1 Refer to control schematic and connect the control wire from incomer terminal ( 1 & 2 / 3 & 4 ), located at the bottom compartment to the installed condaptor terminal accordingly 2 Injection link which is located at outgoing condaptor already provided and terminated 3 Connect primary injection cable to condaptor (outgoing) 4 Fully insert 8E/2 module to the test bench 5 Turn the rotary switch handle to "TEST" position and " ON " the control supply. Contactor will energize 6 Turn the rotary switch handle to " OFF " then to " ON " position. Contactor will energize 7 At " ON Position " the contactor will energize 8 Perform the Primary Injection Test as per schematic diagram
Module size 8E & above (Refer Video)
1 Remove the compartment bottom plate by pulling the plate out from the test bench 2 Remove two (2) screws on the right & left side of the test bench 3 Remove four (4) screws on the 8E/2 condaptor and remove condaptor from the test bench 4 Install the CCU according to the size & rating of the test module 5 Install the side plate c/w terminal block on the right side and connect it with small white terminal plug 6 Refer to control schematic and connect the control wire from incomer terminal ( 1 & 2 / 3 & 4 ), located at the bottom compartment to the terminal block provided on the side plate 7 Connect primary injection cable ( one to CCU and one to the busbar connection located at the back ) 8 Fully Insert 8E module to the test bench 9 Turn the rotary switch handle to " TEST" position and " ON " the control supply. Contactor will energize 10 Turn the rotary switch handle from " TEST" to "OFF" then to "ON" position. Contoctor will energize 11 Perform the Primary Injection Test as per schematic diagram