1. Column :
Building column- 345 cft
Gen Set column- 140 cft
Large tin shade column- 35 cft
Boundary column and guard room’s column- 45 cft
Outside gen set- 60cft
Finish- 95 cft
2. Slab :
Building Roof and 2 nos slab (including sunshade)- 1530 cft
Slab on grade (main building + guard room + gen room + large gen room+ cold room shade + tin
shade)-( 450+48+75+266+551+94)= 1484 cft
Chilekotha- 53 cft
Ground floor peripheral drain- 70 cft
Raised Floor for generator, transformer- 50cft
Floor Finish – 650 cft
3. Stair
4 nos stair at building- 400cft
GF to Mid- 61.5 cft
Connecting area (ramp)- 65cft+ 6cft
Finish – 110 cft
4. Beams
Main Building (GF+1st floor+2nd floor, considering 10*18 beam)- 210+197+197= 604 cft
Guard Room (10*15)- 18cft
Large Gen Room (10*15)- 121 cft
Grade beam (10*15) -228 cft
Chilekotha- (10*15)- 32 cft
Finish- 100 cft
5. Lintle
Main building (GF+ 1st fl+ 2nd fl)- 19.32+50.63+55= 125 cft
Large Gen Room -50 cft
Cold room area – 63 cft
7. Footing
12 nos main building footing (4.5’*4.5’*1.5’’)- 365 cft
Large gen room (3’*3’*1’)- 108 cft
Cold Room – 27 cft
Guard room – 36 cft
Small gen room plus boundary – 63 cft
Brick Work
10’’
Main building- 40.5 cum= 1432 cft
Large gen room- 6.87 cum= 243 cft
Cold room -33.55 cum =1186 cft
Finishes – 430 cft
Drain – 141.4 cft
Total=
CGI sheet removal (cold room+ gen shed+ tin shed+ adjacent to 1st floor and above gen set) =
121.55+17.15+20.75+
No of toilet – 5 nos