Gyratory Crusher Type "TS" & "TSU"

Document No. 2172-0002

4. Examine the arrangement of drilled and tapped holes in the inner eccentric bushing
flange and the eccentric. One hole is spaced unevenly to orient the bushing in the
eccentric. Identify and mark this hole in each piece before proceeding.

Figure 24: Eccentric Assembly

5. Insert a threaded guide rod in two holes of the eccentric to assure alignment of the
bushing during installation. The guide rods must be of sufficient length to permit the
rods to guide the bushing its entire length during installation.
6. Carefully clean the inner eccentric bushing, and remove any upsets on the surfaces.
To facilitate the installation of the bushing, cool the bushing with either dry ice or
liquid nitrogen.
Note: Refer to “Installing Interference Fit Components” in the Installation Section for further
instructions and precautions.

7. Cool the bushing to 176°F [80°C] below ambient temperature. Rig, and with a crane,
lower the bushing onto the guide rods, taking care of the bushing alignment with
respect to the drilled and tapped.
8. Begin insertion of the bushing into the cylinder. If the bushing begins to jam or tilt in
the cylinder, raise it slightly and realign it. Once the bushing begins to lower into the
cylinder, DO NOT STOP! Continue with installation until the bushing is fully
seated.