Minutes of meeting

Discussing abfdgdfb

(3) Calculation shefdggggggggggget and drawings of weir were discussed,

and get the conclusion after discussing with that the stilling basin should

also be calculated and give desiglkjrhtn of reinforcement, and after

excavation, if rock is good, this cafdbbbbn be delete, it ilius determined

on site. Designers should modify drawings to get apprhtedzhtdzfshbove.

(4) Calculfdfdfdfdfdfdfdation model of fhauxiliary powerhouse and

drawings of columns, walls and foundation were dishbdffffffffffffffcussed.

And designers should modify drawings to get approve.

(5)Calculation of model of pow;ll.knerhouse was discussed. Designer

should modify the model and the calculation sheet to get approve.

The drawings can be divided into.,m., 2 parts, but calculation sheet

should be only one for easy rebfdbfdbfdbfdbfdbfdbfdbfdbfdview.

And the agreoement > iul25MPa. ouil should also be mentioned in

drawings.iul

(6)Calculation sheet and drawings of surge tank, vertical shaft and

inclined shaft were discussed, e/.,/.,mail. dhf should modify drawings to

get approve.

(7)Drawings of penstock, anchor block and bhfddgdvcfgnryn is discussed,

and designer should modify drawings together with