Annexure-I: Detailed ETAP Reports included Over Current and Earth Fault curves
Page 2 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
1.0 Source Data:
Ipu = ISC / Ib
Page 3 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Ib = MVAb/ √3 ∗ KVb
Zb = (KVb)2 / MVAb Ω
Zpu = Zactual / Zb
Zpu new = Zpu old x [ (KVb old)2 / (KVb new)2 x (MVAb new) / (MVAb old) ]
2.1.1 @ Source:
Zb = 332 / 20 = 54.45 Ω
Page 4 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.1.2 3-ph fault:
Z1 pu min = j 0.017472
Assume Z1 = Z2
Z1 pu = j 0.116686
ISC = 20030 A & Ib = 349.9 A
Ipu = 20030 / 349.9 = 57.22
∴ Zo pu min = j 0.18094
Cable-1
Z1 pu =Z2 pu = (0.08 + 0.105i) *1/ 54.45 = 0.001469 + j 0.001928
Zo pu = (0.130 + 0.270i) *1/ 54.45 = 0.0023875 + j 0.0049587
OHL -1
Z1 pu =Z2 pu = (0.2276+0.3378i)*2.8/54.45 =0.0117+0.01737i
Zo pu = (0.4046+1.6290i)*2.8/54.45 =0.0208+0.08376i
Cable-2
Z1 pu =Z2 pu = (0.08 + 0.105i) *3.337/ 54.45 = 0.004898 + j 0.006428
Zo pu = (0.130 + 0.270i)*3.337/ 54.45 = 0.007967+ j 0.016547
LINE-1 = Z C1 + Z OHL-1
Z1 pu =Z2 pu = 0.013169 + j 0.019298
Zo pu = 0.0231875 + j 0.088718
LINE-2 = Z C2
Z1 pu =Z2 pu = 0.004898 + j 0.006428
Zo pu = 0.007967 + j 0.016547
2.3 For Transformers:
2.3.1 TR-1&2:
(R2+x2) = 0.12522,
R = 0.004929,
X = 0.118297
Page 5 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.4 Per unit impedances summary refer to 20 MVA base:
Source
line 1& line 2
Item Max 3- Max 1-ph TR-1&2
ph Fault Fault L-1 L-2
Pos. seq.
impedance
j0.017472 j 0.116686 0.013169 + j 0.019298 0.004898 + j 0.006428 0.005212+j 0.12509
Page 6 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.5 Max 3-ph Fault current @11.5 kV bus when both transformers working in
parallel:
For balance 3-ph fault the sequential circuit will be as in fig (1)
=0.0069408+j0.08634
= 0.08662 85.403°
@ 11.5 kV bus
2.6 Min 3-ph Fault current @11.5 kV bus when each Transformer working
separately (11 kV bus section open)
For balance 3-ph fault the sequential circuit will be as in fig (2)
Fig (2)
@ 11.5 kV bus
Ibase = 20 / (1.732 x 11.5) =1004 A
Isc = Ib x Ipu = 6.138 x 1004 = 6163.2775 -85.5° A
Page 7 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
2.7 Max 1-ph Fault current @11.5 kV bus when both transformers working in
parallel
= 0.01648+j0.23522
= 0.2358 86°
IF pu = E / Z T pu (Assume the pre fault voltage equal to nominal voltage, E= 1pu)
∴Io pu = 1 / 0.2358 86° = 4.24 86°Lag.
IF pu = 3 x Io pu = 3 x 4.24=12.722
= 12.722 87.965° Lag.
@ 11.5 kV bus
Ibase = 20 / (1.732 x 11.5) = 1004 A
Isc = Ib x Ipu = 12.722 x 1004 = 12773.2 - 86.0° A
2.8 Min 1-ph Fault current @11.5 kV bus when each Transformer working
separately (11 kV bus section open)
@ 11.5 kV bus
Page 8 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 9 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3.2 Min 3-phase fault:
Page 10 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3.3 Max 1-phase fault:
Page 11 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3.4 Min 1-phase fault
Page 12 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
4.0 ETAP Software Calculation results verses Manual Results:
5.0 Considerations :
o IEC Normal inverse Curve used for all levels O/C & E/F
o O/C &E/F grading done starting from 11 kV OG feeder with 0.1 TMS and 0.3
sec between each relay and other up to minimum fault level
As per MZEC policy E/F for 33 kV TR feeder should be 5 % , 0.05 TMS but as per
the previous stations practice considered 10% to avoid unwanted tripping due to
inrush current
Page 13 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 14 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 15 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 11.57/300 =38 accordingly only 20 Ip will be used = 8000
T = 0.14* TMS/((IF/IS) ^0.02 -1)
= 0.14*0.1/(8000/400) ^0.02-1)
=0.2267 sec
B- Negative Sequence Protection (46-1 ):
Refer to MZEC policy and recommendation instantaneous to be disabled
Pickup value should be 20 % and recommend tripping time 5 sec
CT Ratio 300/5
Current Setting (A) 1
Time ms 5000
Characteristic DT
2- 11 kv Station TR
Relay Type : Siemens 7SJ8022
Rated Current : 1/5 A
C- Time Delayed over current ( 51):
Refer to fault calculation page 7 Max 3-ph fault current @11kv bus is 11.57 KA
The setting will be :
Ifl = MVAb/ √3 ∗ KV
= 0.5/√3 ∗ 11 *1000 = 26.24 A
Page 16 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
In order to insure good grading with LV C.B the IDMT curve to be changed from IEC
IS to IEC EI
CT Ratio 50/5
Current Setting (A) 5.0
TMS 1.22
Characteristic IEC Extremely Inverse
= 80*1.22/(1000/50)2-1)
=0.245 sec
This setting cross checked with B/S setting , grading curves attached
11 kv Bus Section :
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
Page 17 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
3- 11KV Incomer
Relay Type : Siemens 7SJ8041
Rated Current : 1/5 A
A- Directional O/C :
o Refer to MZEC protection policy and recommendation Current Setting of 240A
will be sufficient.
o TMS Can be considered 0.1 to ensure a sufficient grading margin with 132/33
TR incomer
Accordingly:
CT Ratio 1200/1
Current Setting (A) 0.20
TMS 0.1
Characteristic IEC Inverse
MTA 45 Degree
Direction Forward (i.e. toward transformer)
Page 18 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Min fault level Check (6.71KA):
T = 0.14* TMS/((IF/IS)^0.02 -1)
11 kv OG feeder Tripping time = 0.14*0.10/((6710/300)^0.02-1) = 0.218 sec
11 kv Bus section Tripping time = 0.14*0.12/((6710/1200)^0.02-1) = 0.479 sec
11 kv Incomer Tripping time = 0.14*0.19/((6710/1200)^0.02-1) = 0.759sec
So the check results shows that the grading is ok under Minimum fault condition
Page 19 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
4- 33 KV Transformer Feeder
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
CT Ratio 400/1
Current Setting (A) 1.0
TMS 0.28
Characteristic IEC Inverse
o For Delta/ Star Transformer Earth fault @ star side will reflect as phase fault
in the Delta side so the 11kv E/F should be graded with 33kv TR feeder O/C
Form E/F setting and fault calculation found that maximum fault level is 7.1KA &
Current setting is 120 A , TMS = 0.32
The trip time = 0.726 sec
For the same fault value 33kv side L-L fault =7100*(11.5/33)/1.732 =1428.5 A
The trip time with current setting 400 ,TMS 0.28 =1.52 sec
Page 20 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
The the Minimum fault level @ 33 kv side 6.27 which is more 3100 A
CT Ratio 400/1
Current Setting (A) 3100
Time setting (sec) 0.0
Characteristic IEC DT
Page 21 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 22 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
1- 11 kv OG Feeder
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
A- Time Delayed Earth Fault ( 51N)
Refer to fault calculation page 8 Max 1-ph fault current @11kv bus is 12.76
KA
The current setting should be above maximum expected unbalance current
The setting will be :
CT Ratio 300/5
Current Setting (A) 0.5
TMS 0.100
Characteristic IEC Inverse
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/30=425 accordingly only 20 IEp will be used = 800
Tripping time @ 12.75 KA :
T = 0.14* TMS/((IF/IS)^0.02 -1)
= 0.14*0.1/(800/40)^0.02-1)
=0.2267 sec
CT Ratio 300/5
Current Setting (A) 0.175
Time (sec) 5.0
Characteristic IEC DT
Thus , there is no CBCT available , phase CT’s residual connection to be used11
2- kv Station TR :
Relay Type : Siemens 7SJ8022
Rated Current : 1/5 A
Time Delayed Earth Fault ( 51N)
Refer to fault calculation page 10 Max 1-ph fault current @11kv bus is 12.76
KA
The current setting should be above maximum expected unbalance current
The setting will be :
CT Ratio 50/5
Current Setting (A) 1.0
TMS 0.05
Page 23 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/10=1276 accordingly only 20 IEp will be used = 200
Tripping time @ 12760 :
T = 0.14* TMS/((IF/IS)^0.02 -1)
= 0.14*0.05/(200/10)^0.02-1)
=0.113 sec
3- 11 kv Bus Section
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
- Considered 10% of CT Rated Current 1200/1 = 120 A
- 250 m sec to be used as grading time interval between 11 kv OG & 11 kv B.S
- During the Max fault level 12.76 KA , approximately half of this current will
flow through the bus section 6.67 &6.17KA but during one TR in service and
@ MIN fault Level 7.1 KA will flow though :
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/IEp = 6670/120=55 accordingly only 20 IEp will be used = 2400
So :
TMS for the B.S =((IF/IS)^0.02 -1) * T/0.14
= ((2400/120)^0.02 -1)*0.4767/0.14
=0.209
Set TMS= 0.21
CT Ratio 1200/1
Current Setting (A) 0.10
TMS 0.21
Characteristic IEC Inverse
Page 24 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
4- 11kv Incomer :
Relay Type : Siemens 7SJ8041
Rated Current : 1/5 A
A- Directional E/F :
Page 25 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
C- SBEF protection :
o As per MZEC policy the current setting should be above maximum expected
unbalance current & pickup of all downstream earth fault protections
SBEF CT ratio : 1200/1
So setting can be 10 % = 120 A
o TMS setting to be Coordinated with all downstream earth fault protections for the
full range of earth fault levels from minimum to maximum), except 11kV bus
section protection.
So the results shows that the grading is ok under Minimum fault condition
Page 26 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
5- 33 KV Transformer Feeder
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
Time Delayed Earth Fault (51N)
For Delta/ Star Transformer E/F fault @ star side will reflect as phase fault in the
Delta side so the 33kv TR feeder E/F will not be graded with 11Kv incomer and as
per MZEC protection policy the setting should be 5 % , 0.05 TMS but as per the
previous stations practice considered 10% to avoid unwanted tripping due to inrush
current
Current setting :
Is = 20 A with Inrush current blocking function, OR:
Is = 40 A without the function
CT Ratio 400/1
Current Setting (A) 40 A
TMS 0.05
Characteristic IEC Inverse
Refer to MZEC POLICY neutral Voltage Displacement (NVD) shall be set to have:
(a) A pickup of at least 50% of the zero sequence voltage measured for an earth fault at the
remote end of the circuit (i.e. at the sending end), when the line is supplied solely through the
33/11kV transformers.
(b) A pickup greater than the resulting zero sequence voltage experienced for a high resistance
fault on an adjacent feeder that would need to be cleared by that feeder’s SEF protection.
Page 27 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
(c) A pickup above the maximum expected zero sequence voltage due to unbalanced loads on
the feeder.
VT Ratio 33000/110
Voltage Setting (V) 33
Time setting (sec) 10
Characteristic DT
Page 28 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 29 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
1- Over Current & Earth Eault
Relay Type : Siemens 7SJ80
Rated Current : 1/5 A
Number of stage = 5
Stage size = 1 MVAR
A- Time Delayed over current ( 51):
Refer to fault calculation page 8 Max 3-ph fault current @11kv bus is 13.13
KA
Refer to MZEC policy the current setting should be 1.3 times capacitor circuit
rating (1R)
Stage rated current= 1000000/(1.732*11000) =52.5
1R = Stage rated current * number of stages
= 52.5*5 =262.5
Current setting =1.3* 262.5 =341.25
set =400 A
:TMS = 0.1 As per MZEC protection policy
CT Ratio 400/1
Current Setting (A) 1.0
TMS 0.100
Characteristic IEC Inverse
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/400 =32 accordingly only 20 Ip will be used = 8000
T = 0.14* TMS/((IF/IS) ^0.02 -1)
= 0.14*0.1/(8000/400) ^0.02-1) = 0.2267 sec
B- Instantaneous over current (50):
As per MZEC policy If the capacitor consists of N capacitor banks that will be
individually switched into service, then current setting set to:
= (N+5) x rating of one capacitor bank
The Min fault level = 7.1 kA & OC Stage-1 C.S = 400 CR ratio: 400/1
IOC can be less than 7.1 and more than 400, consider 5 * 400 =2000
CT Ratio 400/1
Current Setting (A) 5.0
Time ms 0.0
Characteristic IEC DT
Page 30 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
C- Time Delayed Earth Fault ( 51N)
The current setting should be above maximum expected unbalance current
The setting will be :
CT Ratio 400/1
Current Setting (A) 0.1
TMS 0.100
Characteristic IEC Inverse
Refer to relay manual " The tripping times for Ι/Ιp ≥ 20 are identical with those for Ι/Ιp = 20 "
IP : pickup value , I : Fault current
I/Ip = 12760/40 =319 accordingly only 20 IEp will be used = 800
T = 0.14* TMS/((IF/IS) ^0.02 -1)
= 0.14*0.1/(800/40) ^0.02-1)
=0.2267 sec
Page 31 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
O/C setting summary
O/G feeder /Cap bank 11KV bus coupler 11kv Incomer 33 TR feeder
Curve type IEC Inverse IEC Inverse IEC Inverse IEC Inverse
O/G feeder /CAP OG feeder SEF 11KV bus 11kv Incomer 11 TR SBEF
bank coupler
Curve type IEC Inverse IEC DT IEC Inverse IEC Inverse IEC Inverse
Page 32 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 33 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Relay type : Siemens 7UT61
Rated current : 1A
IN = S /(sqrt(3) * V L-L )
HV side ( Side-1) :
IN side-1 = 20000/(1.732*33)
=349.9 A
CT Ratio :400/1
K1 =400/349.9 = 1.143
Page 34 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
LV side :
IN side-2 = 20000/(1.732*11)
=1004.08 A
CT Ratio :1200/1
At tap -1
At tap -13
Id = |1.177 - 1 | =0.177 A
Stage-1 Setting :
Page 35 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Should be More than Idiff at tap-13 +CT error +Relay error
Slope setting
Slope-1 >8.1 %
Set Slope-1 = 20 %
Slope-2 :
Set slope-2 to 70 %
Hence the highest diff current proved @ Tap-13 will consider this tap for worst case
@ Tap 13
Page 36 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
IN side-2 = 20000/(1.732*11500) =1004.08
= |8.2-1.67| =6.53
= 6.53/9.87 = 0.66
This prove that Diff will be stable with selected slope 70%
The maximum fault current at transformer terminal I sc max can be calculated as:
I s.c max = I N/ Z %
= 1004.08/0.1252
=8019 A
=8019/1200=6.7 Secondary
Harmonic Restrain:
Based on best practice and previous calculations and relay manufacturer information
the setting can be :
Second harmonic = 15 %
5 th harmonic = 30 %
Page 37 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 38 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 39 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Relay Type: Siemens 7SJ80
CT Data
Stability calculation :
= (8019*1*2.1) /1200 = 14 v ,
Rstab = 135 Ω
Rs range : 0 – 1000 Ω
Page 40 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Non linear Resistor Calculation (Metrosil) :
= 8019 *1/1200*(135+.05)
= 902.5 v
Vp =2*(sqrt (2*350*(902.5-350)))
=1.243 kv
Metrosil resistor Not required because the peak voltage not more than 3 Kv
Page 41 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Annexure-1: Detailed ETAP Reports:
Page 42 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 43 of 44
T-36/2017 Replacement of Protection Relays in 11KV System in Nizwa Industrial & SUR
Project
Hospital S/S
Doc. No Client Mazoon
Subject RELAY SETTING CALCULATION Prepared By Mustafa Hamid
Page 44 of 44