 100% 0% 27/12
1825 Painting and Decorating 672.00 1 day Mon 4/2/19 Mon 4/2/19 NA NA 0% 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 14
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1826 Electrical Works 1,240.00 5 days Thu 7/2/19 Wed 13/2/19 NA NA 0% 0%
1830 Wall Finishes 8,864.00 151 days Tue 26/6/18 Thu 7/2/19 Tue 26/6/18 NA 75% 60%
1838 Electrical Works 11,550.00 3 days Fri 8/2/19 Tue 12/2/19 NA NA 0% 0%
1844 Miscellaneous 7,000.00 142 days Mon 22/1/18 Fri 17/8/18 Mon 22/1/18 Fri 17/8/18 100% 100%
1857 Complete Internel Wiring Pencawang Elektrik 0.00 0 days Wed 13/2/19 Wed 13/2/19 NA NA 0% 0% 12/2
1858 Handling Over To Sesb 0.00 1 day Thu 14/2/19 Thu 14/2/19 NA NA 0% 0% 0%
1859 Energized Supply 0.00 1 day Mon 10/6/19 Mon 10/6/19 NA NA 0% 0% 0%
1860 Completion of Pencawang Elektrik 0.00 0 days Mon 10/6/19 Mon 10/6/19 NA NA 0% 0% 7/6
1861 C8 - Inkubator 388,665.80 365 days Fri 8/9/17 Thu 7/3/19 Fri 8/9/17 NA 69% 71%
1862 Structure Work 246,952.80 228 days Fri 8/9/17 Fri 10/8/18 Fri 8/9/17 NA 97% 100%
1863 Work Below Lowest Floor Finish Level 107,156.40 37 days Fri 8/9/17 Wed 1/11/17 Fri 8/9/17 NA 93% 100%
1864 Pile Cap 14,215.20 8 days Fri 8/9/17 Tue 19/9/17 Fri 8/9/17 Tue 19/9/17 100% 100%
1875 Stump 5,268.80 4 days Thu 21/9/17 Wed 27/9/17 Thu 21/9/17 Wed 27/9/17 100% 100%
1881 Ground Beam 46,126.80 9 days Wed 27/9/17 Mon 9/10/17 Wed 27/9/17 Mon 9/10/17 100% 100%
1894 Ground Slab 41,545.60 16 days Tue 10/10/17 Wed 1/11/17 Tue 10/10/17 NA 78% 100%
1895 Soil Filling 1,095.50 1 day Tue 10/10/17 Tue 10/10/17 Tue 10/10/17 Tue 10/10/17 100% 100% 100%
1896 Compacting 313.00 1 day Wed 11/10/17 Wed 11/10/17 Wed 11/10/17 Wed 11/10/17 100% 100% 100%
1897 Levelling 156.50 1 day Thu 12/10/17 Thu 12/10/17 Thu 12/10/17 Thu 12/10/17 100% 100% 100%
1898 Anti termite 1,580.00 1 day Fri 13/10/17 Fri 13/10/17 Fri 13/10/17 Fri 13/10/17 100% 100% 100%
1899 Lean Concrete 3,400.00 1 day Mon 16/10/17 Mon 16/10/17 Mon 16/10/17 Mon 16/10/17 100% 100% 100%
1900 Damp Proof 100.00 1 day Tue 17/10/17 Tue 17/10/17 Tue 17/10/17 Tue 17/10/17 100% 100% 100%
1901 Formwork 500.00 2 days Wed 18/10/17 Thu 19/10/17 Wed 18/10/17 Thu 19/10/17 100% 100% 100%
1902 Main Bar installation 20,000.60 2 days Fri 20/10/17 Mon 23/10/17 Fri 20/10/17 Mon 23/10/17 100% 100% 100%
1903 Electrical Works 0.00 7 days Tue 24/10/17 Wed 1/11/17 Tue 24/10/17 NA 40% 100%
1904 Conduit 0.00 7 days Tue 24/10/17 Wed 1/11/17 Tue 24/10/17 NA 40% 100% 40%
1905 Concreting 12,960.00 1 day Tue 24/10/17 Tue 24/10/17 Tue 24/10/17 Tue 24/10/17 100% 100% 100%
1906 Formwork Striking 1,440.00 1 day Wed 25/10/17 Wed 25/10/17 Wed 25/10/17 Wed 25/10/17 100% 100% 100%
1907 Ramp & Apron 11,799.40 11 days Tue 10/10/17 Wed 25/10/17 Tue 10/10/17 Wed 25/10/17 100% 100%
1920 Frame 32,995.20 28 days Thu 26/10/17 Tue 5/12/17 Thu 26/10/17 Tue 5/12/17 100% 100%
1933 Upper Floor 9,036.80 23 days Thu 2/11/17 Tue 5/12/17 Thu 2/11/17 Tue 5/12/17 100% 100%
1941 Roof 85,965.00 139 days Thu 18/1/18 Fri 10/8/18 Thu 18/1/18 Fri 10/8/18 100% 100%
1956 Architectural 125,813.00 307 days Fri 1/12/17 Thu 7/3/19 Fri 1/12/17 NA 36% 37%
1957 Wall 23,415.00 278 days Fri 1/12/17 Tue 22/1/19 Fri 1/12/17 NA 73% 86%
1958 External Wall & Balustrading 14,665.00 278 days Fri 1/12/17 Tue 22/1/19 Fri 1/12/17 NA 78% 78%
1965 Internal Walls 8,750.00 207 days Fri 1/12/17 Tue 9/10/18 Fri 1/12/17 NA 64% 100%
1966 Non Load Bearing Superstructure 3,630.00 1 day Fri 1/12/17 Thu 4/10/18 Fri 1/12/17 Thu 4/10/18 100% 100% 100%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 15
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
1967 Electrical Works 5,010.00 3 days Fri 5/10/18 Tue 9/10/18 Fri 5/10/18 NA 40% 100%
1968 Wiring 5,010.00 3 days Fri 5/10/18 Tue 9/10/18 Fri 5/10/18 NA 40% 100%
1969 Concealed conduit wiring 5,010.00 3 days Fri 5/10/18 Tue 9/10/18 Fri 5/10/18 NA 40% 100% 40%
1970 Damp Proof 110.00 1 day Tue 5/12/17 Tue 5/12/17 Tue 5/12/17 Tue 5/12/17 100% 100% 100%
1971 Doors & Windows 40,405.00 286 days Wed 3/1/18 Wed 6/3/19 Wed 3/1/18 NA 13% 12%
2005 Floor Finishes 5,815.00 6 days Mon 13/8/18 Mon 20/8/18 Mon 13/8/18 Mon 20/8/18 100% 100%
2006 External Floor Finishes 1,360.00 1 day Mon 13/8/18 Mon 13/8/18 Mon 13/8/18 Mon 13/8/18 100% 100%
2007 Cement Render 1,360.00 1 day Mon 13/8/18 Mon 13/8/18 Mon 13/8/18 Mon 13/8/18 100% 100% 100%
2008 Internal Floor Finishes 4,455.00 5 days Tue 14/8/18 Mon 20/8/18 Tue 14/8/18 Mon 20/8/18 100% 100%
2009 Cement Render 3,640.00 3 days Tue 14/8/18 Thu 16/8/18 Tue 14/8/18 Thu 16/8/18 100% 100% 100%
2010 Bed & Backing 160.00 1 day Fri 17/8/18 Fri 17/8/18 Fri 17/8/18 Fri 17/8/18 100% 100% 100%
2011 Semi Glazed Homogeneous Tiling 655.00 1 day Mon 20/8/18 Mon 20/8/18 Mon 20/8/18 Mon 20/8/18 100% 100% 100%
2012 Ceiling Finishes 23,184.00 7 days Tue 22/1/19 Wed 30/1/19 NA NA 0% 0%
2022 Wall Finishes 25,564.00 254 days Thu 22/2/18 Thu 7/3/19 Thu 22/2/18 NA 47% 47%
2039 Sanitary Fitting 5,430.00 4 days Tue 29/1/19 Mon 4/2/19 NA NA 0% 0%
2041 Sundries 2,000.00 0 days Tue 5/2/19 Tue 5/2/19 NA NA 0% 0%
2043 Plumbing Installation 15,000.00 210 days Mon 2/4/18 Tue 12/2/19 Mon 2/4/18 NA 43% 43%
2050 Electrical Works 900.00 3 days Tue 29/1/19 Thu 31/1/19 NA NA 0% 0%
2051 Earthing system 900.00 3 days Tue 29/1/19 Thu 31/1/19 NA NA 0% 0% 0%
2052 Complete Internel Wiring Inkubator 0.00 0 days Thu 31/1/19 Thu 31/1/19 NA NA 0% 0% 31/1
2053 Completion of Inkubator 0.00 0 days Wed 6/3/19 Wed 6/3/19 NA NA 0% 0% 1/2
2054 C5 - Surau 401,538.80 477.5 days Thu 23/3/17 Fri 8/3/19 Thu 23/3/17 NA 74% 77%
2055 Structure Work 233,037.80 455.5 days Thu 23/3/17 Mon 4/2/19 Thu 23/3/17 NA 87% 93%
2056 Work Below Lowest Floor Finish Level 123,818.40 102 days Thu 23/3/17 Tue 22/8/17 Thu 23/3/17 NA 97% 100%
2057 Pad Footing 51,857.40 21 days Thu 23/3/17 Thu 20/4/17 Thu 23/3/17 Thu 20/4/17 100% 100%
2070 Stump 9,620.20 5 days Wed 19/4/17 Tue 25/4/17 Wed 19/4/17 Tue 25/4/17 100% 100%
2076 Ground Beam 40,700.80 27 days Wed 26/4/17 Wed 7/6/17 Wed 26/4/17 Wed 7/6/17 100% 100%
2088 Ground Slab 21,640.00 50 days Fri 9/6/17 Tue 22/8/17 Fri 9/6/17 NA 84% 100%
2089 Soil Filling 700.00 1 day Fri 9/6/17 Fri 9/6/17 Fri 9/6/17 Fri 9/6/17 100% 100% 100%
2090 Compacting 200.00 1 day Fri 21/7/17 Fri 21/7/17 Fri 21/7/17 Fri 21/7/17 100% 100% 100%
2091 Levelling 100.00 1 day Sat 22/7/17 Mon 24/7/17 Sat 22/7/17 Mon 24/7/17 100% 100% 100%
2092 Lean Concrete 1,800.00 1 day Tue 25/7/17 Tue 25/7/17 Tue 25/7/17 Tue 25/7/17 100% 100% 100%
2093 Damp Proof 880.00 1 day Thu 27/7/17 Thu 27/7/17 Thu 27/7/17 Thu 27/7/17 100% 100% 100%
2094 Wire Mesh Installation 9,800.00 1 day Fri 28/7/17 Fri 28/7/17 Fri 28/7/17 Fri 28/7/17 100% 100% 100%
2095 Electrical Works 0.00 3 days Tue 1/8/17 Thu 3/8/17 Tue 1/8/17 NA 40% 100%
2096 Conduit 0.00 3 days Tue 1/8/17 Thu 3/8/17 Tue 1/8/17 NA 40% 100% 40%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 16
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
2097 Concreting 7,344.00 1 day Sat 19/8/17 Mon 21/8/17 Sat 19/8/17 Mon 21/8/17 100% 100% 100%
2098 Formwork Striking 816.00 1 day Tue 22/8/17 Tue 22/8/17 Tue 22/8/17 Tue 22/8/17 100% 100% 100%
2099 Ramp & Apron 9,000.00 54 days Thu 8/6/17 Fri 25/8/17 Thu 8/6/17 Fri 25/8/17 100% 100%
2111 Frame 34,514.40 32 days Mon 4/9/17 Thu 19/10/17 Mon 4/9/17 Thu 19/10/17 100% 100%
2132 Roof 65,705.00 273.5 days Wed 20/12/17 Mon 4/2/19 Wed 20/12/17 NA 33% 60%
2133 Roof Trusses 31,270.00 256 days Wed 20/12/17 Tue 8/1/19 Wed 20/12/17 NA 25% 83%
2134 Steel Roof Trusses (2 Degree) 20,020.00 3 days Wed 20/12/17 Fri 22/12/17 Wed 20/12/17 Fri 22/12/17 100% 100% 100%
2135 Steel Roof Trusses (10 Degree) 11,250.00 9 days Wed 26/12/18 Tue 8/1/19 NA NA 0% 78% 0%
2136 Roof Decking and Wall Cladding 27,125.00 248 days Tue 9/1/18 Mon 14/1/19 Tue 9/1/18 NA 44% 44%
2137 Underlay 8,680.00 245 days Tue 9/1/18 Wed 9/1/19 Tue 9/1/18 NA 50% 50%
2138 Aluminium Foil insulation (50%) 1,627.50 1 day Tue 9/1/18 Tue 9/1/18 Tue 9/1/18 Tue 9/1/18 100% 100% 100%
2139 Aluminium Foil insulation (50%) 1,627.50 1 day Wed 9/1/19 Wed 9/1/19 NA NA 0% 0% 0%
2140 RockWool Insulation (50%) 2,712.50 1 day Fri 12/1/18 Fri 12/1/18 Fri 12/1/18 Fri 12/1/18 100% 100% 100%
2141 RockWool Insulation (50%) 2,712.50 1 day Wed 9/1/19 Wed 9/1/19 NA NA 0% 0% 0%
2142 Covering Slope ( 2 degree) 12,155.00 2 days Sun 14/1/18 Tue 16/1/18 Sun 14/1/18 Tue 16/1/18 100% 100% 100%
2143 Covering Slope ( 10 degree) 6,290.00 3 days Thu 10/1/19 Mon 14/1/19 NA NA 0% 0% 0%
2144 Sheet Metal Flashing 5,800.00 243.5 days Wed 17/1/18 Wed 16/1/19 Wed 17/1/18 NA 50% 50%
2145 Gutter Fascia Clading (50%) 2,350.00 1 day Wed 17/1/18 Fri 19/1/18 Wed 17/1/18 Fri 19/1/18 100% 100% 100%
2146 Gutter Fascia Clading (50%) 2,350.00 1 day Tue 15/1/19 Tue 15/1/19 NA NA 0% 0% 0%
2147 Girth Flashing 1,100.00 1 day Wed 17/1/18 Wed 16/1/19 Wed 17/1/18 NA 50% 50% 50%
2148 Rain Water Installation 1,510.00 12 days Wed 16/1/19 Mon 4/2/19 NA NA 0% 0%
2149 UPVC Gutter System 750.00 1 day Wed 16/1/19 Thu 17/1/19 NA NA 0% 0% 0%
2150 UPVC RWDP System 760.00 1 day Thu 31/1/19 Mon 4/2/19 NA NA 0% 0% 0%
2151 Architectural 156,551.00 320.5 days Tue 14/11/17 Fri 8/3/19 Tue 14/11/17 NA 47% 45%
2152 Wall 53,080.00 320.5 days Tue 14/11/17 Fri 8/3/19 Tue 14/11/17 NA 68% 75%
2153 External Wall & Balustrading 27,705.00 320.5 days Tue 14/11/17 Fri 8/3/19 Tue 14/11/17 NA 71% 71%
2157 Internal Walls Partition 25,375.00 293 days Tue 14/11/17 Thu 24/1/19 Tue 14/11/17 NA 67% 77%
2158 Non Load Bearing Superstructure 7,095.00 5 days Tue 14/11/17 Mon 4/12/17 Tue 14/11/17 Mon 4/12/17 100% 100% 100%
2159 Electrical Works 4,190.00 5 days Tue 5/12/17 Mon 11/12/17 Tue 5/12/17 NA 40% 100%
2160 Wiring 4,190.00 5 days Tue 5/12/17 Mon 11/12/17 Tue 5/12/17 NA 40% 100%
2161 Concealed conduit wiring 4,190.00 5 days Tue 5/12/17 Mon 11/12/17 Tue 5/12/17 NA 40% 100% 40%
2162 Metal Works 10,090.00 2 days Tue 22/1/19 Wed 23/1/19 Tue 18/12/18 Wed 19/12/18 100% 0%
2163 Aluminium Frame 4,090.00 1 day Tue 22/1/19 Tue 22/1/19 Tue 18/12/18 Tue 18/12/18 100% 0% 18/12
2164 Aluminium Louvres 6,000.00 1 day Wed 23/1/19 Wed 23/1/19 Wed 19/12/18 Wed 19/12/18 100% 0% 100%
2165 Wood Works 4,000.00 1 day Thu 24/1/19 Thu 24/1/19 NA NA 0% 0%
2167 Floor Finishes 10,996.00 103 days Wed 29/8/18 Mon 4/2/19 Wed 29/8/18 NA 20% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 17
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
2174 Ceiling Finishes 17,640.00 2 days Tue 5/2/19 Fri 8/2/19 NA NA 0% 0%
2181 Wall Finishes 50,485.00 228 days Thu 8/3/18 Wed 13/2/19 Thu 8/3/18 NA 61% 59%
2199 Fitting & Furnishing 2,490.00 1 day Tue 12/2/19 Tue 12/2/19 NA NA 0% 0%
2201 Sanitary Fitting 4,360.00 9 days Wed 13/2/19 Mon 25/2/19 NA NA 0% 0%
2204 Sundries 17,500.00 2 days Tue 26/2/19 Wed 27/2/19 NA NA 0% 0%
2206 Plumbing Installation 11,950.00 111 days Mon 27/8/18 Wed 13/2/19 Mon 27/8/18 NA 89% 89%
2213 Complete Internel Wiring Surau 0.00 0 days Wed 13/2/19 Wed 13/2/19 NA NA 0% 0% 13/2
2214 Completion of Surau 0.00 0 days Wed 27/2/19 Wed 27/2/19 NA NA 0% 0% 14/1
2215 C6 - Rumah Contoh 160,992.60 477 days Thu 23/3/17 Thu 7/3/19 Thu 23/3/17 NA 88% 87%
2216 Structure Work 119,186.60 196 days Thu 23/3/17 Wed 10/1/18 Thu 23/3/17 Wed 10/1/18 100% 100%
2298 Architectural 39,806.00 314 days Wed 22/11/17 Thu 7/3/19 Wed 22/11/17 NA 49% 43%
2299 Wall 5,945.00 4 days Wed 22/11/17 Mon 27/11/17 Wed 22/11/17 Mon 27/11/17 100% 100%
2306 Doors & Windows 13,796.00 57.6 days Tue 13/11/18 Fri 8/2/19 Tue 13/11/18 NA 40% 25%
2307 Door 7,626.00 55.6 days Tue 13/11/18 Mon 4/2/19 Tue 13/11/18 NA 33% 33%
2308 Precast Concrete 330.00 1 day Tue 13/11/18 Wed 14/11/18 Tue 13/11/18 Wed 14/11/18 100% 100% 100%
2309 Metal Frame Door 750.00 3 days Thu 22/11/18 Tue 27/11/18 Thu 22/11/18 Tue 27/11/18 100% 100%
2310 900 x 2100 P1 300.00 1 day Thu 22/11/18 Fri 23/11/18 Thu 22/11/18 Fri 23/11/18 100% 100% 100%
2311 900 x 2100 P2 300.00 1 day Fri 23/11/18 Mon 26/11/18 Fri 23/11/18 Mon 26/11/18 100% 100% 100%
2312 750 x 2100 P3 150.00 1 day Mon 26/11/18 Tue 27/11/18 Mon 26/11/18 Tue 27/11/18 100% 100% 100%
2313 Woodwork 2,250.00 3 days Mon 28/1/19 Wed 30/1/19 NA NA 0% 0%
2317 Painting and Decorating 96.00 1 day Thu 31/1/19 Thu 31/1/19 NA NA 0% 0% 0%
2318 Ironmongery 4,200.00 1 day Fri 1/2/19 Mon 4/2/19 NA NA 0% 0%
2323 Windows 6,170.00 2 days Tue 5/2/19 Fri 8/2/19 Thu 20/12/18 NA 67% 0%
2324 Precast Concrete 660.00 1 day Tue 5/2/19 Tue 5/2/19 Thu 20/12/18 Thu 20/12/18 100% 0% 20/12
2325 Windows casement 4,210.00 2 days Wed 6/2/19 Thu 7/2/19 Fri 21/12/18 Mon 24/12/18 100% 0% 100%
2326 Glazing 1,300.00 1 day Fri 8/2/19 Fri 8/2/19 NA NA 0% 0% 0%
2327 Floor Finishes 1,865.00 14 days Mon 11/2/19 Thu 28/2/19 NA NA 0% 0%
2334 Ceiling Finishes 5,832.00 4 days Fri 1/3/19 Wed 6/3/19 NA NA 0% 0%
2341 Wall Finishes 8,298.00 268 days Tue 30/1/18 Thu 7/3/19 Tue 30/1/18 NA 75% 75%
2351 Sanitary Fitting 4,070.00 254 days Fri 16/2/18 Mon 4/3/19 Fri 16/2/18 NA 50% 50%
2354 Plumbing Installation 2,000.00 1 day Tue 20/2/18 Tue 20/2/18 Tue 20/2/18 Tue 20/2/18 100% 100%
2355 Sundries 2,000.00 1 day Tue 20/2/18 Tue 20/2/18 Tue 20/2/18 Tue 20/2/18 100% 100%
2356 Piping work 2,000.00 1 day Tue 20/2/18 Tue 20/2/18 Tue 20/2/18 Tue 20/2/18 100% 100% 100%
2357 Completion of Rumah Contoh 0.00 1 day Tue 5/3/19 Tue 5/3/19 NA NA 0% 0% 0%
2358 C7 - Pondok Pengawal 80,165.20 52 days Tue 29/1/19 Tue 16/4/19 Fri 11/1/19 NA 2% 0%
2511 C9 - Rumah Sampah 42,754.40 48.5 days Tue 29/1/19 Wed 10/4/19 NA NA 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 18
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
2591 Fire Fighting System 71,302.00 7 days Thu 11/4/19 Mon 22/4/19 NA NA 0% 0% 0%
2592 External Works 3,035,303.40 365.4 days Mon 4/12/17 Tue 4/6/19 Mon 4/12/17 NA 31% 43%
2593 Stone Rubble Wall 92,028.00 34 days Tue 19/2/19 Mon 8/4/19 NA NA 0% 0%
2603 Water Reticulation 243,845.00 178.4 days Tue 14/8/18 Thu 9/5/19 Tue 14/8/18 NA 0% 0%
2628 Sewerage 262,288.40 352.4 days Mon 4/12/17 Mon 13/5/19 Mon 4/12/17 NA 44% 66%
2689 Surface Water Drainage 1,188,374.00 64 days Wed 20/2/19 Thu 23/5/19 NA NA 0% 0%
2797 Electrical Works 310,675.00 3 days Thu 23/5/19 Tue 28/5/19 Wed 3/4/19 NA 58% 0%
2798 Underground cable & Outdoor Lighting 310,675.00 3 days Thu 23/5/19 Tue 28/5/19 Wed 3/4/19 NA 58% 0%
2799 Ducting & Pit 2,400.00 1 day Thu 23/5/19 Fri 24/5/19 NA NA 0% 0%
2800 150mm dia. uPVC pipe Class D for 2,400.00 1 day Thu 23/5/19 Fri 24/5/19 NA NA 0% 0% 0%
road crossing
2801 XLPE/SWA/PVC cables 230,975.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0%
2802 3 Nos 4C 240mm Pre MSB To MSB 144,000.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%

2803 2 Nos 4C 185mm MSB To SSB ' BFL ' 48,000.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%
Bengkel Kursus Teknologi Kimpalan
& Fabrikasi Logam
2804 2 Nos 4C 240mm TNB Kiosk 12,000.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%
Metering Panel To PRE MSB
2805 4C 95mm MSB To SSB ' BFE ' 12,800.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%
Bengkel Kursus Pendawaian Elektrik

2806 4C 25mm MSB To SSB ' TRANSIT ' 5,525.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%
Blok Transit
2807 2C 50mm SSB 'BPE' To DB 'PP' 3,900.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%
Pondok Pengawal
2808 2C 25mm SSB 'TRANSIT' To DB 'S' 2,500.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%
Surau
2809 2C 25mm SSB 'TRANSIT' To DB 'RC' 2,250.00 3 days Thu 23/5/19 Tue 28/5/19 Thu 23/5/19 NA 80% 0% 80%
Rumah Contoh
2810 PVC/SWA/PVC cables 18,000.00 3 days Thu 23/5/19 Tue 28/5/19 NA NA 0% 0%
2812 Outdoor Lighting 59,300.00 3 days Thu 23/5/19 Tue 28/5/19 NA NA 0% 0%
2816 Roads 740,465.00 32 days Wed 13/3/19 Fri 26/4/19 NA NA 0% 0%
2843 Fencing & Gates 149,340.00 12 days Fri 26/4/19 Wed 15/5/19 NA NA 0% 0%
2850 Turfing 28,008.00 6 days Wed 15/5/19 Fri 24/5/19 NA NA 0% 0%
2854 Flag Poles 20,280.00 3.6 days Fri 24/5/19 Fri 31/5/19 NA NA 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 19
INFOLADA ENGINEERING (M) SDN BHD CADANGAN PEMBINAAN SEMULA GIATMARA WILAYAH PERSEKUTUAN LABUAN PROPOSAL WORK PROGRAM REV 2
ID Task Task Name Baseline1 Cost Baseline1 Baseline1 Start Baseline1 Finish Actual Start Actual Finish % Complete Scheduled 04
Half 1, 2016
Half 2, 2016
Half 1, 2017
Half 2, 2017
Half 1, 2018
Half 2, 2018
Half 1, 2019
Half 2, 2019
Mode Duration Jan 2019 M J S N J M M J S N J M M J S N J M M J S N
2857 Survey Works for External Works 0.00 5 days Fri 24/5/19 Tue 4/6/19 NA NA 0% 0% 0%
2858 Complete External Works Electric 0.00 0 days Tue 28/5/19 Tue 28/5/19 NA NA 0% 0% 28/5
2859 Prime Cost Sum And Provisional Sum 80,000.00 7 days Fri 24/5/19 Mon 10/6/19 NA NA 0% 0%
2862 Electrical Works 6,940.00 26.9 days Mon 22/4/19 Tue 4/6/19 NA NA 0% 0%
2876 Pre-Completion 66,200.00 90.5 days Wed 6/3/19 Thu 18/7/19 NA NA 0% 0%
2917 Completion 20,500.00 1 day Thu 18/7/19 Thu 18/7/19 NA NA 0% 0%

Task Duration-only Path Predecessor Summary Task


Split Manual Summary Rollup Path Predecessor Normal Task
Milestone Manual Summary Path Driving Predecessor Milestone Task
Summary Start-only Path Driving Predecessor Summary Task
Project: JKRWPL_BGN_GIATMAR
Date: &[04/01/2019] Project Summary Finish-only Path Driving Predecessor Normal Task
Inactive Task External Tasks Progress
Inactive Milestone External Milestone Manual Progress
Inactive Summary Deadline
Manual Task Path Predecessor Milestone Task

Page 20