Sunteți pe pagina 1din 3

Process of Energy Audit: Energy

Total Saving: Audit of


1,159,486 PKR
per month Analysis of
Gadoon
Textile Mill
historical data

Total Energy audit is a process or system to

investment: engineering
analysis
reduce the amount of energy input into
the system without negatively affecting the
2,777,271 PKR output.

Duration of our Analysis of energy


Bills
energy Audit is:
6 months

Budget: 10,000 PKR investment


proposals

preliminary Audit

Deatailed Audit

Recomendations
Energy management Tool:
We made an excel tool for the calculations of
energy audit. You just have to enter the
required values in the tool and it the will
Save Today, Survive Tomorrow. calculate the efficiencies, pay back period. it
will also make the graphs automatically and
Do the Earth a favor, compare the fuel prices.

Be a power saver.
Advisor: Dr.Sohail Malik

Co-Advisor: Miss.Ayesha Khan

Group members:
Recommendations: Danial Amjad (2012093)

• Buy a “STD Flex US ultrasonic leak • Those systems in which oversized fans are installed, Cell# 0332-4290961
detector costing around 0.1 million PKR. following corrective measures should be taken:
o Decrease fan speed using different motors. Asim Iftikhar (2012116)
• Motors <40HP and >15 years old (or o Install an adjustable speed drive (ASD) or
prev. rewound) have significantly lower multiple speed motor. Cell # 0334-4181115
efficiencies, hence it is best to replace • Fans that operate in high moisture airstreams should
them. be cleaned regularly. Hammas Saleem (2012122)
• If the rewind cost exceeds 50% to 65% of • Industry should have detailed data about energy
a new high efficiency motor price, buy a Cell # 0336-0880418
consumption.
new high efficiency motor. Increased
• Department wise detailed data about energy
reliability and efficiency should quickly
consumption should be arranged.
recover price premium.
• In facility all 36-watts tube lights should • Industry should manage detailed energy data
replaced with 18-watts LED lights. graphically in order to help future energy audit
processes.
• Due to corrosion and erosion, fan blades
become weaken and an imbalance is • By using our provided tool kit, industry will be able
created in the impeller. In these cases to manage data graphical about compressor
leakages, motor loadings, fan losses, energy
either the impeller should be replaced or
consumption and energy sources comparison.
fans can be replaced with FRP (Fiber
Reinforced Plastic) fans that can save 20-
25% energy.