MAIN CONTRACTOR CLIENT CLIENT CONSULTANT

PROJECT CONSTRUCTION OF 132kV MADINAT SHINAS PROJECT NO : 113/2015


SUBJECT SITE TEST REPORT LOCATION: 132kV GIS

FEEDER NAME 132kV OHL-1/=E05 MAKE:SIEMENS


EQUIPEMENT CURRENT TRANSFORMER DATE : 14-09-2017 PAGE : 1 of 3

1. NAME PLATE DETAILS

Phase R Y B
Make SIEMENS
Serial No.(T1) 16/157686
Serial No.(T2) 16/157690

Core-1 Core-2 Core-3 Core-4 Core-5


Bus Bar

P1 P2
P2 P1 FEEDER

1S 1S 2S 2S 3S 3S 1S 1S 2S 2S
11 2 1 2 1 2 1 2

Terminal 1S1-1S2(-T1) 2S1-2S2(-T1) 3S1-3S2(-T1) 1S1-1S2(-T2) 1S1-1S2(-T2)


Ratio Pri.(A) 2000 2000 2000 3000 3000
Sec(A) 1 1 1 1 1
CLASS PX PX 5P20 PX PX
Vk or Ual (V)> ≥800V ≥800V -- ≥300V ≥300V
Imag(mA)atVK/2 < ≤15mA ≤15mA -- ≤20mA ≤20mA
R CT(Ohms) < ≤6 ≤6 ≤4 ≤8 ≤8
Burden (VA) -- -- 20VA --
X610- X620- X630- X640- X650-
R phase
12,11 12,11 12,11 11,12 11,12
CT TB.
X610- X620- X630- X640- X650-
Ter. No Y phase
22,21 22,21 22,21 21,22 21,22
in LCC-
X610- X620- X630- X640- X650-
B phase
32,31 32,31 32,31 31,32 31,32
50BF1+50BF2 BUSBAR BUSBAR
87L+21/21N+ 87L+67N+
Function + PROTECTION PROTECTION
67N+DEF1 DEF2
METERING (87BZ) (87BZC)
MAIN CONTRACTOR CLIENT CLIENT CONSULTANT
PROJECT CONSTRUCTION OF 132kV MADINAT SHINAS PROJECT NO : 113/2015
SUBJECT SITE TEST REPORT LOCATION: 132kV GIS

FEEDER NAME 132kV OHL-1/=E05 MAKE:SIEMENS


EQUIPEMENT CURRENT TRANSFORMER DATE : 14-09-2017 PAGE : 2 of 3

2. MECHNICAL AND ELECTRICAL CHECKS

  R Phase Y Phase B Phase


General visual inspection OK OK OK
Name plate OK OK OK
Tightness & ferrule check at ct sec. Terminals OK OK OK
Tightness & ferrule check at ct sec. Terminal blk OK OK OK
Position of P1 - towards bus bar(T1)&(T2) OK OK OK

3. INSULATION RESISTANCE MEASUREMENT.

Notes: Confirm Isolation of the CT Terminal Blocks links. IR Values to be measured up to LCC CT Terminal
Blocks. Time duration of test voltage applied 60 Secs.
Ambient Temperature(t)- 32ºC

DC R Phase(GΩ) Y Phase(GΩ) B Phase(GΩ)


Voltage CT + Lead up to CT + Lead up to CT + Lead up to
  Applied LCC Terminals LCC Terminals LCC Terminals
Primary to Earth(-T1) 5000V 45.2 64.8 82.2
Primary to Core 1(-T1) 5000V 44.9 36.8 21.6
Primary to Core 2(-T1) 5000V 62.6 46.5 22.5
Primary to Core 3(-T1) 5000V 65.4 38.8 32.1
Core1 to Earth(-T1) 500V 6.42 5.9 5.65
Core2 to Earth(-T1) 500V 3.90 3.5 3.50
Core3 to Earth(-T1) 500V 4.37 3.6 4.09
Core1 to Core2 500V 8.83 9.48 9.50
Core2 to Core3 500V 5.27 7.07 8.09
Core1 to Core3 500V 8.61 9.55 10.2
Primary to Earth(-T2) 5000V 45.2 64.8 82.2
Primary to Core 1(-T2) 500V 65.7 29.2 42.2
Primary to Core 2(-T2) 500V 74.7 26.2 69.1
Core1 to Earth(-T2) 500V 3.64 3.41 3.63
Core2 to Earth(-T2) 500V 4.0 3.49 3.65
Core1 to Core2(-T2) 500V 7.19 6.93 7.50
MAIN CONTRACTOR CLIENT CLIENT CONSULTANT
PROJECT CONSTRUCTION OF 132kV MADINAT SHINAS PROJECT NO : 113/2015
SUBJECT SITE TEST REPORT LOCATION: 132kV GIS

FEEDER NAME 132kV OHL-1/=E05 MAKE:SIEMENS


EQUIPEMENT CURRENT TRANSFORMER DATE : 14-09-2017 PAGE : 3 of 3

4. Refer attached results for Polarity,Winding resistance, Magnetising curves & Ratio Tests
T1 R Phase
E05 (T1)R PH-1S1-1S2
E05 (T1)R PH-2S1-2S2
E05 (T1)R PH-3S1-3S2
T1 Y Phase
E05 (T1)Y PH-1S1-1S2
E05 (T1)Y PH-2S1-2S2
E05 (T1)Y PH-3S1-3S2
T1 B Phase
E05 (T1)B PH-1S1-1S2
E05 (T1)B PH-2S1-2S2
E05 (T1)B PH-3S1-3S2
T2 R Phase
E05 (T2)R PH-1S1-1S2
E05 (T2)R PH-2S1-2S2
T2 Y Phase
E05 (T2)Y PH-1S1-1S2
E05 (T2)Y PH-2S1-2S2
T2 B Phase
E05 (T2)B PH-1S1-1S2
E05 (T2)B PH-2S1-2S2

Testing Instruments Details


Particulars Make Type Sr.No. Cal. Due Date
Insulation Tester Megger MIT 510/2 1000-371/081008/1197 27-03-2018
CT Analyzer Omicron CT Analyzer BL262V 4-APR-2018

TESTED BY CONTRACTOR WITNESSED / REVIEWED BY WITNESS/APPROVED BY

SIGNATURE

NAME

DATE

ORGANISATION SIEMENS/SNCC EPE OETC