TABLE REPUBLIC OF THE PHILIPPINES

PHILIPPINE ECONOMIC ZONE AUTHORITY

OF OFFICE OF THE
CONTENTS BUILDING OFFICIAL
RECOMMENDING APPROVAL
ARCHITECTURAL
HEAD ARCHITECTURAL SECTION:
1/5 - PERSPECTIVE VIEW
APPROVED:
- SITE DEVELOPMENT PLAN
- PROJECT LOCATION PLAN
2/5 - GROUND FLOOR PLAN
3/5 - ROOF PLAN
4/5 - FRONT ELEVATION VIEW BUILDING OFFICIAL: DATE:
- REAR ELEVATION VIEW RECOMMENDING APPROVAL:
- LEFT ELEVATION VIEW LINE AND GRADE
- RIGHT ELEVATION VIEW
- CROSS SECTION VIEW
- LONGITUDINAL SECTION
VIEW
HEAD: DATE:
5/5 - SCHEDULES OF DOORS
RECOMMENDING APPROVAL:
AND WINDOWS
LAND USE & ZONING
FLOOR AREA -
-
DOUBLE DECK BED DETS.
BUILT-IN CABINET DETAILS
BUILDING ONE:
STRUCTURAL
26.00M. x 7.50M.= 195.00 SQ.M. 1/3 - FOUNDATION PLAN
BUILDING TWO: 2/3 - ROOF BEAM/FRAMING PLAN HEAD: DATE:
26.00M. x 7.50M.= 195.00 SQ.M. 3/3 - COLUMN/FOOTING DETAILS RECOMMENDING APPROVAL:

TOTAL FLOOR AREA=390.00 SQ.M.


- WALL/FOOTING DETAILS ARCHITECTURAL
- CONC. EAVES/GUTTER DETS.
- ROOF BEAM DETAILS
PERSPECTIVE VIEW -
MECHANICAL
HALF TRUSS DETAILS

SCALE: N.D.T.S. 1/1 - MECHANICAL LAYOUT PLAN HEAD: DATE:


- COMPUTATION AND LEGENDS RECOMMENDING APPROVAL:
ELECTRICAL STRUCTURAL
1/5 - LIGHTING LAYOUT PLAN
- LEGENDS
2/5 - POWER LAYOUT PLAN
(CONVENIENCE OUTLET) HEAD: DATE:
- LEGENDS RECOMMENDING APPROVAL:
3/5 - POWER LAYOUT PLAN
(AIRCON OUTLET)
MECHANICAL
- LEGENDS
4/5 - SCHEDULE OF LOADS
- SCHEMATIC LINE DIAGRAM
HEAD: DATE:
- SERVICE ENTRANCE
COMPUTATIONS RECOMMENDING APPROVAL:
- SUB-FEEDER COMPUTATIONS ELECTRICAL
- MAIN DISTRIBUTION PANEL
5/5 - SCHEDULE OF LOADS
- SCHEMATIC LINE DIAGRAM
- SERVICE ENTRANCE HEAD: DATE:
COMPUTATIONS RECOMMENDING APPROVAL:
- SUB-FEEDER COMPUTATIONS
SANITARY
- MAIN DISTRIBUTION PANEL
PLUMBING
1/3 - PLUMBING LAYOUT PLAN
- LEGENDS
2/3 - DOWNSPOUT LAYOUT PLAN HEAD: DATE:
3/3 - SEPTIC VAULT DETAIL RECOMMENDING APPROVAL:
ELECTRONICS
SITE DEVELOPMENT PLAN PROJECT LOCATION PLAN
SCALE: N.D.T.S. SCALE: N.D.T.S.

HEAD: DATE:
PROJECT NAME: PREPARED: CHECKED: SEAL APPROVED: SHEET NO.
PANFILO P. OCHAVEZ, C.E., JGE PANFILO P. OCHAVEZ, C.E., JGE
AS BUILT PLAN - CONSTRUCTION OF
A
CIVIL ENGINEER CIVIL ENGINEER

V. M. JHEK BUILDERS SHUTDOWNERS BARRACKS PHASE -I REG. NO.: TIN NO.: REG. NO.: TIN NO.:
SOONG ROAD, BACUAG
SURIGAO DEL NORTE P.T.R. NO.: DATE: P.T.R. NO.: DATE: 15
PROJECT LOCATION: TAGANITO, CLAVER, SURIGAO DEL NORTE ISSUED AT: ISSUED AT: