Sunteți pe pagina 1din 6

ANNEXURE - 1

“TITLE OF THE PROJECT”

IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR

MASTER OF _______________________________________ MANAGEMENT

2018-2019

ROLL NO. _____________

JAMNALAL BAJAJ INSTITUTE OF MANAGEMENT STUDIES

1
GUIDELINES FOR PROJECT WORK

OBJECTIVES –

The objectives of the project would be to see that a student does research work in any
“Area of Management” related to the field of specialisation. Every project should include
inter-alia the following:-

Objective/s and Scope of the Study


Formulation of Hypothesis
Research Methodology

Library Research
Data Collection / Sample Size
Drawing of inferences through statistical analysis
Data Collection / Sample Size
Strength and limitations of the study
Bibliography – Systematic and complex list of references

EXPECTED STANDARDS OF PERFORMANCES –

(a) Project work with good understanding of existing literature, framing of Good
methodology, data collection and analysis. 50-60%
(b) Project work with good understanding of existing literature, framing of Very
hypothesis, data collection and drawing of inferences through statistical Good
analysis. 60-69%
(b) Project work with good understanding of existing literature, framing of Excellent
hypothesis, data collection and drawing of inferences through statistical More than
analysis. Further, this research work should be wither of major extension 70%
or developments of new concepts bringing about further trends / acenaries.

DURATION –

The project will be spread over two semesters i.e. Second Semester of the Second Year and
First Semester of the Third Year. The Project carries 100 marks (100 marks internal).

2
GUIDELINES TO BE FOLLOWED BY STUDENTS WHILE PREPARING
THE PROJECT REPORT

1. All the students are required to comply with the requirements as laid down regarding the
submission of Project Work. The projects are individual projects and not joint projects.

2. The projects work is 100 marks and spread over three semesters (first and second
semester of second year and first semester of third year).

3. The Cover Page of the report shall be as per the format given in Annexure I.

4. The acknowledgement page of the report should be brief.

5. There shall be a separate page for contents.

6. After the content page, there shall be a separate page list of Tables / Charts / Diagrams, if
any.

7. After the content page, there will be synopsis of the project briefly written in two pages.

8. All chapters must be numbered.

9. Bibliographical references in the report, if required, shall appear at the end of the project
report, as per the following format :-

10. Fredrick Neubaver and Norman Solomon “A Managerial Approach to Environment


Assessment. Long Range Planning” Vol. 10, April 1977, pp.15-20.

 W.F. Clueck “Business Policy; Strategy Formulation and Effective Action and ed.”
McGraw Hill, New York.

 The report must be typed in Quarter Size paper (8 ½ x 11 ½) in double spacing with ½”
margin on the left side of the paper. Two copies of the report shall be submitted.

11. The name of the guide and student should not appear anywhere in the project.

3
UNIVERSITY OF MUMBAI
JAMNALAL BAJAJ INSTITUTE OF MANAGEMENT STUDIES

PART-TIME MASTER’S DEGREE PROGRAMMES


MHRDM / MIM / MMM / MFM
REGISTRATION FORM FOR PROJECT WORK

1. Name of the candidate


(capital letters)
(beginning with surname)
2. Name of the Programme

3. Third Year Fee Receipt Challan No.


& date
4. Address : Residence :

Tel.No.:
Office :

Tel.No.:
5. Name and Address of the Guide

Tel.No.:
6. Proposed title of the Project

DATE: SIGNATURE OF THE GUIDE

4
PROJECT GUIDE CERTIFICATE FORM

I, the undersigned Ms./ Mr.____________________________________________________

Roll No. _________ studying in the Third Year of ________ is doing my project work

under the guidance of Dr./Ms./Mr. ________________________________, wish to state that

I have met my Internal guide on the following dates mentioned below for Project Guidance:-

Sr.No. Date Signature of the


Internal Guide

______________________ _______________________
Signature of the Candidate Signature of Internal Guide

N.B.: The candidate should retain the Project Guide Certificate Form and submit the same
while submitting the Project to the Institute i.e. on or before 15th October, 2018.

5
Project Submission Form

MHRDM/MIM/MFM/MMM-Third Year-Fifth Semester

This is to certify that Ms./Mr._______________________________________________


(Roll No.__________) of the Master in ______________________________Management
(MHRDM/MIM/MFM/MMM) Three Year Part-time Degree Course has carried out the
work on the
Project_____________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
under my guidance.

Date: Name & Signature of the Guide

(This certificate should be separately pinned with the project)

Received two copies of the Project from Mr./Ms._________________________________


(Roll No._______________) of the Master in ______________________Management
(MHRDM/MIM/MFM/MMM) Three Year Part-time Degree Course on the
Project titled _______________________________________________________________
__________________________________________________________________________
__________________________________________________________________________

Date Receiver’s Signature


6

S-ar putea să vă placă și