Documente Academic
Documente Profesional
Documente Cultură
NO BY CHK APP DATE DESCRIPTION THIS DOCUMENT AND THE INFORMATION DRAWN LRS 07/27/09
ERBIL REFINERY PHASE II 40K BPSD CDU W/NAPHTHA TRAIN
CONTAINED HEREIN IS CONFIDENTIAL AND MAY NOT
0 LS TH MJ 3/17/11 APPROVED FOR CONSTRUCTION CHECKED TH 3/17/11
1 LS TH MJ 4/6/11 REVISED AS NOTED
BE DISCLOSED TO ANY PERSONS OR COPIED OR
REPRODUCED EXCEPT AS PERMITTED IN WRITING APPROVED MJ 3/17/11 KAR GROUP PLANT B / UNIT GENERAL
2 LS TH TH 7/19/11 REVISED AS NOTED BY VENTECH ENGINEERS INC. APPROVED COPYRIGHT 2010 VENTECH ENGINEERS INC.
3 LS TH TH 10/13/2011 REVISED AS NOTED ALL CONTENTS OF THIS DOCUMENT AND ALL APPROVED REVISION DESCRIPTION CABLE SCHEDULE COVER SHEET
COPIES OF IT ARE THE PROPERTY OF VENTECH SCALE
A = PRELIMINARY B = CLIENT APPROVAL JOB NUMBER DRAWING NUMBER REV.
ENGINEERS INC. AND IT'S CLIENT, AND ARE LENT
C = APPROVED FOR DESIGN
VENTECH ENGINEERS INC.
OUT ON THE EXPRESS CONDITION THAT THEY ARE
SUBJECT TO RETURN UPON DEMAND. 0 = APPROVED FOR CONSTRUCTION
NONE
PASADENA, TEXAS 77502 P.O. BOX 4261 4653-030 B000-EM-701 3