DOCUMENT NO.
BLA-PBP-M-CC-00-003
A
Contract No.
PAGE 1 OF 8
3510005983
REVIEW STATUS :
A APPROVED
B APPROVED WITH COMMENTS
May Proceed to Next Stage Resubmit Corrected
Document for Final Approval
C REVIEW / COMMENTED
Resubmit Corrected Document for Approval
D REJECTED AND TO BE
RESUBMITTED
Resubmit New Document With Same Revision
Status
Date : ______________________
Signature : ______________________
NEXT STATUS :
CONTRACTOR COMPANY
REV DATE PURPOSE
PREP’D CHK’D APP’D APP’D
DOCUMENT NO.
PT. PIRIMBILO PERMAI BLA-PBP-M-DS-00-003
PEKERJAAN PEMBUATAN OFFSITE
BUILDING TAHAP 1
UNTUK PROJECT BLOK A ACEH
Date : 13/12/2018
BLA-PBP-M-CC-00-003 Rev. A Calculation for Water Springkle
Page 2 of 6
TABEL REVISION
Date : 13/12/2018
BLA-PBP-M-CC-00-003 Rev. A Calculation for Water Springkle
Page 3 of 6
RECORD OF REVISION
Implemented
Rev. Sec. Page Company’s Comment Explanation
(Y/N)
A ALL ALL
PEKERJAAN PEMBUATAN OFFSITE
BUILDING TAHAP 1
UNTUK PROJECT BLOK A ACEH
Date : 13/12/2018
BLA-PBP-M-CC-00-003 Rev. A Calculation for Water Springkle
Page 4 of 6
TABLE OF CONTENT
1. INTRODUCTION ................................................................................................................ 5
1.1. Project Overview ............................................................................................................... 5
1.2. DEFINISI .......................................................................................................................... 5
2. CALCULATION FOR WATER SPRINGKLE ................................................................ 6
PEKERJAAN PEMBUATAN OFFSITE
BUILDING TAHAP 1
UNTUK PROJECT BLOK A ACEH
Date : 13/12/2018
BLA-PBP-M-CC-00-003 Rev. A Calculation for Water Springkle
Page 5 of 6
1. INTRODUCTION
1.2. DEFINISI
Date : 13/12/2018
BLA-PBP-M-CC-00-003 Rev. A Calculation for Water Springkle
Page 6 of 6
KANTIN LAUNDRY
Panjang = 13 Panjang = 13
Lebar = 13 Lebar = 6
R = 2.4 R = 2.4
Luas Bangunan = PxL Luas Bangunan = PxL
= 169 = 78
Luas Sprinkler = π x (R)^2 Luas Sprinkler = π x (R)^2
= 18.086 = 18.086
Jumlah Titik Springkler = 9.34 Jumlah Titik Springkler = 4.31
10 Buah titik sprinkler 5 Buah titik sprinkler
PANEL ROOM
Panjang = 4
Lebar = 4
R = 2.4
Luas Bangunan = PxL
= 16
Luas Sprinkler = π x (R)^2
= 18.086
Jumlah Titik Springkler = 0.88
1 Buah titik sprinkler
DOCUMENT NO.
REV B
BLA-PBP-M-CC-00-002
Q = 80 litre/menit Q = 80 litre/menit
T = 62 T = 2
Q = 80 litre/menit Q = 80 litre/menit
T = 10 T = 3
LAUNDRY
V=Q×T
Q = 80 litre/menit
T = 5
V = 400 litre/menit 30
= 12000 litre 1000
= 12 m^3