DATOS GENERALES:
Especificaciones
f’c = 210 kg/cm2
fy = 4200 kg/cm2
UBICACIÓN : HUANCAYO FACTOR Z =
USO : PABELLON FACTOR U =
TIPO DE SUELO : TIPO 3 FACTOR S =
Tp =
TIPO DE ESTR. : MIXTO FACTOR R =
L1 = 8.75 m
L2 = 6.40 m
Lint X = m
Lint Y = m
ALTURAS DE ENTREPISO
Nº de pisos 4
H1 = 4.5 m
H2 = 3 m
H3 = 3 m
H4 = 2.8 m
H5 = 0 m
H6 = 0 m
H7 = 0 m
H8 = 0.0 m
PREDIMENSIONAMIENTO
1.- LOSA ALIGERADA:
L1/L2= 1.37
TIPO DE LOSA:
ALIGERADA
ESPESOR DE LA LOSA: ALIGERADA
e losa = 0.32 m
e asumido= 0.30 m
S/C losa (vivienda)= 420 Kg/m2
2.- VIGAS:
3.- COLUMNAS
AREA TRIBUTARIA
P n
Tipo de Columna
C-1 1.50 0.20
C-2, C-3, C-6 1.25 0.25
C-4 , C-5 1.10 0.30
4.- PLACAS:
e= 0.25 m
CONCLUSION:
C1 C2 C6 C6 C2
V-3 (0.70x0.35) V-3 (0.70x0.35) V-4 (0.60x0.30) V-3 (0.70x0.35)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
C3 C4 C5 C5 C4
V-3 (0.70x0.35) V-3 (0.70x0.35) V-4 (0.60x0.30) V-3 (0.70x0.35)
V-2 (0.35x0.20)
V-2 (0.35x0.20)
V-2 (0.35x0.20)
V-2 (0.35x0.20)
V-2 (0.35x0.20)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
C1 C2 C6 C6 C2
V-3 (0.70x0.35) V-3 (0.70x0.35) V-4 (0.60x0.30) V-3 (0.70x0.35)
C3 C4 C5 C5 C4
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-3 (0.70x0.35) V-3 (0.70x0.35) V-4 (0.60x0.30) V-3 (0.70x0.35)
C1 C2 C6 C6 C2
RALES
0.3
1
1.4
0.9
7
Vivienda 200
Almacen 500
Aulas 250
Laboratorio 300
escaleras y
400
corredoredes
0.31 0.35
VIGA 3
NAMIENTO
ormizando= 0.6
AREA Losa
m2
m2
m2
m2
m2
m2
3.4 COLUMNA C-4 4 columnas
CION EN PLANTA
mismas dimensiones
en elevacion
C6 C2 C1
V-3 (0.70x0.35) V-3 (0.70x0.35)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
C5 C4 C3
V-3 (0.70x0.35) V-3 (0.70x0.35)
V-2 (0.35x0.20)
V-2 (0.35x0.20)
V-2 (0.35x0.20)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-1 (0.50x0.25)
V-3 (0.70x0.35) V-3 (0.70x0.35)
C6 C2 C1
VIGA 3 VIGA 3
C1 C2 C6
C4 C5
METRADO DE CARGAS POR PISO
DATOS:
P.E. Concreto = 2400 kg/m3 H1 = 4.50 m
S/C (VIVIENDA) = 500 kg/m2 H2 = 3.00 m
S/C azotea = 100 kg/m2 H3 = 3.00 m
Acabados = 100 kg/m2 H4 = 2.80 m
Tabiqueria = 210 kg/m2
P. aligerado = 420 kg/m2
espesor alig = 0.30 m
13.30
PCV
S/C Hospital 500 x 309.7 x 1.0 =
PL =
PCV
S/C Hospital 500 x 309.7 x 1.0 =
PL =
METRADO (AZOTEA)
PCM
Peso columnas C-1 = 2400 x 0.30 x 0.30 x 1.40 x 2 =
C-2 = 2400 x 0.40 x 0.50 x 1.40 x 4 =
C-3 = 2400 x 0.30 x 0.30 x 1.40 x 2 =
C-4 = 2400 x 0.50 x 0.30 x 1.40 x 4 =
C-5 = 2400 x 0.00 x 0.00 x 1.40 x 0 =
C-6 = 2400 x 0.00 x 0.00 x 0.00 x 0 =
Peso vigas V-P = 2400 x 0.6 x 0.3 x 8.7 x 6 =
V-S = 2400 x 0.3 x 0.3 x 30.8 x 3 =
V-CH= 2400 x 0.3 x 0.3 x 8.7 x 3 =
Peso losa aligerado 420 x 258.2 x 1.0 =
Peso acabado 0 x 309.7 x 1.0 =
Tabiquería móvil 0 x 258.2 x 1.0 =
PD =
PCV
S/C Hospital 100 x 309.7 x 1.0 =
PL =
2.80
m
3.00
m
1º
3.00
m 2º
3º
4º
TOTAL
4.50
m
1.62 Ton.
7.20 Ton.
1.62 Ton.
5.40 Ton.
0 Ton.
0 Ton.
22.98 Ton.
19.94 Ton.
5.65 Ton.
108.46 Ton.
30.97 Ton.
54.23 Ton.
258.0713 Ton.
154.87 Ton.
154.87 Ton.
1.30 Ton.
5.76 Ton.
1.30 Ton.
4.32 Ton.
0.00 Ton.
0.00 Ton.
22.98 Ton.
19.94 Ton.
5.65 Ton.
108.46 Ton.
30.97 Ton.
54.23 Ton.
254.9033 Ton.
154.87 Ton.
154.87 Ton.
1.25 Ton.
5.57 Ton.
1.25 Ton.
4.18 Ton.
0.00 Ton.
0.00 Ton.
22.98 Ton.
19.94 Ton.
5.65 Ton.
108.46 Ton.
30.97 Ton.
54.23 Ton.
254.4809 Ton.
154.86775 Ton.
154.87 Ton.
0.6048 Ton.
2.688 Ton.
0.6048 Ton.
2.016 Ton.
0 Ton.
0 Ton.
22.98 Ton.
19.94 Ton.
5.65 Ton.
108.459498 Ton.
0 Ton.
0 Ton.
162.9416 Ton.
30.97355 Ton.
30.97355 Ton.
MASA TOTAL DEL EDIFICIO - PISO X PISO
Pi PCM % PCV
α= 0.5 g= 9.81 m/seg2
PCM PCV Pi Mi
258.0713 154.87 335.505 Ton. 34.200320 ton-m/seg2
254.9033 154.87 332.337 Ton. 33.877384 ton-m/seg2
254.4809 154.87 331.915 Ton. 33.834326 ton-m/seg2
162.9416 30.97 178.428 Ton. 18.188414 ton-m/seg2
930.3969 Err:522 Err:522 Ton. Err:522 ton-m/seg2