Sunteți pe pagina 1din 108

Name of the O&M Division : Tumkur

Name of the O&M Sub-division: RSD-1

Name of the O&M : CT KERE


Name Of the Feeder: F-9 RG HALLI
Feeder wise d
No of Installations
Energy sent out Billed
Energy in Metered Energy
Sl.no Month from station in in MU
Unmetered MU (Input) MU
Metered (IP Sets)

1 2 3 4 5 6 7

1 Jul-17 NA 0 148830 NA NA

2 Aug-17 NA 0 157930 NA NA

3 Sep-17 NA 0 137790 NA NA

4 Oct-17 NA 0 135400 NA NA

5 Nov-17 1982 0 135400 176260 0

6 Dec-17 117487 0 160180 117487 117487.00

7 Jan-18 88622.46 0 158620 88622.46 88622.46

8 Feb-18 2329.00 0 182290 133651 133651.00

9 Mar-18 2468.00 0 176260.0000 127804 127804.00


10 Apr-18 2474.00 0 213280.0000 159786 159786

11 May-18 2480.00 0 223100.0000 168345 168345

12 Jun-18 2472.00 0 180810.0000 143151 143151

Total 218332.46 0 501090 467564.46 467564.46

Note: The detailed for the bifurcated feeders a


TPIA, NJY Ph-3, Pre an

Estimate Cost :
Feeder wise details for conducting pre and post analysis of 11 kv comb
No of Transformer existing

Unmetered Toatl %age


Total
Energy in MU of failure
25 KVA 63 KVA 100 KVA 250 KVA

8 9 10 11 12 13 14

NA 22 12 0 1 35 2.78

NA 22 12 0 1 35 0.00

NA 22 12 0 1 35 2.78

NA 22 12 0 1 35 0.00

0 22 12 0 1 35 0.00

0 22 12 0 1 35 2.78

0 22 12 0 1 35 0.00

0 22 12 0 1 35 2.78

0 22 12 0 1 35 0.06
0 22 12 0 1 35 0.06

0.00 22 12 0 1 35 0.06

0.00 22 12 0 1 35 0.06

0 154 84 0 7 245 5.81262496

bifurcated feeders also to be sent along with this format


A, NJY Ph-3, Pre and Post Analysis

W.O.No:
nalysis of 11 kv combo feeders (Rural & Agriculture) for Previous 24 months

Peak Energy
% Voltage Peak load in Connected Energy Billed Losses (T&D) BilledLakkhs
amount in
load in
regulation MW load (kVA)
Amps in MU

15 16 17 18 19 20 21

7 26 0.43 1306 NA NA NA

7 25 0.42 1306 NA NA NA

7 25 0.42 1306 NA NA NA

7 25 0.42 1306 NA NA NA

7 25 0.42 1306 0 - -

6 26 0.43 1306 0.73 26.65 731690.91

6 28 0.47 1306 0.56 44.13 622529.9

6 30 0.5 1306 0.73 -0.92 904940.62

6 25 0.42 1369 0.73 27.49 904380.03


6.5 24 0.41 1369 0.75 25.08 1049446.52

7 22 0.39 1369 0.75 24.54 1078042.35

6 23 0.4 1369 0.79 20.83 1014356.46

43.5 178 3.02 9394 4.25 $167.80 2259161.43


ious 24 months
Feeder Interruption

Collected amount AT&C losses ARR 11 KV Scheduled 11 KV Unscheduled


in Lakhs
Interruptions Interruptions

No's Durations No's

22 23 24 25 26 27

NA NA NA NA NA NA

NA NA NA NA NA NA

NA NA NA NA NA NA

NA NA NA NA NA NA

- - 4.2 15 10 8

763619.90 24.08 4.3 16 11 7

1285483.91 -15.36 4.1 15 10 8

-836069.38 167.16 4.05 17 12 9

14389776.06 -1061.43 4.2 20 18 30


714746.12 49.00 4.1 18 20 28

713369.76 $50.50 4 19 21 27

575888.04 54.97 4.3 20 18 30

1213034.43 50.50 29.05 125 110 139


uption

11 KV Unscheduled
Interruptions

Durations

28

NA

NA
232

NA

NA

22
20

19

22

95

S-ar putea să vă placă și