Sunteți pe pagina 1din 44

T-36/2017:

Replacement of Protection Relays in 11KV


System in Nizwa Industrial Sur & Hospital S/S

RELAY SETTING CALCULATION

NIZWA INDUSTRIAL PSS

Done by : Mustafa Hamid


DCRP PE Lic. No : PE 006/2015
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Contents:

1.0 Source Data

2.0 Fault Calculations – ETAP

3.0 Consideration of Calculations

4.0 Relay setting calculations

Annexure-I: Detailed ETAP Reports included Over Current and Earth Fault curves

Page 2 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
1.0 Source Data:

1.1. Short Circuit Current (As per MZEC data):

No. Description 33 kV BUS


1 Three phase Fault (Maximum) at 33 kV Bus in kA 20.03
3 Single phase Fault (Maximum) at 33 kV Bus in kA 3.000

1.2. Short Circuit MVA:


𝑴𝑽𝑨𝒔𝒄 = √𝟑 ∗ 𝑲𝑽 ∗ 𝑰𝒔𝒄

No. Description 33 kV BUS


1 Three phase Fault (Maximum) at 33 kV Bus in MVA 1144.0
3 Single phase Fault (Maximum) at 33 kV Bus in MVA 171.4730

1.3. 33kV Line Data:


UG-1
- 33 kV, 3C, 300 mm2

Positive Sequence impedance = 0.080+0.105i Ω/km


Negative Sequence impedance = 0.080+0.105i Ω/km
Zero Sequence impedance = 0.130+0.270i Ω/km
Cable Length ≈ 100m = 1.0 km
UG-2
Positive Sequence impedance = 0.080+0.105i Ω/km
Negative Sequence impedance = 0.080+0.105i Ω/km
Zero Sequence impedance = 0.130+0.270i Ω/km
Cable Length = 3.3337 km
OHL-1
Positive Sequence impedance = 0.2276+0.3378i Ω/km
Negative Sequence impedance = 0.2276+0.3378i Ω/km
Zero Sequence impedance = 0.4046+1.6290i Ω/km
Cable Length = 2.8 km

1.4. Transformers Data:

Transformer TR-1 TR-2


HV Side Voltage 33000 33000
LV Side Voltage 11500 11500
SC impedance Zsc % 12.53 12.52
X/R Ratio 24 24

2.0 Manual Calculation:

2.1 Per Unit Transformation

Ipu = ISC / Ib

Page 3 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Ib = MVAb/ √3 ∗ KVb

Zb = (KVb)2 / MVAb Ω

Zpu = Zactual / Zb

Zpu new = Zpu old x [ (KVb old)2 / (KVb new)2 x (MVAb new) / (MVAb old) ]

Isc pu 1-ph = 3 x Io = 3 x E / (Z1pu + Z2 pu + Zo pu)

2.1.1 @ Source:

KVb = 33 kV & MVAb = 20 MVA

Zb = 332 / 20 = 54.45 Ω

Ib = 20000 / (√3 ∗ 33 ) = 349.9 A

Page 4 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.1.2 3-ph fault:

Z1 pu min = j 0.017472

2.1.3 1-ph fault:

Assume Z1 = Z2

Z1 pu = j 0.116686
ISC = 20030 A & Ib = 349.9 A
Ipu = 20030 / 349.9 = 57.22

Isc pu 3-ph = 3 x Io = 3 x E / (Z1pu + Z2pu + Zopu)

57.22 = 3 x 1 / (j 0.116686+ j 0.116686 + Zo pu)

∴ Zo pu min = j 0.18094

2.2 For Cables:

Cable-1
Z1 pu =Z2 pu = (0.08 + 0.105i) *1/ 54.45 = 0.001469 + j 0.001928
Zo pu = (0.130 + 0.270i) *1/ 54.45 = 0.0023875 + j 0.0049587
OHL -1
Z1 pu =Z2 pu = (0.2276+0.3378i)*2.8/54.45 =0.0117+0.01737i
Zo pu = (0.4046+1.6290i)*2.8/54.45 =0.0208+0.08376i
Cable-2
Z1 pu =Z2 pu = (0.08 + 0.105i) *3.337/ 54.45 = 0.004898 + j 0.006428
Zo pu = (0.130 + 0.270i)*3.337/ 54.45 = 0.007967+ j 0.016547
LINE-1 = Z C1 + Z OHL-1
Z1 pu =Z2 pu = 0.013169 + j 0.019298
Zo pu = 0.0231875 + j 0.088718
LINE-2 = Z C2
Z1 pu =Z2 pu = 0.004898 + j 0.006428
Zo pu = 0.007967 + j 0.016547
2.3 For Transformers:

2.3.1 TR-1&2:

Z1 pu = 0.1252 & X/R = 24

(R2+x2) = 0.12522,
R = 0.004929,
X = 0.118297

Assume Z1 pu=Z2 pu=Zo pu= 0.005212+j 0.12509

Page 5 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.4 Per unit impedances summary refer to 20 MVA base:

Source
line 1& line 2
Item Max 3- Max 1-ph TR-1&2
ph Fault Fault L-1 L-2
Pos. seq.
impedance
j0.017472 j 0.116686 0.013169 + j 0.019298 0.004898 + j 0.006428 0.005212+j 0.12509

Neg. seq. Not


impedance Required
j 0.116686 0.013169 + j 0.019298 0.004898 + j 0.006428 0.005212+j 0.12509

Zero seq. Not


impedance Required J 0.18094 0.0231875 + j 0.088718 0.007967 + j 0.016547 0.005212+j 0.12509

Page 6 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.5 Max 3-ph Fault current @11.5 kV bus when both transformers working in
parallel:

For balance 3-ph fault the sequential circuit will be as in fig (1)

Z T pu = ZS1 min pu + (ZL1 1 pu + ZTR1 1 pu ) // ( ZL2 1 pu + ZTR2 1 pu )

= j 0.017472 +( 0.013169 + j 0.019298 + 0.005212+j 0.12509) //


(0.007967 + j 0.016547+ 0.005212+j 0.12509))

=0.0069408+j0.08634
= 0.08662 85.403°

IF pu = E / Z T pu (Assume the pre fault voltage equal to nominal voltage, E= 1pu)

∴IF pu = 1 / 0.07650 85.403°


= 11.5446 85.40° Lag.

@ 11.5 kV bus

Ibase = 20 / (1.732 x 11.5) = 1004 A


Isc = Ib x Ipu = 11.544x 1004 = 11590.8 -85.403° A

Isc 3-ph max = 11.59KA

2.6 Min 3-ph Fault current @11.5 kV bus when each Transformer working
separately (11 kV bus section open)

For balance 3-ph fault the sequential circuit will be as in fig (2)

Fig (2)

Z T pu = (ZS1 pu +ZLine-2 pu + ZTR2 1 pu)


= j 0.017472 +0.013169 + j 0.019298+ 0.005212+j 0.12509
= 0.018381+j0.16186
= 0.1629 83.5°

IF pu = E / Z T pu (Assume the pre fault voltage equal to nominal voltage , E= 1 pu)

∴IF pu = 1/0.1629 ∠ 83.5


= 6.138 83.5° Lag.

@ 11.5 kV bus
Ibase = 20 / (1.732 x 11.5) =1004 A
Isc = Ib x Ipu = 6.138 x 1004 = 6163.2775 -85.5° A

Isc 3-ph min = 6.163 KA

Page 7 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.7 Max 1-ph Fault current @11.5 kV bus when both transformers working in
parallel

For 1-ph fault the sequential circuit will be as in fig (3)

Z T pu = ZS1 min pu + (ZL1 1 pu + ZTR1 1 pu ) // ( ZL2 1 pu + ZTR2 1 pu ) +


ZS2 min pu + (ZL1 2 pu + ZTR1 2 pu ) // ( ZL2 2 pu + ZTR2 2 pu )+ ((ZTR1 o pu) // (ZTR2 o pu))

= j 0.017472 +( 0.013169 + j 0.019298 + 0.005212+j 0.12509) //


(0.007967 + j 0.016547+ 0.005212+j 0.12509)) + j 0.017472 +( 0.013169 + j 0.019298 +
0.005212+j 0.12509) // (0.007967 + j 0.016547+ 0.005212+j 0.12509)) +(0.005212+j 0.12509)//
(0.005212+j 0.12509)

= 0.01648+j0.23522
= 0.2358 86°
IF pu = E / Z T pu (Assume the pre fault voltage equal to nominal voltage, E= 1pu)
∴Io pu = 1 / 0.2358 86° = 4.24 86°Lag.
IF pu = 3 x Io pu = 3 x 4.24=12.722
= 12.722 87.965° Lag.

@ 11.5 kV bus
Ibase = 20 / (1.732 x 11.5) = 1004 A
Isc = Ib x Ipu = 12.722 x 1004 = 12773.2 - 86.0° A

Isc 1-ph max = 12.77 KA

2.8 Min 1-ph Fault current @11.5 kV bus when each Transformer working
separately (11 kV bus section open)

For 1-ph fault the sequential circuit will be as in fig (4)

Z T pu = [(j 0.017472 +0.013169 + j 0.019298+ 0.005212+j 0.12509)+ (j 0.017472 +0.013169 + j


0.019298+ 0.005212+j 0.12509)+ (0.005212+j 0.12509)]
= 0.04197+j 0.4488 = 0.4507 87.78°

IF pu = E / Z T pu (Assume the pre fault voltage equal to nominal voltage , E= 1pu)

∴Io pu = 1 / 0.2065 87.78° 2.218 84.65° Lag.

IF pu = 3 x Io pu = 3 x 2.2184 = 6.655 84.6° Lag.

@ 11.5 kV bus

Ibase = 20 / (1.732 x 11.5) = 1004 A


Isc = Ib x Ipu = 6.655 x 1004 = 6681.92 84.65° A

Isc 1-ph max = 6.68 K

Page 8 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

3.0 Fault Calculation by ETAP Software:

3.1 Max 3-phase fault:

Page 9 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3.2 Min 3-phase fault:

Page 10 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3.3 Max 1-phase fault:

Page 11 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3.4 Min 1-phase fault

ETAP detailed reports are given in Annexure-1.

Page 12 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
4.0 ETAP Software Calculation results verses Manual Results:

ETAP Software Results MANUAL CALCULATION


No. Description (KA)
(KA)
1 Maximum Three phase Fault 11.57 11.59
2 Minimum Three phase Fault 6.15 6.16
3 Maximum Single phase Fault 12.76 12.77
4 Minimum Single phase Fault 6.67 6.68

5.0 Considerations :

 relay setting calculation done by with the following considerations:

o IEC Normal inverse Curve used for all levels O/C & E/F

o O/C &E/F grading done starting from 11 kV OG feeder with 0.1 TMS and 0.3
sec between each relay and other up to minimum fault level

o E/F graded up to 11 kV incomer only ( TR delta / Star )

 As per MZEC policy E/F for 33 kV TR feeder should be 5 % , 0.05 TMS but as per
the previous stations practice considered 10% to avoid unwanted tripping due to
inrush current

 33 kV TR feeder Instantaneous O/C considered 1.25 of max through fault current to


11 kV

Page 13 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Over Current and Earth Fault RELAY


SETTING CALCULATIONs

Page 14 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Over Current PROTECTION COORDINATION

Page 15 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Over Current Protection Coordination:


1- 11 kv OG Feeder
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
A- Time Delayed over current ( 51):
Refer to fault calculation page 8 Max 3-ph fault current @11kv bus is 11.57 KA
The setting will be :
CT Ratio 300/5
Current Setting (A) 5.0
TMS 0.100
Characteristic IEC Inverse

Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 11.57/300 =38 accordingly only 20 Ip will be used = 8000
T = 0.14* TMS/((IF/IS) ^0.02 -1)
= 0.14*0.1/(8000/400) ^0.02-1)
=0.2267 sec
B- Negative Sequence Protection (46-1 ):
Refer to MZEC policy and recommendation instantaneous to be disabled
Pickup value should be 20 % and recommend tripping time 5 sec
CT Ratio 300/5
Current Setting (A) 1
Time ms 5000
Characteristic DT
2- 11 kv Station TR
Relay Type : Siemens 7SJ8022
Rated Current : 1/5 A
C- Time Delayed over current ( 51):
Refer to fault calculation page 7 Max 3-ph fault current @11kv bus is 11.57 KA
The setting will be :
Ifl = MVAb/ √3 ∗ KV
= 0.5/√3 ∗ 11 *1000 = 26.24 A

Set 1.5 of Tr rating = 1.5* 26.24 = 40 A Set =2 of Tr rating = 50 A


Existing LV setting
L = 800, 18sec (curve D) ,
Instantaneous current setting 9.6 KA
According to TR protection curve :
Hence I rated = 695 A , L setting can be reduced to 0.9 and (Curve B)
HV side :

Page 16 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
In order to insure good grading with LV C.B the IDMT curve to be changed from IEC
IS to IEC EI
CT Ratio 50/5
Current Setting (A) 5.0
TMS 1.22
Characteristic IEC Extremely Inverse

IP : pickup value , I : Fault current


I/Ip = 11570/50 =231.4 , 50 *20 = 1000

= 80*1.22/(1000/50)2-1)
=0.245 sec
This setting cross checked with B/S setting , grading curves attached

11 kv Bus Section :
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A

o Refer to MZEC protection policy the setting should be more than TR


continuous rating current
o Considered 120% of TR Rated Current 1004 = 1200 A
o 250 msec to be used as grading time interval between 11 kv OG & 11 kv B.S
o During the Max fault level 11.57, approximately half of this current will flow
through the bus section 6.07 KA but during one TR in service @ Min fault
level 6.71 will flow

11 kv OG feeder tripping time @ 11.57 KA = 0.2267


11 kv Bus section tripping time @ 6.07 KA = 0.25+0.226=0.4767
T = 0.14* TMS/((IF/IS)^0.02 -1)
So :
TMS for the B.S =((IF/IS)^0.02 -1) * T/0.14
= ((/1200)^0.02 -1)*0.4767/0.14
=0.112
Set TMS= 0.12
CT Ratio 1200/1
Current Setting (A) 1.0
TMS 0.12
Characteristic IEC Inverse (51)

Page 17 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3- 11KV Incomer
Relay Type : Siemens 7SJ8041
Rated Current : 1/5 A

A- Directional O/C :
o Refer to MZEC protection policy and recommendation Current Setting of 240A
will be sufficient.
o TMS Can be considered 0.1 to ensure a sufficient grading margin with 132/33
TR incomer
Accordingly:

CT Ratio 1200/1
Current Setting (A) 0.20
TMS 0.1
Characteristic IEC Inverse
MTA 45 Degree
Direction Forward (i.e. toward transformer)

B- Non Direction O/C :


o The current setting should be A bove maximum 11kV transformer full load
current
TR FL Current = 1004 A
Set the Current setting 120% of FLC =1200A
o TMS to be calculated when the two Transformers are working in parallel with
11.57KA fault level & to be checked when one transformer is working
o TR 11kv incomer setting to be graded with 11kv bus section to avoid wrong
tripping when one transformer working with B.S closed
o During the Max fault level 11.57kA , approximately half of this current will flow
through the TR incomer 6.07 & 5.5 KA but during one TR in service @ Min
fault level 6.71 will flow
11 kv Bus section tripping time @ 6.71 KA = 0.4796 sec
11 kv Incomer tripping time @ 6.71 KA = 0.25+0.4796=0.7296 sec
T = 0.14* TMS/((IF/IS)^0.02 -1)
So :
TMS for the 11 kv incomer =((IF/IS)^0.02 -1) * T/0.14
= ((6710/1200)^0.02 -1)*0.7296/0.14 =0.182
Set TMS = 0.19
CT Ratio 1200/1
Current Setting (A) 1.0
TMS 0.19
Characteristic IEC Inverse

Page 18 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Min fault level Check (6.71KA):
T = 0.14* TMS/((IF/IS)^0.02 -1)
11 kv OG feeder Tripping time = 0.14*0.10/((6710/300)^0.02-1) = 0.218 sec
11 kv Bus section Tripping time = 0.14*0.12/((6710/1200)^0.02-1) = 0.479 sec
11 kv Incomer Tripping time = 0.14*0.19/((6710/1200)^0.02-1) = 0.759sec

So the check results shows that the grading is ok under Minimum fault condition

Page 19 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
4- 33 KV Transformer Feeder
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A

A- Time Delayed Over current (51)


Refer to MZEC policy the current setting should be above maximum expected load
current
TR Full load current = 349.9 A
Set the current setting 400A
TR 33 kv Feeder setting to be graded with 11kv incomer is worst case when 11 kv
Bus section open the fault level is 6.71 kA (its more the 6.07 KA when two TR’s are
in parallel )
So : at 6.71 KA 11kv incomer trip time is 0.759 sec
The trip time for 33 kv TR feeder will be 0.756+0.3=1.059 sec
TMS for the 33kv TR Feeder =((IF/IS)^0.02 -1) * T/0.14
= ((2338.33/400)^0.02 -1)*1.059/0.14
= 0.271
Set TMS = 0.28

CT Ratio 400/1
Current Setting (A) 1.0
TMS 0.28
Characteristic IEC Inverse

o For Delta/ Star Transformer Earth fault @ star side will reflect as phase fault
in the Delta side so the 11kv E/F should be graded with 33kv TR feeder O/C
Form E/F setting and fault calculation found that maximum fault level is 7.1KA &
Current setting is 120 A , TMS = 0.32
The trip time = 0.726 sec
For the same fault value 33kv side L-L fault =7100*(11.5/33)/1.732 =1428.5 A
The trip time with current setting 400 ,TMS 0.28 =1.52 sec

B- Instantaneous Over current (50)


Refer to MZEC policy the TR feeder Instantaneous current setting to be 1.3 times the
maximum prospective fault level (measured at 33kV) for a three phase fault on the
11kV bushings of the transformer.
Accordingly:
worst case when 11 kv Bus section open the fault level is 6.71 kA (when two TR’s
are working in parallel the current flow through 11 kv incomer is half of the maximum
fault level (11.57) equal to 5.6 KA)
Then the reflected current to 33 kv side =6710*11.5/33 =2338.33 A
Instantaneous current setting =1.3*2575.3=3039.8 A
Set the Current setting = 3100 A

Page 20 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

The the Minimum fault level @ 33 kv side 6.27 which is more 3100 A

CT Ratio 400/1
Current Setting (A) 3100
Time setting (sec) 0.0
Characteristic IEC DT

6- 33kv INCOMER O/C Setting :

Refer to MZEC protection policy and MZEC protection team recommendation


Current Setting of 80 A will be sufficient
TMS Can be considered 0.05
CT Ratio 400/1
VT Ratio 33000/110
Current Setting (A) 0.20
TMS 0.05
Characteristic IEC Inverse
MTA 45 Degree
Direction Forward (i.e. toward feeder circuit )

Page 21 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

EARTH FAULT PROTECTION COORDINATION

Page 22 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

1- 11 kv OG Feeder
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
A- Time Delayed Earth Fault ( 51N)
Refer to fault calculation page 8 Max 1-ph fault current @11kv bus is 12.76
KA
The current setting should be above maximum expected unbalance current
The setting will be :
CT Ratio 300/5
Current Setting (A) 0.5
TMS 0.100
Characteristic IEC Inverse

Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/30=425 accordingly only 20 IEp will be used = 800
Tripping time @ 12.75 KA :
T = 0.14* TMS/((IF/IS)^0.02 -1)
= 0.14*0.1/(800/40)^0.02-1)
=0.2267 sec

B- Sensitive Earth Fault (SEF) :


Refer to MZEC protection policy SEFsetting should be
Current Setting = 10A (primary) Definite Time Delay = 5 seconds

CT Ratio 300/5
Current Setting (A) 0.175
Time (sec) 5.0
Characteristic IEC DT
Thus , there is no CBCT available , phase CT’s residual connection to be used11

2- kv Station TR :
Relay Type : Siemens 7SJ8022
Rated Current : 1/5 A
Time Delayed Earth Fault ( 51N)
Refer to fault calculation page 10 Max 1-ph fault current @11kv bus is 12.76
KA
The current setting should be above maximum expected unbalance current
The setting will be :
CT Ratio 50/5
Current Setting (A) 1.0
TMS 0.05

Page 23 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Characteristic IEC Inverse

Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/10=1276 accordingly only 20 IEp will be used = 200
Tripping time @ 12760 :
T = 0.14* TMS/((IF/IS)^0.02 -1)
= 0.14*0.05/(200/10)^0.02-1)
=0.113 sec
3- 11 kv Bus Section
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
- Considered 10% of CT Rated Current 1200/1 = 120 A
- 250 m sec to be used as grading time interval between 11 kv OG & 11 kv B.S
- During the Max fault level 12.76 KA , approximately half of this current will
flow through the bus section 6.67 &6.17KA but during one TR in service and
@ MIN fault Level 7.1 KA will flow though :

11 kv OG feeder tripping time @ 12.76KA = 0.2267


11 kv Bus section tripping time @ 6.67 KA = 0.25+0.2267=0.4767
T = 0.14* TMS/((IF/IS)^0.02 -1)

Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/IEp = 6670/120=55 accordingly only 20 IEp will be used = 2400

So :
TMS for the B.S =((IF/IS)^0.02 -1) * T/0.14
= ((2400/120)^0.02 -1)*0.4767/0.14
=0.209
Set TMS= 0.21
CT Ratio 1200/1
Current Setting (A) 0.10
TMS 0.21
Characteristic IEC Inverse

Page 24 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
4- 11kv Incomer :
Relay Type : Siemens 7SJ8041
Rated Current : 1/5 A

A- Directional E/F :

Refer to MZEC protection policy and MZEC protection team recommendation


Current Setting of 120 A will be sufficient
TMS Can be considered 0.05
CT Ratio 1200/1
Current Setting (A) 0.10
TMS 0.05
Characteristic IEC Inverse
MTA - 45 Degree
Direction Forward (i.e. toward transformer)

B- Non Direction E/F :


o The current setting should be A bove maximum expected unbalance current
Set the Current setting 10% of CT rated = 0.1 * 1200 =120 A
o TMS to be calculated when the two Transformers are working in parallel with
14.2025 kA fault level & to be checked when one transformer is working
o TR 11kv incomer setting to be graded with 11kv bus section to avoid wrong
tripping when one transformer working with B.S closed
o During the Max fault level 12.76 kA, approximately half of this current will flow
through the 11kv incomer 6.67&6.17KA and 7.1 kA if ONE TR in-service @
MIN fault level

11 kv Bus section tripping time @ 7.1 KA = 0.4767 sec


11 kv Incomer tripping time @ 7.1 KA = 0.25+0.4767=0.7267 sec
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20"
IP : pickup value , I : Fault current
I/Ip = 7100/120=59 accordingly only 20 IEp will be used = 2400
T = 0.14* TMS/((IF/IS) ^0.02 -1)
So :
TMS for the 11 kv incomer =((IF/IS)^0.02 -1) * T/0.14
= ((2400/120)^0.02 -1)*0.7267/0.14
=0.32
CT Ratio 1200/1
Current Setting (A) 0.1
TMS 0.32
Characteristic IEC Inverse

Page 25 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
C- SBEF protection :
o As per MZEC policy the current setting should be above maximum expected
unbalance current & pickup of all downstream earth fault protections
SBEF CT ratio : 1200/1
So setting can be 10 % = 120 A
o TMS setting to be Coordinated with all downstream earth fault protections for the
full range of earth fault levels from minimum to maximum), except 11kV bus
section protection.

o At max fault current can flow through the TR 7.1


Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20"
IP : pickup value , I : Fault current
I/Ip = 7100/120=60 accordingly only 20 IEp will be used = 2400
Accordingly :
SBEF time at the Max fault level =0.726+0.25 =0.9767
TMS =((IF/IS)^0.02 -1) * T/0.14
= ((2400/120)^0.02 -1)*0.9267/0.14
=0.43
Set TMS = 0.43
CT Ratio 1200/1
Current Setting (A) 0.1
TMS 0.43
Characteristic IEC Inverse

Min fault level Check (7.1KA):


T = 0.14* TMS/((IF/IS)^0.02 -1)
11 kv OG feeder Tripping time = 0.14*0.10/((800/40)^0.02-1) = 0.2267 sec
11 kv Bus section Tripping time = 0.14*0.21/((2400/120)^0.02-1) = 0.476 sec
11 kv Incomer Tripping time = 0.14*0.32/((2400/120)^0.02-1) = 0.7267 sec
11 kv Incomer SBEF Tripping time = 0.14*0.41/((2400/120)^0.02-1) = 0.975 sec

So the results shows that the grading is ok under Minimum fault condition

Page 26 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
5- 33 KV Transformer Feeder
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
Time Delayed Earth Fault (51N)
For Delta/ Star Transformer E/F fault @ star side will reflect as phase fault in the
Delta side so the 33kv TR feeder E/F will not be graded with 11Kv incomer and as
per MZEC protection policy the setting should be 5 % , 0.05 TMS but as per the
previous stations practice considered 10% to avoid unwanted tripping due to inrush
current
Current setting :
Is = 20 A with Inrush current blocking function, OR:
Is = 40 A without the function
CT Ratio 400/1
Current Setting (A) 40 A
TMS 0.05
Characteristic IEC Inverse

6- 33kv INCOMER DEF setting :

Refer to MZEC protection policy and MZEC protection team recommendation


Current Setting of 40 A will be sufficient
TMS Can be considered 0.05
CT Ratio 400/1
VT Ratio 33000/110
Current Setting (A) 0.1
TMS 0.05
Characteristic IEC Inverse
MTA 0 Degree
Direction Forward (i.e. toward feeder circuit )

Relay Type: Siemens 7SJ804


VT Ratio: 33000/sqrt (3)/110/3)

7- 33kv incomer Neutral Voltage Displacement (NVD) setting:

Refer to MZEC POLICY neutral Voltage Displacement (NVD) shall be set to have:
(a) A pickup of at least 50% of the zero sequence voltage measured for an earth fault at the
remote end of the circuit (i.e. at the sending end), when the line is supplied solely through the
33/11kV transformers.

(b) A pickup greater than the resulting zero sequence voltage experienced for a high resistance
fault on an adjacent feeder that would need to be cleared by that feeder’s SEF protection.

Page 27 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
(c) A pickup above the maximum expected zero sequence voltage due to unbalanced loads on
the feeder.

(d) a definite time setting of 10 seconds


Set NVD = 0.3 Vn

VT Ratio 33000/110
Voltage Setting (V) 33
Time setting (sec) 10
Characteristic DT

Page 28 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Capacitor bank protection

Page 29 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
1- Over Current & Earth Eault
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
Number of stage = 5
Stage size = 1 MVAR
A- Time Delayed over current ( 51):
Refer to fault calculation page 8 Max 3-ph fault current @11kv bus is 13.13
KA
Refer to MZEC policy the current setting should be 1.3 times capacitor circuit
rating (1R)
Stage rated current= 1000000/(1.732*11000) =52.5
1R = Stage rated current * number of stages
= 52.5*5 =262.5
Current setting =1.3* 262.5 =341.25
set =400 A
:TMS = 0.1 As per MZEC protection policy
CT Ratio 400/1
Current Setting (A) 1.0
TMS 0.100
Characteristic IEC Inverse
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/400 =32 accordingly only 20 Ip will be used = 8000
T = 0.14* TMS/((IF/IS) ^0.02 -1)
= 0.14*0.1/(8000/400) ^0.02-1) = 0.2267 sec
B- Instantaneous over current (50):

As per MZEC policy If the capacitor consists of N capacitor banks that will be
individually switched into service, then current setting set to:
= (N+5) x rating of one capacitor bank

=(5+5) *52.5 =525

But this value very low to be considered

The Min fault level = 7.1 kA & OC Stage-1 C.S = 400 CR ratio: 400/1

IOC can be less than 7.1 and more than 400, consider 5 * 400 =2000

Set IOC = 2000

CT Ratio 400/1
Current Setting (A) 5.0
Time ms 0.0
Characteristic IEC DT

Page 30 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
C- Time Delayed Earth Fault ( 51N)
The current setting should be above maximum expected unbalance current
The setting will be :
CT Ratio 400/1
Current Setting (A) 0.1
TMS 0.100
Characteristic IEC Inverse
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/40 =319 accordingly only 20 IEp will be used = 800
T = 0.14* TMS/((IF/IS) ^0.02 -1)
= 0.14*0.1/(800/40) ^0.02-1)
=0.2267 sec

D- Over & Under Voltage Protection (27 & 59)


Relay Type: Siemens 7SJ80
VT Ratio: 33000/sqrt (3)/110/sqrt (3)
As per MZEC policy over voltage pickup should be 110 % of rated voltage
Vs =1.1 *110 =121 V
Time setting 5 sec
VT Ratio 33000/110
Voltage Setting (V) 121
Time setting (sec) 5
Characteristic DT

Under voltage setting 80 % of the rated voltage


Vs = 0.8 *110 =88 V
Time setting 5 sec
VT Ratio 33000/110
Voltage Setting (V) 88
Time setting (sec) 5
Characteristic DT

Page 31 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
O/C setting summary

O/G feeder /Cap bank 11KV bus coupler 11kv Incomer 33 TR feeder

CT Ratio 300/5 / 400/1 1200/1 1200/1 400/1

Current setting 5.0 / 1.0 1.0 1.0 1.0

TMS 0.1 0.12 0.19 0.28

Curve type IEC Inverse IEC Inverse IEC Inverse IEC Inverse

E/F setting summary

O/G feeder /CAP OG feeder SEF 11KV bus 11kv Incomer 11 TR SBEF
bank coupler

CT Ratio 300/5 / 400/1 300/1 1200/5 1200/1 1200/1

Current 0.5 / 0.1 0.175 0.1 0.1 0.1


setting

TMS 0.1 5 sec 0.21 0.32 0.43

Curve type IEC Inverse IEC DT IEC Inverse IEC Inverse IEC Inverse

Page 32 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Power Transformer Differential


Protection

Page 33 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Relay type : Siemens 7UT61

Rated current : 1A

Power Transformer Data :

20 MVA , 33/11.5 KV , number of taps = 13 , nominal tap : 4 , bandwidth = 1.67 %

Max voltage = 34.65 (Tap :1 )

Min voltage = 34.049 (Tap :13 )

IN = S /(sqrt(3) * V L-L )

HV side ( Side-1) :

IN side-1 = 20000/(1.732*33)

=349.9 A

CT Ratio :400/1

I sec = 349.9/400 =0.875

K1 =400/349.9 = 1.143

IN side-1 at tap 1 = 20000/(1.732*34.65) =333.25

= 333.25/400 =0.833 secondary

I1 = INsec * K1 =0.833 * 1.143 = 0.952 A

IN side-1 at tap 13 = 20000/(1.732*28.049) =411.8 A

= 411.8/400 =1.0295 secondary

I1 = IN sec * K1 =1.0295 * 1.143 = 1.177 A

Page 34 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
LV side :

IN side-2 = 20000/(1.732*11)

=1004.08 A

CT Ratio :1200/1

IN side-2 sec =1004.08/1200

K2= 1200/1004.08 = 1.195

I2= IN sec * K2 =0.837 * 1.195 = 1 A

Ιdiff = |Ι1 + Ι2|

At nominal tap Idiff = |1 - 1 | =0

At tap -1

Idiff = |0.952 - 1 | =0.048 A

At tap -13

Id = |1.177 - 1 | =0.177 A

The maximum differential current when tap changer at tap -13

Stage-1 Setting :

Page 35 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Should be More than Idiff at tap-13 +CT error +Relay error

Assume CT error = 0.005 (Class X) and Relay error = 0.005

Idiff >0.177 + 0.005+0.005 =0.187

Set I diff > = 0.2

Restrain Current (Istab ):

Ιstab = |Ι1| + |Ι2|=1.117 + 1 =2.117

Slope setting

Slope = Idiff/Istab *100 %

Slope-1 should be greater than 0.177/2.177 = 8.1 %

Slope-1 >8.1 %

Set Slope-1 = 20 %

Slope-2 :

To avoid mal-operation of 87T due to current Transformer saturation during heavy


external fault

Set slope-2 to 70 %

Base point calculation :

Base point for slope-1 : (0.0)

Slope-1 should be working up to maximum loading condition

Take the max load 125 %

Istab= 1.25 |I1| +1.25 |I2 | = 2.5

Base point for slope-2: (2.5, 0)

Slope-2 stability verification

Hence the highest diff current proved @ Tap-13 will consider this tap for worst case

@ Tap 13

IN side-1 at tap 13 = 20000/(1.732*28.049) =411.8 A

Hv side Max through fault = 411.8/0.1252= 3289 A

IN side-1 = 8.2 A secondary

Page 36 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
IN side-2 = 20000/(1.732*11500) =1004.08

Lv side Max through fault = 1004.08/0.1252 = 8019.0 A

IN side-2 = 8019/1200 =6.68

Considering 75 % saturation error

IN side-2 = 1.67 A secondary

Ιdiff = |Ι1 + Ι2|

= |8.2-1.67| =6.53

Ιstab = |Ι1| + |Ι2|

Ιstab = |8.2| + |1.67| = 9.87

Slope = Idiff/Istab *100 %

= 6.53/9.87 = 0.66

This prove that Diff will be stable with selected slope 70%

Differential Stage-2 (High Setting):

IN =1004.08 , Z% for TR1=12.52 , CT Ratio 1200/1

The maximum fault current at transformer terminal I sc max can be calculated as:

I s.c max = I N/ Z %

= 1004.08/0.1252

=8019 A

=8019/1200=6.7 Secondary

I diff >> should be greater than I s.c max

Set I diff >> = 7.0

Harmonic Restrain:

Based on best practice and previous calculations and relay manufacturer information
the setting can be :

Second harmonic = 15 %

5 th harmonic = 30 %

Item Setting value


I diff > 0.2

Page 37 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

I diff >> 7.0


Slope-1 20 %
Slope-2 70 %
Base point-1 (0,0)
Base point-1 (0,2.5)
Second harmonic 15 %
5 th harmonic 30%

Page 38 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Power Transformer Restricted Earth fault


Protection

Page 39 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Relay Type: Siemens 7SJ80

Is.c max = 12.76 kA ,Is.cmin =6.71 kA

SC impedance Zsc % = 12.52 , IFL = 1004 A , ITR SC = 1004 /0.1252 =8019 A

ITR SC > Is.cmin accordingly ITR SC (8.019 KA) will be used

CT Data

CT Ratio: 1200/1, VK =350 v , Imag < 10 mA @Vk/2

Rct < 2.0 , Rct + Rlead =2.1 Ω (Asummed) , RRelay =0.05 Ω

No of CT’s in parallel (N) =4

Stability calculation :

Vs Should be more than vs vsmin

vsmin =Is.cmax * Isn/Ipn*( Rct + Rlead)

= (8019*1*2.1) /1200 = 14 v ,

Set vs = 20 v vs > vsm and vk > 2vs (350 > 40)

Current Setting calculation :

Ifl =MVA/ ( √3 vL-L ) = 20000/(√3 × 11500 ) = 1004 A

Is = Ip des × Ins/1200 – N × I mag × vs/vk

Considering Ip desired = 15% of IFL

Ip des = 0.15×1004 = 150 A

Is = 0.12, set Iset to 0.15 A

Stabilizing Resistor Calculation :

Rs = vs/Is -RRelay = 20/0.15 - 0.05 Neglect RRelay

Rstab = 135 Ω

Ises = 0.15 , vs = 20 v , RStab = 135 Ω

Rs range : 0 – 1000 Ω

Stabilizing resistor minimum continuous power = Vs^2 /Rs = 400/135 = 3 watts

Page 40 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Non linear Resistor Calculation (Metrosil) :

The maximum peak voltage across the relay can be found by :


Vp =2*(sqrt (2*Vk *(VF max –V))

VF max=Is.c max * Isn/Ipn*( Rstab + Rrelay)

= 8019 *1/1200*(135+.05)
= 902.5 v
Vp =2*(sqrt (2*350*(902.5-350)))
=1.243 kv
Metrosil resistor Not required because the peak voltage not more than 3 Kv

Page 41 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Annexure-1: Detailed ETAP Reports:

The ETAP detailed reports are attached in following pages.

Page 42 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Protection Setting – overcurrent & earth


fault

Page 43 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid

Over Current and Earth Fault TOC Curves

Page 44 of 44