SANITARY SEWER DESIGN CALCULATIONS Page 1

CLEIENT: OJALA FINANCIAL CORPORATION


PROJECT: 151, Peel Street - Harmony Living Collingwood Designed by: VEG Date: November 25, 2016
PROJECT NO.: 115105 Checked by: RCJ

Sewer Location Design Flow Calculation Pipe Selection

Indiv. Cum. Pop. Extran. Design Invert Invert


Street Name From To No. of Indiv. Area Cum. Area Peaking Flow Flow Flow Pipe Pipe Q V Pipe Elev. Fall Elev. Drop
MH# MH# Units Pop. (ha) Pop. (ha) Factor Q (p) Q (i) Q (d) Dia. Slope Full Full Length at Inlet at Outlet at MH
M (L/s) (L/s) (L/s) (mm) (%) (L/s) (m/s) (m) (m) (m) (m) (m)

Block 151 4 3 28 64 0.75 64 0.75 4.29 1.44 0.17 1.61 200 1.00 32.80 1.044 100.4 187.864 1.004 186.860 0.050
Block 151 3 2 6 14 0.34 78 1.08 4.27 1.74 0.25 1.99 200 1.00 32.80 1.044 22.9 186.810 0.229 186.581 0.050
Block 151 2 1 16 37 0.41 115 1.50 4.23 2.53 0.34 2.88 200 0.80 29.34 0.934 56.3 186.531 0.450 186.080 0.050
Existing stub Peel St. 1 15A Ex 0 0 0.00 115 1.50 4.23 2.53 0.34 2.88 200 0.85 30.24 0.963 11.0 186.030 0.093 185.937 0.050

Block 151 4 5 14 32 0.43 32 0.43 4.35 0.73 0.10 0.83 200 1.00 32.80 1.044 63.2 187.892 0.632 187.260 0.050
Block 151 5 6 6 14 0.23 46 0.66 4.32 1.04 0.15 1.19 200 1.00 32.80 1.044 15.9 187.210 0.159 187.051 0.050
Block 151 6 7 10 23 0.28 69 0.95 4.28 1.54 0.22 1.76 200 0.90 31.12 0.991 41.1 187.001 0.370 186.631 0.050
Existing stub Peel St 7 10A Ex 0 0 0.00 69 0.95 4.28 1.54 0.22 1.76 200 0.90 31.12 0.991 9.0 186.581 0.081 186.500 0.000

Peak Domestic Flow, Q (p) = PqM (L/s) P = Population in thousands Pipe flow calculation uses Manning formula
86.4
q = Ave. daily per capita domestic flow = 450 L/cap.d. Manning roughness coeff., n= 0.013
Peak Extraneous Flow,Q (i) = IA (L/s)
M = Peaking factor = 1 + 14
4+P^0.5
Total Design Flow, Q (d) = Q (p) + Q (i) Persons per unit = 2.3
I = Peak extran. flow per hectare= 0.23 L/ha.s.