ESTIMATE OF COLUMNS

Total Height of
COLUMNS Mark Height No. of Columns Columns (m)

C1F1 1.2 2 2.4

C2F1 1.2 11 13.2

Foundation to GF
C2F2 1 1 1

C3F1 1.2 2 2.4


C3F2 1 3 3
C1 3.4 2 6.8
C2 3.4 7 23.8
GF to 2F
C3 3.4 2 6.8
PC 3.4 4 13.6
C1 3 2 6
C2 3 7 21
2F to ROOF Beam
C3 3 2 6
PC 3 4 12

REINFORCEMENT
Reinforcements
COLUMNS Mark Height No. of Columns
No. Reinforcing Bars

C1F1 1.2 2 8

C2F1 1.2 11 6
Foundation to GF
C2F2 1 1 6
C3F1 1.2 2 6
C3F2 1 3 6
C1 3.4 2 8
C2 3.4 7 6
GF to 2F C3 3.4 2 6
PC 3.4 4 6
C1 3 2 8
C2 3 7 6
2F to ROOF Beam
C3 3 2 6
PC 3 4 6
Total length of reinfor
S
TIES
Reinforcements
COLUMNS Mark Height No. of Columns
Reinforcing Bars Dia

C1F1 1.2 2 10

C2F1 1.2 11 10
Foundation to GF
C2F2 1 1 10
C3F1 1.2 2 10
C3F2 1 3 10
C1 3.4 2 10
C2 3.4 7 10
GF to 2F
C3 3.4 2 10
PC 3.4 4 10
C1 3 2 10
C2 3 7 10
2F to ROOF Beam
C3 3 2 10
PC 3 4 10

FORMS
Dimension (m)
COLUMNS Mark Height No. of Columns
Width

C1F1 1.2 2 0.3

C2F1 1.2 11 0.2


Foundation to GF
C2F2 1 1 0.2
C3F1 1.2 2 0.15
C3F2 1 3 0.15
C1 3.4 2 0.3
C2 3.4 7 0.2
GF to 2F
C3 3.4 2 0.15
PC 3.4 4 0.15
C1 3 2 0.3
C2 3 7 0.2
2F to ROOF Beam
C3 3 2 0.15
PC 3 4 0.15

Material Cost
Description Size Quantity Unit

Phenolic Plywood 1/4" x 4' x 8' 19 pcs


Lumber 1"x2"x8' 692 pcs
Materials
Materials Clamps 50 pcs
Form Oil 4 gallon
Nail 11 kg

Labor Cost

Description Labor SFCA HR


Carpenter 384.1043 3.5
Making Forms
Helper 384.1043 1.5
Carpenter 1536.4173 6.5
Erecting and Removing Forms Helper 1536.4173 5
Foreman Based on 4 carpenters

Summary of Cost

Total Cost (PHP)

Materials 15550
Total Surface Area
Labor 14586.39
No. of Columns Placed Simultaneo
Total Material and Labor Cost 30136.39
Columns to be build

Columns to be erected and removed


COLUMNS
Dimension (m) LEGEND
Volume of Concrete for
Width Length Columns (m3) Cubic meter=

0.3 0.3 0.22 Kg Bags


Approximate
0.2 0.3 0.79 number of
bags
Bag of
0.2 0.3 0.06 concrete cost
0.15 0.3 0.11
0.15 0.3 0.14
0.3 0.3 0.61
0.2 0.3 1.43
0.15 0.3 0.31
0.15 0.3 0.61
0.3 0.3 0.54
0.2 0.3 1.26
0.15 0.3 0.27
0.15 0.3 0.54
Total Volume = 6.88
Sub-cost= PHP 111,450.00
T
Reinforcements LEGEND
Length of Reinforcement Length of
Diameter (mm) reinforment
Price per
16 19.20 length
16 79.20
16 6.00
16 14.40
16 18.00
16 54.40
16 142.80
16 40.80
16 81.60
16 48.00
16 126.00
16 36.00
16 72.00
Total length of reinforcement = 738.40
Sub-cost= PHP 36,417.89
S
Reinforcements Dimension (m)
No of Lateral
Perimeter
Diameter (mm) Width Length Ties

5@50, 3@100, rest@200 0.3 0.3 1.20 11

5@50, 3@100, rest@200 0.2 0.3 1.00 11


5@50, 3@100, rest@200 0.2 0.3 1.00 10
5@50, 3@100, rest@200 0.15 0.3 0.90 11
5@50, 3@100, rest@200 0.15 0.3 0.90 10
5@50, 3@100, rest@200 0.3 0.3 1.20 23
5@50, 3@100, rest@200 0.2 0.3 1.00 23
5@50, 3@100, rest@200 0.15 0.3 0.90 23
5@50, 3@100, rest@200 0.15 0.3 0.90 23
5@50, 3@100, rest@200 0.3 0.3 1.20 21
5@50, 3@100, rest@200 0.2 0.3 1.00 21
5@50, 3@100, rest@200 0.15 0.3 0.90 21
5@50, 3@100, rest@200 0.15 0.3 0.90 21
Total length of reinforcement =
Sub-cost=
MS
Dimension (m)
SURFACE AREA Total
Depth

0.3 1.44
2.88
0.3 1.20 13.2
0.3 1.00 1
0.3 1.08 2.16
0.3 0.90 2.7
0.3 4.08 8.16
0.3 3.40 23.8
0.3 3.06 6.12
0.3 3.06 12.24
0.3 3.60 7.2
0.3 3.00 21
0.3 2.70 5.4
0.3 2.70 10.8
Total Required Forms = 116.66

Unit Cost Total Cost

365 6935
7.5 5190
3.5 175
620 2480
70 770
Total Material Cost = 15550
ost

HR/100 SCFA WAGE/HR (PHP) Cost of Labor (PHP)


0.035 67.5 907.45
0.015 60 345.7
0.065 67.5 6741.04
0.05 60 4609.26
on 4 carpenters 70 1982.94
Total Labor Cost = 14586.39

Quantity of Materials

Total Surface Area

of Columns Placed Simultaneously

Columns to be build

o be erected and removed


LEGEND
6.88

20.00

743.00

150

LEGEND
9.00

443.88
Length of required Ties
LEGEND
Length of reinforment 9.00
26.4
121 Price per length 110.88
10
19.8
27
55.2
161
41.4
82.8
50.4
147
37.8
75.6
855.4
PHP 10,538.53

LEGEND
1/4" x 4' x 8' Phenolic Plywood

Area (sq. m)= 2.9729