now. While in the earlier days they were used to produce mechanical energy to pump
water, these days they are being used to generate electricity. You can in fact build
one for your home too by following instructions that you can find in the various do it
yourself online guides on the topic. From helping save the environment to cutting
down on your energy bills, windmill power comes with a host of advantages.
1. The biggest advantage that you get with windmill power is that it substantially
reduces the cost of electricity. In fact in some cases it completely eliminates the cost
too.
3. You can sell the electricity produced back to power companies in certain areas.
6. You directly contribute to your country's cause by helping it reduce its dependency
on other countries for oil.
7. By using windmill power you are setting an example for the next generation to
follow.
8. Homemade windmills are extremely easy to maintain. All that you need to do is to
check for some worn out components at regular intervals of time.
9. The operating cost of a windmill is also very low, one of the reasons why it is
gradually becoming popular among homeowners around the world.
10. You need not spend a fortune building a windmill. Most of the materials that you
want for building can be found in a local hardware store near you.
You can choose to build one or the other or why not build both. The projects are easy for thehome
handyman to complete, are heaps of fun and give a great sense of satifaction, once completed. Not
only will you get satisfaction from building these two useful projects, it will also save you money. How
much money - well it starts with A and ends with lot, that is you will save alot over the years, especially
if you stay on the grid and feed your excess power back into the grid.
The savings don't just last for a month or two, you will continue to save for the length of time that you
continue to have the windmill/s and solar panels operating.
The second point that should make you feel good is that it is good for the environment.
No more relying on nuclear power plants or coal fired power stations. You can honestly
say that you are doing a significant good deed for the environment.
Also in uncertain economic times you will have more money than normal...because the money
normally spent on energy will be still in your
pocket.
There is the growing wind energy installations in the number of the states across the India.
India is keen to decrease its reliance on fossil fuels to meet its energy demand. Shown here is a wind farm in Muppandal, Tamil
Nadu.
Tamil Nadu is the state with the most wind generating capacity: 4889.765 MW at the end of the March 2010.
[3]
Not far from Aralvaimozhi, the Muppandal wind farm, the largest in the subcontinent, is located near the
once impoverished village of Muppandal, supplying the villagers with electricity for work.[14][15] The village had
been selected as the showcase for India's $2 billion clean energy program which provides foreign
companies with tax breaks for establishing fields of wind turbines in the area. In february 2009, Shriram EPC
bagged INR 700 million contract for setting up of 60 units of 250 KW (totaling 15 MW) wind turbines in
Tirunelveli district by Cape Energy.[16] Enercon is also playing a major role in development of wind energy in
India. In Tamil Nadu, Coimbatore and Tiruppur Districts having more wind Mills from 2002
Maharashtra is second only to Tamil Nadu in terms of generating capacity. Suzlon has been heavily
involved.[12] Suzlon operates what was once Asia's largest wind farm, the Vankusawade Wind Park (201
Samana in Rajkot district is set to host energy companies like China Light Power (CLP) and Tata
Power have pledged to invest up to Rs.8.15 billion ($189.5 million) in different projects in the area. CLP,
through its India subsidiary CLP India, is investing close to Rs.5 billion for installing 126 wind turbines in
Samana that will generate 100.8 MW power. Tata Power has installed wind turbines in the same area for
generating 50 MW power at a cost of Rs.3.15 billion. Both projects are expected to become operational by
early next year, according to government sources. The Gujarat government, which is banking heavily on
wind power, has identified Samana as an ideal location for installation of 450 turbines that can generate a
total of 360 MW. To encourage investment in wind energy development in the state, the government has
introduced a raft of incentives including a higher wind energy tariff. Samana has a high tension transmission
grid and electricity generated by wind turbines can be fed into it. For this purpose, a substation at Sadodar
has been installed. Both projects are being executed by Enercon Ltd, a joint venture between Enercon of
ONGC Ltd has commissioned its first wind power project. The 51 MW project is located at Motisindholi
in Kutch district of Gujarat. ONGC had placed the EPC order on Suzlon Energy in January 2008, for setting
up the wind farm comprising 34 turbines of 1.5-mw each. Work on the project had begun in February 2008,
and it is learnt that the first three turbines had begun production within 43 days of starting construction work.
Power from this Rs 308 crore captive wind farm will be wheeled to the Gujarat state grid for onward use by
ONGC at its Ankleshwar, Ahmedabad, Mehsana andVadodara centres. ONGC has targeted to develop a
captive wind power capacity of around 200 MW in the next two years.[19]
There are many small wind farms in Karnataka, making it one of the states in India which has a high number
of wind mill farms. Chitradurga, Gadag are some of the districts where there are a large number of
The 13.2 MW Arasinagundi (ARA) and 16.5 MW Anaburu (ANA) wind farms are ACCIONA’S first in India.
Located in the Davangere district (Karnataka State), they have a total installed capacity of 29.7 MW and
comprise a total 18 Vestas 1.65MW wind turbines supplied by Vestas Wind Technology India Pvt. Ltd.[citation
needed]
The ARA wind farm was commissioned in June 2008 and the ANA wind farm, in September 2008. Each
facility has signed a 20-year Power Purchase Agreement (PPA) with Bangalore Electricity Supply Company
(BESCOM) for off-take of 100% of the output. ARA and ANA are Acciona’s first wind farms eligible for CER
ACCIONA is in talks with the World Bank for The Spanish Carbon Fund which is assessing participation in
the project as buyer for CERs likely to arise between 2010 and 2012. An environmental and social
assessment has been conducted as part of the procedure and related documents have been provided.
These are included below, consistent with the requirement of the World Bank's disclosure policy.[citation needed]
[edit]Rajasthan (738.5 MW)
farm in Jodhpur district of Rajasthan. A senior official[who?] told Projectmonitor that out of the total 31.5 mw
capacity, 12 mw had been completed so far. The remaining capacity would come on line shortly, he added.
For the INOX Group company, this would be the largest wind farm. In 2006-07, GFL commissioned a 23.1-
mw wind power project at Gudhe village near Panchgani in Satara district of Maharashtra. Both the wind
farms will be grid-connected and will earn carbon credits for the company, the official noted.[citation needed] In an
independent development, cement major ACC Ltd has proposed to set up a new wind power project in
Rajasthan with a capacity of around 11 mw. Expected to cost around Rs 60 crore, the wind farm will meet
the power requirements of the company's Lakheri cement unit where capacity was raised from 0.9 million
tpa to 1.5 million tpa through a modernisation plan. For ACC, this would be the second wind power project
after the 9-mw farm at Udayathoor in Tirunelvelli district of Tamil Nadu.[citation needed] Rajasthan is emerging as
an important destination for new wind farms, although it is currently not amongst the top five states in terms
of installed capacity. As of 2007 end, this northern state had a total of 496 mw, accounting for a 6.3 per cent
In consideration of unique concept, Govt. of Madhya Pradesh has sanctioned another 15 MW project to
MPWL at Nagda Hills near Dewas. All the 25 WEGs have been commissioned on 31.03.2008 and under
successful operation.[20].
The first wind farm of the state was set up at Kanjikode in Palakkad district. It has a generating capacity of
23.00 MW. A new wind farm project was launched with private participation at Ramakkalmedu in Idukki
district. The project, which was inaugurated by chief minister V. S. Achuthanandan in April 2008, aims at
generating 10.5 MW of electricity.[citation needed]
The Agency for Non-Conventional Energy and Rural Technology (ANERT), an autonomous body under the
Department of Power, Government of Kerala, is setting up wind farms on private land in various parts of the
state to generate a total of 600 mw of power. The agency has identified 16 sites for setting up wind farms
through private developers. To start with, ANERT will establish a demonstration project to generate 2 mw of
power at Ramakkalmedu in Idukki district in association with the Kerala State Electricity Board. The project
is slated to cost Rs 21 crore. Other wind farm sites include Palakkad and Thiruvananthapuram districts. The
contribution of non-conventional energy in the total 6,095 mw power potential is just 5.5 per cent, a share
the Kerala government wants to increase by 30 per cent. ANERT is engaged in the field of development and
promotion of renewable sources of energy in Kerala. It is also the nodal agency for implementing renewable
The total installation in West Bengal is just 1.10 MW as there was only 0.5 MW addition in 2006-2007 and
Suzlon Energy Ltd plans to set up a large wind-power project in West Bengal Suzlon Energy Ltd is planning
to set up a large wind-power project in West Bengal, for which it is looking at coastal Midnapore and South
24-Parganas districts. According to SP Gon Chaudhuri, chairman of the West Bengal Renewable Energy
Development Agency, the 50 MW project would supply grid-quality power. Gon Chaudhuri, who is also the
principal secretary in the power department, said the project would be the biggest in West Bengal using wind
energy. At present, Suzlon experts are looking for the best site. Suzlon aims to generate the power solely for
commercial purpose and sell it to local power distribution outfits like the West Bengal State Electricity Board
(WBSEB).[citation needed]
Suzlon will invest around Rs 250 crore initially, without taking recourse to the funding available from the
Indian Renewable Energy Development Agency (Ireda), said Gon Chaudhuri. He said there are five wind-
power units in West Bengal, at Frazerganj, generating a total of around 1 MW. At Sagar Island, there is a
composite wind-diesel plant generating 1 MW. In West Bengal, power companies are being encouraged to
buy power generated by units based on renewable energy. The generating units are being offered special
rates. S Banerjee, private secretary to the power minister, said this had encouraged the private sector
Wind power windmills provide the most efficient alternative source of energy as of
today. And while most may not realize the importance of this technology, there are
already a growing number of people that is slowly embracing this form of energy
source.
Reasons for the adaptation of this energy source might vary. There are those that
adapt this mode of energy production due to economical reasons, other for
environmental reasons. But one thing is for sure. This energy source is cheap and at
the same time safe. It is cheap in that it uses the wind as its source of energy and
therefore does not have any capital to go along with its construction except those
necessary for building it like materials necessary thereto. It is safe since it doesn't
produce smoke that will create gases harmful to our health and not to mention to the
environment.
It is for this reason that the use of wind power windmills is slowly gaining ground.
Every year, various companies have released models by models to improve this
technology. Such that every year, windmill technology is getting more sufficient.
In short, wind power windmills are the key to future power consumption. So why
wait for other to follow when you could lead them to follow you?