Volume
Unit / Harga Satuan
No Uraian Real. s/d Pengajuan Jumlah Jumlah Rp.
Kebutuhan satuan Rp.
tahap lalu sekarang kumulatif
Jalan Lapen
I Bahan
1 Batu Pecah 5 - 7 3.0 3.0 3.00 m3 205,700 617,100
2 Batu Pecah 3 - 5 31.0 31.0 31.00 m3 293,800 9,107,800
3 Batu Pecah 2 - 3 17.0 17.0 17.00 m3 352,500 5,992,500
4 Pasir bersih/Agregat halus 14.0 14.0 14.00 m3 305,500 4,277,000
5 Asphalt 60/70 36.0 36.0 36.00 drum 1,800,000 64,800,000
6 Kayu bakar 14.0 14.0 14.00 m3 140,000 1,960,000
86,754,400
Alat
1 Cangkul 2.0 2.0 2 bh 75,000 150,000
2 Sekop 1.0 1.0 1 bh 60,000 60,000
3 Cikrak besi / Pengki 1.0 1.0 1 bh 20,000 20,000
4 Meteran rol 5 meter 1.0 1.0 1 bh 22,100 22,100
5 Benang 2.0 2.0 2 bh 10,000 20,000
6 Sapu Lidi 2.0 2.0 2 bh 10,000 20,000
7 Gerobak dorong bh 450,000 -
8 Sewa wales 6-8 ton 6.0 6.0 6 hari 700,000 4,200,000
9 Mobilisasi wales 1.0 1.0 1 ls 2,000,000 2,000,000
10 Papan Proyek 1.0 1.0 1 unit 400,000 400,000
11 Prasasti 1.0 1.0 1 unit 500,000 500,000
7,392,100
Upah
1 Pekerja 81 81.0 81 HOK 70,000 5,670,000
2 Tukang 30 30.0 30 HOK 80,000 2,400,000
3 Kepala Kelompok 4 4.0 4 HOK 85,000 340,000
8,410,000
Jumlah I 102,556,500
Operasional
- -
- -
Jumlah II -
Jumlah I + II 102,556,500
Jumlah I + II Rp. 102,556,500
Saldo Kas Rp. 0
Jml Pengajuan Rp. 102,556,500
(74,619,000)
Muarip
REKAPITULASI RENCANA PENGGUNAAN DANA (RPD)
2 BOP Rp - Rp - Rp -
3 BOP Rp - Rp - Rp -
0 ___________________
Muarip 0
Rp 122,444,392.00
Rp 19,887,892
0.084
0.416
0.584