Sunteți pe pagina 1din 4

MEJORAMIENTO Y CONSTRUCCION DE VIAS, VEREDAS Y BERMAS DE LA ASOCI

PAVIMENTO RIGIDO MONTO EXPEDIENTE


CASETA PARA GUARDIANIA S/. 3,200.00
CARTEL DE OBRA S/. 1,505.24
MOVILIZACION Y DESMOVILIZACION DE EQUIPO S/. 6,785.02
SEGURIDAD Y SALUD OCUPACIONAL S/. 10,527.77
CORTE DE ROCA SUELTA-PERFORACION Y DISPARO S/. 29,809.54
JUNTAS S/. 13,478.09
metrado original 1,879.79ml, metrado contratista 5,190.29ml

diferencia en pavimento rigido total S/. 384,705.19

VEREDAS, BERMAS MUROS Y OTROS


CONCRETO VEREDAS F'C=175 S/. 33,314.95
CONCRETO MURO CONTENCION F'C=210 S/. 48,828.18
BARANDA METALICA PARA MUROS S/. 25,884.37

S/. 396,922.84
VEREDAS Y BERMAS DE LA ASOCIACION VILLA SUREÑA, DISTRITO DE ISLAY - ISLAY - AREQUIPA
OBRA X CONTRATO COSTO MAYOR/MENOR
S/. 3,100.00 -S/. 100.00
S/. 752.62 -S/. 752.62
S/. 6,000.00 -S/. 785.02
S/. 0.00 -S/. 10,527.77 NO EJECUTO
S/. 24,420.03 -S/. 5,389.51 -S/. 17,554.92
S/. 37,214.38 S/. 23,736.29 S/. 6,181.37

S/. 392,916.78 S/. 8,211.59

S/. 26,569.03 -S/. 6,745.92


S/. 46,617.11 -S/. 2,211.07 -S/. 8,956.99
S/. 28,659.99 S/. 2,775.62 -S/. 6,181.37

S/. 388,711.26 -S/. 8,211.58


.
.
.

25.82 8 206.56
19.86 8 158.88
16.31 8 130.48
14.66 8 117.28

9.9 1.482 6.68016194


1 0.15 6.66666667
0.689 0.135 5.1037037
0.676 0.108 6.25925926
4957.44
3813.12
3131.52
2814.72

S-ar putea să vă placă și