Additional points to be added to ITP (add construction code – API 1104 latest ed.

/ DNV-OS-F101)

1.0 Prefab / production requirements (additional points)


1.4 include repair procedures.
1.5 include FBE coating PQT
1.6 Procedure for Control of Welding Consumables (Storage, Handling, Issuance, Conditioning)
2.0 In process inspection and test requirements (additional points)
2.1 Beveling / Bevel restoration if req. / Lamination check
2.2 Marking of Pipes, Bends etc.
2.3 cleaning (swabbing), Gauging
2.4 Welding Consumables-Verification, Visual Inspection, Storage and Handling
2.5 Welding Equipment Calibration Verification
2.6 Control of Welding Consumables- Storage, Handling, Issuance & Conditioning
2.8 preheat / Inter pass – as per approved WPS
2.7 Verification of Non-Destructive Examination Method Application and Evaluation of Results
2.8 RT /MUT/PAUT (100%) – as appropriate
2.9 Add TIE IN WELDING
3.0 Final Inspection ad test requirements
3.1 Release for Hydrotest (test pack)
3.2 Completion of Pipe Book
4.0 Release for Shipment.