Detailed Design for Yas Mina Zayed Pipeline Pr

Detailed Engineering Services, Procurement Assistance & Client Offic

CLASS-I (CATEGORY-I) DOCUMENTS CONTROL REGISTER


FOR Submission / Review status

Class-1 (Cat-1)
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 (IFD/ICR)
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Complete
Category No. (IFR / IDC) SUBMIT Comments SUBMIT End User
Review
5.0% 20.0% 35.0% 45.0% - 60.0% 70.0%

Detailed Design for Yas Mina Zayed Pipeline Project


PROCESS
P&ID - DRAWINGS
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram Symbols F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-000-00-30-001 1-I 0
and Legends F
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram 24" Natural F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-001 Gas Tie-In and 24" Natural Gas Pipeline at Yas 1-I 0
F
Island and 581-SVS-1/2/3
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-002 Sectionalizing Valve Stations (581-SVS-4, 1-I 0
F
581-SVS-5 & 581-SVS-6)
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-003 Sectionalizing Valve Stations (581-SVS-7, 1-I 0
F
581-SVS-8 & 581-SVS-9)
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-004 Sectionalizing Valve Stations (581-SVS-10 & 1-I 0
F
581-SVS-11)
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram Scraper F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-830-00-30-001 1-I 0
Receiver (830-V-101) at Saadiyat CRS F
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram Natural Gas F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-830-00-30-002 1-I 1
Filtration and Metering F
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram Natural Gas F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-830-00-30-003 1-I 0
Pressure Reduction Station F
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram CS/400mm
5275-PL-581-00-30-005
409603376.xlsx HDPE Pipeline From Saadiyat CRS To Reem 1-I 0 Page 1 of 186
Island and Mina Zayed
Detailed Design for Yas Mina Zayed Pipeline Pr
Detailed Engineering Services, Procurement Assistance & Client Offic

CLASS-I (CATEGORY-I) DOCUMENTS CONTROL REGISTER


FOR Submission / Review status

Class-1 (Cat-1)
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 (IFD/ICR)
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Complete
Category No. (IFR / IDC) SUBMIT Comments SUBMIT End User
Review
5.0% 20.0% 35.0% 45.0% - 60.0% 70.0%

Detailed Design for Yas Mina Zayed Pipeline Project


Piping & Instrumentation Diagram CS/400mm F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-005 HDPE Pipeline From Saadiyat CRS To Reem 1-I 0
F
Island and Mina Zayed
A 26Jun13 2Jul13 2Jul13 9Jul13 - 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram Scraper F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-006 1-I 1
Receiver (581-V-103) at Reem Island F
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
Piping & Instrumentation Diagram PPRS Meter F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-007 1-I 0
Module F
A 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-012D P&ID demolition - Natural gas tie-in 1-I 0
F
A 26Jun13 25Jul13 25Jul13 28Jul13 5Aug13 17Aug13 23Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-013D P&ID demolition Mina Zayed tie-in 1-I 0
F
A 26Jun13 25Jul13 25Jul13 28Jul13 5Aug13 17Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-30-014D P&ID demolition - FCV modification in PPRS 1-I 0
F
A 26Jun13 25Jul13 25Jul13 28Jul13 5Aug13 17Aug13 7Sep13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13
F 26Jun13 2Jul13 2Jul13 9Jul13 25Jul13 14Aug13 7Sep13
5275-PL-581-00-40-001 P&ID utility water distribution 1-I 0
F
A 26Jun13 31Jul13 31Jul13 23Sep13 5Oct13 12Oct13 12Oct13
P 7Nov13 10Nov13 12Nov13 17Nov13 1Dec13 8Dec13 1Dec13
F
- Miscellaneous Process Deliverables 1-I
F
A - - - - - - -

LOSS PREVENTION
CALCULATIONS / PHILOSOPHY / REPORTS
409603376.xlsx Page 2 of 186
Detailed Design for Yas Mina Zayed Pipeline Pr
Detailed Engineering Services, Procurement Assistance & Client Offic

CLASS-I (CATEGORY-I) DOCUMENTS CONTROL REGISTER


FOR Submission / Review status

Class-1 (Cat-1)
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 (IFD/ICR)
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Complete
Category No. (IFR / IDC) SUBMIT Comments SUBMIT End User
Review
5.0% 20.0% 35.0% 45.0% - 60.0% 70.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 22Sep13 25Sep13 26Sep13 30Sep13 14Oct13 30Sep13 14Oct13
F 27Aug13 30Aug13 12Sep13 16Sep13 28Sep13 - -
RPT-5275-PL-000-61-002 Vent dispersion study 1 0
F
A 27Aug13 30Aug13 12Sep13 16Sep13 28Sep13 - -
P 24Sep13 28Oct13 29Oct13 3Nov13 17Nov13 3Nov13 17Nov13
F 26Sep13 24Oct13 25Oct13 29Oct13 28Nov13 5Dec13 19Dec13
HSEIA Phase II Report 1
F
A 26Sep13 24Oct13 25Oct13 29Oct13 10Nov13 21Nov13 -

409603376.xlsx Page 3 of 186


Detailed Design for Yas Mina Zayed Pipeline Pr
Detailed Engineering Services, Procurement Assistance & Client Offic

CLASS-I (CATEGORY-I) DOCUMENTS CONTROL REGISTER


FOR Submission / Review status

Class-1 (Cat-1)
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 (IFD/ICR)
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Complete
Category No. (IFR / IDC) SUBMIT Comments SUBMIT End User
Review
5.0% 20.0% 35.0% 45.0% - 60.0% 70.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 10Sep13 14Oct13 17Oct13 21Oct13 4Nov13 11Nov13 25Nov13
F 12Sep13 15Oct13 17Oct13 22Oct13 28Nov13 5Dec13 19Dec13
QRA Report 1
F
A 12Sep13 15Oct13 17Oct13 22Oct13 10Nov13 21Nov13 -
P 4Nov13 19Nov13 20Nov13 24Nov13 8Dec13 15Dec13 29Dec13
Noise Survey Report (refer to Appendix F 26Sep13 24Oct13 25Oct13 29Oct13 28Nov13 5Dec13 19Dec13
1
B11.2.16) F
A 26Sep13 24Oct13 25Oct13 29Oct13 10Nov13 21Nov13 -
P 4Nov13 19Nov13 20Nov13 24Nov13 8Dec13 15Dec13 29Dec13
Noise Allocation Report (refer to Appendix F 26Sep13 24Oct13 25Oct13 29Oct13 28Nov13 5Dec13 19Dec13
1
B11.2.16) F
A 26Sep13 24Oct13 25Oct13 29Oct13 10Nov13 21Nov13 -
P 4Nov13 19Nov13 20Nov13 24Nov13 8Dec13 15Dec13 29Dec13
F 26Sep13 24Oct13 25Oct13 29Oct13 28Nov13 5Dec13 19Dec13
Noise data Sheet (refer to Appendix B11.2.16) 1
F
A 26Sep13 24Oct13 25Oct13 29Oct13 10Nov13 21Nov13 -
P 4Nov13 19Nov13 20Nov13 24Nov13 8Dec13 15Dec13 29Dec13
Noise Control Design Report (refer to F 26Sep13 24Oct13 25Oct13 29Oct13 28Nov13 5Dec13 19Dec13
1
Appendix B11.2.16) F
A 26Sep13 19Nov13 25Oct13 29Oct13 10Nov13 21Nov13 -
P 25Nov13 3Dec13 4Dec13 8Dec13 22Dec13 29Dec13 12Jan14
Site Noise Verification Survey and Report F 26Sep13 24Oct13 25Oct13 29Oct13 28Nov13 5Dec13 19Dec13
1
(refer to Appendix B11.2.16) F
A 26Sep13 24Oct13 25Oct13 29Oct13 10Nov13 21Nov13 -
P 8Dec13 11Dec13 15Dec13 15Dec13 29Dec13 5Jan14 12Jan14
Final Noise Control Report (refer to Appendix F 26Sep13 24Oct13 25Oct13 29Oct13 28Nov13 5Dec13 19Dec13
1
B11.2.16) F
A 26Sep13 24Oct13 25Oct13 29Oct13 10Nov13 21Nov13 -
P 23Jul13 25Jul13 25Jul13 29Jul13 12Aug13 19Aug13 2Sep13
F 23Jul13 25Jul13 25Jul13 29Jul13 12Aug13 19Aug13 2Sep13
HSE plan (By EPC Contractor) 1
F
A 23Jul13 25Jul13 25Jul13 29Jul13 12Aug13 19Aug13 2Sep13
P 17Nov13 20Nov13 25Nov13 28Nov13 12Dec13 19Dec13 2Jan14
F 17Nov13 20Nov13 25Nov13 28Nov13 12Dec13 19Dec13 2Jan14
Test Run Philospophy
F
A

409603376.xlsx Page 4 of 186


Detailed Design for Yas Mina Zayed Pipeline Pr
Detailed Engineering Services, Procurement Assistance & Client Offic

CLASS-I (CATEGORY-I) DOCUMENTS CONTROL REGISTER


FOR Submission / Review status

Class-1 (Cat-1)
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 (IFD/ICR)
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Complete
Category No. (IFR / IDC) SUBMIT Comments SUBMIT End User
Review
5.0% 20.0% 35.0% 45.0% - 60.0% 70.0%

Detailed Design for Yas Mina Zayed Pipeline Project

** The yellow highlighted deliverables are under EPC Contractor scope

409603376.xlsx Page 5 of 186


as Mina Zayed Pipeline Project
ement Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status EST % % %
Issue-2 (IFD/ICR) Issue - 3 (IFA) Issue IFC
Complete Incorporate Receive 1st Issue Final Progress Remarks
Specialist Comment & Company Issue MRS. WTG PRG
Reviews Resubmit Approval Planned Actual
80.0% 85.0% 90.0% 95.0% 100.0%

17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%


17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
31 0.207 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 31Oct13 29Oct13 21Nov13 21Nov13 100.00%
31 0.207 100% 100%
17Sep13 31Oct13 18Nov13 27Nov13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
28 0.187 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
31 0.207 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
28 0.187 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
31 0.207 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 31Oct13 29Oct13 21Nov13 21Nov13 100.00%
31 0.207 100% 100%
17Sep13 31Oct13 18Nov13 20Nov13 23Dec13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 31Oct13 29Oct13 10Dec13 10Dec13 100.00%
31 0.207 100% 100%
17Sep13 12Oct13 29Oct13 4Dec13 5Dec13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%

409603376.xlsx 31 0.207 100% 100% Page 6 of 186


as Mina Zayed Pipeline Project
ement Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status EST % % %
Issue-2 (IFD/ICR) Issue - 3 (IFA) Issue IFC
Complete Incorporate Receive 1st Issue Final Progress Remarks
Specialist Comment & Company Issue MRS. WTG PRG
Reviews Resubmit Approval Planned Actual
80.0% 85.0% 90.0% 95.0% 100.0%

17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%


31 0.207 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
31 0.207 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 31Oct13 29Oct13 21Nov13 21Nov13 100.00%
28 0.187 100% 100%
17Sep13 31Oct13 18Nov13 20Nov13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
19 0.127 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
19 0.127 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
19 0.127 100% 100%
17Sep13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
17Sep13 6Oct13 20Oct13 27Oct13 27Oct13 100.00%
17Sep13 12Oct13 29Oct13 31Oct13 31Oct13 100.00%
25 0.167 100% 100%
12Oct13 12Oct13 29Oct13 31Oct13 27Nov13 100.00%
8Dec13 15Dec13 29Dec13 5Jan14 5Jan14 100.00%
100.00%
0 0.000 0% 0%
- - - - - 100.00%
414 2.770
100.00% 100.00%

409603376.xlsx Page 7 of 186


as Mina Zayed Pipeline Project
ement Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status EST % % %
Issue-2 (IFD/ICR) Issue - 3 (IFA) Issue IFC
Complete Incorporate Receive 1st Issue Final Progress Remarks
Specialist Comment & Company Issue MRS. WTG PRG
Reviews Resubmit Approval Planned Actual
80.0% 85.0% 90.0% 95.0% 100.0%

21Oct13 21Oct13 4Nov13 11Nov13 11Nov13 100.00%


- 3Oct13 22Oct13 25Oct13 25Oct13 100.00%
36 0.241 100% 100%
- 3Oct13 22Oct13 25Oct13 25Oct13 100.00%
24Nov13 1Dec13 23Feb14 2Mar14 2Mar14 85.00%
19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
150 1.004 85% 100%
- - 26Dec13 9Jan14 9Jan14 100.00%

409603376.xlsx Page 8 of 186


as Mina Zayed Pipeline Project
ement Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status EST % % %
Issue-2 (IFD/ICR) Issue - 3 (IFA) Issue IFC
Complete Incorporate Receive 1st Issue Final Progress Remarks
Specialist Comment & Company Issue MRS. WTG PRG
Reviews Resubmit Approval Planned Actual
80.0% 85.0% 90.0% 95.0% 100.0%

2Dec13 9Dec13 16Dec13 23Dec13 23Dec13 100.00%


19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
100 0.669 100% 100%
- - - 4Dec13 9Jan14 100.00%
5Jan14 12Jan14 19Jan14 26Jan14 26Jan14 100.00%
19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
40 0.268 100% 100%
- - 26Dec13 9Jan14 9Jan14 100.00%
5Jan14 12Jan14 19Jan14 26Jan14 26Jan14 100.00%
19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
45 0.301 100% 100%
- - 26Dec13 9Jan14 9Jan14 100.00%
5Jan14 12Jan14 19Jan14 26Jan14 26Jan14 100.00%
19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
40 0.268 100% 100%
- - - 9Jan14 9Jan14 100.00%
5Jan14 12Jan14 19Jan14 26Jan14 26Jan14 100.00%
19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
40 0.268 100% 100%
- - 26Dec13 9Jan14 9Jan14 100.00%
19Jan14 19Jan14 26Jan14 29Jan14 29Jan14 100.00%
19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
45 0.301 100% 100%
- - 26Dec13 - 9Jan14 100.00%
12Jan14 19Jan14 26Jan14 29Jan14 29Jan14 100.00%
19Dec13 19Dec13 2Jan14 9Jan14 9Jan14 100.00%
35 0.234 100% 100%
- - 26Dec13 - 9Jan14 100.00%
9Sep13 16Sep13 23Sep13 30Sep13 30Sep13 100.00%
9Sep13 16Sep13 23Sep13 4Sep13 4Sep13 100.00%
30 0.201 100% 100%
9Sep13 16Sep13 23Sep13 23Sep13 23Sep13 100.00%
9Jan14 16Jan14 23Jan14 30Jan14 30Jan14 100.00%
9Jan14 16Jan14 23Jan14 30Jan14 30Jan14 100.00%
0 0.000 0% 0%
0.00%

409603376.xlsx Page 9 of 186


as Mina Zayed Pipeline Project
ement Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status EST % % %
Issue-2 (IFD/ICR) Issue - 3 (IFA) Issue IFC
Complete Incorporate Receive 1st Issue Final Progress Remarks
Specialist Comment & Company Issue MRS. WTG PRG
Reviews Resubmit Approval Planned Actual
80.0% 85.0% 90.0% 95.0% 100.0%

561 3.754
95.99% 100.00%

409603376.xlsx Page 10 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


GENERAL
REPORTS
P 11Jun13 12Jun13 13Jun13 17Jun13 1Jul13 8Jul13 22Jul13 8Jul13
F 13Jun13 13Jun13 13Jun13 17Jun13 - - - -
RPT-5275-PL-000-50-001 Site Visit Report 2 A
A 13Jun13 13Jun13 13Jun13 17Jun13 - - - -
P 16Jul13 22Jul13 23Jul13 25Jul13 8Aug13 25Jul13 8Aug13 15Aug13
Walk down Review Report for existing F 8Jul13 8Jul13 8Jul13 11Jul13 14Jul13 16Jul13 17Jul13 3Oct13
RPT-5275-PL-000-50-003 2 0
facilities
A 8Jul13 8Jul13 8Jul13 11Jul13 14Jul13 16Jul13 17Jul13 3Oct13
P 18Jun13 24Jun13 25Jun13 27Jun13 11Jul13 27Jun13 11Jul13 11Jul13
F 23Jun13 25Jun13 27Jun13 1Jul13 21Jul13 5Aug13 25Aug13 -
DBM-5275-PL-000-50-001 Design Basis Memorandum 1-II 0
A 23Jun13 25Jun13 27Jun13 1Jul13 21Jul13 5Aug13 25Aug13 -

PROCESS
CALCULATIONS / PHILOSOPHY / REPORTS
P 30Jun13 3Jul13 4Jul13 8Jul13 29Jul13 8Jul13 29Jul13 5Aug13
F 4Jul13 14Jul13 16Jul13 23Jul13 4Aug13 - - 15Aug13
RPT-5275-PL-581-00-001 Hydraulic study report 2 1
A 4Jul13 14Jul13 16Jul13 23Jul13 4Aug13 - - 15Aug13
P 21Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
F 14Jul13 15Jul13 16Jul13 29Jul13 15Aug13 - - 23Oct13
RPT-5275-PL-581-00-002 Pipeline De-pressurising Calculation 2 0
A 14Jul13 15Jul13 16Jul13 29Jul13 15Aug13 - - 23Oct13
P 1Aug13 4Aug13 5Aug13 7Aug13 21Aug13 7Aug13 21Aug13 28Aug13
F 7Aug13 7Aug13 7Aug13 12Aug13 12Sep13 - - 20Sep13
PHL-5275-PL-000-00-001 Operating Control Philosophy 2 0
A 7Aug13 7Aug13 7Aug13 12Aug13 12Sep13 - - 20Sep13
P 8Aug13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 4Sep13
F 22Aug13 22Aug13 22Aug13 26Aug13 15Sep13 - - 24Sep13
PHL-5275-PL-000-00-002 Start up & Shut down philosophy 2 0
A 22Aug13 22Aug13 22Aug13 26Aug13 15Sep13 - - 24Sep13
P 8Jul13 10Jul13 11Jul13 14Jul13 28Jul13 14Jul13 28Jul13 4Aug13
F 23Jun13 26Jun13 24Jun13 1Jul13 - - - 3Oct13
RPT-5275-PL-000-00-003 Battery limit definition 2 0

409603376.xlsx Page 11 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignBattery
RPT-5275-PL-000-00-003 for limit
Yas Mina Zayed Pipeline
definition 2 0 Project
A 23Jun13 26Jun13 24Jun13 1Jul13 - - - 3Oct13
P 11Jul13 28Jul13 29Jul13 31Jul13 14Aug13 27Aug13 10Sep13 6Oct13
Existing system at Yas - P&ID Review F 25Aug13 25Aug13 25Aug13 29Aug13 24Sep13 - - 3Oct13
RPT-5275-PL-000-00-004 2 0
Report
A 25Aug13 25Aug13 25Aug13 29Aug13 24Sep13 - - 3Oct13
P 8Sep13 15Sep13 16Sep13 18Sep13 2Oct13 9Oct13 23Oct13 9Oct13
Utility, Effluent & Chemical Summary F 24Sep13 25Sep13 29Sep13 3Oct13 29Oct13 - - -
RPT-5275-PL-000-00-005 2 1
Report
A 24Sep13 25Sep13 29Sep13 3Oct13 29Oct13 - - -
P 4Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
Pre Commissioning and Commissioning F 1Sep13 1Sep13 1Sep13 5Sep13 8Oct13 - - 24Oct13
PHL-5275-PL-000-00-003 2 0
philosophy
A 1Sep13 1Sep13 1Sep13 5Sep13 8Oct13 - - 24Oct13
P 14Jul13 17Jul13 18Jul13 21Jul13 4Aug13 21Jul13 4Aug13 11Aug13
F 18Jul13 18Jul13 18Jul13 24Jul13 30Jul13 - - 16Sep13
NC-5275-PL-000-00-001 Line Sizing Report 2 0
A 18Jul13 18Jul13 18Jul13 24Jul13 30Jul13 - - 16Sep13
PFDs - DRAWINGS
P 2Jul13 7Jul13 8Jul13 10Jul13 29Jul13 10Jul13 29Jul13 2Sep13
PFD - Tie-in/Sectionalising valve - Yas F 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
5275-PL-581-00-20-002 1-II 0
Island / Fahed Island
A 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
P 2Jul13 7Jul13 8Jul13 10Jul13 29Jul13 10Jul13 29Jul13 2Sep13
F 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 4Dec13 15Sep13
5275-PL-581-00-20-003 PFD - Sectionalising valve - Jubail Island 1-II 0
A 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 4Dec13 15Sep13
P 2Jul13 7Jul13 8Jul13 10Jul13 29Jul13 10Jul13 29Jul13 2Sep13
PFD - Sectionalising valve - Saadiyat F 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
5275-PL-581-00-20-004 1-II 0
Island
A 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13

409603376.xlsx Page 12 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 2Jul13 7Jul13 8Jul13 10Jul13 29Jul13 10Jul13 29Jul13 2Sep13
PFD- Consumer receipt station - F 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
5275-PL-830-00-20-001 1-II 0
Saadiyat Island
A 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
P 2Jul13 7Jul13 8Jul13 10Jul13 29Jul13 10Jul13 29Jul13 2Sep13
PFD - CS and HDPE pipeline from F 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
5275-PL-581-00-20-005 1-II 0
Saadiyat to Reem Island & Mina Zayed.
A 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
P 2Jul13 7Jul13 8Jul13 10Jul13 29Jul13 10Jul13 29Jul13 2Sep13
F 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
5275-PL-581-00-20-001 PFD - FCV modification in PPRS 1-II 0
A 24Jun13 24Jun13 24Jun13 27Jun13 16Jul13 25Jul13 30Jul13 15Sep13
P 6Oct13 8Oct13 13Oct13 17Oct13 24Oct13 31Oct13 7Nov13 21Nov13
F 7Oct13 8Oct13 8Oct13 9Oct13 26Oct13 - - -
5275-PL-581-00-20-006 Heat & Mass Balance Table 2 0
A 7Oct13 8Oct13 8Oct13 9Oct13 26Oct13 - - -
P 6Oct13 8Oct13 13Oct13 17Oct13 24Oct13 31Oct13 7Nov13 21Nov13
F 13Oct13 17Oct13 30Oct13 31Oct13 5Dec13 - - 12Dec13
5275-PL-581-00-20-007 PSFD - FCV modification in PPRS 1-II 0
A 13Oct13 17Oct13 30Oct13 31Oct13 4Dec13 - - 18Dec13
P 6Oct13 8Oct13 13Oct13 17Oct13 24Oct13 31Oct13 7Nov13 21Nov13
PSFD - Tie-in/Sectionalising valve - Yas F 13Oct13 17Oct13 30Oct13 31Oct13 5Dec13 - - 12Dec13
5275-PL-581-00-20-008 1-II 0
Island / Fahed Island
A 13Oct13 17Oct13 30Oct13 31Oct13 4Dec13 - - 18Dec13
P 6Oct13 8Oct13 13Oct13 17Oct13 24Oct13 31Oct13 7Nov13 21Nov13
PSFD - Sectionalising valve - Jubail F 13Oct13 17Oct13 30Oct13 31Oct13 5Dec13 - - 12Dec13
5275-PL-581-00-20-009 1-II 0
Island
A 13Oct13 17Oct13 30Oct13 31Oct13 4Dec13 - - 18Dec13
P 6Oct13 8Oct13 13Oct13 17Oct13 24Oct13 31Oct13 7Nov13 21Nov13
PSFD - Sectionalising valve - Saadiyat F 13Oct13 17Oct13 30Oct13 31Oct13 5Dec13 - - 12Dec13
5275-PL-581-00-20-010 1-II 0
Island
A 13Oct13 17Oct13 30Oct13 31Oct13 4Dec13 - - 18Dec13
P 6Oct13 8Oct13 13Oct13 17Oct13 24Oct13 31Oct13 7Nov13 21Nov13
PSFD - CS and HDPE pipeline from F 13Oct13 17Oct13 30Oct13 31Oct13 5Dec13 - - 12Dec13
5275-PL-581-00-20-011 1-II 0
Saadiyat to Reem Island & Mina Zayed.
A 13Oct13 17Oct13 30Oct13 31Oct13 4Dec13 - - 18Dec13
P 6Oct13 8Oct13 13Oct13 17Oct13 24Oct13 31Oct13 7Nov13 21Nov13
PSFD- Consumer receipt station - F 13Oct13 17Oct13 30Oct13 31Oct13 5Dec13 - - 12Dec13
5275-PL-830-00-20-002 1-II 0
Saadiyat Island
A 13Oct13 17Oct13 30Oct13 31Oct13 4Dec13 - - 18Dec13
409603376.xlsx Page 13 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project

LOSS PREVENTION
CALCULATIONS / PHILOSOPHY / REPORTS
P 23Jul13 24Jul13 25Jul13 29Jul13 12Aug13 29Jul13 12Aug13 19Aug13
F 4Jul13 10Jul13 17Jul13 22Jul13 29Jul13 11Aug13 1Oct13 23Oct13
PHL-5275-PL-000-61-001 HSE Philosophy 2 0
A 4Jul13 10Jul13 17Jul13 22Jul13 29Jul13 11Aug13 1Oct13 23Oct13
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 19Nov13
F 20Oct13 22Oct13 23Oct13 24Oct13 - - - -
DOD-5275-PL-000-61-001 HSE Action Tracking Register 2
A 20Oct13 22Oct13 23Oct13 24Oct13 - - - -
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 19Nov13
F 17Oct13 20Oct13 21Oct13 22Oct13 17Nov13 - - 12Dec13
DOD-5275-PL-000-61-002 Register of Safety Related Devices 2 0
A 17Oct13 20Oct13 21Oct13 22Oct13 17Nov13 - - 7Jan14
P 27Oct13 5Nov13 6Nov13 10Nov13 - - - 5Nov13
F 22Oct13 24Oct13 29Oct13 31Oct13 20Nov13 - - 12Dec13
RPT-5275-PL-000-61-001 HAZOP Close out report 2 0
A 22Oct13 24Oct13 29Oct13 31Oct13 13Nov13 - - 23Dec13
P 25Jun13 26Jun13 27Jun13 1Jul13 15Jul13 1Jul13 15Jul13 22Jul13
F 21Jun13 23Jun13 26Jun13 27Jun13 15Jul13 23Jul13 30Jul13 -
SOW-5275-PL-000-61-001 Scope of Work for HSE Studies 2 0
A 21Jun13 23Jun13 26Jun13 27Jun13 15Jul13 23Jul13 30Jul13 -
P 22Sep13 1Oct13 2Oct13 6Oct13 20Oct13 27Oct13 10Nov13 27Oct13
HAZOP/HAZID/SIL Workshop and F 17Sep13 26Sep13 2Oct13 2Nov13 15Dec13 - - 22Dec13
2 0
Report
A 17Sep13 26Sep13 2Oct13 2Nov13 12Nov13 - - -

409603376.xlsx Page 14 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 22Sep13 14Oct13 17Oct13 20Oct13 3Nov13 10Nov13 24Nov13 10Nov13
F 17Sep13 26Sep13 2Oct13 14Nov13 15Dec13 - - 22Dec13
SIMOPS Report 2 0
A 17Sep13 26Sep13 2Oct13 14Nov13 - - - -
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 19Nov13
F 22Oct13 24Oct13 27Oct13 29Oct13 15Dec13 - - 22Dec13
PP-5275-PL-000-00-001 Operating Manual 2 A
A 22Oct13 24Oct13 27Oct13 29Oct13 -
SPECIFICATIONS
P 1Aug13 6Aug13 7Aug13 11Aug13 25Aug13 11Aug13 25Aug13 1Sep13
Specification for Fire Protection, Safety F 28Jul13 29Jul13 1Aug13 7Aug13 11Sep13 - - -
SP-5275-PL-000-19-001 1-II 0
Equipment, Accessories
A 28Jul13 29Jul13 1Aug13 7Aug13 11Sep13 - - -
P 12Aug13 14Aug13 15Aug13 18Aug13 1Sep13 18Aug13 1Sep13 8Sep13
Specification for Clean Agent F 12Aug13 12Aug13 12Aug13 18Aug13 7Sep13 - - -
SP-5275-PL-000-19-002 1-II 0
Extinguishing System
A 12Aug13 12Aug13 12Aug13 18Aug13 7Sep13 - - -
DATA SHEETS
P 1Aug13 6Aug13 7Aug13 11Aug13 25Aug13 11Aug13 25Aug13 1Sep13
F 6Aug13 6Aug13 6Aug13 13Aug13 5Sep13 - - -
SPP-5275-PL-000-19-001 Data Sheet for Fire & Safety Equipment 1-II 0
A 6Aug13 6Aug13 6Aug13 13Aug13 5Sep13 - - -
P 12Aug13 14Aug13 15Aug13 18Aug13 1Sep13 18Aug13 1Sep13 8Sep13
Data Sheet for Clean Agent F 7Aug13 7Aug13 12Aug13 10Sep13 - - - -
SPP-5275-PL-000-19-002 1-II 0
Extinguishing System
A 7Aug13 7Aug13 12Aug13 10Sep13 - - - -
MATERIAL REQUISITION
P 1Aug13 6Aug13 7Aug13 11Aug13 25Aug13 11Aug13 25Aug13 1Sep13
Material Requisition for Fire Protection, F 29Jul13 31Jul13 1Aug13 29Aug13 12Oct13 - - 21Oct13
R-5275-PL-000-19-001 2 0
Safety Equipment, Accessories
A 29Jul13 31Jul13 1Aug13 29Aug13 12Oct13 - - 21Oct13
P 12Aug13 14Aug13 15Aug13 18Aug13 1Sep13 18Aug13 1Sep13 8Sep13
Material Requisition for Clean Agent F 28Jul13 29Jul13 12Aug13 29Aug13 12Oct13 - - -
R-5275-PL-000-19-002 2 0
Extinguishing System
A 28Jul13 29Jul13 12Aug13 29Aug13 12Oct13 - - -
TECHNICAL BID EVALUATIONS
P 13Nov13 13Nov13 14Nov13 17Nov13 1Dec13 - - -
TBE for Fire Protection, Safety F 27Nov13 28Nov13 15Dec13 18Dec13 1Jan14 18Dec13 1Jan14 -
TBE-5275-PL-000-19-001 1-II 0
Equipment, Accessories
409603376.xlsx Page 15 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignTBE
forfor Yas MinaSafety
Fire Protection, Zayed Pipeline Project
TBE-5275-PL-000-19-001 1-II 0
Equipment, Accessories
A 27Nov13 28Nov13 25Dec13 20Jan14 - - - -
P 13Nov13 13Nov13 14Nov13 17Nov13 1Dec13 - - -
F 15Dec13 18Dec13 24Dec13 30Dec13 13Jan14 30Dec13 13Jan14 -
TBE-5275-PL-000-19-002 TBE for Clean Agent System 1-II A
A 3Dec13 5Dec13 15Jan14 26Jan14
SCHEDULES / LISTS
P 8Aug13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 4Sep13
Hazardous area F 29Aug13 2Sep13 2Sep13 11Sep13 8Oct13 - - -
SCH-5275-PL-000-00-101 2 0
schedule(CRS,SVS1,SVS7)
A 29Aug13 2Sep13 2Sep13 11Sep13 8Oct13 - - -
DRAWINGS
P 12Nov13 14Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 10Dec13
Safety Equipment Layout - Saadiyat F 16Sep13 16Sep13 16Sep13 20Sep13 3Oct13 - - -
5275-PL-830-19-00-001 2 0
CRS
A 16Sep13 16Sep13 16Sep13 20Sep13 3Oct13 - - -
P 27Nov13 1Dec13 2Dec13 4Dec13 18Dec13 4Dec13 18Dec13 25Dec13
Safety Equipment Layout - E&I Bldg SVS F 16Sep13 16Sep13 16Sep13 20Sep13 3Oct13 - - -
5275-PL-581-19-00-001 2 0
1
A 16Sep13 16Sep13 16Sep13 20Sep13 3Oct13 - - -
P 19Nov13 20Nov13 21Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
F 17Oct13 20Oct13 24Oct13 25Oct13 6Nov13 - - 5Dec13
5275-PL-581-19-00-002 Safety Equipment Layout - SVS 7 2 0
A 17Oct13 20Oct13 24Oct13 25Oct13 6Nov13 - - -
P 26Aug13 1Sep13 2Sep13 4Sep13 18Sep13 4Sep13 18Sep13 25Sep13
F 8Sep13 12Sep13 16Sep13 20Sep13 3Oct13 - - -
5275-PL-830-00-70-101 Hazardous area layout(Saadiyat CRS) 2 0
A 8Sep13 12Sep13 16Sep13 20Sep13 3Oct13 - - -
P 26Aug13 1Sep13 2Sep13 4Sep13 18Sep13 4Sep13 18Sep13 25Sep13
Hazardous area layout(Reem, SVS 1 to F 8Sep13 12Sep13 16Sep13 18Sep13 8Oct13 - - -
5275-PL-581-00-70-101 2 0
SVS 11)
A 8Sep13 12Sep13 16Sep13 18Sep13 8Oct13 - - -

409603376.xlsx Page 16 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 28Aug13 1Sep13 2Sep13 4Sep13 18Sep13 4Sep13 18Sep13 25Sep13
Typical Hazardous area layout for all F 9Sep13 12Sep13 16Sep13 18Sep13 8Oct13 - - -
5275-PL-000-00-70-101 2 0
areas
A 9Sep13 12Sep13 16Sep13 18Sep13 8Oct13 - - -
P 27Nov13 1Dec13 2Dec13 4Dec13 18Dec13 4Dec13 18Dec13 25Dec13
Miscellaneous Loss Prevention F 15Dec13 18Dec13 24Dec13 30Dec13 13Jan14 30Dec13 13Jan14 20Jan14
-
Deliverables
A - - - - - - - -

PIPELINE
SPECIFICATIONS
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Specification for F 11Jun13 11Jun13 12Jun13 13Jun13 9Jul13 - - 14Jul13
5275-ADD-9510-001 Submerged Arc Welded Line Pipes 1-II 0
(DGS-9510-001)
A 11Jun13 11Jun13 12Jun13 13Jun13 9Jul13 - - 14Jul13
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - High Frequency F 11Jun13 11Jun13 12Jun13 13Jun13 9Jul13 - - 14Jul13
5275-ADD-9510-003 Electric Welded (HFW) Line Pipes (DGS- 1-II 0
9510-003)
A 11Jun13 11Jun13 12Jun13 13Jun13 9Jul13 - - 14Jul13
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Pipeline Ball Valves F 20Jun13 23Jun13 23Jun13 26Jun13 11Jul13 18Jul13 1Aug13 -
5275-ADD-9520-001 1-II 0
(DGS-9520-001)
A 20Jun13 23Jun13 23Jun13 26Jun13 11Jul13 18Jul13 1Aug13 -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Factory Hot Bends F 13Jun13 16Jun13 16Jun13 17Jun13 30Jun13 - - -
5275-ADD-9530-001 1-II 0
(DGS-9530-001)
A 13Jun13 16Jun13 16Jun13 17Jun13 30Jun13 - - -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Pipeline Pigging F 15Jun13 16Jun13 17Jun13 19Jun13 19Sep13 - - -
5275-ADD-9530-002 1-II 0
Tees (DGS-9530-002)
A 15Jun13 16Jun13 17Jun13 19Jun13 19Sep13 - - -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Pipeline Isolating F 15Jun13 16Jun13 17Jun13 19Jun13 19Sep13 - - -
5275-ADD-9540-002 1-II 0
Joints (DGS-9540-002)
A 15Jun13 16Jun13 17Jun13 19Jun13 19Sep13 - - -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Pipeline Anchor F 15Jun13 16Jun13 17Jun13 19Jun13 19Sep13 - - -
5275-ADD-9530-003 1-II 0
Flanges (DGS-9530-003)
409603376.xlsx Page 17 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignAddendum
for Yas Mina
to DGS Zayed
- Pipeline Anchor Pipeline Project
5275-ADD-9530-003 1-II 0
Flanges (DGS-9530-003)
A 15Jun13 16Jun13 17Jun13 19Jun13 19Sep13 - - -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Materials for Sour F 4Jul13 8Jul13 8Jul13 9Jul13 23Jul13 - - 30Jul13
5275-ADD-0000-002 1-II 0
Environment
A 4Jul13 8Jul13 8Jul13 9Jul13 23Jul13 - - 30Jul13
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
F 22Jun13 24Jun13 24Jun13 26Jun13 11Jul13 18Jul13 1Aug13 -
SP-5275-PL-581-95-001 Requirements for HDPE Pipes & Fittings 1-II 0
A 22Jun13 24Jun13 24Jun13 26Jun13 11Jul13 18Jul13 1Aug13 -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Three layer F 11Jun13 12Jun13 13Jun13 17Jun13 30Jun13 6Jul13 17Jul13 -
5275-ADD-1470-003 Polyethylene Coating System (DGS- 1-II 0
1470-003)
A 11Jun13 12Jun13 13Jun13 17Jun13 30Jun13 6Jul13 17Jul13 -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Polyurethane - Tar F 24Jun13 25Jun13 26Jun13 27Jun13 9Jul13 - - -
5275-ADD-1470-002 Coating for Bends, Valves and Fittings 1-II 0
(DGS-1470-002)
A 24Jun13 25Jun13 26Jun13 27Jun13 9Jul13 - - -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Field Joint Coating F 24Jun13 25Jun13 26Jun13 27Jun13 9Jul13 - - 14Jul13
5275-ADD-1470-004 Using Heat Shrinkable Sleeves (DGS- 1-II 0
1470-004)
A 24Jun13 25Jun13 26Jun13 27Jun13 9Jul13 - - 14Jul13
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Flexibility Analysis F 1Jul13 3Jul13 3Jul13 6Jul13 11Jul13 - - -
5275-ADD-9550-004 1-II 0
(Pipeline (DGS-9550-004)
A 1Jul13 3Jul13 3Jul13 6Jul13 11Jul13 - - -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Topographic Survey F 11Jun13 12Jun13 13Jun13 13Jun13 30Jun13 6Jul13 17Jul13 -
5275-ADD-9550-006 1-II 0
- Pipelines (Onshore) (DGS-9550-006)
A 11Jun13 12Jun13 13Jun13 13Jun13 30Jun13 6Jul13 17Jul13 -

409603376.xlsx Page 18 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Specification for Offshore Pipeline F 11Jun13 12Jun13 13Jun13 13Jun13 30Jun13 6Jul13 17Jul13 -
SP-5275-PL-581-95-002 1-II 0
Survey
A 11Jun13 12Jun13 13Jun13 13Jun13 30Jun13 6Jul13 17Jul13 -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Pipeline F 4Jul13 8Jul13 8Jul13 9Jul13 23Jul13 - - 30Jul13
5275-ADD-9550-002 1-II 0
Construction (DGS-9550-002)
A 4Jul13 8Jul13 8Jul13 9Jul13 23Jul13 - - 30Jul13
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Pipeline Bund and F 3Jul13 3Jul13 3Jul13 6Jul13 11Jul13 - - -
5275-ADD-1486-004 1-II 0
R.O.W Construction (DGS-1486-004)
A 3Jul13 3Jul13 3Jul13 6Jul13 11Jul13 - - -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Requirements for F 3Jul13 3Jul13 3Jul13 6Jul13 11Jul13 17Jul13 29Jul13 -
5275-ADD-6300-005 the Radiographic Inspection of Pipeline 1-II 0
Welds (DGS-6300-005)
A 3Jul13 3Jul13 3Jul13 6Jul13 11Jul13 17Jul13 29Jul13 -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Hydrostatic Testing F 3Jul13 3Jul13 3Jul13 6Jul13 11Jul13 17Jul13 29Jul13 -
5275-ADD-9550-003 1-II 0
- Pipeline (DGS-9550-003)
A 3Jul13 3Jul13 3Jul13 6Jul13 11Jul13 17Jul13 29Jul13 -
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Pipeline Welding F 24Jun13 25Jun13 26Jun13 27Jun13 9Jul13 - - 14Jul13
5275-ADD-6300-004 1-II 0
(DGS-6300-004)
A 24Jun13 25Jun13 26Jun13 27Jun13 9Jul13 - - 14Jul13
P 18Jun13 3Jul13 4Jul13 8Jul13 17Jul13 8Jul13 17Jul13 22Jul13
Addendum to DGS - Internal Coating of F 13Jun13 16Jun13 16Jun13 17Jun13 30Jun13 6Jul13 17Jul13 -
5275-ADD-1470-008 Line Pipe for Non-Corrosive Sales Gas 1-II 0
Transmission (DGS-1470-008)
A 13Jun13 16Jun13 16Jun13 17Jun13 30Jun13 6Jul13 17Jul13 -
DATA SHEETS
P 18Jun13 19Jun13 20Jun13 24Jun13 3Jul13 24Jun13 3Jul13 10Jul13
F 13Jun13 13Jun13 13Jun13 17Jun13 30Jun13 - - -
SPP-5275-PL-581-95-001 Data Sheet for Line Pipe 2 0
A 13Jun13 13Jun13 13Jun13 17Jun13 30Jun13 - - -
P 7Jul13 8Jul13 9Jul13 11Jul13 25Jul13 11Jul13 25Jul13 1Aug13
F 30Jun13 30Jun13 30Jun13 2Jul13 11Jul13 18Jul13 31Jul13 -
SPP-5275-PL-581-95-002 Data Sheet for Pipeline Pigging Tees 2 1
A 30Jun13 30Jun13 30Jun13 2Jul13 11Jul13 18Jul13 31Jul13 -
P 2Jul13 3Jul13 4Jul13 8Jul13 22Jul13 8Jul13 22Jul13 29Jul13
F 30Jun13 30Jun13 30Jun13 1Jul13 11Jul13 - - -
SPP-5275-PL-581-95-003 Datasheet for Pipeline Isolating Joints 2 1
409603376.xlsx Page 19 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


SPP-5275-PL-581-95-003 Datasheet for Pipeline Isolating Joints 2 1
A 30Jun13 30Jun13 30Jun13 1Jul13 11Jul13 - - -
P 8Jul13 10Jul13 11Jul13 14Jul13 28Jul13 14Jul13 28Jul13 4Aug13
F 30Jun13 30Jun13 30Jun13 1Jul13 11Jul13 - - -
SPP-5275-PL-581-95-004 Data Sheet for Anchor Flanges 2 0
A 30Jun13 30Jun13 30Jun13 1Jul13 11Jul13 - - -
P 27Jun13 30Jun13 1Jul13 3Jul13 17Jul13 3Jul13 17Jul13 24Jul13
Data Sheet for Manual Pipeline Ball F 25Jun13 25Jun13 7Jul13 26Jun13 - 8Jul13 23Jul13 -
SPP-5275-PL-581-95-005 2 0
Valves
A 25Jun13 25Jun13 7Jul13 26Jun13 - 8Jul13 23Jul13 -
P 8Sep13 8Sep13 9Sep13 11Sep13 25Sep13 11Sep13 25Sep13 2Oct13
F 27Aug13 28Aug13 15Sep13 2Oct13 26Oct13 - - 10Nov13
SPP-5275-PL-581-95-006 Data Sheet for Mechanical Pig signallers 2 0
A 27Aug13 28Aug13 15Sep13 2Oct13 26Oct13 - - 10Nov13
MATERIAL REQUISITION
P 18Jun13 19Jun13 20Jun13 24Jun13 3Jul13 24Jun13 3Jul13 10Jul13
F 6Jun13 6Jun13 6Jun13 23Jun13 1Jul13 22Jul13 1Aug13 -
R-5275-PL-581-95-001 Material Requisition for Line Pipes 2 1
A 6Jun13 6Jun13 6Jun13 23Jun13 1Jul13 22Jul13 1Aug13 -
P 25Jun13 26Jun13 27Jun13 30Jun13 14Jul13 30Jun13 14Jul13 21Jul13
F 23Jun13 26Jun13 2Jul13 6Jul13 18Jul13 - - -
R-5275-PL-581-95-002 Material Requisition for Hot Bends 2 1
A 23Jun13 26Jun13 2Jul13 6Jul13 18Jul13 - - -
P 7Jul13 8Jul13 9Jul13 11Jul13 25Jul13 11Jul13 25Jul13 1Aug13
Material Requisition for Pipeline Pigging F 3Jul13 4Jul13 7Jul13 23Jul13 1Aug13 - - -
R-5275-PL-581-95-003 2 1
Tees
A 3Jul13 4Jul13 7Jul13 23Jul13 1Aug13 - - -
P 2Jul13 3Jul13 4Jul13 8Jul13 22Jul13 8Jul13 22Jul13 29Jul13
Material Requisition for Pipeline Isolating F 3Jul13 4Jul13 2Jul13 8Jul13 28Jul13 - - -
R-5275-PL-581-95-004 2 1
Joints
A 3Jul13 4Jul13 2Jul13 8Jul13 28Jul13 - - -

409603376.xlsx Page 20 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 8Jul13 10Jul13 11Jul13 14Jul13 28Jul13 14Jul13 28Jul13 4Aug13
Material Requisition for Pipeline Anchor F 4Jul13 4Jul13 7Jul13 6Jul13 28Jul13 - - -
R-5275-PL-581-95-005 2 1
Flanges
A 4Jul13 4Jul13 7Jul13 6Jul13 28Jul13 - - -
P 27Jun13 30Jun13 1Jul13 3Jul13 17Jul13 3Jul13 17Jul13 24Jul13
Material Requisition for Manual Pipeline F 23Jun13 25Jun13 7Jul13 8Jul13 23Jul13 - - -
R-5275-PL-581-95-006 2 0
Ball Valves
A 23Jun13 25Jun13 7Jul13 8Jul13 23Jul13 - - -
P 14Jul13 14Jul13 15Jul13 17Jul13 31Jul13 17Jul13 31Jul13 7Aug13
Material Requisition for Heat Shrinkable F 8Jul13 9Jul13 10Jul13 22Jul13 1Aug13 - - -
R-5275-PL-581-95-007 2 0
Sleeves
A 8Jul13 9Jul13 10Jul13 22Jul13 1Aug13 - - -
Material requisition for Polyurethane and P 9Jul13 10Jul13 11Jul13 14Jul13 28Jul13 14Jul13 28Jul13 4Aug13
polyurethane modified coatings for F 11Jul13 11Jul13 11Jul13 18Jul13 31Jul13 - - 20Aug13
R-5275-PL-581-95-008 2 0
bends, valves and fittings
A 11Jul13 11Jul13 11Jul13 18Jul13 31Jul13 - - 20Aug13
P 17Jul13 21Jul13 21Jul13 23Jul13 6Aug13 23Jul13 6Aug13 13Aug13
Material Requisition for Pipeline Flanges F 15Jul13 16Jul13 18Jul13 4Aug13 15Aug13 - - -
R-5275-PL-581-95-009 2 1
and Fittings
A 15Jul13 16Jul13 18Jul13 4Aug13 15Aug13 - - -
P 25Jun13 26Jun13 27Jun13 30Jun13 14Jul13 30Jun13 14Jul13 21Jul13
Material Requisition for Design, Supply F 22Jun13 23Jun13 24Jun13 1Jul13 11Jul13 22Jul13 29Jul13 -
R-5275-PL-581-95-010 and Construction of HDPE Pipes and 2 1
Fittings
A 22Jun13 23Jun13 24Jun13 1Jul13 11Jul13 22Jul13 29Jul13 -
P 29Sep13 30Sep13 1Oct13 3Oct13 10Oct13 3Oct13 10Oct13 17Oct13
Material Requisition for Mechanical Pig F 25Sep13 30Sep13 1Oct13 23Oct13 - - - -
R-5275-PL-581-95-011 2 0
Signaller
A 25Sep13 30Sep13 1Oct13 23Oct13 - - - -
TECHNICAL BID EVALUATIONS
P 18Jul13 18Jul13 21Jul13 23Jul13 6Aug13 - - -
F 4Jul13 16Jul13 16Jul13 21Jul13 21Jul13 24Jul13 30Jul13 19Aug13
TBE-5275-PL-581-95-001 TBE for Topographic Survey Verification 1-II 0
A 4Jul13 16Jul13 16Jul13 21Jul13 21Jul13 24Jul13 30Jul13 19Aug13
P 10Sep13 10Sep13 11Sep13 15Sep13 29Sep13 - - -
TBE for Design, Supply and Construction F 10Sep13 25Sep13 1Oct13 3Oct13 13Oct13 - - -
TBE-5275-PL-581-95-002 1-II 0
of HDPE Pipes and Fittings
A 10Sep13 25Sep13 1Oct13 3Oct13 13Oct13 - - -
P 18Aug13 18Aug13 19Aug13 21Aug13 4Sep13 - - -
F 25Aug13 28Aug13 1Sep13 3Sep13 22Sep13 - - 11Sep13
TBE-5275-PL-581-95-003 TBE for Line Pipes 1-II 0
409603376.xlsx Page 21 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


TBE-5275-PL-581-95-003 TBE for Line Pipes 1-II 0
A 25Aug13 28Aug13 1Sep13 3Sep13 22Sep13 - - 11Sep13
P 9Sep13 9Sep13 10Sep13 12Sep13 26Sep13 - - -
F 17Sep13 3Oct13 6Oct13 12Oct13 26Oct13 - - 29Oct13
TBE-5275-PL-581-95-005 TBE for Pipeline Pigging Tees 1-II 0
A 17Sep13 3Oct13 6Oct13 12Oct13 26Oct13 - - 29Oct13
P 4Sep13 4Sep13 5Sep13 9Sep13 23Sep13 - - -
F 17Sep13 3Oct13 3Oct13 6Oct13 9Oct13 9Oct13 10Oct13 17Oct13
TBE-5275-PL-581-95-006 TBE for Pipeline Isolating Joints 1-II 0
A 17Sep13 3Oct13 3Oct13 6Oct13 9Oct13 9Oct13 10Oct13 17Oct13
P 11Sep13 11Sep13 12Sep13 15Sep13 29Sep13 - - -
F 17Sep13 3Oct13 13Oct13 22Oct13 26Oct13 - - -
TBE-5275-PL-581-95-007 TBE for Pipeline Anchor Flanges 1-II 0
A 17Sep13 3Oct13 13Oct13 22Oct13 26Oct13 - - -
P 1Sep13 1Sep13 2Sep13 4Sep13 18Sep13 - - -
F 28Aug13 12Sep13 16Sep13 22Sep13 30Sep13 - - 2Oct13
TBE-5275-PL-581-95-008 TBE for Manual Pipeline Ball Valves 1-II 0
A 28Aug13 12Sep13 16Sep13 22Sep13 30Sep13 - - 2Oct13
P 9Oct13 9Oct13 10Oct13 13Oct13 27Oct13 - - -
F 31Oct13 7Nov13 10Dec13 15Dec13 22Dec13 - - 29Dec13
TBE-5275-PL-581-95-009 TBE for Heat Shrinkable Sleeves 1-II A
A 31Oct13 7Nov13 18Dec13 31Dec13 19Jan14 - - -
P 9Oct13 9Oct13 10Oct13 13Oct13 27Oct13 - - -
TBE for External Coating of Buried F 31Oct13 7Nov13 22Nov13 28Nov13 5Dec13 - - 12Dec13
TBE-5275-PL-581-95-010 1-II B
Pipeline Fittings
A 31Oct13 7Nov13 22Nov13 28Nov13 19Jan14 - - 26Jan14
P 18Jul13 18Jul13 21Jul13 23Jul13 6Aug13 - - -
F 14Jul13 15Jul13 16Jul13 24Jul13 30Jul13 - - 19Aug13
TBE-5275-PL-581-95-011 TBE for Bathymetric survey 1-II 0
A 14Jul13 15Jul13 16Jul13 24Jul13 30Jul13 - - 19Aug13

409603376.xlsx Page 22 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 18Jul13 18Jul13 21Jul13 23Jul13 6Aug13 - - -
F 26Jan14 26Jan14 26Jan14 30Jan14 30Dec99 30Dec99 30Dec99 30Dec99
TBE-5275-PL-581-95-012 TBE for Mechanical Pig Signaller 1-II A
A 26Jan14 26Jan14 26Jan14 30Jan14
SCOPE OF WORK
P 6Jun13 10Jun13 11Jun13 13Jun13 24Jun13 13Jun13 24Jun13 1Jul13
Scope of Work for Topographic Survey F 9Jun13 9Jun13 9Jun13 13Jun13 - 23Jun13 11Jul13 -
SOW-5275-PL-581-95-001 2 0
Verification
A 9Jun13 9Jun13 9Jun13 13Jun13 - 23Jun13 11Jul13 -
P 1Jul13 1Jul13 2Jul13 4Jul13 18Jul13 4Jul13 18Jul13 25Jul13
Scope of Work for Horizontal Directional F 24Jun13 24Jun13 24Jun13 26Jun13 15Jul13 - - -
SOW-5275-PL-581-95-002 2 0
Drilling (HDD)
A 24Jun13 24Jun13 24Jun13 26Jun13 15Jul13 - - -
P 1Jul13 1Jul13 2Jul13 4Jul13 18Jul13 4Jul13 18Jul13 25Jul13
F 24Jun13 24Jun13 24Jun13 26Jun13 15Jul13 - - -
SOW-5275-PL-581-95-003 Scope of Work for Microtunneling 2 0
A 24Jun13 24Jun13 24Jun13 26Jun13 15Jul13 - - -
P 6Jun13 9Jun13 9Jun13 11Jun13 25Jun13 11Jun13 25Jun13 2Jul13
F 12Jun13 12Jun13 12Jun13 12Jun13 1Jul13 12Jun13 1Jul13 12Jun13
SOW-5275-PL-581-95-004 Scope of Work for Bathymetric Survey 2 0
A 12Jun13 12Jun13 12Jun13 12Jun13 1Jul13 12Jun13 1Jul13 12Jun13
CALCULATIONS / PHILOSOPHY / REPORTS
P 14Aug13 12Sep13 15Sep13 17Sep13 1Oct13 8Oct13 22Oct13 8Oct13
Topographical survey report - 24" & 16" F 28Aug13 12Sep13 31Oct13 31Oct13 12Nov13 - - -
RPT-5275-PL-581-95-001 3 1
Pipeline
A 28Aug13 12Sep13 31Oct13 31Oct13 12Nov13 - - -
P 14Aug13 12Sep13 15Sep13 17Sep13 1Oct13 8Oct13 22Oct13 8Oct13
F 28Aug13 12Sep13 27Sep13 27Dec13 3Jan14 - - 10Jan14
RPT-5275-PL-581-95-006 Topographical survey report - HDPE Line 3 A
A 28Aug13 12Sep13 27Sep13 18Dec13 - - - -
P 14Aug13 12Sep13 15Sep13 17Sep13 1Oct13 8Oct13 22Oct13 8Oct13
Bathymetric survey report - Channel F 29Aug13 12Sep13 27Sep13 12Oct13 12Oct13 - - 12Oct13
RPT-5275-PL-581-95-002 3 0
Crossing 1
A 29Aug13 12Sep13 27Sep13 12Oct13 - - - -
P 14Aug13 12Sep13 15Sep13 17Sep13 1Oct13 8Oct13 22Oct13 8Oct13
Bathymetric survey report - Channel F 29Aug13 19Sep13 27Sep13 12Oct13 12Oct13 - - 12Oct13
RPT-5275-PL-581-95-003 3 0
Crossing 2
A 29Aug13 19Sep13 27Sep13 12Oct13 - - - -

409603376.xlsx Page 23 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 14Aug13 12Sep13 15Sep13 17Sep13 1Oct13 8Oct13 22Oct13 8Oct13
Bathymetric survey report - Channel F 29Aug13 19Sep13 27Sep13 12Oct13 12Oct13 - - 12Oct13
RPT-5275-PL-581-95-004 3 0
Crossing 3
A 29Aug13 19Sep13 27Sep13 12Oct13 - - - -
P 14Aug13 12Sep13 15Sep13 17Sep13 1Oct13 8Oct13 22Oct13 8Oct13
Bathymetric survey report - Channel F 29Aug13 19Sep13 27Sep13 12Oct13 12Oct13 - - 12Oct13
RPT-5275-PL-581-95-005 3 0
Crossing 4
A 29Aug13 19Sep13 27Sep13 12Oct13 - - - -
P 28Aug13 3Sep13 4Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
Pipeline Calculation Book - 24" Gas F 23Jul13 24Jul13 25Jul13 28Jul13 7Aug13 - - -
NC-5275-PL-581-95-001 2 0
Pipeline from Yas to Saadiyat CRS
A 23Jul13 24Jul13 25Jul13 28Jul13 7Aug13 - - -
P 9Sep13 15Sep13 16Sep13 18Sep13 2Oct13 18Sep13 2Oct13 9Oct13
Pipeline Calculation Book - 16" Gas F 21Aug13 22Aug13 27Aug13 28Aug13 11Sep13 - - -
NC-5275-PL-581-95-002 Pipeline from Saadiyat CRS to Reem 2 0
Island
A 21Aug13 22Aug13 27Aug13 28Aug13 11Sep13 - - -
P 16Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
Crossing Schedule Report - 24" Gas F 22Aug13 27Aug13 24Oct13 25Oct13 4Nov13 25Oct13 4Nov13 11Nov13
SCH-5275-PL-581-95-001 2 0
Pipeline from Yas to Saadiyat CRS
A 22Aug13 27Aug13 24Oct13 25Oct13 4Nov13 - - -
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 19Nov13
Crossing Schedule Report - 16" Gas F 22Oct13 24Oct13 30Oct13 31Oct13 - - - -
SCH-5275-PL-581-95-002 Pipeline from Saadiyat CRS to Reem 2 0
Island
A 22Oct13 24Oct13 30Oct13 31Oct13 - - - -
P 29Oct13 30Oct13 31Oct13 4Nov13 18Nov13 4Nov13 18Nov13 25Nov13
Crossing Schedule Report - 400mm F 25Nov13 26Nov13 28Nov13 15Dec13 22Dec13 - - 29Dec13
SCH-5275-PL-581-95-003 HDPE Pipeline from Saadiyat CRS to 2 0
Mina Zayed
A 25Nov13 26Nov13 31Dec13 2Jan14 6Jan14 - - -
P 22Oct13 24Oct13 27Oct13 28Oct13 - - - -
F 4Nov13 6Nov13 13Nov13 18Nov13 5Dec13 - - 12Dec13
MTO-5275-PL-581-95-001 Pipeline MTO 2 A
A 4Nov13 6Nov13 13Nov13 14Nov13 2Dec13 - - -

409603376.xlsx Page 24 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


ROUTE MAP - DRAWINGS
P 18Sep13 19Sep13 22Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
5275-PL-581-95-10-001 Overall Pipeline Route Map 2 2
A 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
P 23Sep13 23Sep13 24Sep13 26Sep13 10Oct13 26Sep13 10Oct13 17Oct13
Pipeline Route Map 24" Pipeline Yas F 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
5275-PL-581-95-10-002 2 0
Island to Saadiyat Island
A 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
P 26Sep13 29Sep13 30Sep13 2Oct13 16Oct13 2Oct13 16Oct13 23Oct13
Pipeline Route Map 16" Pipeline F 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
5275-PL-581-95-10-003 2 0
Saadiyat CRS to Reem Island
A 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
P 2Oct13 3Oct13 6Oct13 7Oct13 21Oct13 7Oct13 21Oct13 28Oct13
Pipeline Route Map (HDPE) Pipeline F 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
5275-PL-581-95-10-004 2 1
from Saadiyat CRS to tie-in
A 13Jun13 13Jun13 13Jun13 13Jun13 27Jun13 - - -
P 26Aug13 1Sep13 3Sep13 5Sep13 19Sep13 26Sep13 10Oct13 26Sep13
Pipeline Schematic Diagram for Yas F 28Aug13 28Aug13 28Aug13 29Aug13 19Sep13 - - -
5275-PL-581-95-10-005 2 0
Mina PL Project
A 28Aug13 28Aug13 28Aug13 29Aug13 19Sep13 - - -
ALIGNMENT SHEETS / CROSSING DRAWINGS
24" Natural Gas Pipeline Alignment Sheet from Yas to Saadiyat
P 26Sep13 29Sep13 30Sep13 2Oct13 16Oct13 2Oct13 16Oct13 23Oct13
Pipeline Alignment Sheet Key Plan New F 27Sep13 30Sep13 3Oct13 13Oct13 12Nov13 - - -
5275-PL-581-95-40-001 24" Gas Pipeline from Yas Island to 2 0
Saadiyat CRS
A 27Sep13 30Sep13 3Oct13 13Oct13 12Nov13 - - -
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-002 Yas Island to Saadiyat CRS KP 2 1
00+000.00 to KP 1+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-003 Yas Island to Saadiyat CRS KP 2 0
1+000.00 to KP 2+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-004 Yas Island to Saadiyat CRS KP 2 0
2+000.00 to KP 3+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
409603376.xlsx Page 25 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-005 Yas Island to Saadiyat CRS KP 2 1
3+000.00 to KP 4+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-006 Yas Island to Saadiyat CRS KP 2 1
4+000.00 to KP 5+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-007 Yas Island to Saadiyat CRS KP 2 0
5+000.00 to 6+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-008 Yas Island to Saadiyat CRS KP 2 1
6+000.00 to 7+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
5275-PL-581-95-40-009 Yas Island to Saadiyat CRS KP 2 0
7+000.00 to KP 8+000.00
A 27Sep13 9Oct13 9Oct13 11Oct13 6Nov13 - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-010 Yas Island to Saadiyat CRS KP 2 1
8+000.00 to KP 9+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-011 Yas Island to Saadiyat CRS KP 2 1
9+000.00 to KP 10+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-012 Yas Island to Saadiyat CRS KP 2 1
10+000.00 to KP 11+000.00
A 14Nov13 - - - - - - 22Nov13

409603376.xlsx Page 26 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-013 Yas Island to Saadiyat CRS KP 2 0
11+000.00 to KP 12+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-014 Yas Island to Saadiyat CRS KP 2 1
12+000.00 to KP 13+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-015 Yas Island to Saadiyat CRS KP 2 1
13+000.00 to 14+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-016 Yas Island to Saadiyat CRS KP 2 0
14+000.00 to 15+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-017 Yas Island to Saadiyat CRS KP 2 1
15+000.00 to 16+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-018 Yas Island to Saadiyat CRS KP 2 0
16+000.00 to 17+000.00
A 14Nov13 - - - - - - 22Nov13
P 2Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 6Nov13
24" Gas Pipeline Alignment Sheet from F 14Nov13 - - - - - - 22Nov13
5275-PL-581-95-40-019 Yas Island to Saadiyat CRS KP 2 0
17+000.00 to 17+890.53
A 14Nov13 - - - - - - 22Nov13
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline- F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-001 Express Highway In Jubail No 1 (KP 2 1
06+690.00 to KP 06+950.00)
A 23Oct13 31Oct13 14Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-002 -Express Highway In Jubail No. 2 (KP 2 1
12+360.00 to KP 12+620.00)
A 23Oct13 31Oct13 14Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline-Road F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-003 Crossing in Saadiyat Island KP 2 0
13+810.00 to KP 14+070.00
A 23Oct13 31Oct13 14Nov13 20Nov13 8Dec13 - - -
409603376.xlsx Page 27 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline-Road F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-004 Crossing in Saadiyat Island KP 2 0
15+270.00 to KP 15+530.00
A 23Oct13 31Oct13 14Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline-Road F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-005 Crossing in Saadiyat Island KP 2 0
16+570.00 to KP 16+830.00
A 23Oct13 31Oct13 14Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline-Road F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-006 and Bridge in Saadiyat Island KP 2 0
17+010.00 to KP 17+270.00
A 23Oct13 31Oct13 17Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline- F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-007 Express Highway in Saadiyat Island KP 2 0
17+270.00 to KP 17+530.00
A 23Oct13 31Oct13 17Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline- At F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-008 Channel-1 Yas-Fahed KP 0+030.00 to 2 1
KP 0+250.00
A 23Oct13 31Oct13 17Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline- At F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-009 Channel-2 Fahed-Jubail KP 5+950.00 to 2 1
KP 6+210.00
A 23Oct13 31Oct13 17Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline- At F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-010 Channel 3 Jubail-Saadiyat KP 2 0
13+050.00 to KP 13+310.00
A 23Oct13 31Oct13 17Nov13 20Nov13 8Dec13 - - -
P 16Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Crossing Details-24" Gas Pipeline-Road F 23Oct13 31Oct13 14Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
5275-PL-581-95-50-011 Crossing in Saadiyat Island KP 2 0
14+160.00 to KP 14+420.00
A 23Oct13 31Oct13 14Nov13 20Nov13 8Dec13 - - -

409603376.xlsx Page 28 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 16Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
Pipeline Station Approach and F 24Oct13 24Oct13 24Oct13 5Nov13 18Nov13 - - 5Dec13
5275-PL-581-95-30-001 Sectionalizing Valve Station (581-SVS-1) 2 0
- Yas Island
A 24Oct13 24Oct13 24Oct13 5Nov13 18Nov13 - - -
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 19Nov13
Pipeline Station Approach for Consumer F 24Oct13 24Oct13 24Oct13 5Nov13 18Nov13 - - 5Dec13
5275-PL-581-95-30-002 2 0
Receipt Station (CRS) - Saadiyat Island
A 24Oct13 24Oct13 24Oct13 5Nov13 18Nov13 - - -
400 Dia HDPE Line Natural Gas Pipeline Alignment Sheet from Saadiyat
P 7Oct13 7Oct13 8Oct13 10Oct13 24Oct13 10Oct13 24Oct13 31Oct13
Pipeline Alignment Sheet Key Plan F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-031 400mm Dia HDPE Gas Pipeline from 2 0
Saadiyat CRS to Mina Zayed
A 9Dec13 12Dec13 22Dec13 23Dec13 - - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
400 Dia HDPE Gas Pipeline Alignment F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-032 Sheet from Saadiyat CRS to Mina KP 2 0
0+000.00 to KP 1+000.00
A 9Dec13 12Dec13 19Dec13 22Dec13 25Dec13 - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
400 Dia HDPE Gas Pipeline Alignment F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-033 Sheet from Saadiyat CRS to Mina KP 2 0
1+000.00 to KP 2+000.00
A 9Dec13 12Dec13 19Dec13 22Dec13 25Dec13 - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
400 Dia HDPE Gas Pipeline Alignment F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-034 Sheet from Saadiyat CRS to Mina 2 0
2+000.00 to KP 3+000.00
A 9Dec13 12Dec13 19Dec13 22Dec13 25Dec13 - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
400 Dia HDPE Gas Pipeline Alignment F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-035 Sheet from Saadiyat CRS to Mina 2 0
3+000.00 to KP 4+000.00
A 9Dec13 12Dec13 19Dec13 22Dec13 25Dec13 - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
400 Dia HDPE Gas Pipeline Alignment F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-036 Sheet from Saadiyat CRS to Mina 2 0
4+000.00 to KP 5+000.00
A 9Dec13 12Dec13 19Dec13 22Dec13 25Dec13 - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
400 Dia HDPE Gas Pipeline Alignment F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-037 Sheet from Saadiyat CRS to Mina 2 0
5+000.00 to KP 6+000.00
A 9Dec13 12Dec13 19Dec13 22Dec13 25Dec13 - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
400 Dia HDPE Gas Pipeline Alignment F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-40-038 Sheet from Saadiyat CRS to Mina 2 0
409603376.xlsx 6+000.00 to KP 6+588.37 Page 29 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design400
forDia Yas Mina
HDPE Gas Zayed
Pipeline AlignmentPipeline Project
5275-PL-581-95-40-038 Sheet from Saadiyat CRS to Mina 2 0
6+000.00 to KP 6+588.37
A 9Dec13 12Dec13 19Dec13 22Dec13 25Dec13 - - -
400mm Gas Pipeline from Saadiyat CRS P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
to Mina Zayed Crossing Details - F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-031 2 0
Express Highway KP 00+000.00 to KP
00+260.00 A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
400mm Gas Pipeline from Saadiyat CRS P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
to Mina Zayed Crossing Details - F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-032 2 0
Express Highway KP 1+710.00 to KP 1-
970.00 A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
400mm Gas Pipeline from Saadiyat CRS P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
to Mina Zayed Crossing Details - F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-033 2 0
Express Highway KP 2+220.00 to KP
2+470.00 A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
400mm Gas Pipeline from Saadiyat CRS P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
to Mina Zayed Crossing Details - F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-034 2 0
Express Highway KP 2+510.00 to KP
2+770.00 A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
400mm Gas Pipeline from Saadiyat CRS F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-035 to Mina Zayed Crossing Details - 2 0
Channel-4 KP 3+840.00 to KP 4+090.00
A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
400mm Gas Pipeline from Saadiyat CRS P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
to Mina Zayed Crossing Details - F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-036 2 0
Express Highway KP 4+650.00 to KP
4+910.00 A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
400mm Gas Pipeline from Saadiyat CRS P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
to Mina Zayed Crossing Details - F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-037 2 0
Express Highway KP 5+640.00 to KP
5+900.00 A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -

409603376.xlsx Page 30 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


400mm Gas Pipeline from Saadiyat CRS P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
to Mina Zayed Crossing Details - F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-038 2 0
Express Highway KP 5+980.00 to KP
6+240.00 A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
P 17Oct13 24Oct13 27Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
400mm Gas Pipeline from Saadiyat CRS F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-50-039 to Mina Zayed Crossing Details - 2 0
Channel-4 KP 6+100.00 to KP 6+360.00
A 9Dec13 12Dec13 24Dec13 26Dec13 5Jan14 - - -
P 31Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 26Nov13
Tie-In Details at Mina Zayed for New F 15Dec13 16Dec13 18Dec13 22Dec13 29Dec13 - - 5Jan14
5275-PL-581-95-001 1-II A
400mm HDPE Pipeline
A 16Dec13 19Dec13 2Jan14 7Jan14 29Jan14 - - -
16" CS Natural Gas Pipeline Alignment Sheet from Saadiyat CRS to REEM Island
P 2Oct13 3Oct13 6Oct13 7Oct13 21Oct13 7Oct13 21Oct13 27Oct13
Pipeline Alignment Sheet Key Plan New F 29Sep13 1Oct13 17Oct13 17Oct13 30Oct13 - - -
5275-PL-581-95-40-061 16" Gas Pipeline from Saadiyat CRS to 2 0
Reem
A 29Sep13 1Oct13 17Oct13 17Oct13 30Oct13 - - -
P 16Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
16" Gas Pipeline Alignment Sheet from F 8Oct13 10Oct13 17Oct13 17Oct13 30Oct13 17Oct13 30Oct13 14Nov13
5275-PL-581-95-40-062 Saadiyat CRS to Reem Receiving 2 0
Station KP 0+000.00 to KP 1+000
A 8Oct13 10Oct13 17Oct13 17Oct13 30Oct13 - - 14Nov13
P 16Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
16" Gas Pipeline Alignment Sheet from F 8Oct13 10Oct13 17Oct13 17Oct13 30Oct13 17Oct13 30Oct13 14Nov13
5275-PL-581-95-40-063 Saadiyat CRS to Reem Receiving 2 0
Station KP 1+000 to KP 2+000
A 8Oct13 10Oct13 17Oct13 17Oct13 30Oct13 - - 14Nov13
P 16Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
16" Gas Pipeline Alignment Sheet from F 10Nov13 12Nov13 14Nov13 14Nov13 14Nov13 - - 14Nov13
5275-PL-581-95-40-064 Saadiyat CRS to Reem Receiving 2 0
Station KP 2+000 to KP 3+000
A 10Nov13 12Nov13 14Nov13 14Nov13 14Nov13 - - 14Nov13
P 16Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
16" Gas Pipeline Alignment Sheet from F 10Nov13 12Nov13 14Nov13 14Nov13 14Nov13 - - 14Nov13
5275-PL-581-95-40-065 Saadiyat CRS to Reem Receiving 2 0
Station KP 3+000 to KP 4+000
A 10Nov13 12Nov13 14Nov13 14Nov13 14Nov13 - - 14Nov13
P 16Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
16" Gas Pipeline Alignment Sheet from F 10Nov13 12Nov13 14Nov13 14Nov13 14Nov13 - - 14Nov13
5275-PL-581-95-40-066 Saadiyat CRS to Reem Receiving 2 0
Station KP 4+000 to KP 4+254.96
A 10Nov13 12Nov13 14Nov13 14Nov13 14Nov13 - - 14Nov13
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 18Nov13
Pipeline Station Approach for 16" Pig F 20Oct13 22Oct13 24Oct13 5Nov13 20Nov13 - - 10Dec13
5275-PL-581-95-30-061 2 1
Launcher at Saadiyat Island
409603376.xlsx Page 31 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignPipeline
for Yas StationMina
Approach Zayed
for 16" Pig Pipeline Project
5275-PL-581-95-30-061 2 1
Launcher at Saadiyat Island
A 20Oct13 22Oct13 24Oct13 5Nov13 18Nov13 - - -
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 18Nov13
Pipeline Station Approach for 16" Pig F 20Oct13 22Oct13 24Oct13 5Nov13 20Nov13 - - 10Dec13
5275-PL-581-95-30-062 2 0
Receiver at Reem Island
A 20Oct13 22Oct13 24Oct13 5Nov13 18Nov13 - - -
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 18Nov13
16" Gas Pipeline Crossing Details - from F 23Jan14 23Jan14 14Nov13 14Nov13 5Dec13 14Nov13 5Dec13 12Dec13
5275-PL-581-95-50-021 Saadiyat CRS to Saadiyat South KP 2 A
0+000.00 to KP 0+258.00
A 23Jan14 23Jan14 23Jan14 26Jan14
16" Gas Pipeline Crossing Details - P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 18Nov13
Channel-5 from Saadiyat CRS to Reem F 31Oct13 7Nov13 14Nov13 14Nov13 5Dec13 14Nov13 5Dec13 12Dec13
5275-PL-581-95-50-061 2 0
Receiving Station KP 1+800.00 to KP
4+164.91 A 31Oct13 7Nov13 14Nov13 14Nov13 2Dec13 - - -
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 18Nov13
16" Gas Pipeline Crossing Details - F 31Oct13 7Nov13 19Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
5275-PL-581-95-50-062 Channel-5 from Saadiyat CRS to Reem 2 0
Receiving Station KP 2+030 to 2+550
A 31Oct13 7Nov13 14Nov13 14Nov13 2Dec13 - - -
Typical Drawings
P 3Jul13 7Jul13 8Jul13 10Jul13 24Jul13 10Jul13 24Jul13 31Jul13
Typical Details of Ultrasonic Type Pig F 24Jun13 24Jun13 24Jun13 25Jun13 10Sep13 - - -
5275-PL-581-95-10-031 2 0
Signaler Pit
A 24Jun13 24Jun13 24Jun13 25Jun13 10Sep13 - - -
P 10Jul13 11Jul13 14Jul13 16Jul13 30Jul13 16Jul13 30Jul13 6Aug13
F 24Jun13 24Jun13 24Jun13 25Jun13 10Sep13 - - -
5275-PL-581-95-10-032 Typical Detail of Directional Marker 2 0
A 24Jun13 24Jun13 24Jun13 25Jun13 10Sep13 - - -
P 16Jul13 18Jul13 21Jul13 23Jul13 6Aug13 23Jul13 6Aug13 13Aug13
Typical Detail of Sea Water Channel F 24Jun13 24Jun13 24Jun13 25Jun13 10Sep13 - - -
5275-PL-581-95-10-033 2 0
Crossing
A 24Jun13 24Jun13 24Jun13 25Jun13 10Sep13 - - -

409603376.xlsx Page 32 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 28Dec13 30Dec13 2Jan14 9Jan14 23Jan14 9Jan14 23Jan14 9Jan14
F 2Jan14 2Jan14 2Jan14 6Jan14 13Jan14 - - 30Jan14
5275-PL-581-95-10-034 Typical Details of Trench and ROW 2 B
A 2Jan14 2Jan14 2Jan14 6Jan14 13Jan14 - - 30Jan14
P 17Nov13 19Nov13 25Nov13 3Dec13 17Dec13 3Dec13 17Dec13 24Dec13
F 9Dec13 11Dec13 15Dec13 17Dec13 31Dec13 17Dec13 31Dec13 7Jan14
- Miscellaneous Pipeline Deliverables
A - - - - - - -

MECHANICAL
MECHANICAL - SCHEDULES / LISTS
P 7Aug13 8Aug13 11Aug13 12Aug13 26Aug13 12Aug13 26Aug13 2Sep13
F 27Aug13 29Aug13 5Sep13 10Sep13 28Sep13 - - -
NM-5275-PL-000-21-001 Equipment Schedule 2 0
A 27Aug13 29Aug13 5Sep13 10Sep13 28Sep13 - - -
MECHCANICAL SPECIFICATIONS (Amendment to Gasco DGS)
P 6Aug13 7Aug13 8Aug13 11Aug13 25Aug13 11Aug13 25Aug13 1Sep13
Addendum to DGS - Pressure vessels - F 3Jul13 4Jul13 4Jul13 9Jul13 29Jul13 - - -
5275-ADD-0810-001 1-II 0
DGS
A 3Jul13 4Jul13 4Jul13 9Jul13 29Jul13 - - -
P 11Aug13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 2Sep13
Addendum to DGS - Pressure vessels - F 3Jul13 4Jul13 7Jul13 9Jul13 29Jul13 - - -
5275-ADD-0810-002 1-II 0
Design Basis
A 3Jul13 4Jul13 7Jul13 9Jul13 29Jul13 - - -
P 14Aug13 18Aug13 18Aug13 20Aug13 3Sep13 20Aug13 3Sep13 10Sep13
Addendum to DGS - Specification for F 3Jul13 4Jul13 7Jul13 9Jul13 29Jul13 - - -
5275-ADD-0810-003 1-II 0
Manufacturing Data Reports
A 3Jul13 4Jul13 7Jul13 9Jul13 29Jul13 - - -
P 20Aug13 21Aug13 22Aug13 25Aug13 8Sep13 25Aug13 8Sep13 15Sep13
Addendum to DGS - Welding and NDE F 4Jul13 7Jul13 7Jul13 9Jul13 29Jul13 - - -
5275-ADD- 6300-003 1-II 0
of Pressure Vessels
A 4Jul13 7Jul13 7Jul13 9Jul13 29Jul13 - - -
MECHANICAL - DATA SHEETS
P 16Jul13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
F 11Jul13 14Jul13 14Jul13 23Jul13 7Aug13 - - 20Aug13
SPP-5275-PL-830-21-101 Data Sheet for Launcher at Saadiyat 2 0

409603376.xlsx Page 33 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignData
SPP-5275-PL-830-21-101 forSheet
Yas Mina atZayed
for Launcher Saadiyat Pipeline
2 0 Project
A 11Jul13 14Jul13 14Jul13 23Jul13 7Aug13 - - 20Aug13
P 16Jul13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
F 14Jul13 16Jul13 18Jul13 23Jul13 7Aug13 - - 20Aug13
SPP-5275-PL-581-21-101 Data Sheet for Receiver at Reem 2 0
A 14Jul13 16Jul13 18Jul13 23Jul13 7Aug13 - - 20Aug13
P 16Jul13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
F 16Jul13 23Jul13 23Jul13 25Jul13 7Aug13 - - 20Aug13
SPP-5275-PL-830-21-102 Data Sheet for Receiver at Saadiyat 2 0
A 16Jul13 23Jul13 23Jul13 25Jul13 7Aug13 - - 20Aug13
P 23Jul13 24Jul13 25Jul13 29Jul13 12Aug13 29Jul13 12Aug13 19Aug13
F 11Jul13 14Jul13 14Jul13 23Jul13 7Aug13 - - 15Aug13
SPP-5275-PL-830-21-103 Data Sheet for Gas Filter 2 0
A 11Jul13 14Jul13 14Jul13 23Jul13 7Aug13 - - 15Aug13
P 30Jul13 31Jul13 1Aug13 5Aug13 19Aug13 5Aug13 19Aug13 26Aug13
Data Sheet for Odorant Adsorption F 14Jul13 16Jul13 22Jul13 28Jul13 7Aug13 19Aug13 7Sep13 24Sep13
SPP-5275-PL-830-21-104 2 1
System
A 14Jul13 16Jul13 22Jul13 28Jul13 7Aug13 19Aug13 7Sep13 24Sep13
MECHANICAL - MATERIAL REQUISITIONS
P 16Jul13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Material Requisition for Scraper F 16Jul13 17Jul13 18Jul13 7Aug13 7Sep13 - - 9Sep13
R-5275-PL-000-21-101 2 0
Launcher & Receiver
A 16Jul13 17Jul13 18Jul13 7Aug13 7Sep13 - - 9Sep13
P 23Jul13 24Jul13 25Jul13 29Jul13 12Aug13 29Jul13 12Aug13 19Aug13
F 16Jul13 17Jul13 18Jul13 25Jul13 7Aug13 - - 14Aug13
R-5275-PL-830-21-101 Material Requisition for Gas Filter 2 0
A 16Jul13 17Jul13 18Jul13 25Jul13 7Aug13 - - 14Aug13
P 30Jul13 31Jul13 1Aug13 5Aug13 19Aug13 5Aug13 19Aug13 26Aug13
Material Requisition for Odorant F 18Jul13 25Jul13 28Jul13 1Aug13 7Sep13 - - 16Sep13
R-5275-PL-830-21-102 2 0
Adsorption System
A 18Jul13 25Jul13 28Jul13 1Aug13 7Sep13 - - 16Sep13

409603376.xlsx Page 34 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


MECHANICAL - TECHNICAL BID EVALUATIONS
P 18Sep13 18Sep13 19Sep13 23Sep13 7Oct13 - - -
F 27Sep13 30Sep13 20Oct13 21Oct13 4Nov13 - - -
TBE-5275-PL-000-21-101 TBE for Pig Traps 1-II 0
A 27Sep13 30Sep13 20Oct13 21Oct13 4Nov13 - - -
P 3Oct13 3Oct13 6Oct13 8Oct13 22Oct13 - - -
F 27Sep13 30Sep13 28Oct13 29Oct13 4Nov13 - - 21Nov13
TBE-5275-PL-830-21-101 TBE for Gas Filter 1-II 0
A 27Sep13 30Sep13 28Oct13 29Oct13 4Nov13 - - 21Nov13
P 3Oct13 3Oct13 6Oct13 10Oct13 24Oct13 - - -
F 12Nov13 14Nov13 10Dec13 12Dec13 17Dec13 12Dec13 17Dec13 24Dec13
TBE-5275-PL-830-21-102 TBE for Odorant Adsorption System 1-II A
A 12Nov13 14Nov13 22Jan14 22Jan14
P 17Nov13 19Nov13 25Nov13 3Dec13 17Dec13 3Dec13 17Dec13 24Dec13
F 8Dec13 11Dec13 15Dec13 22Dec13 5Jan14 22Dec13 5Jan14 12Jan14
- Miscellaneous Mechanical Deliverables 1-II
A - - - - - - -

PIPING
PIPING - SCHEDULES / LISTS
P 1Aug13 4Aug13 5Aug13 7Aug13 21Aug13 7Aug13 21Aug13 28Aug13
F 21Aug13 21Aug13 21Aug13 27Aug13 11Sep13 - - 3Oct13
SCH-5275-PL-000-13-001 Line Schedule 2 0
A 21Aug13 21Aug13 21Aug13 27Aug13 11Sep13 - - 3Oct13
P 14Aug13 15Aug13 18Aug13 19Aug13 2Sep13 19Aug13 2Sep13 5Sep13
F 21Aug13 21Aug13 21Aug13 27Aug13 11Sep13 - - -
SCH-5275-PL-000-13-002 Tie-in Schedule 2 0
A 21Aug13 21Aug13 21Aug13 27Aug13 11Sep13 - - -
P 19Aug13 21Aug13 22Aug13 25Aug13 8Sep13 25Aug13 8Sep13 15Sep13
F 5Sep13 5Sep13 5Sep13 5Sep13 29Sep13 - - -
NM-5275-PL-000-13-001 Piping specialty item list 2 0
A 5Sep13 5Sep13 5Sep13 5Sep13 29Sep13 - - -
P 20Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
F 10Sep13 10Sep13 16Sep13 22Sep13 13Oct13 22Sep13 13Oct13 27Nov13
SCH-5275-PL-000-13-65-081 Pipe support schedule 2 0
A 10Sep13 10Sep13 16Sep13 22Sep13 13Oct13 - - 19Nov13

409603376.xlsx Page 35 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


PIPING - CALCULATIONS / REPORTS / MTO
P 4Jul13 7Jul13 7Jul13 9Jul13 23Jul13 9Jul13 23Jul13 30Jul13
F 26Jun13 1Jul13 1Jul13 3Jul13 11Jul13 - - -
NC-5275-PL-000-13-001 Pipe wall thickness calculation 3 0
A 26Jun13 1Jul13 1Jul13 3Jul13 11Jul13 - - -
P 15Aug13 4Sep13 5Sep13 9Sep13 23Sep13 9Sep13 23Sep13 30Sep13
F 5Sep13 12Sep13 16Sep13 19Sep13 - - - -
RPT-5275-PL-581-13-001 Stress Analysis Report for SVS-01 3 1
A 5Sep13 12Sep13 16Sep13 19Sep13 - - - -
P 15Aug13 4Sep13 5Sep13 9Sep13 23Sep13 9Sep13 23Sep13 30Sep13
F 5Sep13 10Sep13 12Sep13 12Sep13 - - - -
RPT-5275-PL-581-13-002 Stress Analysis Report for Reem Island 3 1
A 5Sep13 10Sep13 12Sep13 12Sep13 - - - -
P 15Aug13 4Sep13 5Sep13 9Sep13 23Sep13 9Sep13 23Sep13 30Sep13
F 5Sep13 12Sep13 19Sep13 22Sep13 - - - -
RPT-5275-PL-830-13-001 Stress Analysis Report for Saadiyat CRS 1 1
A 5Sep13 12Sep13 19Sep13 22Sep13 - - - -
P 15Aug13 19Aug13 20Aug13 22Aug13 - - - -
F 17Jul13 25Jul13 25Jul13 5Aug13 25Aug13 - - 22Sep13
MTO-5275-PL-000-13-001 MTO - Onsite Piping Bulk Materials 2 0
A 17Jul13 25Jul13 25Jul13 5Aug13 25Aug13 - - 22Sep13
P 1Aug13 4Aug13 4Aug13 6Aug13 - - - -
F 15Jul13 16Jul13 18Jul13 5Aug13 18Aug13 - - 18Sep13
MTO-5275-PL-000-13-002 MTO - Onsite Piping Valves 2 1
A 15Jul13 16Jul13 18Jul13 5Aug13 18Aug13 - - 18Sep13
PIPING - SPECIFICATIONS (Amendment to Gasco DGS)
P 14Jul13 14Jul13 15Jul13 17Jul13 31Jul13 17Jul13 31Jul13 5Aug13
Addendum to DGS - Onsite, Non- F 8Jul13 9Jul13 11Jul13 17Jul13 29Jul13 - - -
5275-ADD-9510-004 Piggable Piping Materials (DGS-9510- 1-II 0
004)
A 8Jul13 9Jul13 11Jul13 17Jul13 29Jul13 - - -

409603376.xlsx Page 36 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 23Jul13 25Jul13 28Jul13 30Jul13 13Aug13 30Jul13 13Aug13 20Aug13
F 14Jul13 14Jul13 14Jul13 17Jul13 29Jul13 - - -
5275-ADD-9520-002 Addendum to DGS - Plug Valves 1-II 1
A 14Jul13 14Jul13 14Jul13 17Jul13 29Jul13 - - -
P 9Jul13 10Jul13 11Jul13 14Jul13 28Jul13 14Jul13 28Jul13 4Aug13
Addendum to DGS-1300-015 Pipes and F 3Jul13 3Jul13 3Jul13 8Jul13 16Jul13 - - 6Aug13
5275-ADD-1300-015 piping components 1-II 0
A 3Jul13 3Jul13 3Jul13 8Jul13 16Jul13 - - 6Aug13
P 11Aug13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 4Sep13
F 24Jul13 24Jul13 24Jul13 25Jul13 7Aug13 - - -
5275-ADD-6300-001 Addendum to DGS - Welding and NDE 1-II 0
A 24Jul13 24Jul13 24Jul13 25Jul13 7Aug13 - - -
P 15Aug13 18Aug13 18Aug13 20Aug13 3Sep13 20Aug13 3Sep13 10Sep13
Addendum to DGS - General piping, F 12Aug13 12Aug13 12Aug13 14Aug13 25Aug13 - - 27Aug13
5275-ADD-1300-040 1-II 0
Process and Utility design
A 12Aug13 12Aug13 12Aug13 14Aug13 25Aug13 - - 27Aug13
P 15Aug13 18Aug13 18Aug13 20Aug13 3Sep13 20Aug13 3Sep13 8Sep13
F 23Jul13 24Jul13 28Jul13 3Aug13 14Aug13 - - -
5275-ADD-6600-010 Addendum to DGS - Painting 1-II 0
A 23Jul13 24Jul13 28Jul13 3Aug13 14Aug13 - - -
P 20Aug13 21Aug13 22Aug13 25Aug13 8Sep13 25Aug13 8Sep13 15Sep13
Addendum to DGS - Process And Utility F 24Jul13 12Aug13 13Aug13 17Aug13 5Sep13 - - 9Sep13
5275-ADD-1300-030 1-II 0
Field / Shop Pressure Testing
A 24Jul13 12Aug13 13Aug13 17Aug13 5Sep13 - - 9Sep13
P 25Aug13 26Aug13 27Aug13 29Aug13 12Sep13 29Aug13 12Sep13 19Sep13
F 13Aug13 13Aug13 13Aug13 15Aug13 5Sep13 - - 9Sep13
5275-ADD-1300-100 Addendum to DGS - Piping Tie-Ins 1-II 0
A 13Aug13 13Aug13 13Aug13 15Aug13 5Sep13 - - 9Sep13
P 29Aug13 1Sep13 1Sep13 3Sep13 17Sep13 3Sep13 17Sep13 24Sep13
Addendum to DGS - Preservation and F 23Jul13 24Jul13 25Jul13 3Aug13 14Aug13 - - -
5275-ADD-6710-001 1-II 0
export packing
A 23Jul13 24Jul13 25Jul13 3Aug13 14Aug13 - - -
P 3Sep13 4Sep13 5Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
F 13Aug13 13Aug13 19Aug13 22Aug13 8Sep13 - - 10Sep13
5275-ADD-1300-060 Addendum to DGS - Flexibility Analysis 1-II 0
A 13Aug13 13Aug13 19Aug13 22Aug13 8Sep13 - - 10Sep13
P 8Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
F 13Aug13 13Aug13 13Aug13 15Aug13 7Sep13 - - 10Sep13
5275-ADD-1300-070 Addendum to DGS - Pipe support 1-II 0
A 13Aug13 13Aug13 13Aug13 15Aug13 7Sep13 - - 10Sep13
409603376.xlsx Page 37 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 12Sep13 15Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
Addendum to DGS - Positive Material F 23Jul13 24Jul13 25Jul13 3Aug13 14Aug13 - - -
5275-ADD-0000-001 1-II 0
Identification
A 23Jul13 24Jul13 25Jul13 3Aug13 14Aug13 - - -
P 15Aug13 18Aug13 19Aug13 21Aug13 4Sep13 21Aug13 4Sep13 11Sep13
Addendum to DGS - Fabrication, F 23Jul13 24Jul13 25Jul13 3Aug13 14Aug13 - - -
5275-ADD-1300-185 Handling and Installation of Process and 1-II 0
Utility Piping
A 23Jul13 24Jul13 25Jul13 3Aug13 14Aug13 - - -
PIPING - DATA SHEETS
P 14Jul13 14Jul13 15Jul13 17Jul13 31Jul13 17Jul13 31Jul13 7Aug13
F 8Jul13 9Jul13 11Jul13 17Jul13 25Jul13 - - 5Aug13
SPP-5275-PL-000-13-001 Data Sheet for Onsite Piping Ball Valves 2 0
A 8Jul13 9Jul13 11Jul13 17Jul13 25Jul13 - - 5Aug13
P 23Jul13 25Jul13 28Jul13 30Jul13 13Aug13 30Jul13 13Aug13 20Aug13
F 8Jul13 9Jul13 11Jul13 17Jul13 25Jul13 - - 5Aug13
SPP-5275-PL-000-13-002 Data Sheet for Onsite Piping Plug Valves 2 0
A 8Jul13 9Jul13 11Jul13 17Jul13 25Jul13 - - 5Aug13
P 21Aug13 25Aug13 26Aug13 28Aug13 11Sep13 28Aug13 11Sep13 18Sep13
F 26Aug13 27Aug13 28Aug13 2Sep13 19Sep13 - - -
SPP-5275-PL-000-13-004 Data Sheet for Hose Coupling 2 0
A 26Aug13 27Aug13 28Aug13 2Sep13 19Sep13 - - -
MATERIAL REQUISITION
P 17Jul13 21Jul13 22Jul13 24Jul13 7Aug13 24Jul13 7Aug13 14Aug13
Material Requisition for Onsite Piping F 16Jul13 18Jul13 25Jul13 5Aug13 25Aug13 - - -
R-5275-PL-000-13-001 2 1
Bulk Materials
A 16Jul13 18Jul13 25Jul13 5Aug13 25Aug13 - - -
P 14Jul13 14Jul13 15Jul13 17Jul13 31Jul13 17Jul13 31Jul13 7Aug13
Material Requisition for Onsite Piping F 15Jul13 17Jul13 24Jul13 6Aug13 25Aug13 - - -
R-5275-PL-000-13-002 2 2
Ball Valves
A 15Jul13 17Jul13 24Jul13 6Aug13 25Aug13 - - -

409603376.xlsx Page 38 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 23Jul13 25Jul13 28Jul13 30Jul13 13Aug13 30Jul13 13Aug13 20Aug13
Material Requisition for Onsite Piping F 15Jul13 17Jul13 24Jul13 5Aug13 25Aug13 - - -
R-5275-PL-000-13-003 2 2
Plug Valves
A 15Jul13 17Jul13 24Jul13 5Aug13 25Aug13 - - -
P 21Aug13 25Aug13 26Aug13 28Aug13 11Sep13 28Aug13 11Sep13 18Sep13
F 4Sep13 5Sep13 5Sep13 8Sep13 28Sep13 - - 3Oct13
R-5275-PL-000-13-005 Material Requisition for Hose Coupling 2 0
A 4Sep13 5Sep13 5Sep13 8Sep13 28Sep13 - - 3Oct13
TECHNICAL BID EVALUATIONS
P 1Sep13 1Sep13 2Sep13 4Sep13 18Sep13 - - -
F 1Oct13 3Oct13 14Nov13 21Nov13 5Dec13 21Nov13 5Dec13 -
TBE-5275-PL-000-13-001 TBE for Onsite Piping Ball Valves 1-II 0
A 1Oct13 3Oct13 17Nov13 20Nov13 2Dec13 - - 17Dec13
P 30Sep13 30Sep13 1Oct13 3Oct13 17Oct13 - - -
F 17Sep13 3Oct13 31Oct13 10Nov13 20Nov13 - - -
TBE-5275-PL-000-13-002 TBE for Onsite Piping Plug Valves 1-II 0
A 17Sep13 3Oct13 31Oct13 10Nov13 18Nov13 - - 12Dec13
P 27Oct13 27Oct13 28Oct13 30Oct13 13Nov13 - - -
F 15Dec13 18Dec13 22Dec13 29Dec13 12Jan14 - - -
TBE-5275-PL-000-13-004 TBE for Hose Coupling 1-II
A 20Jan14 22Jan14
DRAWINGS
P 7Jul13 14Jul13 15Jul13 17Jul13 31Jul13 17Jul13 31Jul13 7Aug13
F 4Jul13 4Jul13 8Jul13 14Jul13 23Jul13 22Sep13 10Oct13 26Oct13
5275-PL-581-13-60-001 Plot Plan - SVS 1 1-II 0
A 4Jul13 4Jul13 8Jul13 14Jul13 23Jul13 22Sep13 10Oct13 26Oct13
P 17Jul13 24Jul13 25Jul13 29Jul13 12Aug13 29Jul13 12Aug13 19Aug13
F 4Jul13 8Jul13 8Jul13 16Jul13 22Jul13 22Sep13 10Oct13 26Oct13
5275-PL-830-13-60-001 Plot Plan - Saadiyat CRS 1-II 0
A 4Jul13 8Jul13 8Jul13 16Jul13 22Jul13 22Sep13 10Oct13 26Oct13
P 29Jul13 5Aug13 6Aug13 8Aug13 22Aug13 8Aug13 22Aug13 29Aug13
F 14Jul13 15Jul13 16Jul13 15Aug13 7Sep13 22Sep13 10Oct13 26Oct13
5275-PL-581-13-60-002 Plot Plan - Reem Receiver 1-II 0
A 14Jul13 15Jul13 16Jul13 15Aug13 7Sep13 22Sep13 10Oct13 26Oct13
P 15Aug13 18Aug13 18Aug13 20Aug13 3Sep13 20Aug13 3Sep13 10Sep13
F 16Jul13 16Jul13 16Jul13 22Sep13 23Oct13 - - 26Oct13
5275-PL-581-13-60-003 Plot Plan -SVS 7 1-II 0
A 16Jul13 16Jul13 16Jul13 22Sep13 23Oct13 - - 26Oct13
P 1Aug13 4Aug13 4Aug13 6Aug13 20Aug13 6Aug13 20Aug13 27Aug13
409603376.xlsx Page 39 of 186
5275-PL-830-13-30-001 Key Plan - CRS Saadiyat 1-II 0
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


F 5Sep13 5Sep13 5Sep13 9Sep13 19Sep13 - - 7Oct13
5275-PL-830-13-30-001 Key Plan - CRS Saadiyat 1-II 0
A 5Sep13 5Sep13 5Sep13 9Sep13 19Sep13 - - 7Oct13
P 15Aug13 18Aug13 18Aug13 20Aug13 3Sep13 20Aug13 3Sep13 10Sep13
F 10Sep13 10Sep13 10Sep13 11Sep13 1Oct13 - - 9Oct13
5275-PL-581-13-20-001 Yas Island PPRS Layout 3 1
A 10Sep13 10Sep13 10Sep13 11Sep13 1Oct13 - - 9Oct13
P 6Aug13 8Aug13 11Aug13 13Aug13 27Aug13 13Aug13 27Aug13 3Sep13
F 15Aug13 19Aug13 19Aug13 22Aug13 11Sep13 - - 1Oct13
5275-PL-581-13-20-002 Piping Layout SVS 1 3 0
A 15Aug13 19Aug13 19Aug13 22Aug13 11Sep13 - - 1Oct13
P 1Aug13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 11Sep13
F 20Aug13 22Aug13 5Sep13 5Sep13 30Sep13 - - 7Oct13
5275-PL-830-13-20-001 Piping layout - CRS Saadiyat 3 0
A 20Aug13 22Aug13 5Sep13 5Sep13 30Sep13 - - 7Oct13
P 8Aug13 12Aug13 13Aug13 15Aug13 29Aug13 15Aug13 29Aug13 12Sep13
F 22Aug13 22Aug13 22Aug13 25Aug13 11Sep13 - - 1Oct13
5275-PL-581-13-20-003 Piping Layout - Reem Receiver 3 0
A 22Aug13 22Aug13 22Aug13 25Aug13 11Sep13 - - 1Oct13
P 6Aug13 15Aug13 18Aug13 20Aug13 3Sep13 20Aug13 3Sep13 10Sep13
F 22Aug13 22Aug13 22Aug13 27Aug13 11Sep13 - - 24Sep13
5275-PL-581-13-20-004 Piping Layout - SVS (2,4,5,6,8,9,10,11) 3 0
A 22Aug13 22Aug13 22Aug13 27Aug13 11Sep13 - - 24Sep13
P 15Aug13 18Aug13 18Aug13 20Aug13 3Sep13 20Aug13 3Sep13 10Sep13
F 20Aug13 22Aug13 25Aug13 27Aug13 11Sep13 - - 24Sep13
5275-PL-581-13-20-005 Piping Layout - SVS 3 3 0
A 20Aug13 22Aug13 25Aug13 27Aug13 11Sep13 - - 24Sep13
P 19Aug13 21Aug13 22Aug13 26Aug13 9Sep13 26Aug13 9Sep13 16Sep13
F 28Aug13 29Aug13 15Sep13 1Oct13 10Nov13 1Oct13 10Nov13 17Nov13
5275-PL-581-13-20-006 Piping Layout - SVS 7 3 0
A 28Aug13 29Aug13 15Sep13 1Oct13 10Nov13 - - 14Nov13

409603376.xlsx Page 40 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 29Sep13 29Sep13 30Sep13 2Oct13 16Oct13 2Oct13 16Oct13 23Oct13
Piping Layout Future Connection for F 22Aug13 28Aug13 28Aug13 29Aug13 3Oct13 - - 12Oct13
5275-PL-581-13-20-007 3 2
Saadiyat South
A 22Aug13 28Aug13 28Aug13 29Aug13 3Oct13 - - 12Oct13
P 2Oct13 6Oct13 7Oct13 9Oct13 23Oct13 9Oct13 23Oct13 30Oct13
F 22Aug13 28Aug13 28Aug13 29Aug13 3Oct13 - - 7Nov13
5275-PL-581-13-20-008 Typ. HDPE Valve Pit (8 Nos) 3 1
A 22Aug13 28Aug13 28Aug13 29Aug13 3Oct13 - - 7Nov13
P 25Aug13 25Aug13 26Aug13 28Aug13 11Sep13 28Aug13 11Sep13 18Sep13
Standard Pipe Supports and Supporting F 11Sep13 11Sep13 11Sep13 13Sep13 13Oct13 - - 31Oct13
5275-PL-581-13-81-010 2 0
Components
A 11Sep13 11Sep13 11Sep13 13Sep13 13Oct13 - - 31Oct13
P 22Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
Piping Demolition Layout - Existing F 10Sep13 10Sep13 9Sep13 11Sep13 1Oct13 - - 9Oct13
5275-PL-581-13-20-011D 3 0
Launcher atYAS Island
A 10Sep13 10Sep13 9Sep13 11Sep13 1Oct13 - - 9Oct13
P 9Dec13 13Jan14 14Jan14 19Jan14 - - - -
F 17Oct13 31Oct13 24Dec13 31Dec13 - - - 26Jan14
5275-PL-830-13-61-001 Isometrics - Saadiyat CRS 3 ZZ
A 17Oct13 31Oct13 30Jan14
P 9Dec13 13Jan14 14Jan14 19Jan14 - - - -
F 30Sep13 3Oct13 14Nov13 12Dec13 - - - 19Jan14
5275-PL-581-13-61-001 Isometrics - SVS-1 3 ZZ
A 30Sep13 3Oct13 14Nov13
P 9Dec13 13Jan14 14Jan14 19Jan14 - - - -
F 15Dec13 19Dec13 24Dec13 31Dec13 - - - 26Jan14
5275-PL-581-13-61-002 Isometrics - Other SVS 3 ZZ
A 5Jan14 9Jan14 14Jan14
P 9Dec13 13Jan14 14Jan14 19Jan14 - - - -
F 20Oct13 24Oct13 14Nov13 22Dec13 - - - 19Jan14
5275-PL-581-13-61-003 Isometrics - Reem 3 ZZ
A 20Oct13 24Oct13 14Nov13
P 17Nov13 19Nov13 25Nov13 3Dec13 17Dec13 3Dec13 17Dec13 24Dec13
F 9Dec13 11Dec13 15Dec13 17Dec13 31Dec13 17Dec13 31Dec13 7Jan14
- Miscellaneous Piping Deliverables
A - - - - - - -

INSTRUMENTATION AND CONTROL


409603376.xlsx Page 41 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


SPECIFICATIONS
Instrumentation & Control
P 21Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
Addendum to DGS - Instrument Design F 22Aug13 25Aug13 25Aug13 26Aug13 11Sep13 - - 12Oct13
5275-ADD-1511-032 1-II 0
Criteria
A 22Aug13 25Aug13 25Aug13 26Aug13 11Sep13 - - 12Oct13
P 25Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
Specification for Leak Detection System F 28Jul13 28Jul13 29Jul13 30Jul13 19Aug13 - - 13Sep13
SP-5275-PL-000-15-001 1-II 0
(LDS)
A 28Jul13 28Jul13 29Jul13 30Jul13 19Aug13 - - 13Sep13
P 18Jul13 21Jul13 22Jul13 24Jul13 7Aug13 24Jul13 7Aug13 14Aug13
Addendum to DGS - Sales Gas Metering F 8Jul13 15Jul13 18Jul13 23Jul13 1Aug13 - - 21Aug13
5275-ADD-1511-075 1-II 0
System
A 8Jul13 15Jul13 18Jul13 23Jul13 1Aug13 - - 21Aug13
P 7Aug13 11Aug13 11Aug13 13Aug13 27Aug13 13Aug13 27Aug13 3Sep13
F 27Aug13 3Sep13 3Sep13 4Sep13 18Sep13 - - 5Nov13
SP-5275-PL-000-15-003 Specification for RTU,SMC Modifications 1-II 0
A 27Aug13 3Sep13 3Sep13 4Sep13 18Sep13 - - 5Nov13
P 25Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
F 7Aug13 7Aug13 7Aug13 7Aug13 8Sep13 - - -
5275-ADD-1541-001 Addendum to DGS - Control Valve 1-II 1
A 7Aug13 7Aug13 7Aug13 7Aug13 8Sep13 - - -
P 7Jul13 10Jul13 11Jul13 15Jul13 29Jul13 15Jul13 29Jul13 5Aug13
Addendum to DGS - Pipeline Pneumatic F 27Jun13 1Jul13 1Jul13 6Jul13 11Jul13 16Jul13 25Jul13 -
5275-ADD-1542-053 1-II 0
Hydraulic Valve Operator
A 27Jun13 1Jul13 1Jul13 6Jul13 11Jul13 16Jul13 25Jul13 -
P 16Jul13 18Jul13 21Jul13 23Jul13 6Aug13 23Jul13 6Aug13 13Aug13
F 14Jul13 14Jul13 14Jul13 15Jul13 24Jul13 - - 15Aug13
5275-ADD-1543-001 Addendum to DGS - MOV 1-II 0
A 14Jul13 14Jul13 14Jul13 15Jul13 24Jul13 - - 15Aug13

409603376.xlsx Page 42 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 1Sep13 2Sep13 3Sep13 5Sep13 19Sep13 5Sep13 19Sep13 26Sep13
Specification for Tube, Pipe, Fittings, F 26Aug13 28Aug13 5Sep13 6Sep13 18Sep13 - - 28Nov13
SP-5275-PL-000-15-002 1-II 0
Cable Glands and Junction Boxes
A 26Aug13 28Aug13 5Sep13 6Sep13 18Sep13 - - 28Nov13
P 11Sep13 12Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
Addendum to DGS - Instrumentation & F 1Sep13 1Sep13 1Sep13 1Sep13 24Sep13 - - 30Oct13
5275-ADD-1511-036 1-II 0
F&G Cables
A 1Sep13 1Sep13 1Sep13 1Sep13 24Sep13 - - 30Oct13
P 30Sep13 30Sep13 1Oct13 3Oct13 17Oct13 3Oct13 17Oct13 24Oct13
Addendum to DGS - Instrument F 3Sep13 3Sep13 3Sep13 3Sep13 18Sep13 - - 12Oct13
5275-ADD-1511-043 1-II 0
Installation Design
A 3Sep13 3Sep13 3Sep13 3Sep13 18Sep13 - - 12Oct13
P 31Jul13 4Aug13 5Aug13 7Aug13 21Aug13 7Aug13 21Aug13 28Aug13
Specification for Pressure Reduction F 29Jul13 30Jul13 5Aug13 7Aug13 25Aug13 - - 1Sep13
SP-5275-PL-830-15-002 1-II 0
Skid
A 29Jul13 30Jul13 5Aug13 7Aug13 25Aug13 - - 1Sep13
P 8Sep13 8Sep13 9Sep13 11Sep13 25Sep13 11Sep13 25Sep13 2Oct13
Addendum to DGS - Ultrasonic scraper F 29Aug13 9Sep13 9Sep13 11Sep13 22Sep13 - - 12Oct13
5275-ADD-1511-077 1-II 0
(pig) signaller (DGS-1511-077)
A 29Aug13 9Sep13 9Sep13 11Sep13 22Sep13 - - 12Oct13
Telecom
P 16Jul13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
F 9Jul13 9Jul13 9Jul13 10Jul13 23Jul13 - - 27Aug13
5275-ADD-1532-011 Addendum to DGS - Fiber Optic Cables 1-II 0
A 9Jul13 9Jul13 9Jul13 10Jul13 23Jul13 - - 27Aug13
P 16Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
Specification for FO Transmission F 28Aug13 4Sep13 4Sep13 6Sep13 18Sep13 - - 5Nov13
SP-5275-PL-000-15-031 1-II 0
Equipment & Accessories
A 28Aug13 4Sep13 4Sep13 6Sep13 18Sep13 - - 5Nov13
P 11Sep13 12Sep13 15Sep13 16Sep13 30Sep13 16Sep13 30Sep13 7Oct13
F 5Sep13 5Sep13 5Sep13 11Sep13 22Sep13 - - 5Nov13
SP-5275-PL-000-15-032 Specification for FOC Installation 1-II 0
A 5Sep13 5Sep13 5Sep13 11Sep13 22Sep13 - - 5Nov13
P 8Sep13 8Sep13 9Sep13 11Sep13 25Sep13 11Sep13 25Sep13 2Oct13
Specification for Telecommunication F 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - 12Oct13
SP-5275-PL-000-15-033 1-II 0
Installation
A 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - 12Oct13
P 22Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
F 3Sep13 3Sep13 3Sep13 3Sep13 23Sep13 - - 12Oct13
SP-5275-PL-000-15-034 Specification for CCTV System 1-II 0
409603376.xlsx Page 43 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


SP-5275-PL-000-15-034 Specification for CCTV System 1-II 0
A 3Sep13 3Sep13 3Sep13 3Sep13 23Sep13 - - 12Oct13
Fire & Gas
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 1Sep13 1Sep13 1Sep13 1Sep13 24Sep13 - - 12Oct13
5275-ADD-1511-031 Addendum to DGS - F&G Detectors 1-II 0
A 1Sep13 1Sep13 1Sep13 1Sep13 24Sep13 - - 12Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - 12Oct13
SP-5275-PL-000-15-061 F&G System Specification 1-II 0
A 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - 12Oct13
DATA SHEETS
Instrumentation & Control
P 21Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
F 25Aug13 25Aug13 25Aug13 26Aug13 11Sep13 - - 30Oct13
SPP-5275-PL-000-15-001 Data Sheet for Pressure Gauges 2 0
A 25Aug13 25Aug13 25Aug13 26Aug13 11Sep13 - - 30Oct13
P 21Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
Data Sheet for Thermowell & F 27Aug13 28Aug13 7Oct13 12Oct13 28Oct13 - - -
SPP-5275-PL-000-15-002 2 0
Temperature Gauges
A 27Aug13 28Aug13 7Oct13 12Oct13 28Oct13 - - -
P 21Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
Data Sheet for Pressure Transmitters & F 27Aug13 28Aug13 1Sep13 2Sep13 18Sep13 - - 12Oct13
SPP-5275-PL-000-15-003 2 0
DP Transmitters
A 27Aug13 28Aug13 1Sep13 2Sep13 18Sep13 - - 12Oct13
P 21Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
Data Sheet for Temp. Elements & Temp. F 27Aug13 28Aug13 5Sep13 19Sep13 8Oct13 - - 30Oct13
SPP-5275-PL-000-15-004 2 0
Transmitters
A 27Aug13 28Aug13 5Sep13 19Sep13 8Oct13 - - 30Oct13

409603376.xlsx Page 44 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 16Jul13 18Jul13 21Jul13 23Jul13 6Aug13 23Jul13 6Aug13 13Aug13
Data Sheet for Motor Operated Valves F 14Jul13 14Jul13 14Jul13 15Jul13 24Jul13 - - 15Aug13
SPP-5275-PL-000-15-005 2 0
(MOV)
A 14Jul13 14Jul13 14Jul13 15Jul13 24Jul13 - - 15Aug13
P 7Jul13 10Jul13 11Jul13 15Jul13 29Jul13 15Jul13 29Jul13 5Aug13
Data Sheet for Remote Operated Valves F 27Jun13 3Jul13 1Jul13 7Jul13 16Jul13 - - 26Aug13
SPP-5275-PL-581-15-006 2 0
(ROV)
A 27Jun13 3Jul13 1Jul13 7Jul13 16Jul13 - - 26Aug13
P 23Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
F 8Oct13 9Oct13 9Oct13 13Oct13 28Oct13 - - 31Oct13
SPP-5275-PL-000-15-007 Data Sheet for Restriction Orifice Plate 2 0
A 8Oct13 9Oct13 9Oct13 13Oct13 28Oct13 - - 31Oct13
P 30Jul13 31Jul13 1Aug13 4Aug13 18Aug13 4Aug13 18Aug13 25Aug13
F 22Aug13 25Aug13 25Aug13 26Aug13 11Sep13 - - 31Oct13
SPP-5275-PL-000-15-008 Data Sheet for Pressure Safety Valve 2 0
A 22Aug13 25Aug13 25Aug13 26Aug13 11Sep13 - - 31Oct13
P 25Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
F 6Aug13 6Aug13 6Aug13 13Aug13 5Sep13 - - 19Sep13
SPP-5275-PL-000-15-009 Data Sheet for Control Valve 2 1
A 6Aug13 6Aug13 6Aug13 13Aug13 5Sep13 - - 19Sep13
P 7Jul13 10Jul13 11Jul13 15Jul13 29Jul13 15Jul13 29Jul13 5Aug13
F 4Jul13 8Jul13 8Jul13 9Jul13 24Jul13 - - 22Aug13
SPP-5275-PL-000-15-010 Data Sheet for GOV 2 0
A 4Jul13 8Jul13 8Jul13 9Jul13 24Jul13 - - 22Aug13
P 1Oct13 2Oct13 3Oct13 6Oct13 13Oct13 - - 20Oct13
Data Sheet for Pressure Safety Valve F 30Oct13 30Oct13 30Oct13 5Nov13 20Nov13 - - -
SPP-5275-PL-000-15-011 2 0
(Odorant Absorption system)
A 30Oct13 30Oct13 30Oct13 5Nov13 12Nov13 - - -
P 31Jul13 4Aug13 5Aug13 7Aug13 21Aug13 7Aug13 21Aug13 28Aug13
F 29Jul13 30Jul13 5Aug13 7Aug13 25Aug13 - - 12Oct13
SPP-5275-PL-830-15-001 Data Sheet for Pressure Reduction Skid 2 1
A 29Jul13 30Jul13 5Aug13 7Aug13 25Aug13 - - 12Oct13
P 18Jul13 21Jul13 22Jul13 24Jul13 7Aug13 24Jul13 7Aug13 14Aug13
F 10Jul13 14Jul13 18Jul13 23Jul13 1Aug13 - - 26Aug13
SPP-5275-PL-830-15-002 Data Sheet for Metering Skid 2 0
A 10Jul13 14Jul13 18Jul13 23Jul13 1Aug13 - - 26Aug13
P 8Sep13 8Sep13 9Sep13 11Sep13 25Sep13 11Sep13 25Sep13 2Oct13
Data Sheet for Ultrasonic scraper (pig) F 5Sep13 9Sep13 9Sep13 11Sep13 22Sep13 - - 12Oct13
SPP-5275-PL-581-15-001 2 0
signaller
A 5Sep13 9Sep13 9Sep13 11Sep13 22Sep13 - - 12Oct13
409603376.xlsx Page 45 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


Telecom
P 16Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
Data Sheet for SDH based FO Telecom F 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 31Oct13
SPP-5275-PL-000-15-031 System Data sheet & Equipment 2 0
Summary
A 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 31Oct13
P 22Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
Data Sheet for CCTV System Data sheet F 3Sep13 3Sep13 3Sep13 4Sep13 18Sep13 - - 31Oct13
SPP-5275-PL-000-15-032 2 0
& Equipment Summary
A 3Sep13 3Sep13 3Sep13 4Sep13 18Sep13 - - 31Oct13
Fire & Gas
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-061 Data Sheet for Toxic Gas Detectors 2 0
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
Data Sheet for Flammable Gas F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-062 2 0
Detectors
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
Data Sheet for High Sensitivity Smoke F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-063 2 0
Detectors
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-064 Data Sheet for Flame Detectors 2 0
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-065 Data Sheet for LEL Detectors 2 0
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13

409603376.xlsx Page 46 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-066 Data Sheet for Manual Call Points 2 0
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-067 Data Sheet for Beacons 2 0
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-068 Data Sheet for Sounders, Horns/Sirens 2 0
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
SPP-5275-PL-000-15-069 Data Sheet for Smoke Detectors 2 0
A 24Aug13 24Aug13 24Aug13 26Aug13 12Sep13 - - 3Oct13
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 25Sep13 29Sep13 1Oct13 3Oct13 - - - -
SPP-5275-PL-000-15-070 Data Sheet for Egress Switches 2 0
A 25Sep13 29Sep13 1Oct13 3Oct13 - - - -
P 16Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 25Sep13 29Sep13 1Oct13 3Oct13 24Oct13 - - -
SPP-5275-PL-000-15-071 Data Sheet for Heat Detectors 2 0
A 25Sep13 29Sep13 1Oct13 3Oct13 24Oct13 - - -
MATERIAL REQUISITION
Instrumentation & Control
P 21Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
F 22Oct13 24Oct13 27Oct13 5Nov13 12Nov13 - - -
R-5275-PL-000-15-001 Material Requisition for Gauges 2 0
A 22Oct13 24Oct13 27Oct13 5Nov13 12Nov13 - - -
P 21Aug13 27Aug13 28Aug13 1Sep13 15Sep13 1Sep13 15Sep13 22Sep13
F 22Oct13 24Oct13 27Oct13 5Nov13 12Nov13 - - -
R-5275-PL-000-15-010 Material Requisition for Transmitters 2 0
A 22Oct13 24Oct13 27Oct13 5Nov13 12Nov13 - - -
P 25Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
Material Requisition for Leak Detection F 30Jul13 30Jul13 30Jul13 4Aug13 25Aug13 - - 13Sep13
R-5275-PL-000-15-002 2 0
System (LDS)
A 30Jul13 30Jul13 30Jul13 4Aug13 25Aug13 - - 13Sep13
P 18Jul13 21Jul13 22Jul13 24Jul13 7Aug13 24Jul13 7Aug13 14Aug13
409603376.xlsx Material Requisition for Flow Metering Page 47 of 186
R-5275-PL-830-15-001 2 0
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


Material Requisition for Flow Metering F 11Jul13 23Jul13 23Jul13 29Jul13 4Aug13 - - 26Aug13
R-5275-PL-830-15-001 2 0
Skid
A 11Jul13 23Jul13 23Jul13 29Jul13 4Aug13 - - 26Aug13
P 7Aug13 11Aug13 11Aug13 13Aug13 27Aug13 13Aug13 27Aug13 3Sep13
Material Requisition for RTU, SDH, F 15Sep13 17Sep13 19Sep13 3Oct13 22Oct13 - - 11Nov13
R-5275-PL-000-15-003 2 0
CCTV and F&G system and detectors
A 15Sep13 17Sep13 19Sep13 3Oct13 22Oct13 - - 11Nov13
P 7Jul13 10Jul13 11Jul13 15Jul13 29Jul13 15Jul13 29Jul13 5Aug13
F 27Jun13 1Jul13 1Jul13 4Jul13 - 9Jul13 24Jul13 -
R-5275-PL-581-15-004 Material Requisition for ROV / GOV 2 0
A 27Jun13 1Jul13 1Jul13 4Jul13 - 9Jul13 24Jul13 -
P 16Jul13 18Jul13 21Jul13 23Jul13 6Aug13 23Jul13 6Aug13 13Aug13
F 11Jul13 11Jul13 11Jul13 16Jul13 25Jul13 - - 26Aug13
R-5275-PL-000-15-005 Material Requisition for MOV 2 0
A 11Jul13 11Jul13 11Jul13 16Jul13 25Jul13 - - 26Aug13
P 1Sep13 2Sep13 3Sep13 5Sep13 19Sep13 5Sep13 19Sep13 26Sep13
Material Requisition for Instrument Bulk F 11Jul13 11Jul13 2Dec13 5Dec13 19Dec13 5Dec13 19Dec13 26Dec13
R-5275-PL-000-15-006 2 0
Material Take Off
A 11Jul13 11Jul13 2Dec13 12Dec13 22Dec13 - - -
P 31Jul13 4Aug13 5Aug13 7Aug13 21Aug13 7Aug13 21Aug13 28Aug13
Material Requisition for Pressure F 29Jul13 30Jul13 7Aug13 7Aug13 8Sep13 - - 22Sep13
R-5275-PL-830-15-002 2 0
Reduction Skid
A 29Jul13 30Jul13 7Aug13 7Aug13 8Sep13 - - 22Sep13
P 8Sep13 8Sep13 9Sep13 11Sep13 25Sep13 11Sep13 25Sep13 2Oct13
Material Requisition for Ultrasonic F 29Aug13 10Sep13 10Sep13 20Sep13 1Oct13 - - 12Oct13
R-5275-PL-581-15-007 2 0
scraper (pig) signaller
A 29Aug13 10Sep13 10Sep13 20Sep13 1Oct13 - - 12Oct13
P 25Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
F 25Aug13 25Aug13 25Aug13 28Aug13 11Sep13 - - 12Oct13
R-5275-PL-000-15-007 Material Requisition for Control Valve 2 1
A 25Aug13 25Aug13 25Aug13 28Aug13 11Sep13 - - 12Oct13

409603376.xlsx Page 48 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 14Nov13 17Nov13 19Nov13 24Nov13 8Dec13 - - 15Dec13
Material Requisition for Restriction orifice F 31Oct13 3Nov13 5Nov13 11Nov13 18Nov13 - - -
R-5275-PL-000-15-008 2 0
plate
A 31Oct13 3Nov13 5Nov13 11Nov13 18Nov13 - - -
Telecom
P 16Jul13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Material Requisition for Fiber Optic F 10Jul13 10Jul13 10Jul13 18Jul13 25Jul13 - - 27Aug13
R-5275-PL-000-15-031 2 0
Cable
A 10Jul13 10Jul13 10Jul13 18Jul13 25Jul13 - - 27Aug13
Fire & Gas
P 11Sep13 12Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
Material Requisition for Instrumentation F 5Nov13 7Nov13 5Dec13 12Dec13 26Dec13 12Dec13 26Dec13 2Jan14
R-5275-PL-000-15-061 2 0
& F&G Cables
A 5Nov13 7Nov13 12Dec13 24Dec13 5Jan14 - - -
TECHNICAL BID EVALUATIONS
Instrumentation & Control
P 20Nov13 20Nov13 21Nov13 24Nov13 8Dec13 - - -
F 15Dec13 18Dec13 26Dec13 5Jan14 19Jan14 - - -
TBE-5275-PL-000-15-001 TBE for Gauges 1-II
A 5Feb14 7Feb14
P 20Nov13 20Nov13 21Nov13 24Nov13 8Dec13 - - -
F 15Dec13 18Dec13 26Dec13 5Jan14 19Jan14 - - -
TBE-5275-PL-000-15-010 TBE for Transmitters 1-II
A 5Feb14 7Feb14
P 29Sep13 29Sep13 30Sep13 2Oct13 16Oct13 - - -
F 10Oct13 31Oct13 16Nov13 19Nov13 5Dec13 - - -
TBE-5275-PL-000-15-002 TBE for Leak Detection System (LDS) 1-II A
A 10Oct13 31Oct13 17Nov13 19Nov13 2Dec13
P 3Oct13 3Oct13 6Oct13 9Oct13 23Oct13 - - -
F 24Oct13 31Oct13 14Nov13 19Nov13 5Dec13 - - -
TBE-5275-PL-830-15-001 TBE for Metering Skid 1-II 0
A 24Oct13 31Oct13 14Nov13 24Nov13 8Dec13 - - 5Jan14
P 12Jan14 12Jan14 13Jan14 15Jan14 22Jan14 - - -
TBE for RTU, SDH, CCTV and F&G F 15Dec13 18Dec13 26Dec13 5Jan14 19Jan14 - - -
TBE-5275-PL-000-15-003 1-II
system and detectors
A 12Dec13 26Dec13
P 12Sep13 12Sep13 15Sep13 16Sep13 30Sep13 - - -
TBE-5275-PL-000-15-004
409603376.xlsx TBE for ROV / GOV 1-II 0 Page 49 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


F 28Aug13 23Sep13 23Sep13 23Sep13 30Sep13 - - 31Oct13
TBE-5275-PL-000-15-004 TBE for ROV / GOV 1-II 0
A 28Aug13 23Sep13 23Sep13 23Sep13 30Sep13 - - 31Oct13
P 19Sep13 19Sep13 22Sep13 24Sep13 8Oct13 - - -
F 29Aug13 30Oct13 24Oct13 27Oct13 4Nov13 27Oct13 4Nov13 11Nov13
TBE-5275-PL-000-15-005 TBE for MOV 1-II 0
A 29Aug13 30Oct13 24Oct13 27Oct13 4Nov13 - - 14Nov13
P 30Sep13 30Sep13 1Oct13 3Oct13 17Oct13 - - -
F 15Dec13 18Dec13 26Dec13 5Jan14 19Jan14 - - -
TBE-5275-PL-000-15-006 TBE for Tube, Pipe, Fittings 1-II
A
P 30Sep13 30Sep13 1Oct13 3Oct13 17Oct13 - - -
TBE for Cable Glands and Junction F 15Dec13 18Dec13 26Dec13 5Jan14 19Jan14 - - -
TBE-5275-PL-000-15-009 1-II
Boxes
A
P 8Oct13 8Oct13 9Oct13 13Oct13 27Oct13 - - -
F 24Oct13 31Oct13 13Nov13 18Nov13 2Dec13 - - -
TBE-5275-PL-830-15-002 TBE for Pressure Reduction Skid 1-II C
A 24Oct13 31Oct13 13Nov13 19Nov13 4Dec13 20Jan14 26Jan14 30Jan14
P 10Nov13 10Nov13 11Nov13 13Nov13 27Nov13 - - -
F 15Dec13 18Dec13 26Dec13 5Jan14 19Jan14 - - -
TBE-5275-PL-581-15-001 TBE for Ultrasonic scraper (pig) signaller 1-II 0
A 24Dec13 26Dec13 6Jan14 20Jan14 - - - -
P 2Oct13 2Oct13 3Oct13 6Oct13 20Oct13 - - -
F 24Oct13 31Oct13 5Nov13 11Nov13 17Nov13 - - -
TBE-5275-PL-000-15-007 TBE for Control Valve 1-II B
A 24Oct13 31Oct13 5Nov13 11Nov13 17Nov13 9Jan14 21Jan14 23Jan14
P 1Dec13 3Dec13 4Dec13 5Dec13 8Dec13 - -
F 15Dec13 18Dec13 26Dec13 5Jan14 19Jan14 - - -
TBE-5275-PL-000-15-008 TBE for Restriction orifice plate 1-II
A 21Jan14 23Jan14

409603376.xlsx Page 50 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


Telecom
P 18Sep13 18Sep13 19Sep13 23Sep13 7Oct13 - - -
F 30Aug13 24Sep13 24Sep13 24Sep13 29Sep13 - - 1Oct13
TBE-5275-PL-000-15-031 TBE for FO Cable 1-II 0
A 30Aug13 24Sep13 24Sep13 24Sep13 29Sep13 - - 1Oct13
Fire & Gas
P 18Dec13 18Dec13 19Dec13 22Dec13 5Jan14 - - -
F 18Dec13 18Dec13 19Dec13 22Dec13 5Jan14 - - -
TBE-5275-PL-000-15-061 TBE for Instrumentation & F&G Cables 1-II
A
SCHEDULES / LISTS
Instrumentation & Control
P 8Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
F 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 17Oct13
SCH-5275-PL-581-15-001 Instrument Schedule - SVS-1 to 6 3 0
A 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 17Oct13
P 8Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
F 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 17Oct13
SCH-5275-PL-581-15-002 Instrument Schedule - SVS-7 to 11 3 0
A 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 17Oct13
P 8Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
Instrument Schedule - Saadiyat CRS & F 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 17Oct13
SCH-5275-PL-830-15-001 3 0
Reem Island
A 5Sep13 5Sep13 5Sep13 16Sep13 1Oct13 - - 17Oct13
P 12Sep13 15Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
F 5Sep13 5Sep13 5Sep13 9Sep13 26Sep13 9Sep13 26Sep13 18Nov13
SCH-5275-PL-581-15-003 RTU I/O Schedule - SVS-1 2 0
A 5Sep13 5Sep13 5Sep13 9Sep13 26Sep13 - - 21Nov13
P 12Sep13 15Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
F 5Sep13 5Sep13 5Sep13 9Sep13 26Sep13 9Sep13 26Sep13 18Nov13
SCH-5275-PL-581-15-004 RTU I/O Schedule - SVS-7 2 0
A 5Sep13 5Sep13 5Sep13 9Sep13 26Sep13 - - 21Nov13
P 12Sep13 15Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
F 5Sep13 5Sep13 5Sep13 9Sep13 26Sep13 9Sep13 26Sep13 18Nov13
SCH-5275-PL-830-15-002 RTU I/O Schedule - CRS 2 0
A 5Sep13 5Sep13 5Sep13 9Sep13 26Sep13 - - 21Nov13
P 24Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
SCH-5275-PL-581-15-005
409603376.xlsx Instrument Cable Schedule - SVS-1 3 0 Page 51 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


F 13Oct13 17Oct13 23Oct13 30Oct13 13Nov13 - - -
SCH-5275-PL-581-15-005 Instrument Cable Schedule - SVS-1 3 0
A 13Oct13 17Oct13 23Oct13 30Oct13 13Nov13 - - -
P 24Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
F 13Oct13 17Oct13 23Oct13 5Nov13 20Nov13 - - 27Nov13
SCH-5275-PL-581-15-006 Instrument Cable Schedule - SVS-7 3 0
A 13Oct13 17Oct13 23Oct13 5Nov13 24Nov13 - - 26Nov13
P 24Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
F 13Oct13 17Oct13 23Oct13 5Nov13 20Nov13 - - 27Nov13
SCH-5275-PL-830-15-003 Instrument Cable Schedule - CRS 3 0
A 13Oct13 17Oct13 23Oct13 5Nov13 24Nov13 - - 26Nov13
P 3Sep13 4Sep13 5Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
F 5Sep13 5Sep13 5Sep13 9Sep13 24Sep13 - - 10Nov13
SCH-5275-PL-581-15-007 Alarm & Trip Setting Schedule - SVS-1 1-II 0
A 5Sep13 5Sep13 5Sep13 9Sep13 24Sep13 - - 10Nov13
P 3Sep13 4Sep13 5Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
F 5Sep13 5Sep13 5Sep13 9Sep13 24Sep13 - - 10Nov13
SCH-5275-PL-581-15-008 Alarm & Trip Setting Schedule - SVS-7 1-II 0
A 5Sep13 5Sep13 5Sep13 9Sep13 24Sep13 - - 10Nov13
P 3Sep13 4Sep13 5Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
F 5Sep13 5Sep13 5Sep13 9Sep13 24Sep13 - - 10Nov13
SCH-5275-PL-830-15-004 Alarm & Trip Setting Schedule - CRS 1-II 0
A 5Sep13 5Sep13 5Sep13 9Sep13 24Sep13 - - 10Nov13
P 24Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
F 26Nov13 27Nov13 27Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
SCH-5275-PL-000-15-005 Cable Drum Schedule 3 B
A 26Nov13 27Nov13 27Nov13 28Nov13 11Dec13 - - 16Jan14
P 8Oct13 9Oct13 10Oct13 13Oct13 - - - -
F 5Oct13 7Oct13 17Nov13 21Nov13 5Dec13 21Nov13 5Dec13 12Dec13
MTO-5275-PL-000-15-001 Instrument Bulk MTO 2 0
A 5Oct13 7Oct13 21Nov13 21Nov13 2Dec13 - - 12Dec13

409603376.xlsx Page 52 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


Telecom
P 23Sep13 23Sep13 24Sep13 26Sep13 10Oct13 26Sep13 10Oct13 17Oct13
F 30Oct13 30Oct13 31Oct13 31Oct13 20Nov13 - - 27Nov13
SCH-5275-PL-000-15-031 Telecom Equipment Schedule 3 0
A 30Oct13 30Oct13 31Oct13 31Oct13 12Nov13 - - 14Nov13
P 22Sep13 29Sep13 30Sep13 2Oct13 16Oct13 23Oct13 6Nov13 23Oct13
F 19Nov13 21Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
SCH-5275-PL-000-15-032 Fibre Optic Cable Drum Schedule 3 0
A 19Nov13 21Nov13 26Nov13 28Nov13 11Dec13 - - -
P 19Nov13 20Nov13 21Nov13 25Nov13 - - - -
F 20Nov13 5Dec13 12Dec13 18Dec13 1Jan14 18Dec13 1Jan14 8Jan14
MTO-5275-PL-000-15-031 FOC MTO 2 0
A 21Nov13 3Dec13 5Dec13 5Dec13 15Dec13 - - -
Fire & Gas
P 17Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
F & G Instrument (Detector) Schedule F 1Sep13 1Sep13 1Sep13 31Oct13 12Nov13 - - -
SCH-5275-PL-581-15-061 3 0
SVS-1
A 1Sep13 1Sep13 1Sep13 31Oct13 12Nov13 - - -
P 17Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
F & G Instrument (Detector) Schedule F 1Sep13 1Sep13 1Sep13 31Oct13 12Nov13 - - -
SCH-5275-PL-581-15-062 3 0
SVS-7
A 1Sep13 1Sep13 1Sep13 31Oct13 12Nov13 - - -
P 17Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
F & G Instrument (Detector) Schedule - F 1Sep13 1Sep13 1Sep13 31Oct13 12Nov13 - - -
SCH-5275-PL-830-15-061 3 0
CRS
A 1Sep13 1Sep13 1Sep13 31Oct13 12Nov13 - - -
P 23Sep13 23Sep13 24Sep13 26Sep13 10Oct13 26Sep13 10Oct13 17Oct13
F 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 - - 28Nov13
SCH-5275-PL-581-15-063 F & G I/O Schedule - SVS-1 2 B
A 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 - - 28Nov13
P 23Sep13 23Sep13 24Sep13 26Sep13 10Oct13 26Sep13 10Oct13 17Oct13
F 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 15Sep13 22Sep13 20Nov13
SCH-5275-PL-581-15-064 F & G I/O Schedule - SVS-7 2 B
A 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 - - 28Nov13
P 23Sep13 23Sep13 24Sep13 26Sep13 10Oct13 26Sep13 10Oct13 17Oct13
F 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 15Sep13 22Sep13 20Nov13
SCH-5275-PL-830-15-062 F & G I/O Schedule - CRS 2 B
A 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 - - 28Nov13

409603376.xlsx Page 53 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 26Sep13 29Sep13 29Sep13 1Oct13 15Oct13 1Oct13 15Oct13 22Oct13
F 31Oct13 5Nov13 7Nov13 10Nov13 19Nov13 - - -
SCH-5275-PL-581-15-065 F & G Cable Schedule - SVS-1 3 0
A 31Oct13 5Nov13 7Nov13 10Nov13 19Nov13 - - -
P 26Sep13 29Sep13 29Sep13 1Oct13 15Oct13 1Oct13 15Oct13 22Oct13
F 31Oct13 5Nov13 5Nov13 6Nov13 20Nov13 - - -
SCH-5275-PL-581-15-066 F & G Cable Schedule - SVS-7 3 0
A 31Oct13 5Nov13 5Nov13 6Nov13 18Nov13 - - -
P 26Sep13 29Sep13 29Sep13 1Oct13 15Oct13 1Oct13 15Oct13 22Oct13
F 31Oct13 5Nov13 7Nov13 10Nov13 20Nov13 - - -
SCH-5275-PL-830-15-063 F & G Cable Schedule - CRS 3 0
A 31Oct13 5Nov13 7Nov13 10Nov13 19Nov13 - - -
P 8Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
F 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - -
SCH-5275-PL-581-15-067 F&G Alarm & Trip Setting - SVS-1 1-II 0
A 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - -
P 8Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
F 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - -
SCH-5275-PL-581-15-068 F&G Alarm & Trip Setting - SVS-7 1-II 0
A 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - -
P 8Sep13 9Sep13 10Sep13 12Sep13 26Sep13 12Sep13 26Sep13 3Oct13
F 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - -
SCH-5275-PL-830-15-064 F&G Alarm & Trip Setting - CRS 1-II 0
A 5Sep13 5Sep13 5Sep13 6Sep13 18Sep13 - - -
P 7Nov13 10Nov13 11Nov13 13Nov13 - - - -
F 18Nov13 20Nov13 21Nov13 26Nov13 - - - -
MTO-5275-PL-000-15-061 F & G Bulk MTO 2 0
A 18Nov13 20Nov13 21Nov13 26Nov13 9Dec13 - - 12Dec13
CALCULATIONS / PHILOSOPHY / REPORTS
P 2Sep13 2Sep13 3Sep13 5Sep13 19Sep13 5Sep13 19Sep13 26Sep13
F 19Nov13 19Nov13 19Nov13 20Nov13 15Dec13 20Nov13 15Dec13 22Dec13
RPT-5275-PL-000-15-002 Instrument load summary 3 B
A 19Nov13 19Nov13 19Nov13 20Nov13 2Dec13 - - 5Dec13

409603376.xlsx Page 54 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 27Oct13 5Nov13 6Nov13 10Nov13 - - - 5Nov13
F & G Mapping Study (RPT-5275-PL- F 15Nov13 18Dec13 24Dec13 29Dec13 12Jan14 29Dec13 12Jan14 -
RPT-5275-PL-000-15-004 1
000-61-003)
A 15Nov13 10Dec13 14Dec13 22Dec13 - - - -
DRAWINGS
Instrumentation & Control
P 26Sep13 29Sep13 30Sep13 2Oct13 16Oct13 2Oct13 16Oct13 23Oct13
Supervisory Monitoring & Control F 28Aug13 2Sep13 2Sep13 2Sep13 14Sep13 - - 19Sep13
5275-PL-000-15-80-001 2 0
System Architecture Overall Drawing
A 28Aug13 2Sep13 2Sep13 2Sep13 14Sep13 - - 19Sep13
P 25Sep13 26Sep13 29Sep13 1Oct13 15Oct13 1Oct13 15Oct13 21Oct13
F 4Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 5Nov13
5275-PL-830-15-65-001 Cable Block Diagram RTU - CRS 3 0
A 4Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 5Nov13
P 17Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
F 5Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 30Oct13
5275-PL-581-15-65-001 Cable Block Diagram RTU - SVS-1 3 0
A 5Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 30Oct13
P 24Sep13 25Sep13 26Sep13 30Sep13 14Oct13 30Sep13 14Oct13 20Oct13
F 5Sep13 17Oct13 30Oct13 30Oct13 20Nov13 - - 27Nov13
5275-PL-581-15-65-002 Cable Block Diagram RTU - SVS-7 3 0
A 5Sep13 17Oct13 30Oct13 30Oct13 13Nov13 - - 21Nov13
P 12Sep13 15Sep13 16Sep13 18Sep13 2Oct13 18Sep13 2Oct13 8Oct13
F 29Aug13 29Aug13 29Aug13 1Sep13 18Sep13 - - 28Oct13
5275-PL-830-15-41-001 CR / Equipment Room Layout -CRS 1-II 0
A 29Aug13 29Aug13 29Aug13 1Sep13 18Sep13 - - 28Oct13
P 3Sep13 4Sep13 5Sep13 9Sep13 23Sep13 9Sep13 23Sep13 30Sep13
F 29Aug13 29Aug13 29Aug13 1Sep13 18Sep13 3Oct13 10Oct13 28Oct13
5275-PL-581-15-41-001 CR / Equipment Room Layout -SVS-1 1-II 0
A 29Aug13 29Aug13 29Aug13 1Sep13 18Sep13 3Oct13 10Oct13 28Oct13
P 27Oct13 29Oct13 31Oct13 3Nov13 17Nov13 3Nov13 17Nov13 24Nov13
F 22Oct13 23Oct13 25Oct13 10Nov13 20Nov13 - - 27Nov13
5275-PL-581-15-41-003 CR / Equipment Room Layout -SVS-7 1-II 0
A 22Oct13 23Oct13 25Oct13 10Nov13 19Nov13 - - 28Nov13
P 9Sep13 12Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 7Oct13
Instrument Location Layout Drawing F 2Sep13 2Sep13 2Sep13 3Sep13 - - - 5Sep13
5275-PL-581-15-30-001 3 0
SVS-1
A 2Sep13 2Sep13 2Sep13 3Sep13 - - - 5Sep13
P 17Sep13 18Sep13 19Sep13 23Sep13 7Oct13 23Sep13 7Oct13 14Oct13
409603376.xlsx Instrument Location Layout Drawing- Page 55 of 186
5275-PL-581-15-30-002 3 0
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


Instrument Location Layout Drawing- F 5Sep13 17Sep13 17Sep13 19Sep13 3Oct13 - - 24Oct13
5275-PL-581-15-30-002 3 0
SVS-7
A 5Sep13 17Sep13 17Sep13 19Sep13 3Oct13 - - 24Oct13
P 18Sep13 19Sep13 22Sep13 24Sep13 8Oct13 24Sep13 8Oct13 15Oct13
Instrument Location Layout Drawing - F 5Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 3Oct13
5275-PL-830-15-30-001 3 0
CRS
A 5Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 3Oct13
P 24Sep13 25Sep13 26Sep13 30Sep13 14Oct13 30Sep13 14Oct13 20Oct13
F 3Sep13 3Sep13 3Sep13 5Sep13 18Sep13 - - 25Sep13
5275-PL-581-15-31-001 Cable Routing Layout Drawing SVS-1 3 0
A 3Sep13 3Sep13 3Sep13 5Sep13 18Sep13 - - 25Sep13
P 30Sep13 2Oct13 3Oct13 6Oct13 20Oct13 6Oct13 20Oct13 27Oct13
F 24Oct13 27Oct13 27Oct13 30Oct13 20Nov13 - - -
5275-PL-581-15-31-002 Cable Routing Layout Drawing SVS-7 3 0
A 24Oct13 27Oct13 27Oct13 30Oct13 13Nov13 - - -
P 1Oct13 2Oct13 3Oct13 7Oct13 21Oct13 7Oct13 21Oct13 28Oct13
F 25Sep13 26Sep13 29Sep13 1Oct13 26Oct13 - - -
5275-PL-830-15-31-001 Cable Routing Layout Drawing CRS 3 0
A 25Sep13 26Sep13 29Sep13 1Oct13 26Oct13 - - -
P 30Sep13 30Sep13 1Oct13 3Oct13 17Oct13 3Oct13 17Oct13 24Oct13
F 25Aug13 25Aug13 25Aug13 27Aug13 15Sep13 - - 19Sep13
5275-PL-581-15-38-001 I&C Hook up Diagrams - SVS-1 to 6 3 0
A 25Aug13 25Aug13 25Aug13 27Aug13 15Sep13 - - 19Sep13
P 30Sep13 30Sep13 1Oct13 3Oct13 17Oct13 3Oct13 17Oct13 24Oct13
F 25Aug13 25Aug13 25Aug13 27Aug13 15Sep13 - - 19Sep13
5275-PL-581-15-38-002 I&C Hook up Diagrams - SVS-7 to 11 3 0
A 25Aug13 25Aug13 25Aug13 27Aug13 15Sep13 - - 19Sep13
P 30Sep13 30Sep13 1Oct13 3Oct13 17Oct13 3Oct13 17Oct13 24Oct13
I&C Hook up Diagrams - Saadiyat CRS F 25Aug13 25Aug13 25Aug13 27Aug13 15Sep13 - - 19Sep13
5275-PL-830-15-38-001 3 0
& Reem Island
A 25Aug13 25Aug13 25Aug13 27Aug13 15Sep13 - - 19Sep13

409603376.xlsx Page 56 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 6Oct13 7Oct13 8Oct13 10Oct13 24Oct13 10Oct13 24Oct13 31Oct13
Instrument Interconnection, Termination F 20Oct13 22Oct13 30Oct13 30Oct13 13Nov13 - - -
5275-PL-581-15-45-002 3 0
Diagrams SVS-1
A 20Oct13 22Oct13 30Oct13 30Oct13 13Nov13 - - -
P 10Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
Instrument Interconnection, Termination F 20Oct13 22Oct13 11Nov13 14Nov13 5Dec13 14Nov13 5Dec13 12Dec13
5275-PL-581-15-45-003 3 B
Diagrams SVS-7
A 20Oct13 22Oct13 10Nov13 14Nov13 2Dec13 - - 8Dec13
P 22Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 19Nov13
Instrument Interconnection, Termination F 20Oct13 22Oct13 7Nov13 10Nov13 20Nov13 - - 5Dec13
5275-PL-830-15-45-001 3 0
Diagrams Saadiyat CRS
A 20Oct13 22Oct13 7Nov13 10Nov13 19Nov13 - - -
P 24Sep13 30Sep13 1Oct13 3Oct13 17Oct13 3Oct13 17Oct13 24Oct13
F 11Nov13 13Nov13 14Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
5275-PL-581-15-80-002 Instrument Loop Diagrams SVS-1 2 B
A 11Nov13 13Nov13 13Nov13 14Nov13 2Dec13 - - 5Dec13
P 30Sep13 3Oct13 6Oct13 10Oct13 24Oct13 10Oct13 24Oct13 31Oct13
F 11Nov13 13Nov13 14Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
5275-PL-581-15-80-003 Instrument Loop Diagrams SVS-7 2 A
A 11Nov13 13Nov13 14Nov13 17Nov13 8Dec13
P 10Oct13 17Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
Instrument Loop Diagrams Saadiyat F 11Nov13 13Nov13 18Nov13 19Nov13 3Dec13 19Nov13 3Dec13 10Dec13
5275-PL-830-15-80-001 2 A
CRS
A 11Nov13 13Nov13 18Nov13 19Nov13 2Dec13
P 10Nov13 13Nov13 14Nov13 17Nov13 1Dec13 17Nov13 1Dec13 5Dec13
F 18Nov13 20Nov13 25Nov13 26Nov13 10Dec13 26Nov13 10Dec13 17Dec13
5275-PL-000-15-30-001 Update the existing FO Network layout 3 0
A 18Nov13 20Nov13 25Nov13 26Nov13 11Dec13 - - -
P 14Nov13 17Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 10Dec13
F 18Nov13 20Nov13 25Nov13 26Nov13 10Dec13 26Nov13 10Dec13 17Dec13
5275-PL-000-15-80-003 Existing patch panel Diagram update 3 0
A 18Nov13 20Nov13 25Nov13 26Nov13 11Dec13 - - -
P 8Oct13 9Oct13 10Oct13 14Oct13 28Oct13 14Oct13 28Oct13 3Nov13
Update the instrument termination F 15Dec13 18Dec13 23Dec13 29Dec13 12Jan14 29Dec13 12Jan14 19Jan14
5275-PL-581-15-45-001 3
diagram at PPRS
A
P 14Oct13 14Oct13 17Oct13 20Oct13 3Nov13 20Oct13 3Nov13 10Nov13
Update instrument loop Diagram at F 15Dec13 18Dec13 23Dec13 29Dec13 12Jan14 29Dec13 12Jan14 19Jan14
5275-PL-581-15-80-001 3
PPRS
A
409603376.xlsx Page 57 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 1Oct13 2Oct13 3Oct13 7Oct13 21Oct13 7Oct13 21Oct13 28Oct13
Update the Instrument cable block F 12Sep13 12Sep13 12Sep13 15Sep13 - - - 10Dec13
5275-PL-581-15-65-003 3 A
diagram at PPRS
A 12Sep13 12Sep13 12Sep13 15Sep13 - - - -
P 21Oct13 23Oct13 24Oct13 27Oct13 10Nov13 27Oct13 10Nov13 14Nov13
Multiple Cable Transist (MCT) Details - F 5Dec13 8Dec13 11Dec13 15Dec13 29Dec13 15Dec13 29Dec13 5Jan14
5275-PL-581-15-35-001 3 B
SVS-1
A 8Dec13 9Dec13 9Dec13 12Dec13 22Dec13 - - 9Jan14
P 21Oct13 23Oct13 24Oct13 27Oct13 10Nov13 27Oct13 10Nov13 14Nov13
Multiple Cable Transist (MCT) Details - F 5Dec13 8Dec13 11Dec13 15Dec13 29Dec13 15Dec13 29Dec13 5Jan14
5275-PL-581-15-35-002 3 B
SVS-7
A 8Dec13 9Dec13 9Dec13 12Dec13 22Dec13 - - 9Jan14
P 21Oct13 23Oct13 24Oct13 27Oct13 10Nov13 27Oct13 10Nov13 14Nov13
Multiple Cable Transist (MCT) Details - F 5Dec13 8Dec13 25Nov13 26Nov13 10Dec13 26Nov13 10Dec13 17Dec13
5275-PL-830-15-35-001 3 0
CRS
A 24Nov13 25Nov13 25Nov13 26Nov13 17Dec13 - - -
P 27Oct13 27Oct13 28Oct13 30Oct13 13Nov13 30Oct13 13Nov13 20Nov13
F 11Sep13 11Sep13 11Sep13 13Sep13 1Oct13 - - -
5275-PL-830-15-80-010 Flow Metering Skid Architecture Diagram 3 0
A 11Sep13 11Sep13 11Sep13 13Sep13 1Oct13 - - -
Fire & GAS
P 2Oct13 6Oct13 7Oct13 9Oct13 23Oct13 9Oct13 23Oct13 29Oct13
F&G System Architecture Drawing F 26Aug13 26Aug13 26Aug13 27Aug13 24Oct13 - - 6Nov13
5275-PL-830-15-80-061 2 0
Saadiyat CRS
A 26Aug13 26Aug13 26Aug13 27Aug13 24Oct13 - - 6Nov13
P 5Nov13 7Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
F&G System Architecture Drawing F 3Nov13 5Nov13 7Nov13 10Nov13 20Nov13 - - 27Nov13
5275-PL-581-15-80-063 2 0
Saadiyat SVS-1
A 3Nov13 5Nov13 7Nov13 10Nov13 19Nov13 - - -

409603376.xlsx Page 58 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 5Nov13 7Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
F&G System Architecture Drawing F 3Nov13 5Nov13 7Nov13 10Nov13 20Nov13 - - 27Nov13
5275-PL-581-15-80-064 2 0
Saadiyat SVS-7
A 3Nov13 5Nov13 7Nov13 10Nov13 19Nov13 - - -
P 9Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 5Nov13
F 4Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 30Oct13
5275-PL-581-15-65-061 F&G Cable Block Diagram - SVS-1 3 0
A 4Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - 30Oct13
P 9Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 5Nov13
F 5Sep13 17Oct13 6Nov13 6Nov13 20Nov13 - - -
5275-PL-581-15-65-062 F&G Cable Block Diagram - SVS-7 3 0
A 5Sep13 17Oct13 6Nov13 6Nov13 18Nov13 - - -
P 9Oct13 10Oct13 13Oct13 16Oct13 30Oct13 16Oct13 30Oct13 5Nov13
F 4Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - -
5275-PL-830-15-65-061 F&G Cable Block Diagram - CRS 3 0
A 4Sep13 5Sep13 5Sep13 9Sep13 23Sep13 - - -
P 8Oct13 9Oct13 10Oct13 13Oct13 27Oct13 13Oct13 27Oct13 31Oct13
Update the Instrument location plan F&G F 5Dec13 8Dec13 11Dec13 15Dec13 29Dec13 15Dec13 29Dec13 5Jan14
5275-PL-581-15-30-061 3 A
Detectors at PPRS
A 20Jan14 20Jan14 21Jan14 21Jan14
P 3Sep13 4Sep13 5Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
F 11Sep13 13Sep13 15Sep13 19Sep13 3Oct13 - - 10Dec13
5275-PL-581-15-65-063 F & G Cause & Effect Diagrams - SVS-1 1-II B

A 11Sep13 13Sep13 15Sep13 19Sep13 3Oct13 - - 2Dec13


P 3Sep13 4Sep13 5Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
F 11Sep13 13Sep13 15Sep13 19Sep13 3Oct13 - - 10Dec13
5275-PL-581-15-65-064 F & G Cause & Effect Diagrams - SVS-7 1-II B

A 11Sep13 13Sep13 15Sep13 19Sep13 3Oct13 - - 2Dec13


P 3Sep13 4Sep13 5Sep13 8Sep13 22Sep13 8Sep13 22Sep13 29Sep13
F 11Sep13 13Sep13 15Sep13 19Sep13 3Oct13 - - 10Dec13
5275-PL-830-15-65-063 F & G Cause & Effect Diagrams - CRS 1-II B

A 11Sep13 13Sep13 15Sep13 19Sep13 3Oct13 - - 2Dec13


P 23Oct13 27Oct13 28Oct13 30Oct13 13Nov13 30Oct13 13Nov13 20Nov13
F & G Interconnection, Termination F 31Oct13 5Nov13 10Nov13 14Nov13 5Dec13 14Nov13 5Dec13 12Dec13
5275-PL-581-15-45-061 3 B
Diagrams SVS-1
A 31Oct13 5Nov13 10Nov13 14Nov13 2Dec13 - - 12Dec13
P 30Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 27Nov13
F & G Interconnection, Termination F 7Nov13 5Nov13 10Nov13 14Nov13 5Dec13 14Nov13 5Dec13 12Dec13
5275-PL-581-15-45-062 3 B
Diagrams SVS-7

409603376.xlsx Page 59 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%
F & G Interconnection, Termination
Detailed DesignDiagrams
5275-PL-581-15-45-062 for Yas SVS-7Mina Zayed Pipeline
3 BProject
A 7Nov13 5Nov13 10Nov13 14Nov13 2Dec13 - - 12Dec13
P 10Nov13 13Nov13 14Nov13 17Nov13 1Dec13 17Nov13 1Dec13 8Dec13
F & G Interconnection, Termination F 4Nov13 5Nov13 10Nov13 14Nov13 5Dec13 14Nov13 5Dec13 12Dec13
5275-PL-830-15-45-061 3 B
Diagrams - Saadiyat CRS
A 4Nov13 5Nov13 10Nov13 14Nov13 2Dec13 - - 12Dec13
P 16Oct13 20Oct13 21Oct13 23Oct13 6Nov13 23Oct13 6Nov13 13Nov13
F 10Nov13 12Nov13 14Nov13 20Nov13 8Dec13 20Nov13 8Dec13 15Dec13
5275-PL-581-15-80-061 F & G loop Diagrams SVS-1 2 A
A 10Nov13 12Nov13 12Nov13 14Nov13 2Dec13 - - -
P 23Oct13 27Oct13 28Oct13 30Oct13 13Nov13 30Oct13 13Nov13 20Nov13
F 10Nov13 12Nov13 14Nov13 20Nov13 8Dec13 20Nov13 8Dec13 15Dec13
5275-PL-581-15-80-062 F & G loop Diagrams SVS-7 2 A
A 10Nov13 12Nov13 13Nov13 14Nov13 29Dec13 - - -
P 30Oct13 5Nov13 6Nov13 10Nov13 24Nov13 10Nov13 24Nov13 1Dec13
F 10Nov13 12Nov13 14Nov13 20Nov13 8Dec13 20Nov13 8Dec13 15Dec13
5275-PL-830-15-80-062 F & G loop Diagrams Saadiyat CRS 2 A
A 10Nov13 12Nov13 17Nov13 20Nov13 2Dec13 - - -
P 25Sep13 26Sep13 29Sep13 1Oct13 15Oct13 1Oct13 15Oct13 21Oct13
F & G Detector Location Layout (Field- F 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 - - 3Oct13
5275-PL-830-15-30-061 3 1
CRS)
A 5Sep13 10Sep13 10Sep13 15Sep13 22Sep13 - - 3Oct13
P 1Oct13 2Oct13 3Oct13 7Oct13 21Oct13 7Oct13 21Oct13 28Oct13
F & G Detector Location Layout (E&I F 4Sep13 4Sep13 4Sep13 6Sep13 18Sep13 - - 1Oct13
5275-PL-830-15-30-062 3 0
Building-CRS)
A 4Sep13 4Sep13 4Sep13 6Sep13 18Sep13 - - 1Oct13
P 8Oct13 9Oct13 10Oct13 14Oct13 28Oct13 14Oct13 28Oct13 3Nov13
F & G Detector Location Layout (F-SVS- F 4Sep13 5Sep13 5Sep13 11Sep13 22Sep13 - - 28Nov13
5275-PL-581-15-30-062 3 0
1 Yas Island)
A 4Sep13 5Sep13 5Sep13 11Sep13 22Sep13 - - 28Nov13
P 14Oct13 14Oct13 17Oct13 20Oct13 3Nov13 20Oct13 3Nov13 10Nov13
F & G Detector Location Layout (E&I F 4Sep13 4Sep13 4Sep13 6Sep13 18Sep13 - - 3Oct13
5275-PL-581-15-30-063 3 0
Building-SVS-1 Yas Island)
A 4Sep13 4Sep13 4Sep13 6Sep13 18Sep13 - - 3Oct13

409603376.xlsx Page 60 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 21Oct13 23Oct13 24Oct13 27Oct13 10Nov13 27Oct13 10Nov13 14Nov13
F 18Sep13 18Sep13 18Sep13 22Sep13 8Oct13 - - 28Oct13
5275-PL-581-15-30-064 F & G Detector Location Layout - SVS 7 3 0
A 18Sep13 18Sep13 18Sep13 22Sep13 8Oct13 - - 28Oct13
P 27Oct13 28Oct13 29Oct13 3Nov13 17Nov13 3Nov13 17Nov13 24Nov13
F & G Detector Location Layout at F 27Oct13 27Oct13 27Oct13 31Oct13 12Nov13 - - -
5275-PL-581-15-30-065 3 0
Control Building- SVS 7
A 27Oct13 27Oct13 27Oct13 31Oct13 12Nov13 - - -
P 21Oct13 23Oct13 24Oct13 27Oct13 10Nov13 27Oct13 10Nov13 14Nov13
F 3Sep13 3Sep13 3Sep13 5Sep13 18Sep13 - - 25Sep13
5275-PL-581-15-31-061 F & G Cable Routing Layout SVS-1 3 0
A 3Sep13 3Sep13 3Sep13 5Sep13 18Sep13 - - 25Sep13
P 27Oct13 28Oct13 29Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
F 6Nov13 7Nov13 7Nov13 14Nov13 28Nov13 14Nov13 28Nov13 5Dec13
5275-PL-581-15-31-062 F & G Cable Routing Layout SVS-7 3 0
A 6Nov13 7Nov13 7Nov13 14Nov13 2Dec13 - - -
P 3Nov13 4Nov13 5Nov13 7Nov13 21Nov13 7Nov13 21Nov13 27Nov13
F 2Oct13 2Oct13 2Oct13 3Oct13 24Oct13 3Oct13 24Oct13 31Oct13
5275-PL-830-15-31-061 F & G Cable Routing Layout CRS 3 0
A 2Oct13 2Oct13 2Oct13 3Oct13 24Oct13 - - -
P 7Nov13 10Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
F 4Jul13 4Jul13 4Jul13 22Aug13 9Sep13 - - 30Sep13
5275-PL-000-15-35-061 Typical I&C and F&G Installation Details 3 0
A 4Jul13 4Jul13 4Jul13 22Aug13 9Sep13 - - 30Sep13
Telecom
P 19Nov13 20Nov13 21Nov13 24Nov13 8Dec13 24Nov13 8Dec13 15Dec13
F 10Sep13 10Sep13 10Sep13 11Sep13 22Sep13 - - -
5275-PL-000-15-65-031 FO Telecom System Block Diagram 3 0
A 10Sep13 10Sep13 10Sep13 11Sep13 22Sep13 - - -
P 24Nov13 25Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 18Dec13
Typical drwaing for RF Grounding F 11Sep13 11Sep13 11Sep13 13Sep13 1Oct13 - - -
5275-PL-000-15-35-031 3 0
System
A 11Sep13 11Sep13 11Sep13 13Sep13 1Oct13 - - -
P 17Oct13 20Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
F 20Nov13 20Nov13 20Nov13 21Nov13 5Dec13 21Nov13 5Dec13 12Dec13
5275-PL-000-15-35-032 Typical FOC Installation Details 3 0
A 20Nov13 20Nov13 20Nov13 21Nov13 2Dec13 - - -
P 24Nov13 27Nov13 28Nov13 1Dec13 15Dec13 1Dec13 15Dec13 19Dec13
Telecom Cable Entrance Facility F 12Sep13 12Sep13 12Sep13 13Sep13 1Oct13 13Sep13 1Oct13 8Oct13
5275-PL-000-15-35-035 3 0
409603376.xlsx
Drawings Page 61 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignTelecom
for YasCable Mina Zayed Pipeline Project
Entrance Facility
5275-PL-000-15-35-035 3 0
Drawings
A 12Sep13 12Sep13 12Sep13 13Sep13 1Oct13 - - -
P 7Nov13 10Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
FO Cable Routing Layout SVS-1 to F 4Nov13 5Nov13 7Nov13 17Nov13 1Dec13 17Nov13 1Dec13 5Dec13
5275-PL-581-15-31-031 3 0
SPRS-2
A 4Nov13 5Nov13 7Nov13 19Nov13 2Dec13 - - -
P 13Oct13 10Oct13 13Oct13 17Oct13 31Oct13 17Oct13 31Oct13 7Nov13
FO Cable Routing Layout SVS-1 & F 18Nov13 19Nov13 28Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
5275-PL-581-15-31-032 3 0
Saadiyat CRS
A 18Nov13 19Nov13 28Nov13 28Nov13 11Dec13 - - -
P 29Oct13 31Oct13 3Nov13 5Nov13 19Nov13 5Nov13 19Nov13 25Nov13
FO Cable Routing Layout CRS to Reem F 18Nov13 19Nov13 21Nov13 15Dec13 29Dec13 15Dec13 29Dec13 5Jan14
5275-PL-581-15-31-033 3 0
Island
A 18Nov13 19Nov13 21Nov13 3Dec13 11Dec13 - - -
P 23Oct13 24Oct13 27Oct13 29Oct13 12Nov13 29Oct13 12Nov13 19Nov13
F 26Aug13 26Aug13 26Aug13 3Oct13 - - - -
5275-PL-000-15-43-031 CCTV System Block diagram 2 0
A 26Aug13 26Aug13 26Aug13 3Oct13 - - - -
P 12Nov13 14Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
CCTV equipment layout & cable routing F 4Nov13 5Nov13 10Nov13 17Nov13 5Dec13 17Nov13 5Dec13 5Dec13
5275-PL-000-15-31-031 3 0
diagram
A 4Nov13 5Nov13 10Nov13 14Nov13 2Dec13 - - -
P 19Nov13 24Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
F 8Dec13 14Dec13 18Dec13 20Dec13 3Jan14 20Dec13 3Jan14 10Jan14
- Miscellaneous I&C Deliverables
A

409603376.xlsx Page 62 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


ELECTRICAL
COMMON
SPECIFICATIONS
P 15Jul13 22Jul13 23Jul13 25Jul13 8Aug13 25Jul13 8Aug13 14Aug13
Addendum to DGS - Electrical Design F 3Jul13 7Jul13 10Jul13 16Jul13 28Jul13 - - 13Aug13
5275-ADD-1630-003 1-II 0
guidelines
A 3Jul13 7Jul13 10Jul13 16Jul13 28Jul13 - - 13Aug13
P 15Jul13 22Jul13 23Jul13 25Jul13 8Aug13 25Jul13 8Aug13 14Aug13
F 3Jul13 9Jul13 11Jul13 16Jul13 28Jul13 - - 13Aug13
5275-ADD-1630-029 Addendum to DGS - Cables 1-II 0
A 3Jul13 9Jul13 11Jul13 16Jul13 28Jul13 - - 13Aug13
P 15Jul13 22Jul13 23Jul13 25Jul13 8Aug13 25Jul13 8Aug13 14Aug13
F 4Jul13 10Jul13 11Jul13 15Jul13 17Jul13 - - 13Aug13
5275-ADD-1630-033 Addendum to DGS - Distribution Boards 1-II 0
A 4Jul13 10Jul13 11Jul13 15Jul13 17Jul13 - - 13Aug13
P 15Jul13 22Jul13 23Jul13 25Jul13 8Aug13 25Jul13 8Aug13 14Aug13
F 4Jul13 14Jul13 23Jul13 24Jul13 1Aug13 - - 13Aug13
5275-ADD-1630-026 Addendum to DGS - AC UPS 1-II 0
A 4Jul13 14Jul13 23Jul13 24Jul13 1Aug13 - - 13Aug13
P 15Jul13 22Jul13 23Jul13 25Jul13 8Aug13 25Jul13 8Aug13 14Aug13
F 7Jul13 14Jul13 23Jul13 24Jul13 1Aug13 - - 13Aug13
5275-ADD-1630-025 Addendum to DGS - DC UPS 1-II 0
A 7Jul13 14Jul13 23Jul13 24Jul13 1Aug13 - - 13Aug13
P 15Jul13 22Jul13 23Jul13 25Jul13 8Aug13 25Jul13 8Aug13 14Aug13
Addendum to DGS - Field F 12Aug13 13Aug13 15Aug13 15Aug13 4Sep13 - - -
5275-ADD-1630-035 Commissioning of Electrical Installation 1-II 0
& Equipment
A 12Aug13 13Aug13 15Aug13 15Aug13 4Sep13 - - -
P 3Oct13 10Oct13 13Oct13 15Oct13 29Oct13 15Oct13 29Oct13 4Nov13
Specifications for Electrical Bulk F 31Jul13 31Jul13 31Jul13 5Aug13 18Aug13 - - 29Aug13
SP-5275-PL-000-16-001 1-II 0
materials / Package unit requirements
A 31Jul13 31Jul13 31Jul13 5Aug13 18Aug13 - - 29Aug13
DATA SHEETS
P 29Sep13 30Sep13 1Oct13 3Oct13 17Oct13 3Oct13 17Oct13 23Oct13
Data Sheet for Low Voltage Power, F 23Jul13 31Jul13 31Jul13 5Aug13 18Aug13 - - 20Sep13
SPP-5275-PL-000-16-001 2 0
Control and Earthing Cables
A 23Jul13 31Jul13 31Jul13 5Aug13 18Aug13 - - 20Sep13
P 25Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
F 23Jul13 24Jul13 25Jul13 28Jul13 7Aug13 - - 3Oct13
SPP-5275-PL-000-16-002 Data Sheet for Main Distribution Boards 2 0
409603376.xlsx Page 63 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


SPP-5275-PL-000-16-002 Data Sheet for Main Distribution Boards 2 0
A 23Jul13 24Jul13 25Jul13 28Jul13 7Aug13 - - 3Oct13
P 31Jul13 4Aug13 5Aug13 7Aug13 21Aug13 7Aug13 21Aug13 27Aug13
F 30Jul13 1Aug13 5Aug13 7Aug13 4Sep13 - - 9Oct13
SPP-5275-PL-000-16-003 Datasheet for Auxiliary DB 2 0
A 30Jul13 1Aug13 5Aug13 7Aug13 4Sep13 - - 9Oct13
P 11Sep13 12Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
F 4Sep13 4Sep13 4Sep13 4Sep13 18Sep13 - - 26Oct13
SPP-5275-PL-000-16-006 Data Sheet for AC UPS 2 0
A 4Sep13 4Sep13 4Sep13 4Sep13 18Sep13 - - 26Oct13
P 17Sep13 19Sep13 22Sep13 24Sep13 8Oct13 24Sep13 8Oct13 14Oct13
F 4Sep13 5Sep13 5Sep13 11Sep13 23Sep13 - - 1Nov13
SPP-5275-PL-000-16-007 Data Sheet for DC UPS 2 0
A 4Sep13 5Sep13 5Sep13 11Sep13 23Sep13 - - 1Nov13
MATERIAL REQUISITIONS
P 25Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
Material Requisition for Distribution F 24Jul13 24Jul13 25Jul13 7Aug13 4Sep13 - - 3Oct13
R-5275-PL-000-16-001 2 0
Boards
A 24Jul13 24Jul13 25Jul13 7Aug13 4Sep13 - - 3Oct13
P 11Sep13 12Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
F 4Sep13 4Sep13 4Sep13 9Sep13 18Sep13 - - 25Sep13
R-5275-PL-000-16-004 Material Requisition for AC UPS 2 0
A 4Sep13 4Sep13 4Sep13 9Sep13 18Sep13 - - 25Sep13
P 17Sep13 19Sep13 22Sep13 24Sep13 8Oct13 24Sep13 8Oct13 14Oct13
F 4Sep13 5Sep13 10Sep13 20Sep13 8Oct13 - - 1Nov13
R-5275-PL-000-16-005 Material Requisition for DC UPS 2 0
A 4Sep13 5Sep13 10Sep13 20Sep13 8Oct13 - - 1Nov13
P 3Oct13 10Oct13 13Oct13 15Oct13 29Oct13 15Oct13 29Oct13 4Nov13
F 10Oct13 12Dec13 16Dec13 19Dec13 2Jan14 19Dec13 2Jan14 9Jan14
R-5275-PL-000-16-006 Material Requisition for Bulk Materials 2 0
A 10Oct13 12Dec13 29Dec13 31Dec13 - - - -

409603376.xlsx Page 64 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 29Sep13 30Sep13 1Oct13 3Oct13 17Oct13 3Oct13 17Oct13 23Oct13
F 24Jul13 28Aug13 3Oct13 25Oct13 31Oct13 - - -
R-5275-PL-000-16-007 Material Requisition for Cables 2 0
A 24Jul13 28Aug13 3Oct13 25Oct13 31Oct13 - - -
TECHNICAL BID EVALUATIONS
P 6Nov13 6Nov13 7Nov13 11Nov13 25Nov13 - - -
F 22Dec13 24Dec13 29Dec13 9Jan14 23Jan14 9Jan14 23Jan14 -
TBE-5275-PL-000-16-002 TBE for Distribution Boards 2
A
P 20Nov13 20Nov13 21Nov13 25Nov13 9Dec13 - - -
F 19Nov13 21Nov13 29Dec13 9Jan14 23Jan14 9Jan14 23Jan14 -
TBE-5275-PL-000-16-004 TBE for AC UPS 1-II 0
A 19Nov13 21Nov13 25Dec13 29Dec13 - - - -
P 20Nov13 20Nov13 21Nov13 25Nov13 9Dec13 - - -
F 19Nov13 21Nov13 29Dec13 9Jan14 23Jan14 9Jan14 23Jan14 -
TBE-5275-PL-000-16-005 TBE for DC UPS 1-II 0
A 19Nov13 21Nov13 25Dec13 29Dec13 - - - -
P 5Jan14 5Jan14 6Jan14 8Jan14 22Jan14 - - -
F 22Dec13 24Dec13 29Dec13 9Jan14 23Jan14 9Jan14 23Jan14 -
TBE-5275-PL-000-16-006 TBE for Bulk Materials 1-II
A
P 1Dec13 1Dec13 2Dec13 4Dec13 18Dec13 - - -
F 22Dec13 24Dec13 29Dec13 9Jan14 23Jan14 9Jan14 23Jan14 -
TBE-5275-PL-000-16-007 TBE for Cables 1-II
A 10Dec13 12Dec13
SCHEDULES / LISTS
P 28Aug13 29Aug13 1Sep13 3Sep13 17Sep13 3Sep13 17Sep13 23Sep13
F 7Aug13 8Aug13 13Aug13 15Aug13 4Sep13 - - -
SCH-5275-PL-830-16-001 Load List - Saadiyat CRS 2 0
A 7Aug13 8Aug13 13Aug13 15Aug13 4Sep13 - - -
P 3Sep13 4Sep13 5Sep13 9Sep13 23Sep13 9Sep13 23Sep13 30Sep13
F 7Aug13 8Aug13 13Aug13 15Aug13 4Sep13 - - -
SCH-5275-PL-581-16-001 Load List - SVS1 2 0
A 7Aug13 8Aug13 13Aug13 15Aug13 4Sep13 - - -
P 10Sep13 12Sep13 15Sep13 16Sep13 30Sep13 16Sep13 30Sep13 6Oct13
F 7Aug13 8Aug13 13Aug13 15Aug13 4Sep13 - - -
SCH-5275-PL-581-16-002 Load List - SVS7 2 0
A 7Aug13 8Aug13 13Aug13 15Aug13 4Sep13 - - -
P 10Sep13 12Sep13 15Sep13 16Sep13 30Sep13 16Sep13 30Sep13 6Oct13
SCH-5275-PL-830-16-002
409603376.xlsx Cable schedule - Saadiyat CRS 3 0 Page 65 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


F 15Aug13 28Aug13 1Oct13 3Oct13 - - - -
SCH-5275-PL-830-16-002 Cable schedule - Saadiyat CRS 3 0
A 15Aug13 28Aug13 1Oct13 3Oct13 - - - -
P 16Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
F 15Aug13 28Aug13 17Sep13 3Oct13 4Nov13 - - -
SCH-5275-PL-581-16-003 Cable schedule - SVS1 3 0
A 15Aug13 28Aug13 17Sep13 3Oct13 4Nov13 - - -
P 23Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 17Oct13
F 15Aug13 5Sep13 7Nov13 7Nov13 18Nov13 - - 5Dec13
SCH-5275-PL-581-16-004 Cable schedule - SVS7 3 0
A 15Aug13 5Sep13 7Nov13 7Nov13 18Nov13 - - 5Dec13
P 16Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
Equipment schedule(Saadiyat F 5Sep13 18Sep13 1Oct13 3Oct13 - - - -
SCH-5275-PL-000-16-001 3 0
CRS,SVS1,SVS7)
A 5Sep13 18Sep13 1Oct13 3Oct13 - - - -
P 24Nov13 24Nov13 25Nov13 27Nov13 - - - -
F 13Oct13 18Dec13 19Dec13 23Dec13 - 23Dec13 - -
MTO-5275-PL-830-16-001 MTO - Saadiyat CRS 2 B
A 13Oct13 18Dec13 18Dec13 19Dec13 6Jan14 - - 8Jan14
P 10Dec13 11Dec13 12Dec13 15Dec13 - - - -
F 13Oct13 18Dec13 22Dec13 25Dec13 - 25Dec13 - -
MTO-5275-PL-581-16-001 MTO - SVS1 2 0
A 13Oct13 18Dec13 18Dec13 19Dec13 6Jan14 - - 8Jan14
P 24Nov13 25Nov13 26Nov13 28Nov13 - - - -
F 18Dec13 19Dec13 23Dec13 26Dec13 - 26Dec13 - -
MTO-5275-PL-581-16-002 MTO - SVS7 2 0
A 11Dec13 18Dec13 19Dec13 19Dec13 6Jan14 - - 8Jan14
P 14Oct13 10Oct13 13Oct13 17Oct13 - - - -
F 13Oct13 18Dec13 23Dec13 26Dec13 - 26Dec13 - -
MTO-5275-PL-581-16-003 MTO - For all other Stations 2 0
A 13Oct13 18Dec13 18Dec13 19Dec13 6Jan14 - - 8Jan14

409603376.xlsx Page 66 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


CALCULATIONS / PHILOSOPHY / REPORTS
P 3Sep13 4Sep13 5Sep13 9Sep13 23Sep13 9Sep13 23Sep13 30Sep13
Cable Sizing Calculations - Saadiyat F 8Aug13 20Aug13 20Aug13 21Aug13 5Sep13 - - 26Oct13
NC-5275-PL-830-16-001 1-II 0
CRS
A 8Aug13 20Aug13 20Aug13 21Aug13 5Sep13 - - 26Oct13
P 10Sep13 12Sep13 15Sep13 16Sep13 30Sep13 16Sep13 30Sep13 6Oct13
F 8Aug13 20Aug13 20Aug13 21Aug13 5Sep13 - - 26Oct13
NC-5275-PL-581-16-001 Cable Sizing Calculations - SVS1 1-II 0
A 8Aug13 20Aug13 20Aug13 21Aug13 5Sep13 - - 26Oct13
P 16Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
F 15Aug13 20Aug13 22Aug13 1Sep13 22Sep13 - - 26Oct13
NC-5275-PL-581-16-002 Cable Sizing Calculations - SVS7 1-II 0
A 15Aug13 20Aug13 22Aug13 1Sep13 22Sep13 - - 26Oct13
P 12Nov13 14Nov13 17Nov13 18Nov13 2Dec13 18Nov13 2Dec13 5Dec13
Lighting Calculations Indoor - Saadiyat F 4Sep13 5Sep13 5Sep13 11Sep13 23Sep13 - - -
NC-5275-PL-830-16-002 1-II 0
CRS
A 4Sep13 5Sep13 5Sep13 11Sep13 23Sep13 - - -
P 27Nov13 28Nov13 1Dec13 2Dec13 16Dec13 2Dec13 16Dec13 19Dec13
F 4Sep13 5Sep13 5Sep13 11Sep13 23Sep13 - - -
NC-5275-PL-581-16-003 Lighting Calculations Indoor - SVS1 1-II 0
A 4Sep13 5Sep13 5Sep13 11Sep13 23Sep13 - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 14Nov13 17Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
NC-5275-PL-581-16-011 Lighting Calculations Indoor - SVS -7 1-II 0
A 13Nov13 13Nov13 13Nov13 14Nov13 - - - -
P 19Aug13 19Aug13 20Aug13 22Aug13 5Sep13 22Aug13 5Sep13 12Sep13
Lighting Calculations Outdoor - Saadiyat F 14Jul13 15Jul13 21Aug13 21Aug13 4Sep13 - - -
NC-5275-PL-830-16-003 1-II 0
CRS
A 14Jul13 15Jul13 21Aug13 21Aug13 4Sep13 - - -
P 7Aug13 8Aug13 11Aug13 12Aug13 26Aug13 12Aug13 26Aug13 2Sep13
F 8Jul13 10Jul13 11Jul13 14Jul13 17Jul13 - - 29Aug13
NC-5275-PL-581-16-004 Lighting Calculations Outdoor - SVS -1 1-II 0
A 8Jul13 10Jul13 11Jul13 14Jul13 17Jul13 - - 29Aug13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 14Nov13 17Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
NC-5275-PL-581-16-014 Lighting Calculations Outdoor - SVS -7 1-II 0
A 13Nov13 13Nov13 13Nov13 14Nov13 - - - -
P 30Oct13 3Nov13 3Nov13 5Nov13 19Nov13 5Nov13 19Nov13 25Nov13
F 9Oct13 10Oct13 28Nov13 3Dec13 17Dec13 3Dec13 17Dec13 24Dec13
NC-5275-PL-830-16-004 Earthing Calculations - CRS Saadiyat 1-II 0
409603376.xlsx Page 67 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


NC-5275-PL-830-16-004 Earthing Calculations - CRS Saadiyat 1-II 0
A 9Oct13 10Oct13 2Dec13 5Dec13 - - - -
P 5Nov13 6Nov13 7Nov13 10Nov13 24Nov13 10Nov13 24Nov13 1Dec13
F 9Oct13 10Oct13 21Nov13 21Nov13 5Dec13 21Nov13 5Dec13 12Dec13
NC-5275-PL-581-16-005 Earthing Calculations - SVS1 1-II 0
A 9Oct13 10Oct13 21Nov13 21Nov13 2Dec13 - - 5Dec13
P 10Nov13 10Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
F 9Oct13 10Oct13 21Nov13 21Nov13 5Dec13 21Nov13 5Dec13 12Dec13
NC-5275-PL-581-16-006 Earthing Calculations - SVS7 1-II 0
A 9Oct13 10Oct13 21Nov13 21Nov13 2Dec13 - - 5Dec13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 9Oct13 10Oct13 28Nov13 4Dec13 18Dec13 4Dec13 18Dec13 25Dec13
NC-5275-PL-581-16-007 Earthing Calculations - Other SVS 1-II 0
A 9Oct13 10Oct13 4Dec13 5Dec13 - - - -
P 5Sep13 8Sep13 9Sep13 11Sep13 25Sep13 11Sep13 25Sep13 1Oct13
F 4Sep13 4Sep13 4Sep13 4Sep13 28Sep13 - - 26Oct13
NC-5275-PL-830-16-005 AC UPS sizing - CRS Saadiyat 2 0
A 4Sep13 4Sep13 4Sep13 4Sep13 28Sep13 - - 26Oct13
P 11Sep13 12Sep13 15Sep13 16Sep13 30Sep13 16Sep13 30Sep13 6Oct13
F 4Sep13 5Sep13 5Sep13 10Sep13 18Sep13 - - 1Nov13
NC-5275-PL-581-16-008 DC UPS sizing - SVS 1 2 0
A 4Sep13 5Sep13 5Sep13 10Sep13 18Sep13 - - 1Nov13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 14Nov13 21Nov13 21Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
NC-5275-PL-581-16-012 DC UPS sizing - SVS 7 2 0
A 14Nov13 21Nov13 21Nov13 21Nov13 - - - -
P 30Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 27Nov13
Lightning Protection Calculations - F 9Oct13 10Oct13 28Nov13 10Dec13 24Dec13 10Dec13 24Dec13 31Dec13
NC-5275-PL-830-16-006 1-II ZZ
Saadiyat CRS
A 9Oct13 10Oct13 28Nov13

409603376.xlsx Page 68 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 14Nov13 18Nov13 19Nov13 21Nov13 5Dec13 21Nov13 5Dec13 12Dec13
Lightning Protection Calculations - SVS F 9Oct13 10Oct13 28Nov13 10Dec13 24Dec13 10Dec13 24Dec13 31Dec13
NC-5275-PL-581-16-010 1-II ZZ
1
A 9Oct13 10Oct13 28Nov13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
Lightning Protection Calculations - SVS F 28Nov13 3Dec13 5Dec13 10Dec13 24Dec13 10Dec13 24Dec13 31Dec13
NC-5275-PL-581-16-013 1-II 0
7
A 28Nov13 5Dec13 11Dec13 12Dec13 - - - -
DRAWINGS
P 3Sep13 8Sep13 9Sep13 11Sep13 25Sep13 11Sep13 25Sep13 1Oct13
F 20Aug13 22Aug13 3Sep13 3Sep13 12Sep13 - - 1Nov13
5275-PL-830-16-33-011 SLD-Main DB's - Saadiyat CRS 1-II 0
A 20Aug13 22Aug13 3Sep13 3Sep13 12Sep13 - - 1Nov13
P 10Sep13 12Sep13 15Sep13 17Sep13 1Oct13 17Sep13 1Oct13 8Oct13
F 20Aug13 22Aug13 3Sep13 3Sep13 12Sep13 - - 1Nov13
5275-PL-581-16-33-011 SLD-Main DB's - SVS 1 1-II 0
A 20Aug13 22Aug13 3Sep13 3Sep13 12Sep13 - - 1Nov13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 5Nov13 7Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
5275-PL-581-16-33-016 SLD-Main DB's - SVS 7 1-II 0
A 5Nov13 7Nov13 12Nov13 14Nov13 - - - -
P 12Nov13 14Nov13 17Nov13 18Nov13 2Dec13 18Nov13 2Dec13 8Dec13
SLD & Schedule - Indoor Lighting F 5Sep13 5Sep13 29Sep13 1Oct13 2Oct13 9Oct13 26Oct13 -
5275-PL-830-16-33-012 1-II 0
&Small power DB - Saadiyat CRS
A 5Sep13 5Sep13 29Sep13 1Oct13 2Oct13 9Oct13 26Oct13 -
P 27Nov13 28Nov13 1Dec13 2Dec13 16Dec13 2Dec13 16Dec13 23Dec13
SLD & Schedule - Indoor Lighting F 5Sep13 5Sep13 3Oct13 9Oct13 4Nov13 - - -
5275-PL-581-16-33-012 1-II 0
&Small power DB - SVS1
A 5Sep13 5Sep13 3Oct13 9Oct13 4Nov13 - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
SLD & Schedule - Indoor Lighting F 5Nov13 7Nov13 20Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
5275-PL-581-16-33-018 1-II 0
&Small power DB - SVS7
A 5Nov13 7Nov13 14Nov13 14Nov13 - - - -
P 25Aug13 25Aug13 26Aug13 28Aug13 11Sep13 28Aug13 11Sep13 17Sep13
SLD and Schedule - Outdoor Lighting F 19Aug13 22Aug13 28Aug13 29Aug13 11Sep13 - - 26Oct13
5275-PL-830-16-33-013 1-II 0
DB's - Saadiyat CRS
A 19Aug13 22Aug13 28Aug13 29Aug13 11Sep13 - - 26Oct13
P 13Aug13 14Aug13 15Aug13 18Aug13 1Sep13 18Aug13 1Sep13 5Sep13
SLD and Schedule - Outdoor Lighting F 14Jul13 16Jul13 28Aug13 29Aug13 11Sep13 - - 26Oct13
5275-PL-581-16-33-013 1-II 0
DB's - SVS1
409603376.xlsx Page 69 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignSLD
forandYas Mina
Schedule Zayed
- Outdoor Lighting Pipeline Project
5275-PL-581-16-33-013 1-II 0
DB's - SVS1
A 14Jul13 16Jul13 28Aug13 29Aug13 11Sep13 - - 26Oct13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
SLD and Schedule - Outdoor Lighting F 5Nov13 7Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
5275-PL-581-16-33-017 1-II 0
DB's - SVS7
A 5Nov13 7Nov13 12Nov13 14Nov13 - - - -
P 11Sep13 12Sep13 15Sep13 16Sep13 30Sep13 16Sep13 30Sep13 6Oct13
F 5Sep13 5Sep13 11Sep13 20Sep13 8Oct13 - - 7Nov13
5275-PL-830-16-33-015 SLD for AC UPS - Saadiyat 1-II 0
A 5Sep13 5Sep13 11Sep13 20Sep13 8Oct13 - - 7Nov13
P 16Sep13 16Sep13 17Sep13 19Sep13 3Oct13 19Sep13 3Oct13 10Oct13
F 5Sep13 5Sep13 11Sep13 20Sep13 8Oct13 - - 7Nov13
5275-PL-581-16-33-014 SLD for DC UPS - SVS1 1-II 0
A 5Sep13 5Sep13 11Sep13 20Sep13 8Oct13 - - 7Nov13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 19Nov13 20Nov13 20Nov13 21Nov13 5Dec13 21Nov13 5Dec13 12Dec13
5275-PL-581-16-33-019 SLD for DC UPS - SVS7 1-II 0
A 19Nov13 20Nov13 20Nov13 21Nov13 - - - -
P 25Sep13 26Sep13 29Sep13 30Sep13 14Oct13 30Sep13 14Oct13 20Oct13
F 4Sep13 5Sep13 22Oct13 1Nov13 10Nov13 1Nov13 10Nov13 5Dec13
5275-PL-830-16-60-001 Cable routing drawing - Saadiyat CRS 3 B
A 4Sep13 5Sep13 22Oct13 1Nov13 10Nov13 - - 8Jan14
P 30Sep13 2Oct13 3Oct13 7Oct13 21Oct13 7Oct13 21Oct13 27Oct13
F 4Sep13 5Sep13 4Dec13 5Dec13 19Dec13 5Dec13 19Dec13 26Dec13
5275-PL-581-16-60-001 Cable routing drawing - SVS1 3 0
A 4Sep13 5Sep13 4Dec13 5Dec13 - - - -
P 23Sep13 25Sep13 26Sep13 29Sep13 13Oct13 29Sep13 13Oct13 20Oct13
F 8Oct13 10Oct13 15Dec13 18Dec13 1Jan14 18Dec13 1Jan14 8Jan14
5275-PL-581-16-60-002 Cable routing drawing(SVS7) 3 0
A 8Oct13 10Oct13 10Dec13 12Dec13 - - - -

409603376.xlsx Page 70 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 7Oct13 9Oct13 10Oct13 14Oct13 28Oct13 14Oct13 28Oct13 3Nov13
Cable Routing from Yas 37 substation to F 1Oct13 3Oct13 28Nov13 5Dec13 22Dec13 5Dec13 22Dec13 29Dec13
5275-PL-581-16-60-003 3 A
SVS1
A 1Oct13 3Oct13 4Dec13 5Dec13 17Dec13
P 30Sep13 3Oct13 8Oct13 14Oct13 28Oct13 14Oct13 28Oct13 3Nov13
Cable Routing from ADDC substation to F 1Oct13 3Oct13 15Dec13 19Dec13 2Jan14 19Dec13 2Jan14 9Jan14
5275-PL-830-16-60-004 3
Saadiyat CRS
A 1Oct13 3Oct13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
Cable Routing from power supply source F 22Dec13 24Dec13 29Dec13 31Dec13 22Dec13 31Dec13 22Dec13 29Dec13
5275-PL-581-16-60-005 3
to SVS-7
A
P 18Nov13 20Nov13 21Nov13 24Nov13 8Dec13 24Nov13 8Dec13 15Dec13
Lighting & small power layout,Indoor - F 11Sep13 13Sep13 29Sep13 1Oct13 2Oct13 9Oct13 - -
5275-PL-830-16-31-001 3 0
Saadiyat CRS
A 11Sep13 13Sep13 29Sep13 1Oct13 2Oct13 9Oct13 - -
P 3Dec13 4Dec13 5Dec13 9Dec13 23Dec13 9Dec13 23Dec13 30Dec13
Lighting & small power layout,Indoor - F 11Sep13 13Sep13 3Oct13 9Oct13 4Nov13 - - -
5275-PL-581-16-31-001 3 0
SVS1
A 11Sep13 13Sep13 3Oct13 9Oct13 4Nov13 - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
Lighting & small power layout,Indoor - F 12Nov13 14Nov13 20Nov13 24Nov13 8Dec13 24Nov13 8Dec13 15Dec13
5275-PL-581-16-31-004 3 0
SVS7
A 12Nov13 13Nov13 13Nov13 14Nov13 - - - -
P 17Sep13 18Sep13 19Sep13 22Sep13 6Oct13 22Sep13 6Oct13 13Oct13
Lighting & small power Layout, Outdoor - F 11Sep13 13Sep13 15Sep13 22Sep13 5Oct13 - - -
5275-PL-830-16-31-002 3 0
Saadiyat CRS
A 11Sep13 13Sep13 15Sep13 22Sep13 5Oct13 - - -
P 22Sep13 22Sep13 23Sep13 25Sep13 9Oct13 25Sep13 9Oct13 16Oct13
Lighting & small power Layout, Outdoor - F 11Sep13 13Sep13 15Sep13 20Sep13 8Oct13 - - -
5275-PL-581-16-31-002 3 0
SVS1)
A 11Sep13 13Sep13 15Sep13 20Sep13 8Oct13 - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
Lighting & small power Layout, Outdoor - F 5Nov13 7Nov13 17Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
5275-PL-581-16-31-003 3 0
SVS7
A 5Nov13 7Nov13 12Nov13 14Nov13 - - - -
P 5Nov13 10Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
F 9Oct13 10Oct13 11Dec13 15Dec13 29Dec13 15Dec13 29Dec13 5Jan14
5275-PL-830-16-21-001 Earthing Layout - Saadiyat CRS 3 ZZ
A 9Oct13 10Oct13 16Dec13
409603376.xlsx Page 71 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 10Nov13 14Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 9Oct13 10Oct13 28Nov13 5Dec13 19Dec13 5Dec13 19Dec13 26Dec13
5275-PL-581-16-21-001 Earthing Layout - SVS1 3 ZZ
A 9Oct13 10Oct13 16Dec13
P 14Nov13 19Nov13 20Nov13 24Nov13 8Dec13 24Nov13 8Dec13 15Dec13
F 9Oct13 10Oct13 28Nov13 5Dec13 19Dec13 5Dec13 19Dec13 26Dec13
5275-PL-581-16-21-002 Earthing Layout - SVS 7 3 0
A 9Oct13 10Oct13 11Dec13 12Dec13 22Dec13 - - -
P 19Nov13 20Nov13 21Nov13 24Nov13 8Dec13 24Nov13 8Dec13 15Dec13
F 9Oct13 10Oct13 17Dec13 19Dec13 2Jan14 19Dec13 2Jan14 9Jan14
5275-PL-581-16-21-003 Typical Earthing Layout for other SVS 3 0
A 9Oct13 10Oct13 11Dec13 12Dec13 - - - -
P 1Oct13 2Oct13 3Oct13 6Oct13 20Oct13 6Oct13 20Oct13 27Oct13
F 7Aug13 8Aug13 14Aug13 18Aug13 - - - -
5275-PL-000-16-21-011 Typical Installation Drawings- Earthing 3 0
A 7Aug13 8Aug13 14Aug13 18Aug13 - - - -
P 6Oct13 6Oct13 7Oct13 9Oct13 23Oct13 9Oct13 23Oct13 30Oct13
F 7Aug13 8Aug13 15Aug13 18Aug13 - - - -
5275-PL-000-16-31-011 Typical Installation Drawings-Power 3 0
A 7Aug13 8Aug13 15Aug13 18Aug13 - - - -
P 25Sep13 29Sep13 29Sep13 1Oct13 15Oct13 1Oct13 15Oct13 21Oct13
F 7Aug13 8Aug13 15Aug13 18Aug13 - - - -
5275-PL-000-16-41-011 Typical Installation Drawings- Lighting 3 0
A 7Aug13 8Aug13 15Aug13 18Aug13 - - - -
P 19Nov13 24Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
F 1Dec13 4Dec13 9Dec13 15Dec13 24Dec13 28Nov13 12Dec13 31Dec13
- Miscellaneous Electrical Deliverables
A

409603376.xlsx Page 72 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


HVAC
SPECIFICATIONS
P 28Jul13 29Jul13 30Jul13 1Aug13 15Aug13 1Aug13 15Aug13 22Aug13
F 23Jul13 24Jul13 25Jul13 30Jul13 14Aug13 - - -
5275-ADD-3400-001 Addendum to DGS - HVAC Design Basis 1-II 0
A 23Jul13 24Jul13 25Jul13 30Jul13 14Aug13 - - -
P 28Jul13 29Jul13 30Jul13 1Aug13 15Aug13 1Aug13 15Aug13 22Aug13
F 23Jul13 24Jul13 25Jul13 30Jul13 14Aug13 - - -
5275-ADD-3400-002 Addendum to DGS - HVAC Equipment 1-II 0
A 23Jul13 24Jul13 25Jul13 30Jul13 14Aug13 - - -
P 28Jul13 29Jul13 30Jul13 1Aug13 15Aug13 1Aug13 15Aug13 22Aug13
Addendum to DGS - HVAC Ductwork F 23Jul13 24Jul13 25Jul13 30Jul13 14Aug13 - - -
5275-ADD-3400-003 1-II 0
and Ductwork Installation
A 23Jul13 24Jul13 25Jul13 30Jul13 14Aug13 - - -
P 28Jul13 29Jul13 30Jul13 1Aug13 15Aug13 1Aug13 15Aug13 22Aug13
F 29Jul13 30Jul13 1Aug13 15Aug13 3Sep13 - - -
5275-ADD-3400-004 Addendum to DGS - HVAC Controls 1-II 0
A 29Jul13 30Jul13 1Aug13 15Aug13 3Sep13 - - -
P 28Jul13 29Jul13 30Jul13 1Aug13 15Aug13 1Aug13 15Aug13 22Aug13
Addendum to DGS - HVAC Testing, F 6Aug13 6Aug13 11Aug13 13Aug13 7Sep13 - - -
5275-ADD-3400-005 1-II 0
Adjusting and Balancing
A 6Aug13 6Aug13 11Aug13 13Aug13 7Sep13 - - -
DATA SHEETS
P 1Aug13 4Aug13 5Aug13 7Aug13 21Aug13 7Aug13 21Aug13 28Aug13
HVAC Equipment Data Sheet - E/I F 12Aug13 14Aug13 15Aug13 21Aug13 5Sep13 - - 12Dec13
SPP-5275-PL-830-34-001 2 0
Building in CRS-Saadiyat Island
A 12Aug13 14Aug13 15Aug13 21Aug13 5Sep13 - - -
P 6Nov13 7Nov13 10Nov13 11Nov13 25Nov13 11Nov13 25Nov13 2Dec13
HVAC Equipment Data Sheet - E/I F 12Aug13 14Aug13 15Aug13 21Aug13 5Sep13 - - 12Dec13
SPP-5275-PL-581-34-001 2 0
Building in SVS1 YAS Island
A 12Aug13 14Aug13 15Aug13 21Aug13 5Sep13 - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
HVAC Equipment Data Sheet - E/I F 17Nov13 17Nov13 5Dec13 12Dec13 26Dec13 - - 2Jan14
SPP-5275-PL-581-34-002 2 0
Building in SVS-7 Jubail Island
A 13Nov13 14Nov13 18Dec13 22Dec13 - - - -
MATERIAL REQUISITIONS
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 10Dec13
Material Requisition for HVAC F 12Aug13 14Aug13 20Aug13 29Aug13 2Oct13 - - 3Oct13
R-5275-PL-000-34-001 2 0
Equipments
409603376.xlsx Page 73 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignMaterial
for Yas Mina
Requisition Zayed Pipeline Project
for HVAC
R-5275-PL-000-34-001 2 0
Equipments
A 12Aug13 14Aug13 20Aug13 29Aug13 2Oct13 - - 3Oct13
TECHNICAL BID EVALUATIONS
P 16Jan14 16Jan14 19Jan14 21Jan14 28Jan14 - - -
F 27Nov13 27Nov13 27Nov13 21Jan14 28Jan14 - - -
TBE-5275-PL-000-34-001 TBE for HVAC Equipments 1-II 0
A 27Nov13 27Nov13 27Nov13 5Dec13 - - - -
SCHEDULES / CALCULATIONS / MTO
P 10Nov13 11Nov13 12Nov13 14Nov13 28Nov13 14Nov13 28Nov13 5Dec13
HVAC Calculations - E/I Building in CRS- F 19Sep13 24Sep13 24Sep13 6Oct13 6Nov13 - - -
NC-5275-PL-830-34-001 2 0
Saadiyat Island
A 19Sep13 24Sep13 24Sep13 6Oct13 6Nov13 - - -
P 14Nov13 17Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
HVAC Equipment Schedule - E/I Building F 25Sep13 3Oct13 9Oct13 13Oct13 6Nov13 - - 15Dec13
SCH-5275-PL-830-34-001 2 0
in CRS-Saadiyat Island
A 25Sep13 3Oct13 9Oct13 13Oct13 6Nov13 - - -
P 28Nov13 1Dec13 1Dec13 3Dec13 - - - -
HVAC MTO - E/I Building in CRS- F 2Oct13 3Oct13 9Oct13 17Oct13 10Dec13 - - 17Dec13
MTO-5275-PL-830-34-001 2 0
Saadiyat Island
A 2Oct13 3Oct13 9Oct13 17Oct13 - - - -
P 11Nov13 11Nov13 12Nov13 14Nov13 28Nov13 14Nov13 28Nov13 5Dec13
HVAC Calculations - E/I Building in F 14Oct13 14Oct13 21Oct13 25Oct13 - 5Nov13 12Nov13 -
NC-5275-PL-581-34-001 2 0
SVS1 YAS Island
A 14Oct13 14Oct13 21Oct13 25Oct13 - 5Nov13 12Nov13 -
P 14Nov13 17Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 11Dec13
HVAC Equipment Schedule - E/I Building F 14Oct13 14Oct13 24Oct13 31Oct13 10Dec13 - - 17Dec13
SCH-5275-PL-581-34-001 2 0
in SVS1 YAS Island
A 14Oct13 14Oct13 24Oct13 31Oct13 2Dec13 - - -
P 25Nov13 27Nov13 28Nov13 1Dec13 - - - -
HVAC MTO - E/I Building in SVS1 YAS F 24Oct13 24Oct13 31Oct13 31Oct13 10Dec13 - - 17Dec13
MTO-5275-PL-581-34-001 2 0
Island
A 24Oct13 24Oct13 31Oct13 31Oct13 2Dec13 - - -

409603376.xlsx Page 74 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
HVAC Calculations - E/I Building in SVS- F 17Nov13 19Nov13 5Dec13 12Dec13 26Dec13 - - 2Jan14
NC-5275-PL-581-34-002 2 0
7 Jubail Island
A 13Nov13 12Dec13 18Dec13 22Dec13 - - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
HVAC Equipment Schedule - E/I Building F 17Nov13 5Dec13 9Dec13 12Dec13 26Dec13 - - 2Jan14
SCH-5275-PL-581-34-002 2 0
in SVS-7 Jubail Island
A 14Nov13 12Dec13 19Dec13 24Dec13 - - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
HVAC MTO - E/I Building in SVS-7 Jubail F 17Nov13 5Dec13 9Dec13 12Dec13 26Dec13 - - 2Jan14
MTO-5275-PL-581-34-002 2 0
Island
A 14Nov13 12Dec13 18Dec13 22Dec13 - - - -
DRAWINGS
P 24Nov13 25Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
F 13Aug13 14Aug13 15Aug13 15Aug13 3Sep13 - - -
5275-PL-581-34-00-001 HVAC Miscellaneous Details 3 0
A 13Aug13 14Aug13 15Aug13 15Aug13 3Sep13 - - -
P 19Nov13 20Nov13 21Nov13 24Nov13 8Dec13 24Nov13 8Dec13 15Dec13
HVAC Control Flow Diagram - E/I F 19Aug13 20Aug13 22Aug13 1Sep13 - - - -
5275-PL-830-34-20-001 3 0
Building in CRS-Saadiyat Island
A 19Aug13 20Aug13 22Aug13 1Sep13 - - - -
P 21Nov13 25Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
HVAC Layout - E/I Building in CRS- F 24Sep13 24Sep13 9Oct13 13Oct13 6Nov13 - - 12Dec13
5275-PL-830-34-10-003 3 0
Saadiyat Island
A 24Sep13 24Sep13 9Oct13 13Oct13 6Nov13 - - -
P 18Nov13 20Nov13 21Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
HVAC Control Flow Diagram - E/I F 19Aug13 20Aug13 22Aug13 1Sep13 - - - -
5275-PL-581-34-20-001 3 0
Building in SVS1 YAS Island
A 19Aug13 20Aug13 22Aug13 1Sep13 - - - -
P 18Nov13 20Nov13 21Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
HVAC Layout - E/I Building in SVS1 YAS F 14Oct13 14Oct13 24Oct13 31Oct13 15Dec13 - - 22Dec13
5275-PL-581-34-10-001 3 0
Island
A 14Oct13 14Oct13 24Oct13 31Oct13 - - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
HVAC Control Flow Diagram - E/I F 14Nov13 5Dec13 9Dec13 12Dec13 26Dec13 - - 2Jan14
5275-PL-581-34-20-002 3 0
Building in SVS-7 Jubail Island
A 14Nov13 10Dec13 19Dec13 29Dec13 7Jan14 - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
HVAC Layout - E/I Building in SVS7 F 14Nov13 5Dec13 9Dec13 12Dec13 26Dec13 - - 2Jan14
5275-PL-581-34-10-002 3 0
Jubail Island
409603376.xlsx Page 75 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed DesignHVAC
forLayout
Yas- Mina
E/I BuildingZayed
in SVS7 Pipeline Project
5275-PL-581-34-10-002 3 0
Jubail Island
A 14Nov13 10Dec13 19Dec13 24Dec13 - - - -
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
F 6Nov13 6Nov13 7Nov13 14Nov13 10Dec13 14Nov13 10Dec13 17Dec13
5275-PL-000-34-10-001 Battery Room Drainage layout 3 0
A 6Nov13 6Nov13 7Nov13 14Nov13 8Dec13 - - -
P 19Nov13 24Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
F 3Dec13 5Dec13 9Dec13 12Dec13 26Dec13 - - 2Jan14
- Miscellaneous HVAC Deliverables
A - - - - - - - -

CIVIL & STRUCTURAL


SPECIFICATIONS
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to DGS - On-Site Testing F 24Jun13 24Jun13 24Jun13 24Jun13 15Jul13 - - 28Jul13
5275-ADD-1783-003 1-II 0
Laboratory
A 24Jun13 24Jun13 24Jun13 24Jun13 15Jul13 - - 28Jul13
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to DGS - Structural Design F 23Jun13 23Jun13 23Jun13 23Jun13 21Jul13 5Aug13 18Aug13 -
5275-ADD-1882-001 1-II 0
Basis
A 23Jun13 23Jun13 23Jun13 23Jun13 21Jul13 5Aug13 18Aug13 -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to DGS - Architectural Design F 24Jun13 24Jun13 24Jun13 24Jun13 15Jul13 - - -
5275-ADD-2010-001 1-II 0
Basis
A 24Jun13 24Jun13 24Jun13 24Jun13 15Jul13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to DGS - Materials and F 25Jun13 25Jun13 25Jun13 26Jun13 10Jul13 3Aug13 18Aug13 -
5275-ADD-1783-006 1-II 0
Construction of Pipeline Anchor Blocks
A 25Jun13 25Jun13 25Jun13 26Jun13 10Jul13 3Aug13 18Aug13 -

409603376.xlsx Page 76 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
F 24Jun13 24Jun13 24Jun13 26Jun13 10Jul13 - - 28Jul13
5275-ADD-2020-005 Addendum to DGS - Doors and Windows 1-II 0
A 24Jun13 24Jun13 24Jun13 26Jun13 10Jul13 - - 28Jul13
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 7Aug13 7Aug13 7Aug13 12Aug13 5Sep13 - - -
5275-ADD-1488-001 1-II 0
Specification (DGS-1488-001) Fencing
A 7Aug13 7Aug13 7Aug13 12Aug13 5Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 7Aug13 8Aug13 8Aug13 12Aug13 5Sep13 - - -
5275-ADD-1782-001 Specification (DGS-1782-001) Civil 1-II 0
Design Basis
A 7Aug13 8Aug13 8Aug13 12Aug13 5Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 7Aug13 7Aug13 7Aug13 12Aug13 5Sep13 - - -
5275-ADD-1783-002 Specification (DGS-1783-002) Concrete 1-II 0
Construction
A 7Aug13 7Aug13 7Aug13 12Aug13 5Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 7Aug13 8Aug13 11Aug13 20Aug13 7Sep13 - - -
5275-ADD-1783-005 Specification (DGS-1783-005) Paving 1-II 0
Materials and Construction
A 7Aug13 8Aug13 11Aug13 20Aug13 7Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 7Aug13 8Aug13 11Aug13 20Aug13 7Sep13 - - -
5275-ADD-1883-001 Specification (DGS-1883-001) Structural 1-II 0
Steel Fabrication
A 7Aug13 8Aug13 11Aug13 20Aug13 7Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 7Aug13 8Aug13 13Aug13 17Aug13 5Sep13 - - -
5275-ADD-1884-001 Specification (DGS-1884-001) Structural 1-II 0
Steel Erection
A 7Aug13 8Aug13 13Aug13 17Aug13 5Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 7Aug13 7Aug13 7Aug13 12Aug13 25Aug13 - - -
5275-ADD-2020-004 Specification (DGS-2020-004) Thermal 1-II 0
and Moisture Protection
A 7Aug13 7Aug13 7Aug13 12Aug13 25Aug13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 13Aug13 14Aug13 15Aug13 20Aug13 7Sep13 - - -
5275-ADD-2020-001 1-II 0
Specification (DGS-2020-001) Masonry
A 13Aug13 14Aug13 15Aug13 20Aug13 7Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 13Aug13 14Aug13 15Aug13 20Aug13 7Sep13 - - -
5275-ADD-2020-002 Specification (DGS-2020-002) 1-II 0
Architectural Metals
A 13Aug13 14Aug13 15Aug13 20Aug13 7Sep13 - - -
409603376.xlsx Page 77 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 13Aug13 14Aug13 15Aug13 20Aug13 7Sep13 - - -
5275-ADD-2020-003 Specification (DGS-2020-003) Wood and 1-II 0
Plastics
A 13Aug13 14Aug13 15Aug13 20Aug13 7Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 19Aug13 19Aug13 19Aug13 22Aug13 7Sep13 - - -
5275-ADD-2020-006 Specification (DGS-2020-006) 1-II 0
Architectural Finishes
A 19Aug13 19Aug13 19Aug13 22Aug13 7Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 22Aug13 22Aug13 22Aug13 22Aug13 10Sep13 - - -
5275-ADD-2020-007 Specification (DGS-2020-007) 1-II 0
Architectural Specialities
A 22Aug13 22Aug13 22Aug13 22Aug13 10Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 22Aug13 22Aug13 22Aug13 22Aug13 10Sep13 - - -
5275-ADD-2020-009 Specification (DGS-2020-009) 1-II 0
Architectural Furnishings
A 22Aug13 22Aug13 22Aug13 22Aug13 10Sep13 - - -
P 30Jun13 17Jul13 18Jul13 22Jul13 5Aug13 22Jul13 5Aug13 12Aug13
Addendum to Design General F 20Aug13 20Aug13 20Aug13 22Aug13 10Sep13 - - -
5275-ADD-2020-011 1-II 0
Specification (DGS-2020-011) Plumbing
A 20Aug13 20Aug13 20Aug13 22Aug13 10Sep13 - - -
TBE
P 24Jul13 24Jul13 25Jul13 28Jul13 11Aug13 - - -
F 10Jul13 11Jul13 17Jul13 29Jul13 - - - 18Aug13
TBE-5275-PL-581-17-001 TBE for Geotechnical Investigation 1-II 0
A 10Jul13 11Jul13 17Jul13 29Jul13 - - - 18Aug13
SCOPE OF WORK
P 10Jun13 12Jun13 13Jun13 16Jun13 30Jun13 16Jun13 30Jun13 7Jul13
SOW for Geotechnical Investigation F 16Jun13 16Jun13 16Jun13 17Jun13 1Jul13 - - -
SOW-5275-PL-581-17-001 2 3
Report
A 16Jun13 16Jun13 16Jun13 17Jun13 1Jul13 - - -

409603376.xlsx Page 78 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


TYPICAL DRAWINGS
P 22Jul13 24Jul13 25Jul13 28Jul13 11Aug13 28Jul13 11Aug13 15Aug13
F 3Jul13 3Jul13 3Jul13 4Jul13 23Jul13 6Aug13 18Aug13 -
5275-PL-000-17-21-001 General Notes for Concrete Works 2 0
A 3Jul13 3Jul13 3Jul13 4Jul13 23Jul13 6Aug13 18Aug13 -
P 28Jul13 28Jul13 29Jul13 31Jul13 14Aug13 31Jul13 14Aug13 21Aug13
F 3Jul13 3Jul13 3Jul13 4Jul13 23Jul13 - - 14Aug13
5275-PL-000-17-11-001 General Notes for Structural Works 2 0
A 3Jul13 3Jul13 3Jul13 4Jul13 23Jul13 - - 14Aug13
P 31Jul13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 4Sep13
F 3Jul13 3Jul13 3Jul13 10Jul13 23Jul13 - - 28Aug13
5275-PL-000-17-31-004 Road and Paving Details 2 0
A 3Jul13 3Jul13 3Jul13 10Jul13 23Jul13 - - 28Aug13
P 31Jul13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 4Sep13
F 4Jul13 10Jul13 11Jul13 11Jul13 22Jul13 - - 29Aug13
5275-STD-1481-001-020 Fence Types and Gate Details 2 0
A 4Jul13 10Jul13 11Jul13 11Jul13 22Jul13 - - 29Aug13
P 25Aug13 25Aug13 26Aug13 28Aug13 11Sep13 28Aug13 11Sep13 18Sep13
Typical Crash Barrier & Access Barrier F 8Jul13 8Jul13 8Jul13 9Jul13 23Jul13 - - 21Aug13
5275-PL-000-17-31-006 2 0
Details.
A 8Jul13 8Jul13 8Jul13 9Jul13 23Jul13 - - 21Aug13
P 31Jul13 11Aug13 12Aug13 14Aug13 28Aug13 14Aug13 28Aug13 4Sep13
Sanitary Sewer and Storm Water F 8Jul13 10Jul13 18Jul13 18Jul13 25Jul13 - - -
5275-STD-1481-001-007 2 0
Manhole & Catchbasin Details
A 8Jul13 10Jul13 18Jul13 18Jul13 25Jul13 - - -
P 14Aug13 15Aug13 18Aug13 19Aug13 2Sep13 19Aug13 2Sep13 9Sep13
Membrane protection to concrete F 2Jul13 2Jul13 2Jul13 4Jul13 23Jul13 - - 14Aug13
5275-STD-1781-002-006 2 0
foundations and pedestals
A 2Jul13 2Jul13 2Jul13 4Jul13 23Jul13 - - 14Aug13
P 28Aug13 1Sep13 1Sep13 3Sep13 17Sep13 3Sep13 17Sep13 23Sep13
Anchor Bolts Materials - Fabrication & F 2Jul13 2Jul13 2Jul13 4Jul13 23Jul13 - - -
5275-STD-1781-002-001 2 0
Marking
A 2Jul13 2Jul13 2Jul13 4Jul13 23Jul13 - - -
CALCULATIONS / REPORTS
P 11Sep13 23Oct13 24Oct13 30Oct13 13Nov13 20Nov13 4Dec13 20Nov13
Geo-Technical Investigation Report - 24" F 11Sep13 31Oct13 31Oct13 31Oct13 12Nov13 - - 12Dec13
RPT-5275-PL-581-17-001 3 1
& 16" Pipeline
A 11Sep13 31Oct13 31Oct13 31Oct13 12Nov13 - - 16Dec13
P 11Sep13 23Oct13 24Oct13 30Oct13 13Nov13 20Nov13 4Dec13 20Nov13
Geo-Technical Investigation Report -
RPT-5275-PL-581-17-002
409603376.xlsx 3 0 Page 79 of 186
HDPE Line
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


Geo-Technical Investigation Report - F 5Jan14 5Jan14 5Jan14 6Jan14 12Nov13 - - 12Dec13
RPT-5275-PL-581-17-002 3 0
HDPE Line
A 5Jan14 5Jan14 5Jan14 6Jan14 - - - -
P 16Oct13 29Oct13 30Oct13 3Nov13 17Nov13 3Nov13 17Nov13 24Nov13
Structural Design Calculation for E & I F 31Oct13 7Nov13 16Nov13 21Nov13 5Dec13 - - 12Dec13
NC-5275-PL-830-20-001 3 B
Building at Saadiyat CRS
A 31Oct13 7Nov13 16Nov13 21Nov13 9Dec13 - - 29Dec13
P 3Nov13 11Nov13 12Nov13 14Nov13 28Nov13 14Nov13 28Nov13 5Dec13
Structural Design Calculation for E & I F 14Nov13 19Nov13 27Nov13 28Nov13 12Dec13 - - 19Dec13
NC-5275-PL-581-20-001 3 B
Building at SVS-1 at YAS Island
A 14Nov13 19Nov13 27Nov13 28Nov13 17Dec13 - - 23Dec13
P 14Nov13 18Nov13 19Nov13 21Nov13 5Dec13 21Nov13 5Dec13 11Dec13
Structural Design Calculation for E & I F 14Nov13 21Nov13 2Dec13 3Dec13 17Dec13 - - 24Dec13
NC-5275-PL-581-20-002 3 B
Building at SVS-7 at YAS Island
A 14Nov13 21Nov13 2Dec13 4Dec13 17Dec13 - - 24Dec13
P 14Nov13 18Nov13 19Nov13 21Nov13 5Dec13 21Nov13 5Dec13 11Dec13
Structural Design Calculation for Fire F 3Dec13 4Dec13 5Dec13 8Dec13 22Dec13 - - 29Dec13
NC-5275-PL-830-20-002 3 0
Point Shelter at Saadiyat Island
A 3Dec13 4Dec13 5Dec13 8Dec13 19Dec13 - - 5Jan14
P 20Nov13 21Nov13 24Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
Structural Design Calculation for F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
NC-5275-PL-830-17-001 Pressure Reduction Skid at Saadiyat 3 A
CRS
A 9Dec13 9Dec13 9Dec13 11Dec13 19Dec13
P 14Nov13 17Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 10Dec13
Structural Design Calculation for F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
NC-5275-PL-830-17-002 3 A
Metering Skid at Saadiyat CRS
A 9Dec13 9Dec13 9Dec13 11Dec13 19Dec13
P 10Nov13 10Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
Structural Design Calculation for Filter F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
NC-5275-PL-830-17-003 3 A
Skid Foundation at Saadiyat CRS
A 13Jan14 15Jan14 19Jan14 21Jan14 2Feb14

409603376.xlsx Page 80 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 1Dec13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
Structural Design Calculation for Impact F 10Dec13 12Dec13 15Dec13 17Dec13 31Dec13 - - 7Jan14
NC-5275-PL-830-17-004 3 A
Wall at Saadiyat CRS
A 5Dec13 12Dec13 18Dec13 19Dec13 30Dec13
P 8Dec13 8Dec13 9Dec13 11Dec13 25Dec13 11Dec13 25Dec13 31Dec13
Structural Design Calculation for CP F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
NC-5275-PL-830-17-005 Transformer Foundation at Saadiyat 3
CRS
A
P 13Nov13 14Nov13 17Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
Structural Design Calculation for Odorant F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
NC-5275-PL-830-17-006 Absorption System Foundation at 3
Saadiyat CRS
A
P 30Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 27Nov13
Structural Design Calculation for Scraper F 10Dec13 12Dec13 15Dec13 19Dec13 2Jan14 - - 9Jan14
NC-5275-PL-830-17-007 Receiver/Launcher Foundation at 3 A
Saadiyat CRS
A 11Dec13 12Dec13 25Dec13 25Dec13 5Jan14
P 24Nov13 25Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
Structural Design Calculation for Jib F 2Dec13 3Dec13 5Dec13 9Dec13 23Dec13 - - 30Dec13
NC-5275-PL-830-17-008 3 A
Crane Foundation at Saadiyat CRS
A 2Dec13 3Dec13 16Dec13 17Dec13 23Dec13
P 30Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 26Nov13
Structural Design Calculation for Anchor F 19Nov13 21Nov13 28Nov13 3Dec13 17Dec13 - - 24Dec13
NC-5275-PL-000-17-001 Block Foundation at Saadiyat CRS/Yas 3 0
SVS1/Reem Island
A 19Nov13 21Nov13 28Nov13 3Dec13 19Dec13 - - 25Dec13
P 16Oct13 20Oct13 21Oct13 23Oct13 6Nov13 23Oct13 6Nov13 12Nov13
Structural Design Calculation for Pipe F 29Oct13 31Oct13 5Dec13 9Dec13 23Dec13 - - 30Dec13
NC-5275-PL-830-17-009 3 A
Supports at Saadiyat CRS
A 29Oct13 31Oct13 5Dec13 23Dec13 5Jan14
P 3Dec13 5Dec13 8Dec13 9Dec13 23Dec13 9Dec13 23Dec13 29Dec13
Structural Design Calculation for Light F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
NC-5275-PL-830-17-010 3 A
Pole Foundation at Saadiyat CRS
A 12Dec13 12Dec13 12Dec13 16Dec13 22Dec13
P 3Dec13 5Dec13 8Dec13 9Dec13 23Dec13 9Dec13 23Dec13 29Dec13
Structural Design Calculation for F 8Dec13 10Dec13 11Dec13 12Dec13 26Dec13 - - 2Jan14
NC-5275-PL-830-17-011 3 A
Windsock Foundation at Saadiyat CRS
A 2Dec13 5Dec13 15Dec13 16Dec13 22Dec13
P 30Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 27Nov13
Structural Design Calculation for Cross F 8Dec13 9Dec13 10Dec13 12Dec13 26Dec13 - - 2Jan14
NC-5275-PL-830-17-013 over and platform foundation at Saadiyat 3 0
CRS
A 3Dec13 4Dec13 17Dec13 18Dec13 - - - -
409603376.xlsx Page 81 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 5Dec13 15Dec13 16Dec13 18Dec13 1Jan14 18Dec13 1Jan14 7Jan14
Structural Design Calculation for Culvert F
NC-5275-PL-581-17-001 3 A
(Optional Scope) at Jubail Island
A 30Dec13 2Jan14 22Jan14 23Jan14 6Feb14
P 6Nov13 10Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
Structural Design Calculation for Scraper F 15Dec13 17Dec13 18Dec13 19Dec13 2Jan14 - - 9Jan14
NC-5275-PL-581-17-004 3 A
Receiver Foundation at Reem Island
A 11Dec13 12Dec13 22Dec13 24Dec13 28Jan14
P 16Oct13 20Oct13 20Oct13 22Oct13 5Nov13 22Oct13 5Nov13 12Nov13
Structural Design Calculation for Pipe F 11Nov13 13Nov13 14Nov13 20Nov13 2Dec13 - - 12Dec13
NC-5275-PL-581-17-006 3 0
Supports at SVS-1 Yas Island
A 11Nov13 13Nov13 14Nov13 20Nov13 2Dec13 - - 17Dec13
P 23Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 27Nov13
Structural Design Calculation for Pipe F 24Sep13 26Sep13 10Oct13 10Nov13 15Dec13 - - 22Dec13
NC-5275-PL-581-17-007 3 0
Supports at SVS-2, 3, 4, 5, 6, 8, 9 & 11
A 24Sep13 26Sep13 10Oct13 10Nov13 - - - -
P 6Nov13 10Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
Structural Design Calculation for Pipe F 12Nov13 12Nov13 13Nov13 14Nov13 2Dec13 - - 12Dec13
NC-5275-PL-581-17-008 3 0
Supports at SVS-7 Jubail Island
A 12Nov13 12Nov13 13Nov13 14Nov13 2Dec13 19Dec13 - -
P 25Nov13 27Nov13 28Nov13 1Dec13 15Dec13 1Dec13 15Dec13 22Dec13
Structural Design Calculation for Cross F 8Dec13 9Dec13 10Dec13 12Dec13 26Dec13 - - 2Jan14
NC-5275-PL-581-17-012 over and platform foundation at Reem 3 ZZ
Island
A 4Dec13 5Dec13 29Dec13
P 24Nov13 27Nov13 28Nov13 1Dec13 15Dec13 1Dec13 15Dec13 22Dec13
Structural Design Calculation for Jib F 29Dec13 30Dec13 31Dec13 2Jan14 16Jan14 - - -
NC-5275-PL-581-17-013 3 A
crane foundation at Reem Island
A 10Dec13 11Dec13 22Dec13 23Dec13 30Dec13
P 18Nov13 20Nov13 21Nov13 25Nov13 9Dec13 25Nov13 9Dec13 16Dec13
Structural Design Calculation for Pipe F 17Nov13 19Nov13 24Nov13 28Nov13 5Dec13 - - 5Jan14
NC-5275-PL-581-17-014 3 0
supports at Reem Island
A 17Nov13 19Nov13 24Nov13 28Nov13 17Dec13 - - 20Dec13

409603376.xlsx Page 82 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 12Nov13 14Nov13 17Nov13 18Nov13 2Dec13 18Nov13 2Dec13 9Dec13
Structural Design Calculation for Vent F 22Dec13 23Dec13 24Dec13 26Dec13 9Jan14 - - -
NC-5275-PL-581-17-015 3 0
support & Foundation at SVS stations
A 22Dec13 23Dec13 22Dec13 26Dec13 7Jan14 - - -
P 1Dec13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
F 22Dec13 23Dec13 24Dec13 26Dec13 9Jan14 - - -
NC-5275-PL-000-17-002 Structural Design calculation for Drain pit 3 0
A 22Dec13 23Dec13 25Dec13 25Dec13 5Jan14 - - -
P 5Dec13 8Dec13 8Dec13 10Dec13 24Dec13 10Dec13 24Dec13 31Dec13
Structural Design Calculation for F 29Aug13 3Sep13 3Sep13 5Sep13 22Sep13 - - 10Nov13
NC-5275-PL-000-17-003 3 1
Concrete Protection slab
A 29Aug13 3Sep13 3Sep13 5Sep13 22Sep13 - - 10Nov13
P 30Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 26Nov13
Structural Design Calculation for Valve F 22Dec13 23Dec13 24Dec13 26Dec13 9Jan14 - - -
NC-5275-PL-581-17-010 3 0
Pit (1-9)
A 10Dec13 11Dec13 19Dec13 23Dec13 5Jan14 - - -
DRAWINGS
P 29Sep13 30Sep13 2Oct13 4Oct13 24Oct13 10Oct13 24Oct13 31Oct13
Civil Grading Plan and Section - F 29Oct13 30Oct13 31Oct13 6Nov13 19Nov13 - - 24Nov13
5275-PL-830-17-33-001 2 0
Saadiyat CRS
A 29Oct13 30Oct13 31Oct13 6Nov13 19Nov13 - - 24Nov13
P 18Sep13 19Sep13 22Sep13 24Sep13 24Oct13 10Oct13 24Oct13 31Oct13
Civil Grading Plan and Section - SVS-1 F 1Oct13 2Oct13 2Oct13 3Oct13 26Oct13 - - 20Nov13
5275-PL-581-17-33-001 2 0
at YAS Island
A 1Oct13 2Oct13 2Oct13 3Oct13 26Oct13 - - 20Nov13
P 19Sep13 22Sep13 23Sep13 25Sep13 24Oct13 10Oct13 24Oct13 31Oct13
F 1Oct13 2Oct13 2Oct13 3Oct13 26Oct13 - - 20Nov13
5275-PL-581-17-33-002 Civil Grading Plan and Section - SVS-2 2 0
A 1Oct13 2Oct13 2Oct13 3Oct13 26Oct13 - - 20Nov13
P 22Sep13 23Sep13 24Sep13 26Sep13 24Oct13 10Oct13 24Oct13 31Oct13
F 1Oct13 2Oct13 2Oct13 3Oct13 26Oct13 - - 20Nov13
5275-PL-581-17-33-003 Civil Grading Plan and Section - SVS-3 2 0
A 1Oct13 2Oct13 3Oct13 6Oct13 26Oct13 - - 20Nov13
P 23Sep13 24Sep13 26Sep13 29Sep13 24Oct13 10Oct13 24Oct13 31Oct13
F 1Oct13 2Oct13 2Oct13 3Oct13 26Oct13 - - 24Nov13
5275-PL-581-17-33-004 Civil Grading Plan and Section - SVS-4 2 0
A 1Oct13 2Oct13 3Oct13 6Oct13 26Oct13 - - 24Nov13
P 24Sep13 25Sep13 29Sep13 30Sep13 24Oct13 10Oct13 24Oct13 31Oct13
F 1Oct13 2Oct13 2Oct13 3Oct13 26Oct13 - - 24Nov13
5275-PL-581-17-33-005 Civil Grading Plan and Section - SVS-5 2 1
409603376.xlsx Page 83 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


5275-PL-581-17-33-005 Civil Grading Plan and Section - SVS-5 2 1
A 1Oct13 2Oct13 6Oct13 9Oct13 26Oct13 - - 24Nov13
P 25Sep13 26Sep13 29Sep13 1Oct13 24Oct13 10Oct13 24Oct13 31Oct13
F 1Oct13 2Oct13 6Oct13 9Oct13 26Oct13 - 2Dec13 21Nov13
5275-PL-581-17-33-006 Civil Grading Plan and Section - SVS-6 2 0
A 1Oct13 2Oct13 6Oct13 9Oct13 26Oct13 - - 21Nov13
P 26Sep13 29Sep13 30Sep13 2Oct13 24Oct13 10Oct13 24Oct13 31Oct13
Civil Grading Plan and Section - SVS-7 F 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - - 8Dec13
5275-PL-581-17-33-007 2 0
at Jubail Island
A 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - - 5Dec13
P 30Sep13 1Oct13 3Oct13 6Oct13 24Oct13 10Oct13 24Oct13 31Oct13
F 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - - 25Nov13
5275-PL-581-17-33-008 Civil Grading Plan and Section - SVS-8 2 1
A 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - - 25Nov13
P 1Oct13 2Oct13 6Oct13 7Oct13 24Oct13 10Oct13 24Oct13 31Oct13
F 29Oct13 30Oct13 31Oct13 6Nov13 19Nov13 - - 8Dec13
5275-PL-581-17-33-009 Civil Grading Plan and Section - SVS-9 2 0
A 29Oct13 30Oct13 31Oct13 6Nov13 19Nov13 - - 24Dec13
P 2Oct13 3Oct13 6Oct13 8Oct13 24Oct13 10Oct13 24Oct13 31Oct13
F 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - 2Dec13 8Dec13
5275-PL-581-17-33-010 Civil Grading Plan and Section - SVS-10 2 1
A 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - - 21Nov13
P 3Oct13 6Oct13 7Oct13 9Oct13 24Oct13 10Oct13 24Oct13 31Oct13
F 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - - 25Nov13
5275-PL-581-17-33-011 Civil Grading Plan and Section - SVS-11 2 0
A 2Oct13 3Oct13 6Oct13 9Oct13 26Oct13 - - 25Nov13
P 6Oct13 7Oct13 8Oct13 10Oct13 24Oct13 10Oct13 24Oct13 31Oct13
Civil Grading Plan and Section - 16" F 29Oct13 30Oct13 31Oct13 6Nov13 19Nov13 - - 8Dec13
5275-PL-581-17-33-012 2 0
Scraper Receiver REEM Island
A 29Oct13 30Oct13 31Oct13 6Nov13 19Nov13 - - 8Dec13

409603376.xlsx Page 84 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 10Oct13 17Oct13 20Oct13 22Oct13 14Nov13 31Oct13 14Nov13 21Nov13
F 29Dec13 30Dec13 31Dec13 2Jan14 16Jan14 - - -
5275-PL-581-17-33-013 Civil General Arrangement at SVS-1 3 A
A 26Dec13 31Dec13 31Dec13 2Jan14 15Jan14
P 17Oct13 20Oct13 21Oct13 22Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Civil General Arrangement at SVS- F 29Dec13 30Dec13 31Dec13 2Jan14 16Jan14 - - -
5275-PL-581-17-33-014 3 A
2,3,4,5,6,8,9,10&11
A 26Dec13 31Dec13 31Dec13 2Jan14 15Jan14
P 22Oct13 24Oct13 27Oct13 28Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Civil General Arrangement at SVS-7 at F 29Dec13 30Dec13 31Dec13 2Jan14 16Jan14 - - -
5275-PL-581-17-33-015 3 A
Jubail island
A 26Dec13 31Dec13 31Dec13 2Jan14 15Jan14
P 24Oct13 27Oct13 28Oct13 31Oct13 14Nov13 31Oct13 14Nov13 21Nov13
Civil General Arrangement at 16" F 29Dec13 30Dec13 31Dec13 2Jan14 16Jan14 - - -
5275-PL-581-17-33-016 3 A
Scraper Receiver REEM Island
A 26Dec13 31Dec13 31Dec13 2Jan14 15Jan14
P 18Sep13 19Sep13 22Sep13 24Sep13 8Oct13 24Sep13 8Oct13 14Oct13
Paving Road & Fence Layout at F 15Dec13 16Dec13 18Dec13 22Dec13 5Jan14 - - -
5275-PL-830-17-33-002 3 A
Saadiyat CRS
A 22Dec13 23Dec13 24Dec13 26Dec13 5Jan14
P 5Dec13 8Dec13 9Dec13 11Dec13 25Dec13 11Dec13 25Dec13 1Jan14
F 22Dec13 23Dec13 24Dec13 26Dec13 9Jan14 - - 16Jan14
5275-PL-000-17-23-001 Details of Drain pit 2 0
A 22Dec13 23Dec13 24Dec13 25Dec13 9Jan14 - - -
P 10Dec13 11Dec13 12Dec13 15Dec13 29Dec13 15Dec13 29Dec13 5Jan14
F 28Aug13 5Sep13 5Sep13 5Sep13 2Oct13 - - 10Nov13
5275-PL-000-17-23-002 Details of Concrete Protection Slab 2 1
A 28Aug13 5Sep13 5Sep13 5Sep13 2Oct13 - - 10Nov13
P 12Dec13 16Dec13 17Dec13 19Dec13 2Jan14 19Dec13 2Jan14 8Jan14
F 29Dec13 30Dec13 31Dec13 2Jan14 16Jan14 - - -
5275-PL-830-17-23-001 Civil Layout - Saadiyat CRS 3 A
A 26Dec13 31Dec13 31Dec13 2Jan14 15Jan14
P 26Nov13 27Nov13 28Nov13 2Dec13 16Dec13 2Dec13 16Dec13 22Dec13
Details of Pressure Reduction Skid at F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
5275-PL-830-17-23-002 2 A
Saadiyat CRS
A 10Dec13 10Dec13 10Dec13 11Dec13 19Dec13
P 20Nov13 21Nov13 24Nov13 26Nov13 10Dec13 26Nov13 10Dec13 17Dec13
F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
5275-PL-830-17-23-003 Details of Metering Skid at Saadiyat CRS 2 A
A 10Dec13 10Dec13 10Dec13 11Dec13 19Dec13
409603376.xlsx Page 85 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 14Nov13 17Nov13 18Nov13 20Nov13 4Dec13 20Nov13 4Dec13 10Dec13
Details of Filter Skid Foundation at F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
5275-PL-830-17-23-004 2 A
Saadiyat CRS
A 13Jan14 15Jan14 19Jan14 21Jan14 2Feb14
P 5Dec13 8Dec13 9Dec13 11Dec13 25Dec13 11Dec13 25Dec13 1Jan14
F 10Dec13 12Dec13 15Dec13 17Dec13 31Dec13 - - 7Jan14
5275-PL-830-17-23-005 Details of Impact Wall at Saadiyat CRS 2 A
A 10Dec13 12Dec13 18Dec13 19Dec13 30Dec13
P 11Dec13 12Dec13 15Dec13 16Dec13 30Dec13 16Dec13 30Dec13 6Jan14
Details of CP Transformer Foundation at F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
5275-PL-830-17-23-006 2
Saadiyat CRS
A
P 19Nov13 20Nov13 21Nov13 24Nov13 8Dec13 24Nov13 8Dec13 12Dec13
Details of Odorant Absorption System F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
5275-PL-830-17-23-007 2
Foundation at Saadiyat CRS
A
P 6Nov13 10Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 2Dec13
Details of Scraper Receiver/Launcher F 10Dec13 12Dec13 15Dec13 19Dec13 2Jan14 - - 9Jan14
5275-PL-830-17-23-008 2 A
Foundation at Saadiyat CRS
A 10Dec13 12Dec13 25Dec13 25Dec13 9Jan14
P 28Nov13 1Dec13 2Dec13 4Dec13 18Dec13 4Dec13 18Dec13 24Dec13
Details of Jib Crane Foundation at F 2Dec13 3Dec13 5Dec13 9Dec13 23Dec13 - - 30Dec13
5275-PL-830-17-23-009 2 A
Saadiyat CRS
A 2Dec13 3Dec13 17Dec13 17Dec13 23Dec13
P 6Nov13 10Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
Details of Anchor Block Foundation at F 24Nov13 26Nov13 28Nov13 3Dec13 17Dec13 - - 24Dec13
5275-PL-000-17-23-004 2 0
Saadiyat CRS/Yas SVS1/Reem Island
A 19Nov13 21Nov13 28Nov13 3Dec13 19Dec13 - - 25Dec13
P 27Oct13 5Nov13 6Nov13 10Nov13 24Nov13 10Nov13 24Nov13 1Dec13
Details of Pipe Supports at Saadiyat F 29Oct13 2Dec13 5Dec13 9Dec13 23Dec13 - - 30Dec13
5275-PL-830-17-23-010 3 A
CRS
A 29Oct13 5Dec13 15Dec13 23Dec13 5Jan14

409603376.xlsx Page 86 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 9Dec13 9Dec13 10Dec13 12Dec13 26Dec13 12Dec13 26Dec13 2Jan14
Details of Light Pole Foundation at F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
5275-PL-830-17-23-011 2 A
Saadiyat CRS
A 12Dec13 12Dec13 12Dec13 12Dec13 22Dec13
P 9Dec13 9Dec13 10Dec13 12Dec13 26Dec13 12Dec13 26Dec13 2Jan14
Details of Windsock Foundation at F 8Dec13 10Dec13 11Dec13 12Dec13 26Dec13 - - 2Jan14
5275-PL-830-17-23-012 2 A
Saadiyat CRS
A 9Dec13 10Dec13 15Dec13 16Dec13 22Dec13
P 6Nov13 10Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
Crossover and Platform foundation and F 8Dec13 9Dec13 10Dec13 12Dec13 26Dec13 - - 2Jan14
5275-PL-830-17-23-014 structural steel drawings at Saadiyat 2 0
CRS
A 3Dec13 5Dec13 12Dec13 18Dec13 24Dec13 - - -
P 10Dec13 11Dec13 12Dec13 16Dec13 30Dec13 16Dec13 30Dec13 6Jan14
Details of Culvert (Optional Scope) at F
5275-PL-581-17-33-017 2 A
Jubail Island
A 30Dec13 2Jan14 22Jan14 23Jan14 6Feb14
P 12Nov13 14Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
Details of Scraper Receiver Foundation F 15Dec13 17Dec13 18Dec13 19Dec13 2Jan14 - - 9Jan14
5275-PL-581-17-23-003 2 A
at Reem Island
A 11Dec13 12Dec13 23Dec13 24Dec13 5Jan14
P 6Nov13 10Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 3Dec13
Details of Pipe Supports at SVS-2, 3, 4, F 24Sep13 26Sep13 4Nov13 10Nov13 12Dec13 - - 19Dec13
5275-PL-581-17-23-005 3 0
5, 6, 8, 9 & 11
A 24Sep13 26Sep13 4Nov13 10Nov13 4Dec13 - - -
P 12Nov13 14Nov13 17Nov13 19Nov13 3Dec13 19Nov13 3Dec13 9Dec13
Details of Pipe Supports at SVS-7 Jubail F 13Nov13 13Nov13 13Nov13 14Nov13 2Dec13 - - 15Dec13
5275-PL-581-17-23-006 3 0
Island
A 13Nov13 13Nov13 13Nov13 14Nov13 2Dec13 - - 19Dec13
P 22Oct13 24Oct13 27Oct13 28Oct13 11Nov13 28Oct13 11Nov13 17Nov13
Details of Pipe Supports at SVS-1 Yas F 12Nov13 13Nov13 17Nov13 20Nov13 3Dec13 - - 12Dec13
5275-PL-581-17-23-008 3 0
Island
A 12Nov13 13Nov13 17Nov13 20Nov13 2Dec13 - - 17Dec13
P 25Nov13 27Nov13 28Nov13 2Dec13 16Dec13 2Dec13 16Dec13 23Dec13
Pipe support foundation drawing at F 17Nov13 19Nov13 27Nov13 28Nov13 19Dec13 - - 26Dec13
5275-PL-581-17-23-011 2 0
Reem Island
A 17Nov13 19Nov13 27Nov13 28Nov13 17Dec13 - - 20Dec13
P 1Dec13 4Dec13 5Dec13 8Dec13 22Dec13 8Dec13 22Dec13 29Dec13
Jib crane foundation details at Reem F 2Jan14 4Jan14 5Jan14 9Jan14 23Jan14 - - -
5275-PL-581-17-23-012 2 A
Island
A 11Dec13 12Dec13 22Dec13 23Dec13 30Dec13
409603376.xlsx Page 87 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 1Dec13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 26Dec13
Crossover and Platform foundation and F 8Dec13 9Dec13 10Dec13 12Dec13 26Dec13 - - 2Jan14
5275-PL-581-17-23-013 2 ZZ
structural steel drawings at Reem Island
A 4Dec13 5Dec13 30Dec13
P 1Dec13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 26Dec13
Details of Vent support & Foundation at F 8Dec13 9Dec13 10Dec13 26Dec13 9Jan14 - - 16Jan14
5275-PL-581-17-23-014 2 0
SVS stations
A 22Dec13 23Dec13 25Dec13 26Dec13 7Jan14 - - -
P 20Oct13 24Oct13 27Oct13 30Oct13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - F 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
5275-PL-830-20-20-001 2 B
Architectural Ground Floor Plan
A 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
P 20Oct13 24Oct13 27Oct13 30Oct13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - F 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
5275-PL-830-20-20-002 2 B
Architectural Roof Plan
A 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
P 20Oct13 24Oct13 27Oct13 30Oct13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - F 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
5275-PL-830-20-20-003 2 B
Architectural Elevations
A 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
P 20Oct13 24Oct13 27Oct13 30Oct13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - F 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
5275-PL-830-20-20-004 2 B
Architectural Sections
A 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
P 30Oct13 7Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - Doors F 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
5275-PL-830-20-20-005 2 B
Windows & Finishes Schedule
A 10Sep13 19Sep13 19Sep13 25Sep13 10Oct13 - - 26Nov13
P 30Oct13 7Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - F 31Oct13 12Nov13 17Nov13 21Nov13 19Dec13 - - 26Dec13
5275-PL-830-20-20-006 2 B
Foundation Layout & Details
A 31Oct13 12Nov13 17Nov13 21Nov13 9Dec13 - - 29Dec13

409603376.xlsx Page 88 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 30Oct13 7Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - F 31Oct13 12Nov13 17Nov13 21Nov13 19Dec13 - - 26Dec13
5275-PL-830-20-20-007 2 B
Ground Floor Layout & Details
A 31Oct13 12Nov13 17Nov13 21Nov13 9Dec13 - - 29Dec13
P 30Oct13 7Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
E & I Building at Saadiyat Island - Roof F 31Oct13 12Nov13 17Nov13 21Nov13 19Dec13 - - 26Dec13
5275-PL-830-20-20-008 2 B
Layout & Details
A 31Oct13 12Nov13 17Nov13 21Nov13 9Dec13 - - 29Dec13
P 5Nov13 12Nov13 13Nov13 17Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
5275-PL-581-20-20-001 2 B
Architectural Ground Floor Plan
A 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
P 5Nov13 12Nov13 13Nov13 17Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
5275-PL-581-20-20-002 2 B
Architectural Roof Plan
A 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
P 5Nov13 12Nov13 13Nov13 17Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
5275-PL-581-20-20-003 2 B
Architectural Elevations
A 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
P 5Nov13 12Nov13 13Nov13 17Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
5275-PL-581-20-20-004 2 B
Architectural Sections
A 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
P 17Nov13 22Nov13 25Nov13 27Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
5275-PL-581-20-20-005 2 B
Doors Windows & Finishes Schedule
A 10Oct13 17Oct13 23Oct13 25Oct13 4Nov13 - - 28Nov13
P 17Nov13 22Nov13 25Nov13 27Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 14Nov13 19Nov13 27Nov13 28Nov13 12Dec13 - - 19Dec13
5275-PL-581-20-20-006 2 B
Foundation Layout & Details
A 14Nov13 19Nov13 27Nov13 28Nov13 17Dec13 - - 22Dec13
P 17Nov13 22Nov13 25Nov13 27Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 14Nov13 19Nov13 27Nov13 28Nov13 12Dec13 - - 19Dec13
5275-PL-581-20-20-007 2 B
Ground Floor Layout & Details
A 14Nov13 19Nov13 27Nov13 28Nov13 17Dec13 - - 22Dec13
P 17Nov13 22Nov13 25Nov13 27Nov13 11Dec13 27Nov13 11Dec13 18Dec13
E & I Building at SVS-1 at YAS Island - F 14Nov13 19Nov13 27Nov13 28Nov13 12Dec13 - - 19Dec13
5275-PL-581-20-20-008 2 B
Roof Layout & Details
A 14Nov13 19Nov13 27Nov13 28Nov13 17Dec13 - - 22Dec13
409603376.xlsx Page 89 of 186
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 19Dec13 - - 9Jan14
5275-PL-581-20-20-010 2 B
Architectural Ground Floor Plan
A 19Nov13 21Nov13 2Dec13 3Dec13 17Dec13 - - 24Dec13
P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 19Dec13 - - 9Jan14
5275-PL-581-20-20-011 2 B
Architectural Roof Plan
A 19Nov13 21Nov13 2Dec13 3Dec13 17Dec13 - - 24Dec13
P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 19Dec13 - - 9Jan14
5275-PL-581-20-20-012 2 B
Architectural Elevations
A 19Nov13 21Nov13 2Dec13 3Dec13 17Dec13 - - 24Dec13
P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 19Dec13 - - 9Jan14
5275-PL-581-20-20-013 2 B
Architectural Sections
A 19Nov13 21Nov13 2Dec13 3Dec13 17Dec13 - - 24Dec13
P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 19Dec13 - - 9Jan14
5275-PL-581-20-20-014 2 B
Doors Windows & Finishes Schedule
A 19Nov13 21Nov13 2Dec13 3Dec13 17Dec13 - - 24Dec13
P 5Dec13 11Dec13 12Dec13 16Dec13 30Dec13 16Dec13 30Dec13 5Jan14
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 30Dec13 - - 9Jan14
5275-PL-581-20-20-015 2 B
Foundation Layout & Details
A 19Nov13 21Nov13 3Dec13 3Dec13 17Dec13 - - 24Dec13
P 5Dec13 11Dec13 12Dec13 16Dec13 30Dec13 16Dec13 30Dec13 5Jan14
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 30Dec13 - - 9Jan14
5275-PL-581-20-20-016 2 B
Ground Floor Layout & Details
A 19Nov13 21Nov13 3Dec13 3Dec13 17Dec13 - - 24Dec13
P 5Dec13 11Dec13 12Dec13 16Dec13 30Dec13 16Dec13 30Dec13 5Jan14
E & I Building at SVS-7 at Jubail Island - F 19Nov13 21Nov13 2Dec13 3Dec13 30Dec13 - - 9Jan14
5275-PL-581-20-20-017 2 B
Roof Layout & Details
A 19Nov13 21Nov13 3Dec13 3Dec13 17Dec13 - - 24Dec13

409603376.xlsx Page 90 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
Fire Point Shelter at Saadiyat Island - F 2Dec13 3Dec13 5Dec13 8Dec13 22Dec13 - - 29Dec13
5275-PL-830-20-43-001 2 0
Ground and Roof Floor Plan
A 4Dec13 5Dec13 5Dec13 8Dec13 19Dec13 - - 5Jan14
P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
Fire Point Shelter at Saadiyat Island - F 2Dec13 3Dec13 5Dec13 8Dec13 22Dec13 - - 29Dec13
5275-PL-830-20-43-002 2 0
Elevations and Sections
A 4Dec13 5Dec13 5Dec13 8Dec13 19Dec13 - - 5Jan14
P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
Fire Point Shelter at Saadiyat Island - F 2Dec13 3Dec13 5Dec13 8Dec13 22Dec13 - - 29Dec13
5275-PL-830-20-43-003 2 0
Foundation Layout & Details
A 4Dec13 5Dec13 5Dec13 8Dec13 19Dec13 - - 5Jan14
P 21Nov13 2Dec13 3Dec13 5Dec13 19Dec13 5Dec13 19Dec13 25Dec13
Fire Point Shelter at Saadiyat Island - F 2Dec13 3Dec13 5Dec13 8Dec13 22Dec13 - - 29Dec13
5275-PL-830-20-43-004 2 0
Structural Details
A 4Dec13 5Dec13 5Dec13 8Dec13 19Dec13 - - 5Jan14
P 6Nov13 7Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 3Dec13
F 22Dec13 23Dec13 24Dec13 26Dec13 9Jan14 - - 16Jan14
5275-PL-581-17-23-009 Details of Valve Pit 2 0
A 10Dec13 12Dec13 22Dec13 23Dec13 5Jan14 - - -
P 19Nov13 24Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
F 2Jan14 5Jan14 7Jan14 12Jan14 17Jan14 - - 22Jan14
- Miscellaneous Civil Deliverables
A - - - - -

CATHODIC PROTECTION
SPECIFICATIONS
P 28Aug13 1Sep13 2Sep13 4Sep13 18Sep13 4Sep13 18Sep13 25Sep13
Design, Installations, Commissioning & F 29Aug13 29Aug13 29Aug13 29Aug13 23Sep13 - - 9Oct13
5275-ADD-1674-002 Monitoring of Cathodic Protection for 1-II 0
Pipelines.
A 29Aug13 29Aug13 29Aug13 29Aug13 23Sep13 - - 9Oct13
CALCULATIONS / REPORTS
P 30Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 27Nov13
F 12Sep13 25Sep13 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14
NC-5275-PL-000-95-051 CP Design Calculation Report 2
A 12Sep13 25Sep13
P 12Nov13 13Nov13 14Nov13 17Nov13 - - - -
409603376.xlsx Page 91 of 186
MTO-5275-PL-000-95-051 CP - MTO 2
Detailed Design for Yas Mina Zayed Pipeline Project
Detailed Engineering Services, Procurement Assistance & Client Office Acco

CLASS -1 (CATEGORY-II), CLASS-II & CLASS-III DOCUMENTS CONTROL REGISTER

FOR Submission / Review status

Class-1,2,3
DOC. Latest DRAFT INTERNAL CLIENT REVIEW (ICR) Issue-2 APPROVAL (IFD/IFA
DOC. / DWG NUMBER DOC. / DWG DESCRIPTION CLASS / Rev. START COMPLETE REVIEW Receive Receive
Category No. (SDC / IDC) SUBMIT Comments SUBMIT Comments SUBMIT
5.0% 25.0% 40.0% 50.0% - - - 75.0%

Detailed Design for Yas Mina Zayed Pipeline Project


F 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14
MTO-5275-PL-000-95-051 CP - MTO 2
A
P 6Nov13 10Nov13 11Nov13 13Nov13 27Nov13 13Nov13 27Nov13 4Dec13
F 12Sep13 24Oct13 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14
RPT-5275-PL-000-95-051 CP Site survey report 2
A 12Sep13 24Oct13
DRAWINGS
P 31Oct13 3Nov13 4Nov13 6Nov13 20Nov13 6Nov13 20Nov13 27Nov13
F 20Oct13 24Oct13 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14
5275-PL-000-95-70-011 CP Typical Details 3
A 20Oct13 24Oct13
P 6Nov13 10Nov13 10Nov13 12Nov13 26Nov13 12Nov13 26Nov13 2Dec13
F 7Nov13 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14
5275-PL-000-95-70-001 CP Layout 3
A 7Nov13
P 19Nov13 24Nov13 26Nov13 28Nov13 12Dec13 28Nov13 12Dec13 19Dec13
F 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14 30Jan14
- Miscellaneous CP Deliverables
A

DETAILED ENGINEERING DESIGN

** The yellow highlighted deliverables are under EPC Contractor scope

409603376.xlsx Page 92 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

22Jul13 29Jul13 29Jul13 100.00% 100% claimed


- 17Jun13 17Jun13 100.00% As discussed
103 0.689 100% 100%
with GASCO
- 17Jun13 17Jun13 100.00% EM
29Aug13 5Sep13 5Sep13 100.00%
- 7Oct13 7Oct13 100.00%
43 0.288 100% 100%
- 7Oct13 7Oct13 100.00%
25Jul13 1Aug13 1Aug13 100.00%
- 29Aug13 27Nov13 100.00%
106 0.709 100% 100%
- 29Aug13 27Nov13 100.00%
252 1.686
100.00% 100.00%

19Aug13 26Aug13 26Aug13 100.00%


5Sep13 21Oct13 21Oct13 100.00%
46 0.308 100% 100%
5Sep13 21Oct13 21Oct13 100.00%
4Sep13 11Sep13 11Sep13 100.00%
4Nov13 5Nov13 5Nov13 100.00%
37 0.248 100% 100%
4Nov13 5Nov13 5Nov13 100.00%
11Sep13 18Sep13 18Sep13 100.00%
3Oct13 9Oct13 9Oct13 100.00%
33 0.221 100% 100%
3Oct13 9Oct13 9Oct13 100.00%
18Sep13 25Sep13 25Sep13 100.00%
5Oct13 9Oct13 9Oct13 100.00%
28 0.187 100% 100%
5Oct13 9Oct13 9Oct13 100.00%
18Aug13 25Aug13 25Aug13 100.00%
29Oct13 30Oct13 30Oct13 100.00%
19 0.127 100% 100%

409603376.xlsx Page 93 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%
19 0.127 100% 100%
29Oct13 30Oct13 30Oct13 100.00%
20Oct13 27Oct13 27Oct13 100.00%
22Oct13 25Oct13 25Oct13 100.00%
12 0.080 100% 100%
22Oct13 25Oct13 25Oct13 100.00%
23Oct13 30Oct13 30Oct13 100.00% Added as
17Nov13 25Nov13 25Nov13 100.00% mentioned in CRS
12 0.080 100% 100%
(T-PET-5275-
17Nov13 25Nov13 25Nov13 100.00% 00131)
17Oct13 24Oct13 24Oct13 100.00%
4Nov13 5Nov13 5Nov13 100.00%
28 0.187 100% 100%
4Nov13 5Nov13 5Nov13 100.00%
25Aug13 1Sep13 1Sep13 100.00%
1Oct13 7Oct13 7Oct13 100.00%
37 0.248 100% 100%
1Oct13 7Oct13 7Oct13 100.00%

16Sep13 23Sep13 23Sep13 100.00%


1Oct13 9Oct13 27Nov13 100.00%
25 0.167 100% 100%
1Oct13 9Oct13 27Nov13 100.00%
16Sep13 23Sep13 23Sep13 100.00%
- 5Dec13 5Dec13 100.00%
25 0.167 100% 100%
- 5Dec13 5Dec13 100.00%
16Sep13 23Sep13 23Sep13 100.00%
1Oct13 9Oct13 27Nov13 100.00%
25 0.167 100% 100%
1Oct13 9Oct13 27Nov13 100.00%

409603376.xlsx Page 94 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

16Sep13 23Sep13 23Sep13 100.00%


1Oct13 9Oct13 27Nov13 100.00%
25 0.167 100% 100%
1Oct13 9Oct13 27Nov13 100.00%
16Sep13 23Sep13 23Sep13 100.00%
1Oct13 9Oct13 27Nov13 100.00%
25 0.167 100% 100%
1Oct13 9Oct13 27Nov13 100.00%
16Sep13 23Sep13 23Sep13 100.00%
1Oct13 9Oct13 27Nov13 100.00%
25 0.167 100% 100%
1Oct13 9Oct13 27Nov13 100.00%
28Nov13 5Dec13 5Dec13 100.00%
- 28Oct13 28Oct13 100.00%
7 0.047 100% 100%
- 28Oct13 28Oct13 100.00%
28Nov13 5Dec13 5Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
2 0.010 100% 100%
5Jan14 6Jan14 6Jan14 100.00%
28Nov13 5Dec13 5Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
2 0.010 100% 100%
5Jan14 6Jan14 6Jan14 100.00%
28Nov13 5Dec13 5Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
2 0.010 100% 100%
5Jan14 6Jan14 6Jan14 100.00%
28Nov13 5Dec13 5Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
2 0.010 100% 100%
5Jan14 6Jan14 6Jan14 100.00%
28Nov13 5Dec13 5Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
2 0.010 100% 100%
5Jan14 6Jan14 6Jan14 100.00%
28Nov13 5Dec13 5Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
2 0.010 100% 100%
5Jan14 6Jan14 6Jan14 100.00%
409603376.xlsx Page 95 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

832 5.57
100.00% 100.00%

26Aug13 2Sep13 2Sep13 100.00%


5Dec13 12Dec13 12Dec13 100.00%
19 0.127 100% 100%
13Jan14 30Jan14 30Jan14 100.00%
3Dec13 10Dec13 10Dec13 100.00% By Petrojet, No
- 24Oct13 24Oct13 100.00% further rev. of doc
19 0.127 100% 100% is required.
Existing doc will
- 24Oct13 24Oct13 100.00% be updated
3Dec13 10Dec13 10Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00% Will be Issued by
13 0.087 100% 100%
Process
21Jan14 22Jan14 22Jan14 100.00%
19Nov13 26Nov13 26Nov13 100.00%
26Dec13 2Jan14 2Jan14 100.00% Will be Issued by
13 0.087 100% 100%
Process
20Jan14 23Jan14 23Jan14 100.00%
5Aug13 12Aug13 12Aug13 100.00%
- 7Aug13 7Aug13 100.00%
29 0.194 100% 100%
- 7Aug13 7Aug13 100.00%
10Nov13 17Nov13 17Nov13 100.00%
5Jan14 12Jan14 12Jan14 100.00%
240 1.606 100% 100%
- 13Nov13 13Nov13 100.00%

409603376.xlsx Page 96 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

24Nov13 1Dec13 1Dec13 100.00%


5Jan14 12Jan14 12Jan14 100.00%
140 0.937 100% 100%
- 28Nov13 28Nov13 100.00%
3Dec13 10Dec13 10Dec13 100.00%
5Jan14 12Jan14 12Jan14 100.00%
29 0.191 100% 50% By Petrojet
50.00%

15Sep13 22Sep13 22Sep13 100.00%


11Sep13 20Sep13 20Sep13 100.00%
13 0.087 100% 100%
11Sep13 20Sep13 20Sep13 100.00%
22Sep13 29Sep13 29Sep13 100.00%
- 9Oct13 9Oct13 100.00%
16 0.107 100% 100%
- 9Oct13 9Oct13 100.00%

15Sep13 22Sep13 22Sep13 100.00%


- 5Sep13 5Sep13 100.00%
19 0.127 100% 100%
- 5Sep13 5Sep13 100.00%
22Sep13 29Sep13 29Sep13 100.00%
- 11Oct13 11Oct13 100.00%
25 0.167 100% 100%
- 11Oct13 11Oct13 100.00%

15Sep13 22Sep13 22Sep13 100.00%


4Nov13 21Nov13 21Nov13 100.00%
25 0.167 100% 100%
4Nov13 28Nov13 28Nov13 100.00%
22Sep13 29Sep13 29Sep13 100.00%
- 24Oct13 24Oct13 100.00%
25 0.167 100% 100%
- 24Oct13 24Oct13 100.00%

- 8Dec13 8Dec13 100.00%


- 8Jan14 8Jan14 100.00%
18 0.120 100% 100%
409603376.xlsx Page 97 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

18 0.120 100% 100%


26Jan14 5Feb14 5Feb14 100.00%
- 8Dec13 8Dec13 100.00%
- 20Jan14 20Jan14 100.00%
18 0.120 100% 50%
50.00%

18Sep13 25Sep13 25Sep13 100.00%


- 17Oct13 17Oct13 100.00%
28 0.187 100% 100%
- 17Oct13 17Oct13 100.00%

24Dec13 31Dec13 31Dec13 100.00%


- 20Oct13 20Oct13 100.00%
25 0.167 100% 100%
- 20Oct13 20Oct13 100.00%
8Jan14 15Jan14 15Jan14 100.00%
- 20Oct13 20Oct13 100.00%
25 0.167 100% 100%
- 20Oct13 20Oct13 100.00%
30Dec13 6Jan14 6Jan14 100.00%
19Dec13 26Dec13 26Dec13 100.00%
25 0.167 100% 100%
- 11Dec13 11Dec13 100.00%
9Oct13 16Oct13 16Oct13 100.00%
- 25Oct13 25Oct13 100.00%
31 0.204 100% 100%
- 25Oct13 25Oct13 100.00%
9Oct13 16Oct13 16Oct13 100.00%
- 25Oct13 25Oct13 100.00%
31 0.204 100% 100%
- 25Oct13 25Oct13 100.00%

409603376.xlsx Page 98 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

9Oct13 16Oct13 16Oct13 100.00%


- 20Oct13 20Oct13 100.00%
61 0.408 100% 100%
- 20Oct13 20Oct13 100.00%
8Jan14 15Jan14 15Jan14 100.00%
25Jan14 30Jan14 30Jan14 100.00%
0 0.000 0% 0%
- - - 100.00%
1,447 9.679
98.44% 98.39%

31Jul13 5Aug13 5Aug13 100.00%


23Jul13 30Jul13 30Jul13 100.00%
6 0.040 100% 100%
23Jul13 30Jul13 30Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
23Jul13 30Jul13 30Jul13 100.00%
6 0.040 100% 100%
23Jul13 30Jul13 30Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 12Aug13 12Aug13 100.00%
6 0.040 100% 100%
- 12Aug13 12Aug13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 6Jul13 6Jul13 100.00%
6 0.040 100% 100%
- 6Jul13 6Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
19Sep13 22Sep13 22Sep13 100.00%
6 0.040 100% 100%
19Sep13 22Sep13 22Sep13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 22Sep13 22Sep13 100.00%
6 0.040 100% 100%
- 22Sep13 22Sep13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
19Sep13 22Sep13 22Sep13 100.00%
6 0.040 100% 100%
409603376.xlsx Page 99 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

6 0.040 100% 100%


19Sep13 22Sep13 22Sep13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
7Aug13 13Aug13 13Aug13 100.00%
6 0.040 100% 100%
7Aug13 13Aug13 13Aug13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 12Aug13 12Aug13 100.00%
28 0.187 100% 100%
- 12Aug13 12Aug13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 21Jul13 21Jul13 100.00%
6 0.040 100% 100%
- 21Jul13 21Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 14Jul13 14Jul13 100.00%
6 0.040 100% 100%
- 14Jul13 14Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
25Jul13 30Jul13 30Jul13 100.00%
6 0.040 100% 100%
25Jul13 30Jul13 30Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 17Jul13 17Jul13 100.00%
6 0.040 100% 100%
- 17Jul13 17Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 21Jul13 21Jul13 100.00%
6 0.040 100% 100%
- 21Jul13 21Jul13 100.00%

409603376.xlsx Page 100 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

31Jul13 5Aug13 5Aug13 100.00%


- 21Jul13 21Jul13 100.00%
6 0.040 100% 100%
- 21Jul13 21Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
7Aug13 23Oct13 23Oct13 100.00%
6 0.040 100% 100%
7Aug13 23Oct13 23Oct13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 17Jul13 17Jul13 100.00%
6 0.040 100% 100%
- 17Jul13 17Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 4Aug13 4Aug13 100.00%
6 0.040 100% 100%
- 4Aug13 4Aug13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 4Aug13 4Aug13 100.00%
6 0.040 100% 100%
- 4Aug13 4Aug13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
25Jul13 30Jul13 30Jul13 100.00%
6 0.040 100% 100%
25Jul13 30Jul13 30Jul13 100.00%
31Jul13 5Aug13 5Aug13 100.00%
- 21Jul13 21Jul13 100.00%
6 0.040 100% 100%
- 21Jul13 21Jul13 100.00%

24Jul13 31Jul13 31Jul13 100.00%


- 6Jul13 6Jul13 100.00%
9 0.060 100% 100%
- 6Jul13 6Jul13 100.00%
15Aug13 22Aug13 22Aug13 100.00%
- 20Aug13 22Sep13 100.00%
9 0.060 100% 100%
- 20Aug13 22Sep13 100.00%
12Aug13 19Aug13 19Aug13 100.00%
- 22Jul13 20Sep13 100.00%
9 0.060 100% 100%
409603376.xlsx Page 101 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

9 0.060 100% 100%


- 22Jul13 20Sep13 100.00%
18Aug13 25Aug13 25Aug13 100.00%
- 22Jul13 22Jul13 100.00%
9 0.060 100% 100%
- 22Jul13 22Jul13 100.00%
7Aug13 14Aug13 14Aug13 100.00%
- 5Aug13 5Aug13 100.00%
9 0.060 100% 100%
- 5Aug13 5Aug13 100.00%
16Oct13 23Oct13 23Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
9 0.060 100% 100%
18Nov13 20Nov13 20Nov13 100.00%

24Jul13 31Jul13 31Jul13 100.00%


- 12Aug13 7Nov13 100.00%
13 0.087 100% 100%
- 12Aug13 7Nov13 100.00%
4Aug13 11Aug13 11Aug13 100.00%
- 23Jul13 30Jan14 100.00%
7 0.047 100% 100%
- 23Jul13 30Jan14 100.00%
15Aug13 22Aug13 22Aug13 100.00%
- 12Aug13 22Sep13 100.00%
7 0.047 100% 100%
- 12Aug13 22Sep13 100.00%
12Aug13 19Aug13 19Aug13 100.00%
- 23Jul13 20Sep13 100.00%
7 0.047 100% 100%
- 23Jul13 20Sep13 100.00%

409603376.xlsx Page 102 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

18Aug13 25Aug13 25Aug13 100.00%


- 23Jul13 12Aug13 100.00%
7 0.047 100% 100%
- 23Jul13 12Aug13 100.00%
7Aug13 14Aug13 14Aug13 100.00%
- 5Aug13 5Aug13 100.00%
7 0.047 100% 100%
- 5Aug13 5Aug13 100.00%
21Aug13 28Aug13 28Aug13 100.00%
- 12Aug13 12Aug13 100.00%
7 0.047 100% 100%
- 12Aug13 12Aug13 100.00%
18Aug13 25Aug13 25Aug13 100.00%
8Sep13 17Sep13 17Sep13 100.00%
7 0.047 100% 100%
8Sep13 17Sep13 17Sep13 100.00%
27Aug13 3Sep13 3Sep13 100.00%
- 29Aug13 25Dec13 100.00%
7 0.047 100% 100%
- 29Aug13 25Dec13 100.00%
4Aug13 11Aug13 11Aug13 100.00%
- 12Aug13 30Jan14 100.00%
19 0.127 100% 100%
- 12Aug13 30Jan14 100.00%
24Oct13 31Oct13 7Nov13 100.00%
17Nov13 19Nov13 19Nov13 100.00%
7 0.047 100% 100%
17Nov13 19Nov13 19Nov13 100.00%

- 13Aug13 13Aug13 100.00%


9Sep13 20Sep13 20Sep13 100.00%
27 0.181 100% 100%
9Sep13 20Sep13 20Sep13 100.00%
- 6Oct13 6Oct13 100.00%
- 23Oct13 23Oct13 100.00%
27 0.181 100% 100%
- 23Oct13 23Oct13 100.00%
- 11Sep13 11Sep13 100.00%
22Sep13 24Sep13 24Sep13 100.00%
18 0.120 100% 100%
409603376.xlsx Page 103 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

18 0.120 100% 100%


22Sep13 24Sep13 24Sep13 100.00%
- 3Oct13 3Oct13 100.00%
31Oct13 5Nov13 5Nov13 100.00%
18 0.120 100% 100%
31Oct13 5Nov13 5Nov13 100.00%
- 30Sep13 30Sep13 100.00%
23Oct13 29Oct13 29Oct13 100.00%
18 0.120 100% 100%
23Oct13 29Oct13 29Oct13 100.00%
- 6Oct13 6Oct13 100.00%
- 31Oct13 31Oct13 100.00%
18 0.120 100% 100%
- 31Oct13 31Oct13 100.00%
- 25Sep13 25Sep13 100.00%
26Oct13 10Dec13 10Dec13 100.00%
18 0.120 100% 100%
26Oct13 8Dec13 8Dec13 100.00%
- 3Nov13 3Nov13 100.00%
12Jan14 19Jan14 19Jan14 100.00%
18 0.120 100% 85%
19Jan14 85.00%
- 3Nov13 3Nov13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
18 0.120 100% 75%
75.00%
- 13Aug13 13Aug13 100.00%
9Sep13 20Sep13 20Sep13 100.00% Deliverable is newly
27 0.181 100% 100% added
9Sep13 20Sep13 20Sep13 100.00%

409603376.xlsx Page 104 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

- 13Aug13 13Aug13 100.00%


30Dec99 30Dec99 30Dec99 100.00% Deliverable is newly
0 0.000 0% 0% added
50.00%

10Jul13 17Jul13 17Jul13 100.00%


- 6Jul13 6Jul13 100.00%
9 0.060 100% 100%
- 6Jul13 6Jul13 100.00%
8Aug13 15Aug13 15Aug13 100.00%
- 17Jul13 17Jul13 100.00%
19 0.127 100% 100%
- 17Jul13 17Jul13 100.00%
8Aug13 15Aug13 15Aug13 100.00%
- 17Jul13 17Jul13 100.00%
19 0.127 100% 100%
- 17Jul13 17Jul13 100.00%
16Jul13 23Jul13 23Jul13 100.00%
1Jul13 6Jul13 6Jul13 100.00%
13 0.087 100% 100%
1Jul13 6Jul13 6Jul13 100.00%

22Oct13 29Oct13 29Oct13 100.00%


- 28Nov13 28Nov13 100.00%
127 0.850 100% 100%
- 28Nov13 16Dec13 100.00%
22Oct13 29Oct13 29Oct13 100.00%
24Jan14 31Jan14 31Jan14 100.00%
63 0.422 100% 85%
5Jan14 85.00%
22Oct13 29Oct13 29Oct13 100.00% Class-3 doc N/R
12Oct13 12Oct13 12Oct13 100.00% any comnts on
145 0.970 100% 100%
Rev.A within
- 17Dec13 17Dec13 100.00% review time
22Oct13 29Oct13 29Oct13 100.00% Class-3 doc N/R
12Oct13 12Oct13 12Oct13 100.00% any comnts on
145 0.970 100% 100%
Rev.A within
- 17Dec13 17Dec13 100.00% review time

409603376.xlsx Page 105 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

22Oct13 29Oct13 29Oct13 100.00% Class-3 doc N/R


12Oct13 12Oct13 12Oct13 100.00% any comnts on
145 0.970 100% 100%
Rev.A within
- 17Dec13 17Dec13 100.00% review time
22Oct13 29Oct13 29Oct13 100.00% Class-3 doc N/R
12Oct13 12Oct13 12Oct13 100.00% any comnts on
145 0.970 100% 100%
Rev.A within
- 17Dec13 17Dec13 100.00% review time
13Oct13 20Oct13 20Oct13 100.00%
- 13Aug13 13Aug13 100.00%
69 0.462 100% 100%
- 13Aug13 13Aug13 100.00%
23Oct13 30Oct13 30Oct13 100.00%
- 20Sep13 20Sep13 100.00%
69 0.462 100% 100%
- 20Sep13 20Sep13 100.00%
26Nov13 3Dec13 3Dec13 100.00%
25Nov13 27Nov13 27Nov13 100.00%
19 0.127 100% 100%
- 27Nov13 27Nov13 100.00%
3Dec13 10Dec13 10Dec13 100.00%
17Nov13 27Nov13 27Nov13 100.00%
19 0.127 100% 100%
17Nov13 27Nov13 27Nov13 100.00%
9Dec13 16Dec13 16Dec13 100.00%
12Jan14 19Jan14 19Jan14 100.00%
19 0.127 100% 100%
6Jan14 14Jan14 14Jan14 100.00%
- 8Dec13 8Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
40 0.268 100% 85%
2Dec13 85.00%

409603376.xlsx Page 106 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

28Oct13 4Nov13 4Nov13 100.00%


- 14Aug13 2Dec13 100.00%
28 0.187 100% 100%
- 14Aug13 2Dec13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
- 2Jul13 2Jul13 100.00%
28 0.187 100% 100%
- 2Jul13 2Jul13 100.00%
6Nov13 13Nov13 13Nov13 100.00%
- 2Jul13 2Jul13 100.00%
28 0.187 100% 100%
- 2Jul13 2Jul13 100.00%
11Nov13 18Nov13 18Nov13 100.00%
- 2Jul13 15Dec13 100.00%
28 0.187 100% 100%
- 2Jul13 2Dec13 100.00%
10Oct13 17Oct13 17Oct13 100.00%
- 13Oct13 13Oct13 100.00%
27 0.181 100% 100%
- 13Oct13 13Oct13 100.00%

6Nov13 13Nov13 13Nov13 100.00%


- - 25Nov13 100.00%
19 0.127 100% 100%
- 25Nov13 25Nov13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
409603376.xlsx Page 107 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

20Nov13 27Nov13 27Nov13 100.00%


5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 22Jan14 100.00%

409603376.xlsx Page 108 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

20Nov13 27Nov13 27Nov13 100.00%


8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 22Jan14 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
5Dec13 12Dec13 12Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 30Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 30Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 18Dec13 100.00%
409603376.xlsx Page 109 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

5Dec13 12Dec13 12Dec13 100.00%


23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 18Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 18Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 18Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 18Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
14 0.094 100% 100%
- 18Dec13 30Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
21 0.141 100% 100%
- 18Dec13 30Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
13 0.087 100% 100%
- 18Dec13 18Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00% Added
23Dec13 30Dec13 30Dec13 100.00%
12 0.080 100% 100%
- 18Dec13 18Dec13 100.00% Dated : 20-Nov

409603376.xlsx Page 110 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

26Nov13 3Dec13 3Dec13 100.00%


19Dec13 26Dec13 26Dec13 100.00%
22 0.147 100% 100%
- 11Dec13 11Dec13 100.00%
3Dec13 10Dec13 10Dec13 100.00%
19Dec13 26Dec13 26Dec13 100.00%
22 0.147 100% 100%
- 11Dec13 11Dec13 100.00%

14Nov13 21Nov13 21Nov13 100.00%


19Jan14 26Jan14 26Jan14 100.00%
19 0.127 100% 100%
30Dec13 30Dec13 30Dec13 100.00%
21Nov13 28Nov13 28Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.064 100% 100%
- 26Dec13 26Dec13 100.00%
21Nov13 28Nov13 28Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
8 0.054 100% 100%
- 26Dec13 26Dec13 100.00%
21Nov13 28Nov13 28Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
8 0.054 100% 100%
- 26Dec13 26Dec13 100.00%
21Nov13 28Nov13 28Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
8 0.054 100% 100%
- 26Dec13 26Dec13 100.00%
21Nov13 28Nov13 28Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
8 0.054 100% 100%
- 26Dec13 26Dec13 100.00%
21Nov13 28Nov13 28Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
8 0.052 100% 100%
- 26Dec13 26Dec13 100.00%
21Nov13 28Nov13 28Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
8 0.052 100% 100%
409603376.xlsx Page 111 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

8 0.052 100% 100%


- 26Dec13 26Dec13 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.067 100% 100%
- 9Jan14 9Jan14 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.067 100% 100%
- 9Jan14 9Jan14 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.067 100% 100%
- 9Jan14 9Jan14 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.067 100% 100%
- 9Jan14 9Jan14 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.067 100% 100%
- 9Jan14 9Jan14 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.067 100% 100%
- 9Jan14 9Jan14 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
10 0.067 100% 100%
- 9Jan14 9Jan14 100.00%

409603376.xlsx Page 112 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

5Dec13 11Dec13 11Dec13 100.00%


19Jan14 26Jan14 26Jan14 100.00%
11 0.074 100% 100%
- 9Jan14 9Jan14 100.00%
5Dec13 11Dec13 11Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
11 0.074 100% 100%
- 9Jan14 9Jan14 100.00%
10Dec13 17Dec13 17Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
27 0.181 100% 85%
29Jan14 85.00%

10Nov13 17Nov13 17Nov13 100.00%


- - 25Nov13 100.00%
19 0.127 100% 100%
- 25Nov13 25Nov13 100.00%
26Nov13 2Dec13 2Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
8 0.054 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
26Nov13 2Dec13 2Dec13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
9 0.060 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
26Nov13 2Dec13 2Dec13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
26Nov13 2Dec13 2Dec13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
26Nov13 2Dec13 2Dec13 100.00%
8Dec13 15Dec13 15Dec13 100.00%
7 0.047 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
2Dec13 9Dec13 9Dec13 100.00%
24Dec13 31Dec13 31Dec13 100.00%
22 0.147 100% 100%
409603376.xlsx Page 113 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

22 0.147 100% 100%


- 11Dec13 28Jan14 100.00%
2Dec13 9Dec13 9Dec13 100.00%
24Dec13 31Dec13 31Dec13 100.00%
22 0.147 100% 100%
- 11Dec13 11Dec13 100.00%
2Dec13 9Dec13 9Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
0 0.000 0% 0%
50.00%
2Dec13 9Dec13 9Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
19 0.127 100% 100%
- 5Dec13 5Dec13 100.00%
2Dec13 9Dec13 9Dec13 100.00%
30Dec13 6Jan14 6Jan14 100.00%
17 0.114 100% 100%
- 5Dec13 5Dec13 100.00%

14Aug13 21Aug13 21Aug13 100.00%


10Sep13 18Sep13 18Sep13 100.00%
9 0.060 100% 100%
10Sep13 18Sep13 18Sep13 100.00%
20Aug13 27Aug13 27Aug13 100.00%
10Sep13 18Sep13 18Sep13 100.00%
9 0.060 100% 100%
10Sep13 18Sep13 18Sep13 100.00%
27Aug13 3Sep13 3Sep13 100.00%
10Sep13 18Sep13 18Sep13 100.00%
9 0.060 100% 100%
10Sep13 18Sep13 18Sep13 100.00%

409603376.xlsx Page 114 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

23Jan14 30Jan14 30Jan14 100.00%


30Dec99 30Dec99 30Dec99 100.00%
0 0.000 0% 0%
75.00%
7Jan14 14Jan14 14Jan14 100.00%
21Jan14 28Jan14 28Jan14 100.00%
104 0.696 100% 50%
50.00%
2,525 16.90
100.00% 96.88%

11Sep13 16Sep13 16Sep13 100.00%


28Sep13 1Oct13 1Oct13 100.00%
13 0.087 100% 100%
28Sep13 1Oct13 1Oct13 100.00%

15Sep13 22Sep13 22Sep13 100.00%


- 1Aug13 1Aug13 100.00%
7 0.047 100% 100%
- 1Aug13 1Aug13 100.00%
11Sep13 16Sep13 16Sep13 100.00%
- 1Aug13 1Aug13 100.00%
7 0.047 100% 100%
- 1Aug13 1Aug13 100.00%
24Sep13 1Oct13 1Oct13 100.00%
- 1Aug13 1Aug13 100.00%
7 0.047 100% 100%
- 1Aug13 1Aug13 100.00%
29Sep13 6Oct13 6Oct13 100.00%
- 1Aug13 1Aug13 100.00%
7 0.047 100% 100%
- 1Aug13 1Aug13 100.00%

26Aug13 2Sep13 2Sep13 100.00%


11Sep13 18Sep13 18Sep13 100.00%
10 0.067 100% 100%

409603376.xlsx Page 115 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%
10 0.067 100% 100%
11Sep13 18Sep13 18Sep13 100.00%
26Aug13 2Sep13 2Sep13 100.00%
11Sep13 22Sep13 22Sep13 100.00%
10 0.067 100% 100%
11Sep13 22Sep13 22Sep13 100.00%
26Aug13 2Sep13 2Sep13 100.00%
11Sep13 18Sep13 18Sep13 100.00%
10 0.067 100% 100%
11Sep13 18Sep13 18Sep13 100.00%
2Sep13 9Sep13 9Sep13 100.00%
5Sep13 9Sep13 9Sep13 100.00%
13 0.087 100% 100%
5Sep13 9Sep13 9Sep13 100.00%
9Sep13 16Sep13 16Sep13 100.00%
5Oct13 9Oct13 24Nov13 100.00%
13 0.087 100% 100%
5Oct13 9Oct13 24Nov13 100.00%

26Aug13 2Sep13 2Sep13 100.00%


22Sep13 24Sep13 24Sep13 100.00%
5 0.033 100% 100%
22Sep13 24Sep13 24Sep13 100.00%
2Sep13 9Sep13 9Sep13 100.00%
7Sep13 9Sep13 9Sep13 100.00%
5 0.033 100% 100%
7Sep13 9Sep13 9Sep13 100.00%
9Sep13 16Sep13 16Sep13 100.00%
28Sep13 3Oct13 3Oct13 100.00%
10 0.067 100% 100%
28Sep13 3Oct13 3Oct13 100.00%

409603376.xlsx Page 116 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

- 14Oct13 14Oct13 100.00%


- - 12Nov13 100.00%
18 0.120 100% 100%
- 12Nov13 12Nov13 100.00%
- 29Oct13 29Oct13 100.00%
5Dec13 10Dec13 10Dec13 100.00%
18 0.120 100% 100%
2Dec13 4Dec13 4Dec13 100.00%
- 31Oct13 31Oct13 100.00%
7Jan14 14Jan14 14Jan14 100.00%
18 0.120 100% 50%
50.00%
7Jan14 14Jan14 14Jan14 100.00%
26Jan14 30Jan14 30Jan14 100.00%
7 0.047 100% 50%
50.00%
178 1.191
100.00% 92.98%

11Sep13 18Sep13 18Sep13 100.00%


22Oct13 31Oct13 31Oct13 100.00%
25 0.167 100% 100%
22Oct13 31Oct13 31Oct13 100.00%
16Sep13 19Sep13 19Sep13 100.00%
11Sep13 1Oct13 1Oct13 100.00%
13 0.087 100% 100%
11Sep13 1Oct13 1Oct13 100.00%
24Sep13 29Sep13 29Sep13 100.00%
- 3Oct13 3Oct13 100.00%
16 0.107 100% 100%
- 3Oct13 3Oct13 100.00%
6Oct13 13Oct13 13Oct13 100.00%
11Dec13 18Dec13 18Dec13 100.00% Deliverable is
37 0.248 100% 100% added as
mentioned in CRS
8Dec13 3Feb14 3Feb14 100.00%

409603376.xlsx Page 117 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

13Aug13 20Aug13 20Aug13 100.00%


- 17Jul13 17Jul13 100.00%
13 0.087 100% 100%
- 17Jul13 17Jul13 100.00%
14Oct13 21Oct13 21Oct13 100.00% Class-3 doc N/R
- - 19Sep13 100.00% any comnts on
46 0.308 100% 100%
Rev.A within
- - 28Jan14 100.00% review time
14Oct13 21Oct13 21Oct13 100.00%
- 17Sep13 30Jan14 100.00%
45 0.301 100% 100%
- 17Sep13 30Jan14 100.00%
14Oct13 21Oct13 21Oct13 100.00%
- 7Oct13 29Jan14 100.00%
45 0.301 100% 100%
- 7Oct13 29Jan14 100.00%
- 23Jan14 23Jan14 100.00%
23Oct13 20Dec13 20Dec13 100.00%
55 0.368 100% 100%
23Oct13 27Jan14 27Jan14 100.00%
- 31Oct13 31Oct13 100.00%
5Oct13 15Dec13 15Dec13 100.00%
25 0.167 100% 100%
5Oct13 11Dec13 2Jan14 100.00%

14Aug13 21Aug13 21Aug13 100.00%


- 1Aug13 1Aug13 100.00%
16 0.107 100% 100%
- 1Aug13 1Aug13 100.00%

409603376.xlsx Page 118 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

3Sep13 10Sep13 10Sep13 100.00%


- 5Sep13 5Sep13 100.00%
7 0.047 100% 100%
- 5Sep13 5Sep13 100.00%
18Aug13 25Aug13 25Aug13 100.00%
25Aug13 29Aug13 29Aug13 100.00%
7 0.047 100% 100%
25Aug13 29Aug13 29Aug13 100.00%
18Sep13 29Sep13 29Sep13 100.00%
- 21Aug13 21Aug13 100.00%
7 0.047 100% 100%
- 21Aug13 21Aug13 100.00%
24Sep13 1Oct13 1Oct13 100.00%
15Sep13 18Sep13 18Sep13 100.00%
7 0.047 100% 100%
15Sep13 18Sep13 18Sep13 100.00%
17Sep13 22Sep13 22Sep13 100.00%
- 17Aug13 17Aug13 100.00%
7 0.047 100% 100%
- 17Aug13 17Aug13 100.00%
29Sep13 6Oct13 6Oct13 100.00%
19Sep13 24Sep13 24Sep13 100.00%
7 0.047 100% 100%
19Sep13 24Sep13 24Sep13 100.00%
3Oct13 10Oct13 10Oct13 100.00%
19Sep13 24Sep13 24Sep13 100.00%
7 0.047 100% 100%
19Sep13 24Sep13 24Sep13 100.00%
8Oct13 15Oct13 15Oct13 100.00%
- 17Aug13 17Aug13 100.00%
7 0.047 100% 100%
- 17Aug13 17Aug13 100.00%
13Oct13 20Oct13 20Oct13 100.00%
28Sep13 3Oct13 3Oct13 100.00%
7 0.047 100% 100%
28Sep13 3Oct13 3Oct13 100.00%
17Oct13 24Oct13 24Oct13 100.00%
28Sep13 3Oct13 3Oct13 100.00%
7 0.047 100% 100%
28Sep13 3Oct13 3Oct13 100.00%
409603376.xlsx Page 119 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

22Oct13 29Oct13 29Oct13 100.00%


- 17Aug13 17Aug13 100.00%
7 0.047 100% 100%
- 17Aug13 17Aug13 100.00%
25Sep13 2Oct13 2Oct13 100.00%
- 17Aug13 17Aug13 100.00%
7 0.047 100% 100%
- 17Aug13 17Aug13 100.00%

21Aug13 28Aug13 28Aug13 100.00%


10Sep13 18Sep13 18Sep13 100.00%
19 0.127 100% 100%
10Sep13 18Sep13 18Sep13 100.00%
3Sep13 10Sep13 10Sep13 100.00%
10Sep13 18Sep13 18Sep13 100.00%
16 0.107 100% 100%
10Sep13 18Sep13 18Sep13 100.00%
2Oct13 9Oct13 9Oct13 100.00%
19Sep13 24Sep13 24Sep13 100.00%
10 0.067 100% 100%
19Sep13 24Sep13 24Sep13 100.00%

28Aug13 4Sep13 4Sep13 100.00%


- 28Aug13 5Nov13 100.00%
5 0.033 100% 100%
- 28Aug13 5Nov13 100.00%
21Aug13 28Aug13 28Aug13 100.00%
- 29Aug13 2Jan14 100.00%
5 0.033 100% 100%
- 29Aug13 2Jan14 100.00%

409603376.xlsx Page 120 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

3Sep13 10Sep13 10Sep13 100.00%


- 29Aug13 2Jan14 100.00%
5 0.033 100% 100%
- 29Aug13 2Jan14 100.00%
2Oct13 9Oct13 9Oct13 100.00%
22Oct13 29Oct13 29Oct13 100.00%
5 0.033 100% 100%
22Oct13 18Nov13 18Nov13 100.00%

- 25Sep13 25Sep13 100.00%


- 15Dec13 15Dec13 100.00%
9 0.060 100% 100%
23Dec13 30Dec13 30Dec13 100.00%
- 24Oct13 24Oct13 100.00%
- 10Dec13 10Dec13 100.00%
9 0.060 100% 100%
19Dec13 5Jan14 5Jan14 100.00%
- 20Nov13 20Nov13 100.00%
- 19Jan14 19Jan14 100.00%
9 0.060 100% 25%
25.00%

6Oct13 8Dec13 8Dec13 100.00%


23Oct13 27Nov13 27Nov13 100.00%
22 0.147 100% 100%
17Nov13 24Nov13 24Nov13 100.00%
6Oct13 9Jan14 9Jan14 100.00%
23Oct13 27Nov13 24Dec13 100.00%
28 0.187 100% 95%
17Nov13 24Nov13 95.00%
6Oct13 8Dec13 8Dec13 100.00%
23Oct13 27Nov13 24Dec13 100.00%
22 0.147 100% 95%
17Nov13 24Nov13 95.00%
6Oct13 5Jan14 5Jan14 100.00%
20Nov13 27Nov13 24Dec13 100.00%
42 0.281 100% 95%
17Nov13 24Nov13 95.00%
6Oct13 27Oct13 27Oct13 100.00%
409603376.xlsx Page 121 of 186
13 0.087 100% 100%
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

20Nov13 27Nov13 27Nov13 100.00%


13 0.087 100% 100%
17Nov13 24Nov13 24Nov13 100.00%
24Sep13 1Oct13 1Oct13 100.00%
13Oct13 24Oct13 27Nov13 100.00%
25 0.167 100% 100%
13Oct13 24Oct13 27Nov13 100.00%
6Oct13 15Dec13 15Dec13 100.00%
6Nov13 13Nov13 2Jan14 100.00%
25 0.167 100% 95%
6Nov13 14Nov13 95.00%
6Oct13 16Jan14 16Jan14 100.00%
20Nov13 27Nov13 2Jan14 100.00%
127 0.850 100% 95%
17Nov13 24Nov13 95.00%
6Oct13 22Dec13 22Dec13 100.00%
10Nov13 17Nov13 2Jan14 100.00%
25 0.167 100% 95%
10Nov13 14Nov13 95.00%
6Oct13 29Dec13 29Dec13 100.00%
6Nov13 27Nov13 27Nov13 100.00%
121 0.810 100% 100%
6Nov13 27Nov13 27Nov13 100.00%
6Oct13 5Jan14 5Jan14 100.00%
6Nov13 - 24Nov13 100.00%
25 0.167 100% 100%
6Nov13 24Nov13 24Nov13 100.00%
6Oct13 12Jan14 12Jan14 100.00%
1Dec13 8Dec13 8Dec13 100.00%
25 0.167 100% 95%
4Dec13 4Feb14 95.00%

409603376.xlsx Page 122 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

6Nov13 13Nov13 13Nov13 100.00%


28Oct13 28Nov13 6Feb14 100.00%
31 0.207 100% 100%
28Oct13 28Nov13 6Feb14 100.00%
13Nov13 20Nov13 20Nov13 100.00%
19Nov13 28Nov13 15Dec13 100.00%
37 0.248 100% 100%
19Nov13 28Nov13 6Feb14 100.00%
2Oct13 9Oct13 9Oct13 100.00%
17Nov13 - 19Nov13 100.00%
28 0.187 100% 100%
17Nov13 19Nov13 19Nov13 100.00%
3Nov13 10Nov13 10Nov13 100.00%
13Oct13 24Oct13 24Oct13 100.00%
20 0.134 100% 100%
13Oct13 24Oct13 24Oct13 100.00%
19Jan14 19Jan14 19Jan14 100.00%
26Jan14 26Jan14 26Jan14 100.00% Deliverable is
121 0.810 100% 40% added as
mentioned in CRS
40.00%
19Jan14 19Jan14 19Jan14 100.00%
19Jan14 19Jan14 19Jan14 100.00% Deliverable is
40 0.268 100% 40% added as
mentioned in CRS
40.00%
19Jan14 19Jan14 19Jan14 100.00%
26Jan14 26Jan14 26Jan14 100.00% Deliverable is
40 0.268 100% 40% added as
mentioned in CRS
40.00%
19Jan14 19Jan14 19Jan14 100.00%
19Jan14 19Jan14 19Jan14 100.00% Deliverable is
40 0.268 100% 40% added as
mentioned in CRS
40.00%
7Jan14 14Jan14 14Jan14 100.00%
21Jan14 28Jan14 28Jan14 100.00%
119 0.796 100% 50%
50.00%
1,488 9.957
100.00% 84.84%

409603376.xlsx Page 123 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

6Oct13 13Oct13 13Oct13 100.00%


4Nov13 6Nov13 6Nov13 100.00%
12 0.080 100% 100%
4Nov13 6Nov13 6Nov13 100.00%
4Sep13 11Sep13 11Sep13 100.00%
1Oct13 5Nov13 5Nov13 100.00%
15 0.100 100% 100%
1Oct13 5Nov13 5Nov13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
5Sep13 19Sep13 19Sep13 100.00%
24 0.161 100% 100%
5Sep13 19Sep13 19Sep13 100.00%
17Sep13 24Sep13 24Sep13 100.00%
12Nov13 19Nov13 19Nov13 100.00%
15 0.100 100% 100%
12Nov13 14Nov13 14Nov13 100.00%
4Sep13 11Sep13 11Sep13 100.00%
- 3Oct13 30Dec13 100.00%
12 0.080 100% 100%
- 3Oct13 30Dec13 100.00%
19Aug13 26Aug13 26Aug13 100.00%
- 7Aug13 7Aug13 100.00%
9 0.060 100% 100%
- 7Aug13 7Aug13 100.00%
27Aug13 3Sep13 3Sep13 100.00%
5Sep13 13Sep13 13Sep13 100.00%
9 0.060 100% 100%
5Sep13 13Sep13 13Sep13 100.00%

409603376.xlsx Page 124 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

10Oct13 17Oct13 17Oct13 100.00%


17Nov13 12Dec13 12Dec13 100.00%
9 0.060 100% 100%
10Dec13 12Dec13 12Dec13 100.00%
22Oct13 29Oct13 29Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
12 0.080 100% 100%
13Nov13 14Nov13 14Nov13 100.00%
7Nov13 14Nov13 14Nov13 100.00% Added as
4Nov13 6Nov13 6Nov13 100.00% mentioned in CRS
12 0.080 100% 100%
(T-PET-5275-
4Nov13 6Nov13 6Nov13 100.00% 00131)
11Sep13 18Sep13 18Sep13 100.00%
18Sep13 19Sep13 19Sep13 100.00%
15 0.100 100% 100%
18Sep13 19Sep13 19Sep13 100.00%
16Oct13 23Oct13 23Oct13 100.00%
4Nov13 6Nov13 6Nov13 100.00%
12 0.080 100% 100%
4Nov13 6Nov13 6Nov13 100.00%

26Aug13 2Sep13 2Sep13 100.00%


11Sep13 19Sep13 19Sep13 100.00%
18 0.120 100% 100%
11Sep13 19Sep13 19Sep13 100.00%
27Oct13 3Nov13 3Nov13 100.00%
12Nov13 19Nov13 19Nov13 100.00%
18 0.120 100% 100%
12Nov13 14Nov13 14Nov13 100.00%
21Oct13 28Oct13 28Oct13 100.00%
12Nov13 19Nov13 19Nov13 100.00%
12 0.080 100% 100%
12Nov13 14Nov13 14Nov13 100.00%
16Oct13 23Oct13 23Oct13 100.00%
4Nov13 6Nov13 6Nov13 100.00%
12 0.080 100% 100%
4Nov13 6Nov13 6Nov13 100.00%
3Nov13 10Nov13 10Nov13 100.00%
4Nov13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
409603376.xlsx Page 125 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

9 0.060 100% 100%


4Nov13 6Nov13 6Nov13 100.00%

28Oct13 4Nov13 4Nov13 100.00%


4Nov13 6Nov13 6Nov13 100.00%
12 0.080 100% 100%
4Nov13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
4Nov13 10Nov13 10Nov13 100.00%
15 0.100 100% 100%
4Nov13 10Nov13 10Nov13 100.00%

6Oct13 13Oct13 13Oct13 100.00%


20Nov13 27Nov13 27Nov13 100.00%
9 0.060 100% 100%
13Nov13 21Nov13 21Nov13 100.00%
6Oct13 13Oct13 13Oct13 100.00%
- 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
- 6Nov13 6Nov13 100.00%
6Oct13 13Oct13 13Oct13 100.00%
28Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
28Oct13 6Nov13 6Nov13 100.00%
6Oct13 13Oct13 13Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
9 0.060 100% 100%
13Nov13 14Nov13 14Nov13 100.00%

409603376.xlsx Page 126 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

27Aug13 3Sep13 3Sep13 100.00%


5Sep13 13Sep13 13Sep13 100.00%
9 0.060 100% 100%
5Sep13 13Sep13 13Sep13 100.00%
19Aug13 26Aug13 26Aug13 100.00%
11Sep13 25Sep13 25Sep13 100.00%
12 0.080 100% 100%
11Sep13 25Sep13 25Sep13 100.00%
3Nov13 10Nov13 10Nov13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
9 0.060 100% 100%
17Nov13 21Nov13 21Nov13 100.00%
8Sep13 15Sep13 15Sep13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
9 0.060 100% 100%
17Nov13 21Nov13 21Nov13 100.00%
4Sep13 11Sep13 11Sep13 100.00%
8Oct13 30Dec13 30Dec13 100.00%
12 0.080 100% 100%
8Oct13 30Dec13 30Dec13 100.00%
19Aug13 26Aug13 26Aug13 100.00%
9Sep13 19Sep13 19Sep13 100.00%
9 0.060 100% 100%
9Sep13 19Sep13 19Sep13 100.00%
27Oct13 3Nov13 10Nov13 100.00%
- - 21Nov13 100.00%
9 0.060 100% 100%
- 21Nov13 21Nov13 100.00%
11Sep13 18Sep13 18Sep13 100.00%
28Oct13 5Dec13 5Dec13 100.00%
18 0.120 100% 100%
28Oct13 5Dec13 5Dec13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
11Sep13 3Oct13 3Oct13 100.00%
21 0.141 100% 100%
11Sep13 3Oct13 3Oct13 100.00%
16Oct13 23Oct13 23Oct13 100.00%
28Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
28Oct13 6Nov13 6Nov13 100.00%
409603376.xlsx Page 127 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

27Oct13 3Nov13 3Nov13 100.00%


20Nov13 27Nov13 27Nov13 100.00%
15 0.100 100% 100%
17Nov13 21Nov13 21Nov13 100.00%
3Nov13 10Nov13 10Nov13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
12 0.080 100% 100%
17Nov13 21Nov13 21Nov13 100.00%

28Oct13 4Nov13 4Nov13 100.00%


13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%

409603376.xlsx Page 128 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

28Oct13 4Nov13 4Nov13 100.00%


13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
13Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
13Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
13Oct13 20Nov13 20Nov13 100.00%
9 0.060 100% 100%
13Oct13 21Nov13 21Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
24Oct13 6Nov13 6Nov13 100.00%
9 0.060 100% 100%
24Oct13 6Nov13 6Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
- - 21Nov13 100.00%
9 0.060 100% 100%
- 21Nov13 21Nov13 100.00%

6Oct13 13Oct13 13Oct13 100.00%


- 17Nov13 17Nov13 100.00%
5 0.030 100% 100%
- 17Nov13 17Nov13 100.00%
6Oct13 13Oct13 13Oct13 100.00%
- - 21Nov13 100.00%
5 0.030 100% 100%
- 21Nov13 21Nov13 100.00%
4Sep13 11Sep13 11Sep13 100.00%
1Oct13 5Nov13 5Nov13 100.00%
7 0.047 100% 100%
1Oct13 5Nov13 5Nov13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
409603376.xlsx Page 129 of 186
9 0.060 100% 100%
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

12Sep13 22Sep13 22Sep13 100.00%


9 0.060 100% 100%
12Sep13 22Sep13 22Sep13 100.00%
17Sep13 24Sep13 24Sep13 100.00%
19Nov13 - 21Nov13 100.00%
9 0.060 100% 100%
19Nov13 21Nov13 21Nov13 100.00%
19Aug13 26Aug13 26Aug13 100.00%
- 22Aug13 19Sep13 100.00%
9 0.060 100% 100%
- 22Aug13 19Sep13 100.00%
27Aug13 3Sep13 3Sep13 100.00%
11Sep13 22Sep13 22Sep13 100.00%
9 0.060 100% 100%
11Sep13 22Sep13 22Sep13 100.00%
10Oct13 17Oct13 17Oct13 100.00%
9Jan14 16Jan14 16Jan14 100.00%
9 0.060 100% 100%
- 9Jan14 9Jan14 100.00%
11Sep13 18Sep13 18Sep13 100.00%
3Oct13 12Oct13 6Oct13 100.00%
4 0.027 100% 100%
3Oct13 12Oct13 6Oct13 100.00%
16Oct13 23Oct13 23Oct13 100.00%
3Nov13 14Nov13 14Nov13 100.00%
9 0.060 100% 100%
3Nov13 14Nov13 14Nov13 100.00%
4Sep13 11Sep13 11Sep13 100.00%
3Nov13 14Nov13 14Nov13 100.00%
9 0.060 100% 100%
3Nov13 14Nov13 30Dec13 100.00%

409603376.xlsx Page 130 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

22Dec13 29Dec13 29Dec13 100.00%


- - 28Nov13 100.00%
6 0.040 100% 100%
- 28Nov13 28Nov13 100.00%

26Aug13 2Sep13 2Sep13 100.00%


11Sep13 1Oct13 1Oct13 100.00%
9 0.060 100% 100%
11Sep13 1Oct13 1Oct13 100.00%

22Oct13 29Oct13 29Oct13 100.00%


16Jan14 23Jan14 23Jan14 100.00%
9 0.060 100% 100%
- 9Jan14 9Jan14 100.00%

- 15Dec13 15Dec13 100.00%


- 26Jan14 26Jan14 100.00%
5 0.030 100% 25%
25.00%
- 15Dec13 15Dec13 100.00%
- 26Jan14 26Jan14 100.00%
5 0.030 100% 25%
25.00%
- 23Oct13 23Oct13 100.00%
- 12Dec13 12Dec13 100.00%
18 0.120 100% 50%
50.00%
- 30Oct13 30Oct13 100.00%
- 12Dec13 12Dec13 100.00%
18 0.120 100% 100%
19Jan14 21Jan14 21Jan14 100.00%
- 29Jan14 29Jan14 100.00%
- 26Jan14 26Jan14 100.00%
54 0.361 100% 25%
25.00%
- 7Oct13 7Oct13 100.00%

409603376.xlsx 18 0.120 100% 100% Page 131 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

20Nov13 27Nov13 27Nov13 100.00%


18 0.120 100% 100%
17Nov13 24Nov13 24Nov13 100.00%
- 15Oct13 15Oct13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
18 0.120 100% 100%
9Dec13 23Dec13 23Dec13 100.00%
- 24Oct13 24Oct13 100.00%
- 26Jan14 26Jan14 100.00%
5 0.030 100% 0%
0.00%
- 24Oct13 24Oct13 100.00%
- 26Jan14 26Jan14 100.00%
5 0.030 100% 0%
0.00%
- 3Nov13 3Nov13 100.00%
- 9Dec13 9Dec13 100.00%
9 0.060 100% 75%
75.00%
- 4Dec13 4Dec13 100.00%
- 26Jan14 26Jan14 100.00%
9 0.060 100% 100%
26Jan14 27Jan14 27Jan14 100.00%
- 27Oct13 27Oct13 100.00%
- 5Dec13 5Dec13 100.00%
18 0.120 100% 75%
75.00%
15Dec13 15Dec13 100.00%
- 26Jan14 26Jan14 100.00%
18 0.120 100% 25%
25.00%

409603376.xlsx Page 132 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

- 14Oct13 14Oct13 100.00%


3Oct13 5Nov13 5Nov13 100.00%
9 0.060 100% 100%
3Oct13 5Nov13 5Nov13 100.00%

- 12Jan14 12Jan14 100.00%


- 12Jan14 12Jan14 100.00%
9 0.060 100% 0%
0.00%

17Oct13 24Oct13 24Oct13 100.00%


28Oct13 30Oct13 30Oct13 100.00%
6 0.040 100% 100%
28Oct13 30Oct13 30Oct13 100.00%
17Oct13 24Oct13 24Oct13 100.00%
28Oct13 30Oct13 30Oct13 100.00%
6 0.040 100% 100%
28Oct13 30Oct13 30Oct13 100.00%
17Oct13 24Oct13 24Oct13 100.00%
28Oct13 30Oct13 30Oct13 100.00%
6 0.040 100% 100%
28Oct13 30Oct13 30Oct13 100.00%
22Oct13 29Oct13 29Oct13 100.00%
2Dec13 9Dec13 9Dec13 100.00%
9 0.060 100% 100%
9Dec13 26Dec13 26Dec13 100.00%
22Oct13 29Oct13 29Oct13 100.00%
2Dec13 9Dec13 9Dec13 100.00%
9 0.060 100% 100%
9Dec13 26Dec13 26Dec13 100.00%
22Oct13 29Oct13 29Oct13 100.00%
2Dec13 9Dec13 9Dec13 100.00%
9 0.060 100% 100%
9Dec13 26Dec13 26Dec13 100.00%
3Nov13 10Nov13 10Nov13 100.00%

409603376.xlsx 10 0.067 100% 100% Page 133 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

- - 21Nov13 100.00%
10 0.067 100% 100%
- 21Nov13 21Nov13 100.00%
3Nov13 10Nov13 10Nov13 100.00%
11Dec13 18Dec13 18Dec13 100.00%
10 0.067 100% 100%
22Dec13 9Jan14 9Jan14 100.00%
3Nov13 10Nov13 10Nov13 100.00%
11Dec13 18Dec13 18Dec13 100.00%
10 0.067 100% 100%
22Dec13 9Jan14 9Jan14 100.00%
13Oct13 20Oct13 20Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
3 0.020 100% 100%
24Nov13 28Nov13 28Nov13 100.00%
13Oct13 20Oct13 20Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
3 0.020 100% 100%
24Nov13 28Nov13 28Nov13 100.00%
13Oct13 20Oct13 20Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
3 0.020 100% 100%
24Nov13 28Nov13 28Nov13 100.00%
3Nov13 10Nov13 10Nov13 100.00%
2Jan14 9Jan14 9Jan14 100.00%
18 0.120 100% 85%
21Jan14 85.00%
- 30Jan14 30Jan14 100.00%
26Dec13 2Jan14 2Jan14 100.00%
30 0.201 100% 100%
29Dec13 30Dec13 27Jan14 100.00%

409603376.xlsx Page 134 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

31Oct13 7Nov13 7Nov13 100.00%


11Dec13 18Dec13 18Dec13 100.00%
18 0.120 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
6Nov13 13Nov13 13Nov13 100.00%
2Jan14 9Jan14 9Jan14 100.00% Added as
18 0.120 100% 100% mentioned in PTJ
Comments
- 24Dec13 24Dec13 100.00%
- 30Jan14 30Jan14 100.00%
22Jan14 29Jan14 29Jan14 100.00%
24 0.161 100% 100%
- 9Jan14 9Jan14 100.00%

27Oct13 3Nov13 3Nov13 100.00%


- - 21Nov13 100.00%
3 0.020 100% 100%
- 21Nov13 21Nov13 100.00%
27Oct13 3Nov13 3Nov13 100.00%
- - 21Nov13 100.00%
3 0.020 100% 100%
- 21Nov13 21Nov13 100.00%
27Oct13 3Nov13 3Nov13 100.00%
- - 21Nov13 100.00%
3 0.020 100% 100%
- 21Nov13 21Nov13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
12Dec13 19Dec13 19Dec13 100.00%
8 0.054 100% 85%
10Dec13 85.00%
31Oct13 7Nov13 7Nov13 100.00%
4Dec13 11Dec13 11Dec13 100.00%
8 0.054 100% 85%
10Dec13 85.00%
31Oct13 7Nov13 7Nov13 100.00%
4Dec13 11Dec13 11Dec13 100.00%
8 0.054 100% 85%
10Dec13 85.00%

409603376.xlsx Page 135 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

5Nov13 12Nov13 12Nov13 100.00%


- - 28Nov13 100.00%
8 0.054 100% 100%
- 28Nov13 28Nov13 100.00%
5Nov13 12Nov13 12Nov13 100.00%
- - 28Nov13 100.00%
8 0.054 100% 100%
- 28Nov13 28Nov13 100.00%
5Nov13 12Nov13 12Nov13 100.00%
- - 28Nov13 100.00%
8 0.054 100% 100%
- 28Nov13 28Nov13 100.00%
17Oct13 24Oct13 24Oct13 100.00%
- 3Oct13 3Oct13 100.00%
3 0.020 100% 100%
- 3Oct13 3Oct13 100.00%
17Oct13 24Oct13 24Oct13 100.00%
- 3Oct13 3Oct13 100.00%
3 0.020 100% 100%
- 3Oct13 3Oct13 100.00%
17Oct13 24Oct13 24Oct13 100.00%
- 3Oct13 3Oct13 100.00%
3 0.020 100% 100%
- 3Oct13 3Oct13 100.00%
- 24Dec13 24Dec13 100.00%
- 24Dec13 24Dec13 100.00%
24 0.161 100% 100%
29Dec13 30Dec13 27Jan14 100.00%

10Oct13 17Oct13 17Oct13 100.00%


5Jan14 12Jan14 12Jan14 100.00%
9 0.060 100% 85%
17Dec13 85.00%

409603376.xlsx Page 136 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

19Nov13 26Nov13 26Nov13 100.00%


- 19Jan14 19Jan14 100.00% By EPC
26 0.174 100% 100%
Contractor
- 18Jan14 18Jan14 100.00%

6Nov13 12Nov13 12Nov13 100.00%


3Oct13 11Oct13 11Oct13 100.00%
30 0.201 100% 100%
3Oct13 11Oct13 11Oct13 100.00%
4Nov13 11Nov13 11Nov13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
9 0.060 100% 95%
17Nov13 24Nov13 95.00%
28Oct13 3Nov13 3Nov13 100.00%
13Nov13 21Nov13 15Jan14 100.00%
9 0.060 100% 95%
13Nov13 21Nov13 95.00%
3Nov13 10Nov13 10Nov13 100.00%
11Dec13 18Dec13 18Dec13 100.00%
9 0.060 100% 95%
9Dec13 23Dec13 95.00%
22Oct13 29Oct13 29Oct13 100.00%
6Nov13 10Nov13 15Jan14 100.00%
15 0.100 100% 95%
6Nov13 10Nov13 95.00%
14Oct13 20Oct13 20Oct13 100.00%
6Nov13 6Nov13 15Jan14 100.00%
15 0.100 100% 95%
6Nov13 6Nov13 95.00%
8Dec13 15Dec13 15Dec13 100.00%
11Dec13 18Dec13 30Dec13 100.00%
19 0.127 100% 95%
10Dec13 16Dec13 95.00%
21Oct13 22Dec13 22Dec13 100.00%
14Sep13 19Sep13 19Sep13 100.00%
12 0.080 100% 100%
14Sep13 19Sep13 19Sep13 100.00%
28Oct13 19Jan14 19Jan14 100.00%
409603376.xlsx Page 137 of 186
12 0.080 100% 100%
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

4Nov13 5Nov13 5Nov13 100.00%


12 0.080 100% 100%
4Nov13 5Nov13 5Nov13 100.00%
29Oct13 23Jan14 23Jan14 100.00%
5Dec13 12Dec13 12Dec13 100.00%
15 0.100 100% 100%
8Dec13 12Dec13 12Dec13 100.00%
3Nov13 26Dec13 26Dec13 100.00%
13Oct13 30Oct13 22Jan14 100.00%
12 0.080 100% 95%
13Oct13 30Oct13 95.00%
10Nov13 23Jan14 23Jan14 100.00%
- 28Nov13 22Jan14 100.00%
12 0.080 100% 95%
- 28Nov13 95.00%
11Nov13 17Nov13 17Nov13 100.00%
- 10Nov13 22Jan14 100.00%
12 0.080 100% 95%
- 10Nov13 95.00%
7Nov13 13Nov13 13Nov13 100.00%
3Oct13 24Oct13 24Oct13 100.00%
5 0.033 100% 100%
3Oct13 24Oct13 24Oct13 100.00%
7Nov13 13Nov13 13Nov13 100.00%
3Oct13 24Oct13 24Oct13 100.00%
5 0.033 100% 100%
3Oct13 24Oct13 24Oct13 100.00%
7Nov13 13Nov13 13Nov13 100.00%
3Oct13 24Oct13 24Oct13 100.00%
5 0.033 100% 100%
3Oct13 24Oct13 24Oct13 100.00%

409603376.xlsx Page 138 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

14Nov13 21Nov13 21Nov13 100.00%


- - 21Nov13 100.00%
15 0.100 100% 100%
- 21Nov13 21Nov13 100.00%
21Nov13 21Nov13 28Nov13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
15 0.100 100% 85%
19Dec13 85.00%
3Dec13 10Dec13 10Dec13 100.00%
19Dec13 26Dec13 26Dec13 100.00%
15 0.100 100% 100%
- 9Dec13 9Dec13 100.00%
7Nov13 14Nov13 14Nov13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
18 0.120 100% 85%
17Dec13 85.00%
14Nov13 21Nov13 21Nov13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
18 0.120 100% 50%
50.00%
26Nov13 3Dec13 3Dec13 100.00%
24Dec13 31Dec13 31Dec13 100.00%
18 0.120 100% 50%
50.00%
19Dec13 26Dec13 26Dec13 100.00%
31Dec13 7Jan14 7Jan14 100.00%
15 0.100 100% 100%
- 15Dec13 15Dec13 100.00%
24Dec13 31Dec13 31Dec13 100.00%
31Dec13 7Jan14 7Jan14 100.00%
15 0.100 100% 100%
- 16Dec13 16Dec13 100.00%
17Nov13 24Nov13 24Nov13 100.00%
26Jan14 30Jan14 30Jan14 100.00%
15 0.100 100% 0%
0.00%
24Nov13 28Nov13 28Nov13 100.00%
26Jan14 30Jan14 30Jan14 100.00%
15 0.100 100% 0%
0.00%
409603376.xlsx Page 139 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

11Nov13 17Nov13 17Nov13 100.00%


24Dec13 31Dec13 31Dec13 100.00%
15 0.100 100% 85%
22Sep13 85.00%
28Nov13 5Dec13 5Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
6 0.040 100% 85%
16Jan14 85.00%
28Nov13 5Dec13 5Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
6 0.040 100% 85%
16Jan14 85.00%
28Nov13 5Dec13 5Dec13 100.00%
31Dec13 7Jan14 7Jan14 100.00%
6 0.040 100% 100%
- 16Dec13 16Dec13 100.00%
4Dec13 10Dec13 10Dec13 100.00%
- 3Oct13 3Oct13 100.00%
20 0.134 100% 100%
- 3Oct13 3Oct13 100.00%

12Nov13 19Nov13 19Nov13 100.00%


18Nov13 25Nov13 25Nov13 100.00%
18 0.120 100% 100%
18Nov13 20Nov13 20Nov13 100.00%
18Dec13 25Dec13 25Dec13 100.00%
11Dec13 18Dec13 18Dec13 100.00%
0 0.000 0% 0%
- 21Nov13 21Nov13 100.00%

409603376.xlsx Page 140 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

18Dec13 25Dec13 25Dec13 100.00%


11Dec13 18Dec13 18Dec13 100.00%
0 0.000 0% 0%
- 21Nov13 21Nov13 100.00%
19Nov13 26Nov13 26Nov13 100.00%
13Nov13 28Nov13 12Dec13 100.00%
30 0.201 100% 95%
13Nov13 28Nov13 95.00%
19Nov13 26Nov13 26Nov13 100.00%
- 28Nov13 22Jan14 100.00%
13 0.087 100% 95%
- 28Nov13 95.00%
19Nov13 26Nov13 26Nov13 100.00%
23Sep13 7Nov13 22Jan14 100.00%
25 0.167 100% 95%
23Sep13 7Nov13 95.00%
14Nov13 21Nov13 21Nov13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
15 0.100 100% 50%
50.00%
13Oct13 17Oct13 17Oct13 100.00%
24Dec13 31Dec13 31Dec13 100.00%
4 0.027 100% 85%

19Dec13 85.00%
13Oct13 17Oct13 17Oct13 100.00%
24Dec13 31Dec13 31Dec13 100.00%
4 0.027 100% 85%

19Dec13 85.00%
13Oct13 17Oct13 17Oct13 100.00%
24Dec13 31Dec13 31Dec13 100.00%
4 0.027 100% 85%

19Dec13 85.00%
4Dec13 11Dec13 11Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
12 0.080 100% 85%
22Dec13 85.00%
11Dec13 18Dec13 18Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
12 0.080 100% 85%

409603376.xlsx Page 141 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%
12 0.080 100% 85%
22Dec13 85.00%
22Dec13 29Dec13 29Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
12 0.080 100% 85%
22Dec13 85.00%
27Nov13 4Dec13 4Dec13 100.00%
29Dec13 5Jan14 5Jan14 100.00%
18 0.120 100% 85%
2Dec13 85.00%
4Dec13 11Dec13 11Dec13 100.00%
29Dec13 5Jan14 5Jan14 100.00%
18 0.120 100% 85%
29Dec13 85.00%
15Dec13 22Dec13 22Dec13 100.00%
29Dec13 5Jan14 5Jan14 100.00%
18 0.120 100% 85%
2Dec13 85.00%
4Nov13 11Nov13 11Nov13 100.00%
5Dec13 12Dec13 12Dec13 100.00%
12 0.080 100% 95%
8Dec13 23Jan14 95.00%
11Nov13 17Nov13 17Nov13 100.00%
23Oct13 25Oct13 22Jan14 100.00%
12 0.080 100% 95%
23Oct13 25Oct13 95.00%
17Nov13 24Nov13 24Nov13 100.00%
12Dec13 19Dec13 19Dec13 100.00%
12 0.080 100% 95%
11Dec13 16Dec13 95.00%
24Nov13 28Nov13 28Nov13 100.00%
10Oct13 28Oct13 31Dec13 100.00%
12 0.080 100% 95%
10Oct13 28Oct13 95.00%

409603376.xlsx Page 142 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

28Nov13 5Dec13 5Dec13 100.00%


4Nov13 5Nov13 31Dec13 100.00%
12 0.080 100% 95%
4Nov13 5Nov13 95.00%
8Dec13 15Dec13 15Dec13 100.00%
- 28Nov13 22Jan14 100.00%
12 0.080 100% 95%
- 28Nov13 95.00%
28Nov13 5Dec13 5Dec13 100.00%
13Oct13 20Oct13 29Jan14 100.00%
12 0.080 100% 95%
13Oct13 26Nov13 95.00%
5Dec13 11Dec13 11Dec13 100.00%
19Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 95%
- 5Dec13 95.00%
11Dec13 18Dec13 18Dec13 100.00%
14Nov13 21Nov13 29Jan14 100.00%
12 0.080 100% 95%
- 26Nov13 95.00%
18Dec13 24Dec13 24Dec13 100.00%
8Oct13 10Nov13 10Nov13 100.00%
21 0.141 100% 100%
8Oct13 10Nov13 10Nov13 100.00%

29Dec13 2Jan14 2Jan14 100.00%


- 11Oct13 11Oct13 100.00%
27 0.181 100% 100%
- 11Oct13 11Oct13 100.00%
1Jan14 8Jan14 8Jan14 100.00%
- 3Oct13 3Oct13 100.00%
18 0.120 100% 100%
- 3Oct13 3Oct13 100.00%
26Nov13 2Dec13 2Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
21 0.141 100% 100%
- 5Dec13 5Dec13 100.00%
2Jan14 9Jan14 9Jan14 100.00%
22Oct13 29Oct13 30Jan14 100.00%
30 0.201 100% 95%
409603376.xlsx Page 143 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

30 0.201 100% 95%


- 21Nov13 95.00%
17Dec13 23Dec13 23Dec13 100.00%
19Dec13 26Dec13 26Dec13 100.00%
42 0.281 100% 100%
- 11Dec13 11Dec13 100.00%
21Nov13 27Nov13 27Nov13 100.00%
2Jan14 9Jan14 9Jan14 100.00%
42 0.281 100% 100%
- 19Dec13 19Dec13 100.00%
9Dec13 16Dec13 16Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
27 0.181 100% 100%
- 19Dec13 19Dec13 100.00%
3Dec13 9Dec13 9Dec13 100.00%
24Oct13 21Nov13 30Jan14 100.00%
18 0.120 100% 95%
24Oct13 21Nov13 95.00%
23Dec13 30Dec13 30Dec13 100.00%
19Dec13 26Dec13 26Dec13 100.00%
36 0.241 100% 95%
- 5Dec13 95.00%
2Jan14 16Jan14 30Jan14 100.00%
24Jan14 31Jan14 31Jan14 100.00%
67 0.448 100% 0%
0.00%
2,239 14.98
100.00% 88.05%

409603376.xlsx Page 144 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

28Aug13 4Sep13 4Sep13 100.00%


25Aug13 29Aug13 29Aug13 100.00%
11 0.074 100% 100%
25Aug13 29Aug13 29Aug13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
25Aug13 29Aug13 29Aug13 100.00%
7 0.047 100% 100%
25Aug13 29Aug13 29Aug13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
25Aug13 29Aug13 29Aug13 100.00%
7 0.047 100% 100%
25Aug13 29Aug13 29Aug13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
25Aug13 29Aug13 29Aug13 100.00%
7 0.047 100% 100%
25Aug13 29Aug13 29Aug13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
25Aug13 29Aug13 29Aug13 100.00%
7 0.047 100% 100%
25Aug13 29Aug13 29Aug13 100.00%
28Aug13 4Sep13 4Sep13 100.00%
- 5Sep13 5Sep13 100.00%
13 0.087 100% 100%
- 5Sep13 5Sep13 100.00%
18Nov13 25Nov13 25Nov13 100.00%
11Sep13 20Sep13 20Sep13 100.00%
7 0.047 100% 100%
11Sep13 20Sep13 20Sep13 100.00%

6Nov13 13Nov13 13Nov13 100.00%


8Oct13 11Oct13 11Oct13 100.00%
7 0.047 100% 100%
8Oct13 11Oct13 11Oct13 100.00%
4Sep13 10Sep13 10Sep13 100.00%
26Oct13 1Nov13 1Nov13 100.00%
13 0.087 100% 100%
409603376.xlsx Page 145 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

13 0.087 100% 100%


26Oct13 1Nov13 1Nov13 100.00%
10Sep13 17Sep13 17Sep13 100.00%
4Nov13 7Nov13 7Nov13 100.00%
13 0.087 100% 100%
4Nov13 7Nov13 7Nov13 100.00%
22Oct13 28Oct13 28Oct13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
9 0.060 100% 100%
31Oct13 7Nov13 7Nov13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
10Nov13 20Nov13 20Nov13 100.00%
9 0.060 100% 100%
10Nov13 14Nov13 14Nov13 100.00%

4Sep13 10Sep13 10Sep13 100.00%


26Oct13 29Oct13 29Oct13 100.00%
12 0.080 100% 100%
26Oct13 29Oct13 29Oct13 100.00%
22Oct13 28Oct13 28Oct13 100.00%
3Oct13 9Oct13 9Oct13 100.00%
5 0.033 100% 100%
3Oct13 9Oct13 9Oct13 100.00%
28Oct13 4Nov13 4Nov13 100.00%
10Nov13 20Nov13 20Nov13 100.00%
5 0.033 100% 100%
10Nov13 14Nov13 14Nov13 100.00%
18Nov13 25Nov13 25Nov13 100.00%
23Jan14 30Jan14 30Jan14 100.00%
5 0.033 100% 100%
13Jan14 19Jan14 19Jan14 100.00%

409603376.xlsx Page 146 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

6Nov13 13Nov13 13Nov13 100.00%


- 7Nov13 7Nov13 100.00%
5 0.033 100% 100%
- 7Nov13 7Nov13 100.00%

- 2Dec13 2Dec13 100.00%


- 30Jan14 30Jan14 100.00%
18 0.120 100% 0%
0.00%
- 16Dec13 16Dec13 100.00%
- 30Jan14 30Jan14 100.00%
9 0.060 100% 100%
5Jan14 5Feb14 5Feb14 100.00%
- 16Dec13 16Dec13 100.00%
- 30Jan14 30Jan14 100.00%
9 0.060 100% 100%
5Jan14 5Feb14 5Feb14 100.00%
- 29Jan14 29Jan14 100.00%
- 30Jan14 30Jan14 100.00%
9 0.060 100% 0%
0.00%
- 25Dec13 25Dec13 100.00%
- 30Jan14 30Jan14 100.00%
9 0.060 100% 25%
25.00%

7Oct13 14Oct13 14Oct13 100.00%


- 20Sep13 20Sep13 100.00%
10 0.067 100% 100%
- 20Sep13 20Sep13 100.00%
14Oct13 20Oct13 20Oct13 100.00%
- 25Sep13 25Sep13 100.00%
10 0.067 100% 100%
- 25Sep13 25Sep13 100.00%
20Oct13 27Oct13 27Oct13 100.00%
- 12Oct13 10Oct13 100.00%
10 0.067 100% 100%
- 12Oct13 10Oct13 100.00%
20Oct13 27Oct13 27Oct13 100.00%
409603376.xlsx 10 0.067 100% 100% Page 147 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

26Oct13 1Nov13 1Nov13 100.00%


10 0.067 100% 100%
26Oct13 1Nov13 1Nov13 100.00%
27Oct13 31Oct13 31Oct13 100.00%
- 7Nov13 7Nov13 100.00%
10 0.067 100% 100%
- 7Nov13 7Nov13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
19Dec13 26Dec13 26Dec13 100.00%
10 0.067 100% 100%
18Dec13 19Dec13 19Dec13 100.00%
27Oct13 31Oct13 31Oct13 100.00%
23Oct13 29Oct13 29Oct13 100.00%
25 0.167 100% 100%
23Oct13 29Oct13 29Oct13 100.00%
- 29Jan14 29Jan14 100.00%
- 29Jan14 29Jan14 100.00%
15 0.100 100% 85%
16Jan14 85.00%
- 26Jan14 26Jan14 100.00%
- 26Jan14 26Jan14 100.00%
15 0.100 100% 100%
16Jan14 19Jan14 19Jan14 100.00%
- 22Jan14 22Jan14 100.00%
- 22Jan14 22Jan14 100.00%
14 0.094 100% 100%
16Jan14 19Jan14 19Jan14 100.00%
- 27Nov13 27Nov13 100.00%
- 22Jan14 22Jan14 100.00%
13 0.087 100% 100%
16Jan14 19Jan14 19Jan14 100.00%

409603376.xlsx Page 148 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

14Oct13 20Oct13 20Oct13 100.00%


31Oct13 7Nov13 7Nov13 100.00%
10 0.067 100% 100%
31Oct13 7Nov13 7Nov13 100.00%
20Oct13 27Oct13 27Oct13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
10 0.067 100% 100%
31Oct13 7Nov13 7Nov13 100.00%
27Oct13 31Oct13 31Oct13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
10 0.067 100% 100%
31Oct13 7Nov13 7Nov13 100.00%
16Dec13 19Dec13 19Dec13 100.00%
- 3Oct13 3Oct13 100.00%
13 0.087 100% 100%
- 3Oct13 3Oct13 100.00%
30Dec13 2Jan14 2Jan14 100.00%
- 3Oct13 3Oct13 100.00%
13 0.087 100% 100%
- 3Oct13 3Oct13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
12 0.080 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
26Sep13 2Oct13 2Oct13 100.00%
- 5Sep13 5Sep13 100.00%
10 0.067 100% 100%
- 5Sep13 5Sep13 100.00%
16Sep13 22Sep13 22Sep13 100.00%
11Sep13 20Sep13 20Sep13 100.00%
10 0.067 100% 100%
11Sep13 20Sep13 20Sep13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
9 0.060 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
9Dec13 16Dec13 16Dec13 100.00%
7Jan14 14Jan14 14Jan14 100.00%
10 0.067 100% 100%
409603376.xlsx Page 149 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

10 0.067 100% 100%


17Dec13 19Dec13 19Dec13 100.00%
15Dec13 19Dec13 19Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
10 0.067 100% 100%
18Dec13 19Dec13 19Dec13 100.00%
18Dec13 24Dec13 24Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
10 0.067 100% 100%
18Dec13 19Dec13 19Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
8Jan14 15Jan14 15Jan14 100.00%
10 0.067 100% 100%
17Dec13 19Dec13 19Dec13 100.00%
15Oct13 22Oct13 22Oct13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
13 0.087 100% 100%
31Oct13 7Nov13 7Nov13 100.00%
20Oct13 27Oct13 27Oct13 100.00%
10Nov13 20Nov13 20Nov13 100.00%
13 0.087 100% 100%
10Nov13 14Nov13 14Nov13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
30Dec13 6Jan14 6Jan14 100.00%
12 0.080 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
11Dec13 18Dec13 18Dec13 100.00%
14Jan14 21Jan14 21Jan14 100.00%
19 0.127 100% 40%
40.00%

409603376.xlsx Page 150 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

26Dec13 2Jan14 2Jan14 100.00%


14Jan14 21Jan14 21Jan14 100.00%
19 0.127 100% 40%
40.00%
23Dec13 30Dec13 30Dec13 100.00%
14Jan14 21Jan14 21Jan14 100.00%
18 0.120 100% 100%
22Dec13 26Dec13 26Dec13 100.00%

15Oct13 22Oct13 22Oct13 100.00%


10Nov13 14Nov13 14Nov13 100.00%
16 0.107 100% 100%
10Nov13 14Nov13 14Nov13 100.00%
22Oct13 28Oct13 28Oct13 100.00%
10Nov13 14Nov13 14Nov13 100.00%
16 0.107 100% 100%
10Nov13 14Nov13 14Nov13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
25 0.167 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
22Dec13 29Dec13 29Dec13 100.00%
25Oct13 1Nov13 1Nov13 100.00%
26 0.174 100% 100%
25Oct13 1Nov13 1Nov13 100.00%
6Jan14 12Jan14 12Jan14 100.00%
- 7Nov13 7Nov13 100.00%
26 0.174 100% 100%
- 7Nov13 7Nov13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
30Dec13 6Jan14 6Jan14 100.00%
25 0.167 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
1Oct13 8Oct13 8Oct13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
26 0.174 100% 100%
31Oct13 7Nov13 7Nov13 100.00%
19Sep13 26Sep13 26Sep13 100.00%
31Oct13 7Nov13 7Nov13 100.00%
26 0.174 100% 100%
409603376.xlsx Page 151 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

26 0.174 100% 100%


31Oct13 7Nov13 7Nov13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
25 0.167 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
20Oct13 27Oct13 27Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
33 0.221 100% 100%
18Nov13 21Nov13 21Nov13 100.00%
24Oct13 30Oct13 30Oct13 100.00%
20Nov13 27Nov13 27Nov13 100.00%
33 0.221 100% 100%
18Nov13 21Nov13 21Nov13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
26 0.174 100% 100%
4Dec13 12Dec13 12Dec13 100.00%
3Nov13 29Jan14 29Jan14 100.00%
19Dec13 26Dec13 26Dec13 100.00%
29 0.194 100% 85%
16Jan14 85.00%
10Nov13 22Dec13 22Dec13 100.00%
9Jan14 16Jan14 16Jan14 100.00%
29 0.194 100% 100%
17Dec13 19Dec13 19Dec13 100.00%
3Nov13 19Jan14 19Jan14 100.00%
22Jan14 29Jan14 29Jan14 100.00%
29 0.194 100% 100%
22Dec13 26Dec13 26Dec13 100.00%

409603376.xlsx Page 152 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

17Nov13 24Nov13 24Nov13 100.00%


12Jan14 19Jan14 19Jan14 100.00%
61 0.408 100% 50%
50.00%
17Nov13 24Nov13 24Nov13 100.00%
23Jan14 30Jan14 30Jan14 100.00%
118 0.790 100% 25%
25.00%
23Dec13 30Dec13 30Dec13 100.00%
12Jan14 19Jan14 19Jan14 100.00%
63 0.422 100% 0%
0.00%
29Dec13 2Jan14 2Jan14 100.00%
25Oct13 1Nov13 1Nov13 100.00%
19 0.127 100% 100%
25Oct13 1Nov13 1Nov13 100.00%
13Jan14 20Jan14 20Jan14 100.00%
- 7Nov13 7Nov13 100.00%
19 0.127 100% 100%
- 7Nov13 7Nov13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
29Dec13 5Jan14 5Jan14 100.00%
18 0.120 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
27Oct13 3Nov13 3Nov13 100.00%
- 1Nov13 1Nov13 100.00%
19 0.127 100% 100%
- 1Nov13 1Nov13 100.00%
30Oct13 6Nov13 6Nov13 100.00%
- 1Nov13 1Nov13 100.00%
19 0.127 100% 100%
- 1Nov13 1Nov13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
24 0.161 100% 100%
2Dec13 5Dec13 5Dec13 100.00%
18Dec13 24Dec13 24Dec13 100.00%
19Jan14 26Jan14 26Jan14 100.00%
22 0.147 100% 40%
40.00%
409603376.xlsx Page 153 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

23Dec13 30Dec13 30Dec13 100.00%


9Jan14 16Jan14 16Jan14 100.00%
22 0.147 100% 40%
40.00%
29Dec13 2Jan14 2Jan14 100.00%
9Jan14 16Jan14 16Jan14 100.00%
22 0.147 100% 100%
- 26Dec13 26Dec13 100.00%
29Dec13 2Jan14 2Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
21 0.141 100% 100%
22Dec13 26Dec13 26Dec13 100.00%
10Nov13 14Nov13 14Nov13 100.00% Class-3 doc N/R
- 14Nov13 18Aug13 100.00% any comnts on
22 0.147 100% 100%
Rev.A within
- 14Nov13 14Nov13 100.00% review time
13Nov13 19Nov13 19Nov13 100.00% Class-3 doc N/R
- 14Nov13 18Aug13 100.00% any comnts on
22 0.147 100% 100%
Rev.A within
- 14Nov13 14Nov13 100.00% review time
4Nov13 11Nov13 11Nov13 100.00% Class-3 doc N/R
- 14Nov13 18Aug13 100.00% any comnts on
22 0.147 100% 100%
Rev.A within
- 14Nov13 14Nov13 100.00% review time
2Jan14 16Jan14 30Jan14 100.00%
4Jan14 16Jan14 30Jan14 100.00%
47 0.314 100% 0%
0.00%
1,519 10.164
100.00% 79.03%

409603376.xlsx Page 154 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

5Sep13 12Sep13 12Sep13 100.00%


- 18Aug13 18Aug13 100.00%
4 0.027 100% 100%
- 18Aug13 18Aug13 100.00%
5Sep13 12Sep13 12Sep13 100.00%
- 18Aug13 18Aug13 100.00%
4 0.027 100% 100%
- 18Aug13 18Aug13 100.00%
5Sep13 12Sep13 12Sep13 100.00%
- 18Aug13 18Aug13 100.00%
4 0.027 100% 100%
- 18Aug13 18Aug13 100.00%
5Sep13 12Sep13 12Sep13 100.00%
- 6Sep13 6Sep13 100.00%
4 0.027 100% 100%
- 6Sep13 6Sep13 100.00%
5Sep13 12Sep13 12Sep13 100.00%
- 9Sep13 9Sep13 100.00%
4 0.027 100% 100%
- 9Sep13 9Sep13 100.00%

11Sep13 18Sep13 18Sep13 100.00%


26Dec13 2Jan14 2Jan14 100.00%
13 0.087 100% 100%
- 4Dec13 4Dec13 100.00%
16Dec13 23Dec13 23Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
13 0.087 100% 100%
- 20Dec13 20Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
16Jan14 23Jan14 23Jan14 100.00%
1 0.007 100% 100%
5Jan14 8Jan14 8Jan14 100.00%

24Dec13 31Dec13 31Dec13 100.00%


6Nov13 10Nov13 10Nov13 100.00%
10 0.067 100% 100%
409603376.xlsx Page 155 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

10 0.067 100% 100%


6Nov13 10Nov13 10Nov13 100.00%

- 30Jan14 30Jan14 100.00%


- 30Jan14 30Jan14 100.00%
9 0.060 100% 100%
11Dec13 23Dec13 23Dec13 100.00%

19Dec13 26Dec13 26Dec13 100.00%


- 10Nov13 10Nov13 100.00%
28 0.187 100% 100%
- 10Nov13 10Nov13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
29Dec13 5Jan14 5Jan14 100.00%
22 0.147 100% 100%
- 4Dec13 4Dec13 100.00%
- 9Jan14 9Jan14 100.00%
31Dec13 7Jan14 7Jan14 100.00%
13 0.087 100% 100%
2Dec13 4Dec13 4Dec13 100.00%
19Dec13 26Dec13 26Dec13 100.00%
17Nov13 15Dec13 15Dec13 100.00%
28 0.187 100% 100%
17Nov13 20Dec13 20Dec13 100.00%
25Dec13 1Jan14 1Jan14 100.00%
31Dec13 7Jan14 7Jan14 100.00%
22 0.147 100% 100%
- 23Dec13 23Dec13 100.00%
- 6Jan14 6Jan14 100.00%
31Dec13 7Jan14 7Jan14 100.00%
13 0.087 100% 100%
- 23Dec13 23Dec13 100.00%

409603376.xlsx Page 156 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

23Dec13 30Dec13 30Dec13 100.00%


16Jan14 23Jan14 23Jan14 100.00%
4 0.027 100% 100%
5Jan14 8Jan14 8Jan14 100.00%
23Dec13 30Dec13 30Dec13 100.00%
16Jan14 23Jan14 23Jan14 100.00%
2 0.013 100% 100%
8Jan14 9Jan14 9Jan14 100.00%
23Dec13 30Dec13 30Dec13 100.00%
16Jan14 23Jan14 23Jan14 100.00%
1 0.007 100% 100%
5Jan14 8Jan14 8Jan14 100.00%

2Jan14 9Jan14 9Jan14 100.00%


- 6Sep13 6Sep13 100.00%
22 0.147 100% 100%
- 6Sep13 6Sep13 100.00%
29Dec13 5Jan14 5Jan14 100.00%
14Sep13 25Oct13 25Oct13 100.00%
26 0.174 100% 100%
14Sep13 25Oct13 25Oct13 100.00%
2Jan14 9Jan14 9Jan14 100.00% Class-3 doc N/R
26Dec13 2Jan14 2Jan14 100.00% any comnts on
22 0.147 100% 100%
Rev.A within
- 4Dec13 4Dec13 100.00% review time
30Dec13 6Jan14 6Jan14 100.00%
14Sep13 25Oct13 25Oct13 100.00%
26 0.174 100% 100%
14Sep13 25Oct13 25Oct13 100.00%
30Dec13 6Jan14 6Jan14 100.00%
5Jan14 12Jan14 12Jan14 100.00%
22 0.147 100% 100%
2Dec13 23Dec13 23Dec13 100.00%
23Dec13 30Dec13 30Dec13 100.00%
16Jan14 23Jan14 23Jan14 100.00%
3 0.020 100% 100%
- 20Jan14 20Jan14 100.00%
23Dec13 30Dec13 30Dec13 100.00%
16Jan14 23Jan14 23Jan14 100.00%
3 0.020 100% 100%
409603376.xlsx Page 157 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

3 0.020 100% 100%


8Jan14 9Jan14 9Jan14 100.00%
23Dec13 30Dec13 30Dec13 100.00%
31Dec13 7Jan14 7Jan14 100.00%
2 0.013 100% 100%
- 20Dec13 20Dec13 100.00%
2Jan14 16Jan14 30Jan14 100.00%
16Jan14 23Jan14 23Jan14 100.00%
0 0.000 0% 0%
- - 95.00%
325 2.175
100.00% 100.00%

26Aug13 1Sep13 1Sep13 100.00%


1Aug13 6Aug13 6Aug13 100.00%
6 0.040 100% 100%
1Aug13 6Aug13 6Aug13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 20Aug13 20Aug13 100.00%
6 0.040 100% 100%
- 20Aug13 20Aug13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 28Jul13 28Jul13 100.00%
6 0.040 100% 100%
- 28Jul13 28Jul13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 21Aug13 21Aug13 100.00%
6 0.040 100% 100%
- 21Aug13 21Aug13 100.00%

409603376.xlsx Page 158 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

26Aug13 1Sep13 1Sep13 100.00%


1Aug13 6Aug13 6Aug13 100.00%
6 0.040 100% 100%
1Aug13 6Aug13 6Aug13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 26Aug13 26Aug13 100.00%
6 0.040 100% 100%
- 26Aug13 26Aug13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
409603376.xlsx Page 159 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

26Aug13 1Sep13 1Sep13 100.00%


- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
- 10Sep13 10Sep13 100.00%
6 0.040 100% 100%
- 10Sep13 10Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
10Sep13 17Sep13 17Sep13 100.00%
6 0.040 100% 100%
10Sep13 17Sep13 17Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
10Sep13 17Sep13 17Sep13 100.00%
6 0.040 100% 100%
10Sep13 17Sep13 17Sep13 100.00%
26Aug13 1Sep13 1Sep13 100.00%
10Sep13 17Sep13 17Sep13 100.00%
6 0.040 100% 100%
10Sep13 17Sep13 17Sep13 100.00%

- 18Aug13 18Aug13 100.00%


7Sep13 23Sep13 23Sep13 100.00%
27 0.181 100% 100%
7Sep13 23Sep13 23Sep13 100.00%

21Jul13 25Jul13 25Jul13 100.00%


- 13Sep13 13Sep13 100.00%
36 0.241 100% 100%
- 13Sep13 13Sep13 100.00%

409603376.xlsx Page 160 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

29Aug13 5Sep13 5Sep13 100.00%


- 20Aug13 20Aug13 100.00%
9 0.060 100% 100%
- 20Aug13 20Aug13 100.00%
4Sep13 10Sep13 10Sep13 100.00%
8Sep13 9Sep13 9Sep13 100.00%
9 0.060 100% 100%
8Sep13 9Sep13 9Sep13 100.00%
18Sep13 25Sep13 25Sep13 100.00%
22Sep13 23Jan14 23Jan14 100.00%
10 0.067 100% 100%
22Sep13 14Jan14 14Jan14 100.00%
18Sep13 25Sep13 25Sep13 100.00%
1Oct13 3Oct13 3Oct13 100.00%
9 0.060 100% 100%
1Oct13 3Oct13 3Oct13 100.00%
2Oct13 8Oct13 8Oct13 100.00%
11Sep13 16Sep13 16Sep13 100.00%
9 0.060 100% 100%
11Sep13 16Sep13 16Sep13 100.00%
18Sep13 25Sep13 25Sep13 100.00%
- 20Aug13 20Aug13 100.00%
9 0.060 100% 100%
- 20Aug13 20Aug13 100.00%
23Sep13 29Sep13 29Sep13 100.00%
8Sep13 9Sep13 9Sep13 100.00%
9 0.060 100% 100%
8Sep13 9Sep13 9Sep13 100.00%
7Oct13 14Oct13 14Oct13 100.00%
- 3Aug13 3Aug13 100.00%
9 0.060 100% 100%
- 3Aug13 3Aug13 100.00%

4Dec13 11Dec13 11Dec13 100.00%


26Dec13 2Jan14 2Jan14 100.00%
145 0.970 100% 100%
22Dec13 31Dec13 30Jan14 100.00%
4Dec13 11Dec13 11Dec13 100.00%
409603376.xlsx 0 0.000 0% 0% Page 161 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

26Dec13 2Jan14 2Jan14 100.00%


0 0.000 0% 0%
21Jan14 27Jan14 27Jan14 100.00%
8Dec13 12Dec13 12Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
90 0.602 100% 85%
5Jan14 85.00%
19Dec13 25Dec13 25Dec13 100.00%
2Jan14 9Jan14 9Jan14 100.00%
72 0.482 100% 85%
30Dec13 85.00%
25Dec13 1Jan14 1Jan14 100.00%
7Jan14 14Jan14 14Jan14 100.00%
72 0.482 100% 85%
6Jan14 85.00%
25Dec13 1Jan14 1Jan14 100.00%
12Jan14 19Jan14 19Jan14 100.00%
36 0.241 100% 100%
14Jan14 16Jan14 16Jan14 100.00%
30Dec13 5Jan14 5Jan14 100.00%
- 30Jan14 30Jan14 100.00%
27 0.181 100% 50%
50.00%
24Dec13 31Dec13 31Dec13 100.00%
- 30Jan14 30Jan14 100.00%
27 0.181 100% 50%
50.00%
18Dec13 24Dec13 24Dec13 100.00%
- 30Jan14 30Jan14 100.00%
27 0.181 100% 50%
50.00%

409603376.xlsx Page 162 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

8Jan14 15Jan14 15Jan14 100.00%


21Jan14 28Jan14 28Jan14 100.00%
27 0.181 100% 50%
50.00%
14Jan14 21Jan14 21Jan14 100.00%
- 30Jan14 30Jan14 100.00%
27 0.181 100% 0%
0.00%
23Dec13 29Dec13 29Dec13 100.00%
- 30Jan14 30Jan14 100.00%
27 0.181 100% 0%
0.00%
11Dec13 17Dec13 17Dec13 100.00%
23Jan14 30Jan14 30Jan14 100.00%
24 0.161 100% 50%
50.00%
2Jan14 8Jan14 8Jan14 100.00%
13Jan14 20Jan14 20Jan14 100.00%
24 0.161 100% 50%
50.00%
10Dec13 17Dec13 17Dec13 100.00%
7Jan14 14Jan14 14Jan14 100.00%
36 0.241 100% 100%
13Jan14 14Jan14 14Jan14 100.00%
26Nov13 3Dec13 3Dec13 100.00%
13Jan14 20Jan14 20Jan14 100.00%
45 0.301 100% 50%
50.00%
12Jan14 19Jan14 19Jan14 100.00%
- 30Jan14 30Jan14 100.00%
18 0.120 100% 50%
50.00%
12Jan14 19Jan14 19Jan14 100.00%
16Jan14 23Jan14 23Jan14 100.00%
18 0.120 100% 50%
50.00%
11Dec13 18Dec13 18Dec13 100.00%
16Jan14 23Jan14 23Jan14 100.00%
36 0.241 100% 100%
24Dec13 9Jan14 9Jan14 100.00%
409603376.xlsx Page 163 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

21Jan14 28Jan14 28Jan14 100.00%


100.00%
72 0.482 100% 50%
50.00%
17Dec13 24Dec13 24Dec13 100.00%
23Jan14 30Jan14 30Jan14 100.00%
27 0.181 100% 50%
50.00%
26Nov13 2Dec13 2Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
21 0.141 100% 100%
24Dec13 25Dec13 25Dec13 100.00%
11Dec13 17Dec13 17Dec13 100.00%
5Jan14 12Jan14 12Jan14 100.00%
54 0.361 100% 100%
4Dec13 6Jan14 6Jan14 100.00%
17Dec13 23Dec13 23Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
27 0.181 100% 100%
26Dec13 30Dec13 30Dec13 100.00%
5Jan14 12Jan14 12Jan14 100.00%
16Jan14 23Jan14 23Jan14 100.00%
36 0.241 100% 40%
40.00%
5Jan14 12Jan14 12Jan14 100.00%
- 23Jan14 23Jan14 100.00%
27 0.181 100% 50%
50.00%
30Dec13 6Jan14 6Jan14 100.00%
19Jan14 26Jan14 26Jan14 100.00%
27 0.181 100% 100%
30Dec13 7Jan14 7Jan14 100.00%

409603376.xlsx Page 164 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

23Dec13 29Dec13 29Dec13 100.00%


- 30Jan14 30Jan14 100.00%
18 0.120 100% 100%
- 23Jan14 23Jan14 100.00%
8Jan14 15Jan14 15Jan14 100.00%
- 30Jan14 30Jan14 100.00%
27 0.181 100% 100%
- 13Jan14 13Jan14 100.00%
14Jan14 20Jan14 20Jan14 100.00%
12Dec13 15Dec14 15Dec14 85.00%
18 0.120 100% 100%
8Dec13 9Dec13 6Feb14 100.00%
10Dec13 17Dec13 17Dec13 100.00%
- 30Jan14 30Jan14 100.00%
36 0.241 100% 100%
- 13Jan14 13Jan14 100.00%

14Nov13 20Nov13 20Nov13 100.00%


12Dec13 26Dec13 26Dec13 100.00%
24 0.161 100% 100%
4Dec13 9Jan14 9Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
12Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 100%
5Dec13 14Jan14 14Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
12Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 100%
5Dec13 8Jan14 8Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
12Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 100%
5Dec13 8Jan14 8Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
12Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 100%
4Dec13 8Jan14 8Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
12Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 100%
409603376.xlsx Page 165 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

12 0.080 100% 100%


4Dec13 8Jan14 5Feb14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
12Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 100%
4Dec13 8Jan14 8Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
22Dec13 29Dec13 29Dec13 100.00%
15 0.100 100% 100%
17Dec13 9Jan14 9Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
9Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 100%
4Dec13 8Jan14 5Feb14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
22Dec13 29Dec13 29Dec13 100.00%
12 0.080 100% 100%
9Jan14 19Jan14 19Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
22Dec13 29Dec13 29Dec13 100.00%
12 0.080 100% 100%
5Dec13 9Jan14 5Feb14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
9Dec13 16Dec13 16Dec13 100.00%
12 0.080 100% 100%
4Dec13 9Jan14 9Jan14 100.00%
14Nov13 20Nov13 20Nov13 100.00%
22Dec13 29Dec13 29Dec13 100.00%
24 0.161 100% 100%
17Dec13 9Jan14 9Jan14 100.00%

409603376.xlsx Page 166 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

5Dec13 11Dec13 11Dec13 100.00%


- 23Jan14 23Jan14 100.00%
40 0.268 100% 50%
50.00%
5Dec13 11Dec13 11Dec13 100.00%
- 23Jan14 23Jan14 100.00%
150 1.004 100% 50%
50.00%
5Dec13 11Dec13 11Dec13 100.00%
- 23Jan14 23Jan14 100.00%
30 0.201 100% 50%
50.00%
5Dec13 11Dec13 11Dec13 100.00%
- 23Jan14 23Jan14 100.00%
30 0.201 100% 50%
50.00%
28Oct13 4Nov13 4Nov13 100.00%
- 12Jan14 12Jan14 100.00%
36 0.241 100% 50%
50.00%
15Jan14 21Jan14 21Jan14 100.00%
30Jan14 6Feb14 6Feb14 100.00%
36 0.241 100% 100%
- 13Jan14 13Jan14 100.00%
19Jan14 23Jan14 23Jan14 100.00%
12Dec13 26Dec13 26Dec13 100.00%
27 0.181 100% 100%
8Dec13 9Dec13 6Feb14 100.00%
22Jan14 29Jan14 29Jan14 100.00%
- 23Jan14 23Jan14 100.00%
54 0.361 100% 50%
50.00%
5Jan14 12Jan14 12Jan14 100.00%
- 30Jan14 30Jan14 100.00%
36 0.241 100% 50%
50.00%
31Dec13 7Jan14 7Jan14 100.00%
- 30Jan14 30Jan14 100.00%
36 0.241 100% 50%
50.00%
409603376.xlsx Page 167 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

24Dec13 31Dec13 31Dec13 100.00%


- 30Jan14 30Jan14 100.00%
36 0.241 100% 50%
50.00%
15Jan14 21Jan14 21Jan14 100.00%
21Jan14 28Jan14 28Jan14 100.00%
24 0.161 100% 50%
50.00%
20Jan14 26Jan14 26Jan14 100.00%
- 30Jan14 30Jan14 100.00%
24 0.161 100% 0%
0.00%
26Dec13 2Jan14 2Jan14 100.00%
- 30Jan14 30Jan14 100.00%
24 0.161 100% 0%
0.00%
16Dec13 23Dec13 23Dec13 100.00%
23Jan14 30Jan14 30Jan14 100.00%
36 0.241 100% 50%
50.00%
7Jan14 14Jan14 14Jan14 100.00%
13Jan14 20Jan14 20Jan14 100.00%
24 0.161 100% 50%
50.00%
18Dec13 24Dec13 24Dec13 100.00%
7Jan14 14Jan14 14Jan14 100.00%
50 0.335 100% 100%
13Jan14 14Jan14 14Jan14 100.00%
15Dec13 19Dec13 19Dec13 100.00%
13Jan14 20Jan14 20Jan14 100.00%
108 0.723 100% 50%
50.00%

409603376.xlsx Page 168 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

16Jan14 22Jan14 22Jan14 100.00%


- 30Jan14 30Jan14 100.00%
12 0.080 100% 50%
50.00%
16Jan14 22Jan14 22Jan14 100.00%
16Jan14 23Jan14 23Jan14 100.00%
12 0.080 100% 50%
50.00%
17Dec13 24Dec13 24Dec13 100.00%
16Jan14 23Jan14 23Jan14 100.00%
45 0.301 100% 100%
24Dec13 9Jan14 9Jan14 100.00%
20Jan14 26Jan14 26Jan14 100.00%
100.00%
63 0.422 100% 50%
50.00%
23Dec13 30Dec13 30Dec13 100.00%
23Jan14 30Jan14 30Jan14 100.00%
36 0.241 100% 50%
50.00%
17Dec13 24Dec13 24Dec13 100.00%
2Jan14 9Jan14 9Jan14 100.00%
54 0.361 100% 100%
4Dec13 6Jan14 6Jan14 100.00%
23Dec13 30Dec13 30Dec13 100.00%
29Dec13 5Jan14 5Jan14 100.00%
36 0.241 100% 100%
26Dec13 30Dec13 30Dec13 100.00%
1Dec13 8Dec13 8Dec13 100.00%
26Dec13 2Jan14 2Jan14 100.00%
24 0.161 100% 100%
24Dec13 25Dec13 25Dec13 100.00%
6Jan14 13Jan14 13Jan14 100.00%
9Jan14 16Jan14 16Jan14 100.00%
36 0.241 100% 100%
30Dec13 7Jan14 7Jan14 100.00%
12Jan14 19Jan14 19Jan14 100.00%
- 30Jan14 30Jan14 100.00%
30 0.201 100% 50%
50.00%
409603376.xlsx Page 169 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

9Jan14 16Jan14 16Jan14 100.00%


16Jan14 23Jan14 23Jan14 100.00%
45 0.301 100% 40%
40.00%
9Jan14 16Jan14 16Jan14 100.00%
30Jan14 6Feb14 6Feb14 100.00%
27 0.181 100% 100%
- 23Jan14 23Jan14 100.00%
17Dec13 23Dec13 23Dec13 100.00%
12Dec13 19Dec13 19Dec13 100.00%
24 0.161 100% 85%
9Dec13 85.00%
17Dec13 23Dec13 23Dec13 100.00%
12Dec13 19Dec13 19Dec13 100.00%
15 0.100 100% 85%
9Dec13 85.00%
17Dec13 23Dec13 23Dec13 100.00%
12Dec13 19Dec13 19Dec13 100.00%
21 0.141 100% 85%
9Dec13 85.00%
17Dec13 23Dec13 23Dec13 100.00%
12Dec13 19Dec13 19Dec13 100.00%
21 0.141 100% 85%
9Dec13 85.00%
17Dec13 23Dec13 23Dec13 100.00%
12Dec13 19Dec13 19Dec13 100.00%
9 0.060 100% 85%
9Dec13 85.00%
17Dec13 23Dec13 23Dec13 100.00%
9Jan14 16Jan14 16Jan14 100.00%
24 0.161 100% 85%
5Jan14 85.00%

409603376.xlsx Page 170 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

17Dec13 23Dec13 23Dec13 100.00%


9Jan14 16Jan14 16Jan14 100.00%
24 0.161 100% 85%
5Jan14 85.00%
17Dec13 23Dec13 23Dec13 100.00%
9Jan14 16Jan14 16Jan14 100.00%
21 0.141 100% 85%
5Jan14 85.00%
1Jan14 7Jan14 7Jan14 100.00%
12Dec13 26Dec13 26Dec13 100.00%
24 0.161 100% 85%
9Dec13 85.00%
1Jan14 7Jan14 7Jan14 100.00%
12Dec13 26Dec13 26Dec13 100.00%
12 0.080 100% 85%
9Dec13 85.00%
1Jan14 7Jan14 7Jan14 100.00%
12Dec13 26Dec13 26Dec13 100.00%
18 0.120 100% 85%
9Dec13 85.00%
1Jan14 7Jan14 7Jan14 100.00%
12Dec13 26Dec13 26Dec13 100.00%
18 0.120 100% 85%
9Dec13 85.00%
1Jan14 7Jan14 7Jan14 100.00%
12Dec13 26Dec13 26Dec13 100.00%
9 0.060 100% 85%
9Dec13 85.00%
1Jan14 7Jan14 7Jan14 100.00%
2Jan14 9Jan14 9Jan14 100.00%
21 0.141 100% 85%
30Dec13 85.00%
1Jan14 7Jan14 7Jan14 100.00%
2Jan14 9Jan14 9Jan14 100.00%
21 0.141 100% 85%
30Dec13 85.00%
1Jan14 7Jan14 7Jan14 100.00%
2Jan14 9Jan14 9Jan14 100.00%
21 0.141 100% 85%
30Dec13 85.00%
409603376.xlsx Page 171 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

8Jan14 15Jan14 15Jan14 100.00%


23Jan14 30Jan14 30Jan14 100.00%
24 0.161 100% 85%
5Jan14 85.00%
8Jan14 15Jan14 15Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
12 0.080 100% 85%
5Jan14 85.00%
8Jan14 15Jan14 15Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
18 0.120 100% 85%
5Jan14 85.00%
8Jan14 15Jan14 15Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
18 0.120 100% 85%
5Jan14 85.00%
8Jan14 15Jan14 15Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
9 0.060 100% 85%
5Jan14 85.00%
19Jan14 26Jan14 26Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
21 0.141 100% 85%
5Jan14 85.00%
19Jan14 26Jan14 26Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
21 0.141 100% 85%
5Jan14 85.00%
19Jan14 26Jan14 26Jan14 100.00%
23Jan14 30Jan14 30Jan14 100.00%
21 0.141 100% 85%
5Jan14 85.00%

409603376.xlsx Page 172 of 186


as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%

8Jan14 15Jan14 15Jan14 100.00%


12Jan14 19Jan14 19Jan14 100.00%
24 0.161 100% 100%
14Jan14 16Jan14 16Jan14 100.00%
8Jan14 15Jan14 15Jan14 100.00%
12Jan14 19Jan14 19Jan14 100.00%
27 0.181 100% 100%
14Jan14 16Jan14 16Jan14 100.00%
8Jan14 15Jan14 15Jan14 100.00%
12Jan14 19Jan14 19Jan14 100.00%
27 0.181 100% 100%
14Jan14 16Jan14 16Jan14 100.00%
8Jan14 15Jan14 15Jan14 100.00%
12Jan14 19Jan14 19Jan14 100.00%
27 0.181 100% 100%
14Jan14 16Jan14 16Jan14 100.00%
17Dec13 23Dec13 23Dec13 100.00%
30Jan14 6Feb14 6Feb14 100.00%
63 0.422 100% 100%
- 13Jan14 13Jan14 100.00%
2Jan14 16Jan14 30Jan14 100.00% 50% claimed as
27Jan14 30Jan14 30Jan14 100.00% discussed in the
509 3.406 100% 50% meeting with
GASCO/Petrojet
50.00% on 29-Dec-13
3,946 26.404
100.00% 72.50%

9Oct13 15Oct13 15Oct13 100.00% As mentioned in


26Oct13 27Oct13 27Oct13 100.00% PTJ email IN-099
31 0.207 100% 100% dated 10th Nov
13, CP is put on
26Oct13 27Oct13 27Oct13 100.00% hold

11Dec13 17Dec13 17Dec13 100.00% As mentioned in


30Jan14 30Jan14 30Jan14 100.00% PTJ email IN-099
37 0.248 100% 25% dated 10th Nov
13, CP is put on
25.00% hold
- 26Dec13 26Dec13 100.00% As mentioned in
PTJ email IN-099
409603376.xlsx 19 0.127 100% 0% dated 10th Nov Page 173 of 186
as Mina Zayed Pipeline Project
ment Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14


Submission / Review status
APPROVAL (IFD/IFA) Issue IFC Progress
Receive 1st Issue Final EST. WTG PRG % REMARKS
Approval Issue M-HRS. % %
Planned Actual
85.0% 95.0% 100.0%
As mentioned in
30Jan14 30Jan14 30Jan14 100.00% PTJ email IN-099
19 0.127 100% 0% dated 10th Nov
13, CP is put on
0.00% hold
18Dec13 25Dec13 25Dec13 100.00% As mentioned in
30Jan14 30Jan14 30Jan14 100.00% PTJ email IN-099
19 0.127 100% 25% dated 10th Nov
13, CP is put on
25.00% hold

11Dec13 17Dec13 17Dec13 100.00% As mentioned in


30Jan14 30Jan14 30Jan14 100.00% PTJ email IN-099
31 0.207 100% 25% dated 10th Nov
13, CP is put on
25.00% hold
16Dec13 23Dec13 23Dec13 100.00% As mentioned in
30Jan14 30Jan14 30Jan14 100.00% PTJ email IN-099
46 0.308 100% 5% dated 10th Nov
13, CP is put on
5.00% hold
2Jan14 16Jan14 30Jan14 100.00% As mentioned in
30Jan14 30Jan14 30Jan14 100.00% PTJ email IN-099
11 0.074 100% 0% dated 10th Nov
13, CP is put on
0.00% hold
194 1.30
100.00% 28.38%

14,945 100
99.85% 85.61%

409603376.xlsx Page 174 of 186


Detailed Design for Yas Mina Zayed Pipeline Project
DELIVERABLES' STATUS REPORT
Penspen Project No : 12642
Cut off Date: 07-Feb-14

ISSUED FOR COMPANY


DESCRIPTION TOTAL COMPANY COMMENTS RETURNED ISSUED FOR APPROVAL APPROVAL RECEIVED ISSUED FOR CONSTRUCTION
REVIEW(Rev.A)

Plan Actual Variance Plan Actual Variance Plan Actual Variance Plan Actual Varaince Plan Actual Variance

GENERAL 3 3 3 0 3 3 0 3 3 0 3 3 0 3 3 0

PROCESS 37 37 37 0 31 37 0 37 37 0 37 37 0 37 31 -6

LOSS PREVENTION 34 34 30 -4 33 18 -12 34 16 -18 31 15 -1 33 14 -19

PIPELINE 135 135 85 -50 134 77 -8 135 65 -70 123 131 66 135 127 -8

MECHANICAL 17 17 17 0 17 16 -1 17 15 -2 14 15 0 17 15 -2

PIPING 53 53 48 -5 47 48 0 49 48 -1 48 37 -11 53 48 -5

INSTRUMENTATION AND CONTROL 173 173 164 -9 169 163 -1 173 160 -13 156 76 -84 173 139 -34

ELECTRICAL 83 83 74 -9 79 74 0 83 73 -10 74 73 0 83 71 -12

HVAC 27 27 27 0 25 27 0 27 27 0 24 27 0 27 27 0

CIVIL & STRUCTURAL 132 132 126 -6 132 126 0 132 96 -36 131 96 0 132 69 -63

CATHODIC PROTECTION (REMOVED FROM THE SCOP 6 6 1 -5 5 1 0 6 1 -5 5 1 0 6 1 -5

TOTAL 700 700 612 -88 675 590 -22 696 541 -155 646 511 -30 699 545 -154
Progress Summary Sheet
Cut off Date: 07-Feb-14

PROGRESS

WEEKLY CUMULATIVE % PROGRESS


WEIGHT LAST WEEK LAST WEEK
DESCRIPTION MAN-HOURS
FACTOR VAR. VAR.
PLANNED ACTUAL PLANNED ACTUAL VAR. PLANNED ACTUAL VAR.

GENERAL 1.69 252.00 0.00 0.00 1.69 1.69 0.00 0.00 100.00% 100.00% 0.00% 0.00%

PROCESS 5.57 832.00 0.00 0.00 5.57 5.57 0.00 0.00 100.00% 100.00% 0.00% 0.00%

LOSS PREVENTION 9.68 1,446.50 0.00 0.34 9.53 9.52 -0.01 -0.35 98.44% 98.39% -0.05% -3.59%

PIPELINE 16.90 2,525.00 0.00 0.00 16.90 16.37 -0.53 -0.53 100.00% 96.88% -3.12% -3.12%

MECHANICAL 1.19 178.00 0.00 0.00 1.19 1.11 -0.08 -0.08 100.00% 92.98% -7.02% -7.02%

PIPING 9.96 1,488.00 0.00 0.07 9.96 8.45 -1.51 -1.58 100.00% 84.84% -15.16% -15.82%

INSTRUMENTATION AND CONTROL 14.98 2,239.00 0.00 0.02 14.98 13.19 -1.79 -1.81 100.00% 88.05% -11.95% -12.05%

ELECTRICAL 10.16 1,519.00 0.00 0.02 10.16 8.03 -2.13 -2.15 100.00% 79.03% -20.97% -21.15%

HVAC 2.17 325.00 0.00 0.00 2.17 2.17 0.00 0.00 100.00% 100.00% 0.00% 0.00%

CIVIL & STRUCTURAL 26.40 3,946.00 0.00 0.00 26.40 19.14 -7.26 -7.26 100.00% 72.50% -27.50% -27.50%
CATHODIC PROTECTION (REMOVED FROM THE
1.30 194.00 0.00 0.00 1.30 0.37 -0.93 -0.93 100.00% 28.38% -71.62% -71.62%
SCOPE)

TOTAL 100.00 14,944.50 0.00 0.44 99.85 85.61 -14.24 -14.68 99.85% 85.61% -14.24% -14.68%
Detailed Design for Y
Detailed Engineering Services, Procu

Penspen Project No : 12642

Planned Vs Actual Progr

8.00%

7.00%

6.00%

5.00%

4.00%

3.00%

2.00%
Week End
Week start
0.00%
1.00%
2.00%
3.00%
4.00%

14-Jun-13 30-May-13

01
21-Jun-13 15-Jun-13

02
Penspen Project No : 12642

28-Jun-13 22-Jun-13

03

5-Jul-13 29-Jun-13
04

12-Jul-13 6-Jul-13
05

19-Jul-13 13-Jul-13
06

26-Jul-13 20-Jul-13
07

2-Aug-13 27-Jul-13 08

9-Aug-13 3-Aug-13 09

16-Aug-13 10-Aug-13 10
14-Jun-1321-Jun-1328-Jun-135-Jul-13 12-Jul-1319-Jul-1326-Jul-132-Aug-139-Aug-1316-Aug-13

11
23-Aug-13 17-Aug-13
23-Aug-13

12
30-Aug-13 24-Aug-13

13
6-Sep-13 31-Aug-13

14
13-Sep-13 7-Sep-13
30-Aug-136-Sep-1313-Sep-13

15
20-Sep-13

20-Sep-13 14-Sep-13
Plan Wk %

16

27-Sep-13 21-Sep-13
17

4-Oct-13 28-Sep-13
18
Detailed Engineering Services, Procu

27-Sep-134-Oct-1311-Oct-1318-Oc

Actual W
Detailed Design for Y
Week No.

Plan Wk %

Actual Wk %

Plan Cumm. %

Actual Cumm %
01
0.00% 0.55% 0.00% 0.55%

02
1.60% 0.78% 1.60% 0.24%
Penspen Project No : 12642

03

3.20% 1.27% 1.60% 0.49%


04

4.60% 2.13% 1.40% 0.86%


05

6.60% 3.69% 2.00% 1.57%


06

7.99% 4.75% 1.39% 1.06%


07

9.48% 6.61% 1.49% 1.85%


08

10.23% 8.97% 0.75% 2.37%


09

11.37% 10.42% 1.14% 1.45%


10

14.01% 13.22% 2.64% 2.80%


11

16.98% 15.03% 2.97% 1.81%


12

20.29% 16.87% 3.31% 1.84%


13

23.24% 19.74% 2.95% 2.86%


14

25.04% 23.47% 1.80% 3.73%


15

29.20% 27.50% 4.16% 4.03%


16

31.47% 30.27% 2.27% 2.78%


17

34.56% 34.05% 3.09% 3.77%


Detailed Engineering Services, Procu
Detailed Design for Y
n for Yas Mina Zayed Pipeline Project
, Procurement Assistance & Client Office Accommodation

Cut off Date: 07-Feb-14

Progress
18

11-Oct-13 5-Oct-13
19

Actual Wk %
18-Oct-13 12-Oct-13
20

25-Oct-13 19-Oct-13 21

1-Nov-13 26-Oct-13 22

8-Nov-13 2-Nov-13 23

Plan Cumm. %
Oct-1318-Oct-1325-Oct-131-Nov-138-Nov-1315-Nov-13
23
15-Nov-13 9-Nov-13

22-Nov-13
24
22-Nov-13 16-Nov-13
n for Yas Mina Zayed Pipeline Project

25
29-Nov-13 23-Nov-13

26
29-Nov-136-Dec-1313-Dec-13

6-Dec-13 30-Nov-13
Actual Cumm %
, Procurement Assistance & Client Office Accommodation

27
20-Dec-13

13-Dec-13 7-Dec-13
28

20-Dec-13 14-Dec-13
29

27-Dec-13 21-Dec-13
30

3-Jan-14 28-Dec-13
31

10-Jan-14 4-Jan-14 32

17-Jan-14 11-Jan-14 33

24-Jan-14 18-Jan-14 34

35
31-Jan-14 25-Jan-14

36
7-Feb-14 1-Feb-14
Cut off Date: 07-Feb-14

37
14-Feb-14 8-Feb-14

38
27-Dec-133-Jan-1410-Jan-1417-Jan-1424-Jan-1431-Jan-147-Feb-1414-Feb-1421-Feb-1428-Feb-147-Mar-1
18
38.54% 38.99% 3.98% 4.94%

19
38.78% 42.34% 0.24% 3.35%

20
43.15% 47.15% 4.37% 4.81%
21

48.69% 52.78% 5.54% 5.63%


22

50.92% 56.93% 2.23% 4.15%


23

54.49% 61.75% 3.57% 4.82%


23

58.07% 68.67% 3.58% 6.93%


n for Yas Mina Zayed Pipeline Project

24

62.91% 74.23% 4.84% 5.55%


25

66.45% 78.95% 3.54% 4.73%


, Procurement Assistance & Client Office Accommodation

26

70.56% 83.15% 4.11% 4.19%


27

72.54% 87.27% 1.98% 4.12%


28

78.90% 90.22% 6.35% 2.95%


29

80.63% 92.56% 1.74% 2.34%


30

82.43% 94.38% 1.79% 1.82%


31

84.08% 96.78% 1.65% 2.40%


32

84.69% 98.62% 0.61% 1.84%


33

85.17% 99.8% 0.48% 1.23%


34

85.61% 0.44%
Cut off Date: 07-Feb-14
35

0.00% 0.00%
100.00%

90.00%

80.00%

70.00%

60.00%

50.00%

40.00%

30.00%
50.00%

40.00%

30.00%

20.00%

10.00%

0.00%
30

32

37
29

31

33

34

35

36

38
Jan-1410-Jan-1417-Jan-1424-Jan-1431-Jan-147-Feb-1414-Feb-1421-Feb-1428-Feb-147-Mar-14

15-Feb-14

22-Feb-14

1-Mar-14
21-Feb-14

28-Feb-14

7-Mar-14
36

0.00% 0.00%
37

0.00% 0.00%
38

0.00% 0.00%
Detailed Design for Yas Mina Zayed Pipeline Project
CLIENT : PETROJET DELIVERABLES' STATUS REPORT ENGG. CONSULTANT : PENSPEN International LTD.
Penspen Project No : 12642
Cut off Date: 07-Feb-14

DESCRIPTION TOTAL ISSUED FOR COMMENTS COMMENTS RECEIVED ISSUED FOR APPROVAL APPROVAL RECEIVED ISSUED FOR CONSTRUCTION

Plan Actual Variance Actual Varaince Overdue Plan Actual Variance Actual Varaince Overdue Plan Actual Variance

GENERAL 3 3 3 0 3 0 0 3 3 0 3 0 0 3 3 0

PROCESS 37 37 37 0 37 0 0 37 37 0 37 0 0 37 37 0

LOSS PREVENTION 34 34 33 -1 32 -1 0 34 31 -3 31 0 0 33 31 -2

PIPELINE 135 135 135 0 133 -2 0 135 133 -2 131 -2 0 135 127 -8

MECHANICAL 17 17 17 0 16 -1 1 17 15 -2 15 0 0 17 15 -2

PIPING 53 53 48 -5 48 0 0 49 48 -1 48 0 0 53 48 -5

INSTRUMENTATION AND CONTROL 173 173 164 -9 163 -1 1 173 160 -13 158 -2 1 173 139 -34

ELECTRICAL 83 83 74 -9 74 0 0 83 73 -10 73 0 0 83 71 -12

HVAC 27 27 27 0 27 0 0 27 27 0 27 0 0 27 27 0

CIVIL & STRUCTURAL 132 132 126 -6 126 0 0 132 96 -36 96 0 0 132 69 -63

CATHODIC PROTECTION (REMOVED FROM THE


6 6 1 -5 1 0 0 6 1 -5 1 0 0 6 1 -5
SCOPE)

TOTAL 700 700 665 -35 660 -5 2 696 624 -72 620 -4 1 699 568 -131