HIRAC, On-Going Process
Review Risk
HIRAC Assessment
Job Safety
Analysis
(JSA)
Severity
(an event)
Likelihood
(the number of times which consequence happens per unit of time)
4
Hazard Identification
5
Risk Assessment
Semi-quantitative
Semi-quantitative analyses are based on a mix of qualitative and quantitative
scales
Quantitative
Quantitative risk analysis uses actual numerical values
6
Rating Of Likelihood Level
Of An Occurence
7
Rating Of Severity Of
An Impact
SEVERITY OF EXAMPLE RATING
AN IMPACT
Severe (S) Death occurs, toxic off-site release with 5
detrimental effect, huge financial loss
Major (M) Extensive injuries, loss of production capability, 4
off-site release with no detrimental effect, major
financial loss
Moderate (Mo) Medical alert and light injuries, on site 3
containment requires outside assistance, high
financial loss
Minor (Mi) Minor injuries, rapid containment on site, medium 2
financial loss
Insignificant (I) No injuries, minor abrasion, low financial cost 1
8
Quantitative Analysis
LIKE- SEVERITY
LIHOOD 1 2 3 4 5
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
9
Quantitative Analysis
Risk Ranking Categories
10
Qualitative Analysis
SEVERITY
11
Qualitative Analysis
Risk Matrix Develop Using Severity and
Likelihood Parameters
14
Standard Operating Procedure
(SOP)
Standard operating procedures (SOP) are
intended to provide general guidance on
how to safely work SELECT JOB
Integrate to became
SOP IDENTIFY HAZARDS
Develop
solution
15
Conclusion
16
Thank you.
Question?
17
Final Assignment (Group)
Report On Hazards (Risk Assessment Analysis)
Find 10 Hazards in any areas in Polytechnic (e.g
library, cafetaria, canteen, computer lab, classroom,
lecturer’s room, lecture hall, hostel, kitchen, etc.)
Prepare a proper analysis and recommend the
control measures
Contents: Introduction, Background of Analysis,
Potential Hazard, Hazard Identification Method, Risk
Assessment, Result and Discussion, Control
Measures Recommendation based on Risk Control
Hierarchy (refer to the example of report)
Report should be submitted by 9th March 2011 18