Documente Academic
Documente Profesional
Documente Cultură
Purpose: This research will identify the potential savings/cost for a project team if information is exchanged using a
COBie-based approach over the traditional “Paper-Based” approach.
Criteria
Project Definition
Requirement
Bidding
Design
Construction
Assumptions Tab Assumptions were made when developing the COBie Calculator. These assumptions should be modified
based on your project variables in order to calculate the potential savings.
Information
Attributes L E G E N D
Color Description Allowed User Actions
user defined information unique to this worksheet change on inputs worksheet in project phase variables section
common user information, listed on assumptions worksheet change on inputs worksheet
calculated information do not change this cell
variables section
Inputs
Value Unit
Owner Project / Program Variables
Avg. Number of Pages in Facility Criteria 0 pages
Project Variables
Number of Space Types per Building 0 space types /
building
Pre-Design Variables
Avg. Number of Options 0 count
Avg. Number of Pre-Design Submittal Sets Reqd. (sets / submittal) 0 sets / submittal
Design Variables
Number of Design Submittal Sets Reqd. (sets / submittal) 0 sets / submittal
Avg QTO Time for Spaces in building (hours / plan drawing) 0.00 hours / plan
drawing
Organizational Variables
Owner Administrative Rate ($ / hour) $0.00 $ / hour
Discipline Specification
Avg. Number of Sets Required (sets / submittal) 0 sets
Avg. In-house Reproduction Time Per Set (hours/set) 0.000 hours/set
Feasibility Study
Avg. Number of Transmittals 0 Transmittals
Space Program
Avg. Time Spent Searching for Space Program Criteria (hours/space) 0 hours / space
Avg. Time Spent Reformatting Space Program Criteria into Room Data 0.000 hours / space
Sheets (hours/space)
Avg. Time for Owners Rep to Validate Space Program (hours) 0 hours
Avg. Time Spent Re-Searching for Product Program Criteria (hours / 0 hours / space
product)
Avg. Number of Re-Submit Cycles 0 Cycles
Avg. Number of Transmittals 0 Transmittals
Avg. Time Spent Re-Searching for Product Program Criteria (hours / 0.000 hours / space
product)
Avg. Number of Re-Submit Cycles 0 Cycles
Avg. Time Spent Reformatting Product Program (hours /product) 0 hours / product
Avg. Time Spent Evaluating Design Early Drawings against Design 0 hours
Requirements - Space and Equipment
Avg. Time spent making corrections due to non-conformance with 0.00 hours
Space or Product Program
Avg Time to Review Design Early Drawings for conformance to Space 0 hours
and Product Program
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.000 hours /
set) submittal set
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to Owners $0.00 $ / Transmittal
Rep
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours /
transmittal
Design Schematic
Avg. Number of Plan Drawings in Design Schematic Drawings 0 plans / drawing
set
Avg. Time Spent Developing Equipment (product) Type Template 0 hours / product
(hours / product type) type
Avg. Time spent making corrections due to non-conformance with 0.00 hours
Space or Product Program
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.00 hours/submittal
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to Owners $0.00 $ / Transmittal
Rep
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours /
transmittal
Design Coordinated
Avg. Number of Plan Drawings in Design Coordinate Drawings 0 plans / drawing
set
Avg. Time Spent Developing Detailed Equipment (products) Type 0 hours / product
Template (hours / product)
Avg. Time Searching for Product Literature for Candidates 0 hours / product
(Hours/product)
Avg. Time Spent Evaluating Design Coordinated Drawings against 0 hours
Design Requirements - Space and Equipment
Avg. Time Spent making Corrections due to Non-Conformance with 0.00 hours
Space Program
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to Owners $0.00 $ / Transmittal
Rep
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours /
transmittal
Design Final
Avg. Number of Plan Drawings in Design Final Drawings 0 plans / drawing
set
Avg. Time Spent Developing Detailed Equipment (products) Type 0 hours / product
Candidate (hours / product)
Avg. Time Spent Evaluating Design Final Drawings against Design 0 hours
Requirements - Space and Equipment
Avg. Time Spent making Corrections due to Non-Conformance with 0.00 hours
Space or Product Program
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to Owners $0.00 $ / Transmittal
Rep
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours /
transmittal
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.00 hours /
set) submittal set
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours /
transmittal
Avg. Number of Request for Proposal Submittal Sets Reqd. 0 submittal sets
Inquiry Issue
Avg. Number of Transmittals 0 Transmittals
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal
Avg. Time to Prepare Transmittals for Inquiry Issues (hours / 0.000 hours /
transmittal) - Contractor / Architect transmittal
Pre-Construction Plan
Avg. Time to Prepare Transmittals for Inquiry Issues (RFI) (hours / 0.000 hours /
transmittal) - Contractor / Architect transmittal
Avg. Time to Prepare Transmittals for Inquiry Issues (RFI) (hours / 0.00 hours /
transmittal) - Owner transmittal
System Layout
Submittal Package
Average Time Spent Organizing Equipment (product) Type information 0.00 hours /
(hours / submittal item) submittal item
Avg. Time Spent Transferring Comments per Sheet 0.000 hours / sheet
Purchase Order
Product Installation
Avg. Time Spent Re-formatting Product Installation Report in Office 0.00 hours /
(hours/ component) component
Avg. Number of Transmittals (Transmittals) 0 Transmittals
Start-Up
Product Inspection
Avg. Field Time Spent Documenting Report per Site Visit (hours / visit) 0 hours / visit
Turnover Package
Avg. Time Spent Searching and Assembling Operations & Maintenance 0 hours /
Manuals (hours / document) document
Avg. Time Spent Searching and Assembling Commissioning Report 0 hours /
(hours / document) document
Avg. Time Spent Searching and Assembling Record Specifications 0 hours /
(hours / document) document
Avg. Time Spent Searching and Assembling Record (As-Built) 0.0000 hours / sheet
Drawings (hours / sheet)
Avg. Time Spent Searching and Assembling Final Approved Shop 0.0000 hours / sheet
Drawings (hours / sheet)
Avg. Number of Pages in Operations & Maintenance Manuals (pages / 0 pages /
product) product
Avg. Number of Pages in Commissioning Report 0 pages /
component
Avg. Number of Components & Systems to be Commissioned 0 components
Avg. Number of Pages in Record Specifications 0 pages
Avg. Number of Sheets in Record (As-Built) Drawings 0 sheets
Avg. Number of Sheets in Final Approved Shop Drawings 0 sheets
Avg. Time Spent Reviewing Operations & Maintenance Manuals 0.0000 hours / page
(hours/page)
Avg. Time Spent Reviewing Commissioning Report (hours / page) 0.0000 hours / page
Avg. Time Spent Reviewing Record Specifications (hours / page) 0.0000 hours / page
Avg. Time Spent Reviewing Record (As-Built) Drawings (hours/ sheet) 0.0000 hours / sheet
Avg. Time Spent Reviewing Final Approved Shop Drawings (hours / 0.0000 hours / sheet
sheet)
Avg. Time Spent Filing Operations & Maintenance Manuals 0.000 hours /
(hours/document) document
Avg. Time Spent Filing Commissioning Report (hours/document) 0 hours /
document
Avg. Time Spent Filing Record Specifications (hours/document) 0.000 hours /
document
Avg. Time Spent Filing Record (As-Built) Drawings (hours / sheet) 0.0000 hours / sheet
Avg. Time Spent Filing Final Approved Shop Drawings(hours / sheet) 0.0000 hours / sheet
Percentage of Time Spent by Construction Project Manager 0% %
- 10,20,30,40,50,60,70,80,90,100,110,120,180,2
50
- 30,70,80,90,100,110,120,180,250
Project Variables
Number of Space Types per Building 0 space types / 0.00
building
Number of Unique Product Types (Types / buildng) 0 types / building 0.00
Number of Tagged Components (components / building) 0 components / 0.00
building
Pre-Design Variables
Avg. Number of Options 0 count 0.00
Avg. Number of Pre-Design Submittal Sets Reqd. (sets / submittal) 0 sets / submittal 100% 0.00
Design Variables
Number of Design Submittal Sets Reqd. (sets / submittal) 0 sets / submittal 100% 0.00
Avg QTO Time for Spaces in building (hours / plan drawing) 0.00 hours / plan 90% 0.00
drawing
Avg. Number of Submittal Items in a Product Submittal Package (submittal 0 submittal items / 0.00
items/submittal package) submittal package
Avg. Number of Submittal Pages in a Submittal Item (pages/submittal item) 0 pages/submittal item 0.00
Avg. Number of Submittal Sheets in a Submittal Item (sheets/submittal item) 0 sheets/submittal 0.00
item
Organizational Variables
Owner Administrative Rate ($ / hour) $0.00 $ / hour $0.00
Owners Rep. Rate ($ / hour) $0.00 $ / hour $0.00
Owners Rep. Administrative Rate ($ / hour) $0.00 $ / hour $0.00
Planner Rate ($ / hour) $0.00 $ / hour $0.00
Planner Administrative Rate ($ / hour) $0.00 $ / hour $0.00
Licensed Professional Architect Rate ($ / hour) $0.00 $ / hour $0.00
Specifier $0.00 $ / hour $0.00
Discipline Specification
Avg. Number of Sets Required (sets / submittal) 0 sets / submittal 100% 0.00
Avg. In-house Reproduction Time Per Set (hours/set) 0.000 hours/set 100% 0.00
Feasibility Study
Avg. Number of Transmittals 0 Transmittals - 0.00
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0 hours / submittal 100% 0.00
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Space Program
Avg. Time Spent Searching for Space Program Criteria (hours/space) 0 hours / space 100% 0.00
Avg. Time Spent Reformatting Space Program Criteria into Room 0.000 hours 100% 0.00
Data Sheets (hours/space)
Avg. Time for Owners Rep to Validate Space Program (hours) 0.00 hours 90% 0.00
Avg. Time Spent Re-Searching for Product Program Criteria (hours / 0 hours / space 100% 0.00
product)
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Avg. Time to Prepare Transmittal (hours / transmittal) 0.00 hours / 60% 0.00
transmittal
Product Program
Avg. Time Spent Searching for Product Program Criteria (hours / 0 hours / product 100% 0.00
product)
Avg. Time for Owners Rep to Validate Product Program (hours) 0.0 hour 90% 0.00
Avg. Time Spent Re-Searching for Product Program Criteria (hours / 0.000 hours / product 100% 0.00
product)
Avg. Number of Re-Submit Cycles 0 Cycles 100% 0.00
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Avg. Time to Prepare Transmittal (hours / transmittal) 0.00 hours / 60% 0.00
transmittal
Request for Proposal
Avg. Number of Letter Sized Pages in Proposal (pages / proposal) 0 pages / proposal 0.00
Avg. Number of Drawing Sheets in Proposal (sheets / proposal) 0 sheets / proposal 0.00
Number of RFP copies Reqd. (sets / submittal) 0 sets / submittal 100% 0.00
Avg. Number of Transmittals - Owners Rep documents to Bidders 0 Transmittals - 0.00
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0 hours / submittal 100% $0.00
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep $0.00 $ / Transmittal 100% $0.00
documents to Bidders
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to $0.00 $ / Transmittal 100% $0.00
Owners Rep
Avg. Time to Prepare Transmittal (hours / transmittal) - Owners Rep 0 hours / 60% 0.00
transmittal
Avg. Time to Prepare Transmittal (hours / transmittal) - Architect 0 hours / 60% 0.00
transmittal
Design Early
Avg. Time Spent Reformatting Space Program (hours / space) 0.00 hours / space 100% 0.00
type
Avg. Time Spent Reformatting Product Program (hours /product) 0 hours / product 100% 0.00
Avg. Time Spent Evaluating Design Early Drawings against Design 0 hours 90% 0.00
Requirements - Space and Equipment
Avg. Time spent making corrections due to non-conformance with 0 hours 100% 0.00
Space or Product Program
Avg Time to Review Design Early Drawings for conformance to Space 0 hours 90% 0.00
and Product Program
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.0 hours / submittal 100% 0.00
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal 100% $0.00
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to $0.00 $ / Transmittal 100% $0.00
Owners Rep
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours / 60% 0.00
transmittal
Design Schematic
Avg. Number of Plan Drawings in Design Schematic Drawings 0 plans / drawing set - 0.00
Avg. Time Spent Developing Equipment (product) Type Template 0 hours / product 70% 0.00
(hours / product type) type
Avg. Time Spent Evaluating Design Schematic Drawings against 0 hours 90% 0
Design Requirements - Space and Equipment
Avg. Time spent making corrections due to non-conformance with 0 hours 100% 0.00
Space or Product Program
Avg Time to Review Design Schematic Drawings for conformance to 0 hours 90% 0.00
Space and Product Program
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.00 hours/submittal 100% 0.00
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal 100% $0.00
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to $0.00 $ / Transmittal 100% $0.00
Owners Rep
Design Coordinated
Avg. Number of Plan Drawings in Design Coordinate Drawings 0 plans / drawing set - 0.00
Avg. Time Spent Developing Detailed Equipment (products) Type 0 hours / product 70% 0.00
Template (hours / product)
Avg. Time Searching for Product Literature for Candidates 0 hours / product 90% 0.00
(Hours/product)
Avg. Time Spent Evaluating Design Coordinated Drawings against 0 hours 90% 0.00
Design Requirements - Space and Equipment
Avg. Time Spent making Corrections due to Non-Conformance with 0.00 hours 100% 0.00
Space Program
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.00 hours / submittal 100% 0.00
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal 100% 0.00
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to $0.00 $ / Transmittal 100% $0.00
Owners Rep
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours / 60% 0.00
transmittal
Design Final
Avg. Number of Plan Drawings in Design Final Drawings 0 plans / drawing set - 0.00
Avg. Time Spent Developing Detailed Equipment (products) Type 0 hours / product 90% 0.00
Candidate (hours / product)
Avg. Time Spent Evaluating Design Final Drawings against Design 0 hours 90% 0.00
Requirements - Space and Equipment
Avg. Time Spent making Corrections due to Non-Conformance with 0.00 hours 100% 0.00
Space or Product Program
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.00 hours / submittal 100% 0.00
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Owners Rep to $0.00 $ / Transmittal 100% $0.00
Architect
Avg. Mailing Cost per Transmittal ($ / Transmittal) - Architect to $0.00 $ / Transmittal 100% $0.00
Owners Rep
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours / 60% 0.00
transmittal
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.0 hours / submittal 100% 0.00
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Avg. Number of Request for Proposal Submittal Sets Reqd. 0 submittal sets 100% 0.00
Inquiry Issue
Avg. Number of Transmittals 0 Transmittals - 0.00
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Avg. Time to Prepare Transmittals for Inquiry Issues (hours / 0.00 hours / 60% 0.00
transmittal) - Contractor / Architect transmittal
Avg. Time to Prepare Transmittals for Inquiry Issues (hours / 0 hours / 60% 0.00
transmittal) - Owners Rep transmittal
Pre-Construction Plan
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Avg. Time to Prepare Transmittals for Inquiry Issues (RFI) (hours / transmittal) - 0.00 hours / 60% 0.00
Contractor / Architect transmittal
Avg. Time to Prepare Transmittals for Inquiry Issues (RFI) (hours / transmittal) - 0.00 hours / 60% 0.00
Owner transmittal
System Layout
Submittal Package
Average Time Spent Organizing Equipment (product) Type 0.00 hours / submittal 60% 0.00
information (hours / submittal item) item
Average Time Spent Evaluating Equipment (product) Type Submittal 0 hours / submittal 90% 0.00
Items against Contract Documents (hours / submittal item) item
Avg. Time to Sign each Page (hours / page) 0.000 hours/page 100% 0.00
Avg. Time to Stamp each Sheet (hours / sheet) 0.000 hours/sheet 100% 0.00
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0 hours / submittal 100% 0.00
set) set
Average Mailing Costs per Transmittal ($) $0.00 $ / Transmittal 100% $0.00
Avg. Time to Prepare Transmittal (hours / transmittal) 0 hours / 60% 0.00
transmittal
Submittal Issue
Avg. Time Spent Evaluating Product Type Submittal Items against 0 hours / submittal 90% 0.00
Contract Documents (hours / product type submittal item) item
Avg. Time Spent Revising one Product Type Submittal Item (hours / 0 hours / product 90% 0.00
product type submittal item)
Avg. Time Spent Transferring Comments per Page 0.000 hours / submittal 100% 0.00
package
Avg. Time Spent Transferring Comments per Sheet 0.000 hours / submittal 100% 0.00
package
Percentage of Time Spent by Construction Project Manager 0% % - 0%
Percentage of Time Spent by Assistant (Construction) Project Manager 0% % - 0%
Avg. Time to Prepare Transmittal (hours / transmittal) 0.000 hours / 60% 0.00
transmittal
Avg. Mailing Cost per Transmittal $0.00 $ / Transmittal 100% $0.00
Purchase Order
Product Installation
Avg. Time Spent Re-formatting Product Installation Report in Office 0.00 hours / 100% 0.00
(hours/ component) component
Avg. Number of Transmittals (Transmittals) 0 Transmittals - 0.00
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Start-Up
Product Inspection
Avg. Field Time Spent Documenting Report per Site Visit (hours / visit) 0 hours / visit 60% 0.00
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
Avg. Time to Prepare Transmittal (hours / transmittal) 0.000 hours / 60% 0.00
transmittal
Punch list Issue
Turnover Package
Avg. Time Spent Searching and Assembling Operations & 0 hours / 90% 0.00
Maintenance Manuals (hours / document) document
Avg. Time Spent Searching and Assembling Commissioning Report 0 hours / 90% 0.00
(hours / document) document
Avg. Time Spent Searching and Assembling Record Specifications 0 hours / 90% 0.00
(hours / document) document
Avg. Time Spent Searching and Assembling Record (As-Built) 0 hours / sheet 90% 0.0000
Drawings (hours / sheet)
Avg. Time Spent Searching and Assembling Final Approved Shop 0.0000 hours / sheet 90% 0.0000
Drawings (hours / sheet)
Avg. Number of Pages in Operations & Maintenance Manuals (pages / product) 0 pages / product - 0.00
Avg. Number of Pages in Commissioning Report 0 pages / component - 0.00
Avg. Number of Components & Systems to be Commissioned 0 components - 0.00
Avg. Number of Pages in Record Specifications 0 pages - 0.00
Avg. Number of Sheets in Record (As-Built) Drawings 0 sheets - 0.00
Avg. Time Spent Reviewing Operations & Maintenance Manuals 0.0000 hours / page 0% 0.0000
(hours/page)
Avg. Time Spent Reviewing Commissioning Report (hours / page) 0.0000 hours / page 0% 0.0000
Avg. Time Spent Reviewing Record Specifications (hours / page) 0.0000 hours / page 100% 0
Avg. Time Spent Reviewing Record (As-Built) Drawings (hours/ 0.0000 hours / sheet 0% 0.000
sheet)
Avg. Time Spent Reviewing Final Approved Shop Drawings (hours / 0.0000 hours / sheet 100% 0.000
sheet)
Avg. Time Spent Filing Operations & Maintenance Manuals 0.000 hours / 100% 0.000
(hours/document) document
Avg. Time Spent Filing Commissioning Report (hours/document) 0 hours / 100% 0.000
document
Avg. Time Spent Filing Record Specifications (hours/document) 0.000 hours / 100% 0.000
document
Avg. Time Spent Filing Record (As-Built) Drawings (hours / sheet) 0.0000 hours / sheet 100% 0.000
Avg. Time Spent Filing Final Approved Shop Drawings(hours / sheet) 0.0000 hours / sheet 100% 0.000
Avg. In-house Reproduction Time Per Submittal Set (hours/submittal 0.000 hours / submittal 100% 0.000
set) set
Avg. Mailing Cost per Transmittal ($ / Transmittal) $0.00 $ / Transmittal 100% $0.00
- 10,20,30,40,50,60,70,80,90,100,110,120,180,2
50
- 30,70,80,90,100,110,120,180,250
Total $ - $ -
Breakdown by Role
Total $ - $ -
Architect
OmniClass Project Phase Current Process Expected Process
LCie 01 - Facility Criteria $ - $ -
LCie 02 - Design Specification $ - $ -
LCie 03 - Feasibility Study $ - $ -
LCie 04 - Project Definition $ - $ -
LCie 05 - Space Program $ - $ -
LCie 06 - Product Program $ - $ -
LCie 07 - Request for Proposal $ - $ -
LCie 08 - Design Early $ - $ -
LCie 09 - Design Schematic $ - $ -
LCie 10 -Design Coordinated $ - $ -
LCie 11 - Design Final $ - $ -
LCie 12 - Request for Proposal $ - $ -
LCie 13 - Inquiry Issue $ - $ -
LCie 14 - Pre-Construction Plan $ - $ -
LCie 15 - Inquiry Issue (RFI) $ - $ -
LCie 16 - Product Type Selection $ - $ -
LCie 17 - System Layout $ - $ -
LCie 18 - Submittal Package $ - $ -
LCie 19 - Submittal Issue $ - $ -
LCie 20 - Purchase Order $ - $ -
LCie 21 - Product Installation $ - $ -
LCie 22 - Start-Up $ - $ -
LCie 23 - Product Inspection $ - $ -
LCie 24 - Punchlist Issue $ - $ -
LCie 25 - Turnover Package $ - $ -
Total $ - $ -
Contractor
OmniClass Project Phase Current Process Expected Process
LCie 01 - Facility Criteria $ - $ -
LCie 02 - Design Specification $ - $ -
LCie 03 - Feasibility Study $ - $ -
LCie 04 - Project Definition $ - $ -
LCie 05 - Space Program $ - $ -
LCie 06 - Product Program $ - $ -
LCie 07 - Request for Proposal $ - $ -
LCie 08 - Design Early $ - $ -
LCie 09 - Design Schematic $ - $ -
LCie 10 -Design Coordinated $ - $ -
LCie 11 - Design Final $ - $ -
LCie 12 - Request for Proposal $ - $ -
LCie 13 - Inquiry Issue $ - $ -
LCie 14 - Pre-Construction Plan $ - $ -
LCie 15 - Inquiry Issue (RFI) $ - $ -
LCie 16 - Product Type Selection $ - $ -
LCie 17 - System Layout $ - $ -
LCie 18 - Submittal Package $ - $ -
LCie 19 - Submittal Issue $ - $ -
LCie 20 - Purchase Order $ - $ -
LCie 21 - Product Installation $ - $ -
LCie 22 - Start-Up $ - $ -
LCie 23 - Product Inspection $ - $ -
LCie 24 - Punchlist Issue $ - $ -
LCie 25 - Turnover Package $ - $ -
Total $ - $ -
y
Savings % Savings
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0.0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - #DIV/0!
p
Savings % Savings
by Role
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - #DIV/0!
$ - #DIV/0!
Savings % Savings
by Role
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - #DIV/0!
% Savings
Savings
by Role
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - 0%
$ - #DIV/0!
Process Name Facility Criteria
OmniClass Stage 31-10 11 14 Project Description Phase
OmniClass Role 34-21 14 00 Owner
Description Standard facility information must be available in order to determine the basic requireme
owner indentifies the need and either develops technical criteria for the facility if none ex
criteria if available. If it does exist, this information must be checked for relevancy every
with overall needs.
Information
Attributes
Process
Current Process
Reproduction Costs
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00
$0.00
SubTotal $0.00
Description Specification information for equipment based on facility criteria is generated early in the pla
Owner. This information must be check for relevancy every five years to remain consistent w
Information
Attributes
Process
Current Process
Reproduction Costs
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00
$0.00
py Discipline Specification
Avg. Number of Pages in Discipline Specification
Avg. Number of Sets Required (sets / submittal)
Avg. Per Page Copy Cost ($ / page)
Avg. In-house Reproduction Time Per Set (hours/set)
SubTotal $0.00
Description The Feasibility Study allows the Owner to evaluate different options (typically three) based o
requirements before finalizing specific information about the project. The Architect or Planne
on the information contained in the Facility Criteria and Discipline Specification information e
Information
Attributes
Architect/
Total Owner
Planner
Current process cost: $ - $ - $ -
Expected process cost: $ - $ - $ -
Process Cost Difference: $ - $ - $ -
Process
Current Process
Reproduction Costs
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
Reproduction Costs
SubTotal
Mailing Costs
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
py Feasibility Study
Avg. Number of Options
Avg. Number of Sheets per Option
Avg. Number of Letter-Sized Pages in Pre-Design Narrative per Option
Avg. Number of Pre-Design Submittal Sets Reqd. (sets / submittal)
Avg. Per Page Copy Cost ($ / page)
Avg. Per Sheet Copy Cost ($ / sheet)
Avg. In-house Reproduction Time Per Set (hours/set)
SubTotal $0.00
nd Feasibility Study
Avg. Number of Transmittals (Transmittals)
Avg. Mailing Cost per Transmittal ($ / Transmittal)
Avg. Time to Prepare a Transmittal (hours/transmittal)
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
nd Comments to Planner
Avg. Number of Transmittals (Transmittals)
Avg. Mailing Cost per Transmittal ($ / Transmittal)
Avg. Time to Prepare a Transmittal (hours/transmittal)
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
Description Initial criteria about a project must be established in order to evaluate the project feasibility. T
Facility Criteria, Discipline Specification, and Feasibility Study to determine whether or not to
project.
Information
Attributes
Architect/
Total Owner
Planner
Current process cost: $ - $ - $ -
Expected process cost: $ - $ - $ -
Process Cost Difference: $ - $ - $ -
Process
Current Process
040.01 Review Information for Facility Criteria, Discipline Specifications, and Feasibility Stud
Reproduction Costs
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
Specifications, and Feasibility Study 040.01 Review Information for Facility Criteri
$0.00 $0.00
$0.00
$0.00
py Project definition
Avg. Number of Pages in Project Definition
Avg. Number of Sets Required (sets / submittal)
Avg. Per Page Copy Cost ($ / page)
Avg. In-house Reproduction Time Per Set (hours/set)
SubTotal $0.00
Description Once the Project Definition has been established and approved, further development of
occur. The Architect or Planner evaluates information contained in the Project Definition
identify space needs based on the facility type. If no standard facility space criteria exist,
referencing similar facility types.
Information
Attributes
Planner/
Total Owner
Architect
Current process cost: $ - $ - $ -
Expected process cost: $ - $ - $ -
Process Cost Difference: $ - $ - $ -
Process
Current Process
SubTotal
REFORMATTING/ 050.04 Reformat Space Program Criteria into Room Data Sheets
COBie 0 Number of Space Types per Building
0.000 Avg. Time Spent Reformatting Space Program Criteria into Room Data Shee
SubTotal
Copying Costs
Mailing Costs
SubTotal
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
SubTotal
Copying Costs
Mailing Costs
SubTotal
Contractor
$ -
$ -
$ -
$0.00
$0.00
$0.00
$0.00
s Reqd. (sets / submittal)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
ce Program (hours)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SubTotal
REFORMATTING/ 050.04 Reformat Space Program Criteria into Room Data Sheets
COBie 0 Number of Space Types per Building
0 Avg. Time Spent Reformatting Space Program Criteria into Room Data She
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
$0.00
$0.00
sets / submittal)
$0.00
$0.00
$0.00
am (hours)
$0.00
$0.00
$0.00
$0.00
$0.00
sets / submittal)
$0.00
$0.00
$0.00
Process Name Product Program
OmniClass Stage 31-10 14 21 Project Programming Phase
OmniClass Role 34-21 17 00 Planner
Description The Architect or Planner evaluates information contained in the Project Definition informa
product needs based on the facility type. If no standard facility product criteria exist, it mu
similar facility types.
Information
Attributes
Planner/
Total Owner
Architect
Current process cost: $ - $ - $ -
Expected process cost: $ - $ - $ -
Process Cost Difference: $ - $ - $ -
Process
Current Process
060.01 Utilize Project Definition & Space Requirements to Determine Product Program
SubTotal
Copying Costs
Mailing Costs
SubTotal
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
SubTotal
Copying Costs
Mailing Costs
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $ -
$0.00
$0.00 $ -
$0.00
$0.00
$0.00
$0.00 $ -
$0.00
$0.00 $ -
$0.00
$0.00 $ -
$0.00
$0.00 $ -
$0.00
$0.00
$0.00 $ -
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $ -
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
nd Comments
Avg. Number of Transmittals (Transmittals)
Avg. Mailing Cost per Transmittal ($ / Transmittal)
Avg. Time to Prepare a Transmittal (hours/transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
SubTotal $0.00
ceive Comments
Receipt of Product Program Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
Description Once the major criteria have been determined, the Owner prepares and distributes a Reque
Information
Attributes
Process
Current Process
COPYING & 070.02 Send Copies of Request for Proposal (RFP) Package
HANDLING/ 0 Avg. Number of Pages in Space Program
ELEC.DOC. 0 Avg. Number of Pages in Product Program
0 Avg. Number of Pages in Project Definition
0 Avg. Number of Pages in Front Matter
0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Per Page Copy Cost ($ / page)
$0.00 Avg. Mailing Cost per Transmittal ($ / Transmittal)
0 Number of RFP Submittal sets Reqd.
0.00 Avg. Time to Prepare a Transmittal (hours/transmittal)
Copying Cost
Mailing Cost
SubTotal
Reproduction Costs
SubTotal
Mailing Costs
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
SubTotal $0.00
duce Proposal
py Proposal
Avg. Number of Letter Sized Pages in Proposal
Avg. Number of Drawing Sheets in Proposal
Avg. Per Page Copy Cost ($ / page)
Avg. Per Sheet Copy Cost ($ / sheet)
Avg. Number of Pre-Design Submittal Sets Reqd. (sets / submittal)
Avg. In-house Reproduction Time Per Set (hours/set)
SubTotal $0.00
nd Proposal
Avg. Number of Transmittals (Transmittals)
Avg. Mailing Cost per Transmittal ($ / Transmittal)
Avg. Time to Prepare a Transmittal (hours/transmittal)
SubTotal $0.00
Description The Architect utilizes the specific information produced during pre-design to develop a solu
requirements stated in the Project Definition, Space Program, and Product Program. The A
before submitting to the owner. After receiving the submission, the Owner's Representative
to the Architect. The Architect and Consultants are then required to update the documents
revisions are made, the Architect resubmits.
Information
Attributes
Process
Current Process
Copying Cost
Mailing Cost
SubTotal
SubTotal
080.05 Receive Design Requirements
SubTotal
SubTotal
VALIDATING/ 080.12 Validate Checkset before Submission through manual QA/QC Process – Space and
COBie 0 Avg. Time Spent Evaluating Design Early Drawings against Design Requireme
SubTotal
SubTotal
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
SubTotal
Mailing Cost
SubTotal
HANDLING/ 080.17.30 Log Transmittal of Comments
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
SubTotal
SubTotal
SubTotal
Copying Cost
SubTotal
Mailing Cost
SubTotal
HANDLING/ 080.23 Log Transmittal of Revised Design Early Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
0 Avg. Number of Re-Submit Cycles
SubTotal
SubTotal
VALIDATING/ 080.26 Validate Revised Design Early Documents - Space and Equipment
COBie - Avg Time to Review Design Early Drawings for conformance to Space and Pro
0 Avg. Number of Re-Submit Cycles
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
080.05 Receive Design Requirements
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00
QA/QC Process – Space and Equipment VALIDATING/ 080.12 Validate Checkset before Submiss
ngs against Design Requirements - Space and Equipment COBie 0.00
$0.00 $ -
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $ -
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
HANDLING/ 080.17.30 Log Transmittal of Comments
ELEC.DOC. 0
0
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
HANDLING/ 080.23 Log Transmittal of Revised Design
ELEC.DOC. 0
0
0
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
SubTotal $0.00
SubTotal $0.00
ve Design Requirements
SubTotal $0.00
w Design Requirements
SubTotal $0.00
te Checkset before Submission through manual QA/QC Process – Space and Equipment
Avg. Time Spent Evaluating Design Early Drawings against Design Requirements - Space and Equipment
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
ansmittal of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
SubTotal $0.00
ve Review Comments
eceipt of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
ansmittal of Revised Design Early Documents
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
ansmittal of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
ve Review Comments
eceipt of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
Description The Architect further develops the approved Design Early deliverable documents to produce
documents. The Architect performs a QA/QC check before submitting to the Owner. After rece
Owner's Representative reviews and provides comments to the Architect. The Architect and C
update the documents based on the comments. After revisions are made the Architect resubm
Information Attributes
Process
Current Process
SubTotal
$ - Specifier
SubTotal
VALIDATING/ 090.05 Validate Checkset before Submission through manual QA/QC Process - Space and Equ
COBie
VALIDATING/
COBie 0 Avg. Time Spent Evaluating Design Schematic Drawings against Design Require
SubTotal
SubTotal
COPYING/ 090.06.20 Copy Design Schematic & Product Type Template Documents
ELEC.DOC. - Avg. Number of Sheets in Design Schematic Drawings
0 Avg. Number of Letter Sized Pages in Design Schematic Narrative
- Avg. Number of Letter Sized Pages in a Design Schematic Specification
- Number of Design Submittal Sets Reqd. (sets / submittal)
$0.00 Avg. Per Page Copy Cost ($ / page)
$0.00 Avg. Per Sheet Copy Cost ($ / sheet)
0 Avg. In-house Reproduction Time Per Set (hours/set)
Copying Cost
SubTotal
HANDLING/ 090.06.30 Send Design Schematic & Product Type Template Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Mailing Cost per Transmittal ($ / Transmittal)
0 Avg. Time to Prepare a Transmittal (hours/transmittal)
Mailing Cost
SubTotal
HANDLING/ 090.06.40 Log Transmittal of Design Schematic & Product Type Template Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
SubTotal
HANDLING/ 090.08 Log Receipt of Design Schematic & Product Type Template Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
VALIDATING/ 090.09 Validate Design Schematic Space & Product Type Template Documents
COBie - Avg Time to Review Design Schematic Drawings for conformance to Space and P
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
COPYING/ 090.14 Copy Revised Design Schematic & Product Type Template Documents
ELEC.DOC. - Avg. Number of Sheets in Design Schematic Drawings
0 Avg. Number of Letter Sized Pages in Design Schematic Narrative
- Avg. Number of Letter Sized Pages in a Design Schematic Specification
- Number of Design Submittal Sets Reqd. (sets / submittal)
$0.00 Avg. Per Page Copy Cost ($ / page)
$0.00 Avg. Per Sheet Copy Cost ($ / sheet)
0 Avg. In-house Reproduction Time Per Set (hours/set)
0 Avg. Number of Re-Submit Cycles
Copying Cost
SubTotal
HANDLING/ 090.15 Send Revised Design Schematic & Product Type Template Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Mailing Cost per Transmittal ($ / Transmittal)
0.00 Avg. Time to Prepare a Transmittal (hours/transmittal)
0 Avg. Number of Re-Submit Cycles
Mailing Cost
SubTotal
HANDLING/ 090.16 Log Transmittal of Revised Design Schematic & Product Type Template Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
0 Avg. Number of Re-Submit Cycles
SubTotal
090.17 Receive Revised Design Schematic & Product Type Template Documents
HANDLING/ 090.18 Log Receipt of Revised Design Schematic & Product Type Template Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
0 Avg. Number of Re-Submit Cycles
SubTotal
VALIDATING/ 090.19 Validate Revised Design Schematic Space & Product Type Template Documents
COBie 0 Avg Time to Review Design Schematic Drawings for conformance to Space and P
0 Avg. Number of Re-Submit Cycles
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $ -
$0.00
ual QA/QC Process - Space and Equipment VALIDATING/ 090.05 Validate Checkset before Sub
COBie
VALIDATING/
matic Drawings against Design Requirements - Space and Equipment COBie 0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
SubTotal $0.00
Specifier $0.00
SubTotal $0.00
idate Checkset before Submission through manual QA/QC Process - Space and Equipment
Avg. Time Spent Evaluating Design Schematic Drawings against Design Requirements - Space and Equipment
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
g Transmittal of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
SubTotal $0.00
g Receipt of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
idate Revised Design Schematic Space & Product Type Template Documents
Avg Time to Review Design Schematic Drawings for conformance to Space and Product Program
Avg. Number of Re-Submit Cycles
SubTotal $0.00
SubTotal $0.00
g Transmittal of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
g Receipt of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
Description The Architect further develops the approved Design Schematic deliverable documents to pro
documents. In addition, the building systems are coordinated to eliminate spatial interference
before the final delivery package. The Architect performs a QA/QC check before distributing
receiving the submission, the Owner's Representative reviews and provides comments to th
Consultants are then required to update the documents based on the comments. After revisi
Information Attributes
Process
Current Process
SubTotal
$0.00 Specifier
SubTotal
SubTotal
VALIDATING/ 100.06 Validate Checkset before Submission through manual QA/QC Process - Space and Eq
COBie 0.00 Avg. Time Spent Evaluating Design Coordinated Drawings against Design Requ
SubTotal
SubTotal
SEARCHING & 100.07.10 Re- Search and Recreate Product Type Candidates and Detailed Specifications based
RECREATING/ 0% Avg. Percent of Errors in Product Type Candidate
COBie 0 Number of Unique Product Types (Types / buildng)
0 Avg. Time Searching for Product Literature for Candidates (Hours/product)
SubTotal
COPYING/ 100.07.20 Copy Design Coordinated & Product Type Candidate Documents
ELEC.DOC. - Avg. Number of Sheets in Design Coordinated Drawings
0 Avg. Number of Letter Sized Pages in a Design Coordinated Narrative
- Avg. Number of Letter Sized Pages in a Design Coordinated Specification
- Number of Design Submittal Sets Reqd. (sets / submittal)
$0.00 Avg. Per Page Copy Cost ($ / page)
$0.00 Avg. Per Sheet Copy Cost ($ / sheet)
0 Avg. In-house Reproduction Time Per Set (hours/set)
Copying Cost
SubTotal
HANDLING/ 100.07.30 Send Design Coordinated & Product Type Candidate Documents
ELEC.DOC.
HANDLING/
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Mailing Cost per Transmittal ($ / Transmittal)
0.00 Avg. Time to Prepare a Transmittal (hours/transmittal)
Mailing Cost
SubTotal
HANDLING/ 100.07.40 Log Transmittal of Design Coordinated & Product Type Candidate Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
SubTotal
HANDLING/ 100.09 Log Receipt of Design Coordinated & Product Type Candidate Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
SubTotal
VALIDATING/ 100.10 Validate Design Coordinated Space & Product Type Candidate Documents
COBie 0.00 Avg. Time to Review Design Coordinated Drawings for conformance to Space an
SubTotal
Mailing Costs
SubTotal
SubTotal
COPYING/ 100.15 Copy Revised Design Coordinated & Product Type Candidate Documents
ELEC.DOC. - Avg. Number of Sheets in Design Coordinated Drawings
0 Avg. Number of Letter Sized Pages in a Design Coordinated Narrative
- Avg. Number of Letter Sized Pages in a Design Coordinated Specification
- Number of Design Submittal Sets Reqd. (sets / submittal)
$0.00 Avg. Per Page Copy Cost ($ / page)
$0.00 Avg. Per Sheet Copy Cost ($ / sheet)
0 Avg. In-house Reproduction Time Per Set (hours/set)
0 Avg. Number of Re-Submit Cycles
Copying Cost
SubTotal
HANDLING/ 100.16 Send Revised Design Coordinated & Product Type Candidate Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Mailing Cost per Transmittal ($ / Transmittal)
0.00 Avg. Time to Prepare a Transmittal (hours/transmittal)
0 Avg. Number of Re-Submit Cycles
Mailing Cost
SubTotal
HANDLING/ 100.17 Log Transmittal of Revised Design Coordinated & Product Type Candidate Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
0 Avg. Number of Re-Submit Cycles
$0.00 Architect Drafter Rate ($ / hour)
SubTotal
HANDLING/ 100.19 Log Receipt of Revised Design Coordinated & Product Type Candidate Documents
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
0 Avg. Number of Re-Submit Cycles
SubTotal
VALIDATING/ 100.20 Validate Revised Design Coordinated Space & Product Type Candidate Documents
COBie - Avg Time to Review Design Coordinated Drawings for conformance to Space an
0 Avg. Number of Re-Submit Cycles
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
ual QA/QC Process - Space and Equipment VALIDATING/ 100.06 Validate Checkset before
nated Drawings against Design Requirements - Space and Equipment COBie 0.00
0 $0.00
$0.00 $0.00
$0.00
and Detailed Specifications based on QA/QC Results SEARCHING & 100.07.10 Re- Search and Recreate
RECREATING/ 0%
COBie 0
for Candidates (Hours/product) 0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
SubTotal $0.00
Specifier $0.00
SubTotal $0.00
SubTotal $0.00
alidate Checkset before Submission through manual QA/QC Process - Space and Equipment
Avg. Time Spent Evaluating Design Coordinated Drawings against Design Requirements - Space and Equipment
SubTotal $0.00
SubTotal $0.00
e- Search and Recreate Product Type Candidates and Detailed Specifications based on QA/QC Results
Avg. Percent of Errors in Product Type Candidate
Number of Unique Product Types (Types / buildng)
Avg. Time Searching for Product Literature for Candidates (Hours/product)
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
og Transmittal of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
og Receipt of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
alidate Revised Design Coordinated Space & Product Type Candidate Documents
Avg Time to Review Design Coordinated Drawings for conformance to Space and Product Program
Avg. Number of Re-Submit Cycles
SubTotal $0.00
SubTotal $0.00
og Transmittal of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
og Receipt of Comments
Avg. Number of Transmittals (Transmittals)
Time to Log (hours / transmittal)
Avg. Number of Re-Submit Cycles
SubTotal $0.00
Description The Design Final package is the final set of contract documents ready for bid solicitation by
design deliverable does not require another review by the Owner's Representative.
Information
Attributes
Process
Current Process
SubTotal
$0.00 Specifier
SubTotal
SubTotal
SubTotal
Copying Cost
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
SubTotal $0.00
Specifier $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
Description Once the design is complete, the Owner packages the Design Final Documents information tog
supplied information (e.g., contractual terms) and creates a Request for Proposals (RFP). This
set.
Information
Attributes
Total Owner Architect
Current process cost: $ - $ - $ -
Expected process cost: $ - $ - $ -
Process Cost Difference: $ - $ - $ -
Process
Current Process
SubTotal
Copying Cost
SubTotal
HANDLING/ 120.04 Send Request for Proposal (RFP) Package
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Mailing Cost per Transmittal ($ / Transmittal)
0.00 Avg. Time to Prepare a Transmittal (hours/transmittal)
Mailing Cost
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 SubTotal
$0.00 SubTotal
HANDLING/ 120.04 Send Request for Proposal (RFP) Package
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Mailing Cost per Transmittal ($ / Transm
0.00 Avg. Time to Prepare a Transmittal (hours/tra
$0.00 SubTotal
$0.00
RFP) Package
ges in Front Matter
eets in Design Final Drawings
ter Sized 'Pages in Design Final Narrative
ter Sized Pages in Design Final Specification
quest for Proposal Submittal Sets Reqd.
y Cost ($ / page)
py Cost ($ / sheet)
oduction Time Per Set (hours/set)
$0.00
$0.00
RFP) Package
nsmittals (Transmittals)
er Transmittal ($ / Transmittal)
re a Transmittal (hours/transmittal)
$0.00
$0.00
Description Before finalizing a bid proposal, the Contractor typically request additional information or cla
documents.
Information
Attributes
Total Owner Architect
Current process cost: $ - $ - $ -
Expected process cost: $ - $ - $ -
Process Cost Difference: $ - $ - $ -
Process
Current Process
Mailing Costs
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00
$0.00
e (Clarification)
nsmittals (Transmittals)
/ transmittal)
$0.00
Clarification)
nsmittals (Transmittals)
/ transmittal)
$0.00
n) to Architect
nsmittals (Transmittals)
er Transmittal ($ / Transmittal)
re Transmittals for Inquiry Issues (hours / transmittal)
$0.00
$0.00
e (Clarification)
nsmittals (Transmittals)
/ transmittal)
$0.00
Clarification)
nsmittals (Transmittals)
/ transmittal)
te ($ / hour) $0.00
$0.00
n) Response
nsmittals (Transmittals)
er Transmittal ($ / Transmittal)
re Transmittals for Inquiry Issues (hours / transmittal)
te ($ / hour) $0.00
$0.00
$0.00
e (Clarification) Response
nsmittals (Transmittals)
/ transmittal)
te ($ / hour) $0.00
$0.00
Clarification) Response
nsmittals (Transmittals)
/ transmittal)
te ($ / hour) $0.00
$0.00
ssue (Clarification)
n) Response to Contractor
nsmittals (Transmittals)
er Transmittal ($ / Transmittal)
re Transmittals for Inquiry Issues (hours / transmittal)
$0.00
$0.00
e (Clarification) Response
nsmittals (Transmittals)
/ transmittal)
$0.00
ation) Response
Clarification) Response
nsmittals (Transmittals)
/ transmittal)
$0.00
Description The Contractor is required to develop a Pre-Construction Plan that describes how the Contracto
manage the construction of the facility. This is sent as a submittal package. Refer to the submit
for detailed requirements related to transmitting and handling Pre-Construction Plan Submittals
Information
Attributes
Process
Current Process
Contractor
$ -
$ -
$ -
Expected Process
truction Plan
Description The Contractor submits a Request for Information (RFI) to ask for clarification during the con
questions may be due to ambiguities or contradictions in the drawings or to site conditions.
Information
Attributes
Process
Current Process
Mailing Costs
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
Mailing Costs
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 SubTotal
Err:511 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
. Number of RFIs
. Mailing Cost per Transmittal ($ / Transmittal)
. Time to Prepare Transmittals for Inquiry Issues (RFI) (hours / transmittal)
$0.00
$0.00
Err:511
$0.00
ue (RFI) to Architect
. Number of RFIs
. Mailing Cost per Transmittal ($ / Transmittal)
. Time to Prepare Transmittals for Inquiry Issues (RFI) (hours / transmittal)
$0.00
$0.00
$0.00
$0.00
ue (RFI) Response
. Number of RFIs
. Mailing Cost per Transmittal ($ / Transmittal)
. Time to Prepare Transmittals for Inquiry Issues (RFI) (hours / transmittal)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Description The Contractor and Sub-Contractors gather information for products identified in the Design
prepare submittals. Refer to the Submittal Package exchange for detailed requirements rela
handling Product Type Selection submittals.
Information
Attributes
Process
Current Process
Contractor
$ -
$ -
$ -
Expected Process
$ -
Information
Description The Contractor and Sub-Contractors review information for products identified in the Design Fin
prepare shop drawings. Refer to Submittal Package exchange for detailed requirements related
handling System Layout submittals.
Information
Attributes
Process
Current Process
Contractor
$ -
$ -
$ -
Expected Process
ts (Shop Drawings)
s (Shop Drawings)
Description The Contractor organizes the required submittal information and creates Submittal Packages to be rev
and/or Owner's Representative.
Information
Attributes
Process
Current Process
HANDLING/ 180.02.15 Log Receipt of Submittal Package from Sub-Contractors and Vendors
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0.00 Time to Log (hours / transmittal)
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
Expected Process
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
Copying Cost
$0.00 SubTotal
$0.00 SubTotal
Mailing Costs
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
Mailing Costs
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00
on Submittal Register
$0.00
mation
Unique Product Types (Types / buildng)
Spent Organizing Equipment (product) Type information (hours / submittal item)
$0.00
$0.00
$0.00
$0.00
$0.00
er of Transmittals (Transmittals)
g Cost per Transmittal ($ / Transmittal)
o Prepare a Transmittal (hours/transmittal)
$0.00
$0.00
ttal Package
er of Transmittals (Transmittals)
g (hours / transmittal)
Administrative Rate ($ / hour) $0.00
$0.00
Package
er of Transmittals (Transmittals)
g (hours / transmittal)
$0.00
to Architect
er of Transmittals (Transmittals)
g Cost per Transmittal ($ / Transmittal)
o Prepare a Transmittal (hours/transmittal)
$0.00
$0.00
ttal Package
er of Transmittals (Transmittals)
g (hours / transmittal)
$0.00
Package
er of Transmittals (Transmittals)
g (hours / transmittal)
$0.00
Description The Owner's Representative and Architect review the submittals provided by the contractor and provide c
Information
Attributes
Current Process
190.01 Examine Submittal Package (Pre-Construction, Product Type Selection, System Layout)
HANDLING/ 190.02.10 Send Copies of Submittal Package (Product Type Selection, System Layout) to Sub-Consultants
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
$0.00 Avg. Mailing Cost per Transmittal
- Avg. Time to Prepare a Transmittal (hours/transmittal)
SubTotal
HANDLING/ 190.02.11 Log Transmittal of Submittal Package (Product Type Selection, System Layout)
ELEC.DOC. 0 Avg. Number of Transmittals (Transmittals)
0 Time to Log (hours / transmittal)
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
RECREATING/ 190.06.10 Recreate Submittal Package (Product Type Selection, System Layout)
COBie 0 Number of Unique Product Types (Types / buildng)
0 Avg. Time Spent Revising one Product Type Submittal Item (hours / product type submittal it
0% Percentage of Time Spent by Construction Project Manager
0% Percentage of Time Spent by Assistant (Construction) Project Manager
SubTotal $0.00
190.07 2nd Review Cycle of Submittal Package (Product Type Selection, System Layout)
0% Percentage of Product Submittals rejected on 2nd review
Architect's Cost $0.00
Contractor's Cost $0.00
190.08 3rd Review Cycle of Submittal Package (Product Type Selection, System Layout)
0% Percentage of Product Submittals rejected on 3rd review
Architect's Cost $0.00
Contractor's Cost $0.00
190.09 4th Review Cycle of Submittal Package (Product Type Selection, System Layout)
0% Percentage of Product Submittals rejected on 4th review
Architect's Cost $0.00
Contractor's Cost $0.00
3rd review
Architect's Cost $0.00
Contractor's Cost $0.00
4th review
Architect's Cost $0.00
Contractor's Cost $0.00
3rd review
Architect's Cost $0.00
Contractor's Cost $0.00
4th review
Architect's Cost $0.00
Contractor's Cost $0.00
Expected Process
Mailing Costs
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
Mailing Cost
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00
SubTotal
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
age (Pre-Construction, Product Type Selection, System Layout)
$0.00
$0.00
$0.00
$0.00
s Submittal Mark-ups/Comments
$0.00
$0.00
al Issues
ber of Transmittals (Transmittals)
ng Cost per Transmittal
to Prepare a Transmittal (hours/transmittal)
$0.00
$0.00
mittal Issues
ber of Transmittals (Transmittals)
og (hours / transmittal)
$0.00
l Issue
ber of Transmittals (Transmittals)
og (hours / transmittal)
r Administrative Rate ($ / hour) $0.00
$0.00
$0.00
3rd review
Architect's Cost $0.00
Contractor's Cost $0.00
4th review
Architect's Cost $0.00
Contractor's Cost $0.00
3rd review
Architect's Cost $0.00
Contractor's Cost $0.00
4th review
Architect's Cost $0.00
Contractor's Cost $0.00
Description The Contractor contacts a Supplier to order equipment and materials. The Supplier then
Contractor for the equipment and/or materials. The Contractor verifies the specifications
materials in the quote against approved submittal documentation and then submits a Pur
Information
Attributes
Process
Current Process
200.07 Send Purchase Order and Approved Product Type Selection to Supplier
Contractor
$ -
$ -
$ -
Expected Process
Selection to Supplier 200.07 Send Purchase Order and Approved Product Type
$ - Expected Process To
pproved Product Type Selection to Supplier
Description The Contractor installs the building equipment, materials, and systems using the design final
approved shop drawings, product data and manufacturer's instructions.
Information Attributes
Process
Current Process
210.03.12 Install Equipment, Materials and Building Systems - Recording Component Data
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
ording Component Data 210.03.12 Install Equipment, Materials and Building Systems -
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
Installation Report
mber of Tagged Components (components / building)
. Time Spent Re-formatting Product Installation Report in Office (hours/ component)
$0.00
$0.00
$0.00
$0.00
nstallation Report
$0.00
Description After the Contractor completes the installation process, the equipment/systems must be tested
testing must be completed with the Owner's Representative and Manufacturer's representative
Information
Attributes
Process
Current Process
220.01 Send Start-Up Test Procedures and Recording Forms to Owner's Rep.
Contractor
$ -
$ -
$ -
Expected Process
Description When the Contractor has completed installation of equipment or systems, a notification is se
installed item is ready for inspection/observation. The Architect conducts regular inspections
The findings of the inspections including any deficiencies are identified in the inspection repo
and requests a re-inspection.
Information
Attributes
Process
Current Process
SubTotal
Mailing Cost
SubTotal
SubTotal
SubTotal
Contractor
$ -
$ -
$ -
Expected Process
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
ct Product Inspection
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
SubTotal $0.00
Deficiencies
st Re-inspection
Description The Architect creates a final punchlist based upon a survey of the completed construction
Contractor corrects the deficiencies identified in the punchlist. The Architect verifies that t
Contractor has corrected the deficiencies in the punchlist by performing a final walkthrou
Information
Attributes
Process
Current Process
Contractor
$ -
$ -
$ -
Expected Process
$ - Expected Proce
Expected Process Total $ -
Process Name Turnover Package
OmniClass Stage 31-40 40 91 17 Evaluation Phase
OmniClass Role 34-35 14 00 Contractor
Description The Contractor gathers all the as-built information related to the project and forwards the informat
Information
Attributes
Process
Current Process
Construction
$0.00 Assistant Project Manager
(Construction) ProjectRate ($ / hour)
Manager Rate ($ / $0.00
$0.00 hour) $0.00
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
SubTotal
Expected Process
$0.00 SubTotal
Reproduction Costs
$0.00 SubTotal
$0.00 SubTotal
$0.00 SubTotal
Err:511 SubTotal
$0.00 SubTotal
$0.00 SubTotal
$0.00
and Assembling Operations & Maintenance Manuals (hours / document)
and Assembling Commissioning Report (hours / document)
and Assembling Record Specifications (hours / document)
Record (As-Built) Drawings
and Assembling Record (As-Built) Drawings (hours / sheet)
inal Approved Shop Drawings
and Assembling Final Approved Shop Drawings (hours / sheet)
by Construction Project Manager
by Assistant (Construction) Project Manager
$0.00
$0.00
$0.00
mittal ($ / Transmittal)
nsmittal (hours/transmittal)
$0.00
$0.00
ittal)
$0.00
ittal)
($ / hour) $0.00
Err:511
($ / hour) $0.00
$0.00
($ / hour) $0.00
$0.00