Where: Tc = in hours
L = Maximum length of flow (km)
H= the difference in elevation between the outlet and the R
Total time of concentration is calculated for both the mountan watershed and town sub catchment
CN 75
S 86.68
Ia 17.34
For Chatchment-7
For Chatchment -8
Year 2 Year 5 Year
Intensity (mm/hr) 25 28
p1=tc(hr)*I(mm/hr) 31.825 35.644
Ia 21.627 21.627
(p-Ia)^2 103.994 196.471
(p-Ia)+S 118.336 122.155
Q=(P-Ia)^2/(P-Ia)+S(mm) 0.879 1.608
qu=α10^Co+C1logtc+C2(logtc)^2 0.132 0.132
qu*A*Q 3.513 6.429
For Chatchment -6
Year 2 Year 5 Year
Intensity (mm/hr) 32.000 40.000
p1=tc(hr)*I(mm/hr) 27.840 34.800
Ia 0.875 0.875
(p-Ia)^2 727.111 1150.906
(p-Ia)+S 135.103 142.063
Q=(P-Ia)^2/(P-Ia)+S(mm) 5.382 8.101
qu=α10^Co+C1logtc+C2(logtc)^2 0.168 0.168
qu*A*Q 1.953 2.940
Length(Km) Length(m) Slope(m/m) Tc(hr)
1.54 1540 0.29 0.1108367778
2.79 2790 0.21 0.2477214003
10.28 10280 0.14 0.4981513082
Weighted Weighted CN
CN
73.265
12.548 86.683
0.662
0.141
0.053
0.014
86.683
Ia/p 0.2626746855
Tc 1.50
C0 c1 c2
2.20282 -0.516 -0.0126
0.000431
Sub -watershed Area(Ha) Area(km²) 2.152
1 97.39 0.9739
2 166.55 1.6655
3 3172.65 31.7265
For Tc 1.0465025437
C0 c1 c2
2.55323 -0.6151 -0.164
0.000431
Area(km²) 32.2226
Tc 1.02
C0 c1 c2
2.20282 -0.516 -0.0126
0.000431
Area(km²) 1.5
Ia/p 0.4153772134
Total Tc(hr)
0.0078 0.77 -0.385
0.0078 0.77 -0.385
0.0078 0.77 -0.385
Existing condition
Subcatchment Depth(m) Width(m) Existing Discharge(m3/s)
CM-1 0.5 1.2 3.04
CM-2 0.45 1.2 1.94
CM-3 0.4 1.2 1.94
CM-4 0.5 1.1 2.16
CM-5 0.5 0.6 0.68
CM-6 0.5 1.2 4.36
CM-7 0.5 1 3.36
CM-8 0.5 1 0.61
CM-9 0.5 1.2 1.43
CM-10 0.4 0.6 0.76
CM-11 0.45 0.5 0.31
CM-12 0.4 0.6 0.70
0.00278
0.00278
0.00278
0.00278
0.00278
0.00278
0.00278
0.00278
0.00278
0.00278
0.00278
0.00278
Existing condition Proposed
Sub- catchment Excess Discharge(m3/s)
Discharge(m3/s) Discharged(m3/s)
CM-1 3.040 4.13 4.13
CM-2 1.941 4.00 4.00
CM-3 1.941 3.13 3.13
CM-4 2.159 4.19 4.19
CM-5 0.677 3.06 3.06
CM-6 4.364 4.51 4.51
CM-7 3.362 4.16 4.16
CM-8 0.611 4.05 4.05
CM-9 1.426 2.28 2.28
CM-10 0.756 3.02 3.02
CM-11 0.306 2.90 2.90
CM-12 0.698 3.12 3.12
Depth=2*width that is
y=2*y
Q=
=
A channel 2y^2, P=4y and R =
0
n S S^1/2 Q*n Q*n/S^1/2 y b=2y
0.013 0.02 0.5 0.14 0.05 0.38 0.38 0.70 1.39
0.013 0.04 0.5 0.20 0.05 0.26 0.38 0.60 1.21
0.013 0.015 0.5 0.12 0.04 0.33 0.38 0.66 1.32
0.013 0.025 0.5 0.16 0.05 0.34 0.38 0.67 1.34
0.013 0.03 0.5 0.17 0.04 0.23 0.38 0.58 1.15
0.013 0.01 0.5 0.10 0.06 0.59 0.38 0.82 1.64
0.013 0.03 0.5 0.17 0.05 0.31 0.38 0.65 1.29
0.013 0.04 0.5 0.20 0.05 0.26 0.38 0.61 1.21
0.013 0.01 0.5 0.10 0.03 0.30 0.38 0.63 1.27
0.013 0.02 0.5 0.14 0.04 0.28 0.38 0.62 1.24
0.013 0.025 0.5 0.16 0.04 0.24 0.38 0.58 1.17
0.013 0.025 0.5 0.16 0.04 0.26 0.38 0.60 1.20
1.Sheet Flow Time
Tt=[0.091(nL)0.8/(P2)0.5S0.4]
Where: Tt = travel time, hr
n = Manning's roughness coefficient 0.013
L = flow length, m 100
P2 = 2-year, 24-hour rainfall, mm 33.4664053403
S = slope of hydraulic grade line (land slope), m/m based on topographic map
1 Sheet Flow(hr)
0.6666666667
Area P R R^2/3
0.72 2 2.40 0.30 0.45
0.6 2 2.20 0.27 0.42
0.6 2 2.20 0.27 0.42
0.5 2 2.00 0.25 0.40
0.18 2 1.20 0.15 0.28
0.78 2 2.50 0.31 0.46
0.6 2 2.20 0.27 0.42
0.15 2 1.10 0.14 0.26
0.48 2 2.00 0.24 0.39
0.3 2 1.60 0.19 0.33
0.15 2 1.10 0.14 0.26
0.24 2 1.40 0.17 0.31
Total
Open Channels Flow Total Tc Tc
TC2(Hr) (Hr) min
0.045 0.782 46.891 60
0.030 0.896 53.768 60
0.064 0.930 55.807 60
0.073 0.729 43.753 60
0.086 0.645 38.679 60
0.092 1.018 61.078 60
0.077 0.921 55.256 60
0.047 1.047 62.790 60
0.058 0.924 55.464 60
0.095 0.962 57.691 60
0.120 0.986 59.146 60
0.104 0.841 50.441 60
Tc(hr)
0.5 0.4 1.078297025 0.74
0.5 0.4 0.9168576297 0.87
0.5 0.4 0.9168576297 0.87
0.5 0.4 1.2098008955 0.66
0.5 0.4 1.4228214546 0.56
0.5 0.4 0.9168576297 0.87
0.5 0.4 1.078297025 0.74
0.5 0.4 1.2098008955 0.66
0.5 0.4 0.9168576297 0.87
0.5 0.4 0.9168576297 0.87
0.5 0.4 0.9168576297 0.87
0.5 0.4 1.078297025 0.74
0.5
S^1/2 V Length Factor Tc(hr) Q
0.1224744871 3.66 593 3600 0.05 2.63
0.1 2.80 302.19 3600 0.03 1.68
0.1 2.80 645.19 3600 0.06 1.68
0.1414213562 3.74 980.25 3600 0.07 1.87
0.1732050808 3.26 1014.85 3600 0.09 0.59
0.1 3.07 1015 3600 0.09 2.39
0.1224744871 3.43 950 3600 0.08 2.06
0.1414213562 2.50 419.37 3600 0.05 0.37
0.1 2.57 539.5 3600 0.06 1.24
0.1 2.18 749.48 3600 0.10 0.66
0.1 1.77 760.29 3600 0.12 0.26
0.1224744871 2.52 944.94 3600 0.10 0.60
2 Year 5 Year 10 Year 25 Year 50 Year 100 Year
0.08 89.65761516 106.027 115.9712 126.9228 134.7131 146.251
0.17 72.3288324 85.53442 93.55659 102.3915 108.6762 117.984
0.25 65.57814137 77.55121 84.82464 92.83498 98.53305 106.9722
0.33 57.44297421 67.93075 74.30189 81.31852 86.30972 93.70197
0.5 46.10963065 54.5282 59.64233 65.2746 69.28105 75.21483
1 29.71509531 35.14039 38.43617 42.06585 44.64779 48.47178
1.5 22.20093328 26.25432 28.71668 31.42851 33.35754 36.21455
2 17.67535842 20.90247 22.86289 25.02193 26.55773 28.83235
2.17 16.76284576 19.82336 21.68257 23.73014 25.18666 27.34384
2.33 16.05151663 18.98216 20.76247 22.72315 24.11787 26.18351
2.67 14.19938688 16.79187 18.36676 20.10121 21.33499 23.16229
3 12.80823074 15.14672 16.56731 18.13183 19.24474 20.89301
Total Tc
(Hr) 2 5 10 25 50 100
0.143117 0.1 80 96.66 103.33 116.66 120 136.66
0.14838 0.1 79 95.65 102.33 115.65 118.5 135.66
0.177832 0.2 68 80 88 96.00 104 120
0.155858 0.2 70 85 92 98.50 106.66 125.5
0.153841 0.2 71 86 93 99.50 108 126.5
0.120182 0.1 85 100.66 105.66 120.65 125.66 140.56
0.114923 0.1 85 1101.65 106.66 121.65 126.65 141.56
0.098899 0.1 88 1105 110.66 126.56 130.65 144
0.172878 0.2 68 80 88 96.00 104 120
0.205048 0.2 65 75 85 92.00 101 115
0.226062 0.2 61 72 81 87.00 98 111
0.194386 0.2 67 78 87.6 95.00 103 118
Manning
Sub catchmentDepth(m)Width(m) A (m2) P(m) R (m) Slope
coefficient
CM-1 0.6 1.2 0.72 2.4 0.3 0.013 0.015
CM-2 0.5 1.2 0.6 2.2 0.27 0.013 0.01
CM-3 0.5 1.2 0.6 2.2 0.27 0.013 0.01
CM-4 0.5 1 0.5 2 0.25 0.013 0.02
CM-5 0.3 0.6 0.18 1.2 0.15 0.013 0.03
CM-6 0.6 1.3 0.78 2.5 0.31 0.013 0.025
CM-7 0.5 1.2 0.6 2.2 0.27 0.013 0.03
CM-8 0.3 0.5 0.15 1.1 0.14 0.013 0.04
CM-9 0.4 1.2 0.48 2 0.24 0.013 0.01
CM-10 0.5 0.6 0.3 1.6 0.19 0.013 0.01
CM-11 0.3 0.5 0.15 1.1 0.14 0.013 0.01
CM-12 0.4 0.6 0.24 1.4 0.17 0.013 0.015
Idf
140
120
25
Yea r
100
80
60
40
20
0
0 0.5 1 1.5 2 2.5 3 3.5
0.666666667
2y+b 0.5
Slope V(m/sec) Discharge
(m3/sec) 0.015 0.6
0.02 0.05 0.01 0.5
0.01 0.04 0.03 0.01 0.5
0.01 0.00 0.02 0.5
0.02 4.45 2.23 0.03 0.3
0.03 4.36 0.79 0.025 0.6
0.03 5.12 3.99 0.03 0.5
0.03 5.29 3.17 0.04 0.3
0.04 6.11 0.92 0.01 0.4
0.01 3.24 1.55 0.01 0.5
0.01 2.52 0.76 0.01 0.3
0.01 2.27 0.34 0.015 0.4
0.02 2.91 0.70
1.1 Investigate the impact of Gra Kahsu Mountain on the storm water drainage of study a
= Where H=1374304.125m-1373341.04m=963.085m
Where: Tc = in hours
L = Maximum length of flow (m)
H= the difference in elevation between the outlet and the Remote point (m
= 0.11hr
Total Tc=Tc of watershed area + Tc of town sub-catchment
Total Tc=0.11hr+0.62hr=0.73hr
orm water drainage of study area Using SCS Curve Number method.
e direct impact on the urban storm water drainage systemof the town sub catchments.
s the storm water to reach from the most remotes distance to the outlet. Kiripach, formula was adopted in estimating Tc;
=963.085m
ub-catchment
n estimating Tc;
Annual runoff Estimation from land use land cover map for the year 2000
Land use/cover categories Area(m²) Percentage runoff coefficient Rainfall depth (m)
Built -up Area 964800 17.41 0.8 0.054
Vegetation 4221900 76.20 0.2 0.054
Bare Land 353700 6.38 0.45 0.054
5540400
Annual runoff Estimation from land use land cover map for the year 2010
Land use/cover categorie Area(m²) Percentage runoff coefficient Rainfall depth (m)
Built -up Area 2646000 47.76 0.8 0.054
Vegetation 2242800 40.48 0.2 0.054
Bare Land 651600 11.76 0.45 0.054
5540400
Annual runoff Estimation from land use land cover map for the year 2018
Land use/cover categorie Area(m²) Percentage runoff coefficient Rainfall depth (m)
Built -up Area 3624300 65.42 0.8 0.054
Vegetation 693900 12.52 0.2 0.054
Bare Land 1222200 22.06 0.45 0.054
5540400
Area and amount of change in different land use/cover categories during 2000 to 2010
Land use/ 2000 2010
cover categories Area(m²) Area(%) Area(m²) Area(%)
Built -up Area 964800 17.41 2646000 47.76
Vegetation 4221900 76.20 2242800 40.48
Bare Land 353700 6.38 651600 11.76
Total 5540400 5540400
Area and amount of change in different land use/cover categories during 2010 to 2018
Land use/ 2010 2018
cover categories Area(m²) Area(%) Area(m²) Area(%)
Built -up Area 2646000 47.76 3624300 65.42
Vegetation 2242800 40.48 693900 12.52
Bare Land 651600 11.76 1222200 22.06
Total 5540400 5540400
Volume runoff(m3)
41679.36
45596.52
8594.91
Volume runoff(m3)
114307.20 174.25373
24222.24 -46.877
15833.88 84.223919
Volume runoff(m³)
156569.76 36.972789
7494.12 -69.061
29699.46 87.569061
Change 2000–2010
Area(m²) Area(%)
1681200 30.34
-1979100 -35.72
297900 5.38
Change 2010–2018
Area(m²) Area(%)
978300 17.66
-1548900 -27.96
570600 10.30
The dynamic changes of area coverage by square kilometers for all categories on different period
146.49
267.53
54.75648
Sub Total Tc Intensity from IDF
Catchment (Hr) (for 25 year frequency)(mm/hr)
140
SC-1 0.78 50
SC-2 0.90 46
SC-3 0.93 43 120
SC-4 0.73 53
SC-5 0.64 60 100
SC-6+SWS-1 1.02 41
SC-7+SWS-2 0.92 44
SC-8+SWS-3 1.05 40 80
SC-9 0.92 44
SC-10 0.96 42 60
SC-11 0.99 41
SC-12 0.84 50
40
20
0
0 0.5
25 Year
140 25 Year
120
100
80
60
40
20
0
0 0.5 1 1.5 2 2.5 3 3.5
2 Year 5 Year 10 Year 25 Year 50 Year 100 Year
0.08 89.65762 106.027 115.9712 126.9228 134.7131 146.251
0.17 72.32883 85.53442 93.55659 102.3915 108.6762 117.984
0.25 65.57814 77.55121 84.82464 92.83498 98.53305 106.9722
0.33 57.44297 67.93075 74.30189 81.31852 86.30972 93.70197
0.5 46.10963 54.5282 59.64233 65.2746 69.28105 75.21483
1 29.7151 35.14039 38.43617 42.06585 44.64779 48.47178
1.5 22.20093 26.25432 28.71668 31.42851 33.35754 36.21455
2 17.67536 20.90247 22.86289 25.02193 26.55773 28.83235
2.17 16.76285 19.82336 21.68257 23.73014 25.18666 27.34384
2.33 16.05152 18.98216 20.76247 22.72315 24.11787 26.18351
2.67 14.19939 16.79187 18.36676 20.10121 21.33499 23.16229
3 12.80823 15.14672 16.56731 18.13183 19.24474 20.89301