Sunteți pe pagina 1din 47

GCGV PROJECT

PIPERACK FOUNDATION CALCULATIONS

CLIENT NO: USYO-AF-NCSTL-Z1-0007

AMEC Foster Wheeler Doc No.


191941-2100-DD2-CAL-0007

B 28-Feb-18 IFF SKP/AAK TAK/AA TAK/WEP SB/BAE


A 8-Feb-18 IFR SKP/AAK TAK/AA TAK/WEP SB/BAE
Project
Rev Rev Date Issued For Prepared Checked Discipline Lead Approved
PROJECT GCGV PROJECT CALC NoUSYO-AF-NC

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

CONTENTS

SECTION DESCRIPTION PAGE N

1.0 SCOPE 2

2.0 CODE AND STANDARDS 3

3.0 DESCRIPTION OF FOUNDATION 3

4.0 DESIGN BASIS 4

5.0 GENERAL DESIGN INFORMATION 4

6.0 LOADS AND LOAD COMBINATIONS 4

APPENDICES DETAILED CALCULATION REPORT (MAT3D REPORT)


PROJECT GCGV PROJECT CALC NoUSYO-AF-NC

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP


APPENDIX-A DETAILED CALCULATION REPORT - (RAILCAR AREA)

APPENDIX-B DETAILED CALCULATION REPORT - (TANKAGE AREA)

APPENDIX-C DETAILED CALCULATION REPORT - (INDUSTRIAL AREA)

APPENDIX-D DETAILED CALCULATION REPORT - (WWT AREA)


PROJECT GCGV PROJECT CALC NoUSYO-AF-NC

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP


1.0 SCOPE

This document covers the foundation design for Piperack for Tankage area, Railcar area, Waste water treatme

Industrial water tank area in GCGV project.

2.0 CODE AND STANDARDS

i) ACI:318-2011- Building Code Requirement for Structural Concrete

ii) ASCE 7 -2010 - Minimum Design Loads for Buildings and other structures

iii) USYO-AF-NBDES-Z1-0001-Structual Design Basis-FEED

iv) Wind laods for Petrochemical and Other Industrial facility

v) AISC 360-10 - Specification for Structural Steel Buildings

vi) USYO-TW-GRZZZ-Z1-0009-Feed Geotechnical Report

3.0 DESCRIPTION OF FOUNDATION

Piperack foundation consists of various types, such as isolated footing, combined footing & Mat type foundatio

Foundation sizes of various areas are as described below

Foundation Type Length Width Thickness of Footing Type of footin

Tankage area ft' - inch" ft' - inch" ft' - inch"

T01 26'-00" 27'-00" 1'-06" Mat type footi

T02 26'-00" 12'-00" 1'-06" Combined foo

T03 20'-00" 10'-00" 1'-06" Combined foo

T04 24'-11" 26'-00" 1'-06" Mat type footi

T05 25'-00" 26'-00" 1'-06" Mat type footi

T06 25'-00" 26'-00" 2'-00" Mat type footi

T07 25'-00" 12'-00" 1'-06" Combined foo


PROJECT GCGV PROJECT CALC NoUSYO-AF-NC

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP


T08 20'-00" 08'-00" 1'-06" Combined foo

T09 20'-00" 08'-00" 1'-06" Combined foo

T10 15'-00" 08'-00" 1'-06" Combined foo

T11 15'-00" 06'-00" 1'-06" Combined foo

Railcar area ft' - inch" ft' - inch" ft' - inch"

F01 06'-00" 06'-00" 1'-06" Isolated footin

F02 15'-00" 10'-00" 1'-06" Combined foo

F02A 15'-00" 12'-06" 1'-06" Combined foo

F03 25'-00" 10'-00" 1'-06" Combined foo

F04 26'-00" 27'-00" 1'-06" Mat type footi

F05 33-04" 20'-00" 1'-06" Mat type footi

Waste water treatment area ft' - inch" ft' - inch" ft' - inch"

W01 16'-00" 6'-00" 1'-06" Combined foo

W02 16'-00" 6'-00" 1'-06" Combined foo

W03 28'-00" 16'-00" 1'-06" Combined foo

W04 23'-00" 08'-00" 1'-06" Combined foo

W05 28'-00" 15'-00" 1'-06" Combined foo

W06 18'-00" 10'-00" 1'-06" Combined foo

W07 6'-00" 06'-00" 1'-06" Isolated footin


PROJECT GCGV PROJECT CALC NoUSYO-AF-NC

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

Industrial area ft' - inch" ft' - inch" ft' - inch"

C01 18'-00" 08'-00" 1'-06" Combined foo

C02 22'-00" 12'-00" 1'-06" Combined foo

C03 22'-00" 10'-00" 1-06" Combined foo

C04 27-00" 27'-00" 1'-06" Mat type footi

C05 27-00" 27'-00" 1'-06" Mat type footi

C06 8'-00" 44'-00" 2-06" Combined foo

4.0 DESIGN BASIS

4.1 Design Philosophy

Foundation analysis and design is carried out using Mat3D, a software to carry out foundation design.

5.0 GENERAL DESIGN INFORMATION

5.1 Material Data

Concrete

Unit weight of Concrete gc = 150 pcf


(STD. Engg
PROJECT GCGV PROJECT CALC NoUSYO-AF-NC

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP


fck = 4000 psi (CL. 3.2,USY
Specified compressive strength of concrete

Reinforcement

Grade of Reinforcement = ASTM A615 (CL. 3.3,USY

Specified yield strength of reinforcement fy = 60 ksi

Unit weight of Steel g st = 490 pcf (STD. Engg

5.2 Geotechnical Data

Unit weight of Soil gs = 125 pcf (Pg.11, USY

snet = 2000 psf (Pg.11, USY


Allowable Net safe bearing capacity
Water table depth from HPP hw = 0 ft (CL. 4.8.1,US

Unit weight of water gw = 62 pcf (STD. Engg

Elevation of Grade / HPP HPP = 35.00 ft USYO-AF-C

5.3 Allowable Limits

Fs = 1.50 (CL. 7.4,USY


Factor of safety for sliding & Uplift
Fo = 1.80 (CL. 7.4,USY
Factor of safety for overturning (Operating & test case)
Fo = 1.50 (CL. 7.4,USY
Factor of safety for overturning (Erection case )

6.0 LOADS AND LOAD COMBINATIONS

For baisc loads and load calculation refer PIPERACK STEEL WORK CALCULATIONS document: USYO-AF-NCST
USYO-AF-NCSTL-Z1-0007

SKP/AAK Date 28/Feb/18

TAK/AA Date 28/Feb/18

TAK/WEP Date 28/Feb/18

PAGE NO.

4
USYO-AF-NCSTL-Z1-0007

SKP/AAK Date 28/Feb/18

TAK/AA Date 28/Feb/18

TAK/WEP Date 28/Feb/18


USYO-AF-NCSTL-Z1-0007

SKP/AAK Date 28/Feb/18

TAK/AA Date 28/Feb/18

TAK/WEP Date 28/Feb/18

n for Piperack for Tankage area, Railcar area, Waste water treatment area &

es, such as isolated footing, combined footing & Mat type foundation.

Type of footing

Mat type footing

Combined footing

Combined footing

Mat type footing

Mat type footing

Mat type footing

Combined footing
USYO-AF-NCSTL-Z1-0007

SKP/AAK Date 28/Feb/18

TAK/AA Date 28/Feb/18

TAK/WEP Date 28/Feb/18


Combined footing

Combined footing

Combined footing

Combined footing

Isolated footing

Combined footing

Combined footing

Combined footing

Mat type footing

Mat type footing

Combined footing

Combined footing

Combined footing

Combined footing

Combined footing

Combined footing

Isolated footing
USYO-AF-NCSTL-Z1-0007

SKP/AAK Date 28/Feb/18

TAK/AA Date 28/Feb/18

TAK/WEP Date 28/Feb/18

Combined footing

Combined footing

Combined footing

Mat type footing

Mat type footing

Combined footing

(STD. Engg practice)


USYO-AF-NCSTL-Z1-0007

SKP/AAK Date 28/Feb/18

TAK/AA Date 28/Feb/18

TAK/WEP Date 28/Feb/18


(CL. 3.2,USYO-AF-NBDES-Z1-0001)

(CL. 3.3,USYO-AF-NBDES-Z1-0001)

(STD. Engg practice)

(Pg.11, USYO-TW-GRZZZ-Z1-0001)

(Pg.11, USYO-TW-GRZZZ-Z1-0001)

(CL. 4.8.1,USYO-AF-NBDES-Z1-0001)

(STD. Engg practice)

USYO-AF-CDZZZ-Z1-0011

(CL. 7.4,USYO-AF-NBDES-Z1-0001)

(CL. 7.4,USYO-AF-NBDES-Z1-0001)

(CL. 7.4,USYO-AF-NBDES-Z1-0001)

ACK STEEL WORK CALCULATIONS document: USYO-AF-NCSTL-Z1-0006


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS
ASD Load combinations for Stability Check of Foundations

*DEAD LOAD ONLY - (Structural + Piping / Elec. / Equip)

1 1.05 1.05 1.00


*OPERATING WITH THERMAL
Operating with Thermal – (Structural Dead Load + Piping / Elec. / Equip Operating + Live Load + Anchor & Thermal Loads)-
in basic load for foundation design.

2 1.05 1.05 1.00 1.00 1.00 1.00

3 1.05 1.05 1.00 1.00 1.00 -1.00

4 1.05 1.05 1.00 -1.00 -1.00 1.00

5 1.05 1.05 1.00 -1.00 -1.00 -1.00

*Operating with Wind – (Structural Dead Load + Piping / Elec. / Equip Operating + Anchor Loads + Wind)
[DS+DO(+/-)ATX(+/-)ATZ(+/-)0.6W(+/-)0.3W(Perp.)

6 1.05 1.05 1.00 1.00 1.00 0.60

7 1.05 1.05 1.00 1.00 -1.00 0.60

8 1.05 1.05 1.00 1.00 1.00 0.30

9 1.05 1.05 1.00 -1.00 1.00 -0.30


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

10 1.05 1.05 1.00 -1.00 1.00 -0.60

11 1.05 1.05 1.00 -1.00 -1.00 -0.60

12 1.05 1.05 1.00 1.00 -1.00 0.30

13 1.05 1.05 1.00 -1.00 -1.00 -0.30


*Empty Wind – (Structural Dead Load + Piping / Elec. / Equip Dead Load + Wind)

14 0.60 0.60 0.60 0.60

15 0.60 0.60 0.60 0.60

16 0.60 0.60 0.60 0.30

17 0.60 0.60 0.60 -0.30

18 0.60 0.60 0.60 -0.60

19 0.60 0.60 0.60 -0.60


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

20 0.60 0.60 0.60 0.30

21 0.60 0.60 0.60 -0.30


*Uplift/Operating/ Wind – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Uplift Anchor Loads + Wind)

22 1.05 1.05 1.00 1.00 1.00 1.00 0.60

23 1.05 1.05 1.00 1.00 -1.00 1.00 0.60

24 1.05 1.05 1.00 1.00 1.00 1.00 0.30

25 1.05 1.05 1.00 -1.00 1.00 1.00 -0.30

26 1.05 1.05 1.00 -1.00 1.00 1.00 -0.60

27 1.05 1.05 1.00 -1.00 -1.00 1.00 -0.60

28 1.05 1.05 1.00 1.00 -1.00 1.00 0.30

29 1.05 1.05 1.00 -1.00 -1.00 1.00 -0.30


*Hydrotest Condition – (Structural Dead Load + Hydrotest Pipe / Equip Loads + Live + Partial Wind)

30 1.05 1.05 1.00 0.20

31 1.05 1.05 1.00 0.20


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

32 1.05 1.05 1.00 0.10

33 1.05 1.05 1.00 -0.10

34 1.05 1.05 1.00 -0.20

35 1.05 1.05 1.00 -0.20

36 1.05 1.05 1.00 0.10

37 1.05 1.05 1.00 -0.10


*Operating with Seismic – (Structural Dead Load + Piping / Elec. / Equip Operating + Anchor Loads + Seismic)
[DS+DO(+/-)ATX(+/-)ATZ(+/-)0.7E]

38 1.05 0.70 1.05 1.00 1.00 1.00

39 1.05 0.70 1.05 1.00 1.00 -1.00

40 1.05 -0.70 1.05 1.00 -1.00 1.00

41 1.05 -0.70 1.05 1.00 -1.00 -1.00


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

42 1.05 0.70 1.05 1.00 1.00 1.00

43 1.05 0.70 1.05 1.00 -1.00 1.00

44 1.05 -0.70 1.05 1.00 1.00 -1.00

45 1.05 -0.70 1.05 1.00 -1.00 -1.00


*Empty Seismic – (Structural Dead Load + Piping / Elec. / Equip Dead Load + Seismic)
[0.6DS+0.6DE+0.7E]

46 0.60 0.7 0.60 0.60

47 0.60 -0.7 0.60 0.60

48 0.60 0.7 0.60 0.60

49 0.60 -0.7 0.60 0.60


*Abnormal Conditions – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Abnormal Anchor Loads + Partial W

50 1.05 1.05 1.00 0.20

51 1.05 1.05 1.00 0.20

52 1.05 1.05 1.00 0.10

53 1.05 1.05 1.00 -0.10


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

54 1.05 1.05 1.00 -0.20

55 1.05 1.05 1.00 -0.20

56 1.05 1.05 1.00 0.10

57 1.05 1.05 1.00 -0.10


*OPERATING WITH WIND [DS+DO(+/-)ATX(+/-)ATZ(+/-)0.75*0.6W(+/-)0.75*0.3W(Perp.)+0.75LL

58 1.05 1.05 1.00 1.00 1.00 0.45

59 1.05 1.05 1.00 1.00 -1.00 0.45

60 1.05 1.05 1.00 1.00 1.00 0.225

61 1.05 1.05 1.00 -1.00 1.00 -0.225

62 1.05 1.05 1.00 -1.00 1.00 -0.45

63 1.05 1.05 1.00 -1.00 -1.00 -0.45


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

64 1.05 1.05 1.00 1.00 -1.00 0.225

65 1.05 1.05 1.00 -1.00 -1.00 -0.225


*OPERATING WITH SEISMIC [DS+DO(+/-)ATX(+/-)ATZ(+/-)0.75*0.7E+0.75LL]

66 1.05 0.525 1.05 1.00 1.00 1.00

67 1.05 0.525 1.05 1.00 1.00 -1.00

68 1.05 -0.525 1.05 1.00 -1.00 1.00

69 1.05 -0.525 1.05 1.00 -1.00 -1.00

70 1.05 0.525 1.05 1.00 1.00 1.00

71 1.05 0.525 1.05 1.00 -1.00 1.00

72 1.05 -0.525 1.05 1.00 1.00 -1.00

73 1.05 -0.525 1.05 1.00 -1.00 -1.00


*OPERATING WITH SEISMIC [0.6DS+0.6DO(+/-)ATX(+/-)ATZ(+/-)0.7E]

74 0.60 0.70 0.60 0.60 1.00 1.00 1.00

75 0.60 0.70 0.60 0.60 1.00 -1.00 1.00


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

76 0.60 -0.70 0.60 0.60 -1.00 1.00 1.00

77 0.60 -0.70 0.60 0.60 -1.00 -1.00 1.00

78 0.60 0.70 0.60 0.60 1.00 1.00 1.00

79 0.60 0.70 0.60 0.60 -1.00 1.00 1.00

80 0.60 -0.70 0.60 0.60 1.00 -1.00 1.00

81 0.60 -0.70 0.60 0.60 -1.00 -1.00 1.00

LRFD Load combinations for Strength design of Foundations

*DEAD LOAD ONLY - (Structural + Piping / Elec. / Equip)

1 1.40 1.40 1.40

Operating with Thermal – (Structural Dead Load + Piping / Elec. / Equip Operating + Live Load + Anchor / Thermal Loads)-
in basic load for foundation design.

2 1.20 1.20 1.20 1.20 1.20 1.20


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

3 1.20 1.20 1.20 1.20 1.20 -1.20

4 1.20 1.20 1.20 -1.20 -1.20 1.20

5 1.20 1.20 1.20 -1.20 -1.20 -1.20

*Operating with Wind – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Anchor Loads + Wind+Live load)

6 1.20 1.20 1.20 1.20 1.20 1.00

7 1.20 1.20 1.20 1.20 -1.20 1.00

8 1.20 1.20 1.20 1.20 1.20 0.50

9 1.20 1.20 1.20 -1.20 1.20 -0.50

10 1.20 1.20 1.20 -1.20 1.20 -1.00

11 1.20 1.20 1.20 -1.20 -1.20 -1.00

12 1.20 1.20 1.20 1.20 -1.20 0.50

13 1.20 1.20 1.20 -1.20 -1.20 -0.50

*Empty Wind – (Structural Dead Load + Piping / Elec. / Equip Dead Load + Wind)

14 0.90 0.90 0.90 1.00


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

15 0.90 0.90 0.90 1.00

16 0.90 0.90 0.90 0.50

17 0.90 0.90 0.90 -0.50

18 0.90 0.90 0.90 -1.00

19 0.90 0.90 0.90 -1.00

20 0.90 0.90 0.90 0.50

21 0.90 0.90 0.90 -0.50

*Uplift/Operating/ Wind – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Uplift Anchor Loads + Wind)

22 0.90 0.90 0.90 1.20 1.20 1.20 1.00

23 0.90 0.90 0.90 1.20 -1.20 1.20 1.00

24 0.90 0.90 0.90 1.20 1.20 1.20 0.50


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

25 0.90 0.90 0.90 -1.20 1.20 1.20 -0.50

26 0.90 0.90 0.90 -1.20 1.20 1.20 -1.00

27 0.90 0.90 0.90 -1.20 -1.20 1.20 -1.00

28 0.90 0.90 0.90 1.20 -1.20 1.20 0.50

29 0.90 0.90 0.90 -1.20 -1.20 1.20 -0.50

*Hydrotest Condition – (Structural Dead Load + Hydrotest Pipe / Equip Loads + Live + Partial Wind)

30 1.20 1.20 1.20 0.33

31 1.20 1.20 1.20 0.33

32 1.20 1.20 1.20 0.165

33 1.20 1.20 1.20 -0.165

34 1.20 1.20 1.20 -0.33

35 1.20 1.20 1.20 -0.33

36 1.20 1.20 1.20 0.165

37 1.20 1.20 1.20 -0.165


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

*Operating with Seismic – (Structural Dead Load + Piping / Elec. / Equip Operating + Anchor Loads + Seismic)

38 1.20 1.00 1.20 1.20 1.20 1.20

39 1.20 1.00 1.20 1.20 1.20 -1.20

40 1.20 -1.00 1.20 1.20 -1.20 1.20

41 1.20 -1.00 1.20 1.20 -1.20 -1.20

42 1.20 1.00 1.20 1.20 1.20 1.20

43 1.20 1.00 1.20 1.20 -1.20 1.20

44 1.20 -1.00 1.20 1.20 1.20 -1.20

45 1.20 -1.00 1.20 1.20 -1.20 -1.20

*Seismic wind – (Structural Dead Load + Piping / Elec. / Equip Operating load+ Uplift Anchor Loads + Seismic)

46 0.90 1.00 0.90 0.90 1.20 1.20 1.20


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

47 0.90 1.00 0.90 0.90 1.20 -1.20 1.20

48 0.90 -1.00 0.90 0.90 -1.20 1.20 1.20

49 0.90 -1.00 0.90 0.90 -1.20 -1.20 1.20

50 0.90 1.00 0.90 0.90 1.20 1.20 1.20

51 0.90 1.00 0.90 0.90 -1.20 1.20 1.20

52 0.90 -1.00 0.90 0.90 1.20 -1.20 1.20

53 0.90 -1.00 0.90 0.90 -1.20 -1.20 1.20

*Abnormal Conditions – (Structural Dead Load + Piping / Elec. / Equip Operating Load + Abnormal Anchor Loads + Partial W

54 1.20 1.20 1.20 0.33

55 1.20 1.20 1.20 0.33

56 1.20 1.20 1.20 0.165

57 1.20 1.20 1.20 -0.165

58 1.20 1.20 1.20 -0.33

59 1.20 1.20 1.20 -0.33


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007

JOB No 191941 Rev No B

CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK

LOCATION GREGORY, TEXAS CHECK TAK/AA

SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP

LOAD COMBINATION FOR FOUNDATION DESIGN OF PIPE RACK


MAT3D STAAD BASIC LOAD CASES
MAT3D DEFAULT
LC LC LC LC LC LC LC LC LC LC LC LC

1 2 3 4 5 6 7 8 9 10 11
LOAD
DEAD
COMB
EX EZ DS DE DO DT TF ATX ATZ ATY XWS

60 1.20 1.20 1.20 0.165

61 1.20 1.20 1.20 -0.165


USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

uip Operating + Live Load + Anchor & Thermal Loads)- Only 50% of TF load considered

1.00

1.00

1.00

1.00

p Operating + Anchor Loads + Wind)

0.60 0.30

0.60 -0.30

0.60 0.60

0.60 0.60
USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

-0.60 0.30

-0.60 -0.30

-0.60 -0.60

-0.60 -0.60
Load + Wind)

0.60 0.30

0.60 -0.30

0.60 0.60

0.60 0.60

-0.60 0.30

-0.60 -0.30
USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

-0.60 -0.60

-0.60 -0.60
uip Operating Load + Uplift Anchor Loads + Wind)

0.60 0.30

0.60 -0.30

0.60 0.60

0.60 0.60

-0.60 0.30

-0.60 -0.30

-0.60 -0.60

-0.60 -0.60
uip Loads + Live + Partial Wind)

0.20 0.10 1.00

0.20 -0.10 1.00


USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

0.20 0.20 1.00

0.20 0.20 1.00

-0.20 0.10 1.00

-0.20 -0.10 1.00

-0.20 -0.20 1.00

-0.20 -0.20 1.00


quip Operating + Anchor Loads + Seismic)
USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

ad Load + Seismic)

ip Operating Load + Abnormal Anchor Loads + Partial Wind+Live load)

0.20 0.10 1.00 1.00 1.00

0.20 -0.10 1.00 1.00 -1.00

0.20 0.20 1.00 1.00 1.00

0.20 0.20 1.00 -1.00 1.00


USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

-0.20 0.10 1.00 -1.00 1.00

-0.20 -0.10 1.00 -1.00 -1.00

-0.20 -0.20 1.00 1.00 -1.00

-0.20 -0.20 1.00 -1.00 -1.00


+/-)0.75*0.3W(Perp.)+0.75LL

0.45 0.225 0.75

0.45 -0.225 0.75

0.45 0.45 0.75

0.45 0.45 0.75

-0.45 0.225 0.75

-0.45 -0.225 0.75


USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

-0.45 -0.45 0.75

-0.45 -0.45 0.75


7E+0.75LL]

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75
7E]
USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

uip Operating + Live Load + Anchor / Thermal Loads)- Only 50% of TF load considered

1.60
USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

1.60

1.60

1.60

p Operating Load + Anchor Loads + Wind+Live load)

1.00 0.50 1.00

1.00 -0.50 1.00

1.00 1.00 1.00

1.00 1.00 1.00

-1.00 0.50 1.00

-1.00 -0.50 1.00

-1.00 -1.00 1.00

-1.00 -1.00 1.00

Load + Wind)

1.00 0.50
USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

1.00 -0.50

1.00 1.00

1.00 1.00

-1.00 0.50

-1.00 -0.50

-1.00 -1.00

-1.00 -1.00

uip Operating Load + Uplift Anchor Loads + Wind)

1.00 0.50

1.00 -0.50

1.00 1.00
USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

1.00 1.00

-1.00 0.50

-1.00 -0.50

-1.00 -1.00

-1.00 -1.00

uip Loads + Live + Partial Wind)

0.33 0.165 1.00

0.33 -0.165 1.00

0.33 0.33 1.00

0.33 0.33 1.00

-0.33 0.165 1.00

-0.33 -0.165 1.00

-0.33 -0.33 1.00

-0.33 -0.33 1.00


USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

quip Operating + Anchor Loads + Seismic)

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

ating load+ Uplift Anchor Loads + Seismic)


USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

ip Operating Load + Abnormal Anchor Loads + Partial Wind+Live load)

0.33 0.165 1.00 1.20 1.20

0.33 -0.165 1.00 1.20 -1.20

0.33 0.33 1.00 1.20 1.20

0.33 0.33 1.00 -1.20 1.20

-0.33 0.165 1.00 -1.20 1.20

-0.33 -0.165 1.00 -1.20 -1.20


USYO-AF-NCSTL-Z1-0007

DATE 28-Feb-18

DATE 28-Feb-18

DATE 28-Feb-18

LC LC LC LC LC LC

12 13 14 15 16 17

XWE ZWS ZWE LL ABX ABZ

-0.33 -0.33 1.00 1.20 -1.20

-0.33 -0.33 1.00 -1.20 -1.20


PROJECT GCGV PROJECT CALC No USYO-AF-NCSTL-Z1-0007
JOB No 191941 Rev No B
CLIENT GCGV ASSET HOLDING, LLC BY SKP/AAK
LOCATION GREGORY, TEXAS CHECK TAK/AA
SUBJECT PIPERACK FOUNDATION CALCULATIONS APPR TAK/WEP
6.1 Wind Load due to Pipe for waterfall of pipes:

(For End Elevation) - WL IN X direction

For water fall of pipes, wind force calculated based on the overall area of piping i.e, assuming a solid wall of pipes.

(Ref. Cl 5.10 STAAD pipe rack Design Guide)

Sample Calculation

Height from ground level Z = 15.5

Contributed Pipe Height@ Beam level H = 9

Width of waterfall of pipe rack (W) = 16.67

Gross area of piping (Ag) = 150.03

Contributed area on pipes at beam level (Af) = 150.03

Wind pressure G*qz = 0.038

Cf = 2

Wind load on beam, F = G*qz* Af * Cf

= 11.4

Force/ft width of beam = 0.68

Wind Load on pipe beams in X direction

Contributed pipe Width of Contributed Wind pressure @ 'z'


S.No Height Gross area Cf
height @Beam level rack area height

Z (ft) H (ft) W (ft) Ag (ft^2) Af (ft^2) G*qz (klb/sq.ft)

1 14.000 10.000 10.000 100.000 100.000 0.038 2.000


2 17.000 7.500 15.000 112.500 112.500 0.044 2.000
USYO-AF-NCSTL-Z1-0007

Date 28/Feb/18
Date 28/Feb/18
Date 28/Feb/18

ll area of piping i.e, assuming a solid wall of pipes.

15.5 ft

9 ft

16.67 ft

150.03 ft^2
(100% of Gross area
150.03 ft^2 considered)

0.038 klb/sq.ft (Ref Wind int. calc, Sec. 6.0)

G*qz* Af * Cf

11.4 kips

0.68 klb/ft

Force/ft
Total
Cf width of Remarks
Force
beam

kips
Tankage Area- West
2.000 7.600 0.760 Low Rack
Tankage Area- East
2.000 9.900 0.660 Low Rack
PROJECT GCGV PROJECT CALC No
JOB No 191941 Rev No
CLIENT GCGV ASSET HOLDING, LLC BY
LOCATION GREGORY, TEXAS CHECK
SUBJECT APPR
Sheet No
Date
Date
Date

S-ar putea să vă placă și