Documente Academic
Documente Profesional
Documente Cultură
NUMBER
PROJECT KARACHAGANAK PROCESSING COMPLEX (KPC) GAS
TITLE: DEBOTTLENECKING (KGDBN) PROJECT
DOCUMENT GLYCOL PRECAST CHANNEL STRUCTURAL CALCULATION
TITLE
THE LOAD PER LIFTING EYE LEG IS CALCULATED AUTOMATICALLY BY THE SOFTWARE.
FAB. STAGE 8.492 9.865 9.865 8.492 8.492 9.865 9.865 8.492
2
AREA OF STEEL = 490.8739 mm
T = 100.3592 kN ≥ 9.865 kN OK
>> THE BASIC REQUIRED ANCHORAGE LENGTH, lb,reqd FOR ANCHORING THE FORCE IN A STRAIGHT
BAR ASSUMING CONSTRANT BOND STRESS EQUAL TO fbd FOLLOWS FROM:
>> FOR BENT BARS THE BASIC REQUIRED ANCHORAGE LENGTH, lb,reqd, AND THE DESIGN LENGTH,
lbd, SHOULD BE MEASURED ALONG THE CENTERLINE OF THE BAR.
WHERE:
= 25 mm
= 235 Mpa
CALCULATION REPORT FOR LIFTING ANCHOR EYE AND ADEQUACY CHECK OF WASTEWATER TANK COVER SLABS (PC1 & PC2) Page #REF! #REF!
DOCUMENT
KZ611-00-0320-SC-0003-00
NUMBER
PROJECT KARACHAGANAK PROCESSING COMPLEX (KPC) GAS
TITLE: DEBOTTLENECKING (KGDBN) PROJECT
DOCUMENT GLYCOL PRECAST CHANNEL STRUCTURAL CALCULATION
TITLE
fbd = DESIGN VALUE OF ULTIMATE BOND STRESS (Ref. Section 8.4.2 of Euro Code 2)
= 2.25 * η1 * η2 * fctd
WHERE:
η1 = 1.0 (Ref. Section 8.4.2 EuroCode 2)
= αct * fctk,0,05 / ϒc
where:
lbd = α1 * α2 * α3 * α4 * α5 * lb,reqd
where:
α1 = 1.0 (Ref. Table 8.2 of EuroCode 2)
α5 = 0.85 AVERAGE OF MIN. AND MAX. LIMIT (Ref. Table 8.2 of EuroCode 2)
FOR CONSERVATIVE DESIGN
lbd = 243.2777 mm
lbdmin = 250 mm say 250 mm
CALCULATION REPORT FOR LIFTING ANCHOR EYE AND ADEQUACY CHECK OF WASTEWATER TANK COVER SLABS (PC1 & PC2) Page #REF! #REF!
DOCUMENT
KZ611-00-0320-SC-0003-00
NUMBER
PROJECT KARACHAGANAK PROCESSING COMPLEX (KPC) GAS
TITLE: DEBOTTLENECKING (KGDBN) PROJECT
DOCUMENT GLYCOL PRECAST CHANNEL STRUCTURAL CALCULATION
TITLE
MANDREL DIAMETER
600
220
NOTE: AS PER EUROCODE 2 SECTION 8.3 THE MANDREL DIAMETER NEED NOT BE CHECKED TO AVOID
CONCRETE FAILURE IF THE FOLLOWING CONDITIONS EXIST:
- THE LIFTING HOOK IS NOT LOCATED AT THE EDGE AND A 25mm DIAMETER REBAR WILL BE PROVIDED
INSIDE THE BEND.
- THE MANDREL DIAMETER IS AT LEAST EQUAL TO THE RECOMMEDED VALUES GIVIN IN TABLE 8.1N.
- THE ANCHORAGE OF THE BAR DOES NOT REQUIRE A LENGTH MORE THAN 5 x LIFTING EYE DIAMETER
PAST THE END OF THE BEND.
CALCULATION REPORT FOR LIFTING ANCHOR EYE AND ADEQUACY CHECK OF WASTEWATER TANK COVER SLABS (PC1 & PC2) Page #REF! #REF!
DOCUMENT
KZ611-00-0320-SC-0003-00
NUMBER
PROJECT KARACHAGANAK PROCESSING COMPLEX (KPC) GAS
TITLE: DEBOTTLENECKING (KGDBN) PROJECT
DOCUMENT GLYCOL PRECAST CHANNEL STRUCTURAL CALCULATION
TITLE
WHERE:
n = NUMBER OF ANCHORS
= 1
NOTE:
THE LOCATION OF LIFTING ANCHOR EYE IS DISTRIBUTED SYMMETRICALLY ON THE PRECAST CHANNEL.
FOR GRAPHICAL REPRESENTATION, REFER TO SECTION "F"
CALCULATION REPORT FOR LIFTING ANCHOR EYE AND ADEQUACY CHECK OF WASTEWATER TANK COVER SLABS (PC1 & PC2) Page #REF! #REF!
DOCUMENT
KZ611-00-0320-SC-0003-00
NUMBER
PROJECT KARACHAGANAK PROCESSING COMPLEX (KPC) GAS
TITLE: DEBOTTLENECKING (KGDBN) PROJECT
DOCUMENT GLYCOL PRECAST CHANNEL STRUCTURAL CALCULATION
TITLE
CALCULATION REPORT FOR LIFTING ANCHOR EYE AND ADEQUACY CHECK OF WASTEWATER TANK COVER SLABS (PC1 & PC2) Page #REF! #REF!