Contract Announcements

August 28, 2013 through January 21, 2009


Foster Wheeler AG (Nasdaq: FWLT) is a leading engineering and construction company and power equipment supplier.
Note: EPC/CM = Engineering, Procurement, Construction/Construction Management
FEED = Front-End Engineering Design
PMC = Project Management Consultancy
E&C = Global Engineering & Construction Group
Power = Global Power Group
N/S = Not stated
LNG = Liquefied Natural Gas
CFB = Circulating Fluidized-Bed
BFB = Bubbling Fluidized-Bed
PC = Pulverized Coal
ITB = Invitation to Bid

Please be advised that the information in these news releases was accurate as of the date the release was issued (the dateline) but does not reflect any later changes or developments. There is no duty
on the part of Foster Wheeler to update the information.

Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

2013
8-29-13 2Q2013 E&C Study 4Q2013 Oil & Gas Norway: A subsidiary of the Global Engineering and Construction Group has been awarded a contract
by Statoil to undertake a feasibility study for the upgrade of the Statoil’s Mongstad Refinery in Norway.
The project aims to address crude feedstock flexibility requirements and to increase diesel production,
including the production of ultra-low sulfur diesel. The upgrade is expected to include the installation
of a new vacuum distillation unit, together with new diesel hydrotreaters.
8-6-13 3Q2013 E&C Study 3Q2013 Other Liberia: A subsidiary of the Global Engineering and Construction Group has been awarded a concept
study by Western Cluster Limited for power plant facilities to serve planned iron ore mines in Liberia.
(Minerals WCL plans to build three iron ore mines in Liberia. The study to be undertaken by Foster Wheeler will
& Metals) investigate various options for greenfield captive power facilities to meet the mine’s power demands.
8-5-13 2Q2013 E&C EPC Chemical Mont Belvieu, Texas: A subsidiary of the Global Engineering and Construction Group has been
awarded an engineering, procurement and construction (EPC) contract by Enterprise Products
Operating LLC for a propane dehydrogenation unit (PDH) and associated power, utilities and
infrastructure.
8-01-13 2Q2013 E&C Project 4Q2014 Oil & Gas Venezuela: A subsidiary of the Global Engineering and Construction Group has been awarded a project
Management management contract by Cardon IV S.A. for new production facilities for the Perla Field in the Gulf of
Venezuela. The new facilities will be comprised of offshore structures, trees, controls, offshore
processing, subsea flowlines, export pipelines, the shore approach and utilities facilities from the
wellheads to an onshore gas plant, and tie-in to an existing gas and condensate pipeline system.

2
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

7-30-13 2Q2013 E&C PMC 2017 Refining Vietnam: A subsidiary of the Global Engineering and Construction Group has been awarded a project
management and consultancy (PMC) services contract by the Nghi Son Refinery & Petrochemical
Limited Liability Company for its Nghi Son Refinery & Petrochemical complex. The complex will
include an integrated refinery, processing 200,000 barrels of oil per stream day.
7-29-13 2Q2013 E&C EPCm Chemical LOUISIANA, USA: A subsidiary of the Global Engineering and Construction Group has been
awarded a contract by The Dow Chemical Company to provide detailed engineering, procurement and
construction management (EPCm) services for the LA-3 Crack More Ethane (CME) project at Dow’s
Plaquemine petrochemical facility in Louisiana, USA.
7-8-13 N/A E&C Master Service HOUSTON, TX USA: A subsidiary of the Engineering and Construction Group signed a Master
Agreement Service Agreement with Enterprise Products to support the capital project program for Enterprise. FW
will provide services for multiple projects that will be awarded in a release arrangement.

6-13-13 N/A E&C Cooperation Oil & Gas SHANGHAI, CHINA: A subsidiary of the Engineering and Construction Group signed a cooperation
Agreement agreement with Clariant International AG and Wison Engineering to build a pilot plant to demonstrate
Foster Wheeler’s VESTA substitute natural gas (SNG) technology. The pilot plant will be constructed
in China and is planned to go on-stream during 2013.
5-7-13 1Q2013 E&C FEED 1Q2014 Refining MOSCOW, RUSSIA: A subsidiary of the Engineering and Construction Group has been awarded a
contract by OJSC Gazpromneft Moscow Refinery to provide front-end engineering design (FEED) and
design documentation in accordance with Russian norms, for a major investment, termed the Combined
Oil Refinery Unit (CORU) Project. Foster Wheeler was previously awarded the process design
package for the facilities’ crude and vacuum distillation units and the gas plant.

4-9-13 1Q2013 Power Design & Supply 1Q2014 Power ASKEATON, IRELAND: A subsidiary of the Global Power Group has been awarded a contract by
Aughinish Alumina Refinery for the design and supply of two shop-assembled steam generators located
at the alumina facility. Foster Wheeler will design and supply the package steam generators including
auxiliary equipment and technical advisory services for the project. The two steam generators will be
designed to generate a total of 300 tons per hour of reliable, high-pressure superheated steam which will
be fed to the plant’s process steam system.
4-2-13 1Q2013 E&C Feasibility Study, Mid-2013 Chemicals PUNTA ARENAS, CHILE: A subsidiary of the Global Engineering and Construction Group has
Conceptual and been awarded a contract by Pecket Energy to perform feasibility, conceptual and basic engineering
basic engineering studies, and develop an overall investment costs estimate for a substitute natural gas (SNG) production
studies facility. The main objective of the project is to produce syngas that will be used as a clean feedstock
for the production of SNG, which gas is intended to be distributed to the existing grid in the region of
Magallanes, Chile for domestic consumption or for industrial purposes.
4-2-13 1Q2013 E&C Consultancy 1Q2015 Oil & Gas CAIRO, EGYPT: Subsidiaries of the Global Engineering and Construction Group have been awarded
Services contracts by Apache Khalda Corporation LDC (Apache Khalda) for the provision of technical
consultancy services to oversee engineering, procurement and construction (EPC) phase of the Qasr
Compression Project in Egypt. The Qasr Compression Project will provide additional compression of

3
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

the existing facilities at the Qasr gas condensate field, in the Western Desert, approximately 525km
west of Cairo.

3-26-13 Work will be E&C Engineering and Refining UNITED KINGDOM: A subsidiary of the Global Engineering and Construction Group has signed an
released as project support evergreen agreement with Valero Energy Ltd. (Valero) for the provision of home office front-end
bookings are services engineering and project support services to Valero’s Pembroke Refinery and other facilities in the UK.
recorded Foster Wheeler will provide other support services including project control and cost estimating.
FEED
3-15-13 1Q2013 GPG Design & Supply 3Q2015 Power DANGJIN, SOUTH CHUNGCHEONG PROVINCE, SOUTH KOREA: A subsidiary of the
Global Power Group has been awarded a contract by GS E&C EPS, for the design and supply of a
circulating fluidized-bed (CFB) steam generator. Foster Wheeler will design and supply the 105 MWe
(gross megawatt electric) CFB steam generator and auxiliary equipment for the boiler island, including
a Foster Wheeler baghouse for flue gas cleaning.
2-28-13 1Q2013 Power Design and Supply 2015 Power SOUTHERN MINDANAO, PHILIPPINES: A subsidiary of its Global Power Group has been
awarded a contract by Daelim Industries Co., Ltd. for the design and supply of one circulating
fluidized-bed (CFB) steam generator for the SM200 Phase 1 Coal Fired Power Station for Sarangani
Energy Corporation, a joint venture between Alsons Consolidated Resources, Inc. and Toyota Group.
Foster Wheeler will design and supply the 100 MWe (net megawatt electric) CFB steam generator plus
auxiliary equipment for the project.
2-21-13 1Q2013 E&C Study Oil & Gas UNITED KINGDOM: The Global Engineering and Construction Group has been awarded a study
contract by the Energy Technologies Institute (ETI). The five month study will assess the economics of
flexible power generation systems which involve the production of hydrogen from coal, biomass or
natural gas, the intermediate storage of hydrogen (for example in underground salt caverns) and the
production of power in flexible turbines. Foster Wheeler will execute the study in collaboration with
the British Geological Survey.
2-21-13 1Q2013 Power Design and Supply 4Q2014 Power BLAYDIN POINT, NORTHERN TERRITORY, AUSTRALIA: The Global Power Group has been
awarded a contract by the joint venture comprised of CH2M Australia Pty Ltd. and UGL Engineering
Pty Ltd. for the design and supply of three utility package steam generators located at the Ichthys
Project onshore LNG facilities. The three steam generators will be designed to generate a total of 278
tonnes per hour of reliable, high-pressure superheated steam which will be fed to the customer’s steam
header.
2-14-13 Bookings will E&C Basic engineering Refining ASIA: The Global Engineering and Construction Group has signed a global Enterprise Framework
be made as package support Agreement (EFA) with Shell Global Solutions International B.V. (“Shell”). Shell may request Foster
work is Wheeler to provide support in the preparation of basic engineering packages for the following Shell
released. Technologies: distillation, hydrocracking, hydrotreating, thermal conversion, ethylene oxide, pyrolysis
gas, fluid catalytic cracking and CANSOLV sulfur dioxide scrubbing.

2012
4
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

12-19-12 4Q2012 E&C PMC 2Q2018 Refining MINA AL-AHMADI & MINA ABDULLAH, KUWAIT: The Global Engineering and Construction
Group has been awarded a project management consultancy (PMC) services contract by Kuwait
National Petroleum Company (KNPC) for its Clean Fuels Project. KNPC’S Clean Fuels Project is a
major upgrade and expansion of the Mina Al-Ahmadi and Mina Abdullah Refineries to increase the
combined throughput by 264,000 barrels per stream day to 800,000 barrels per stream day.
12-12-12 Bookings will E&C FEED Oil & Gas NORWAY: A subsidiary of the Global Engineering and Construction Group has signed a three-year
be made as frame agreement with Statoil Petroleum AS for the provision of front-end engineering design (FEED)
work is services for future projects at the Karsto and Kollsnes processing plants located north of Stavanger and
released. north-west of Bergen.
11-26-12 3Q2012 E&C EPCM 2015 Chemicals CHANGZHOU, JIANGSU PROVINCE, PEOPLES REPUBLIC OF CHINA: A subsidiary of the
Global Engineering and Construction Group has been awarded an engineering, procurement and
construction management contract by LANXESS Changzhou Co., Ltd. for a new ethylene propylene
diene monomer (EPDM) rubber plant. The new facility will be designed to produce 160,000 tonnes per
annum EPDM rubber.
11-15-12 4Q2012 E&C FEED Oil & Gas ALBERTA, CANADA: A subsidiary of the Global Engineering and Construction Group (Foster
Wheeler Canada Ltd.) and Three Streams Engineering Ltd. have been awarded the front-end
engineering design (FEED) for the proposed Cenovus Energy Inc. Telephone Lake SAGD (steam-
assisted gravity drainage) central processing facility phase A development. The project is expected to
have an initial production capacity of 90,000 barrels per day (bbls/d) over two phases and an estimated
project life of up to 40 years.
11-8-12 E&C Engineering and Chemicals INDIA: The E&C Group has been awarded a contract by Reliance Industries Limited for the provision
procurement of engineering and procurement services for its Paraxylene Project at the Jamnagar, Gujarat State, on
services the west coast of India. This project is part of Reliance’s multi-billion-dollar expansion project at its
world-scale Jamnagar refining and petrochemical complex.
11-7-12 3Q2012 Power Design 2015 for Power SOUTH KOREA: The Global Power Group has been awarded a contract by BHI Co., Ltd. for design
first unit collaboration on two supercritical pulverized coal (PC) fired steam generators for the Buk-Pyeong
2016 for Power Plant project for STX Electric Power Co., Ltd. BHI, which is Foster Wheeler’s licensee for
second unit utility PC technology in the region, will supply two 595 MWe (gross megawatt electric) supercritical
PC steam generators and other major equipment for the project, which is located in the province of
Gangwon-do, South Korea.
11-6-12 3Q2012 E&C Consulting 2Q2013 Oil & Gas CHINA: The E&C Group has been awarded a contract by The World Bank Group to provide
services consulting services in the field of carbon capture and transportation in China. The World Bank has
launched an analytical and advisory assistance program in China in order to build the country’s
understanding of, and capacity for, application of carbon capture and storage (CCS). The main
objective for Foster Wheeler under its contract is to strengthen the CCS and transportation know-how
of the China Power Investment Corporation (CPI), one of the largest power producers in China, and of
relevant government institutions.

5
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

10-15-12 3Q2012 E&C Engineering and 2Q2014 Chemicals JUBAIL INDUSTRIAL CITY, KINGDOM OF SAUDI ARABIA: Subsidiaries of its Global
procurement Engineering and Construction Group have been awarded an engineering and procurement contract by
Sardara Chemical Company (Sadara) for a packaging center at Jubail Industrial City in the Eastern
province of the Kingdom of Saudi Arabia. The packaging center will be part of a world-scale, fully
integrated chemicals complex that is being built by Sadara, a joint venture between Saudi Arabian Oil
Company (Saudi Aramco) and the Dow Chemical Company (Dow).
10-12-12 3Q2012 E&C EPCm 2014 Chemicals JURONG ISLAND, SINGAPORE: A subsidiary of its Global Engineering and Construction Group
has been awarded an engineering, procurement and construction management contract by LANXESS
Butyl Pte. Ltd. for a new neodymium polybutadiene (ND-PBR) rubber plant. This award follows
Foster Wheeler’s successful completion of the front-end engineering design for this project earlier in
2012. The new facility, which LANXESS states is expected to be the largest of its kind in the world,
will be designed to produce 140,000 tonnes per annum of Nd-PBR and will include process and
finishing buildings, a central control room, a substation and a tank farm.
10-1-12 3Q2012 Power Design 1Q2015 Power YEOSU, KOREA: A subsidiary of the Global Power Group has been awarded a contract by Doosan
Heavy Industries & Construction Co., Ltd. for cooperation in the design of a circulating fluidized-bed
(CFB) steam generator for the Yeosu Thermal Power Plant 1 Project for Korea South East Power Co.,
Ltd. (KOSEP). Foster Wheeler will provide the design review of the 350 MWe (gross megawatt
electric) CFB steam generator for Doosan Heavy Industries & Construction Co. Ltd., Foster Wheeler’s
licensee for Utility CFB technology in the region.
9-24-12 2Q2012 GPG Design and Supply Mid-2013 Power VERACRUZ, NEW MEXICO: A subsidiary of its Global Power Group has been awarded a contract
by SCS Proyectos, S.A.P.I. de C.V. for the design and supply of two heat recovery steam generators
(HRSGs) to be installed in a cogeneration power plant for TEREFTALATOS MEXICANOS S.A. TOP
1002 Cogeneration Project in Cosoleacaque. Foster Wheeler will design, supply and provide advisory
services for erection and start-up of the two HRSG’S, which will be coupled to two LM 6000PF
combustion turbines.
9-20-12 Bookings will E&C EPCm CANADA: A subsidiary of the Global Engineering and Construction Group has been awarded a
be made as contract by Karnalyte Resources Inc. for the Wynyard Carnallite Project. The project involves the
work is construction of a facility which is expected to produce 625,000 tonnes of potash per year. As part of
released. this project, Foster Wheeler will coordinate with ERCOSPLAN Ingenieurgesellschaft Geotechnik und
Bergbau mbH (“ERCOSPLAN”) of Erfurt Germany which will provide engineering, cavern
development, mine plan, and commissioning for the solution mining of the project (under direct
contract to the client).
9-20-12 2Q2012 E&C Detailed Refining BARINAS, VENEZUELA: A subsidiary of the Global Engineering and Construction Group, in
engineering design consortium with Hyundai Engineering and Construction Co., Ltd. (HDEC), of South Korea has been
awarded a contract by Petroleos de Venezuela, S.A. (PDVSA) for Phase I (Hydroskimming section) of
the new Batalla Santa Ines Refinery. Foster Wheeler’s scope of work includes early detailed
engineering design and delivery of an open book estimate for the crude distillation unit, storage and
blending unit and fuel distribution plant.

6
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

9-11-12 2Q2012 E&C Engineering, 2014 Refining VLISSINGEN, THE NETHERLANDS: A subsidiary of the Global Engineering and Construction
procurement Group has been awarded a contract by Zeeland Refinery, N.V., a joint venture between Total and
assistance and LUKOIL, for engineering, procurement assistance and construction management assistance for the
construction upgrade of the distillate hydrocracker at the Zeeland Refinery. The objective of the project is to
management maximize the throughput of the distillate hydrocracker by debottlenecking the unit’s reaction and
fractionation sections of the distillate hydrocracker.
9-6-12 2Q2012 E&C Engineering and 4Q2013 Refining BASHKORTOSTAN, RUSSIA:A subsidiary of the Global Engineering and Construction Group has
material supply been awarded a contract by JSC Gazprom Neftekhim Salavat, for the engineering and material supply
of a new double-cell Terrace WallTM steam reformer heater and air preheating system to be built at the
Salavat Refinery.
9-5-12 3Q2012 E&C BEP Chemicals RAS LAFFAN, QATAR: A subsidiary of the Global Engineering and Construction Group has been
awarded a contract by Shell Global Solutions B.V. to develop a basic engineering package (BEP) for a
world-scale mono-ethylene glycol (MEG) facility. The MEG facility will be part of a new
petrochemicals complex in Ras Laffan Industrial City, being developed by a joint venture of Qatar
Petroleum and Shell.
9-4-12 3Q2012 Power Design and Supply 1Q2015 Power YEOSU CITY, SOUTH KOREA: A subsidiary of the Global Power Group has been awarded a
contract by Yeosu Cogeneration Corporation, a subsidiary of Hanwha Corporation, for the design and
supply of one circulating fluidized-bed (CFB) steam generator located in an industrial complex in
Yeosu City, South Korea. Foster Wheeler will design and supply the 60 MWe (gross megawatt
electric) CFB steam generator plus auxiliary equipment and provide site advisory services for the
project.
8-29-12 Bookings will E&C Consultancy Oil & Gas EGYPT: A subsidiary of the Global Engineering and Construction Group has signed a three-year
be made as framework agreement with Apache Khalda Corporation for the provision of consultancy services.
work is Apache Kahlda, a subsidiary of Apache Corporation, is one of the leading liquid hydrocarbons and
released. natural gas producers in Egypt.
8-28-12 3Q2012 E&C FEED Q1 2013 Oil & Gas STAINFORTH, YORKSHIRE, UK: A subsidiary of the Global Engineering and Construction Group
has been awarded a contract by Samsung C&T ECUK Ltd (Samsung), a wholly-owned subsidiary of
Samsung C&T Korea, to participate in a comprehensive update of the front-end engineering design
(FEED) developed previously by a third party for 2Co Energy Limited’s (2Co) Don Valley Power
Project. Foster Wheeler will undertake the majority of the process engineering, process integration and
FEED update work for inside the battery limits and will manage the process licensors’ technical scope
for the gasification and acid removal units.
8-23-12 3Q2012 E&C FEED, BED, EPC End 2013 Oil & Gas LINHARES, ESPIRITO SANTO STATE, BRAZIL: A subsidiary of the Global Engineering and
Construction Group has been awarded a contract by Petroleo Brasileiro S.A. (Petrobras) for a world-
scale grassroots gas-to-chemicals complex. Foster Wheeler will provide basic engineering (BED),
front-end engineering design (FEED), and technical assistance and training during the engineering,
procurement and construction (EPC) phase through to successful completion of the plant performances.

7
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

8-1-12 2Q2012 E&C Engineering, 3Q2013 Oil & Gas MAP TA PHUT, THAILAND: A subsidiary of the Global Engineering and Construction Group has
Design & Supply been awarded a contract by Samsung Engineering Co. Ltd. for a waste heat recovery unit for PTT
Public Company Limited’s Power Generation and Heavy Recovery Project. Foster Wheeler will
design, engineer and supply the waste heat recovery unit, including selective catalytic reduction system
and other associated equipment.
7-19-12 3Q2012 E&C EPCm 2016 Refining VENEZUELA: A subsidiary of the Global Engineering and Construction Group has signed a contract
with PDVSA Petroleo S.A. for the engineering, procurement services and construction management
(EPCm) for the El Palito Refinery Expansion Project. Foster Wheeler will execute the project in
consortium with Toyo Engineering Corporation from Japan and Y & V Ingenenieria y Construccion.
The expansion is intended to double the refinery’s capacity to 280,000 BPSD, processing heavy and
extra-heavy crudes from the Orinoco Belt, and increasing production of clean fuels.
7-16-12 2Q2012 E&C EPCm 1Q2013 Pharma TEESSIDE, UNITED KINGDOM: A subsidiary of the Global Engineering and Construction Group
has been awarded a contract by EPAX Pharma UK Limited, the UK subsidiary of Trygg Pharma AS,
based in Norway, for the provision of engineering, procurement and construction management (EPCm)
services to convert part of the former Lundbeck pharmaceutical plant at Seal Sands, Teesside, UK, to
process fish oil to produce an Omega-3 active pharmaceutical ingredient.
5-8-12 Bookings will E&C Engineering and Refining ASIA: A subsidiary of the Global Engineering and Construction Group has signed an Asian Enterprise
be made as project and petro- Framework Agreement (EFA) with Shell Global Solutions International B.V. (“Shell”). Foster Wheeler
work orders management chemical will provide engineering and project management services for Shell’s downstream projects in Asia.
are received services The agreement is for a five-year period, with an option to extend for another five years.
4-30-12 1Q2012 E&C PMC Chemicals EMIRATE OF ABU DHABI: A subsidiary of the Global Engineering and Construction Group has
been awarded a contract by Abu Dhabi National Chemicals Company (ChemaWEyaat) for the
provision of a project management consultancy (PMC) services for an aromatics complex (Stage 1 of
the Tacaamol Project) and the supporting infrastructure. The aromatics complex is planned to convert
almost three million tons per year of heavy and medium naphtha, supplied via pipeline from the Takreer
Ruwais Refinery, into paraxylene, mixed xylenes and benzene. Foster Wheeler will, for the aromatics
complex and infrastructure, provide PMC service for the front-end design (FEED) phase. The contract
also includes an option for Foster Wheeler to provide PMC services for the engineering, procurement
and construction phase.
4-27-12 4Q2011 E&C Owner’s engineer Oil & Gas HACKBERRY, LOUISIANA: A subsidiary of the Global Engineering and Construction Group has
been awarded an owner’s engineer contract for a new LNG liquefaction project by Cameron LNG LLC,
an affiliate of Sempra Energy, planned to export up to 12 million tons per annum of LNG. Foster
Wheeler’s scope of work includes technical assistance for project development, the execution of front-
end engineering to support permit applications to the U.S. Federal Energy Regulatory Commission,
development of technical specifications and invitation to bid packages for engineering, procurement
and construction activities, and technical reviews.

8
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

4-3-12 1Q2012 E&C EPCm July 2013 Refining ANTWERP, BELGIUM: A subsidiary of the Global Engineering and Construction Group has been
awarded an engineering, procurement and construction management (EPCm) services contract by
(EP scope) TOTAL Raffinage-Chimie for the revamp of a hydrodesulfurization unit at TOTAL’s refinery. The
revamp of the hydrodesulfurization unit should enable the refinery to produce jet fuel with sulfur
content below 30 parts per million (ppm), and diesel with a sulfur content below 10 ppm, in accordance
with European Union requirements.
4-2-12 Bookings will E&C Project Chemicals DOW CHEMICAL COMPANY: The Global Engineering and Construction Group has signed a
be made as management, Strategic Umbrella Agreement with the Dow Chemical Company. The agreement has an initial term of
work orders consulting, three years and provides support by Foster Wheeler to selected Dow global capital projects, which form
are received engineering, part of its growth strategy across its diversified portfolio of businesses: specialty chemicals, advanced
procurement, materials, agrosciences and plastics.
construction
management, and
construction
services

3-27-12 1Q2012 E&C PMC 2014 Refining JAVA, INDONESIA: A subsidiary of the Global Engineering and Construction Group has been
awarded a contract by PT Pertamina (Persero) (“Pertamina”), the national oil company of the Republic
of Indonesia, to provide project management consultancy services for the Residue Fluid Catalytic
Cracker Project at the Cilacap Refinery. Foster Wheeler will manage the engineering, procurement and
construction contractor on behalf of Pertamina.
3-12-12 1Q2012 E&C Basic engineering Sept. 2012 Oil & Gas SAN PEDRO DE MARCORIS, DOMINICAN REPUBLIC: A subsidiary of the Global
design, FEED Engineering and Construction Group has been awarded the basic design and front-end engineering
design contract by Complejo GNL del Este, a Consortium formed by Dominican and Colombian
companies that participate in the energy sector of these countries, for a new LNG receiving terminal
and jetty. Foster Wheeler previously completed a feasibility study for the selection of the most suitable
technology for the new terminal, which will be designed for a send-out capacity of 240 million standard
cubic feet per day, with an LNG storage tank of 160,000 cubic meters.
3-8-12 4Q2011 E&C Engineering and 4Q2012 Refining TYUMEN, TYUMEN REGION, RUSSIA: A subsidiary of the Global Engineering and Construction
material supply Group has been awarded a contract by CJSC Antipinsky Refinery for the engineering and material
supply of a new fired heater and air preheating system for the Antipinsky Refinery. The fired heater
will be part of a new crude distillation unit being built as part of the modernization of the Antipinsky
refinery.
2-28-12 4Q2011 E&C Supply 1Q2013 Refining NIZHNY, NOVGOROD, RUSSIA: A subsidiary of the Global Engineering and Construction Group
has been awarded a contract by a subsidiary of JSC LUKOIL for the supply of a waste heat boiler. The
waste heat boiler will be installed downstream of a fluid catalytic cracking unit, enabling the production
of gasoline that is intended to meet European Union Euro-5 standards. A similar unit has been in
operation since 2010 to Lukoil’s full satisfaction.

9
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

2-21-12 4Q2011 E&C Conceptual & May 2012 Pharma JEDDAH, KINGDOM OF SAUDI ARABIA: A subsidiary of the Global Engineering and
basic design Construction Group has been awarded a conceptual and basic design contract by SAJA Pharmaceuticals
for the expansion of a manufacturing facility. Foster Wheeler will provide conceptual and basic design
services for a new research and development building, which will be designed to manufacture small
production lots for launching new products on the market, a new oral solid dosing manufacturing and
packing facility, a warehouse, quality control laboratories and an administrative building.
2-14-12 1Q2012 Power Design, supply 2Q2014 Power SWEDEN: A subsidiary of the Global Power Group awarded a contract by Lunds Energi, a
municipality-owned energy supplier in the Southern region of Sweden, for the design, supply and
erection of a 35 MWe (gross megawatt electric) biomass-fired circulating fluidized-bed (CFB) boiler
island. Foster Wheeler will design and supply the steam generator and auxiliary equipment, and will
carry out the erection and commissioning of the boiler island. The steam generator will be designed to
burn 100% bio fuel with up to 50% demolition wood. Lunds Energi is building the new combined heat
and power plant to replace existing old equipment operating on fossil fuels.
2-13-12 4Q2011 E&C EPCm 2015 Chemicals JUBAIL INDUSTRIAL CITY, KINGDOM OF SAUDI ARABIA: Subsidiaries of the Global
Engineering and Construction Group have been awarded an engineering, procurement and construction
management contract by ARAMCO Overseas Company B.V. (AOC), a subsidiary of Saudi Aramco,
and by Dow Europe Holding B.V. (Dow) for propylene oxide (PO) unit. The unit will be a part of a
world-wide scale, fully integrated chemicals complex, one of the largest of its kind in the world, which
will be constructed, owned and operated by Sadara Chemical Company (Sadara), a joint venture
between Saudi Aramco and Dow. This contract was awarded as an extension to the front-end
engineering design (FEED) contract awarded to Foster Wheeler by AOC and Dow in 2008.
2-9-12 4Q2011 E&C Design, Oil & Gas SOUTH TIMBALIER 283, GULF OF MEXICO: Foster Wheeler Upstream, part of its Global
engineering and Engineering and Construction group, has been awarded a contract by Discovery Gas Transmission,
technical services LLC to provide design, engineering and technical services for a junction platform, facilities and
associated pipelines with the Discovery System at South Timabalier 283. The platform located in
approximately 350 feet of water, will be a four-pile structure with a two-level deck. It will be designed
as an unmanned structure with a control system design to shut down the facility in the event of an upset
condition.
1-31-12 4Q2011 E&C Feasibility Study Mid-2012 Refining BALLSH & FIER, ALBANIA: A subsidiary of the Global Engineering & Construction Group has
been awarded a feasibility study by Albanian Refining & Marketing of Oil sh.a. (ARMO) relating to the
modernization of two refineries. ARMO intends to modernize the existing refineries to restore
production to the original design capacity and produce transportation fuels in line with European Union
regulations.
1-31-12 4Q2011 E&C PMC 2013 Oil & Gas STAINFORTH, YORKSHIRE, UNITED KINGDOM: A subsidiary of the Global Engineering &
Construction Group has been awarded a project management consultancy contract by 2Co Power
(Yorkshire) Limited (2Co) for the Don Valley Power Project. The project is part of a carbon capture,
utilization and storage scheme (CCS) being developed by 2Co, comprising a 900 MW installed capacity
(650 MW net export capacity) integrated coal gasification combined cycle (IGCC) power plant, CO2
transportation, and storage combined with enhanced oil recovery (EOR). The plant will be designed to

10
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

capture, as CO2, some 90 percent of the carbon in the fossil fuel.

1-19-12 4Q2011 E&C Basic design, Oil & Gas TAMIL, NADU, INDIA: A subsidiary of its India subsidiary, Foster Wheeler India Private Limited,
FEED part of its Global Engineering and Construction Group, has been awarded a contract for a new LNG
receiving terminal. The contract was awarded by India’s national oil company, Indian Oil Corporation
Limited (IOCL).
1-18-12 1Q2012 Power Design & Supply 4Q2013 Power YANGZHOU JIANGSU PROVINCE, CHINA: A subsidiary of the Global Power Group has been
awarded a contract by Yuen Foong Fu Paper Mfg. (Yangzhou) Co., Ltd. for the design and supply of
one circulating fludized-bed (CFB) steam generator for captive use at its industrial paper complex.
Foster Wheeler will design and supply the 50 MWe (gross megawatt electric) CFB steam generator plus
auxiliary equipment and provide site advisory services for the project.
1-17-12 2Q2011 E&C Engineering & Refining BATAAN, PHILIPPINES: A subsidiary of the Engineering & Construction Group has been awarded
procurement a contract by Petron Corporation for the Petron Refinery Master Plant-2 Project. Foster Wheeler will
services execute detailed engineering and procurement services for the delayed coker unit (DCU), including the
engineering and material supply of two double-fired Terrace WallTM coker heaters. The DCU will have
a design capacity of 37,500 barrels per stream day and is a key part of this significant refinery upgrade.
1-5-12 4Q2011 Power Design & Supply Mid-2013 Power BUDAPEST, HUNGARY: A subsidiary of the Global Power Group has been given a limited notice
to proceed (LNTP) by GS Engineering and Construction for the design and supply of two heat recovery
steam generators (HRSGs) to Técnicas Reunidas, S.A. (TRSA). The HRSGs will be installed in a
combined cycle power plant that TRSA will build near Budapest, Hungary. Foster Wheeler will design,
supply and provide advisory services for erection and start-up of two HRSGs, which will be coupled to
two Siemens combustion turbines model SGT5-4000F, with a total installed capacity of 860 MWe
(gross megawatt electric).
1-3-12 4Q2011 Power Design & Supply 2Q2015 Power MONG DUONG, VIETNAM: A subsidiary of the Global Power Group has been awarded a contract
by Hyundai Engineering and Construction for the design and supply of 4 x 250 MWe (net megawatt
electric) circulating fluidized-bed (CFB) steam generators for the Mong Duong 1 Thermal Power Plant
for Vietnam Electricity (EVN), the owner and developer of the project. The CFB steam generators
will be designed to burn Vietnamese anthracite coal while meeting applicable environmental regulatory
requirements.
1-3-12 4Q2011 Power Design & Supply 4Q2014 Power DAEGU METROPOLITAN CITY, SOUTH KOREA: A subsidiary of the Global Power Group has
been given a limited notice to proceed (LNTP) by GS Engineering and Construction for the design of a
circulating fluidized-bed steam generator for the Green Energy Centre BTO (Build, Transfer, Operate)
Project of Daegu Metropolitan City, South Korea, the owner and developer of the project. The CFB
steam generator will be designed to burn 380/tons day of refuse derived fuel (RDF) while meeting
applicable environmental regulatory requirements.

11
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

2011

12-21-11 4Q2011 E&C EPCm 2013 Oil & Gas SCOTLAND: A subsidiary of Foster Wheeler’s Global Engineering and Construction Group has been
awarded an engineering, procurement and construction management contract by BP Exploration
Operating Company Limited for BP Exploration’s Enhanced Gas Separation Project (EGSP). The
project, for which Foster Wheeler has already successfully completed the pre-front-end design (pre-
FEED) and FEED, relates to the debottlenecking of the Forties Pipeline Systems crude degasification
facilities at BP Exploration’s Kinneil terminal to allow it to handle high gas-to-oil ratio unstabilized
crude oils and natural gas liquids. (NGLs). The debottlenecking will involve modifications to the
existing plant, including improvements to heater and process control systems, as well as new facilities,
including crude coolers and a cooling water system.
11-23-11 3Q2011 E&C Project 3Q2012 Oil & Gas OPAL HUB, WYOMING: Foster Wheeler Upstream, part of its Global Engineering and Construction
management Group, has been awarded a contract by Ryckman Creek Resources, LLC, a subsidiary of Peregrine
Midstream Partners, LLC, for project management support for the 35 billion-cubic-foot Ryckman Creek
natural gas capacity storage facility. The new gas storage unit will serve the natural gas markets at the
Opal Hub in Wyoming.
11-15-11 Bookings will E&C EPCm, pre-FEED, Oil & Gas RAS LAFFAN INDUSTRIAL CITY, QATAR: A subsidiary of Foster Wheeler’s Global
be made as FEED Engineering & Construction Group and the subsidiary’s joint venture partner, Qatar Kentz WLL, have
work orders signed an engineering, procurement and construction framework agreement with Qatargas Operating
are received Company Limited. The framework agreement covers projects associated with the existing Qatargas
LNG facility at Ras Laffan Industrial City and will include both onshore and offshore work.
11-1-11 2Q2011 Power 20-Year License Power INDIA: A subsidiary of Foster Wheeler AG has entered into a 20-year agreement with Essar Projects
Agreement India Ltd. (EPIL), a subsidiary of Essar Group, to provide a technology license for utility sized
circulating fluidized-bed (CFB) steam generators to be sold in India.

10-26-11 E&C Memorandum of Mining & CHILE: A subsidiary of Foster Wheeler’s Chilean Global Engineering & Construction Group has
Understanding Metals signed a memorandum of understanding with a unit of GE Energy to explore the pursuit of selected
mining and metals projects in South America. Together, GE and Foster Wheeler Chile S.A. would be
able to offer innovative solutions to the mining sector, combining equipment and technology from GE
Energy, together with technical expertise in mining and metals and the projection execution capability
of Foster Wheeler Chile S.A.

12
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

10-26-11 3Q2011 E&C EPCm 3Q2012 Other SASOLBURG, SOUTH AFRICA: Foster Wheeler has received an engineering, procurement and
construction management (EPCm) services contract from Sasol New Energy Holdings (Proprietary)
Limited for the outside battery limit (OBL) portion of a new gas-fired power generation plant. Sasol
stated that this project is expected to raise its electricity self-sufficiency to 840 megawatt electric
(MWe) or 60% of its overall power draw. Foster Wheeler’s scope will include the earthworks for the
entire outside battery limit site, an access road; utility connections; 15/88kV step-up transformers and
an 88kV substation with associated electrical infrastructure and network system.

10-14-11 2Q2011 Power Design & Supply Power SALAYA, INDIA: Foster Wheeler has been awarded a contract by Essar Projects Limited, a United
Arab Emirates (UAE) Company, for the design and supply of four circulating fluidized-bed (CFB)
steam generators for the Essar Power Salaya Limited in India, which is the owner and developer of the
project. Foster Wheeler will design and supply four 150 MWe CFB steam generators and provide site
advisory and commissioning services for the project.
10-4-11 3Q2011 E&C PMC 4Q2011 Oil & Gas CAIRO, EGYPT: Foster Wheeler has received a contract from Apache Khalda Corporation for the
provision of project management consultancy services to oversee the front-end engineering design
(FEED) for the Qasr compression project. The Qasr Compression Project will provide additional
compression to the existing facilities at the Qasr gas condensate field and Foster Wheeler will provide
expertise and personnel to assist Apache Khalda in the management and administration of the FEED
phase of this project.
9-15-11 2Q2011 E&C EPCm 2Q2012 Chemicals SASOLBURG, SOUTH AFRICA: Foster Wheeler has been awarded a contract by Sasol Chemical
Industries Ltd to provide engineering, procurement and construction management services for the
Sasolburg Utilities Expansion Project. The project involves the expansion of the utility systems at the
Sasol complex at Sasolburg to support a program of expansion projects. This EPCm award follows
Foster Wheeler’s successful completion of the front-end engineering design (FEED) phase for this
project.
9-13-11 2Q2011 E&C Basic engineering 2015 Refining SOHAR, OMAN: Foster Wheeler, through a collaborative agreement with Honeywell’s UOP, was
design recently awarded a contract by Oman Refineries and Petrochemical Co. (Orpic). UOP/Foster Wheeler
will provide a basic engineering design package for a solvent deasphalting (SDA) unit. The unit is a
major part of the Sohar Refinery Expansion Project which will significantly increase the refinery’s
production of petroleum products such as LPG, naphtha, Jet A-1 fuel, gasoline, diesel and propylene.
The SDA will be designed to process 2.5 million metric tonnes per annum of vacuum reside of Oman
Export Blend crude to produce Deasphalted Oil (DAO) and asphalt for road bitumen production.
9-1-11 1Q2011 E&C Basic engineering 3Q2011 Refining ATYRAU, KAZAKHSTAN: Foster Wheeler awarded a contract for the basic engineering design of a
design new hydrogen production unit, based on Foster Wheeler Terrace-WallTM steam reforming technology.
Atyrau Refinery is a member of the JS National Company “KazMunayGas” group that is the leading
national oil and gas company of Kazakhstan. The main purpose of the project is to increase the oil
conversion rate and production of all types of motor fuels to meet Euro IV and Euro V standards.

13
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

8-30-11 3Q2011 E&C Detailed design Oil & Gas KARSTO, NORWAY: Foster Wheeler awarded a contract by Aibel AS for the provision of detailed
engineering design engineering services to support Aibel, which has been appointed by Statoil as the main
engineering, procurement and construction contract for Karsto Development Project (KDP) 2013 for
the Karsto and Kollsnes oil and gas processing plants in Norway. The scope of work includes detailed
design engineering services for modification to the Karsto plant to enable it to process light oil from the
Gudrun offshore oil field and condensate from the Sleipner field and also covers the upgrading of eight
compressors, three at Karsto and five at Kollsnes.
8-24-11 1Q2011 Power Supply 2Q2012 Power CORDOBA & BADAJOZ, SPAIN: Foster Wheeler awarded contracts to supply solar steam
generator systems to two separate solar projects. The first is with UTE Africa Solar, the EPC contractor
for the La Africana Solar Thermal Power Plant located in Fuenta Palmera (Cordoba, Spain) to supply
steam generating components (feedwater heaters, preheaters, evaporators, superheaters and reheaters)
for a single 50 MWe train thermal plant.
The second is with UTE Termosolar Olivenza (a joint venture created by Acciona and Seridom), the
EPC contractor for the Olivenza Solar Thermal Power Plant, located in Olivenza (Badajoz, Spain) to
supply a similar scope as that of the La Africana project. This 50 MWe plant consists of 2 x 25 MWe
trains and also utilizes concentrated parabolic trough technology with thermal oil as the heat transfer
fluid.
8-23-11 2Q2011 E&C EPCm Refining SOUTH AFRICA: Foster Wheeler has been awarded a contract by Engen Petroleoum Limited for
engineering, procurement and construction management services for Engen’s new multi-products
pipeline feeder lines and infrastructure project at Engen’s Durban Refinery in South Africa. The
objective is to develop the pipeline network from Engen’s depots to tie in to the Transnet pipeline in
order to enhance Engen’s access to key refined product markets in the South African interior.
8-9-11 2Q2011 E&C PMC, FEED, Refining BARRANCABERMEJA, COLOMBIA: Foster Wheeler has been given a release to perform the
detailed second phase scope for an existing contract with Ecopetrol S.A. for the Project for Modernization of the
engineering Refinery in Barrancabermeja in Colombia. The release also includes project management consultancy
and front end engineering design for the crude unit revamps, assisting Ecopetrol in the selection process
for engineering, procurement and construction contracts, and control and supervision of the EPC and
construction contractors. This upgrade in the refinery will eliminate fuel oil production and increase
overall profitability.
8-4-11 2Q2011 E&C PMC 2Q2012 Pharma NUSAJAYA, WILAYAH ISKANDAR, MALAYSIA: Foster Wheeler has been awarded a project
management consultancy contract for the central utility facilities associated with a new biotechnology
park. The contract was awarded by Malaysian Bio-XCell Sdn Bhd (“Bio-XCell”), a joint venture
company between Malaysian Biotechnology Corporation Sdn Bhd (Biotech Corp.) and UEM Holdings
Bhd., which company owns and is developing the new park. The new 150-acre park is being created as
part of an initiative by the Malaysian Government to develop its healthcare and industrial biotechnology
facilities. The park features green initiatives such as natural lighting, passive cooling, solar energy and
rainwater harvesting. All facilities will be supplied with chilled water and steam from a central utility
facility which will also treat all wastewater.

14
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

7-13-11 2Q2011 Power Design & supply 2015 Power SAMCHEOK, KOREA: Foster Wheeler has been given the full notice to proceed (FNTP) by
Hyundai Engineering & Construction for the design and supply of four 550 MWe (gross megawatt
electric) supercritical circulating fluidized-bed (CFB) steam generators for the Samcheok Green Power
Project for Korea Southern Power Co., Ltd. (KOSPO), the owner and developer of the project. The
plant will utilize the world’s most advanced CFB steam generator technology, representing a
culmination of over 30 years of CFB technology development by Foster Wheeler.
7-7-11 4Q2010 E&C Engineering 2Q2011 Refining LA PLATA, ARGENTINA: Foster Wheeler awarded a contract by YPF.S.A. for the delayed coker
design & supply heater for the new delayed coking unit at YPF’s Complejo Industrial La Plata Argentina. The fired
heater is an integral part of the new coker, which uses Foster Wheeler’s leading Selective Yield
Delayed Coking (SYDECSM) technology. The coker heater incorporates key design features which are
pivotal to the excellent performance and reliability delivered by our cokers.
7/5/11 1Q2011 (initial E&C FEED and project Refining RIYADH, SAUDI ARABIA: Foster Wheeler SOFCON, an unincorporated consortium between a
release only) management subsidiary of Foster Wheeler’s Engineering & Construction Group and A. Al-Saihati, A. Fattani & O.
services Al-Othman Consulting Engineering Co. has been awarded a contract by Saudi Arabian Oil Company
(Saudi Aramco) for the front-end engineering design and project management services for the Clean
Transportation Fuels Project at the Riyadh Refinery, Kingdom of Saudi Arabia.
7/5/11 1Q2011 & E&C FEED and basic 3Q2011 Refining BARINAS, VENEZUELA: Foster Wheeler awarded a process design and front-end engineering
2Q2011 engineering design design (FEED) services contract by PDVSA for the new Batalla Santa Ines Refinery Phase I
Hydroskimming section to be built in Barinas, Venezuela. Foster Wheeler’s scope of work includes the
preparation of the basic engineering design package, FEED and early procurement assistance for the
crude distillation unit, the naphta hydrotreater, the continuous catalytic reformer and the utilities and
offsite facilities.
6/22/11 2Q2011 E&C Feasibility Study 4Q2011 Oil & Gas ALBERTA, CANADA: Foster Wheeler awarded a contract by Sasol to perform the technical portion
of a feasibility study for a planned gas-to-liquids facility on behalf of the Sasol/Talisman Energy
partnership. As well as the technical work on the feasibility study, Foster Wheeler will also develop a
cost estimate to allow the partners in the joint venture (Sasol and Talisman Energy) to assess the
economic viability of the planned facility.
6/15/11 1Q2011 (BED E&C Basic Engineering 6/2011 – Refining GOTHENBURG, SWEDEN: Foster Wheeler awarded a contract by Preem AB (Publ) Preemraff
only) Design & FEED BED Lysekil to perform basic engineering design (BED) and front-end engineering design (FEED) for
Preem’s Energy Savings Program 2013 Turnaround at the Preemraff Lysekil oil refinery. Preem
9/2011 - awarded an energy improvement study (EIS) to Foster Wheeler’s Business Solutions Group, working
FEED with AspenTech, with the aim of improving energy efficiency and reducing emissions in this complex
refinery.
5/31/11 2Q2011 Power Design & supply 2Q2015 Power SAMCHEOK, KOREA: Foster Wheeler given a limited notice to proceed (LNTP) by Hyundai
Engineering & Construction for the design & supply of four 550 MWe supercritical circulating
fluidized-bed (CFB) steam generators for the Samcheok Green Power project for Korean Southern
Power Co. (KOSPO), the owner and developer of the project. The CFB steam generators will be
designed to burn coal mixed with biomass while meeting all environmental requlatory requirements.

15
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

5/16/11 2Q2011 Power Design & supply 4Q2012 Power JIAXING CITY, CHINA: Foster Wheeler awarded a contract by Zhejiang Jiahua Industrial Park
Investment & Development Company for the design and supply of three circulating fluidized-bed steam
generators to meet rapidly increasing steam demand at the China Chemical and New Material Park in
east China’s Jiaxing City, Zheijiang Province. Foster Wheeler will design and supply three 100 MWe
CFB steam generators plus auxiliary equipment and provide site advisory services for the project. The
CFB steam generators will be designed to burn coal while meeting all environmental requirements.
5/16/11 1Q2011 E&C FEED 1Q2012 Refining MAP TA PHUT, THAILAND: Foster Wheeler awarded a contract by Star Petroleum Refining
Limited (SPRC) for front-end engineering design for the Residue Fluidized Catalytic Cracking Unit
(RFCCU) to improve on-stream reliability together with environmental and performance
improvements. Foster Wheeler will carry out the FEED for this major revamp, including licensor
selection and will also work with SPRC to evaluate the existing RFCCU maintenance and reliability
philosophies with a view to identifying any changes that may be needed in the future to retain the
continuous improvement of on-stream performance.
5/11/11 1Q2011 E&C Basic engineering 1Q2013 Refining SRIRACHA, THAILAND: Foster Wheeler received a contract by Thai Oil Public Company Limited
design package for the basic design engineering package and engineering, procurement and construction management
and EPCm (EPCm) services for the Emission Improvement and PSA-3 project at Thai Oil’s refinery. The
objectives are to give the refinery a greater flexibility in the crudes it can process, specifically to enable
the refinery to process higher sulfur crudes, to upgrade fuel oil to more valuable products and to
meeting SOx emissions regulations coming into force in Thailand.
4/14/11 1Q2011 E&C Pre-FEED 2011 Oil & Gas HAMMERFEST, NORWAY: Foster Wheeler received a contract from Statoil Petroleum AS for the
pre-front-end engineering for the Snøhvit Future Development Project at Statoil’s Melkøya-based LNG
facility on Melkøya Island. Foster Wheeler’s scope will include concept design activities to support
finalization of the development concept and the plant capacity for the expansion of LNG production, as
well as energy optimization investigations. Foster Wheeler’s involvement through this contract will
continue through 2011.
4/12/11 1Q2011 E&C Feasibility Study 3Q2011 Oil & Gas BAHRAIN: Foster Wheeler received a contract from Bahrain National Gas Company (BANAGAS)
to undertake a feasibility study for the modifications and expansion of BANAGAS liquefied petroleum
gas facilities. The expansion will allow the plant to increase its gas throughput, which is planned to
reach 285 million standard cubic feet per day (MMSCFD) of associated gas and 18 MMSCFD of
refinery offgas by 2014.
3/31/11 1Q2011 E&C FEED Chemicals CAOJING, SHANGHAI, PEOPLE’S REPUBLIC OF CHINA: Foster Wheeler received a contract
from Huntsman (Europe) BVBA to undertake the front-end engineering design (FEED) for the
expansion of Huntsman’s Isocyanates Facility. Isocyanates are used in the production of polyurethanes
which have a wide range of uses in the plastics industry. It will include front-end engineering,
technology licensor management and development of the project schedule and cost estimates. Foster
Wheeler has worked with Huntsman on the original development of this facility and will bring this
wealth of experience to the planned expansion.

16
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

3/28/11 4Q2010 E&C Engineering and Mid-2012 Refining REPUBLIC OF BASHKORTOSTAN, RUSSIA: Foster Wheeler awarded a contract by JSC Novo-
material supply Ufimsky Refinery, a subsidiary of Russian oil company Bashneft, for the engineering and material
supply of a new Terrace WallTM steam reformer heater and air preheating system for the Ufa refinery.
The steam reformer will be part of the 420 tonnes per day hydrogen production unit being built by JSC
Novo-Ufimsky Refinery and will be one of the largest reformers for hydrogen ever built by Foster
Wheeler. Foster Wheeler has supplied over 200 Terrace WallTM steam reformers to the refining and
petrochemical industries in more than 40 countries worldwide.
3/22/11 1Q2011 E&C Detailed design 2Q2011 Oil & Gas GULF OF MEXICO: Foster Wheeler has been awarded a detail design contract by Enbridge Offshore
Facilities, LLC for the deepwater Walker Ridge Gathering System (WRGS) export gas pipelines and
the deepwater Big Foot (BGF) export pipeline located in the Walker Ridge area. Upstream remains a
high priority for Foster Wheeler and the award of the three deepwater gas and oil pipelines contained in
this project confirms our strategy and commitment to the upstream oil and gas sector.
3/9/11 4Q2010 E&C Engineering 1Q2011 Chemicals PORTLAOISE, IRELAND: Foster Wheeler awarded a contract by Cynar Plc to provide basic
design services engineering design services for 6,000 tonnes per annum (tpa) plant to convert non-recyclable waste
plastics into liquid fuels, primarily diesel. Cynar chose Foster Wheeler to assist with their technology
development because of the wide-ranging engineering expertise and in particular the oil refining
knowledge and capability, and will provide a solution to a significant worldwide issue.
3/7/11 E&C Project Oil & Gas AL –KHOBAR, SAUDI ARABIA: A subsidiary of the Global Engineering and Construction Group
management, pre- Refining together with the subsidiary’s consortium partners comprising A. Al.-Saihati, A. Fattani & Ol-Othman
FEED, FEED, Chemicals Consulting Engineering Co. (SOFCON) and Saudi Consolidated Engineering Company – Khatib &
engineering and Alami (SCEC K&A) signed a contract with Saudi Aramco for provision of services associated with
procurement Saudi Aramco’s General Engineering Services Plus (GES+) initiative for a duration of five years with
services options available for extensions. Foster Wheeler and its consortium partners will perform project
management services, including pre-front-end engineering services (pre-FEED), front-end engineering
design (FEED) and detailed design and procurement services.
3/2/11 4Q2010 E&C Study Oil & Gas ABU DHABI, UAE: Foster Wheeler received a contract from Zakum Development Company
(ZADCO), to perform an availability and reliability study in connection with expansion of the Zirku oil
processing facilities. The facilities at Zirku Island comprise three oil processing trains and one train on
standy-by. ZADCO plans to increase the capacity of this facility to cater for an increased production
profile over the next twenty years. Foster Wheeler will conduct site surveys, identify a range of
potential expansion options and bottlenecking initiatives, and perform availability and reliability studies
to derive a master plan for the facilities and will prepare the basis of design and scope of work for the
next phase of the project.
2/14/11 1Q2011 E&C Front-end 2Q2011 Mining & EL TENIENTE, CHILE: Foster Wheeler awarded an engineering design contract for a copper
engineering Metals concentrator plant in Chile for the Chilean Copper Corporation (CODELCO), the world’s largest
copper producing company. The contract is for provision of front-end conceptual engineering including
optimization, tradeoffs, 3D model design and a capital expenditure estimate for modifications to the
mineral ore feeding system for the SAG-1 and SAG-2 mills, improvement of the molybdenum
processing plant, increased production of soluable copper and improvements to the environmental

17
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

protection at the tailings distribution system.

2/4/11 4Q2010 E&C Feasibility Study Chemicals SASKATCHEWAN, CANADA: Foster Wheeler has been awarded a feasibility study contract by
Karnalyte Resources Inc. for the Wynyard Carnallite Potash Project. The study will consider initial
production of 500,000 tons per year and expansion of the facility to two million tons per year within
five to six years. The Wynyard facility is expected to recover high purity potassium chloride from
potash ore deposits. The potassium chloride will be used to produce potash fertilizer. Foster Wheeler
will also coordinate preparation of the overall Environmental Impact Statement, which will advance
concurrently with the feasibility study.
1/20/11 4Q2010 Power Design, Supply & 4Q2013 Power KLADNO, CZECH REPUBLIC: Foster Wheeler awarded a contract by Kraftanlagen Power Plants
Erect GmbH (KAP) to design, supply and erect and provide commissioning services for a 135 MWe
circulating fluidized-bed (CFB) steam generator with auxiliary equipment, flue gas cleaning, and boiler
building for the Alpiq Generating (CZ) s.r.o. Kladno Power Plant. It will be designed to burn a
combination of lignite and biomass.
1/13/11 4Q2010 Power Design and Supply 4Q2012 Power CANTABRIA, SPAIN: Foster Wheeler awarded contract by Ingesteam Power Plants, S.A. to design,
supply and erect a bubbling fluidized-bed (BFB) steam generator and associated auxiliary equipment
for Biomasa de Cantabria, a company majority owned by the Armando Álvarez Group, and by Mare (an
entity belonging to the Regional Environment Department of the Cantabria Government) with a minor
shareholding. The steam generator will burn residual biomass, mainly bark and branches from nearby
logging operations. The steam produced will be used for electricity generation.
1/5/11 4Q2010 Power Engineering and 4Q2013/ Power BINH THUAN PROVINCE, SOUTH VIETNAM: Foster Wheeler signed a contract with Shanghai
procurement 2Q2014 Boiler Works, Ltd. for cooperation in the design of two pulverized coal (PC) steam generators for the
services Vinh Tan II Project for Vietnam Electricity (EVN). Foster Wheeler will provide the design review of
the two 622 MWe PC’s for Shanghai Boiler Works, Ltd., Foster Wheeler’s licensee for PC technology
in the region.

2010
12/21/10 3Q2010 E&C Engineering Mid-2011 Refining ANTWERP, BELGIUM: Foster Wheeler awarded a contract by Kuwait Petroleum International
services Lubricants for the provision of detailed engineering services for a brownfield lube oil blending plant. It
will be designed to substantially enhance the ability of the Antwerp facility to operate at European scale
by increasing the production capacity from 125 million to 250 million liters per year.

18
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

12/13/10 4Q2010 E&C FEED Refining MARANHAO & CEARA STATE, BRAZIL: Foster Wheeler awarded a basic engineering design
and front-end engineering design contract for two grassroots refineries for Petroleo Brasiliero S.A.
(Petrobras). The Premium I Refinery will be a dual train, 600,000 barrels per stream (BPSD) facility in
Maranhao State and the Premium II Refinery will be a single-train 300,000 BPSD facility in Ceara
State. Foster Wheeler will be the prime subcontractor to Honeywell’s UOP, the managing process
technology licensor.

11/22/10 4Q2010 E&C Feasibility Study 4Q2010 Power SASOLBURG, SOUTH AFRICA: Foster Wheeler received a contract from Sasol New Energy
Holdings (Pty) Limited to perform a feasibility study for a gas-fired power generation plant, using gas
engines with an open cycle electrical output of approximately 140 MWe. Sasol has stated that this
project will raise its electricity self-sufficiency to 840 MWe, or 60% of its overall power draw, and
forms part of a broader plant within the Sasol group to reduce its carbon dioxide emissions and bolster
self-sufficiency in the light of South Africa’s tightening electricity supply/demand balance.

11/15/10 3Q2010 Power Design and Supply Power ABU DHABI, UAE: Foster Wheeler awarded a contract to design and supply a solar steam generator
system (preheaters, drum-type evaporators, and superheaters) including interconnecting piping, valves,
primary I&C, steel structures, and site advisory services for a plant located in Abu Dhabi, United Arab
Emirates. The equipment will be integrated into a solar thermal power plant using concentrated
parabolic trough technology and will have an installed power output capacity of 100 MWe (gross
megawatt electric).

11/2/10 3Q2010 E&C PMC Oil & Gas MEDAN, NORTH SUMATRA, INDONESIA: Foster Wheeler has been awarded a contract by
Perusahaan Gas Negara (PGN), a leading state owned enterprise and public listed company in natural
gas business in Indonesia for the provision of a project management consultancy services for a new
floating LNG receiving terminal (the “Medan Floating LNG Terminal” facility). Foster Wheeler’s
scope of work includes technical assistance through the initial phase of the development of the project,
conceptual design of the terminal, basic design of the subsea and onshore pipeline as well as the
preparation and issue of an invitation to bid for engineering, procurement and construction, EPC bid
evaluations, preparation of the EPC contract and support to PGN in EPC contract negotiation.

11/1/10 4Q2008 – E&C EPCm Refining CENTRAL LONDON, UNITED KINGDOM: Foster Wheeler has been awarded an engineering,
1Q2010 procurement and construction management contract by a subsidiary of DP World for the London
Gateway Import Facilities at the former Shell Haven refinery in the Thames estuary, 40 kilometers from
Central London. The scope of work comprises new jetty topsides, a control room, a substation, import
and export piping and associated modifications.

10/19/10 E&C PMC Chemicals AIN SOKHNA, EGYPT: Foster Wheeler USA has been awarded a project management consultancy
contract by Carbon Holdings for a petrochemical complex with a nameplate capacity to produce 1.35
million tons of annum of polyethylene. Foster Wheeler will provide technical support and consulting
services to Carbon Holdings through financial close.

19
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

10/13/10 4Q2010 Power Design and Supply Power THANH HOA, VIETNAM: Foster Wheeler has been awarded a contract by Japan’s Marubeni
Corporation for the design and supply of two pulverized coal steam generators for the Nghi Son 1
Project for Vietnam electricity (EVN). Once fully operational, Ngh Son 1 is estimated to generate an
average of 3.6 TWh a year and would contribute to the economic development in Thanh Hoa Province
and the northern central region of Vietnam.

10/12/10 3Q2010 E&C Pre-FEED and Oil & Gas BOLIVARIAN REPLUBLIC OF VENEZUELA: Foster Wheeler awarded a pre-front-end
FEED engineering design (pre-FEED) and front-end engineering design (FEED) contract by Cardon IV, S.A.,
for new production facilities at the Perla field located in the Gulf of Venezuela, Caribbean Sea. Cardon
IV is a joint venture company owned by Eni Venezuela B.V. and Repsol YPF Venezuela Gas, S.A. for
developing non-associated natural gas exploration and exploitation activities in Cardon IV area.

10/8/10 2Q2010 E&C Engineering & Refining LA PLATA, ARGENTINA: Foster Wheeler has been awarded a contract by YPF.S.A. for a new
procurement delayed coking unit to be built at YPF’s Complejo Industrial La Plata. The unit will use Foster
services Wheeler’s leading Selective Yield Delayed Coking (SYDECSM) technology, will have a capacity of
28,000 barrels per stream day and will produce anode coke to be used in the aluminium industry.

10/7/10 3Q2010 E&C Feasibility Study 4Q2010 Oil & Gas Foster Wheeler’s Global Engineering and Construction Group has been awarded a contract by the CO2
Capture Project (CCP) to undertake a study to evaluate a range of refinery, in-situ extraction of bitumen
and natural gas power generation Co2 capture scenarios. The CCP is a partnership of seven of the
world’s major energy companies including BP, Chevron, Eni, Petrobras, Shell, Suncor, ConocoPhillips
and associate member EPRI.

9/28/10 E&C Refining TULSA, OKLAHOMA: Foster Wheeler’s Global Engineering and Construction Group, working with
PetroAlgae Inc. has completed its initial testing of PetroAlgae’s biomass, with encouraging results. The
biomass, produced at PetroAlgae’s micro-crop farm in the U.S., is being tested as a delayed coker
feedstock supplement to provide renewable biofuels to the market.

9/23/10 2Q2010 E&C Pre-FEED and Oil & Gas KINNEIL TERMINAL, SCOTLAND: Foster Wheeler has been awarded two contracts by BP
FEED Exploration Operating Company Limited for its Forties Pipeline System (FPS). The first contract is for
the front-end engineering design (FEED) for the Enhanced Gas Separation Project (EGSP). The second
contract is for the pre-FEED for the Refrigerated Liquefied Petroleum Gas (RLPG) Chiller Upgrade
Project.

9/16/10 3Q2010 Power 20-year License Power INDIA: Agreement between a subsidiary of the Global Power Group and The Saraswati Industrial
Agreement Syndicate Ltd. to provide an advanced technology license for wall-fired subcritical and supercritical
pulverized-coal (PC) steam generators to be sold in India.

9/15/10 Power Supply 2010 Power KREFELD-LINN, GERMANY AND KURIKKA, FINLAND: The Global Power Group is
expanding its power boiler services business by establishing two new service centers which supply
spare parts, boiler pressure vessel components and boiler modernizations to existing plants in these
20
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

areas.

9/8/10 1Q2010 E&C PMC 2011 Chemicals SAUDI ARABIA: Foster Wheeler has been awarded a contract by Gulf Farabi Petrochemical
Company for services for Gulf Farabi’s Linear Alkyl Benzene (LAB) plant expansion at Al-Jubail. The
new plant will have a production capacity of 100,000 tonnes per annum of LAB which is a basic
ingredient in the formulation of synthetic detergents.

8/10/10 3Q2010 Power Design and supply 2012 Power BANTEN PROVINCE, INDONESIA: Foster Wheeler has been awarded a contract by Daewoo
Engineering Company for the design and supply of two circulating fluidized-bed steam generators for
PT Merak Energi. They will be designed to burn local coal using state-of-the-art CFB technology for
clean combustion of coal and other fluids.

8/4/10 3Q2010 E&C FEED Oil & Gas KENT, ENGLAND, U.K.: A consortium including Foster Wheeler has received a contract from E.ON
UK plc to support front-end engineering design for post-combustion carbon dioxide capture and
compression plant as part of E.ON’s new supercritical coal-fired power station. It will be designed to
capture CO2 from flue gas generated by the new coal-fired units enabling it to be transported and stored
within a depleted gas reservoir under the North Sea. E.ON is in competition to build the world’s first
industrial-scale CCS demonstration plants.

8/3/10 4Q2009 E&C Owner’s engineer Oil & Gas MONTEVIDEO, URUGUAY: Foster Wheeler awarded an owner’s engineer contract for a new LNG
receiving terminal (GNL Del Plata facility). It will include technical assistance through the initial
phases of the development of the project, conceptual design of the terminal and development of the
invitation to bid for the role of owner and operator of the terminal.
An initial release of work was booked in Q4 2009; the remainder of the work will be booked as soon as
formal release is given by the client.

7/29/10 2Q2010 E&C Engineering & 2011 Oil & Gas DUNKERQUE, FRANCE: Foster Wheeler awarded contract by Gassco AS for the implementation of
procurement the blow-down system modification at the Gassco-operated Dunkerque Terminal. This system is used
services to safely depressurize the process areas of a gas terminal in the event of an emergency.

7/16/10 2Q2010 Power Design, supply and 2013 Power BIELSKO-BIALA, POLAND: Foster Wheeler awarded a contract by Polimex-Mostostal S.A. for a
erect 50 MWe circulating fluidized bed (CFB) boiler island, which is owned by Poludniowy Koncern
Energetyczyny (PKE). The steam generator will be designed to burn local Polish bituminous coal. Four
CFB steam generators are currently online at existing PKE plants, including a 460 MWe supercritical
steam generator at the Lagisza Power Plant in Poland.

7/15/10 2Q2010 E&C FEED Oil & Gas KARSTO, NORWAY: Foster Wheeler entered into a framework agreement for FEED services to
support the development of the Karsto oil and gas processing plant. The first FEED call-off contract,
awarded in the second quarter of 2010, is for the Gudrun Onshore Modifications project, the objective
of which is to enable the Karsto plant to process light oil/condensate production coming on stream in

21
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

the Norwegian North Sea.

7/14/10 2Q2010 E&C PMC 2012 Oil & Gas UNITED ARAB EMIRATES: Foster Wheeler awarded a contract by Abu Dhabi Company for
Onshore Oil Operations (ADCO) for the provision of project management consultancy (PMC) services
for the development of the Bida Al Qemzan oilfield. Foster Wheeler will manage the engineering,
procurement and construction phase of the Bida Al Qemzan development and assist ADCO with the
selection and award of EPC and construction contracts. The project objective is to achieve a production
capacity of 20,000 barrels per day.

7/13/10 3Q2010 E&C PMC 2013 Oil & Gas SOUTHERN IRAQ: Foster Wheeler awarded a contract by South Oil Company (SOC) for the Crude
Oil Export Expansion Project in southern Iraq and offshore in Iraqi waters. The project will include
installation of three single point moorings and a central manifold and metering platform. It is expected
to boost Iraq’s Basra export capacity from 1.8 million bpd per day to 4.5 million bpd by 2014.

7/6/10 2Q2010 E&C EPCm 2013 Chemical STADE, GERMANY: Foster Wheeler awarded a contract by Dow Deutschland Anlagengesellschaft
mbH for a new cogeneration facility to be installed within Dow’s existing chemical complex. The plant
consists of three gas turbogenerators, heat recovery steam generators and combined steam
turbogenerators, electrical infrastructure, offices, storage and facilities and will have a capacity of 150
megawatt electric.

6/28/10 2Q2010 E&C Pre-FEED 2011 Oil & Gas KRIBI, CAMEROON: Foster Wheeler awarded a contract by GDF SUEZ to carry out the pre-front-
end engineering design (pre-FEED) for the development of an onshore LNG plant and offshore gas
gathering infrastructure. Production capacity of up to 3.5 million tons per annum. Project includes
upstream gas gathering system and subsea pipeline tie-ins to offshore production facilities.

6/21/10 1Q10 E&C Design, supply 2010 Refining ALIAGA, TURKEY: SOCAR & TURCAS Rafineri A.S., (STRAS) awarded a contract to cover
overall front-end engineering design for the new grassroots refinery and the basic design package for
the delayed coker, which will use Foster Wheeler’s leading SYDECsm delayed coking technology. The
planned new facility will have a capacity of 214,000 barrels per stream day (BPSD).

6/21/10 2Q10 Power Design, supply 2Q12 Power WUHAN, CHINA: Sinopec Wuhan Company awarded a contract for the design and supply of three
circulating fluidized-bed (CFB) steam generators for the Sinopec Wuhan Cogeneration Plant.

6/15/10 1Q10 Power Design, supply & 2011 Power SAN JOSE DEL VALLE (CADIZ, SPAIN): Contract was awarded by a joint venture created by the
provide site Spanish companies SENER and COBRA to design, supply and provide site advisory services for two
advisory services sets of solar steam generators (preheaters, kettle type evaporators, superheaters and reheaters) as well as
low pressure and high pressure feedwater heaters.
6/2/10 2Q10 E&C Feasibility study Refining NASSIRIYA, IRAQ: The Iraqi Ministry of Oil awarded a feasibility study and front-end engineering
and FEED design contract for a new grassroots refinery. The proposed refinery will have a capacity of 300,000
barrels per day. FW will develop the configuration of the new refinery to meet the client’s processing
objectives, evaluate proprietary technologies, prepare a report covering the feasibility of the project and
22
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

the design basis of the refinery facilities, engage the selected licensors and prepare the FEED package
for the total project.
6/1/10 2Q10 E&C EPCm Refining CAMEROON: Société Nationale de Raffinage (SONARA) awarded an engineering, procurement, and
construction management services contract for Phase 1 of the Limbé Refinery upgrade and
modernization project. FW has already completed the FEED for the entire project. Phase 1 includes
the revamp of the existing crude distillation unit, addition of a new vacuum distillation unit, new
catalytic reformer unit, and power generation and associate offsites and utilities facilities.
5/4/10 1Q10 (Bab) E&C PMC Oil & Gas UNITED ARAB EMIRATES: Abu Dhabi Company for Onshore Oil Operations (ADCO) awarded a
project management consultancy (PMC) contract for the Bab Field expansion and the development of
2Q10 Qusahwira Field. FW’s primary role as PMC will be to manage the engineering, procurement and
(Qusahwira) construction (EPC) tendering and award process and the EPC execution phase on behalf of ADCO.

4/13/10 4Q09 E&C FEED Refining PLOESTI, ROMANIA: PETROM S.A. awarded contracts for investments which form part of its
modification major refinery modernization project at the Petrobrazi Refinery. FW will provide front-end engineering
services and design modification services and engineering, procurement and construction management for the
EPCm revamp of an atmospheric/vacuum distillation unit at the refinery. In addition, FW was awarded an
EPCm contract for a new amine unit and the FEED for the revamp of a delayed coking unit.
4/8/10 1Q10 Power Design and supply 2011 Power TURKEY: METKA, S.A., EPC contractor for the project, awarded a contract for the design and
supply of two axial deaerating surface condensers for the Samsun Power Plant in Turkey. FW has
previously supplied condensers to METKA for five separate projects.
4/7/10 1Q10 Power Design, supply and 2012 Power POLAND: GDF SUEZ awarded a contract for the design, supply and erection of a 190 MWe (gross
erection megawatt electric) 100% biomass-fired CFB boiler island for the Polaniec Power Station. Once
complete, this will be the world’s largest biomass boiler burning wood residues and up to 20% agro
biomass.
3/16/10 1Q10 E&C EPCm 2012 Chemicals SASOLBURG, SOUTH AFRICA: Sasol awarded FW an engineering, procurement and construction
management contract for its Fischer-Tropsch Wax Expansion Project. FW completed the front-end
engineering design in the fourth quarter of 2009 and has subsequently been assisting Sasol in early
EPCm activities.
3/5/10 1Q10 Power Design and supply 2011 Power PONFERRADA, SPAIN: Fundación Ciudad de la Energia (CIUDEN) awarded a contract for the
design and supply of a 30 MWth CFB unit for testing FW’s Flexi-Burn™ carbon capturing CFB
technology. The unit will be part of CIUDEN’s Integrated Carbon Capture and Sequestration
Technology Development Plant located near Endesa’s Compostilla power plant.
2/26/10 1Q10 Power Design and supply 2012 Power JIANGXI PROVINCE, CHINA: Sinopec Jiujiang Company awarded a contract for the design and
supply of two circulating fluidized-bed (CFB) steam generators for the Sinopec Jiujiang Fuel Alteration
Project. The two 50 MWe (gross megawatt electric) steam generators will be designed to burn coal and
petcoke in a manner that will meet China’s increasingly stringent environmental requirements.
2/16/10 E&C Technical and Refining VIETNAM: Nghi Son Refinery and Petrochemical Limited Liability Company awarded a contract for
commercial the provision of technical and commercial services for the planned Nghi Son Refinery and

23
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

services Petrochemicals Complex. Recently, FW successfully completed, on schedule, the front-end engineering
design for this new complex, which will be Vietnam’s second refinery.
2/9/10 1Q10 Power Design and supply 2012/2013 Power VIETNAM: Lilama Corporation, a Vietnamese EPC contractor, awarded a contract for the design and
supply of two steam surface condensers and auxiliary equipment for the Vung Ang Thermal Power
Plant. The 2 x 600 MWe coal-fired power plant will be located in Ha Tinh Province.
JURONG ISLAND, SINGAPORE: Singapore LNG Corporation Pte Ltd awarded a contract to
2/8/10 1Q10 E&C PMC 2013 Oil & Gas provide project management consultancy services in support of the development of the LNG terminal,
which will have an initial capacity of 3.5 million tonnes per annum, with provisions for expansion to 6
Mtpa.
2/2/10 4Q09 E&C Feasibility study 2010 Refining UGANDA: The Government of the Republic of Uganda awarded a contract for a feasibility study for
the development of an oil refinery with a capacity of up to 150,000 barrels per day in Uganda. This is
the first oil refinery project in that country.

1/27/10 4Q09 Power Design and supply 2010 Power PONFERRADA, LEÓN, SPAIN: ENDESA, the Spanish utility company, awarded a contract to
design and supply a low NOx burner system, which will be integrated in the Compostilla Power Plant,
Unit 3 (330 MWe). This is the twelfth low NOx burner system awarded by ENDESA in recent years.

1/7/10 4Q09 Power Design, supply and 2012 Power MURCIA, SPAIN: Repsol Petroleo S.A. awarded a contract to design, supply and erect a heat
erect recovery steam generator which, along with auxiliary equipment, will be integrated in a cogeneration
plant being built at the Repsol Cartagena refinery. This boiler is the seventh HRSG awarded to FW by
Repsol.

2009
12/15/09 4Q09 E&C Project Refining COLOMBIA: Refinería de Cartagena S.A. (REFICAR) accepted the offer by a joint venture of FW
Management and Process Consultants, Inc. (a FW company) to serve as its consultant (PMC) for the expansion of the
Consultancy Cartagena refinery in Colombia.

12/14/09 4Q09 Power Design and supply 2012 Power QUANG NINH PROVINCE, VIETNAM: Wuhan Kaidi Electric Power Co., Ltd. awarded a
contract for the design and supply of two 220 MWe (gross megawatt electric) CFB steam generators for
Vietnam National Coal-Mineral Industries Group’s Mao Khe thermal power plant project .
12/10/09 E&C Memorandum of Refining A memorandum of understanding has been signed between the Global E&C Group and PetroAlgae for
Understanding for engineering services to be performed in conjunction with PetroAlgae’s micro-crop biomass technology,
engineering which allows for the production of dry biomass at a very large scale. The two firms will intend to
services create end-to-end market solutions for the large-scale production of green gasoline, diesel, jet fuel and
specialty chemicals.
12/10/09 3Q09 Power Two design and Power SAUDI ARABIA: Tecnicas Reunidas Power awarded two design and supply contracts, one for two
supply contracts heat recovery steam generators and the other for two package-type steam generators, which will be
installed at the Manifa Cogeneration and main Substations Project by Tecnicas Reunidas for Saudi

24
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

Aramco.
12/3/09 3Q09 E&C Consultancy 2010 Other ALBANIA: The United Nations Development Program awarded a consultancy contract to conduct
environmental impact assessments of ten high-priority contaminated areas in Albania.
11/17/09 2Q09 E&C EPCm and 2011 Pharma GÖDÖLLÖ, HUNGARY: Kedrion Group and its Hungarian-controlled Human Bioplazma LLC.
Commissioning awarded a contract for engineering, procurement, construction management and
commissioning/qualification supervision for the upgrading and expansion of a bulk plasma
fractionation manufacturing facility.
11/16/09 4Q09 E&C FEED 2010 Oil & Gas AUSTRALIA: Woodside awarded a front-end engineering design contract for Train 2 and Train 3 of
the Pluto liquefied natural gas (LNG) project. The contract also includes an option for early EPCm
services.
10/13/09 3Q09 E&C Process design 2011 Other SAUDI ARABIA: SETE Energy Saudia for Industrial Projects Ltd. awarded a contract for the
expansion of an industrial wastewater treatment plant.
9/8/09 3Q09 Power Design, supply and 2012 Power KONIN, POLAND: ZE Pak S.A. awarded a contract for the design, supply and erection of a 55 MWe
erection biomass-fired CFB boiler island for the Konin Power Station. The steam generator will be designed to
burn wood biomass and up to 20% agro biomass.
8/21/09 2Q09 E&C Detailed design Chemicals NORTH AMERICA: A confidential client awarded a detailed design contract for a chemicals project
in the United States.
7/29/09 2Q09 E&C EPC; concept 2010 Oil & Gas ZEEBRUGGE, BELGIUM and DUNKERQUE, FRANCE: Gassco AS awarded an engineering,
development and (Zeebrugge) procurement and construction contract for the implementation of the blow-down system modification at
pre-engineering Gassco’s Zeebrugge Terminal, Belgium, and the concept development and pre-engineering of the blow-
down system at its Dunkerque Terminal in France following its successful completion of the study
phase.
7/23/09 2Q09 E&C FEED 2010 Oil & Gas QUEENSLAND, AUSTRALIA: Santos Ltd. awarded a front-end engineering design (FEED)
contract for its GLNG® Upstream Project. The FEED is for the extraction, collection, compression and
transportation of coal-seam gas to the transmission pipeline, and associated infrastructure and services,
including power generation and water treatment facilities.

6/17/09 2Q09 E&C Pre-FEED Oil & Gas KENT, ENGLAND: E.ON UK plc awarded a technical services agreement to FW and its consortium
partner to perform the pre-front-end-engineering design (pre-FEED) for a post-combustion carbon
dioxide (CO2) capture plant proposed as part of E.ON’s new supercritical coal-fired power station.

5/29/09 1Q09 E&C Engineering Other ROTTERDAM, THE NETHERLANDS: The Rotterdam Climate Initiative (RCI) awarded a contract
consultancy for the provision of engineering consultancy services related to RCI’s planned carbon capture, storage
services and utilization solution.

5/27/09 2Q09 E&C Supply Refining KAOHSIUNG, TAIWAN: CTCI awarded contracts for the supply of a carbon monoxide boiler for
CPC Corporation’s new residue fluidized catalytic cracker (RFCC) at CPC’s Talin refinery. Scope

25
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

includes a proprietary FW-designed incinerator to destroy carbon monoxide in the waste gas stream
from the RFCC, a boiler section to recover heat from the resulting flue gas, and a selective catalytic
reduction flue gas treating system to minimize emissions of nitrogen oxides to the atmosphere.

5/5/09 1Q09 Power Design and supply 2010 Power SEVILLE, SPAIN: SENER-AMSA JV awarded a contract to design and supply the steam generating
equipment for the new Gemasolar Project tower-type concentrated solar power plant and also the
feedwater heater equipment contract for the facility.

4/1/09 Contract value Power 20-Year License Power INDIA: FW has entered into a 20-year agreement with BGR Boilers Limited to provide an advanced
will be booked Agreement technology license for wall-fired subcritical and supercritical pulverized-coal steam generators to be
upon approval sold in India. In addition, the companies have agreed to cooperate on multiple prospective projects
of Indian under separate contracts within the next five years, with FW providing the engineering and design along
Government with selected major components.

3/18/09 1Q09 E&C FEED 2009/2010 Oil & Gas NORWEGIAN SEA: StatoilHydro ASA awarded a contract to undertake the front-end engineering
design for the carbon dioxide/amine project at the Åsgard B offshore production facilities in the
Norwegian Sea.

3/17/09 1Q09 E&C EPCm Refining WHITING, INDIANA, USA: BP Products North America Inc. awarded the full Engineering,
Procurement and Construction Management services contract for the Coker Pillar Project at its Whiting
refinery. This award is an increase in role for FW through the addition of the Construction
Management services beyond the engineering, procurement and fabrication work currently being
executed by FW for this project.

3/11/09 1Q09 E&C EPC and managing Refining PARADIP, ORISSA STATE, INDIA: Indian Oil Corporation Limited awarded an EPC and
PMC Managing PMC contract for a grassroots refinery in India. In the role of Managing Project
Management Consultant, FW will undertake the major part of the development of the new 15 million
tones per annum refinery and will also execute the engineering, procurement and construction
management for 15 of the key refinery process units, plus offsites, utilities and infrastructure. The
EPCm scope includes the crude distillation units, reforming, alkylation and butane isomerization units,
plus significant offsites, utilities and infrastructure. The booking is in excess of four million man-hours.

3/3/09 Bookings will E&C Feasibility, FEED Upstream SOUTH AFRICA: Sasol Technology (Pty) Limited awarded a framework contract that covers all of
be made as and design oil & gas, the sectors in which Sasol is active, including upstream oil and gas, chemicals, gas-to-liquids, coal-to-
work orders services midstream liquids and coal-to-chemicals. Feasibility study, front-end engineering and design services will be
are received and provided as requested by Sasol.
chemicals

2/20/09 4Q08 E&C Basic design 2009 Refining LA PLATA, ARGENTINA: YPF, S.A. awarded a contract to provide the basic design package for
package the new fractionation unit and gas plant for the new delayed coking unit at the La Plata Refinery.

26
Projected
Date Quarter Business Contract Completion Industry
Announced Booked Group Type Date Served Description

2/19/09 1Q09 E&C Basic engineering Oil & Gas IRAQ: South Oil Company awarded a contract for the basic engineering of new offshore oil export
facilities to supplement the existing Al-Basra terminal.

2/19/09 1Q09 E&C FEED and 2014 Other SOUTH KOREA: Doosan Heavy Industries & Construction Co., Ltd. awarded a contract for the
technical services FEED and technical services for a new gasification island, based on Shell technology.

2/18/09 1Q09 E&C Design and supply Chemicals SALTEND, UK: BP Chemicals Ltd. awarded a contract for the design and supply of a Terrace-WallTM
steam reforming furnace, which will replace the existing reformer at BP’s chemicals complex at
Saltend.

1/30/09 4Q08 Power Design, supply, 2010 Power PORTUGAL: UTE IBERESE-SOMAGUE awarded a contract for the design, supply and erection of a
erect and startup heat recovery steam generator (HRSG) at the SINES Refinery, and also startup supervision of the
supervision HRSG, which will be coupled to a Siemens SGT-800 combustion turbine, with a total installed ISO
rating of 47 MWe (gross megawatt electric).

1/21/09 Bookings will E&C Alliance Refining STANLOW, UK: Shell UK Oil Products Limited awarded a two-year extension of its existing alliance
be made as contract for the provision of basic design, engineering, procurement and construction management
work orders services at Shell’s Stanlow Manufacturing Complex, UK.
are received

Safe Harbor Statement


Foster Wheeler AG news releases may contain forward-looking statements that are based on management’s assumptions, expectations and projections about the Company
and the various industries within which the Company operates. These include statements regarding the Company’s expectations about revenues (including as expressed by its
backlog), its liquidity, the outcome of litigation and legal proceedings and recoveries from customers for claims and the costs of current and future asbestos claims and the amount
and timing of related insurance recoveries. Such forward-looking statements by their nature involve a degree of risk and uncertainty. The Company cautions that a variety of
factors, including but not limited to the factors described in the Company’s most recent Annual Report on Form 10-K, which was filed with the U.S. Securities and Exchange
Commission, and the following, could cause the Company’s business conditions and results to differ materially from what is contained in forward-looking statements: benefits,
effects or results of the Company’s redomestication to Switzerland, benefits, effects or results of the Company’s strategic renewal initiative, further deterioration in global
economic conditions, changes in investment by the oil and gas, oil refining, chemical/petrochemical and power generation industries, changes in the financial condition of its
customers, changes in regulatory environments, changes in project design or schedules, contract cancellations, the changes in estimates made by the Company of costs to complete
projects, changes in trade, monetary and fiscal policies worldwide, compliance with laws and regulations relating to the Company’s global operations, currency fluctuations, war,
terrorist attacks and/or natural disasters affecting facilities either owned by the Company or where equipment or services are or may be provided by the Company, interruptions to
shipping lanes or other methods of transit, outcomes of pending and future litigation, including litigation regarding the Company’s liability for damages and insurance coverage for
asbestos exposure, protection and validity of the Company’s patents and other intellectual property rights, increasing global competition, compliance with its debt covenants,
recoverability of claims against the Company’s customers and others by the Company and claims by third parties against the Company, and changes in estimates used in its
critical accounting policies. Other factors and assumptions not identified above were also involved in the formation of these forward-looking statements and the failure of such
other assumptions to be realized, as well as other factors, may also cause actual results to differ materially from those projected. Most of these factors are difficult to predict
accurately and are generally beyond the Company’s control. You should consider the areas of risk described above in connection with any forward-looking statements that may be
27
made by the Company. The Company undertakes no obligation to publicly update any forward-looking statements, whether as a result of new information, future events or
otherwise. You are advised, however, to consult any additional disclosures the Company makes in proxy statements, quarterly reports on Form 10-Q, annual reports on Form 10-K
and current reports on Form 8-K filed or furnished with the Securities and Exchange Commission.