MEASUREMENT BOOK

SL NO DESCRIPTION NO: L B H

1 SITE CLEARING-

Clearing grass and other overgrowths of


vegetation including removal of coconut tree
roots and removal of rubbish outside the
periphery of the cleared area. 2 2 1.5

Earth work excavation for


foundation in ordinary soil and
depositing the soil initial lead up to
2 50m& lift up to 1.5m etc…
FOOTING- C2 15 1.8 1.8 1
FOOTING - C3 5 1.5 1.5 1

P.C.C 1:4:8, 10cm thick for footing


using 40mm broken stone, including
the cost & conveyance of materials,
3 labour charges etc…
FOOTING- C2 15 1.8 1.8 0.15
FOOTING - C3 5 1.5 1.5 0.15

R.C.C 1:2:4, using 20mm broken


stone for footing including the cost &
conveyence of materials, labour
charges, all type of formworks, curing
etc..
4
C2 15 1.5 1.5 0.25
C3 5 1.2 1.2 0.25
R.C.C 1:2:4, using 20mm broken
stone for pedestal column including
the cost & conveyence of materials,
labour charges, all type of formworks,
curing etc..
5
C2 15 0.45 0.45 0.45
C3 5 0.45 0.45 0.45
R.C.C 1:2:4, using 20mm broken
stone for column upto 25 cm
including the cost & conveyence of
materials, labour charges, all type of
formworks, curing etc..
6
C2 15 0.35 0.23 0.25
C3 5 0.35 0.23 0.25

Earth work excavation for column


(C1) in ordinary soil and depositing
the soil initial lead up to 50m& lift up
7 to 1.5m etc… 10 1.5 1.5 1
Earth work excavation for septic tank
in ordinary soil and depositing the soil
initial lead up to 50m& lift up to 1.5m
8
etc… 1 3.7 1.8 2

9 WELL DIGGING

P.C.C 1:4:8, 10cm thick for footing


using 20mm broken stone, including
the cost & conveyance of materials,
10 labour charges etc…
C1 10 1.5 1.5 0.15

R.C.C 1:2:4, using 20mm broken


stone for footing including the cost &
conveyence of materials, labour
charges, all type of formworks, curing
etc..
11
C1 10 1.2 1.2 0.25
R.C.C 1:2:4, using 20mm broken
stone for pedestal column including
the cost & conveyence of materials,
labour charges, all type of formworks,
curing etc..
12
C1 10 0.45 0.45 0.45
R.C.C 1:2:4, using 20mm broken
stone for column upto 25 cm
including the cost & conveyence of
materials, labour charges, all type of
formworks, curing etc..
13
C1 10 0.35 0.23 0.25

P.C.C 1:4:8, 10cm thick for plinth


beam using 40mm broken stone,
including the cost & conveyance of
14
materials, labour charges etc… 1 123 0.3 0.05

P.C.C 1:4:8, 10cm thick for septic


tank using 40mm broken stone,
including the cost & conveyance of
15
materials, labour charges etc… 1 3.7 1.8 0.15

Brickwork for septic tank(solid block)


in cement mortar 1:6 including the
cost & conveyence of
materials,labour charges,curing,
scaffolding etc…
16 1 9.2 0.21 2

R.C.C 1:2:4, using 20mm broken


stone for plinth beam including the
cost & conveyence of materials,
labour charges, all type of formworks,
curing etc..
17 1 123 0.4 0.23

Basement masonary for plinth using


wirecut brick with 1:6 cement mortar
18 1 123 0.21 0.5
Earth filling inside the trench taken
for foundation including the cost &
conveyance of materials, labour
19 charges etc.
Earth filling inside the basement
including the cost & conveyance of
19 materials, labour charges etc.
KITCHEN 1 3.3 3.6 1
TOILET 1 1.32 2.34 1
DINING 1 3.6 5.64 1
WORK AREA 1 3.3 1.8 1
STORE 1 1.32 1.8 1
FOYER 1 1.8 3 1
DRAWING ROOM 1 4.2 3.6 1
TOILET 1 4.8 1.8 1
MASTER BED ROOM 1 4.2 3.6 1
STAIR CASE 1 4.4 2.4 1
VERANDAH 1 6.48 1.74 1
Total

Plastering of brick work inside and


20 outside of basement 1 145.12 0.45

R.C.C 1:2:4, using 20mm broken


stone for plinth belt including the
cost & conveyence of materials,
labour charges, all type of formworks,
curing etc..
21 1 126.04 0.21 0.1

R.C.C 1:2:4, using 20mm broken


stone for column upto lintel level
including the cost & conveyence of
materials, labour charges, all type of
formworks, curing etc..
22 20 0.35 0.23 2.15

Brickwork for super-structure (wire


cut brick) in cement mortar 1:6
including the cost & conveyence of
materials,labour charges,curing,
scaffolding etc…
23 1 103.9 0.21 2.15
Deductions
TOTAL

R.C.C 1:2:4, using 20mm broken


stone for stair case including the cost
& conveyence of materials, labour
charges, all type of formworks, curing
etc..
24
Waste slab 1 6.5 0.9 0.1
Landing 2 1 1 0.1
Steps 12 1 0.3 0.15
R.C.C 1:2:4, using 20mm broken
stone for lintel all around top of
brickwork including the cost &
conveyence of materials, labour
charges, all type of formworks, curing
etc..
25 1 103.9 0.21 0.15

Brickwork for super-structure (wire


cut brick) in cement mortar 1:6 above
lintel ,including the cost &
conveyence of materials,labour
charges,curing, scaffolding etc…
26 1 126.7 0.21 1.3

R.C.C 1:2:4, using 20mm broken


stone for stair case including the cost
& conveyence of materials, labour
charges, all type of formworks, curing
etc..
27
Waste slab 1 4 1 0.1
Steps 7 1 0.3 0.15

R.C.C 1:2:4, using 20mm broken


stone for column (C1) including the
cost & conveyence of materials,
labour charges, all type of formworks,
curing etc..
28 10 0.166 2.4

R.C.C 1:2:4, using 20mm broken


stone for beam over porch and
verandah including the cost &
conveyence of materials, labour
charges, all type of formworks, curing
etc..
29 1 24.56 0.4 0.23

R.C.C 1:2:4, using 20mm broken


stone for beam and roof slab
including the cost & conveyence of
materials, labour charges, all type of
formworks, curing etc..
30
M.BED 4.44 3.84 0.12
TOILET AND DRESSING 4.68 2.04 0.1
DRAWING 4.44 4.08 0.12
FOYER 5.88 2.04 0.1
DINING 6.12 3.84 0.12
TOILET AND STORE 6.12 1.44 0.1
KITCHEN 3.78 4.08 0.12
W.AREA 3.78 2.04 0.1
PORCH 3.54 5.58 0.1
VERANDAH 1.74 6.48 0.1
BEAM 21.24 0.28 0.21

R.C.C 1:2:4, using 20mm broken


stone for sunshade including the
cost & conveyence of materials,
labour charges, all type of formworks,
curing etc..
31 1 24.42 1.15 0.1

Brickwork for super-structure (wire


cut brick) in cement mortar 1:6 upto
lintel ,including the cost &
conveyence of materials,labour
charges,curing, scaffolding etc…
32 1 81.12 0.21 2.15
Deduction

R.C.C 1:2:4, using 20mm broken


stone for lintel all around top of
brickwork including the cost &
conveyence of materials, labour
charges, all type of formworks, curing
etc..
33 1 90.48 0.21 0.15

R.C.C 1:2:4, using 20mm broken


stone for column including the cost
& conveyence of materials, labour
charges, all type of formworks, curing
etc..
34
column-c2 4 0.35 0.23 3.6
column-c1 4 0.166 2.4

Brickwork for super-structure (wire


cut brick) in cement mortar 1:6 above
lintel ,including the cost &
conveyence of materials,labour
charges,curing, scaffolding etc…
35 1 90.84 0.21 1.2
R.C.C 1:2:4, using 20mm broken
stone for beam and roof slab
including the cost & conveyence of
materials, labour charges, all type of
formworks, curing etc..
36

balcony 1 6.72 1.74 0.1


living 1 6.72 3.84 0.12
M.B toilet and dressing 1 2.28 4.68 0.1
M.B 1 3.84 4.68 0.12
stair room 1 2.64 6.12 0.12
m.b 1 3.84 4.08 0.12
m.b toilet 1 1.68 4.08 0.1
beams 1 20.64 0.23 0.2
1 2.88 0.23 0.3
1 9.6 0.21 0.3
1 9.72 0.21 0.45

TOTAL
QTY UNIT RATE AMOUNT

6 m³ 250 1500

48.6 m³ 250 12150


11.25 m³ 250 2812.5

7.29 m³ 4500 32805


1.6875 m³ 4500 7593.75

8.4375 m³ 18500 156093.75


1.8 m³ 18500 33300
1.366875 m³ 18500 25287.1875
0.455625 m³ 18500 8429.0625

0.301875 m³ 18500 5584.6875


0.100625 m³ 18500 1861.5625

22.5 m³ 250 5625

13.32 m³ 250 3330

LS 30000 30000

3.375 m³ 4500 15187.5

3.6 m³ 18500 66600

0.91125 m³ 18500 16858.125


0.20125 m³ 18500 3723.125

1.845 m³ 4500 8302.5

0.999 m³ 4500 4495.5

3.864 m³ 7500 28980

11.316 m³ 18500 209346

12.915 m³ 7000 90405

35.8 m³ 1000 35800

11.88 m³
3.0888 m³
20.304 m³
5.94 m³
2.376 m³
5.4 m³
15.12 m³
8.64 m³
15.12 m³
10.56 m³
11.2752 m³
109.704 m³ 1000 109704

65.304 m² 450 29386.8

2.64684 m³ 18500 48966.54

3.4615 m³ 18500 64037.75

46.91085 m³
3.93 m³
42.98085 m³ 7500 322356.375

0.585 m³ 20000 11700


0.2 m³ 20000 4000
0.54 m³ 20000 10800
3.27285 m³ 20000 65457

34.5891 m³ 7500 259418.25


0.4 20000 8000
0.315 20000 6300

3.984 m³ 18500 73704

2.25952 m³ 18500 41801.12

2.045952 m³
0.95472 m³
2.173824 m³
1.19952 m³
2.820096 m³
0.88128 m³
1.850688 m³
0.77112 m³
1.97532 m³
1.12752 m³
1.248912 m³
17.04895 m³ 18500 315405.612

2.8083 m³ 18500 51953.55

36.62568
7.62

29.00568 m³ 7500 217542.6

2.85012 m³ 18500 52727.22

1.1592 m³ 18500 21445.2


1.5936 m³ 18500 29481.6

22.89168 m³ 7500 171687.6


1.16928
3.096576
1.06704
2.156544
1.938816
1.880064
0.68544
0.94944
0.19872
0.6048
0.91854

14.66526 m³ 18500 271307.31

2993253