Upto Plinth Level

1 Footing F 1 (Rectangular Bottom) 12 1.750 1.750

2 Footing F 1 (Trapezoidal above Bottom) 12

3 Footing F 1 (Pedestal) 12 0.500 0.500

4 Footing F 2 (Rectangular Bottom) 2 2.000 2.000

5 Footing F 2 (Trapezoidal above Bottom) 2

6 Footing F 2 (Pedestal) 2 0.500 0.500

7 Footing F 3 (Rectangular Bottom) 2 2.100 2.100

8 Footing F 3 (Trapezoidal above Bottom) 2

9 Footing F 3 (Pedestal) 2 0.500 0.500

10 Footing F 4 (Rectangular Bottom) 4 2.300 2.300

11 Footing F 4 (Trapezoidal above Bottom) 4

12 Footing F 4 (Pedestal) 4 0.500 0.500

Page 1 of 16
Total
Length
Sl. Quantity Width (m)
Description (m)
No. (nos.)

A B C

13 Combined Footing CF 1 (Trapezoidal Portion) 1

14 Combined Footing CF 1 (Rectangular Portion) 1 1.900 4.950

15 Combined Footing CF 1 (Beam Portion) 1 0.500 4.950

16 Combined Footing CF 2 (Trapezoidal Portion) 1

17 Combined Footing CF 2 (Rectangular Portion) 1 2.300 5.150

18 Combined Footing CF 2 (Beam Portion) 1 0.600 5.150

19 Combined Footing CF 3 (Trapezoidal Portion) 1

20 Combined Footing CF 3 (Rectangular Portion) 1 1.400 4.750

21 Combined Footing CF 3 (Beam Portion) 1 0.500 4.750

22 Tie Beam TB 1 (Axis 1 & 7) 4 0.250 3.400

23 Tie Beam TB 1 (Axis 3 & 5) 4 0.250 3.300

24 Tie Beam TB 2 1 0.250 2.100

25 Tie Beam TB 3 2 0.250 2.775

26 Tie Beam TB 4 1 0.250 2.200

27 Tie Beam TB 4 1 0.250 2.775

28 Tie Beam TB 4 1 0.250 2.100

29 Tie Beam TB 4 1 0.250 2.775

30 Tie Beam TB 4 1 0.250 2.200

31 Tie Beam TB 5 1 0.250 2.100

Page 2 of 16
Total
Length
Sl. Quantity Width (m)
Description (m)
No. (nos.)

A B C

32 Tie Beam TB 6 2 0.250 2.775

33 Tie Beam TB 7 4 0.250 1.625

34 Tie Beam TB 7 4 0.250 0.950

35 Tie Beam TB 8 4 0.250 2.700

36 Tie Beam TB 9 2 0.250 2.750

37 Tie Beam TB 9 2 0.250 2.625

38 Tie Beam TB 10 2 0.250 2.800

39 Tie Beam TB 10 2 0.250 2.750

40 Tie Beam TB 10 2 0.250 2.625

41 Tie Beam TB 10 2 0.250 2.800

42 Tie Beam TB 11 2 0.250 3.650

43 Tie Beam TB 11 2 0.250 4.175

44 Plinth Beam PB 1 4 0.250 2.900

45 Plinth Beam PB 2 1 0.250 2.600

46 Column C 1 with F 1 footing 12 0.250 0.350

47 Column C 2 with F 2 footing 2 0.250 0.350

48 Column C 2 with F 3 footing 2 0.250 0.350

49 Column C 2 with F 4 footing 4 0.250 0.350

50 Column C 3 with CF 1 footing 2 0.250 0.400

51 Column C 4 with CF 2 footing 2 0.250 0.400

52 Column C 3 with CF 3 footing 2 0.250 0.400

Page 3 of 16
Total
Length
Sl. Quantity Width (m)
Description (m)
No. (nos.)

A B C

TOTAL QUANTITY UPTO PLINTH LEVEL

Page 4 of 16
ASTRUCTURES LIMITED
J PROJECT (C-3253)

M-25 GRADE CONCRETE) UPTO PLINTH LEVEL


PLINTH LEVEL TO BOTTOM OF P.C.C. = 1.975 METRE

Total
Thickness / Quantity per Unit
Quantity Remarks
Height (m) (cu.m)
(cu.m)

D E = (B X C X D) F = (A X E)

0.200 0.613 7.350

H/3{(A1+A2+((A1XA2)^(0.5)}
0.209 2.508 =(0.15/3)((1.75*1.75)+(0.5*0.5)+
((1.75*1.75*0.5*0.5)^(0.5)))

0.500 0.125 1.500

0.200 0.800 1.600

H/3{(A1+A2+((A1XA2)^(0.5)}
0.262 0.524
=(0.15/3)((2*2)+(0.5*0.5)+((2*2*0.5*0.5)^(0.5)))

0.500 0.125 0.250

0.200 0.882 1.764

H/3{(A1+A2+((A1XA2)^(0.5)}
0.380 0.760 =(0.2/3)((2.1*2.1)+(0.5*0.5)+
((2.1*2.1*0.5*0.5)^(0.5)))

0.500 0.125 0.250

0.200 1.058 4.232

H/3{(A1+A2+((A1XA2)^(0.5)}
0.558 2.232 =(0.25/3)((2.3*2.3)+(0.5*0.5)+
((2.3*2.3*0.5*0.5)^(0.5)))

0.500 0.125 0.500

Page 5 of 16
Total
Thickness / Quantity per Unit
Quantity Remarks
Height (m) (cu.m)
(cu.m)

D E = (B X C X D) F = (A X E)

0.150 0.891 0.891 0.5*((1.9+0.5))*0.15*4.95

0.200 1.881 1.881

0.400 0.990 0.990

0.200 1.494 1.494 0.5*((2.3+0.6))*0.2*5.15

0.200 2.369 2.369

0.500 1.545 1.545

0.100 0.451 0.451 0.5*((1.4+0.5))*0.1*4.75

0.150 0.998 0.998

0.350 0.831 0.831

0.350 0.298 1.190

0.350 0.289 1.155

0.350 0.184 0.184

0.300 0.208 0.416

0.350 0.193 0.193

0.350 0.243 0.243

0.350 0.184 0.184

0.350 0.243 0.243

0.350 0.193 0.193

0.300 0.158 0.158

Page 6 of 16
Total
Thickness / Quantity per Unit
Quantity Remarks
Height (m) (cu.m)
(cu.m)

D E = (B X C X D) F = (A X E)

0.350 0.243 0.486

0.300 0.122 0.488 (1625 mm + 250 mm)

0.300 0.071 0.285 (1200 mm + 250 mm)

0.350 0.236 0.945

0.300 0.206 0.413

0.300 0.197 0.394

0.350 0.245 0.490

0.350 0.241 0.481

0.350 0.230 0.459

0.350 0.245 0.490

0.400 0.365 0.730

0.400 0.418 0.835

0.250 0.181 0.725

0.300 0.195 0.195

1.050 0.092 1.103 Length = (1.975-0.850-0.075)

1.050 0.092 0.184 Length = (1.975-0.850-0.075)

1.000 0.088 0.175 Length = (1.975-0.900-0.075)

0.950 0.083 0.333 Length = (1.975-0.950-0.075)

1.150 0.115 0.230 Length = (1.975-0.750-0.075)

1.000 0.100 0.200 Length = (1.975-0.900-0.075)

1.300 0.130 0.260 Length = (1.975-0.600-0.075)

Page 7 of 16
Total
Thickness / Quantity per Unit
Quantity Remarks
Height (m) (cu.m)
(cu.m)

D E = (B X C X D) F = (A X E)

48.975

Page 8 of 16
SIMPLEX INFRASTRUCTURES
RANIGANJ PROJECT (C-

DETAIL CALCULATIONS OF R.C.C. (M-25 GRADE CON


CONSIDERING DEPTH OF COLUMN FROM PLINTH LEVEL T

Total
Quantity Width (m)
Sl. No. Description (nos.)

A B

Upto Plinth Level

1 Footing F 1 (Rectangular Bottom) 12 1.750

2 Footing F 1 (Trapezoidal above Bottom) 12

3 Footing F 1 (Pedestal) 12 0.500

4 Footing F 2 (Rectangular Bottom) 2 2.000

5 Footing F 2 (Trapezoidal above Bottom) 2

6 Footing F 2 (Pedestal) 2 0.500

7 Footing F 3 (Rectangular Bottom) 2 2.100

8 Footing F 3 (Trapezoidal above Bottom) 2

9 Footing F 3 (Pedestal) 2 0.500

10 Footing F 4 (Rectangular Bottom) 4 2.300

11 Footing F 4 (Trapezoidal above Bottom) 4

12 Footing F 4 (Pedestal) 4 0.500

Page 1 of 16
Total
Quantity Width (m)
Sl. No. Description (nos.)

A B

13 Combined Footing CF 1 (Trapezoidal Portion) 1

14 Combined Footing CF 1 (Rectangular Portion) 1 1.900

15 Combined Footing CF 1 (Beam Portion) 1 0.500

16 Combined Footing CF 2 (Trapezoidal Portion) 1

17 Combined Footing CF 2 (Rectangular Portion) 1 2.300

18 Combined Footing CF 2 (Beam Portion) 1 0.600

19 Combined Footing CF 3 (Trapezoidal Portion) 1

20 Combined Footing CF 3 (Rectangular Portion) 1 1.400

21 Combined Footing CF 3 (Beam Portion) 1 0.500

22 Tie Beam TB 1 (Axis 1 & 7) 4 0.250

23 Tie Beam TB 1 (Axis 3 & 5) 4 0.250

24 Tie Beam TB 2 1 0.250

25 Tie Beam TB 3 2 0.250

26 Tie Beam TB 4 1 0.250

27 Tie Beam TB 4 1 0.250

28 Tie Beam TB 4 1 0.250

29 Tie Beam TB 4 1 0.250

30 Tie Beam TB 4 1 0.250

31 Tie Beam TB 5 1 0.250

Page 2 of 16
Total
Quantity Width (m)
Sl. No. Description (nos.)

A B

32 Tie Beam TB 6 2 0.250

33 Tie Beam TB 7 4 0.250

34 Tie Beam TB 7 4 0.250

35 Tie Beam TB 8 4 0.250

36 Tie Beam TB 9 2 0.250

37 Tie Beam TB 9 2 0.250

38 Tie Beam TB 10 2 0.250

39 Tie Beam TB 10 2 0.250

40 Tie Beam TB 10 2 0.250

41 Tie Beam TB 10 2 0.250

42 Tie Beam TB 11 2 0.250

43 Tie Beam TB 11 2 0.250

44 Plinth Beam PB 1 4 0.250

45 Plinth Beam PB 2 1 0.250

46 Column C 1 with F 1 footing 12 0.250

47 Column C 2 with F 2 footing 2 0.250

48 Column C 2 with F 3 footing 2 0.250

49 Column C 2 with F 4 footing 4 0.250

50 Column C 3 with CF 1 footing 2 0.250

51 Column C 4 with CF 2 footing 2 0.250

52 Column C 3 with CF 3 footing 2 0.250

Page 3 of 16
Total
Quantity Width (m)
Sl. No. Description (nos.)

A B

TOTAL QUANTITY UPTO PLINTH LEVEL

Page 4 of 16
FRASTRUCTURES LIMITED
ANJ PROJECT (C-3253)

C. (M-25 GRADE CONCRETE) UPTO PLINTH LEVEL


OM PLINTH LEVEL TO BOTTOM OF P.C.C. = 2.175 METRE

Total
Thickness / Quantity per Unit
Length (m) Quantity Remarks
Height (m) (cu.m)
(cu.m)

C D E = (B X C X D) F = (A X E)

1.750 0.200 0.613 7.350

H/3{(A1+A2+((A1XA2)^(0.5)}
0.209 2.508 =(0.15/3)((1.75*1.75)+(0.5*0.5)+
((1.75*1.75*0.5*0.5)^(0.5)))

0.500 0.500 0.125 1.500

2.000 0.200 0.800 1.600

H/3{(A1+A2+((A1XA2)^(0.5)}
0.262 0.524 =(0.15/3)((2*2)+(0.5*0.5)+
((2*2*0.5*0.5)^(0.5)))

0.500 0.500 0.125 0.250

2.100 0.200 0.882 1.764

H/3{(A1+A2+((A1XA2)^(0.5)}
0.380 0.760 =(0.2/3)((2.1*2.1)+(0.5*0.5)+
((2.1*2.1*0.5*0.5)^(0.5)))

0.500 0.500 0.125 0.250

2.300 0.200 1.058 4.232

H/3{(A1+A2+((A1XA2)^(0.5)}
0.558 2.232 =(0.25/3)((2.3*2.3)+(0.5*0.5)+
((2.3*2.3*0.5*0.5)^(0.5)))

0.500 0.500 0.125 0.500

Page 5 of 16
Total
Thickness / Quantity per Unit
Length (m) Quantity Remarks
Height (m) (cu.m)
(cu.m)

C D E = (B X C X D) F = (A X E)

0.150 0.891 0.891 0.5*((1.9+0.5))*0.15*4.95

4.950 0.200 1.881 1.881

4.950 0.400 0.990 0.990

0.200 1.494 1.494 0.5*((2.3+0.6))*0.2*5.15

5.150 0.200 2.369 2.369

5.150 0.500 1.545 1.545

0.100 0.451 0.451 0.5*((1.4+0.5))*0.1*4.75

4.750 0.150 0.998 0.998

4.750 0.350 0.831 0.831

3.400 0.350 0.298 1.190

3.300 0.350 0.289 1.155

2.100 0.350 0.184 0.184

2.775 0.300 0.208 0.416

2.200 0.350 0.193 0.193

2.775 0.350 0.243 0.243

2.100 0.350 0.184 0.184

2.775 0.350 0.243 0.243

2.200 0.350 0.193 0.193

2.100 0.300 0.158 0.158

Page 6 of 16
Total
Thickness / Quantity per Unit
Length (m) Quantity Remarks
Height (m) (cu.m)
(cu.m)

C D E = (B X C X D) F = (A X E)

2.775 0.350 0.243 0.486

1.625 0.300 0.122 0.488 (1625 mm + 250 mm)

0.950 0.300 0.071 0.285 (1200 mm + 250 mm)

2.700 0.350 0.236 0.945

2.750 0.300 0.206 0.413

2.625 0.300 0.197 0.394

2.800 0.350 0.245 0.490

2.750 0.350 0.241 0.481

2.625 0.350 0.230 0.459

2.800 0.350 0.245 0.490

3.650 0.400 0.365 0.730

4.175 0.400 0.418 0.835

2.900 0.250 0.181 0.725

2.600 0.300 0.195 0.195

0.350 1.250 0.109 1.313 Length = (1.975-0.850-0.075)

0.350 1.250 0.109 0.219 Length = (1.975-0.850-0.075)

0.350 1.200 0.105 0.210 Length = (1.975-0.900-0.075)

0.350 1.150 0.101 0.403 Length = (1.975-0.950-0.075)

0.400 1.350 0.135 0.270 Length = (1.975-0.750-0.075)

0.400 1.200 0.120 0.240 Length = (1.975-0.900-0.075)

0.400 1.500 0.150 0.300 Length = (1.975-0.600-0.075)

Page 7 of 16
Total
Thickness / Quantity per Unit
Length (m) Quantity Remarks
Height (m) (cu.m)
(cu.m)

C D E = (B X C X D) F = (A X E)

TH LEVEL 49.445