Sunteți pe pagina 1din 2

o Assistant Manager
Dates EmployedFeb 2018 – Present
Employment Duration10 mos
LocationHub Chowki, Balochisan, Pakistan
o TitleAssistant Manager
Dates EmployedFeb 2018 – Present
Employment Duration10 mos
LocationPakistan
 Responsible for the operation of GAS TURBINE,STEAM TURBINE,HRSG,WATER DEIONIZATION PLANT,GAS COMPRESSOR,
DUAL FUEL BOILER and all the plant auxiliaries.
 Hot and cold start up Boiler and turbine.
Performing the functions of troubleshooting and breakdown/preventive/corrective maintenance for
reducing downtime to minimum and restore the plant in case of shut down.
 Use Maintenace management software like MOGAN.
 Involved in commissioning activities of different auxilariies of power plant.
 Performance monitoring of combined cycle power plant within a varying range of loads.
 Vibration analysis,condition monitoring.
 Make daily fuel and energy report.
See less

Company NameGatron (Industries) Ltd. (Gatro-nova Group)


Total Duration4 yrs

o TitleASISSTANT ENGINEER
Dates EmployedNov 2014 – 2018
Employment Duration4 yrs
About the Plant:
• Gas Turbine: 5.5 MW 3 Stage Reaction Turbine of SOLAR make
• Steam Turbine: 3 MW 6 stage Impulse Reaction Turbine of TUTHILL make
• HRSG: 16 TPH water tube single pass boiler, JOHNSTON make
• Gas & HFO fired Boiler: 14 TPH fire tube 3 pass boiler, ROBEY make
• Water De-Ionization plant: 120 ton capacity

Key Responsibilities:
• Responsible for operation of Gas Turbine, Steam Turbine, HRSG, D.F. Boiler, Water Deionization Plant and all plant
auxiliaries.
• Hot & Cold start up of boiler & turbine.
• Performing the functions of troubleshooting and breakdown/ preventive/ corrective maintenance for reducing downtime
to minimum and to restore the plant in case of shutdown.
• Use Maintenance management software package like MOGAN.
• Handle emergency situations of desk operation confidently.
• Involved in commissioning activities of different auxiliaries of power plant.
• Performance monitoring of combined cycle power plant within a varying range of loads.
• Implemented Standard Operating Procedures, equipment lockout tag out procedures of power plant.
• Monitored the water treatment systems for cooling Tower and HRSG. Maintain the production level of de-mineralized
water Plant and its chemical consumption.
• Managed safety plans and equipment in order to minimize the risk of health and safety hazards.
• Vibration analysis, condition monitoring.
• Prepared capital and spare parts expenditure budget.
Took an active part in the commissioning of Gas Compressor and its Cooling Tower. Also assist Turbomach representatives in
the Level-A and Level-B Maintenance of Gas Turbine. See less

S-ar putea să vă placă și