Sunteți pe pagina 1din 48

KOMPLEKS PERDANA PUTRA

SEWAGE & WASTEWATER TREATMENT PLANT


Location: Inspection Date:

Item Description Yes No N/A

1 Inspect screen, grit chamber, sump pump, oil


& grease chamber, aeration tank,
sedimentation tank, sludge holding tank and
effluent storage tank for the followings :-
a) Remove any screening attached
b) Remove any grit
c) Check sump pump discharge normally
and pump float switch should be set in

d) Check any oil and grease level visually.


Skim off floating debris and clean up oil
particles stick at the wall with water

e) Check aeration water dissolve oxygen


using D.O meter, reading should 1 to 3 ppm.
f) Check sedimentation tank for any scum.
Remove it which float on the surface and
clear the scum skimmer

g) Visual check the sludge volume, if 50% of


the tank volume, desludging is necessary

2 Check control panel for wiring and system


operation in order

Check air blower operation, top-up level if


3 lowered than indicated minimum level and
check belt is in good

REMARK / NON-CONFERMANCE

VERIFICATION
Prepared by: Checked by:
( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KOMPLEKS PERDANA PUTRA
GREASE TRAP, PIPING AND FLOOR TRAPS
Location: Inspection Date:

Item Description Yes No N/A


1 INCOMING CHAMBER (PUMP SUMP)

To check piping for leakage and carry out


1.1 minor repair for leaks, burst pipe etc.

To clean the grease trap and remove


1.2 sediment and hardened oil to ensure no
blockages to main seweer line

Inspect operation of automatic dosing unit


1.3 and aeration unit are working propely

REMARK / NON-CONFERMANCE

VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI45(01)

T PLANT

Remark/No-Comformance

Verified by:
( Civil Engineer/Executive )

Name:
Date:
KFM/P7.5.1/MI46(01)

TRAPS

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA
CARPET AND TIMBER STRUCTURE CHECKLIST
Location: Inspection Date:

Item Description Yes No N/A


1 CARPET
a) Inspect surfaces for defects and permanent
stain , replace if necessary

2 TIMBER STRUCTURE
a) Inspect for termite attack and give treatment if
necessary.

b) Inspect for fungus attack and give treatment if


necessary.

c) Inspect for borers, beetles attacts and give


treatment if necessary.

d) Claen decorative and carving doors, wall


fixtures, scluptures, etc. and if necessary apply
shellac or touch-up. Note:- Internal (every week),
external or exposed surface (every month)

e) Repaint structural members. Note:- every 2


years.

REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI47(01)

CKLIST

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA
DRAINS,SUMPS,GRATING AND CULVERT CHECKLIST
Location: Inspection Date:

Item Description Yes No N/A

Inspect integrity of structures and initiate


1 repair or replace

2 Inspect flow condition and clear blockages

Inspect for missing or damage gratings and


3 replace

REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI48(01)

CHECKLIST

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

RAINWATER GOOD CHECKLIST

Location: Inspection Date:

Item Description Yes No N/A


Inspect intergrity of members including
A hanger and brackets. Repair or replace if
necessary.
Inspect rainwater goods for leakage and
B repair or replace if necessary.
Inspect for blockage. Repair or replace if
C necessary.

Inspect the concrete gutter to detect any


deformities, delaminations and cracks and
D current status of screedings.

REMARK / NON-CONFERMANCE

VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )


Name: Name:
Date: Date:
KFM/P7.5.1/MI49(01)

Remark/No-Comformance

Verified by:

( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA

SIGNAGE AND WALL CHECKLIST

Location: Inspection Date:

Item Description Yes No N/A


1 SIGNAGES
a) Inspect all signages and repair or replace if
necessary.

2 WALL
2.1 Brick Wall (Including Tiled Wall)
a) Inspect for cracks and deflaction. Repair or
replace if necessary.
b) Inspect for defective finishes. Repair or
replace if necessary.
2.2 Curtain Wall, Windows and Glazing
a) Inspect for cracks and replace defective
glass panels if necessary.
b) Inspect for leakage and repair or replace
gasket / adhesives if necessary.
c) Inspect accessories and fixtures and repair
or replace if necessary.
d) Inspect for corrosion and repair if
necessary.

REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI50(01)

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

FLOOR AND CEILING CHECKLIST

Location: Inspection Date:

Item Description Yes No N/A


1 FLOOR

a) Inspect for cracks and repair if necessary.


b) Inspect for defective finishes and repair or
replace if necessary.
c) Inspect for leakages and repair
immediately if necessary.
d) Inspect for settlement, deflection and
repair if necessary.

2 CEILING
a) Inspect ceiling structures. Repair or
replace if necessary.
b) Inspect ceiling finishes inclusive of
cornices, etc and repair or replace if
necessary.
c) Inspect ceiling boards. Repair or replace if
necessary.
d) Inspect for hangers and fixtures to soffit of
slab.

REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI51(01)

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

ROOFING, HAND RAIL AND GRILLE CHECKLIST

Location: Inspection Date:

Item Description Yes No N/A


1 ROOFING
a) Inspect intergrity of roof structures and
repair if necessary.

b) Inspect roof finishes for defects, cracks


and leaks. Repair or replace if necessary.

c) Inspect water proof and vapour barrier for


leaks and tear. Repair or replace if necessary.

d) inspect the concrete flat roof to detect any


deformities, delaminations and cracks.

2 HAND RAIL AND GRILLE


a) Inspect for defective finishes and repair or
replace if necessary.
b) Inspect for corrosion and repair or replace
if necessary.
c) Inspect for support of handrail and grille
especially at higher stories.

REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI52(01)

ECKLIST

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

REINFORCED CONCRETE STRUCTURES, STEEL STRUCTURES AND SPACE FRAME CHECKLIST

Location: Inspection Date:

Item Description Yes No N/A


1 REINFORCED CONCRETE STRUCTURES

a) Inspect for active cracks and to do defect


mapping. Note:- Inspect every 2 years
b) Inspect for spalling of cover and carry out
remedial work if necessary.
c) Inspect for corrosion of reinforcement and
carry out remedial work if necessary.
d) Inspect for settlement and foundation
failures and carry out remedialy work if
necessary.

2 STEEL STRUCTURES AND SPACE FRAME


a) Inspect for corrosion to members and
welding joints. Carry out remedial work if
necessary.

b) Inspect for missing, loose connection and


joints. Carry out remedial work if necessary.
c) Repaint structural members. Note:- every
2 years.

REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI53(01)

AND SPACE FRAME CHECKLIST

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

INTERNAL PARTITION, DOOR AND PAINTING TOUCH-UP CHECKLIST

Location: Inspection Date:

Item Description Yes No N/A


1 INTERNAL PARTITION
a) Inspect intergrity of members and carry
out repair work if nessary.

b) Inspect accessories, fixtures and finishes


and repair or replace if necessary.

2 DOOR (INCLUDING FIRE RATED DOOR)


a) Inspect intergrity of members and carry
out remedial work or replace doo if
necessary.
b) Inspect accessories and fixtures and repair
or replace if necessary.

c) Maintain door finishes in a good condition.


Vanish and painting if necessary.
d) Inspect the allignment of door frame.
(Misalignment may be due to settlement or
movement of the structures)

3 PAINTING TOUCH-UP

a) Inspect painted surfaces for stains and


defects and perform necessary touch-op
painting to match existing if necessary
(maximum area 10m2) Note: Repainting of
the building is recommended every 5 years.

REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI54(01)

UCH-UP CHECKLIST

Remark/No-Comformance
Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

BUILT IN FURNITURE

Location: Inspection Date:

Item Description Yes No N/A


a) Inspect integrity of members, accessories
and fixture and carry out repair work if
necessary
b) Maintain accessories,fixtures and finishes
in good condition
c) Inspect for termite attack and give
treatment if necessary
d) Inspect for borers,beetles attack and give
treatment if necessary
e) Inspect for fungus attack and give
treatment if necessary

REMARK / NON-CONFERMANCE

VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI55(01)

Remark/No-Comformance

Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

ROAD,HARD STANDING AND ROAD FURNITURE,FENCING AND GATES

Location: Inspection Date:

Item Description Yes No N/A


1 ROAD,HARD STANDING AND ROAD
FURNITURE
a) Inspect all road line,dividers and parking
lots painting work.Repainting or repair if
necessary
b) Inspect all curb,grating and scupper
drains. Repair or replace if necessary
c) Inspect all road furniture. Repair or
replace if necessary
d) Inspect interlocking tiles.Repair or replace
if necessary

Item Description Yes No N/A


2 FENCING AND GATES
a) Inspect integrity of structures and cracks.
Repair or replace if necessary
b) Inspect finishes. Repair or replace if
necessary
c) Inspect for corrosion. Repair or replace if
necessary

REMARK / NON-CONFERMANCE

VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI56(01)
A

FENCING AND GATES

Remark/No-Comformance

Remark/No-Comformance

Verified by:

( Civil Engineer/Executive )

Name:
Date:
KOMPLEKS PERDANA PUTRA

FENCING AND GATES

Location: Inspection Date:

Item Description Yes No N/A


1 Inspect integrity of structures and cracks.
Repair or replace if necessary
Inspect finishes. Repair or replace if
2 necessary
Inspect for corrosion .Repair or replace if
3 necessary

REMARK / NON-CONFERMANCE

VERIFICATION
Prepared by: Checked by:

( Civil Technician ) ( Civil Supervisor )

Name: Name:
Date: Date:
KFM/P7.5.1/MI57(01)

Remark/No-Comformance

Verified by:

( Civil Engineer/Executive )

Name:
Date:

S-ar putea să vă placă și