Sunteți pe pagina 1din 12

90 RCC (GREF)

C/O 99 APO

MPR FOR THE MONTH ______________ 2007 (PERIOD FROM 21-___-200

Job No :- Name of Road:-

Work Diary No:-


I Work Done During the month :-
FORMATION WORKS:-

Sl/No Location in Km Item of work A/U Dimensions


Length Breadth Height
From To
in m in m in m

A Altitude:- _______ to_____m


1
2
3
4
5
Total A

B Altitude:- _______ to_____m


1
2
3
4
5
Total B

Total (A+B)

Counter signed

Name :
Designation
OIC _____
From :-
Dett: /RMPL/FCPL/SPL
Date : 2007

__ 2007 (PERIOD FROM 21-___-2007 TO 20-___-2007)

Quantity Formation width Remarks


in cum (0' to 12'/12' to 20'/improvement
of PP & curves etc)

GS No :
Rank
Name :
IC Dett ____________
90 RCC (GREF)
C/O 99 APO

MPR FOR THE MONTH ______________ 2007 (PERIOD FROM 21-_

Job No :- Name of Road:-

Work Diary No:-


I Work Done During the month :-

PERMANENT WORKS

S/ Location in Km Type of E/W in PCC PCC PCC RCC RRM RRM RRM Hard L/steel
No Structure SMB/SR/ 1:4:8 1:3:6 1:2:4 1:2:4 CM 1:6 CM 1:4 Dry core upto
From To HR (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (cum) (cum) 12 mm
(Cum) (Kg)

A Altitude:- _______ to_____m


1
2
3
4
5
6
7
8
Total A

B Altitude:- _______ to_____m


1
2
3
4
5
6
7
8
Total B

Total (A+B)

Counter signed

Name :
Designation
OIC _____
From :-
Dett: /RMPL/FCPL/SPL
Date : 2007

2007 (PERIOD FROM 21-___-2007 TO 20-___-2007)

L/steel Plastering F/pointing W/washing Stone % age Progress Remarks


above 12 mm in in CM 1:3 (Sqm) filling Previous During Up to
12 mm CM 1:6 (Sqm) (Cum) Month Month date
(Kg) (Sqm)
90 RCC (GREF)
C/O 99 APO

MPR FOR THE MONTH ______________ 2007 (PERIOD FROM 2

Job No :-

Work Diary No:-


I Work Done During the month :-

SURFACING WORKS

S/No Location in Km Water gap Net length in Pavement width


in m m (m)
From To

A Altitude:- _______ to_____m


1
2
3
4
5
6
7
8
Total A

B Altitude:- _______ to_____m


1
2
3
4
5
6
7
8
Total B

Total (A+B)

Counter signed
Name :
Designation
OIC _____
From :-
Dett: /RMPL/FCPL/SPL
Date : 2007

___________ 2007 (PERIOD FROM 21-___-2007 TO 20-___-2007)

Name of Road:-

Item of work A/U Quantity Remarks


(Sqm)

GS No :
Rank
Name :
IC Dett ____________
From :-
Dett: /RMPL/FCPL/SPL
90 RCC (GREF) Date : 2007
C/O 99 APO

MPR FOR THE MONTH ______________ 2007 (PERIOD FROM 21-___-2007 TO 20-___-2007)

Job No :- Name of Road:-

Work Diary No:-


I Work Done During the month :-

MAINTENANCE WORKS

S/N Location in Km Item of work A/U Quantity Remarks


o From To

GS No :
Rank
Name :
IC Dett ____________

Counter signed

Name :
Designation
OIC _____
II DEPLOYMENT OF VEH/EQPT/PLANT

S/No EM/BA No. Make& Total days Total Km/Hrs Pol Remarks
Type deployed Run Consumed

1
2
3
4

III DEPLOYMENT OF MAN POWER


S/No Trade Total Man days MR No Remarks
GP CPL
1
2
3
4
5
6

IV MATERIAL STATEMENT (DEPARTMENTAL)


S/No Item A/U Previous Recd during Total Consumed Closing Remarks
balance month Balance
1
2
3
4
5

V MATERIAL STATEMENT (CONTRACT)

S/No Item A/U Previous Recd during Total Consumed Closing Remarks
balance month Balance
1
2
3
4

VI DETAILS OF STORES CONSUMED


S/No Item A/U Qty Remarks

1
2
3
4
5
6
7
8
9
10
11
GS No :
Rank
Name :
IC Dett ____________
Counter signed

Name :
Designation
OIC _____
90 RCC (GREF)
C/O 99 APO

MPR FOR THE MONTH ______________ 2007 (PE

Job No :-

Work Diary No:-


I Work Done During the month :-

CRUSHER OPERATION

S/No Location in Km

1
2
3
4
5
6
MPR FOR THE MONTH ______________ 2007 (PERIOD FROM 21-___-2007 TO 20-___-2007)

Crusher Operation

Work Diary No:-


Work Done During the month :-

CRUSHER OPERATION

Item of work A/U

Crushing of stone Aggregate ( 63-45 MM) Cum


Crushing of stone Aggregate 40 MM Cum
Crusher of stone Chips 20 MM Cum
Crushing of stone chips 13.20 mm Cum
Crushing of stone chips 11.20 mm Cum
Crusher dust Cum

Counter signed

Name :
Designation
OIC _____
From :-
Dett: /RMPL/FCPL/SPL
Date : 2007

007 (PERIOD FROM 21-___-2007 TO 20-___-2007)

Quantity Remarks

GS No :
Rank
Name :
IC Dett ____________

S-ar putea să vă placă și