Sunteți pe pagina 1din 21

SEL PROJECT: NELLORE - CHILAKALURIPET SECTION

SL NO. DRAWING NO.

1 MAJOR BRIDGE @ KM 1261+810


1.1 Report

1.2 Report
1.3 Report
1.4 Report
1.5 Report
1.6 DDG 246
1.7 DDG 247
1.8 DDG 248
1.9 DDG 249
1.10 DDB 250
1.11 DDB 251
1.12 DDB 252
1.13 DDB 253
1.14 DDB 254
1.15 DDB 255
1.16 DDB 256
1.17 DDB 257
1.18 DDB 258
1.19 DDB 259
1.20 DDB 260
1.21 DDB 261

2 MAJOR BRIDGE @ KM 1327+835


2.1 Report

2.2 Report
2.3 Report
2.4 Report
2.5 Report
2.6 DDG 306
2.7 DDG 307
2.8 DDB 318
2.9 DDB 309
2.10 DDB 310
2.11 DDB 311
2.12 DDB 312
2.13 DDB 313
2.14 DDB 314
2.15 DDB 315
2.16 DDB 316
2.17 DDB 317
2.18 DDB 324
2.19 DDB 325
2.2 DDB 326
2.21 DDB 327
2.22 DDB 328
2.23 DDB 329
2.24 DDB 330
2.25 DDB 331
2.26 DDB 332
2.27 DDB 333
2.28 DDB 334
3 FLYOVER @ KM 9+710
3.1 DDG 941

3.2 DDG 942

3.3 DDI 946

3.4 DDI 947

3.5 DDI 948

3.6 DDI 949

3.7 DDI 950

3.8 DDI 400

3.9 Drawings

3.10 Report

3.11 Report

3.12 Report

3.13 Report

3.14 Report

3.15 Report

3.16 Report

4 TOLL PLAZA @ 1264+000


4.1

4.2

4.3

4.4

4.5

4.6

4.7
4.8

4.9

4.10

4.11

4.12

4.13

4.14

4.15

4.16

4.17

4.18

4.19

4.20 Report

4.21 Report

4.22 Report

4.23 Report
NELLORE - CHILAKALURIPET SECTION

DESCRIPTION OF ITEM

RIDGE @ KM 1261+810
Structural Design Calculations Report
Design Report of Abutment A1 & A2
Design Report of Bearing and Bearing pedestal
Design Report of Super structure
Hydraulic Calculaions Report
Geotechnical Reports
Load Test Report (LT Report MJB 1261+810 LHS P3-P4)
QA/QC certification of the material sample tests during execution (cocncrete, steel, bearings, etc.)
GAD - Plan & Profile (Sheet 1 of 2)
GAD - Sections (Sheet 2 of 2)
GAD - Structural details
GAD of superstructure - 22.4m span
Cable profile for longitudinal PSC girders -22.4m span
Numeration & RC details of end anchorages
RC details of longitudinal PSC girders support diaphragms 22.4m
Typical details of Precast slab panel(22.4m)
Numeration & RC details of cast insitu deck slab - 22.4m
MAJOR BRIDGE AT CH 1261+810 NUMERATION DETAILS OF ABUTMENT A1 & A2
Numeration & Rc detail of Pier and Piercap (P1 to P9)
Numeration & Rc detail of Pile and Pilecap (P1 to P9)
Numeration & RC details of Elastomeric bearings & bearing pedestal
Details of Expansion joint
Details of Crash barrier, approach slab, kerb, footpath & Drainage spout
Numeration details of Abutment

RIDGE @ KM 1327+835
Structural Design Calculations Report
Design Report of Substructure and Foundation
Design Report of Substructure Pier 2 & Pier 3
Hydraulic Calculaions Report
Geotechnical Reports
QA/QC certification of the material sample tests during execution (cocncrete, steel, bearings, etc.)
Load Test Report (LT Report MJB 1327+850 P2-P3 RCW)
General arrangement -Plan & Profile
General arrangement -Sections
General arrangement sheet 2 of 2
Major Bridge at Ch 1327+835 Typical construction sequence
Numeration details of superstructure
RC details of Superstructure (Sheet 1 of 2)
RC details of Superstructure (Sheet 2 of 2)
Numeration & RC details of Pile & Pile cap for Piers P1 & P4
Numeration & RC details of Pile & Pile cap for Piers P2 & P3
Numeration & RC details of Abutment Pier A2 and footing
Numeration & RC details of Pier & Piercap for P1 & P4
Numeration & RC details of Pier & Piercap for P2 & P3
Numeraton details of superstructure
Cable profile for longitudinal girders
Num & RC Details of end anchorages
RC details of PSC longitudinal girders and support diaphragms
Num & RC Details of cast in situ deck slab
MAJOR BRIDGE AT 1327+850 - NUM.& RC DETAILS OF EJ PIER (P2 & P3)pdf
MJBR at Ch 1327+850 Numeration and RC details of EJ pier
MAJOR BRIDGE AT 1327+850-NUM. & RC DET. OF ABUTMENT-A1 & A2-A1
MJBR at Ch 1327+850 Numeration and RC details of RCC solid slab for 5.9 m span
Bearing details
Expansion Joint Detail
@ KM 9+710
Plan and elevation of flyover at Ch 9710

GAD Sections

FLYOVER AT CH 9+697 KM -NUMERATION DETAILS OF SUPERSTRUCTURE (40m PSC BOX GIRDER)

FLYOVER AT CH 9+697 KM -RC DETAILS OF 40m PSC BOX SUPER STRUCTURE

FLYOVER AT CH 9+697 KM -CABLE PROFILE FOR 40m PSC SUPERSTRUCTURE

FLYOVER AT CH 9+697 KM -RC DETAIL OF 40m DIAPHRAGM & ANCHORAGE DETAIL

FLYOVER AT CH 9+697 KM -BEARING LAYOUT AND MISCELLANEOUS DETAILS

Misc Details

Sub-Structrue and Foundation Detail Drawings

Load Test Report (LT Report ROB 8+981 AL1-PLA1 LCW)

Load Test Report - LT Report ROB 8+981 PLA11-PLA12 46m span

Load Test Report - LT Report ROB 8+981 PRA1-PRA2 RCW

Design Calculations Report - Flyover

Design Calculations Report - ROB 8+981

Design Report of Substructure and foundation of EJ Pier (P10 & P13)

Design Report of Substructure and foundation of EJ Pier (P11 & P12)

Design Report of Superstructure

Geotechnical Reports

QA/QC certification of the material sample tests during execution (cocncrete, steel, bearings, etc.)

ZA @ 1264+000
Toll Plaza General Layout Drawng

Toll Plaza - Admin Building Structural Drawings

Toll Plaza - ATMS Control Room Structural Drawings

Toll Plaza - Common Toilet Structural Drawings

Toll Plaza - DG Room Structural Drawings

Toll Plaza - Electrical Drawings

Toll Plaza - Loading unloading shed Structural Drawings


Toll Plaza - Maintenance Camp Building Structural Drawings

Toll Plaza - Medical Aid Post Structural Drawings

Toll Plaza -Plumbing Drawings

Toll Plaza - Quarters Structural Drawings

Toll Plaza - Security Room Structural Drawings

Toll Plaza - Toilet Structural Drawings

Toll Plaza - Toll Booth Building

Toll Plaza - Toll Plaza Buildings Elevation & Floor Plans

Toll Plaza -- Toll Plaza Site Layouts

Toll Plaza -Traffic Aid Post Security Barracks Structural Drawings

Toll Plaza - Weigh Booth Structural Drawings

Toll Plaza - Canopy Design Detail Drawing

Toll Plaza - Canopy Design Calculation Report

Toll Plaza - Buildings Design Calculations

Report of Analysis and Design of Foundations

Geotechnical Reports

QA/QC certification of the material sample tests during execution (cocncrete, steel, bearings, etc.)
Availability
REV STAGE IE APPROVAL
(Yes/No)

YES

YES

YES

YES

NO

YES

YES

NO

G3 GFC Stamped YES

G4 GFC Stamped YES

G5 GFC Stamped YES

G1 GFC Stamped YES

G1 GFC Stamped YES

G2 GFC Stamped YES

G2 GFC Stamped YES

Omitted Stamped YES

G1 GFC Stamped YES

G4 GFC Stamped YES

G2 GFC Stamped YES

G1 GFC Stamped YES

G2 GFC Stamped YES

G4 GFC Stamped YES

G1 GFC Stamped YES

G2 GFC Stamped YES


NO

YES

YES

NO

Yes

NO

YES

G1 GFC Stamped YES

G2 GFC Stamped YES

G1 GFC Stamped YES

Omited YES

Omited YES

Omited YES

Omited YES

Omited YES

Omited YES

Omited YES

Omited YES

Omited YES

G1 GFC Stamped YES

G1 GFC Stamped YES

G1 GFC Stamped YES

G1 GFC Stamped YES

G1 GFC Stamped YES

G3 GFC Stamped YES

G3 GFC Stamped Yes

G1 GFC Stamped YES

G1 GFC Missing Stamping YES

G2 GFC Stamped YES

G2 GFC Stamped YES


R0 Stamped YES

R0 Stamped YES

R0 Stamped YES

R0 Stamped YES

R0 Stamped YES

R0 Stamped YES

RA Stamped YES

G1 Stamped YES

NO

YES

YES

YES

NO

YES

YES

YES

YES
YES

NO

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES


GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

GFC No IE Stamp YES

NO

NO

NO

YES
NO

NO
REPL PROJECT: KADAPA - MYDUKURU-NANADYAL-KURNO

SL NO. DRAWING NO.

1 MAJOR BRIDGE @ KM 175+381 (PENNAR)


1.1 Report
1.2 Report
1.3 Report
1.4 Report
1.5 Report
1.6 NH18(167.75-228)/MJB/CH175.381/001
1.7 NH18(167.75-228)/MJB/CH175.381/001
1.8 NH18(167.75-228)/MJB/CH175.381/002
1.9 NH18(167.75-228)/MJB/CH175.381/002
1.10 NH18(167.75-228)/MJB/CH175.381/003
1.11 NH18(167.75-228)/MJB/CH175.381/003
1.12 NH18(167.75-228)/MJB/CH175.381/003
1.13 NH18(167.75-228)/MJB/CH175.381/004
1.14 NH18(167.75-228)/MJB/CH175.381/004
1.15 NH18(167.75-228)/MJB/CH175.381/004
1.16 NH18(167.75-228)/MJB/CH175.381/004
1.17 NH18(167.75-228)/MJB/CH175.381/005
1.18 NH18(167.75-228)/MJB/CH175.381/005
1.19 NH18(167.75-228)/MJB/CH175.381/006
1.20 NH18(167.75-228)/MJB/CH175.381/006
1.21 NH18(167.75-228)/MJB/CH175.381/006
1.22 NH18(167.75-228)/MJB/CH175.381/006
1.23 NH18(167.75-228)/MJB/CH175.381/007

MAJOR
2 BRIDGE @ KM 289+715 (KUNDERU RIVER)
2.1 Report
2.2 Report
2.3 Report
2.4 Report
2.5 Report
2.6 NH-18/REPL/MJB/290335/S-101
2.7 NH-18/REPL/MJB/290335/S-102
2.8 NH-18/REPL/MJB/290335/S-103
2.9 NH-18/REPL/MJB/290335/S-104
2.10 NH-18/REPL/MJB/290335/S-105
2.11 NH-18/REPL/MJB/290335/S-106
2.12 NH-18/REPL/MJB/290335/S-107
2.13 NH-18/REPL/MJB/290335/S-108
2.14 NH-18/REPL/MJB/290335/S-110
2.15 NH-18/REPL/MJB/290335/S-201/1
2.16 NH-18/REPL/MJB/290335/S-201/2
2.17 NH-18/REPL/MJB/290335/S-202/1
2.18 NH-18/REPL/MJB/290335/S-202/2
2.19 NH-18/REPL/MJB/290335/S-202/3
2.2 NH-18/REPL/MJB/290335/S-203
2.21 NH-18/REPL/MJB/290335/S-204
2.22 NH-18/REPL/MJB/290335/S-208
2.23 NH-18/REPL/MJB/290335/S-201/1
2.24 NH-18/REPL/MJB/290335/S-201/2
2.25 NH-18/REPL/MJB/290335/S-201/A
2.26 NH-18/REPL/MJB/290335/S-202/1
2.27 NH-18/REPL/MJB/290335/S-202/2
2.28 NH-18/REPL/MJB/290335/S-202/3
2.29 NH-18/REPL/MJB/290335/S-202/4
2.30 NH-18/REPL/MJB/290335/S-205
2.31 NH-18/REPL/MJB/290335/S-206
2.32 NH-18/REPL/MJB/290335/S-207
3 1.47 KM LONG VIA DUCT @ KM 290+060
3.1
3.2 Report
3.3 Report
3.4 Report
3.5 Report
3.6 Report
MYDUKURU-NANADYAL-KURNOOL SECTION

DESCRIPTION OF ITEM

75+381 (PENNAR)
Structural Design Calculations Report
Hydraulic Calculaions Report
Geotechnical Reports
Load Test Report (LT Report MJB 1327+850 P2-P3 RCW)
QA/QC certification of the material sample tests during execution (cocncrete, steel, bearings, etc.)
GAD(Plans)
GAD(Sections)
Dimensional details of super structure (For 26.0m span)
Dimensional details of super structure (For 32.0m span)
Reinf. Details of super structure (Deck slab) (For 26.0m/32.0m spans)
Reinf. Details of super structure (Girders) (For 26.0m/32.0m spans)
Reinf. Details of super structure (Long cross Girders) (For 26.0m/32.0m spans)
PSC details of super structure (For 26.0m span)
PSC details of super structure (For 32.0m span)
PSC cable details of super structure (For 26.0m span)
PSC cable details of super structure (For 32.0m span)
Dimensional details of sub structure & found. (Piers P1, P2, P16 and P21)
Dimensional details of sub structure & found. (Piers P3 to P14)
Dimensional details of sub structure & found. (Abutment A1 and A2)
Reinf. details of sub structure & found. (Piers P1, P2, P16 and P21)
Reinf. details of sub structure & found. (Piers P3 to P14)
Reinf. details of sub structure & found. (Abutment A1 and A2)
Details of bearings and bearing pedestals

KUNDERU RIVER)
Structural Design Calculations Report
Hydraulic Calculaions Report
Geotechnical Reports
Load Test Reports
QA/QC certification of the material sample tests during execution (cocncrete, steel, bearings, etc.)
General Layout Bridge at km. 290+335
Dimensions of PSc girder deck bridge at km. 290+335
Details of prestressing cables and anchorages bridge at km. 290+335
Reinforcement details of precast PSC girder bridge at km. 290+330
Reinforcement details of end cross girder bridge at km. 290+330
Reinforcement details of deck slab bridge at km. 290+330
Details of precast planks bridge at km. 290+335
Details of elastomeric bearing bridge at km. 290+335
Details of strip seal type expansion joint bridge at km. 290+335
Details of abutment and pile foundation bridge at km. 290+335
Details of abutment and pile foundation bridge at km. 290+335
Details of pier and pile foundation bridge at km. 290+335
Details of pier and pile foundation bridge at km. 290+335
Details of pier and pile foundation bridge at km. 290+335
Details of test pile_Bridge at km. 290+335
Details of test pile_Bridge at km. 290+335
Details of pile cap of pier-P2(RHS)-bridge at km. 290+205
Details of abutement and pile foundation-Bridge at km. 290+205
R C Details of spill through type abutement-Bridge at km. 290+205
R C Details of spill through type abutement-Bridge at km. 290+205
Details of pier and pile foundation-Bridge at km. 290.205
Details of pier and pile foundation-Bridge at km. 290.205
R C Details of pier foundation(P3)-Bridge at km. 290.205
Details of pier and pile foundation-Bridge at km. 290.205
Details of abutement and pile foundation-Bridge at km. 290.205
R. C Details of pile and pile cap-Bridge at km. 290.205
R. C Details of spill through type abutement-Bridge at km. 290.205
KM 290+060
1.47 KM LONG VIA DUCT - DRAWNGS
Structural Design Calculations Report
Hydraulic Calculaions Report
Geotechnical Reports
Load Test Reports
QA/QC certification of the material sample tests during execution (cocncrete, steel, bearings, etc.)
Availability
REV IE APPROVAL
(Yes/No)

NO

NO

YES

YES

NO

R2 Stamped YES

R2 Stamped YES

R2 Stamped YES

R2 Stamped YES

R2 Stamped YES

R1 Stamped YES

R0 Stamped YES

R1 Stamped YES

R1 Stamped YES

R1 Stamped YES

R1 Stamped YES

R1 Stamped YES

R0 Stamped YES

R1 Stamped YES

R1 Stamped YES

R0 Stamped YES

R2 Stamped YES

R2 Stamped YES
Yes ( Abt & pier only )

NO

Yes

Yes

NO

R0 Stamped YES

R2 Stamped YES

R1 Stamped YES

R2 Stamped YES

R2 Stamped YES

R1 Stamped YES

R0 Stamped YES

R1 Stamped YES

R1 Stamped YES

R2 Stamped YES

R2 Stamped YES

R2 Stamped YES

R2 Stamped YES

R2 Stamped YES

R0 Stamped YES

R0 Stamped YES

R1 Stamped YES

R3 Stamped YES

R0 Stamped YES

R5 Stamped YES

R0 Stamped YES

R3 Stamped YES

R0 Stamped YES

R3 Stamped YES

R0 Stamped YES

R0 Stamped YES

R0 Stamped YES
Yes

NO

NO

Yes

Yes

NO